JP2021512421A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2021512421A5 JP2021512421A5 JP2020542004A JP2020542004A JP2021512421A5 JP 2021512421 A5 JP2021512421 A5 JP 2021512421A5 JP 2020542004 A JP2020542004 A JP 2020542004A JP 2020542004 A JP2020542004 A JP 2020542004A JP 2021512421 A5 JP2021512421 A5 JP 2021512421A5
- Authority
- JP
- Japan
- Prior art keywords
- energy
- customer
- data
- load
- energy customer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 claims 16
- 238000000034 method Methods 0.000 claims 5
- 238000013523 data management Methods 0.000 claims 1
- 238000007477 logistic regression Methods 0.000 claims 1
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/886,083 | 2018-02-01 | ||
| US15/886,083 US11308563B2 (en) | 2018-02-01 | 2018-02-01 | Energy program communication control system and method based on load shape analysis |
| PCT/US2019/015512 WO2019152337A1 (en) | 2018-02-01 | 2019-01-29 | Energy program communication control system and method based on load shape analysis |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2021512421A JP2021512421A (ja) | 2021-05-13 |
| JP2021512421A5 true JP2021512421A5 (enExample) | 2021-09-30 |
| JP7590868B2 JP7590868B2 (ja) | 2024-11-27 |
Family
ID=65520386
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020542004A Active JP7590868B2 (ja) | 2018-02-01 | 2019-01-29 | 負荷形状分析に基づく、エネルギープログラム通信制御システムおよび方法 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US11308563B2 (enExample) |
| JP (1) | JP7590868B2 (enExample) |
| CN (1) | CN111512326A (enExample) |
| WO (1) | WO2019152337A1 (enExample) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20220237476A1 (en) * | 2018-02-01 | 2022-07-28 | Oracle International Corporation | Machine learning predictive model based on electricity load shapes |
| CN111598316B (zh) * | 2020-05-06 | 2023-03-24 | 深圳大学 | 物体转移装箱过程策略生成方法、装置、计算机设备 |
| CN113781096B (zh) * | 2021-07-30 | 2024-05-28 | 国网浙江省电力有限公司 | 一种办公楼空置率分析方法 |
| US20240113555A1 (en) * | 2022-10-04 | 2024-04-04 | X Development Llc | Privacy-preserving configuration of location-specific electrical load models |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06130085A (ja) * | 1992-10-19 | 1994-05-13 | Osaka Gas Co Ltd | エネルギ使用情報管理装置 |
| JP2011504082A (ja) * | 2007-11-12 | 2011-01-27 | エオン コンサルティング (プロプライエタリー) リミテッド | 需要側電力負荷管理の方法並びにそれに関連する装置及びシステム |
| US8977404B2 (en) * | 2008-09-08 | 2015-03-10 | Tendril Networks, Inc. | Collaborative energy benchmarking systems and methods |
| US9805321B2 (en) | 2010-10-15 | 2017-10-31 | Accenture Global Services Limited | Eco score analytics system |
| US9171256B2 (en) * | 2010-12-17 | 2015-10-27 | ABA Research Ltd. | Systems and methods for predicting customer compliance with demand response requests |
| US9542510B2 (en) | 2013-08-07 | 2017-01-10 | International Business Machines Corporation | Detecting appliances in a building from coarse grained meter data with partial label |
| US20150081384A1 (en) * | 2013-09-16 | 2015-03-19 | Fraunhofer Usa, Inc. | Determining likelihood of an individual consumer enrolling in a behavior-based energy efficiency program |
| US20150161233A1 (en) * | 2013-12-11 | 2015-06-11 | The Board Of Trustees Of The Leland Stanford Junior University | Customer energy consumption segmentation using time-series data |
| US10115120B2 (en) * | 2014-05-12 | 2018-10-30 | Fujitsu Limited | Dynamic demand response event assessment |
| US10467249B2 (en) * | 2014-08-07 | 2019-11-05 | Opower, Inc. | Users campaign for peaking energy usage |
| JP6137498B2 (ja) * | 2014-10-23 | 2017-05-31 | トヨタ自動車株式会社 | エネルギー節約支援システム |
| CN115082102A (zh) | 2015-12-18 | 2022-09-20 | 思睿人工智能公司 | 能源消费者的预测性细分 |
| JP6722481B2 (ja) * | 2016-03-18 | 2020-07-15 | 株式会社エヌ・ティ・ティ・データ | エネルギー需要制御装置、エネルギー需要制御方法、エネルギー需要制御システム、およびプログラム |
-
2018
- 2018-02-01 US US15/886,083 patent/US11308563B2/en active Active
-
2019
- 2019-01-29 WO PCT/US2019/015512 patent/WO2019152337A1/en not_active Ceased
- 2019-01-29 CN CN201980006847.1A patent/CN111512326A/zh active Pending
- 2019-01-29 JP JP2020542004A patent/JP7590868B2/ja active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2021512421A5 (enExample) | ||
| Shi et al. | Deep learning for household load forecasting—A novel pooling deep RNN | |
| Lucu et al. | A critical review on self-adaptive Li-ion battery ageing models | |
| Wang et al. | A new ARMAX model based on evolutionary algorithm and particle swarm optimization for short-term load forecasting | |
| US9342793B2 (en) | Training a self-learning network using interpolated input sets based on a target output | |
| Muthiah et al. | A comparison of artificial bee colony algorithm and genetic algorithm to minimize the makespan for job shop scheduling | |
| JP2021501421A5 (enExample) | ||
| CN104504460A (zh) | 预测叫车平台的用户流失的方法和装置 | |
| CN108090788B (zh) | 基于时间信息集成模型的广告转化率预估方法 | |
| JP2013030156A5 (enExample) | ||
| CN104239194A (zh) | 基于bp神经网络的任务完成时间预测方法 | |
| CN105447510B (zh) | 基于人工蜂群优化lssvm的脉动风速预测方法 | |
| CN110457737B (zh) | 一种基于神经网络对水污染源快速定位的方法 | |
| CN110739696A (zh) | 智能配网环境中需求侧资源与可再生能源的集成调度方法 | |
| CN105630648B (zh) | 基于多维数据深度学习的数据中心智能控制方法及系统 | |
| CN116345578A (zh) | 基于深度确定性策略梯度的微电网运行优化调度方法 | |
| Muthiah et al. | Hybridization of artificial bee colony algorithm with particle swarm optimization algorithm for flexible job shop scheduling | |
| CN115085202A (zh) | 电网多区域智能功率协同优化方法、装置、设备及介质 | |
| Dolgui et al. | On the performance of binomial and beta-binomial models of demand forecasting for multiple slow-moving inventory items | |
| CN105913142B (zh) | 一种利用车间rfid数据提高订单完工期预测准确度的方法 | |
| Sigurðardóttir et al. | Assessing the impact of policy changes in the icelandic cod fishery using a hybrid simulation model | |
| CN114239973B (zh) | 基于深度学习的换热站热负荷短期预测方法及预测系统 | |
| CN120235430A (zh) | 一种基于人工智能和区块链的大数据控制系统 | |
| JP2021193471A (ja) | 計画装置、方法、およびプログラム | |
| Dinu et al. | Self-adapting fitness evaluation times for on-line evolution of simulated robots |