JP2021099673A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2021099673A5 JP2021099673A5 JP2019231284A JP2019231284A JP2021099673A5 JP 2021099673 A5 JP2021099673 A5 JP 2021099673A5 JP 2019231284 A JP2019231284 A JP 2019231284A JP 2019231284 A JP2019231284 A JP 2019231284A JP 2021099673 A5 JP2021099673 A5 JP 2021099673A5
- Authority
- JP
- Japan
- Prior art keywords
- construction
- database
- design
- model
- measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 claims description 43
- 238000005259 measurement Methods 0.000 claims description 17
- 238000012986 modification Methods 0.000 claims description 8
- 230000004048 modification Effects 0.000 claims description 8
- 230000002093 peripheral effect Effects 0.000 claims description 8
- 238000007689 inspection Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 claims description 3
- 230000002194 synthesizing effect Effects 0.000 claims description 2
- 239000000463 material Substances 0.000 description 3
- 239000004035 construction material Substances 0.000 description 2
- 238000000605 extraction Methods 0.000 description 1
Images
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019231284A JP7385461B2 (ja) | 2019-12-23 | 2019-12-23 | データ管理システム,管理方法,管理プログラム |
| EP20904809.9A EP4083897A4 (en) | 2019-12-23 | 2020-11-27 | DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD AND MANAGEMENT PROGRAM |
| US17/783,215 US20230015599A1 (en) | 2019-12-23 | 2020-11-27 | Data management system, management method, and storage medium |
| PCT/JP2020/044195 WO2021131489A1 (ja) | 2019-12-23 | 2020-11-27 | データ管理システム,管理方法,管理プログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019231284A JP7385461B2 (ja) | 2019-12-23 | 2019-12-23 | データ管理システム,管理方法,管理プログラム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2021099673A JP2021099673A (ja) | 2021-07-01 |
| JP2021099673A5 true JP2021099673A5 (enExample) | 2022-05-31 |
| JP7385461B2 JP7385461B2 (ja) | 2023-11-22 |
Family
ID=76542034
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019231284A Active JP7385461B2 (ja) | 2019-12-23 | 2019-12-23 | データ管理システム,管理方法,管理プログラム |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20230015599A1 (enExample) |
| EP (1) | EP4083897A4 (enExample) |
| JP (1) | JP7385461B2 (enExample) |
| WO (1) | WO2021131489A1 (enExample) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7473457B2 (ja) * | 2020-11-16 | 2024-04-23 | 鹿島建設株式会社 | 物理シミュレーションを伴う施工管理システム,施工管理方法,および施工管理プログラム |
| KR102488803B1 (ko) * | 2021-11-25 | 2023-01-18 | 한국철도기술연구원 | 센서노드와 무선네트워크를 이용한 철도노반 구조물의 형상 데이터 축적 시스템 및 그 방법 |
| JP2023146396A (ja) | 2022-03-29 | 2023-10-12 | 株式会社トプコン | データ管理システム,管理方法,管理プログラム |
| JP2023146397A (ja) | 2022-03-29 | 2023-10-12 | 株式会社トプコン | データ管理システム,管理方法,管理プログラム |
| KR102512419B1 (ko) * | 2022-09-14 | 2023-03-22 | 주식회사 아브로소프트코리아 | Bim 기반 프리캐스트 콘크리트 조립식 주택의 설계 방법 |
| CN116080108B (zh) * | 2023-02-17 | 2023-07-25 | 浙江恒亿达复合材料有限公司 | 风电玻璃纤维拉挤板材生产过程数据采集管理系统 |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4727068B2 (ja) * | 2001-05-29 | 2011-07-20 | 株式会社トプコン | 施工監視システム、施工管理方法 |
| JP2005083088A (ja) | 2003-09-09 | 2005-03-31 | Kengo Kawawaki | 施工支援方法及び施工支援プログラム |
| JP2012022551A (ja) | 2010-07-15 | 2012-02-02 | Hisatomo Takeuchi | 建物3dテクスチャモデル処理電子情報処理装置 |
| US20140200863A1 (en) * | 2013-01-11 | 2014-07-17 | The Regents Of The University Of Michigan | Monitoring proximity of objects at construction jobsites via three-dimensional virtuality in real-time |
| JP6797556B2 (ja) | 2016-05-13 | 2020-12-09 | 株式会社トプコン | 管理装置、管理方法および管理用プログラム |
| JP6975568B2 (ja) | 2017-07-20 | 2021-12-01 | 前田建設工業株式会社 | 施工支援方法、および、施工支援システム |
| CN109544051A (zh) | 2019-01-25 | 2019-03-29 | 中铁三局集团广东建设工程有限公司 | 一种基于bim技术应用的施工管理应用平台 |
| CN110287513A (zh) | 2019-05-09 | 2019-09-27 | 唐付 | 一种基于bim技术的预埋件施工方法 |
-
2019
- 2019-12-23 JP JP2019231284A patent/JP7385461B2/ja active Active
-
2020
- 2020-11-27 US US17/783,215 patent/US20230015599A1/en active Pending
- 2020-11-27 EP EP20904809.9A patent/EP4083897A4/en active Pending
- 2020-11-27 WO PCT/JP2020/044195 patent/WO2021131489A1/ja not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2021099673A5 (enExample) | ||
| JP2017521758A (ja) | 図面注記からの関連する3d製品ドキュメンテーションの生成 | |
| CN105653560B (zh) | 数据归档方法和装置 | |
| JP2013517565A5 (enExample) | ||
| JP2016502652A5 (enExample) | ||
| WO2007092050A3 (en) | Systems and methods for media planning, ad production, ad placement and content customization | |
| CN110520844A (zh) | 云管理平台、虚拟机管理方法及其系统 | |
| JP7385461B2 (ja) | データ管理システム,管理方法,管理プログラム | |
| JP2013137746A5 (enExample) | ||
| JP2017514211A5 (enExample) | ||
| WO2020092310A8 (en) | System and method for rapid evaluation of raw material price risk mitigation contracts | |
| JP2016514393A5 (enExample) | ||
| CN103279347A (zh) | 一种通用的软件产品线领域模型与应用模型的同步方法 | |
| CN104537459A (zh) | 基于bim的微现场系统和方法 | |
| CN111527375A (zh) | 一种测绘采样点的规划方法、装置、控制终端及存储介质 | |
| JP2008211312A5 (enExample) | ||
| JP6655497B2 (ja) | 運用管理装置及び運用管理方法、並びに運用管理システム | |
| CN115062940A (zh) | 一种基于数字孪生的发射台智能可视化巡检方法及系统 | |
| Handayani et al. | Green entrepreneurship development strategy based on local characteristic to support eco-tourism continuous | |
| KR101648774B1 (ko) | 제조자와 설계자 간에 조립식 건축물 구성요소에 대한 정보의 제공 및 관리를 위한 방법 및 시스템 | |
| JP2005301336A5 (enExample) | ||
| US20170286160A1 (en) | Task circumstance processing device and method | |
| CN102763084A (zh) | 在电子构造数据管理中外部数据的集成 | |
| CN114344898A (zh) | 一种游戏中虚拟对象标记的方法和装置 | |
| KR20160095259A (ko) | 대기질 인위적 배출량 산정 모델링 시스템 및 그 방법 |