JP2021067358A - Sheet metal material coating prefabricated construction method - Google Patents
Sheet metal material coating prefabricated construction method Download PDFInfo
- Publication number
- JP2021067358A JP2021067358A JP2019203543A JP2019203543A JP2021067358A JP 2021067358 A JP2021067358 A JP 2021067358A JP 2019203543 A JP2019203543 A JP 2019203543A JP 2019203543 A JP2019203543 A JP 2019203543A JP 2021067358 A JP2021067358 A JP 2021067358A
- Authority
- JP
- Japan
- Prior art keywords
- heat insulating
- insulating material
- site
- sheet metal
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Thermal Insulation (AREA)
Abstract
Description
板金材もしくはプラスチックダンボールまたはその両方を使用することにより、配管に取り付けられた断熱材を損傷させることなく、また、性能を維持させるものである。 By using sheet metal and / or plastic cardboard, the heat insulating material attached to the pipe is not damaged and the performance is maintained.
現場において配管の取り付け工事後に断熱材を取り付けることは一般的ではあるが、狭い、高い場所での断熱材取り付け作業は事故が発生する可能性もあり、昨今の作業工程の期間短縮の面から断熱材取り付け作業を出来る限り現場内では行わない為にプレハブ化はおこなわれていた。 It is common to install heat insulating material after pipe installation work at the site, but there is a possibility of accidents when installing heat insulating material in a narrow or high place. Prefabricated work was done so that the material installation work would not be done on-site as much as possible.
従来この種のプレハブ工法は、配管に断熱材を取り付けた後は傷つけないようにポリフィルムを巻いたり、かぶせたりされていた。しかし、ポリフィルムでは何かに引っ掛けたり、ぶつけたりすると配管に取り付けた断熱材を損傷し易く、損傷した場合には、損傷部を現場搬入後に補修しなければならず、結果的にはプレハブ工法のメリットが少なくなってしまう。 Conventionally, in this type of prefabricated construction method, after the heat insulating material is attached to the pipe, a poly film is wrapped or covered so as not to damage the pipe. However, with polyfilm, if it is caught or hit by something, the heat insulating material attached to the pipe is easily damaged, and if it is damaged, the damaged part must be repaired after it is brought to the site, and as a result, the prefabricated method is used. The merit of is reduced.
本考案は上記従来例の問題点を解決すべくプラスチックダンボール、板金材もしくはその両方を配管に取り付けた断熱材の上に被せることにより、何かに引っ掛けたり、ぶつけたりしても損傷し難くなり、それにより現場内に搬入された後の補修頻度が減少する。
また、配管に取り付けた断熱材に巻き付けたまたは被せたポリテープは、1度の現場搬入で廃棄となるが、現場搬入に伴い、凹んだ板金は、叩いて補修が出来、切れたプラスチックベニアは、テープを貼ることにより、補修が出来るので結果として何度も使用することが可能となる。In order to solve the problems of the above-mentioned conventional example, the present invention covers a plastic cardboard, a sheet metal material, or both on a heat insulating material attached to a pipe, so that it is less likely to be damaged even if it is caught or hit by something. As a result, the frequency of repairs after being brought into the site is reduced.
In addition, the polytape wrapped or covered with the heat insulating material attached to the pipe is discarded once it is brought into the site, but the dented sheet metal can be repaired by hitting it when it is brought into the site, and the broken plastic veneer can be repaired. By attaching the tape, it can be repaired, and as a result, it can be used many times.
本来、現場ではなく工場で加工された配管に現場で断熱材を取り付け、それを損傷させずに現場に納入する目的のプレハブ工法であるが、実際には損傷が多いため現場設置後に補修をおこなうことが多いが、この考案は設置後の補修を極力減少させるものである。 Originally, it is a prefabricated method for attaching heat insulating material to the pipe processed at the factory instead of at the site and delivering it to the site without damaging it, but in reality there is a lot of damage, so repair is done after installation at the site. In many cases, this device reduces repairs after installation as much as possible.
設計図により、現場に搬入、設置される配管の長さに合わせて保温筒などの断熱材を加工、取り付けを行い、それを保護する為にプラスチックダンボール、板金材もしくはその両方を断熱材の上に被せてテープで止めるもしくはベルトや紐状のもので締め付ける等で固定させる。
1.プラスチックベニアだけ断熱材の上に被せる
2.板金材だけ断熱材の上に被せる
3.断熱材の上にプラスチックベニアを被せ、その上に板金材を被せる
上記の選択は断熱材の種類、運搬方法、設置作業の難易度により判断するものとする。According to the design drawing, heat insulating material such as a heat insulating cylinder is processed and attached according to the length of the piping to be carried to the site and installed, and in order to protect it, plastic cardboard, sheet metal material or both are placed on the heat insulating material. Cover it with tape or tighten it with a belt or string to fix it.
1. 1. Cover only the plastic veneer on the heat insulating material. 2. Cover only the sheet metal material on the heat insulating material. The above selection of covering the heat insulating material with a plastic veneer and then covering it with a sheet metal material shall be judged by the type of heat insulating material, the transportation method, and the difficulty of the installation work.
1 保温筒(断熱材)の断面部
2 保温筒(断熱材)の側面部
3 板金材
4 プラスチックダンボールの断面部
5 プラスチックダンボールの側面部1 Cross section of heat insulating cylinder (insulation material) 2 Side surface of heat insulating cylinder (insulation material) 3 Sheet metal material 4 Cross section of plastic cardboard 5 Side surface of plastic cardboard
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019203543A JP2021067358A (en) | 2019-10-23 | 2019-10-23 | Sheet metal material coating prefabricated construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019203543A JP2021067358A (en) | 2019-10-23 | 2019-10-23 | Sheet metal material coating prefabricated construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2021067358A true JP2021067358A (en) | 2021-04-30 |
Family
ID=75636925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019203543A Pending JP2021067358A (en) | 2019-10-23 | 2019-10-23 | Sheet metal material coating prefabricated construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2021067358A (en) |
-
2019
- 2019-10-23 JP JP2019203543A patent/JP2021067358A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5876245B2 (en) | Repair method of flange joint and jig for repair | |
KR200474712Y1 (en) | fluid transfer pipe damage recovery structure | |
JP2021067358A (en) | Sheet metal material coating prefabricated construction method | |
JP3229760U (en) | Hard plate for insulation coating | |
JP2006194368A (en) | Anticorrosive coating structure for site welded part | |
JP7079864B2 (en) | How to Repair Jet Pump Sliding Fittings and Equipment | |
JP3213681U (en) | Steel structure coating protection member | |
KR101819329B1 (en) | Apparatus for repairing pipe | |
JP2008185042A (en) | Repair method of nozzle stub support of pipe | |
US11891827B1 (en) | Device and method for repairing a pole | |
JP2008295239A (en) | Method for repairing communication pipeline of bridge | |
CN212107475U (en) | Pipeline protection device | |
RU2704524C1 (en) | Pipeline coupling | |
RU2211991C2 (en) | Method "polypriomsynthesis" for manufacture of polymer bandage for repair of main and technological pipe lines | |
JP7420599B2 (en) | Leak repair jig, leak repair method | |
JPS6338077Y2 (en) | ||
RU2564307C2 (en) | Method of on-site repair of main wellhead flange | |
JP5551100B2 (en) | Annular gasket packing jig and annular gasket packing | |
JP2009036291A (en) | Method for fixing anchor bolt | |
JP2018138742A (en) | Coating structure, coating method and coating member | |
KR20140078950A (en) | PFP construction method of marine structures | |
JP2020143761A (en) | Method for repairing corrosion part of pull-up pipe | |
JP2022112636A (en) | Electric device and formation method of polyurea layer of electric device | |
RU142025U1 (en) | DEVICE FOR REPAIR OF DEFECTIVE PIPELINE | |
KR200356453Y1 (en) | Pipe an outside diameter a divice protector |