JP2021067358A JP2019203543A JP2019203543A JP2021067358A JP 2021067358 A JP2021067358 A JP 2021067358A JP 2019203543 A JP2019203543 A JP 2019203543A JP 2019203543 A JP2019203543 A JP 2019203543A JP 2021067358 A JP2021067358 A JP 2021067358A
Authority
JP
Japan
Prior art keywords
heat insulating
insulating material
site
sheet metal
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019203543A
Other languages
Japanese (ja)
Inventor
成夫 石橋
Shigeo Ishibashi
成夫 石橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ISHIBASHI KK
Original Assignee
ISHIBASHI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ISHIBASHI KK filed Critical ISHIBASHI KK
Priority to JP2019203543A priority Critical patent/JP2021067358A/en
Publication of JP2021067358A publication Critical patent/JP2021067358A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Thermal Insulation (AREA)

Abstract

To provide a machining method capable of maintaining performance without damaging a heat insulating material attached to a pipe.SOLUTION: Although a prefabricated construction method is to attach a heat insulating material 1 to a pipe, which is machined at a factory instead of a site, at the site and delivering it to the site without damaging it, there is actually a lot of damages, so repairs are often required after installation at the site. In order to such a problem, by protecting the heat insulating material 1 by using plastic cardboard 4, a sheet metal 3 or both so that the heat insulating material 1 attached to the pipe is not damaged during the on-site delivery and installation, it is difficult to be damaged, so that repair work associated with damage can be reduced.SELECTED DRAWING: Figure 3

Description

板金材もしくはプラスチックダンボールまたはその両方を使用することにより、配管に取り付けられた断熱材を損傷させることなく、また、性能を維持させるものである。 By using sheet metal and / or plastic cardboard, the heat insulating material attached to the pipe is not damaged and the performance is maintained.

現場において配管の取り付け工事後に断熱材を取り付けることは一般的ではあるが、狭い、高い場所での断熱材取り付け作業は事故が発生する可能性もあり、昨今の作業工程の期間短縮の面から断熱材取り付け作業を出来る限り現場内では行わない為にプレハブ化はおこなわれていた。 It is common to install heat insulating material after pipe installation work at the site, but there is a possibility of accidents when installing heat insulating material in a narrow or high place. Prefabricated work was done so that the material installation work would not be done on-site as much as possible.

従来この種のプレハブ工法は、配管に断熱材を取り付けた後は傷つけないようにポリフィルムを巻いたり、かぶせたりされていた。しかし、ポリフィルムでは何かに引っ掛けたり、ぶつけたりすると配管に取り付けた断熱材を損傷し易く、損傷した場合には、損傷部を現場搬入後に補修しなければならず、結果的にはプレハブ工法のメリットが少なくなってしまう。 Conventionally, in this type of prefabricated construction method, after the heat insulating material is attached to the pipe, a poly film is wrapped or covered so as not to damage the pipe. However, with polyfilm, if it is caught or hit by something, the heat insulating material attached to the pipe is easily damaged, and if it is damaged, the damaged part must be repaired after it is brought to the site, and as a result, the prefabricated method is used. The merit of is reduced.

本考案は上記従来例の問題点を解決すべくプラスチックダンボール、板金材もしくはその両方を配管に取り付けた断熱材の上に被せることにより、何かに引っ掛けたり、ぶつけたりしても損傷し難くなり、それにより現場内に搬入された後の補修頻度が減少する。
また、配管に取り付けた断熱材に巻き付けたまたは被せたポリテープは、1度の現場搬入で廃棄となるが、現場搬入に伴い、凹んだ板金は、叩いて補修が出来、切れたプラスチックベニアは、テープを貼ることにより、補修が出来るので結果として何度も使用することが可能となる。
In order to solve the problems of the above-mentioned conventional example, the present invention covers a plastic cardboard, a sheet metal material, or both on a heat insulating material attached to a pipe, so that it is less likely to be damaged even if it is caught or hit by something. As a result, the frequency of repairs after being brought into the site is reduced.
In addition, the polytape wrapped or covered with the heat insulating material attached to the pipe is discarded once it is brought into the site, but the dented sheet metal can be repaired by hitting it when it is brought into the site, and the broken plastic veneer can be repaired. By attaching the tape, it can be repaired, and as a result, it can be used many times.

配管に取り付けた断熱材を覆われた板金材 Sheet metal material covered with heat insulating material attached to piping 配管に取り付けた断熱材を覆われたプラスチックダンボール Plastic cardboard covered with insulation attached to piping 配管に取り付けた断熱材を覆うプラスチックダンボールの上に覆われた板金材 Sheet metal material covered on plastic cardboard that covers the heat insulating material attached to the piping

本来、現場ではなく工場で加工された配管に現場で断熱材を取り付け、それを損傷させずに現場に納入する目的のプレハブ工法であるが、実際には損傷が多いため現場設置後に補修をおこなうことが多いが、この考案は設置後の補修を極力減少させるものである。 Originally, it is a prefabricated method for attaching heat insulating material to the pipe processed at the factory instead of at the site and delivering it to the site without damaging it, but in reality there is a lot of damage, so repair is done after installation at the site. In many cases, this device reduces repairs after installation as much as possible.

設計図により、現場に搬入、設置される配管の長さに合わせて保温筒などの断熱材を加工、取り付けを行い、それを保護する為にプラスチックダンボール、板金材もしくはその両方を断熱材の上に被せてテープで止めるもしくはベルトや紐状のもので締め付ける等で固定させる。
1.プラスチックベニアだけ断熱材の上に被せる
2.板金材だけ断熱材の上に被せる
3.断熱材の上にプラスチックベニアを被せ、その上に板金材を被せる
上記の選択は断熱材の種類、運搬方法、設置作業の難易度により判断するものとする。
According to the design drawing, heat insulating material such as a heat insulating cylinder is processed and attached according to the length of the piping to be carried to the site and installed, and in order to protect it, plastic cardboard, sheet metal material or both are placed on the heat insulating material. Cover it with tape or tighten it with a belt or string to fix it.
1. 1. Cover only the plastic veneer on the heat insulating material. 2. Cover only the sheet metal material on the heat insulating material. The above selection of covering the heat insulating material with a plastic veneer and then covering it with a sheet metal material shall be judged by the type of heat insulating material, the transportation method, and the difficulty of the installation work.

1 保温筒(断熱材)の断面部
2 保温筒(断熱材)の側面部
3 板金材
4 プラスチックダンボールの断面部
5 プラスチックダンボールの側面部
1 Cross section of heat insulating cylinder (insulation material) 2 Side surface of heat insulating cylinder (insulation material) 3 Sheet metal material 4 Cross section of plastic cardboard 5 Side surface of plastic cardboard

Claims (3)

配管に取り付けた断熱材を損傷させづらい状態で運ぶことを特徴とする加工方法 A processing method characterized by transporting the heat insulating material attached to the pipe in a state where it is difficult to damage it. 上記において配管に付随するフランジに取り付けた断熱材を損傷させづらい状態で運ぶことを特徴とする加工方法も権利の範囲内とする。 In the above, the processing method characterized by carrying the heat insulating material attached to the flange attached to the pipe in a state where it is difficult to damage is also within the scope of the right. 上記において現場に設置配される機器に取り付けた断熱材を損傷させづらい状態で運ぶことを特徴とする加工方法も権利の範囲内とする。 In the above, the processing method characterized by transporting the heat insulating material attached to the equipment installed and arranged at the site in a state where it is difficult to damage is also within the scope of the right.
JP2019203543A 2019-10-23 2019-10-23 Sheet metal material coating prefabricated construction method Pending JP2021067358A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019203543A JP2021067358A (en) 2019-10-23 2019-10-23 Sheet metal material coating prefabricated construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019203543A JP2021067358A (en) 2019-10-23 2019-10-23 Sheet metal material coating prefabricated construction method

Publications (1)

Publication Number Publication Date
JP2021067358A true JP2021067358A (en) 2021-04-30

Family

ID=75636925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019203543A Pending JP2021067358A (en) 2019-10-23 2019-10-23 Sheet metal material coating prefabricated construction method

Country Status (1)

Country Link
JP (1) JP2021067358A (en)

Similar Documents

Publication Publication Date Title
JP5876245B2 (en) Repair method of flange joint and jig for repair
KR200474712Y1 (en) fluid transfer pipe damage recovery structure
JP2021067358A (en) Sheet metal material coating prefabricated construction method
JP3229760U (en) Hard plate for insulation coating
JP2006194368A (en) Anticorrosive coating structure for site welded part
JP7079864B2 (en) How to Repair Jet Pump Sliding Fittings and Equipment
JP3213681U (en) Steel structure coating protection member
KR101819329B1 (en) Apparatus for repairing pipe
JP2008185042A (en) Repair method of nozzle stub support of pipe
US11891827B1 (en) Device and method for repairing a pole
JP2008295239A (en) Method for repairing communication pipeline of bridge
CN212107475U (en) Pipeline protection device
RU2704524C1 (en) Pipeline coupling
RU2211991C2 (en) Method "polypriomsynthesis" for manufacture of polymer bandage for repair of main and technological pipe lines
JP7420599B2 (en) Leak repair jig, leak repair method
JPS6338077Y2 (en)
RU2564307C2 (en) Method of on-site repair of main wellhead flange
JP5551100B2 (en) Annular gasket packing jig and annular gasket packing
JP2009036291A (en) Method for fixing anchor bolt
JP2018138742A (en) Coating structure, coating method and coating member
KR20140078950A (en) PFP construction method of marine structures
JP2020143761A (en) Method for repairing corrosion part of pull-up pipe
JP2022112636A (en) Electric device and formation method of polyurea layer of electric device
RU142025U1 (en) DEVICE FOR REPAIR OF DEFECTIVE PIPELINE
KR200356453Y1 (en) Pipe an outside diameter a divice protector