JP2019211922A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2019211922A5 JP2019211922A5 JP2018106301A JP2018106301A JP2019211922A5 JP 2019211922 A5 JP2019211922 A5 JP 2019211922A5 JP 2018106301 A JP2018106301 A JP 2018106301A JP 2018106301 A JP2018106301 A JP 2018106301A JP 2019211922 A5 JP2019211922 A5 JP 2019211922A5
- Authority
- JP
- Japan
- Prior art keywords
- factor
- prediction
- data
- unit
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007704 transition Effects 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 2
- 238000000926 separation method Methods 0.000 claims 13
- 238000004458 analytical method Methods 0.000 claims 4
- 238000004364 calculation method Methods 0.000 claims 4
- 238000005259 measurement Methods 0.000 claims 4
- 238000005265 energy consumption Methods 0.000 claims 2
- 238000007726 management method Methods 0.000 claims 2
- 238000004519 manufacturing process Methods 0.000 claims 2
- 230000003111 delayed effect Effects 0.000 description 1
- 238000005338 heat storage Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018106301A JP7217074B2 (ja) | 2018-06-01 | 2018-06-01 | 電力需給管理システム、電力需給管理方法、および電力需給管理装置 |
| US16/298,598 US20190370673A1 (en) | 2018-06-01 | 2019-03-11 | Data prediction system, data prediction method, and data prediction apparatus |
| EP19161867.7A EP3576042A1 (en) | 2018-06-01 | 2019-03-11 | Data prediction system, data prediction method, and data prediction apparatus |
| JP2022179088A JP7340081B2 (ja) | 2018-06-01 | 2022-11-08 | 電力需給管理システム、データ予測方法、およびデータ予測装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018106301A JP7217074B2 (ja) | 2018-06-01 | 2018-06-01 | 電力需給管理システム、電力需給管理方法、および電力需給管理装置 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022179088A Division JP7340081B2 (ja) | 2018-06-01 | 2022-11-08 | 電力需給管理システム、データ予測方法、およびデータ予測装置 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2019211922A JP2019211922A (ja) | 2019-12-12 |
| JP2019211922A5 true JP2019211922A5 (enExample) | 2021-04-08 |
| JP7217074B2 JP7217074B2 (ja) | 2023-02-02 |
Family
ID=65801840
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018106301A Active JP7217074B2 (ja) | 2018-06-01 | 2018-06-01 | 電力需給管理システム、電力需給管理方法、および電力需給管理装置 |
| JP2022179088A Active JP7340081B2 (ja) | 2018-06-01 | 2022-11-08 | 電力需給管理システム、データ予測方法、およびデータ予測装置 |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022179088A Active JP7340081B2 (ja) | 2018-06-01 | 2022-11-08 | 電力需給管理システム、データ予測方法、およびデータ予測装置 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20190370673A1 (enExample) |
| EP (1) | EP3576042A1 (enExample) |
| JP (2) | JP7217074B2 (enExample) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111695733B (zh) * | 2020-06-11 | 2022-09-09 | 国网天津市电力公司 | 一种基于改进模糊聚类算法的“煤改电”负荷预测方法 |
| JP7476713B2 (ja) * | 2020-08-04 | 2024-05-01 | 横河電機株式会社 | データ管理システム、データ管理方法、および、データ管理プログラム |
| US20220374782A1 (en) * | 2021-05-21 | 2022-11-24 | Jpmorgan Chase Bank, N.A. | Method and system for providing counterfactual explanations for artificial intelligence regression models |
| KR102685543B1 (ko) * | 2021-11-17 | 2024-07-16 | 주식회사 에이치에너지 | 날씨 예측 데이터를 이용한 확률적 시나리오 기법의 최적 입찰량 결정 시스템 |
| CN114980188B (zh) * | 2022-03-15 | 2025-03-25 | 国网浙江省电力有限公司嘉兴供电公司 | 一种考虑温湿度因素的5g基站业务能耗预测方法 |
| CN118134540B (zh) * | 2024-05-07 | 2024-07-19 | 国网浙江省电力有限公司 | 基于能源电力供需预测模型的多维数据交互方法及系统 |
| CN118941831B (zh) * | 2024-07-29 | 2025-04-18 | 江门职业技术学院 | 基于计算机视觉识别的纤维分离方法和装置 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07238803A (ja) * | 1994-02-28 | 1995-09-12 | Mitsubishi Heavy Ind Ltd | 発電プラント群に適用される運転制御装置 |
| JP2005141708A (ja) | 2003-11-05 | 2005-06-02 | Yoji Mukuda | 需要予測プログラム、当該需要予測プログラムを記録したコンピュータ読み取り可能な記録媒体、及び需要予測装置 |
| JP5618501B2 (ja) | 2009-07-14 | 2014-11-05 | 株式会社東芝 | 需要予測装置、プログラムおよび記録媒体 |
| JP2012034444A (ja) * | 2010-07-28 | 2012-02-16 | Toshiba Corp | 電力需給計画装置及びその方法 |
| US8942959B2 (en) | 2012-03-29 | 2015-01-27 | Mitsubishi Electric Research Laboratories, Inc. | Method for predicting outputs of photovoltaic devices based on two-dimensional fourier analysis and seasonal auto-regression |
| JP2015192586A (ja) * | 2014-03-31 | 2015-11-02 | 株式会社明電舎 | マイクログリッドの需給制御システムおよび需給制御方法 |
| JP6445909B2 (ja) | 2015-03-23 | 2018-12-26 | 大阪瓦斯株式会社 | 電力需要予測システム |
| JP2017175845A (ja) | 2016-03-25 | 2017-09-28 | 三菱重工業株式会社 | エネルギー需要予測システム、エネルギー需要予測方法およびエネルギー管理システム |
| JP6711074B2 (ja) * | 2016-03-29 | 2020-06-17 | 富士通株式会社 | 発電計画の自動生成プログラム、発電計画の自動生成方法および発電計画生成装置 |
| JP6742813B2 (ja) | 2016-05-20 | 2020-08-19 | 株式会社日立製作所 | 需要予測システム及び需要予測方法 |
| JP6742894B2 (ja) | 2016-06-09 | 2020-08-19 | 株式会社日立製作所 | データ予測システムおよびデータ予測方法 |
| WO2019207622A1 (ja) | 2018-04-23 | 2019-10-31 | 株式会社 東芝 | 電力需要予測装置、電力需要予測方法、およびそのプログラム |
-
2018
- 2018-06-01 JP JP2018106301A patent/JP7217074B2/ja active Active
-
2019
- 2019-03-11 EP EP19161867.7A patent/EP3576042A1/en not_active Ceased
- 2019-03-11 US US16/298,598 patent/US20190370673A1/en not_active Abandoned
-
2022
- 2022-11-08 JP JP2022179088A patent/JP7340081B2/ja active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2019211922A5 (enExample) | ||
| Corizzo et al. | Anomaly detection and repair for accurate predictions in geo-distributed big data | |
| CN118410445B (zh) | 分布式光伏异常数据检测方法、系统、电子设备及存储介质 | |
| US10600036B2 (en) | Wind power plant management system and method thereof | |
| KR102014339B1 (ko) | 머신러닝을 이용한 태양광 발전 시스템의 이상 감지 방법 및 장치 | |
| CN106951997B (zh) | 预测风机的故障的方法和设备 | |
| KR101875329B1 (ko) | 전력 사용량 예측 장치 및 방법 | |
| JP2018537061A (ja) | パワー半導体モジュールの損傷レベル又は寿命予測を推定する方法及びデバイス | |
| US10724499B2 (en) | Controlling wind turbines according to reliability estimates | |
| EP3203338B1 (en) | Plant performance evaluation apparatus, plant performance evaluation system, and plant performance evaluation method | |
| CN110298765B (zh) | 一种基于客观关联因素的配电网用电功率异常检测方法 | |
| US10731887B2 (en) | Toolchain for HVAC system design configuration | |
| CN103778305B (zh) | 基于k‑VNN和LS‑SVM的输电线路覆冰建模方法 | |
| CN105508148B (zh) | 基于风能分布捕获最大风能的方法和系统 | |
| CN107392352B (zh) | 一种基于融合极限学习机的电池未来温度预测方法及系统 | |
| CN113240156A (zh) | 一种架空输电线路舞动状态在线预测方法及系统 | |
| CN119413311A (zh) | 一种基于无线传感的箱变温度监测方法及系统 | |
| CN119064683A (zh) | 一种空中大气平均电场探测方法及系统 | |
| Wang | Forecasting short-term wind speed using support vector machine with particle swarm optimization | |
| CN120633531B (zh) | 一种基于多场耦合的冰雪环境模拟测试方法 | |
| CN105893743B (zh) | 一种基于气象站的输电线路标准冰厚的计算方法 | |
| RU146951U1 (ru) | Устройство прогнозирования остаточного ресурса электромеханической системы | |
| Saha et al. | Recurrent neural network based prediction of Indian summer monsoon using global climatic predictors | |
| KR101802455B1 (ko) | 강우의 공간 규모를 고려한 강우 예측 시스템 및 방법 | |
| Mutaz et al. | Solar radiation prediction using radial basis function models |