JP2019169016A - 施工工程最適化システム - Google Patents
施工工程最適化システム Download PDFInfo
- Publication number
- JP2019169016A JP2019169016A JP2018057393A JP2018057393A JP2019169016A JP 2019169016 A JP2019169016 A JP 2019169016A JP 2018057393 A JP2018057393 A JP 2018057393A JP 2018057393 A JP2018057393 A JP 2018057393A JP 2019169016 A JP2019169016 A JP 2019169016A
- Authority
- JP
- Japan
- Prior art keywords
- construction
- data
- optimization system
- simulation
- optimum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018057393A JP2019169016A (ja) | 2018-03-26 | 2018-03-26 | 施工工程最適化システム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018057393A JP2019169016A (ja) | 2018-03-26 | 2018-03-26 | 施工工程最適化システム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2019169016A true JP2019169016A (ja) | 2019-10-03 |
| JP2019169016A5 JP2019169016A5 (enExample) | 2021-03-04 |
Family
ID=68108344
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018057393A Pending JP2019169016A (ja) | 2018-03-26 | 2018-03-26 | 施工工程最適化システム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2019169016A (enExample) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021149654A (ja) * | 2020-03-19 | 2021-09-27 | Totalmasters株式会社 | 建設現場管理装置 |
| WO2021193839A1 (ja) * | 2020-03-26 | 2021-09-30 | 住友重機械工業株式会社 | 建設機械の情報通信システム、建設機械の表示装置、機械学習装置 |
| CN116629706A (zh) * | 2023-07-19 | 2023-08-22 | 山东新中鲁建设有限公司 | 一种基于bim的绿色节能建筑施工质量评估方法 |
| KR102768731B1 (ko) * | 2024-06-13 | 2025-02-19 | 주식회사 커넥트어스엔 | Bim 기반 통합 설계 관리 플랫폼을 제공하기 위한 방법, 장치 및 프로그램 |
| CN119577908A (zh) * | 2024-11-21 | 2025-03-07 | 交通运输部公路科学研究所 | 一种数字化的施工组织4d仿真模拟方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002121775A (ja) * | 2001-04-26 | 2002-04-26 | Komatsu Ltd | 作業機械の表示装置 |
| JP2002236723A (ja) * | 2001-02-07 | 2002-08-23 | Japan Science & Technology Corp | コンクリート工事システム |
| US20080126025A1 (en) * | 2006-08-11 | 2008-05-29 | Olli Pentti Petteri Seppanen | System and method for modeling risk in contruction location-based planning |
| JP2013097560A (ja) * | 2011-10-31 | 2013-05-20 | Mitsubishi Heavy Ind Ltd | 建設工事の工程最適化システム及び建設工事の工程最適化方法 |
-
2018
- 2018-03-26 JP JP2018057393A patent/JP2019169016A/ja active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002236723A (ja) * | 2001-02-07 | 2002-08-23 | Japan Science & Technology Corp | コンクリート工事システム |
| JP2002121775A (ja) * | 2001-04-26 | 2002-04-26 | Komatsu Ltd | 作業機械の表示装置 |
| US20080126025A1 (en) * | 2006-08-11 | 2008-05-29 | Olli Pentti Petteri Seppanen | System and method for modeling risk in contruction location-based planning |
| JP2013097560A (ja) * | 2011-10-31 | 2013-05-20 | Mitsubishi Heavy Ind Ltd | 建設工事の工程最適化システム及び建設工事の工程最適化方法 |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021149654A (ja) * | 2020-03-19 | 2021-09-27 | Totalmasters株式会社 | 建設現場管理装置 |
| JP7040809B2 (ja) | 2020-03-19 | 2022-03-23 | Totalmasters株式会社 | 建設現場管理装置 |
| US11715295B2 (en) | 2020-03-19 | 2023-08-01 | Totalmasters Co., Ltd. | Construction field management equipment and construction field managing method |
| WO2021193839A1 (ja) * | 2020-03-26 | 2021-09-30 | 住友重機械工業株式会社 | 建設機械の情報通信システム、建設機械の表示装置、機械学習装置 |
| JPWO2021193839A1 (enExample) * | 2020-03-26 | 2021-09-30 | ||
| US12241233B2 (en) | 2020-03-26 | 2025-03-04 | Sumitomo Heavy Industries, Ltd. | Information communications system for construction machine and machine learning apparatus |
| CN116629706A (zh) * | 2023-07-19 | 2023-08-22 | 山东新中鲁建设有限公司 | 一种基于bim的绿色节能建筑施工质量评估方法 |
| CN116629706B (zh) * | 2023-07-19 | 2023-09-22 | 山东新中鲁建设有限公司 | 一种基于bim的绿色节能建筑施工质量评估方法 |
| KR102768731B1 (ko) * | 2024-06-13 | 2025-02-19 | 주식회사 커넥트어스엔 | Bim 기반 통합 설계 관리 플랫폼을 제공하기 위한 방법, 장치 및 프로그램 |
| CN119577908A (zh) * | 2024-11-21 | 2025-03-07 | 交通运输部公路科学研究所 | 一种数字化的施工组织4d仿真模拟方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2019169016A (ja) | 施工工程最適化システム | |
| Han et al. | Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly | |
| Zhang et al. | BIM-based fall hazard identification and prevention in construction safety planning | |
| KR101754328B1 (ko) | Bim기반 건설공사 관리 시스템 및 관리 방법 | |
| KR101662651B1 (ko) | Bim기반 건설공사 관리 시스템 및 관리 방법 | |
| Barg et al. | An analytical method to estimate the total installed cost of structural steel building frames during early design | |
| US8095346B2 (en) | Operation simulation system for plant construction | |
| Axelsson et al. | Towards a system-of-systems for improved road construction efficiency using lean and Industry 4.0 | |
| RazaviAlavi et al. | A hybrid simulation approach for quantitatively analyzing the impact of facility size on construction projects | |
| Sergei et al. | An interactive construction project for method of statement based on BIM technologies for high-speed modular building | |
| Kim et al. | Framework for automated generation of constructible steel erection sequences using structural information of static indeterminacy variation in BIM | |
| Yuan et al. | Review of the potential for a cyber-physical system approach to temporary structures monitoring | |
| CN118966721B (zh) | 一种基于bim模型的施工监控方法及系统 | |
| Peng et al. | Decision support for mobile crane lifting plan with building information modelling (BIM) | |
| CN110348145A (zh) | 一种基于bim技术建设隧道的施工方法 | |
| Ismail et al. | BIM technologies applications in IBS building maintenance | |
| Zaland et al. | Automation in construction industry | |
| Krepp et al. | BIMsite-towards a BIM-based generation and evaluation of realization variants comprising construction methods, site layouts and schedules | |
| JP7595300B2 (ja) | 統合データ生成システム、施工計画管理システム、統合データ生成方法、施工計画管理方法、及びプログラム | |
| Wang et al. | Integrating building information modelling and firefly algorithm to optimize tower crane layout | |
| Olearczyk et al. | Intelligent crane management algorithm for construction operation (iCrane) | |
| Deshpande et al. | Evaluation of the use of BIM tools for construction site utilization planning | |
| CN107832951A (zh) | Bim在预制混凝土构件供应链中的应用方法及系统 | |
| Trani et al. | BIM oriented equipment choice on construction site | |
| Marx et al. | Modeling and simulating spatial requirements of construction activities |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20180511 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20180511 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210120 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210120 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20211124 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211207 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220214 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20220419 |