Prior art keywords
drilling
drill
hoistway
button
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018014356A
Other languages
Japanese (ja)
Inventor
幸治 松原
Koji Matsubara
幸治 松原
直幸 濱田
Naoyuki Hamada
直幸 濱田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2018014356A priority Critical patent/JP2019131343A/en
Publication of JP2019131343A publication Critical patent/JP2019131343A/en
Pending legal-status Critical Current

Links

Images

Abstract

To provide a drilling construction device for a hoistway capable of securing the safety when performing drilling construction of a prepared hole for an anchor bolt with respect to a guide rail of an elevator that has been already installed.SOLUTION: The drilling construction device for a hoistway includes a mechanism installed in a balance weight, a drill for drilling construction, and a mechanism for pushing out the drill.SELECTED DRAWING: Figure 1

Description

本発明は、釣合おもり側ガイドレールブラケット追加時のアンカーボルト打設における昇降路用穴あけ施工装置、および昇降路用穴あけ施工装置を用いた施工方法に関する。   TECHNICAL FIELD The present invention relates to a hoistway drilling apparatus for anchor bolt placement when a counterweight side guide rail bracket is added, and a construction method using the hoistway drilling apparatus.

特許文献1に記載の装置は、穴あけ用のドリルを備えた昇降可能な踏み台を用いてコンクリートに穴あけをする装置である。この装置は作業者が乗り込む踏み台が昇降するので、安全性が損なわれる。また、本発明はエレベーター昇降路内への設置を考慮しており、昇降路内にこの装置を設置するには時間と労力を要する。さらに、昇降路内底面に既に設置された機器等により、設置不可の場合がある。   The apparatus described in Patent Document 1 is an apparatus that drills concrete using a stepped up / down platform equipped with a drill for drilling. In this apparatus, since a step board on which an operator enters is raised and lowered, safety is impaired. Also, the present invention considers installation in an elevator hoistway, and it takes time and effort to install this device in the hoistway. Furthermore, installation may not be possible due to equipment already installed on the bottom surface of the hoistway.

特開平11−235717号公報JP 11-235717 A

既に据付されているエレベーターに対して耐震改造を行う際、釣合おもり側のガイドレールに対してレールブラケットの追加が必要となる場合がある。レールブラケットの追加が必要となる場合、アンカーボルトの打設が必要となり、アンカーボルト用の下穴の穴あけ施工を要する。下穴を穴あけ施工する場合、かごから足場を伸ばした作業や足場の上に乗り作業を行い、安全性を損なうものとなっていた。   When making an earthquake-resistant modification to an elevator that has already been installed, it may be necessary to add a rail bracket to the guide rail on the counterweight side. When it is necessary to add a rail bracket, it is necessary to cast an anchor bolt, and it is necessary to drill a pilot hole for the anchor bolt. When drilling a pilot hole, work was done by extending the scaffold from the car or riding on the scaffold, which compromised safety.

上記課題を解決するために、例えば特許請求の範囲に記載の構成を採用する。
本願は上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、釣合おもりに設置する機構と、穴あけ施工用のドリルと、前記ドリルを押し出す機構を有する、昇降路用穴あけ施工装置である。
In order to solve the above problems, for example, the configuration described in the claims is adopted.
The present application includes a plurality of means for solving the above-mentioned problems. For example, a hoistway drilling having a mechanism installed on a counterweight, a drill for drilling, and a mechanism for pushing out the drill is provided. Construction equipment.

本発明によれば、作業者が足場やエレベーターに乗り込むこと無く穴あけ施工作業を行うため、安全性を保ったまま作業可能となる。
上記した以外の課題、構成及び効果は、以下側の実施の形態の説明により明らかにされる。
According to the present invention, since the operator performs the drilling work without getting on the scaffold or the elevator, the work can be performed while maintaining safety.
Problems, configurations, and effects other than those described above will be clarified by the following description of the embodiment.

本発明に用いる昇降路用穴あけ施工装置の一態様を示す平面図である。It is a top view which shows the one aspect | mode of the hoistway drilling construction apparatus used for this invention. 図1の下側から見た側面図である。It is the side view seen from the lower side of FIG. 図2のA部拡大図である。It is the A section enlarged view of FIG. 図2に示すドリル部の詳細図である。FIG. 3 is a detailed view of a drill portion shown in FIG. 2. 図4に示すB部から見た断面図である。It is sectional drawing seen from the B section shown in FIG. 本実施例における穴あけ施工手順を示すフローチャートである。It is a flowchart which shows the drilling construction procedure in a present Example.

図1に本発明に用いる昇降路用穴あけ施工装置の一態様を示す平面図である。本実施例における昇降路1を昇降するかご2を備えるエレベーターは、かご2をガイドするかご側ガイドレール4を有し、かご2と綱を介して繋がっている釣合おもり3がある。釣合おもり3をガイドする釣合おもり側ガイドレール5がある。   FIG. 1 is a plan view showing an aspect of a hoistway drilling apparatus used in the present invention. The elevator including the car 2 that moves up and down the hoistway 1 in this embodiment includes a car-side guide rail 4 that guides the car 2, and has a counterweight 3 that is connected to the car 2 via a rope. There is a counterweight side guide rail 5 that guides the counterweight 3.

次に、昇降路用穴あけ施工装置20について説明する。先ず釣合おもりに設置する機構として、長穴と固定ボルト7a,7bにより異なった大きさの釣合おもりに取付け可能なU字鋼6a,6bが、釣合おもり3に取り付いている。U字鋼6a,6bの長穴により、穴あけ施工部に対して奥行き方向が調整可能なU字鋼8が取り付いている。U字鋼8の長穴とボルト10a,10bにより、穴あけ施工部に対して水平方向に調整可能なブラケット9a,9bが取り付いている。ブラケット9a,9bにそれぞれドリル11a,11bが取り付いている。   Next, the hoistway drilling apparatus 20 will be described. First, as a mechanism to be installed on the counterweight, U-shaped steels 6a and 6b that can be attached to counterweights of different sizes by long holes and fixing bolts 7a and 7b are attached to the counterweight 3. Due to the long holes of the U-shaped steels 6a and 6b, the U-shaped steel 8 whose depth direction can be adjusted with respect to the drilling construction part is attached. Brackets 9a and 9b that can be adjusted in the horizontal direction with respect to the drilling portion are attached by the elongated holes of U-shaped steel 8 and bolts 10a and 10b. Drills 11a and 11b are attached to the brackets 9a and 9b, respectively.

図2に昇降路1を横から見た側面図を示す。図2は図1の下側から見た側面図である。釣合おもり3の上枠にブラケット12,13を用いてU字鋼6が取り付いている。ドリル11部よりケーブル15が伸びていて、先端にリモコン16が付いている。このリモコン16は「+」ボタン、「−」ボタン、「穴あけ施工開始」ボタンを備えている。このボタンを作業者が操作し、穴あけ施工を行う。   FIG. 2 shows a side view of the hoistway 1 as seen from the side. FIG. 2 is a side view seen from the lower side of FIG. A U-shaped steel 6 is attached to the upper frame of the counterweight 3 using brackets 12 and 13. A cable 15 extends from the drill 11 and a remote controller 16 is attached to the tip. The remote controller 16 includes a “+” button, a “−” button, and a “start drilling” button. The operator operates this button to perform drilling work.

図3に釣合おもり3の釣合おもり上枠3a,3bにU字鋼6が取り付いている詳細図を示す。図3は図2のA部拡大図である。釣合おもり上枠3a,3bにブラケット12,13と押さえボルト14a,14bと固定ボルト7を用いてU字鋼6が取り付いている。ブラケット13は溶接固定されていて、ブラケット12は固定ボルト7で固定されている。固定ボルト7はU字鋼6の長穴に取り付いているので釣合おもり上枠a,3bの異なった幅でも取付け可能である。また、固定ボルト14a,14bを調整することで異なった高さの釣合おもり上枠3a,3bにも取付け可能となる。   FIG. 3 shows a detailed view in which the U-shaped steel 6 is attached to the counterweight upper frames 3 a and 3 b of the counterweight 3. FIG. 3 is an enlarged view of part A of FIG. The U-shaped steel 6 is attached to the counterweight upper frames 3a, 3b using the brackets 12, 13 and the holding bolts 14a, 14b and the fixing bolt 7. The bracket 13 is fixed by welding, and the bracket 12 is fixed by a fixing bolt 7. Since the fixing bolt 7 is attached to the elongated hole of the U-shaped steel 6, it can be attached with different widths of the counterweight upper frames a and 3b. Further, by adjusting the fixing bolts 14a and 14b, the fixing bolts 14a and 14b can be attached to the counterweight upper frames 3a and 3b having different heights.

図4にドリル11部を横から見た詳細図を示す。図4はドリルを押し出す機構を示す図である。ブラケット9のかご側に固定されているモーター17がある。モーター17に取付き、モーター17が稼動することで回転する、ネジが切られた棒18がある。ネジが切られた棒18に設置されたブラケット19にもネジが切られており、モーター17を稼動させ、ネジが切られた棒18が回転し、ブラケット19が移動する。ブラケット19の穴に取付けられたドリル11があり、ドリル11はブラケット19と共に移動する。モーター17およびドリル11にケーブル15が接続されており、このケーブル15により電源や命令を受け取る。   FIG. 4 shows a detailed view of the drill 11 viewed from the side. FIG. 4 is a view showing a mechanism for pushing out the drill. There is a motor 17 fixed to the car side of the bracket 9. There is a threaded rod 18 that attaches to the motor 17 and rotates as the motor 17 operates. The screw 19 is also cut in the bracket 19 installed on the threaded rod 18, the motor 17 is operated, the threaded rod 18 rotates, and the bracket 19 moves. There is a drill 11 attached to the hole of the bracket 19, and the drill 11 moves together with the bracket 19. A cable 15 is connected to the motor 17 and the drill 11, and a power source and a command are received by the cable 15.

図5に図4のB部から見た図を示す。ブラケット19はブラケット9の内寸法とほぼ同等の横幅となっており、ネジが切られた棒18が回ってもブラケット19は回らずに穴あけ施工部に対して奥行き方向移動が可能となる。   FIG. 5 shows a view from the B part of FIG. The bracket 19 has a width substantially equal to the inner dimension of the bracket 9 and can move in the depth direction with respect to the drilling portion without turning the bracket 19 even if the threaded rod 18 rotates.

リモコン16の「+」ボタン、「−」ボタン、「穴あけ施工開始」ボタンについて説明する。「+」ボタンを押下し続けると、ドリル11を稼動させると同時に、モーター17が稼動し、ネジが切られた棒18が回転、ドリル11を昇降路1の穴あけ施工部に近づく方向に移動する。「−」ボタンを押下し続けると、「+」ボタンとは逆方向にモーター17を回転させ、ドリル11を昇降路1の穴あけ施工部から遠ざける方向に移動する。「穴あけ施工開始」ボタンを一度押下するとモーター17とドリル11が稼動し、アンカーボルト打設に必要な寸法を自動で穴あけ施工した後、ドリル11は「穴あけ施工開始」ボタンを押す前の位置まで戻り、モーター17およびドリル11は停止する。   The “+” button, “−” button, and “drilling start” button of the remote controller 16 will be described. If the “+” button is continuously pressed, the drill 11 is operated, and at the same time, the motor 17 is operated, the threaded rod 18 is rotated, and the drill 11 is moved in a direction approaching the drilling section of the hoistway 1. . If the “−” button is kept pressed, the motor 17 is rotated in the direction opposite to the “+” button, and the drill 11 is moved away from the drilling portion of the hoistway 1. When the “Start Drilling” button is pressed once, the motor 17 and the drill 11 are operated, and after drilling the necessary dimensions for anchor bolt placement automatically, the drill 11 reaches the position before pressing the “Start Drilling” button. Returning, the motor 17 and the drill 11 stop.

リモコン16に備えられた「+」ボタンおよび「穴あけ施工開始」ボタンは、昇降路1の穴あけ施工部に近づける機能を有しているため、穴あけ施工部である昇降路1の壁面に凸凹があり、様々な奥行きの穴あけ施工部だとしても「+」ボタンで穴あけ施工部に接触させてから「穴あけ施工開始」ボタンを押すことで穴あけ施工が可能となる。また、リモコン16に備えられた「−」ボタンは、ドリル11を引き戻す機能を有しているため、穴あけ施工後にドリル11を引き戻す役割と、釣合おもり3および本装置が昇降中に梁などの障害物を避けることが可能となる。   Since the “+” button and the “start drilling” button provided on the remote control 16 have a function of approaching the drilling section of the hoistway 1, the wall surface of the hoistway 1 that is the drilling section has irregularities. Even if it is a drilling construction part of various depths, it is possible to make a drilling operation by pressing the “start drilling” button after making contact with the drilling construction part with the “+” button. In addition, since the “−” button provided on the remote controller 16 has a function of pulling back the drill 11, the function of pulling back the drill 11 after drilling is performed, Obstacles can be avoided.

図6は本実施例における穴あけ施工手順を示す。S1で作業を開始する。S2で釣合おもり3をピット部まで下げる。S3で昇降路1のピット部にて本装置を釣合おもり3に取り付ける。S4で穴あけ施工部の水平方向の位置をU字鋼8に設けた長穴により、ブラケット9の取付け位置を調整する。S5で釣合おもり3を昇降させ、穴あけ施工位置の高さ調整を行う。   FIG. 6 shows the drilling procedure in this embodiment. Work is started in S1. In S2, the counterweight 3 is lowered to the pit. At S 3, the apparatus is attached to the counterweight 3 at the pit portion of the hoistway 1. In S4, the mounting position of the bracket 9 is adjusted by the long hole provided in the U-shaped steel 8 at the horizontal position of the drilling portion. In S5, the counterweight 3 is raised and lowered, and the height of the drilling position is adjusted.

S6以降でリモコン16に備えているボタンを操作して穴あけ施工作業を行う。S6で「+」ボタンを押し続け、S7でドリル11と昇降路1の穴あけ施工部の接触音が聞こえたら、S8で「+」ボタンを離してモーター17およびドリル11の動きを止める。S8まででドリル11が昇降路1の施工部に接触した状態となる。   After S6, a button provided on the remote controller 16 is operated to perform drilling work. In step S6, the "+" button is kept pressed. In step S7, when the contact sound between the drill 11 and the drilling section of the hoistway 1 is heard, the "+" button is released in step S8 to stop the movement of the motor 17 and the drill 11. The drill 11 comes into contact with the construction portion of the hoistway 1 until S8.

S9で「穴あけ施工開始ボタン」を押下し、アンカーボルト打設に必要な寸法を穴あけ施工する。S10にて穴あけ施工の施工音が止まったか判別し、施工音が止まったら、S11でリモコン16の「−」ボタンを押し続け、ドリル11を引き戻す。   In S9, the “drilling start button” is pressed to drill the dimensions necessary for anchor bolt placement. In S10, it is determined whether or not the construction sound for drilling construction has stopped. When the construction sound has stopped, the "-" button of the remote control 16 is kept pressed in S11 and the drill 11 is pulled back.

S12で他の箇所に穴あけ施工が必要な箇所を確認し、施工箇所がある場合はS5に戻り、S5以降を行う。S12にて他に穴あけ施工箇所が無い場合は、S13で釣合おもり3をピット部まで下げ、S14で本装置を取り外し、S15で作業終了となる。   In S12, a place where drilling construction is required in other places is confirmed. If there is a construction place, the process returns to S5, and S5 and subsequent steps are performed. If there are no other drilling locations at S12, the counterweight 3 is lowered to the pit at S13, the device is removed at S14, and the operation is terminated at S15.

なお、本発明は上記した実施形態および変形例に限定されるものではなく、さらに様々な変形例が含まれる。例えば、上記した実施形態は本発明をわかりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成に他の実施形態の構成を加えることも可能である。また、各実施形態の構成の一部について、他の構成の追加・削除・置換をすることが可能である。   In addition, this invention is not limited to above-described embodiment and modification, Furthermore, various modifications are included. For example, the above-described embodiment has been described in detail for easy understanding of the present invention, and is not necessarily limited to one having all the configurations described. Further, a part of the configuration of an embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of an embodiment. In addition, it is possible to add, delete, and replace other configurations for a part of the configuration of each embodiment.

1 昇降路
2 かご
3 釣合おもり
4 かご側ガイドレール
5 釣合おもり側ガイドレール
6 U字鋼
7 固定ボルト
8 U字鋼
9 ブラケット
10 ボルト
11 ドリル
12 ブラケット
13 ブラケット
14 押さえボルト
15 ケーブル
16 リモコン
17 モーター
18 ネジが切られた棒
19 ブラケット
20 昇降路用穴あけ施工装置
DESCRIPTION OF SYMBOLS 1 Hoistway 2 Car 3 Counterweight 4 Car side guide rail 5 Counterweight side guide rail 6 U-shaped steel 7 Fixing bolt 8 U-shaped steel 9 Bracket 10 Bolt 11 Drill 12 Bracket 13 Bracket 14 Holding bolt 15 Cable 16 Remote control 17 Motor 18 Threaded rod 19 Bracket 20 Hoistway drilling equipment

Claims (8)

釣合おもりに設置する機構と、
穴あけ施工用のドリルと、
前記ドリルを押し出す機構を有する、
昇降路用穴あけ施工装置。
A mechanism installed on the counterweight,
Drill for drilling construction,
Having a mechanism for pushing out the drill,
Hoistway drilling equipment.
請求項1に記載の昇降路用穴あけ施工装置であって、
前記釣合おもりに設置する機構は、長穴に取付いているブラケットと押さえボルトにより、異なった幅や高さの釣合おもりに設置可能な機構を有する、
昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 1,
The mechanism installed on the counterweight has a mechanism that can be installed on a counterweight with different widths and heights by means of brackets and presser bolts attached to the elongated holes.
Hoistway drilling equipment.
請求項1に記載の昇降路用穴あけ施工装置であって、
前記ドリルを押し出す機構は、モーターに取付けられたネジが切られた棒とブラケットを用いて前記ドリルが取付いており、前記モーターの正回転、逆回転により前記ドリルの押し出しおよび引き戻しを可能にした機構を有する、
昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 1,
The mechanism for pushing out the drill is a mechanism in which the drill is attached by using a threaded rod and bracket attached to a motor, and the drill can be pushed out and pulled back by forward rotation and reverse rotation of the motor. Having
Hoistway drilling equipment.
請求項3に記載の昇降路用穴あけ施工装置であって、
前記ドリルを押し出す機構は、前記ドリルの押し出しと同時に前記ドリルを稼動させ、穴あけ施工を可能にした昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 3,
The mechanism for extruding the drill is a hoistway drilling device that enables the drilling operation by operating the drill simultaneously with the extrusion of the drill.
請求項1に記載の昇降路用穴あけ施工装置であって、
装置に備えられた長穴により前記ドリルの水平方向の位置調整を可能にした機構を有する
昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 1,
A hoistway drilling device having a mechanism that enables the horizontal position adjustment of the drill by means of a long hole provided in the device.
請求項1に記載の昇降路用穴あけ施工装置であって、
穴あけ施工部水平方向の位置決めを、本装置に設けられた長穴により調整可能な機構を有した
昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 1,
A drilling device for hoistways that has a mechanism that can adjust the positioning in the horizontal direction by means of a long hole provided in this device.
請求項3に記載の昇降路用穴あけ施工装置であって、
前記穴あけ施工用のドリルおよび前記ドリルを押し出す機構は、ケーブルおよびリモコンを備えており、遠隔操作を可能にし、
前記リモコンは、前記ドリルを押し出し用のボタンと、前記ドリルを引き戻し用のボタンと、穴あけ施工用のボタンを備え、前記ドリル押し出し用のボタンと前記ドリル引き戻し用のボタンによって、穴あけ施工部に対して前記ドリルを奥行き方向に調整可能な機能を有し、
前記穴あけ施工用のボタンは、前記ドリルを稼動させながら前記ドリルを一定距離押し出し、押し出した距離引き戻す機能を有した
昇降路用穴あけ施工装置。
A hoistway drilling apparatus according to claim 3,
The drill for drilling construction and the mechanism for pushing out the drill are equipped with a cable and a remote control, enabling remote operation,
The remote control includes a button for pushing out the drill, a button for pulling back the drill, and a button for drilling construction, and the drilling push button and the button for pulling back the drill to the drilling construction section. The drill has a function that can be adjusted in the depth direction,
The drilling construction device for a hoistway has a function in which the drilling button has a function of pushing the drill a certain distance while operating the drill, and pulling back the pushed distance.
請求項7に記載の昇降路用穴あけ施工装置を用いた施工方法であって、
前記釣合おもりに前記昇降路用穴あけ施工装置を取り付け、
前記釣合おもりを昇降させ前記穴あけ施工部の高さ位置を調整し、
前記リモコンの前記ドリル押し出し用のボタンを押し続け、前記穴あけ施工部との接触音が聞こえたら、前記穴あけ施工用のボタンを押し、穴あけ施工音がしなくなったら、前記ドリル引き戻し用のボタンを押して前記ドリルを引き戻す
昇降路用穴あけ施工装置を用いた施工方法。
A construction method using the hoistway drilling device according to claim 7,
Attach the hoistway drilling device to the counterweight,
Raise and lower the counterweight and adjust the height position of the drilling construction part,
Press and hold the drill push button on the remote control, and when you hear the contact sound with the drilling section, press the drilling button, and when there is no drilling sound, press the drill pull back button. Pulling back the drill A construction method using a hoistway drilling device.
JP2018014356A 2018-01-31 2018-01-31 Drilling construction device for hoistway and construction method using the same Pending JP2019131343A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018014356A JP2019131343A (en) 2018-01-31 2018-01-31 Drilling construction device for hoistway and construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018014356A JP2019131343A (en) 2018-01-31 2018-01-31 Drilling construction device for hoistway and construction method using the same

Publications (1)

Publication Number Publication Date
JP2019131343A true JP2019131343A (en) 2019-08-08

Family

ID=67544690

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018014356A Pending JP2019131343A (en) 2018-01-31 2018-01-31 Drilling construction device for hoistway and construction method using the same

Country Status (1)

Country Link
JP (1) JP2019131343A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111960251A (en) * 2020-08-28 2020-11-20 江苏银环新材料科技有限公司 Steel bar truss hoisting method and steel bar truss hoisting tool thereof
CN113086810A (en) * 2021-03-20 2021-07-09 北京顺迅电梯设备工程有限公司 Elevator self-provided shaft rapid installation structure and method
CN113401767A (en) * 2021-07-08 2021-09-17 重庆翰洲机电设备有限公司 Elevator guide rail support pre-installation equipment
CN113955666A (en) * 2021-10-12 2022-01-21 广州明森合兴科技有限公司 Elevator installation construction equipment flexible in operation
CN116378727A (en) * 2023-06-02 2023-07-04 太原理工大学 Automatic motor switching device of drilling and anchoring integrated machine

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111960251A (en) * 2020-08-28 2020-11-20 江苏银环新材料科技有限公司 Steel bar truss hoisting method and steel bar truss hoisting tool thereof
CN111960251B (en) * 2020-08-28 2023-08-22 江苏银环新材料科技有限公司 Steel bar truss hoisting method and steel bar truss hoisting tool thereof
CN113086810A (en) * 2021-03-20 2021-07-09 北京顺迅电梯设备工程有限公司 Elevator self-provided shaft rapid installation structure and method
CN113086810B (en) * 2021-03-20 2022-07-12 北京顺迅电梯设备工程有限公司 Elevator self-provided shaft rapid installation structure and method
CN113401767A (en) * 2021-07-08 2021-09-17 重庆翰洲机电设备有限公司 Elevator guide rail support pre-installation equipment
CN113401767B (en) * 2021-07-08 2022-04-29 重庆翰洲机电设备有限公司 Elevator guide rail support pre-installation equipment
CN113955666A (en) * 2021-10-12 2022-01-21 广州明森合兴科技有限公司 Elevator installation construction equipment flexible in operation
CN116378727A (en) * 2023-06-02 2023-07-04 太原理工大学 Automatic motor switching device of drilling and anchoring integrated machine

Similar Documents

Publication Publication Date Title
JP2019131343A (en) Drilling construction device for hoistway and construction method using the same
KR101008359B1 (en) A concrete mold lifter
US20030136611A1 (en) Installing frame for installation of shaft equipment, installing elevator with installing frame and method of installation of shaft equipment
JP2008273644A (en) Replacing method of elevator device, and elevator device
JP2013014395A (en) Elevator and method of repairing elevator
JP5174354B2 (en) Arrangement method of guide rail in elevator apparatus
JP5538470B2 (en) Lift extension method for construction elevators
JPS58216877A (en) Work device for elevator elevating path
JP5003539B2 (en) Elevator installation method, installation jig used therefor, and method of manufacturing the installation jig
JP2010112051A (en) Ascending/descending scaffold
JPH11141271A (en) Guide support device for temporarily installed elevator, extension method therefor, and removal method thereof
JPH05149080A (en) Rising and falling work bench for anchor drill
JP2007210708A (en) Lifting device and lifting method for elevator hoist machine
JP3097010B2 (en) Elevator device for underground construction and underground construction method using it
JP2000095456A (en) Temporary operation device for elevator
JP4233432B2 (en) Elevator pit work platform equipment
JP7107129B2 (en) Elevator sill device and method for replacing elevator sill
CN211338475U (en) Construction elevator in well
JP4134962B2 (en) Elevator equipment
JPH061562A (en) Guide rail erection method for hydraulic elevator
JP2674392B2 (en) Hydraulic elevator installation method
JP2002160876A (en) Elevator device
JP4151791B2 (en) Elevating scaffold for repairing tower structures
JP2002356289A (en) Apparatus for construction works and installation work method for inclined elevator
JP3958655B2 (en) Elevator equipment