JP2019053357A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2019053357A5 JP2019053357A5 JP2017175154A JP2017175154A JP2019053357A5 JP 2019053357 A5 JP2019053357 A5 JP 2019053357A5 JP 2017175154 A JP2017175154 A JP 2017175154A JP 2017175154 A JP2017175154 A JP 2017175154A JP 2019053357 A5 JP2019053357 A5 JP 2019053357A5
- Authority
- JP
- Japan
- Prior art keywords
- area
- industry
- store
- real estate
- opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims 20
- 238000004590 computer program Methods 0.000 claims 6
- 238000004364 calculation method Methods 0.000 claims 4
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017175154A JP6753562B2 (ja) | 2017-09-12 | 2017-09-12 | 不動産活用提案システム、方法、及びコンピュータプログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017175154A JP6753562B2 (ja) | 2017-09-12 | 2017-09-12 | 不動産活用提案システム、方法、及びコンピュータプログラム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2019053357A JP2019053357A (ja) | 2019-04-04 |
| JP2019053357A5 true JP2019053357A5 (enExample) | 2019-09-05 |
| JP6753562B2 JP6753562B2 (ja) | 2020-09-09 |
Family
ID=66014827
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017175154A Active JP6753562B2 (ja) | 2017-09-12 | 2017-09-12 | 不動産活用提案システム、方法、及びコンピュータプログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6753562B2 (enExample) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6773346B1 (ja) * | 2019-07-17 | 2020-10-21 | Assest株式会社 | 入居推薦業者提案プログラム、不動産取引価格提案プログラム |
| WO2021015265A1 (ja) * | 2019-07-25 | 2021-01-28 | プロパー ピーティーイー リミテッド | 情報処理システム、情報処理方法、およびプログラム |
| JP2022035764A (ja) * | 2020-08-21 | 2022-03-04 | 株式会社メディンプル | 営業支援システム及び営業支援方法 |
| JP7727963B2 (ja) * | 2021-08-27 | 2025-08-22 | 株式会社カケコム | 人材マッチングシステム、人材マッチング方法及びプログラム |
| CN113706201B (zh) * | 2021-08-30 | 2024-10-25 | 深圳壹账通智能科技有限公司 | 房产预估模型训练方法、装置、计算机设备及介质 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002063329A (ja) * | 2000-08-23 | 2002-02-28 | Marksquare Co Ltd | 出店意志決定支援システム、出店意志決定支援方法、及びコンピューター読み取り可能な記憶媒体 |
| JP2003303270A (ja) * | 2002-04-08 | 2003-10-24 | Navit Co Ltd | Gisによるエリアマーケティングシステム |
| JP3683264B1 (ja) * | 2004-09-01 | 2005-08-17 | 武 鈴木 | 出店支援方法および出店支援システム |
| JP2006343939A (ja) * | 2005-06-08 | 2006-12-21 | Navitime Japan Co Ltd | 周辺条件物件検索システム、周辺条件物件検索サーバ、端末装置 |
| KR100778177B1 (ko) * | 2005-09-08 | 2007-11-22 | 이형석 | 업종 밀집지수 산출서버 및 그 동작방법 |
| US20120084118A1 (en) * | 2010-09-30 | 2012-04-05 | International Business Machines Corporation | Sales predication for a new store based on on-site market survey data and high resolution geographical information |
-
2017
- 2017-09-12 JP JP2017175154A patent/JP6753562B2/ja active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Vlachos et al. | Lean thinking in the European hotel industry | |
| JP2019053357A5 (enExample) | ||
| Timperio et al. | Integrated decision support framework for distribution network design | |
| Vidalakis et al. | Transportation responsiveness and efficiency within the building supply chain | |
| Raut et al. | Evaluation and selection of third-party logistics providers using an integrated multi-criteria decision making approach | |
| JP6753562B2 (ja) | 不動産活用提案システム、方法、及びコンピュータプログラム | |
| Cifranič | Localization factors in decision making of location of selected enterprises | |
| Chernonog et al. | The effect of risk aversion on a supply chain with postponed pricing | |
| JP6067630B2 (ja) | 損益予測装置及び損益予測プログラム | |
| Amore | Three (or more) is a magic number: hub & spoke collusion as a way to reduce downstream competition | |
| JP2013077109A5 (enExample) | ||
| Jafar | The impact of competitive intelligence (CI) management on the competitiveness and performance of retail companies in Indonesia | |
| Koshkin et al. | The political economy of digital platforms: postindustrial paradigm against self-replicating market failures | |
| Tartavulea | Model for determining the optimum location for performance improvement in supply-chain strategies | |
| Kholod et al. | Upper level processes and projects model building | |
| Biryukova et al. | Methodology for the Formation of Oil Company's Product Program in the Context of Sustainable Development | |
| Lopez et al. | Case study on subcontracting arrangements in the scaffolding supply chain of a Liquefied Natural Gas infrastructure project | |
| Li et al. | Pricing decision in a dual-channel system with heterogeneous consumers | |
| Epstein et al. | The Operational Impact of Customer Location in On-Demand Services | |
| KR20230105883A (ko) | 철강 수출입 서비스장치 및 그 장치의 구동방법 | |
| Trushchenko et al. | Assessing the Expediency of Using Outsourcing in Various Economic Sectors: A Review of the Existing Approaches | |
| Mitra et al. | Visions of a pole position: Developing inimitable resource capacity through enterprise systems implementation in Nestlé | |
| Erzaij et al. | Management model for evaluation and selection of engineering equipment suppliers for construction projects in Iraq | |
| Putkina et al. | Geoinformation systems in the model of improving the efficiency of enterprise infrastructure | |
| Achmad | The Impact of Indomaret Operated on Traditional Small Kiosks Sales in Manado City |