JP2019002263A - Simple fitting construction method of non-welding dry assembly type door frame structure - Google Patents

Simple fitting construction method of non-welding dry assembly type door frame structure Download PDF

Info

Publication number
JP2019002263A
JP2019002263A JP2017174933A JP2017174933A JP2019002263A JP 2019002263 A JP2019002263 A JP 2019002263A JP 2017174933 A JP2017174933 A JP 2017174933A JP 2017174933 A JP2017174933 A JP 2017174933A JP 2019002263 A JP2019002263 A JP 2019002263A
Authority
JP
Japan
Prior art keywords
frame
opening
construction
frame body
door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017174933A
Other languages
Japanese (ja)
Other versions
JP6544599B2 (en
Inventor
成信 藤新
Shigenobu Fujishin
成信 藤新
龍 井無田
Ryu Imuta
龍 井無田
翔太 井上
Shota Inoue
翔太 井上
友孝 澤邉
Tomotaka Sawabe
友孝 澤邉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissho Industry Co Ltd
Original Assignee
Nissho Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissho Industry Co Ltd filed Critical Nissho Industry Co Ltd
Publication of JP2019002263A publication Critical patent/JP2019002263A/en
Application granted granted Critical
Publication of JP6544599B2 publication Critical patent/JP6544599B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

To develop a simple fitting construction method for a non-welding dry assembly type door frame structure using a frame body positioning board for doorway opening and an L-shaped clamp fixing jig for temporary fastening in order to perform construction work of fittings without being influenced by the progress situation of work of wall construction in lightweight steel panel partition wall doorway opening construction.SOLUTION: A doorway door planned for a lightweight steel panel partition wall is configured by: a split door frame body which can be integrally framed by joining a fitting portion; an inter-slab strut member for fixing a door frame body which forms an opening portion in a planned space before wall construction; and a frame body positioning board which holds the door frame body at a planned position. By temporarily fastening both door frame bodies and opening portion constituent members with which the back side of the frame body is brought into contact with the frame body positioning board at the time of construction with an L-shaped clamp fixing jig and fixing them with an angle member and a screw member, it is possible to construct the door frame body without being influenced by the construction situation of the lightweight steel panel partition wall.SELECTED DRAWING: Figure 5

Description

本発明は、建築物の軽量鉄骨間仕切り壁の施工において、異種業者が作業を交錯しながら進捗する現状から、壁工事と建具工事を切り離して工事を進捗できるように、スラブ間支柱部材、枠体位置決定盤及びL字クランプ固定治具を利用し、軽量鉄骨間仕切り壁開口部の進捗状況に関わらず、施工することができる扉枠体の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法に関する。   In the construction of a lightweight steel partition wall of a building, the present invention is a strut member between slabs and a frame so that the construction work can be progressed by separating the wall construction and the joinery construction from the current situation where different contractors work while crossing the work. Easy installation construction method of non-welded dry assembly type door frame structure of door frame body that can be constructed regardless of the progress of lightweight steel partition wall opening using positioning board and L-shaped clamp fixing jig About.

オフィスビル、テナントビル、学校又はマンション等において、主要構造体
部以外は、軽量鉄骨間仕切り壁が多く配置され、その軽量鉄骨間仕切り壁には、
必ず出入口としての扉が設けられる。現在、人材の不足、技能者の不足が問題
となりつつある建築業界において、異種業者が作業を交錯しながら進捗する軽
量鉄骨間仕切り壁の施工では、他の業種へ影響を及ぼし、工事の遅滞、突貫工
事での人員の増加等の深刻な問題になりつつあり、これらの問題を解決できる
軽量鉄骨間仕切り壁の仕上げ工事方法が望まれている。そこで、軽量鉄骨間仕
切り壁の施工の進捗状況に無関係で取り付け出来る鋼製建具の開発を目指して
いる。
In office buildings, tenant buildings, schools, condominiums, etc., there are many lightweight steel partition walls other than the main structure, and the lightweight steel partition walls
A door is always provided as an entrance. In the construction industry, where the shortage of human resources and technicians is currently becoming a problem, the construction of lightweight steel partition walls, where dissimilar contractors make progress while crossing work, has an impact on other industries, resulting in construction delays and rushing. It is becoming a serious problem such as an increase in the number of workers in construction, and a method for finishing a lightweight steel partition wall that can solve these problems is desired. Therefore, we are aiming to develop steel fittings that can be attached regardless of the progress of construction of lightweight steel partition walls.

建築物の軽量鉄骨間仕切り壁及び開口部鋼製建具の施工において、現在は壁業者、鋼製建具業者及び他業者の作業工程が交錯しながら進捗する為、全体の仕上げ工程に少なからず影響を与えている。この従来の交錯した作業を改善する新方法が求められている。そこで、鋼製建具業者が壁業者の工事の進捗状況に影響を受けないで施工できるようにする為、出入り口ドア計画位置に立てるスラブ間支柱部材、枠体位置決め盤及び前記位置決め盤に適合する枠体にし、無溶接乾式組み立て型扉枠体の開発を目指している。 In the construction of lightweight steel partition walls and steel fittings for buildings, the work processes of wall contractors, steel joinery contractors, and other contractors are now progressing in a mixed manner, which has a considerable impact on the overall finishing process. ing. There is a need for new ways to improve this traditional interworking process. Therefore, in order that the steel joiner can perform construction without being affected by the progress of the construction work of the wall supplier, the strut members between the slabs, the frame positioning board, and the frame suitable for the positioning board are set at the planned doorway door position. It aims to develop a non-welded dry assembly door frame.

建築物の軽量鉄骨間仕切り壁の施工において、建物全体の施工計画工期に影響を与えない流れに変えるため、扉枠体をビス固定型組み立て式主要枠体とビス固定型組み立て式付属枠体からなる2分割構造で搬入、配置、保管の容易なものとし、さらに、火災リスクの無い非溶接することで、安全な作業も行い、順調な仕事の流れを作り、建築現場で無理な人員の増員を無くし、又工期の遵守を目指している。 In the construction of lightweight steel partition walls in buildings, the door frame consists of a screw-fixed assembling main frame and a screw-fixing assembling-type attached frame in order to change the flow so as not to affect the construction schedule of the entire building. It is easy to carry in, place and store in a two-part structure. Furthermore, non-welding with no fire risk allows safe work, creates a smooth work flow, and increases the number of unreasonable personnel at the construction site. It aims to eliminate and to comply with the work schedule.

壁面が完成されている開口部に対する扉枠体の組み立てにおいて、仕上げ済み壁面小口と固定するスチフナー状固定金具の第1枠体への嵌め込み工程、仕上げ 済みの壁面の開口部の一方の壁面側にU字状の溝が形成されている第1枠体を、L字アングルを使用して壁面小口に取り付けする工程、当該壁面との前記開口部の他方の仕上げ済みの壁面側から第1枠体のU字状の溝に向けて、先端部分が入り込む構造に形成されている第2枠体を 両枠体の側から挟みこむようにして取り付けする工程と、両枠体を固定する工程と、からなる扉枠の取り付け施工工法が提案されている(特許文献1参照)。 When assembling the door frame to the opening where the wall has been completed, the step of fitting the stiffener-shaped bracket to the first frame to be fixed to the finished wall edge, on one wall side of the finished wall opening A step of attaching the first frame having a U-shaped groove to the wall edge using an L-shaped angle, the first frame from the other finished wall surface side of the opening with the wall surface The second frame formed in a structure in which the tip portion enters into the U-shaped groove is sandwiched from both sides of the frame, and the frame is fixed. A door frame mounting construction method has been proposed (see Patent Document 1).

また仕上げ工事を先行させた軽量鉄骨壁の点検用開口部に施工する扉において、仕上げ済み壁開口部内に開口寸法より3〜5mm小さい寸法で製作した扉を、その奥側の補強材開口部の内側に取り付した扉枠で保持する構造とし、扉枠は縦部材として2本と横部材として0〜2本とからなり、各々分離された構造で軽量鉄骨壁下地材にねじ部材を使用し、固定できる形状になっており、各縦及び横部材を固定時に移動可能な形状にし、縦部材を扉吊金具及び扉鍵金具受け材の取り付け部材に、横部材を扉の戸当り、及び縦部材のつなぎ材とし、壁ボード面とほぼ同一になるように扉本体を正面側から蝶着できるようにしている扉枠外扉の取り付け施工工法が提案されている(特許文献2参照)。 In addition, in a door constructed in the inspection opening of a lightweight steel wall preceded by finishing work, a door manufactured with a dimension 3 to 5 mm smaller than the opening dimension in the finished wall opening is provided on the back side of the reinforcing material opening. It is structured to be held by a door frame attached on the inside, and the door frame consists of two vertical members and 0 to 2 horizontal members, each using a separate structure and using screw members for the lightweight steel wall base material. The vertical and horizontal members can be moved when fixed, the vertical member is used as a mounting member for the door hanging bracket and door key bracket receiving material, the horizontal member is used for the door of the door, and the vertical member. There has been proposed a construction method for attaching a door outside the door frame that can be used as a connecting member for members and hinged to the door body from the front side so as to be substantially the same as the wall board surface (see Patent Document 2).

壁面の開口部の一方の壁面側の開口縁部に設けられる第1枠体と、前記開口部の他方の壁面側の開口縁部に設けられる第2枠体とを備え、前記第1枠体には、開口部内側の先端に設けられた戸当たり部と、前記戸当たり部の裏側に設けられ、前記戸当たり部と重なり合う前記第2枠体の内側先端部分を裏側から前記戸当たり部と共に挟み込む保持部とが形成されている扉枠が提案されている(特許文献3参照)。しかしこれらについては、建築物としては相当進んだ状態での開口部の建具工事をおこなう施工方法であったが、扉施工工事でオールランドの場合に可能な時期に施工できる方法についてはまだ提案されていない。 A first frame provided at an opening edge on one wall surface side of the opening of the wall surface, and a second frame provided at an opening edge on the other wall surface side of the opening; The door stopper provided at the tip inside the opening and the back end of the door stopper, the inner tip of the second frame overlapping the door stopper together with the door stopper from the back side A door frame in which a holding portion to be sandwiched is formed has been proposed (see Patent Document 3). However, for these, the construction method was to perform the fitting work of the opening in a considerably advanced state as a building, but a method that can be constructed at the time possible in the case of Allland in the door construction work has not yet been proposed. Not.

このような扉枠について、開口部の一方の壁面側に設けられる内側枠体と、他方の壁面側と設けられる外側枠体との、二つの枠体から形成されたものが知られている。建物の開口部に取り付ける上枠、下枠、左右の縦枠を有し、上枠、下枠、左右の縦枠の躯体への取り付け面側に、それぞれ外方向に突出する取り付け片を備え、各取り付け片は根本部に切断溝を有する建物開口部材が提供されている(特許文献4参照)。 About such a door frame, what was formed from the two frame bodies of the inner side frame provided in the one wall surface side of an opening part, and the outer side frame provided in the other wall surface side is known. It has an upper frame, a lower frame, and left and right vertical frames to be attached to the opening of the building, and has mounting pieces that protrude outwardly on the mounting surface side of the upper frame, the lower frame, and the left and right vertical frames, respectively, Each attachment piece is provided with a building opening member having a cutting groove at the base (see Patent Document 4).

さらに建具枠を少なくとも上記取り付け部材を工具で調節する為の通し穴が形成された建具枠本体と、上記通し穴を被覆でき、而も上記建具枠本体に結合できる建具枠カバーにより構成し、先ず上記下地枠に対して建具枠本体を鉛直度、真直度、隙間調整等必要な調節を行ないながら取り付け部材を用いて取り付け、しかる後にドアの吊込みを行い、次いで上記通し穴を被覆するように建具枠カバーを上記建具枠本体に結合する工法が提案されている(特許文献5、6参照)。 Further, the joinery frame is constituted by a joinery frame main body formed with a through hole for adjusting at least the mounting member with a tool, and a joinery frame cover that can cover the through hole and can be coupled to the joinery frame main body. Mount the joinery frame body on the base frame using the mounting member while making necessary adjustments such as verticality, straightness, gap adjustment, etc., and then suspend the door and then cover the through hole A method of joining a joinery frame cover to the joinery frame body has been proposed (see Patent Documents 5 and 6).

躯体の取り付け開口部に対応する床スラブに、アングル材を打ち込んで出入りの位置を決める工程と前記取り付け開口部にドア枠を建て込み、ボルト等の回動部材でレベル・建ち調整をする工程と躯体と前記回動部材の頭部とをエポキシ樹脂等の接着剤で固定する工程とを有するドア枠の取り付け工法が提案されている(特許文献5参照)。しかしこれらは取り付けにおいて十分満足できる扉枠体固定補助具は存在していなかった。また部分的に溶接部所を多く使用されている。 A step of driving an angle material into the floor slab corresponding to the mounting opening of the frame to determine the position of entry and exit, a step of building a door frame in the mounting opening, and a level / building adjustment with a rotating member such as a bolt; A door frame mounting method has been proposed that includes a step of fixing the casing and the head of the rotating member with an adhesive such as an epoxy resin (see Patent Document 5). However, there has been no door frame fixing aid that can be satisfactorily installed. Moreover, many welds are used partially.

コンクリート集合住宅、木造住宅、鉄骨住宅等一般住宅におけるユニット押入及びその組立て方法を提供し、根太を嵌める為の根太彫り、根太の仕上げ作業、合板の釘打ち作業を現場において不必要とし、さらに部材の工場製品化を一層徹底し、工事現場の大工の手間を大巾に削減することを目的とされている。 Providing unit push-in and assembly methods for general housing such as concrete apartment houses, wooden houses, steel-framed houses, etc., necessitating joisting for joisting, joist finishing, plywood nailing, and parts The purpose is to further reduce the labor of carpenters at the construction site.

躯体の取り付け開口部に対応する床スラブに、アングル材を打ち込んで出入りの位置を決める工程と前記取り付け開口部にドア枠を建て込み、ボルト等の回動部材でレベル・建ち調整をする工程と躯体と前記回動部材の頭部とをエポキシ樹脂等の接着剤で固定する工程とを有するドア枠の取り付け工法が提案されている(特許文献7参照)。また引き戸枠の外観を損なうことなく、壁クロスが施工された後の壁に対して引き戸枠の施工を行うことができる引き戸枠の後付け工法の提供も行なっている(特許文献8参照)。 A step of driving an angle material into the floor slab corresponding to the mounting opening of the frame to determine the position of entry and exit, a step of building a door frame in the mounting opening, and a level / building adjustment with a rotating member such as a bolt; A door frame mounting method has been proposed that includes a step of fixing the casing and the head of the rotating member with an adhesive such as an epoxy resin (see Patent Document 7). In addition, a sliding door frame retrofitting method is also provided that allows the sliding door frame to be constructed on the wall after the wall cloth has been constructed without impairing the appearance of the sliding door frame (see Patent Document 8).

建造物の躯体枠に取り付けられる開口枠において、前記開口枠の縦方向部材を、前記躯体枠に、調整機構によって鉛直度を出した状態で取り付けて、前記調整機構を、前記躯体枠に取り付けた固定用部材と、該固定用部材に対して、前記開口枠の縦方向部材の位置決めを行う位置決め部材とから構成した開口枠が提案されている(特許文献9参照)。 In the opening frame attached to the building frame of the building, the vertical member of the opening frame is attached to the housing frame in a state where the vertical degree is obtained by the adjusting mechanism, and the adjusting mechanism is attached to the housing frame. An opening frame composed of a fixing member and a positioning member that positions the longitudinal member of the opening frame with respect to the fixing member has been proposed (see Patent Document 9).

一般には軽量鉄骨間仕切り壁での扉枠体の施工において、壁工事が終了後、又内装を終えた状態で扉据付工事が行われていた。しかし建設期間の短縮化において各工事の並列作業が常識的になり、壁面を完成されていない開口部で扉枠体の組み立てを行うこと、また早い時期に扉工事を施工することが期待されている。すなわち壁工事の無い場合に行うこともあり、また取り付けの場合には溶接工事も多いこともある。 In general, in the construction of a door frame body with a lightweight steel partition wall, the door installation work was performed after the wall work was completed and the interior was finished. However, the parallel work of each construction became common sense in shortening the construction period, and it is expected that the door frame will be assembled at the opening where the wall surface is not completed, and that the door construction will be performed early. Yes. In other words, it may be performed when there is no wall construction, and there are many welding works when mounting.

特開2011−80305号公報JP 2011-80305 A 特開2015−151854号公報Japanese Patent Laying-Open No. 2015-151854 特開2010−189872号公報JP 2010-189872 A 特開2000−220347号公報JP 2000-220347 A 特開2009−24336号公報JP 2009-24336 A 特開2006−233604号公報JP 2006-233604 A 特開2002−303081号公報JP 2002-303081 A 特開2000−110443号公報JP 2000-110443 A 特開2009−235881号公報JP 2009-235881 A

軽量鉄骨間仕切り壁及び壁開口部に設けられる出入り口鋼製建具の施工において、壁下地施工業者、ボード施工業者、建具施工業者、クロス貼り業者、塗装施工業者等の交錯した作業の上で間仕切り壁の施工が完成している。その為、作業開始時期を巡り、それぞれの業者がそれぞれの業者の作業効率のボトルネックになっている。その中で、製品製作のリードタイムや施工時間等が著しく違い、大きなボトルネックとなっているのが建具施工業者である。また当発明者が提案している特許文献1においては、壁面が完成されている開口部で扉枠体を組み立てあるが、壁面が完成されていない開口部で鉄骨剝き出しの場合の扉枠体を組み立てには適応が難しい状態である。これらの状態での組み立てを解決することが必要になってくる。 In the construction of entrance and exit steel fittings installed in the lightweight steel partition walls and wall openings, the partition walls can be separated after the interfacing work of wall base construction contractors, board construction contractors, joinery contractors, cloth pasting contractors, paint contractors, etc. Construction is complete. For this reason, each supplier is the bottleneck of the work efficiency of each supplier over the work start time. Among them, joinery contractors are a major bottleneck due to remarkably different product production lead time and construction time. Further, in Patent Document 1 proposed by the present inventor, the door frame body is assembled at the opening portion where the wall surface is completed, but the steel frame is opened at the opening portion where the wall surface is not completed. It is difficult to adapt to assembling the door frame. It will be necessary to solve the assembly in these states.

また、各業種とも人材の不足、技能者の不足が深刻化しつつあり、何度も同じ現場に足を運ぶことが出来なくなっている。建具工事が遅れた場合、壁施工業者は出入り口開口部廻りの仕上げを残し、作業を中断、後日、建具工事の施工完了後に残りを仕上げることになる。又逆の場合において、壁工事が遅れると建具業者は開口補強部材が無く、取り付け作業ができない。後日、壁下地の施工が完了してから、再度取り付けに行くことになり、基本工程通りに進まないのが現状となっている。   In addition, the shortage of human resources and technicians in each industry is becoming more serious, and it is impossible to go to the same site many times. If the joinery work is delayed, the wall construction company will leave the finish around the opening of the entrance and exit, stop the work, and finish the rest after the completion of the joinery work. In the opposite case, if the wall construction is delayed, the joinery contractor does not have an opening reinforcing member and cannot perform the installation work. At a later date, after the construction of the wall foundation is completed, it will be reattached, and the current situation is that it does not proceed according to the basic process.

又、仕様変更が発生した場合等の改造工事において、建具業者の枠体及び扉の
手配から入荷迄の日数と壁業者の壁施工の部材の手配から入荷迄の日数が違い、仕上げ工程の手待ちの期間が生じる。建物の工期が決まっており、手待ちの期間を作ることは大きな問題となる。この状況下において、壁業者が建具業者の作業日程を気にすることなく、壁工事の施工を完了させることができ、その後、建具業者が問題なく施工できれば、ボトルネックの解消になる。
In addition, in the remodeling work such as when specifications change, the number of days from the arrangement of the frame and door of the joinery contractor to the arrival and the number of days from the arrangement of the wall construction member to the arrival of the wall contractor are different. A waiting period occurs. The construction period of the building is fixed, and creating a waiting period is a big problem. Under this circumstance, the wall supplier can complete the construction of the wall work without worrying about the work schedule of the joiner, and then the bottleneck will be eliminated if the joiner can complete the work without problems.

更に、壁業者が複数の現場を掛け持ちしている場合、それぞれの現場の工期が決まっているので、安易に施工現場や工程を変えることができない。そこで変更前の壁開口部に取り付けられていた扉枠体が利用できれば、間仕切り壁の部材の入荷にすべての工程をあわせることが出来る。特別増員作業者も手待ち期間もなくなり、順調な作業を行うことができ、課題の解決につながる。   In addition, when a wall supplier has a plurality of sites, since the construction period of each site is determined, the construction site and process cannot be easily changed. Therefore, if the door frame attached to the wall opening before the change can be used, all processes can be matched with the arrival of the partition wall members. There will be no extra workers and no waiting period, and it will be possible to work smoothly and solve the problem.

従来の流れを改善するには、建具工事業者の施工と軽量鉄骨間仕切り壁に関わる他の工事業者の施工をそれぞれ独立させることが必要となる。建具施工業者は壁施工業者の施工に関係を持たず、工事の進捗状況に影響を受けず、どんな施工状況においても、取り付け可能な出入り口鋼製建具とすれば、解消できることになる。軽量鉄骨間仕切り壁に対して、ボード貼り前の鋼製建具の施工方法やボード貼り完了後の鋼製建具の施工方法はすでに提案されているが、軽量鉄骨間仕切り壁の進捗状態に関係なく取り付けできる鋼製建具の施工方法に関しての提案はない。 In order to improve the conventional flow, it is necessary to make the construction work of the joinery contractor and the construction work of other construction contractors related to the lightweight steel partition wall independent. The joiner contractor is not related to the construction work of the wall builder, and is not affected by the progress of the work. In any construction situation, it can be solved by using an attachable entrance steel joiner. For lightweight steel partition walls, steel joiner construction methods before board pasting and steel joiners after board pasting have already been proposed, but they can be attached regardless of the progress of lightweight steel partition walls. There is no proposal regarding the construction method of steel joinery.

本発明は、軽量鉄骨壁の工事の進捗状況に影響を受けないで取り付けを可能
にできる対応性と、良好な施工性とを兼ね備えた無溶接乾式組み立て型扉枠構
造体の随時に簡易に取り付け可能な施工方法を提供することを目的とする。
The present invention easily attaches a non-welded dry assembly type door frame structure that can be mounted without being affected by the progress of the construction of the lightweight steel wall and has good workability. The purpose is to provide a possible construction method.

建築物の軽量鉄骨間仕切り壁の施工において、異種業者が作業を交錯しながら進捗する場合に、壁工事と建具工事を切り離して工事を進捗できるように、スラブ間支柱部材、枠体位置決め盤及びL字クランプ固定治具を利用し、軽量鉄骨間仕切り壁開口部の進捗状況に関わらず、施工することができる扉枠体の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法を開発することを目的としている。 In the construction of lightweight steel partition walls for buildings, when different contractors make progress while crossing work, the strut members between slabs, frame positioning boards and L To develop a simple installation method for non-welded dry assembly type door frame structure of door frame body that can be constructed regardless of the progress status of lightweight steel partition wall opening using a clamp fixture It is aimed.

軽量鉄骨間仕切り壁の壁面を完成させていない開口部への扉枠体の施工において、扉枠体を組み立て式主要枠体と組み立て式付属枠体からなる2分割構造にして、主要枠体はU字状の嵌合部を持つ2本の縦枠部材と1本の上枠部材及び1本の下枠部材とからなるビス固定型組み立て式枠体構造にし、出入り口計画位置に立てるスラブ間支柱部材及び軽量鉄骨間仕切り壁開口部補強部材に先付した枠体位置決め盤に前記枠体の裏面で当接させて、前記主要枠体と前記支柱部材及び前記開口補強部材と間にL字クランプ固定治具を利用して一時的に挟持させた状態で、アングル部材とねじ部材によって固着し、前記主要枠体のU字状嵌合部にI字状嵌合部を持つ2本の縦枠部材と1本の上枠部材とからなるビス固定型組み立て式枠体構造である付属枠体I字状勘合部先端を挿入し建て込み、前記両枠体間にL字クランプ固定治具を利用して一時的に挟持させた状態で、嵌合可能箇所でビス止めにて挟着させて一体化させ、所望の位置に扉枠体として溶接無しの組み立てでき、軽量鉄骨壁工事の進捗状況に影響を受けずに扉枠体の取り付けを可能にしている。 In the construction of the door frame to the opening that has not completed the wall surface of the lightweight steel partition wall, the door frame has a two-part structure composed of an assembled main frame and an assembled auxiliary frame. A slab-to-slab strut member that has a screw-fixed assembling frame structure composed of two vertical frame members having a letter-shaped fitting portion, one upper frame member, and one lower frame member, and stands at the planned entrance / exit position And an L-shaped clamp fixing jig between the main frame, the column member, and the opening reinforcing member by contacting the frame positioning plate preceding the light steel partition wall opening reinforcing member on the back surface of the frame. Two vertical frame members fixed with an angle member and a screw member and having an I-shaped fitting portion in the U-shaped fitting portion of the main frame in a state of being temporarily sandwiched using a tool; A screw-fixed assembling frame structure consisting of one upper frame member Insert the tip of the frame I-shaped fitting part and install it, and hold it between the two frames using a L-shaped clamp fixing jig. Thus, the door frame can be assembled without welding as a door frame at a desired position, and the door frame can be attached without being influenced by the progress of the lightweight steel wall construction.

前記主要枠体のU字状の凹勘合部と前記付属枠体のI字状の凸勘合部を接合させる建て込み時、前記両枠体の枠裏面と当接して、所定の枠幅を確保して一体の枠体を形成させる枠体位置決め盤は、厚さ1.2〜6mmで、幅20〜100mmでのL字型、コ字型またはI字型の金属板を前記開口部材にねじ部材により固着してものであって、又前記L字クランプ固定治具は、前記開口部材に先付けされた枠体位置決め盤に前記両枠体裏面を当接させ、所定の位置を保持した前記主要枠体と前記開口部材間とを挟持でき、さらに接合し、所定の枠幅を確保した前記両枠体間をも挟持できる、100〜300mmの間隔を挟持できる万力式クランプ型であって、所定の一体枠幅を確保し、所望の位置に組み立て、無溶接で固着できるようになっている。   When the U-shaped concave fitting portion of the main frame body and the I-shaped convex fitting portion of the attached frame body are joined, the predetermined frame width is secured by abutting against the frame back surfaces of the two frame bodies. The frame positioning plate for forming an integral frame is a screw having an L-shaped, U-shaped or I-shaped metal plate having a thickness of 1.2 to 6 mm and a width of 20 to 100 mm to the opening member. The L-shaped clamp fixing jig is fixed by a member, and the main body is held in a predetermined position by abutting the back surfaces of the two frame bodies against a frame body positioning board that is attached to the opening member. A vise clamp type capable of sandwiching a gap between 100 and 300 mm, which can be sandwiched between the two frame bodies which can be sandwiched between the frame body and the opening member, and further joined and secured to a predetermined frame width, Ensures a predetermined integral frame width, can be assembled at a desired position, and can be fixed without welding That.

壁面を完成させていない開口部に施工する前記分割扉枠体である組み立て式の主要枠体と組み立て式付属枠体において、前記主要枠体のU字状嵌合部への前記付属枠体のI字状嵌合部の接合部所は、前記L字クランプ固定治具によって前記枠体位置決め盤と前記分割扉枠体とを締め付け挟持して、前記I字状嵌合部の先端を前記U字状嵌合部の奥行きの半分まで挿入した状態を基本設定とし、前記嵌合部の先端がU字状にしている嵌合部の底に当るまで、又は前記勘合部先端がU字状受態の嵌合部から抜ける範囲までの調整可能な部所を持っている。 In the assembly-type main frame and the assembly-type accessory frame which are the divided door frames to be constructed in the opening portion where the wall surface is not completed, the attachment frame body to the U-shaped fitting portion of the main frame body The joint portion of the I-shaped fitting portion is configured such that the frame positioning board and the divided door frame body are clamped and clamped by the L-shaped clamp fixing jig, and the tip of the I-shaped fitting portion is connected to the U-shape. Basically, the insertion state is half of the depth of the letter-shaped fitting part, and the tip of the fitting part hits the bottom of the fitting part that is U-shaped, or the tip of the fitting part is U-shaped. It has an adjustable part up to the extent of coming off from the fitting part of the state.

前記スラブ間支柱部材及び軽量鉄骨間仕切り壁開口補強部材に取り付ける枠体位置決め盤は、施工条件に応じて使い分けができるように、固定型、又は取り外し型との二種類をもっており、固定型は厚さ1.2mm〜6mmのアルミニウム、鉄、ステンレススチールから選ばれた金属製板曲げ材であって、前記金属製板曲げ材におけるL字状部、又はコの字状部の形状として、10mm〜50mmの当接面を持つようにしており、取り外し型は、電磁石の座面と当接面とを持ち、当接面位置調整可能な本体とを組み合わせた形状にしている。 The frame positioning board to be attached to the strut member between slabs and the lightweight steel partition wall opening reinforcing member has two types, a fixed type or a removable type, so that it can be used properly according to the construction conditions. A metal plate bending material selected from 1.2 mm to 6 mm of aluminum, iron, and stainless steel, and the shape of the L-shaped portion or the U-shaped portion of the metal plate bending material is 10 mm to 50 mm. The removable type has a shape having a seat surface of an electromagnet and a contact surface, and a main body capable of adjusting the position of the contact surface.

さらに詳しくは、軽量鉄骨間仕切り壁の進捗状態に影響を受けず、取り付けを可能にする為、扉枠体を組み立て式の主要枠体と組み立て式の付属枠体からなる2分割構造とし、主要枠体はU字状の嵌合部を持つ2本の縦枠部材と1本の上枠部材及び1本の下枠部材とからなるビス固定型組み立て式枠体構造にし、付属枠体はI字状の嵌合部を持つ2本の縦枠部材と1本の上枠とからなるビス固定型組み立て式枠体構造にし、主要枠体のU字状の凹部と付属枠体のI字状の凸部を嵌合させ、一体の枠体にできる構造とする。 More specifically, the door frame has a two-part structure consisting of a prefabricated main frame and a prefabricated accessory frame so that it can be mounted without being affected by the progress of the lightweight steel partition wall. The body has a screw-fixed assembling frame structure consisting of two vertical frame members with a U-shaped fitting part, one upper frame member, and one lower frame member, and the attached frame has an I-shape. A screw-fixed assembling frame structure composed of two vertical frame members having a fitting portion and an upper frame, and a U-shaped recess in the main frame and an I-shaped in the attached frame The projecting portion is fitted to form a single frame.

躯体工事の後、基本墨迄完了し、これから軽量鉄骨間仕切り壁下地の施工に取
り掛かる進捗状況において、壁業者に先行して建具業者が扉枠体の取り付けを行う場合、出入り口計画位置にスラブ間支柱部材を建て、まぐさ部材を固定して開口部を形成し、次に、主要枠体および付属枠体用枠体位置決め盤を取り付け、前記スラブ間支柱に対して、建て込み前に組み上げた主要枠体を前記支柱部材に建て込み、枠体の裏面を枠体位置決め盤に当接させ、L字クランプ固定治具で一時締着させ、アングル部材、ねじ部材により固着させる。次に同じく建て込み前に組み上げたI字状の嵌合部を持つ付属枠体のI字状嵌合部先端を前記主要枠体のU字状嵌合部に挿入し、前記支柱部材に建て込み、枠体の裏面を枠体位置決め盤に当接させ、L字クランプ固定治具で一時締着させ、ねじ部材により固着させる。最後に、一体化した枠体の前記主要枠体部に扉の吊り込み及び金物取り付けを行い、開閉調整できるようにしている。
After the frame construction, the basic ink is completed, and in the progress of the construction of the lightweight steel partition wall basement, when the joinery contractor installs the door frame before the wall contractor, the slab post at the planned entrance / exit position Build the member, fix the lintel member to form the opening, then attach the main frame body and the frame positioning board for the attached frame body, and assemble the main frame assembled before the slab support The frame body is built in the support member, the back surface of the frame body is brought into contact with the frame body positioning board, is temporarily fastened by an L-shaped clamp fixing jig, and is fixed by an angle member and a screw member. Next, insert the tip of the I-shaped fitting part of the attached frame having the I-shaped fitting part assembled before building into the U-shaped fitting part of the main frame, and build it on the column member. Then, the rear surface of the frame is brought into contact with the frame positioning board, temporarily fixed with an L-shaped clamp fixing jig, and fixed with a screw member. Lastly, the main frame body portion of the integrated frame body is hung with a door and attached with hardware so that the opening and closing can be adjusted.

壁業者が墨出しに従い、軽量鉄骨間仕切り壁下地の施工完了迄進捗した状態において、建具業者が扉枠体の取り付けを行う場合、前記壁開口補強部材に主要枠体および付属枠体用枠体位置決め盤を取り付け、前記主要枠体の裏面を枠体位置決め盤に当接させ、開口部補強部材に建て込み、L字クランプ固定治具で一時締着し、アングル部材、ねじ部材により固着させる。次にI字状の嵌合部を持つ付属枠体のI字状嵌合部先端を前記主要枠体のU字状嵌合部に挿入し、前記付属枠体の裏面を枠体位置決め盤に当接させ、開口部補強部材に建て込み、L字クランプ固定治具で一時締着させ、ねじ部材により固着させる。最後に、一体化した枠体の前記主要枠体部に扉の吊り込み及び金物取り付けを行い、開閉調整できるようにしている。 In the state where the wall supplier followed the completion of the construction of the lightweight steel partition wall base, when the fitting supplier installs the door frame, the main frame and the attachment frame positioning to the wall opening reinforcement member A board is attached, the back surface of the main frame is brought into contact with the frame body positioning board, built into the opening reinforcing member, temporarily fastened with an L-shaped clamp fixing jig, and fixed with an angle member and a screw member. Next, the tip of the I-shaped fitting portion of the attached frame having an I-shaped fitting portion is inserted into the U-shaped fitting portion of the main frame, and the back surface of the attached frame is used as a frame positioning plate. It is brought into contact with each other, built into the opening reinforcing member, temporarily fastened with an L-shaped clamp fixing jig, and fixed with a screw member. Lastly, the main frame body portion of the integrated frame body is hung with a door and attached with hardware so that the opening and closing can be adjusted.

軽量鉄骨間仕切り壁下地及び開口部補強部材、ボード貼りが半分まで進捗した状態において、建具業者が扉枠体の取り付けを行う場合、前記壁開口補強部材に主要枠体および付属枠体用枠体位置決め盤を取り付け、前記主要枠体の裏面を枠体位置決め盤に当接させ、開口部補強部材に建て込み、L字クランプ固定治具で一時締着し、アングル部材、ねじ部材により固着させる。次にI字状の嵌合部を持つ付属枠体のI字状嵌合部先端を前記主要枠体のU字状嵌合部に挿入し、前記付属枠体の裏面を枠体位置決め盤に当接させ、開口部補強部材に建て込み、L字クランプ固定治具で一時締着させ、ねじ部材により固着させる。最後に、一体化した枠体の前記主要枠体部に扉の吊り込み及び金物取り付けを行い、開閉調整できるようにしている。 Lightweight steel partition wall base and opening reinforcement member, and positioning of the main frame and attached frame body to the wall opening reinforcement member when the fitting supplier installs the door frame body in a state where the pasting of the board has progressed to half A board is attached, the back surface of the main frame is brought into contact with the frame body positioning board, built into the opening reinforcing member, temporarily fastened with an L-shaped clamp fixing jig, and fixed with an angle member and a screw member. Next, the tip of the I-shaped fitting portion of the attached frame having an I-shaped fitting portion is inserted into the U-shaped fitting portion of the main frame, and the back surface of the attached frame is used as a frame positioning plate. It is brought into contact with each other, built into the opening reinforcing member, temporarily fastened with an L-shaped clamp fixing jig, and fixed with a screw member. Lastly, the main frame body portion of the integrated frame body is hung with a door and attached with hardware so that the opening and closing can be adjusted.

本発明の構成によれば、軽量鉄骨間仕切り壁の仕上げ工事において、軽量鉄骨間仕切り壁施工の進捗状況に影響を受けないで、扉枠体の取り付けが可能になる。また壁面を完成させていない開口部に施工する分割扉枠体である組み立て式の主要枠体と組み立て式付属枠体において、主要枠体を前記スラブ間支柱部材又は前記開口補強部材に先付けした枠体位置決め盤に前記枠体の裏面を当接させ、前記開口部に建て込み、L字クランプ固定治具を利用して一時締着して、アングル部材とねじ部材により固着し、U字状勘合部にI字状嵌合部の先端を挿入し、前記開口部に建て込み、L字クランプ固定治具を利用して、一時締着し、ねじ部材により、2分割にした主要枠体及び付属枠体を一体の枠体とし、出入り口建具としての機能及び強度を保持した扉枠体の施工が、溶接すること無く、ビス留めで可能になった。それによって工事の簡素化と短時間化が可能になっている。 According to the configuration of the present invention, the door frame body can be attached without being affected by the progress of the construction of the lightweight steel partition wall in the finishing work of the lightweight steel partition wall. Moreover, in the assembly-type main frame body and the assembly-type accessory frame body which are the divided door frame bodies to be constructed in the opening portion where the wall surface is not completed, a frame in which the main frame body is preceded by the inter-slab strut member or the opening reinforcing member. The back of the frame is brought into contact with the body positioning board, built in the opening, and temporarily fastened using an L-shaped clamp fixing jig, and fixed with an angle member and a screw member, and a U-shaped fitting Insert the tip of the I-shaped fitting part into the part, build it into the opening, temporarily tighten it using an L-shaped clamp fixing jig, and divide it into two parts with a screw member and attached Construction of a door frame that maintains the function and strength as an entrance / exit fitting with the frame as an integral frame has become possible with screws without welding. As a result, construction can be simplified and shortened.

L字クランプ固定治具を利用して、U字状勘合部にI字状嵌合部の先端を挿入して、前記開口部に建て込みが、壁面ボードを取り付けていない場合でも、また不完成な場合でも可能になった。詳しくはスラブ間支柱部材を使い、基本墨の完了後に、軽量鉄骨間仕切り壁業者に先駆けて、扉枠体の取り付けができ、又、軽量鉄骨間仕切り壁の下地施工の完了後でも、扉枠体の取り付けができ、さらには、ボード貼りが半分迄、あるいはボード貼りが完了した壁面開口部にも取り付けできるようになり、スムーズな現場管理が行えるようになった。また壁の進捗状況に影響を受けず、何時でも扉工事が簡単に短時間にできるようになった。 Using the L-shaped clamp fixing jig, the tip of the I-shaped fitting part is inserted into the U-shaped fitting part, and it is not completed even when the wall board is not installed in the opening. It became possible even in any case. Specifically, using the strut members between slabs, after the completion of the basic ink, the door frame can be attached prior to the lightweight steel partition wall supplier, and even after the foundation work of the lightweight steel partition wall is completed, the door frame body It can be attached to the board, and it can be attached to the wall opening that has been pasted to half of the board or the board has been pasted, enabling smooth on-site management. In addition, the door construction can be done easily and quickly at any time without being affected by the progress of the wall.

施工完了壁の仕様が変更になった場合でも、前記壁の開口寸法と同じにすれば、扉、枠体を再利用できる対応性と枠体の分解で、狭い作業場所に最適な保管性を兼ね備えることができる。費用的にも安価にすることが可能となり、また改造期間も短くて済み、非常に経済的に変更対応ができる。出入り口鋼製建具の取り付けが、軽量鉄骨間仕切り壁施工の進捗状況に影響を受けずに可能となった。 Even if the specifications of the construction completion wall are changed, if it is the same as the opening size of the wall, the door and the frame can be reused, and the frame can be disassembled, so that optimum storage can be achieved in a narrow work place. Can be combined. The cost can be reduced and the modification period can be shortened, and the change can be dealt with very economically. The installation of doorway steel fittings became possible without being affected by the progress of construction of lightweight steel partition walls.

墨出しの完了した軽量鉄骨間仕切り壁出入り口計画位置にスラブ間支柱部材を建て、前記支柱開口部に対して枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の終えた状態を示す正面図 Aは前記主要枠体の枠体裏面を枠体位置決め盤に当接させ、建て込み、L字クランプ固定治具を利用して前記支柱開口部に締着した状態の正面図。 Bは軽量鉄骨間仕切り壁出入り口計画位置に壁業者の施工より先に扉枠体を取り付けした正面図 Cは前記支柱開口部に枠体位置決め盤を取り付けした状態の拡大図 Dは前記主要枠体をL字クランプ固定治具により一時締着させた状態の拡大図A strut member between slabs is built at the planned position of the lightweight steel partition wall entrance and exit where ink marking is completed, a frame positioning board is attached to the opening of the column, and the main frame and the attached frame are fixed to an L-shaped clamp. A front view showing a state after being temporarily fastened and then fixed, suspended in the door, and mounting and adjustment of the hardware.A is a structure in which the rear surface of the main frame is brought into contact with the frame positioning board, and built. The front view of the state clamp | tightened to the said support | pillar opening using an L-shaped clamp fixing jig. B is a front view in which a door frame is attached at the planned position of the light steel partition wall entrance and exit from the wall supplier. C is an enlarged view of a state in which a frame positioning board is attached to the support opening. D is the main frame. Enlarged view of the state of being temporarily tightened with an L-shaped clamp fixture 軽量鉄骨間仕切り壁出入り口計画位置に軽量鉄骨下地及び開口部補強部材の施工完了後、前記開口部補強部材に対して、枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の終えた状態を示す正面図。 Aは前記主要枠体の枠体裏面を枠体位置決め盤に当接させ、建て込み、L字クランプ固定治具を利用して前記開口部補強部材に締着した状態の正面図 Bは軽量鉄骨間仕切り壁出入り口開口部の施工完了後、前記開口部に扉枠体を取り付けした正面図 Cは前記壁開口部に枠体位置決め盤を取り付けした状態の拡大図 Dは前記主要枠体をL字クランプ固定治具により一時締着させた状態の拡大図After completion of the construction of the lightweight steel base and opening reinforcement member at the planned position of the lightweight steel partition wall entrance / exit, a frame positioning board is attached to the opening reinforcement member, and the main frame and the attached frame are clamped in an L shape. The front view which shows the state which after adhering temporarily with a fixing jig, adhering, door hanging, attachment of a hardware, and adjustment were completed. A is a front view of a state in which the rear surface of the main frame is brought into contact with the frame positioning board, built, and fastened to the opening reinforcing member using an L-shaped clamp fixing jig. After completion of the partition wall entrance / exit opening, a front view with a door frame attached to the opening C is an enlarged view with a frame positioning board attached to the wall opening D is an L-shaped clamp for the main frame Enlarged view of the state temporarily tightened with a fixture 軽量鉄骨間仕切り壁出入り口計画位置に軽量鉄骨下地及び開口部補強部材の施工完了後、ボード貼りの施工途中の出入り口開口部に対して、ボード貼り未施工部分に枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の終えた状態を示す正面図。 Aは前記主要枠体を建て込み、L字クランプ固定治具を利用して前記開口部補強部材に締着した状態の正面図 Bは軽量鉄骨間仕切り壁出入り口開口部にボード貼り施工中、前記開口部に扉枠体を取り付けした正面図 Cはボード未施工部の壁開口部に枠体位置決め盤を取り付けした状態の拡大図 Dは前記主要枠体をL字クランプ固定治具により一時締着させた状態の拡大図After completion of the construction of the lightweight steel base and opening reinforcement member at the planned position of the lightweight steel partition wall entrance / exit, a frame positioning board is attached to the unopened part of the board for the entrance / exit opening in the middle of the pasting of the board. FIG. 3 is a front view showing a state in which the body and the attached frame body are temporarily fastened by an L-shaped clamp fixing jig and then fixed, and the door is hung and the attachment and adjustment of hardware are finished. A is a front view showing a state in which the main frame is built and fastened to the opening reinforcement member using an L-shaped clamp fixing jig. Front view with the door frame attached to the part C is an enlarged view of the state where the frame positioning board is attached to the wall opening of the unworked part of the board D is the temporary fastening of the main frame with the L-shaped clamp fixing jig Enlarged view 軽量鉄骨間仕切り壁の進捗状況に応じた扉枠体を取り付ける作業手順を示す鳥瞰図Aは墨出しの完了した軽量鉄骨間仕切り壁出入り口計画位置にスラブ間支柱部材を建て、前記支柱開口部に対して枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の手順を示す鳥瞰図。Bは軽量鉄骨間仕切り壁出入り口計画位置に軽量鉄骨下地及び開口部補強部材の施工完了後、その開口部補強部材に対して、枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後固着し、扉吊り込み、金物の取り付け及び調整の作業手順を示す鳥瞰図である。A bird's-eye view A showing a work procedure for attaching a door frame body in accordance with the progress of the lightweight steel partition wall is a strut member between slabs built at the planned position of the lightweight steel partition wall entrance and exit where ink marking has been completed. A bird's-eye view showing a procedure of attaching a body positioning board, temporarily fastening the main frame body and the attached frame body with an L-shaped clamp fixing jig, then fixing the main frame body and the attached frame body, hanging the door, attaching and adjusting hardware. B, after completing the construction of the lightweight steel base and the opening reinforcing member at the planned position of the lightweight steel partition wall entrance, attach a frame positioning board to the opening reinforcing member, and attach the main frame and the attached frame to the L It is a bird's-eye view which shows the work procedure of adhering after temporarily fastening with a character clamp fixing jig, hanging a door, attaching and adjusting hardware. 出入り口開口部に枠体位置決め盤をねじ部材により固着、前記主要枠体を建て込み、L字クランプ固定治具を利用して一時締着し、アングル部材、ねじ部材により固着し、次に前記付属枠体を建て込み、L字クランプ固定治具を利用して一時締着し、ねじ部材により固着する手順を示す詳細図。Aはスラブ間支柱部材を建て、前記部材で形成された開口部に枠体位置決め盤をねじ部材により固着し、前記主要枠体を枠体裏面が枠体位置決め盤に当接する迄押し当て、L字クランプ固定治具で一時締着し、アングル部材及びねじ部材により、固着する作業工程を示す縦詳細図。Bは前記作業工程により固着された前記主要枠体を示す縦詳細図。Cは取り付けの完了した前記主要枠体に前記付属枠体を前記開口部の反対側から挿入し、枠体裏面が枠体位置決め盤に当接する迄押し付け、L字クランプ固定治具で一時締着し、ねじ部材により固着する作業工程を示す縦詳細図。Dは出入り口開口部に対して、前記主要枠体及び前記付属枠体を開口部補強部材に固着し、一体の枠体として施工が完了した縦詳細図。A frame positioning board is fixed to the entrance / exit opening with a screw member, the main frame is built, temporarily tightened using an L-shaped clamp fixing jig, and fixed with an angle member and a screw member, and then attached. The detailed figure which shows the procedure in which a frame is built, it fastens temporarily using an L-shaped clamp fixing jig, and it adheres with a screw member. A is a strut member between the slabs, a frame positioning board is fixed to the opening formed by the member with a screw member, and the main frame is pressed until the back of the frame abuts the frame positioning board. The longitudinal detail figure which shows the operation | work process which fastens temporarily with a character clamp fixing jig and adheres with an angle member and a screw member. B is a longitudinal detail view showing the main frame fixed by the work process. C inserts the attached frame body into the main frame body that has been attached from the opposite side of the opening, presses the back surface of the frame body until it contacts the frame body positioning board, and temporarily tightens it with an L-shaped clamp fixing jig. FIG. 3 is a longitudinal detail view showing an operation process of fixing with a screw member. D is a longitudinal detail view showing that the main frame and the attached frame are fixed to the opening reinforcing member with respect to the entrance / exit opening, and the construction is completed as an integral frame. 墨出しの完了した軽量鉄骨間仕切り壁出入り口計画位置にスラブ間支柱部材を建て、前記支柱開口部材に対して枠体位置決め盤を取り付け、次にL字クランプ固定治具を利用し、前記主要枠体及び前記付属枠体を一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の作業手順を示す縦断面詳細図 Aはスラブ間にブラケットを利用し、支柱部材を建て、前記支柱部材にまぐさ部材を固定し、開口部を形成した状態を示す縦断面詳細図。 Bは前記支柱開口部材に枠体位置決め盤をねじ部材の利用により固着する手順を示す縦断面詳細図。 Cは前記支柱開口部に前記主要枠体の枠体裏面を前記枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により、一時締着し、アングル部材及びねじ部材を利用し、固着する縦断面詳細図 Dは開口部の反対側から前記付属枠体を挿入し、枠体裏面を枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により一時締着し、ねじ部材により固着し、一体枠を形成する縦断面詳細図。 Eは前記分離枠体の取り付け作業が完了し、一体とした枠体に扉を吊り込み、取り付け作業が終了した状態の縦断面詳細図A strut member between slabs is built at the planned entrance and exit position of the lightweight steel partition wall where ink marking has been completed, a frame positioning board is attached to the column opening member, and then an L-shaped clamp fixing jig is used to A vertical cross-sectional detail view showing the work procedure of fixing the attached frame body after being temporarily fastened, hanging it, hanging the door, and mounting and adjusting the hardware. The longitudinal cross-section detailed drawing which shows the state which fixed the lintel member to the member and formed the opening part. B is a detailed longitudinal sectional view showing a procedure for fixing a frame positioning board to the support opening member by using a screw member. C is built by pressing the frame back of the main frame against the frame positioning board at the column opening, temporarily tightened with an L-shaped clamp fixing jig, and using an angle member and a screw member, Detail of vertical cross section to be fixed D is the attachment frame is inserted from the opposite side of the opening, the back surface of the frame is pressed against the frame positioning board, and is temporarily tightened with an L-shaped clamp fixing jig. The longitudinal cross-section detailed drawing which adheres by a member and forms an integral frame. E is a detailed longitudinal sectional view of the state in which the mounting operation of the separation frame is completed, the door is hung on the integrated frame, and the mounting operation is completed. 墨出しの完了した軽量鉄骨間仕切り壁出入り口計画位置にスラブ間支柱部材を建て、前記支柱開口部材に対して枠体位置決め盤を取り付け、次にL字クランプ固定治具を利用し、前記主要枠体及び前記付属枠体を一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の作業手順を示す横断面詳細図 Aはスラブ間にブラケットを利用し、支柱部材を建て、前記支柱部材に枠体位置決め盤を固着する手順を示す横断面詳細図。 Bは前記支柱開口部に前記主要枠体の枠体裏面を前記枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により、一時締着し、アングル部材及びねじ部材により、固着する横断面詳細図 Cは開口部補強部材の反対側から前記付属枠体を挿入し、枠体裏面を枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により一時締着し、ねじ部材により固着し、一体枠とする横断面詳細図。 Dは前記分離枠体の取り付け作業が完了し、一体とした枠体に扉を吊り込み、取り付け作業が終了した状態の横断面詳細図A strut member between slabs is built at the planned entrance and exit position of the lightweight steel partition wall where ink marking has been completed, a frame positioning board is attached to the column opening member, and then an L-shaped clamp fixing jig is used to And a detailed cross-sectional view showing the work procedure of fixing, attaching, adjusting the door, and attaching and adjusting the hardware after the attachment frame body is temporarily fastened. The cross-sectional detail drawing which shows the procedure which adheres a frame positioning board to a member. B is built by pressing the back side of the main frame against the frame positioning board at the column opening, temporarily tightened with an L-shaped clamp fixing jig, and fixed with an angle member and a screw member. Detailed cross-sectional view C shows that the attached frame body is inserted from the opposite side of the opening reinforcing member, the back surface of the frame body is pressed against the frame body positioning board, and is temporarily fastened by an L-shaped clamp fixing jig. The cross-sectional detail figure which adheres by a member and makes it an integral frame. D is a detailed cross-sectional view of the state in which the attaching operation of the separation frame is completed, the door is hung on the integrated frame, and the attaching operation is completed. 軽量鉄骨間仕切り壁出入り口計画位置に軽量鉄骨下地及び開口部補強部材の施工完了後、その開口部補強部材に対して、枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の作業手順を示す縦断面詳細図。 Aは前記開口部補強部材に枠体位置決め盤をねじ部材の利用により固着する手順を示す縦断面詳細図。 Bは前記開口部補強部材に前記主要枠体の枠体裏面を前記枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により、一時締着し、アングル部材及びねじ部材を利用し、固着する縦断面詳細図 Cは前記開口部の反対側から前記付属枠体を挿入し、枠体裏面を枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により一時締着し、ねじ部材により固着し、一体枠を形成する縦断面詳細図。 Dは前記分離枠体の取り付け作業が完了し、一体とした枠体に扉を吊り込み、取り付け作業が終了した状態の縦断面詳細図After completion of the construction of the lightweight steel base and opening reinforcement member at the planned position of the lightweight steel partition wall entrance / exit, a frame positioning board is attached to the opening reinforcement member, and the main frame and the attached frame are clamped in an L shape. The longitudinal cross-section detail drawing which shows the work procedure of adhering, door hanging, attachment of a hardware, and adjustment after temporarily fastening with a fixing jig. A is a longitudinal cross-sectional detail drawing which shows the procedure which adheres a frame-positioning board to the said opening part reinforcement member by utilization of a screw member. B is built by pressing the back side of the main frame against the frame positioning board on the opening reinforcing member, and temporarily tightening with an L-shaped clamp fixing jig, and using an angle member and a screw member. Detailed view of the vertical cross section to be fixed C shows the insertion of the attached frame body from the opposite side of the opening, the back surface of the frame body is pressed against the frame body positioning board, and is temporarily fastened by an L-shaped clamp fixing jig. FIG. 3 is a detailed longitudinal sectional view that is fixed by a screw member to form an integral frame. D is a detailed longitudinal sectional view of the state in which the mounting operation of the separation frame is completed, the door is hung on the integrated frame, and the mounting operation is completed. 軽量鉄骨間仕切り壁出入り口計画位置に軽量鉄骨下地及び開口部補強部材の施工完了後、その開口部補強部材に対して、枠体位置決め盤を取り付け、前記主要枠体及び前記付属枠体をL字クランプ固定治具により一時締着した後、固着し、扉吊り込み、金物の取り付け及び調整の作業手順を示す横断面詳細図。 Aは前記開口部補強部材に枠体位置決め盤をねじ部材の利用により固着する手順を示す横断面詳細図。 Bは前記開口部補強部材に前記主要枠体の枠体裏面を前記枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により、一時締着し、アングル部材及びねじ部材により、固着する横断面詳細図 Cは開口部補強部材の反対側から前記付属枠体を挿入し、枠体裏面を枠体位置決め盤に押し当てて建て込み、L字クランプ固定治具により一時締着し、ねじ部材により固着し、一体枠とする横断面詳細図。 Dは前記分離枠体の取り付け作業が完了し、一体とした枠体に扉を吊り込み、取り付け作業が終了した状態の横断面詳細図After completion of the construction of the lightweight steel base and opening reinforcement member at the planned position of the lightweight steel partition wall entrance / exit, a frame positioning board is attached to the opening reinforcement member, and the main frame and the attached frame are clamped in an L shape. FIG. 3 is a detailed cross-sectional view showing a work procedure for fixing, temporarily hanging a door, attaching a hardware, and adjusting after temporarily fastening with a fixing jig. A is a cross-sectional detail drawing which shows the procedure which adheres a frame positioning board to the said opening part reinforcement member by utilization of a screw member. B is built by pressing the frame back of the main frame against the frame positioning board on the opening reinforcing member, and temporarily tightening with an L-shaped clamp fixing jig, and fixing with an angle member and a screw member Detailed cross-sectional view C is to insert the attached frame body from the opposite side of the opening reinforcing member, press the back surface of the frame body against the frame body positioning board, and temporarily tighten it with an L-shaped clamp fixing jig, The cross-sectional detail figure which adheres with a screw member and makes it an integral frame. D is a detailed cross-sectional view of the state in which the attaching operation of the separation frame is completed, the door is hung on the integrated frame, and the attaching operation is completed. 枠体位置決め盤の固定型HW1、HW2の詳細を示した三角法図及び鳥瞰図である。 Aは枠体位置決め盤HW1の平面図 Bは枠体位置決め盤HW1の断面図 Cは枠体位置決め盤HW1の側面図 Dは枠体位置決め盤HW1の鳥瞰図 Eは枠体位置決め盤HW2の平面図 Fは枠体位置決め盤HW2の断面図 Gは枠体位置決め盤HW2の側面図 Hは枠体位置決め盤HW2の鳥瞰図It is the triangulation figure and the bird's-eye view which showed the detail of fixed mold | type HW1 and HW2 of a frame body positioning board. A is a plan view of the frame positioning board HW1 B is a cross-sectional view of the frame positioning board HW1, C is a side view of the frame positioning board HW1, D is a bird's-eye view of the frame positioning board HW1, and E is a plan view of the frame positioning board HW2. Is a sectional view of the frame positioning board HW2. G is a side view of the frame positioning board HW2. H is a bird's-eye view of the frame positioning board HW2. 枠体位置決め盤取り外し型のセット状態を示す鳥瞰図 Aはスラブ間支柱部材に枠体位置決め盤取り外し型HW3をセットした状態を示す鳥瞰図 Bは軽量鉄骨間仕切り壁開口部開口補強部材に枠体用位置決め盤取り外し型HW3をセットした状態を示す鳥瞰図 Cは前記枠体用枠体位置決め盤取り外し型を拡大した鳥瞰図A bird's-eye view showing a set state of the frame positioning board detachable type A is a bird's-eye view showing a state where the frame body positioning board detachable type HW3 is set on a strut member between slabs. B is a positioning board for a frame body on a lightweight steel partition wall opening opening reinforcing member. A bird's-eye view showing a state in which the detachable type HW3 is set C is a bird's-eye view in which the frame body positioning board detachable type is enlarged.

以下、本発明の扉枠構造体の実施形態を、図面を参照して説明する。図1、図2及び図3は軽量鉄骨間仕切り壁の進捗状態に応じた扉枠体の取り付け手順を示す立面姿図である。 Hereinafter, an embodiment of a door frame structure of the present invention will be described with reference to the drawings. 1, 2, and 3 are elevational views showing a procedure for attaching the door frame according to the progress of the lightweight steel partition wall.

図1及び図4−Aは躯体工事が終わり、基本墨を元に出入り口計画部墨出し迄完了し、壁業者による軽量鉄骨間仕切り壁下地の施工に入る進捗状況において、壁業者に先行して建具業者が扉枠体の取り付けを行うとした場合、出入り口開口部計画位置にスラブ間支柱部材を建て、次にまぐさ部材を取り付け、出入り口開口部を形成し、前記開口部に対して枠体位置決め盤をねじ部材により固定し、さらに前記主要枠体を被せるように建て込み、前記主要枠体の枠裏面を枠体位置決め盤に当接させ、L字クランプ固定治具を利用し、一時締着させ、アングル部材及びねじ部材により固着させる。次に前記開口部の反対側より、略J字状の前記付属枠体のI字状勘合部先端を前記主要枠体のU字状勘合部に挿入させて建て込み、その際、前記付属枠体の枠裏面と枠体位置決め盤とを当接させ、L字クランプ固定治具を利用し、一時締着させ、ねじ部材により固着させる。最後に一体に形成した枠体の前記主要枠体部に扉を吊り込み、金物取り付け及び調整を行う手順図である。 Fig. 1 and Fig. 4-A show that the construction work has been completed and the entrance / exit planning section has been completed based on the basic black ink. If the contractor installs the door frame, the strut member between the slabs is built at the planned entrance / exit opening position, then the lintel member is attached, the entrance / exit opening is formed, and the frame is positioned relative to the opening. The board is fixed with a screw member, and is further built so as to cover the main frame body. The frame rear surface of the main frame body is brought into contact with the frame body positioning board, and is temporarily tightened using an L-shaped clamp fixing jig. And fixed by an angle member and a screw member. Next, from the opposite side of the opening, the front end of the I-shaped fitting portion of the substantially J-shaped attachment frame body is inserted into the U-shaped fitting portion of the main frame body, The frame rear surface of the body and the frame positioning board are brought into contact with each other, temporarily tightened using an L-shaped clamp fixing jig, and fixed by a screw member. It is the procedure figure which hangs a door in the said main frame part of the frame formed integrally at the end, and performs metal fitting attachment and adjustment.

図2及び図4−Bは躯体工事後、壁業者が墨出しに従い軽量鉄骨間仕切り下地の施工が終えた進捗状況において、建具業者が扉枠体の取り付けを行うとした場合、前記壁開口部補強部材に対し、枠体位置決め盤をねじ部材により固定し、さらに前記主要枠体を被せるように建て込み、前記主要枠体の枠裏面を枠体位置決め盤に当接させ、L字クランプ固定治具を利用し、一時締着させ、アングル部材及びねじ部材により固着させる。次に前記開口部の反対側より、略J字状の付属枠体のI字状勘合部先端を前記主要枠体のU字状勘合部に挿入させて建て込み、その際、前記付属枠体の枠裏面と枠体位置決め盤とを当接させ、L字クランプ固定治具を利用し、一時締着させ、ねじ部材により固着させる。最後に一体に形成した枠体の前記主要枠体部に扉を吊り込み、金物取り付け及び調整を行う手順図である。 Fig. 2 and Fig. 4-B show the wall opening reinforcement when the joiner installs the door frame body in the progress situation after the construction of the lightweight steel partition after the construction of the frame. An L-shaped clamp fixing jig is fixed to the member by fixing the frame positioning plate with a screw member, and further erected so as to cover the main frame, with the frame rear surface of the main frame contacting the frame positioning plate. Are temporarily tightened and fixed by an angle member and a screw member. Next, from the opposite side of the opening, the front end of the I-shaped fitting portion of the substantially J-shaped attachment frame is inserted and built into the U-shaped fitting portion of the main frame. The frame back surface and the frame body positioning board are brought into contact with each other, temporarily tightened using an L-shaped clamp fixing jig, and fixed by a screw member. It is the procedure figure which hangs a door in the said main frame part of the frame formed integrally at the end, and performs metal fitting attachment and adjustment.

図3は軽量鉄骨間仕切り壁下地及び開口部補強部材の施工終了し、ボード貼りが進行中の進捗状態において、建具業者が扉枠体の取り付けを行うとした場合、前記壁開口部に対して、枠体位置決め盤をねじ部材により固定し、さらに前記主要枠体を被せるように建て込み、前記主要枠体を壁面、もしくは枠体裏面を枠体位置決め盤に当接させ、L字クランプ固定治具を利用し、一時締着させ、アングル部材及びねじ部材により固着させる。次に前記開口部の反対側より、略J字状の前記付属枠体のI字状勘合部先端を前記主要枠体のU字状勘合部に挿入させて建て込み、その際、前記付属枠体を壁面、もしくは枠体裏面を枠体位置決め盤に当接させ、L字クランプ固定治具を利用し、一時締着させ、ねじ部材により固着させる。最後に一体に形成した枠体の前記主要枠体部に扉を吊り込み、金物取り付け及び調整の完了した立面図である。 FIG. 3 shows the completion of the construction of the lightweight steel partition wall base and the opening reinforcing member, and in the progress state where the board is being pasted, when the joinery contractor installs the door frame body, The frame positioning board is fixed with a screw member, and is further built so as to cover the main frame body. The main frame body is brought into contact with the wall surface or the back side of the frame body to the frame positioning board, and an L-shaped clamp fixing jig Are temporarily tightened and fixed by an angle member and a screw member. Next, from the opposite side of the opening, the front end of the I-shaped fitting portion of the substantially J-shaped attachment frame body is inserted into the U-shaped fitting portion of the main frame body, The body is brought into contact with the wall surface or the back surface of the frame body to the frame body positioning board, is temporarily fastened using an L-shaped clamp fixing jig, and is fixed by a screw member. FIG. 5 is an elevational view in which a door is hung on the main frame body portion of the frame body formed integrally at the end, and hardware attachment and adjustment are completed.

図5は枠体位置決め盤、L字クランプ固定治具の役目や重要性及び使用状況、さらに、アングル部材、及びねじ部材の利用箇所及び施工順序を示し、出入り口開口部の仕上がり状態にかかわらず、取り付けを可能にしていることを示す詳細図である。図6及び図7は躯体工事完了後、基本墨を元に出入り口計画部墨出し迄完了し、壁業者による軽量鉄骨間仕切り壁下地の施工に移る進捗状態において、壁業者に先行して建具業者が扉枠体の取り付けを行うとした場合の枠体位置決め盤の取り付け詳細、L字クランプ固定治具の利用状態図、及びアングル部材、ねじ部材を利用し、固着した前記主要枠体と前記付属枠体及び扉の施工手順及び施工完了図を示す縦断面詳細図及び横断面詳細図である。 FIG. 5 shows the role and importance of the frame positioning board, L-shaped clamp fixing jig, the usage status, the usage location and construction sequence of the angle member and screw member, regardless of the finished state of the entrance / exit opening, It is detail drawing which shows having enabled attachment. 6 and 7 show that after the completion of the frame construction, the completion of the entrance / exit planning section based on the basic black ink is completed, and in the progress state of the construction work for the lightweight steel partition wall basement by the wall supplier, Details of installation of the frame body positioning board when attaching the door frame body, utilization state diagram of the L-shaped clamp fixing jig, and the main frame body and the attached frame fixed using the angle member and the screw member It is the longitudinal cross-section detailed view and the cross-sectional detailed view which show the construction procedure and construction completion figure of a body and a door.

図8及び図9は躯体工事完了後、壁業者が墨出しに従い軽量鉄骨間仕切り下地及び開口部補強部材の施工が終えた進捗状態において、建具業者が扉枠体の取り付けを行うとした場合の枠体位置決め盤の取り付け詳細図、L字クランプ固定治具の利用状態図、及びアングル部材、ねじ部材を利用し、固着した前記主要枠体と前記付属枠体及び扉の施工手順図及び施工完了図を示す縦断面詳細図及び横断面詳細図である。 FIGS. 8 and 9 show the frame when the joiner installs the door frame in the progress state in which the wall supplier has finished the construction of the lightweight steel partition partition base and the opening reinforcement member after completion of the frame construction. Detailed installation diagram of body positioning board, utilization state diagram of L-shaped clamp fixing jig, construction procedure diagram and construction completion diagram of main frame, attached frame and door fixed using angle member and screw member It is the longitudinal cross-section detail drawing and horizontal cross-section detail drawing which show.

枠体位置決め盤は、固定型と取り外し型の2種が有り、図10は前記固定型のHW1及びHW2形状を表した図で、固定型は枠体取り付け後、壁内に取り付けたままにするタイプである。又図11のAとBは取り外し型HW3のセット位置及びセット状態を示す図面で、Cは枠体位置決め盤取り外し型HW3の拡大図である。枠体位置決め盤取り外し型は、電磁石の座と当接面を持ち、当接面位置調整可能な本体とを組み合わせた形状にし、繰り返し利用できるようにしている。 There are two types of frame positioning boards: fixed type and detachable type. FIG. 10 is a diagram showing the shape of HW1 and HW2 of the fixed type, and the fixed type remains attached to the wall after the frame is attached. Type. 11A and 11B are drawings showing the setting position and setting state of the detachable type HW3, and C is an enlarged view of the frame positioning board detachable type HW3. The frame positioning board detachable type has a shape combining an electromagnet seat and a contact surface, and a main body capable of adjusting the contact surface position, and can be used repeatedly.

前記主要枠体及び前記付属枠体はJISG3302溶融亜鉛めっき鋼板の板厚1.6mm又は2.3mmの材料を使用し、枠体の内法寸法を0.6m×2.1mの矩形状にし、前記主要枠体は縦枠部材2本、上枠部材1本、下枠部材1本で構成し、前記付属枠体は縦枠部材2本、上枠部材1本で構成し、組み立て型にして製品化をした。又、スラブ間支柱部材2本、まぐさ部材1本、枠体位置決め盤10個を製作した。仮組み立て状態で社内検査を終え、分解し、組立部材番号通りに梱包し、発送した。 The main frame and the attached frame are made of a JISG3302 hot-dip galvanized steel plate having a thickness of 1.6 mm or 2.3 mm, and the inner dimensions of the frame are made into a rectangular shape of 0.6 m × 2.1 m, The main frame is composed of two vertical frame members, one upper frame member, and one lower frame member, and the accessory frame is composed of two vertical frame members and one upper frame member. Commercialized. In addition, two strut-to-slab support members, one lintel member, and 10 frame positioning boards were manufactured. In-house inspection was completed in the pre-assembled state, disassembled, packed according to assembly member number, and shipped.

現場にて荷受け後、仮置きし、基本墨より、軽量鉄骨間仕切り壁出入り口開口部計画位置をレーザーの利用により、墨出しを行った。前記開口部位置にスラブ間支柱部材を建て、次にまぐさ部材を取り付け、開口部を形成し、枠体位置決め盤10個をレーザーにて、位置を確認しながら取り付けした。短時間で枠体取り付け下地の準備ができた。 After receiving the goods on site, they were temporarily placed, and the ink was drawn out from the basic ink using the laser at the planned opening position of the light steel partition wall entrance / exit. A strut member between slabs was built at the opening position, then a lintel member was attached, an opening was formed, and 10 frame positioning boards were attached while confirming the position with a laser. The frame mounting base was ready in a short time.

次に部材状態で搬入した前記主要枠体を組立て、開口部に建て込み、枠体位置決め盤に枠体裏面を当接させ、L字クランプ固定治具により一時締着、保持し、前記主要枠体アンカー部にアングル部材を突き当て、ねじ部材により支柱部材に固着した。次に反対側から、略J字状の前記付属枠体のI字状勘合部先端を前記主要枠体のU字状勘合部に挿入し、開口部に建て込み、枠体位置決め盤に枠体裏面を当接させ、L字クランプ固定治具で一時締着し、ねじ部材により固着させた。最後に一体化させた枠体の前記主要枠体部に扉の吊り込みをおこなったが安定した枠体になったことを確認できた。 Next, the main frame carried in the member state is assembled, built in the opening, the frame rear surface is brought into contact with the frame positioning board, and temporarily fastened and held by an L-shaped clamp fixing jig. An angle member was abutted against the body anchor part, and was fixed to the column member by a screw member. Next, from the opposite side, the front end of the I-shaped fitting portion of the substantially J-shaped attached frame is inserted into the U-shaped fitting portion of the main frame, built into the opening, and the frame is placed on the frame positioning board. The back surface was brought into contact, and was temporarily fastened with an L-shaped clamp fixing jig and fixed with a screw member. Finally, the door was hung on the main frame portion of the integrated frame, but it was confirmed that the frame was stable.

また扉開閉時の扉重心の移動により枠体にかかるひずみ力及びねじれ力や扉閉鎖時の衝撃力に対する強度も確認できた。最後に金物取り付け及び開閉状態の調整を行い、すべての作業を終了した。後日、壁業者による軽量鉄骨間仕切り壁の下地からボード貼り施工迄完了したことを確認した。何も問題点の指摘は受けなかった。 Moreover, the strength against the distortion force and torsional force applied to the frame by the movement of the center of gravity of the door when opening and closing the door and the impact force when closing the door could be confirmed. Finally, the hardware was attached and the open / closed state was adjusted, and all operations were completed. At a later date, it was confirmed that the work from the foundation of the lightweight steel partition wall to the board pasting by the wall supplier was completed. No problems were pointed out.

実施例1と同様に、前記主要枠体及び前記付属枠体はJISG3302溶融亜鉛めっき鋼板の板厚1.6mm又は2.3mmの材料を使用し、枠体の内法寸法を0.8m×2.0mの矩形状にし、前記主要枠体は縦枠部材2本、上枠部材1本、下枠部材1本で構成し、前記付属枠体は縦枠部材2本、上枠部材1本で構成し、組み立て型にして製品化をした。又枠体位置決め盤12個を製作した。仮組み立てをし、社内検査を終えた後、部材組立番号通りに梱包し、発送した。 As in Example 1, the main frame and the attached frame are made of a JISG3302 hot-dip galvanized steel sheet having a thickness of 1.6 mm or 2.3 mm, and the internal dimensions of the frame are 0.8 m × 2 The main frame is composed of two vertical frame members, one upper frame member, and one lower frame member, and the attached frame is composed of two vertical frame members and one upper frame member. Composed and commercialized as an assembly type. In addition, 12 frame positioning boards were manufactured. After temporary assembly and in-house inspection, they were packed and shipped according to the assembly number.

現場にて荷受け後、仮置きし、ねじ部材固定取り付けの準備をした。最初に軽量鉄骨間仕切り壁開口補強部材に枠体位置決め盤12個をレーザーにて、位置を確認しながら取り付けし、次に部材状態で搬入した前記主要枠体及び前記付属枠体をねじ部材で組立した。前記主要枠体を前記開口部に建て込み、枠体裏面を枠体位置決め盤に当接させ、L字クランプ固定治具により一時締着、保持し、主要枠体アンカー部にアングル部材を突き当て、ねじ部材により前記壁開口補強部材に固着した。さらに反対側から、略J字状の前記付属枠体のI字状勘合部の先端を前記主要枠体のU字状勘合部に挿入し、前記開口部に建て込み、枠体裏面を枠体位置決め盤に当接させ、L字クランプ固定治具で一時締着し、この状態でねじ部材により固着させた。 After receiving the cargo on site, it was temporarily placed and prepared for fixing the screw member. First, 12 frame positioning plates are attached to the lightweight steel partition wall opening reinforcing member while confirming the position with a laser, and then the main frame and the attached frame carried in the member state are assembled with screw members. did. The main frame is built in the opening, the back of the frame is brought into contact with the frame positioning board, temporarily tightened and held by an L-shaped clamp fixing jig, and the angle member is abutted against the main frame anchor The wall opening reinforcing member was fixed by a screw member. Further, from the opposite side, the tip of the I-shaped fitting portion of the substantially J-shaped attached frame is inserted into the U-shaped fitting portion of the main frame, built into the opening, and the back surface of the frame is framed It was brought into contact with the positioning board, temporarily fastened with an L-shaped clamp fixing jig, and fixed in this state with a screw member.

最後に一体化させた枠体の前記主要枠体部に扉の吊り込みを行い、安定した枠体になったことを確認できた。また扉開閉時の扉重心の移動により枠体にかかるひずみ力及びねじれ力や扉閉鎖時の衝撃力に対して強度を確保できた。最後に金物取り付け及び開閉状態の調整を行い、作業を終了した。短時間で扉枠体取り付け及び扉の吊り込み、開閉調整が完了した。後日、壁業者による軽量鉄骨間仕切り壁のボード貼り完了を確認した。何も問題点の指摘は受けなかった。 Finally, the door was hung on the main frame portion of the integrated frame, and it was confirmed that the frame was stable. In addition, the strength of the strain and twisting force applied to the frame body and the impact force when the door was closed were secured by the movement of the center of gravity of the door when the door was opened and closed. Finally, the hardware was attached and the open / closed state was adjusted, and the work was completed. In a short time, the door frame attachment, door suspension, and opening / closing adjustment were completed. At a later date, it was confirmed by the wall supplier that the lightweight steel partition wall had been pasted onto the board. No problems were pointed out.

実施例1と同様に、前記主要枠体及び前記付属枠体はJISG3302溶融亜鉛めっき鋼板の板厚1.6mm又は2.3mmの材料を使用し、枠体の内法寸法を0.9m×2.1mの矩形状にし、前記主要枠体は縦枠部材2本、上枠部材1本、下枠部材1本で構成し、前記付属枠体は縦枠部材2本、上枠部材1本で構成し、組み立て型にして製品化をした。又枠体位置決め盤6個を製作した。仮組み立てをし、社内検査を終えた後、組立部材を番号通りに分解して梱包し、発送した。 As in Example 1, the main frame and the attached frame are made of a JISG3302 hot-dip galvanized steel sheet having a thickness of 1.6 mm or 2.3 mm, and the inner dimensions of the frame are 0.9 m × 2 The main frame is composed of two vertical frame members, one upper frame member, and one lower frame member, and the attached frame is composed of two vertical frame members and one upper frame member. Composed and commercialized as an assembly type. In addition, six frame positioning boards were manufactured. After the temporary assembly and in-house inspection, the assembly members were disassembled and packed according to the numbers and shipped.

現場にて荷受け後、仮置きし、扉枠体をねじ部材により、取り付けする段取りをした。ボード貼り最中の進捗状況の軽量鉄骨間仕切り壁開口部補強部材のボード貼り未施工位置に枠体位置決め盤6個をレーザーにて、位置を確認しながら取り付けし、次に部材状態で搬入した前記主要枠体及び前記付属枠体をねじ部材で組立した。 After receiving the goods at the site, it was temporarily placed, and the door frame body was set up with screw members. The frame positioning board 6 was attached to the board non-working position of the lightweight steel partition wall opening reinforcing member in the progress state during board pasting while confirming the position with a laser, and then carried in the member state The main frame and the attached frame were assembled with screw members.

前記主要枠体を開口部に建て込み、貼り終わったボード面及び枠体位置決め盤に枠体を当接させ、L字クランプ固定治具により一時締着、保持し、前記主要枠体アンカー部にアングル部材を突き当て、ねじ部材により前記壁開口補強部材に固着した。さらに反対側から、略J字状の前記付属枠体のI字状勘合部先端を前記主要枠体のU字状勘合部に挿入し、開口部に建て込み、貼り終わったボード面及び枠体位置決め盤に枠体を当接させ、L字クランプ固定治具で一時締着し、この状態でねじ部材により固着させた。最後に一体化させた枠体の前記主要枠体部に扉の吊り込みを行い、安定した枠体になったことを確認できた。 The main frame is built in the opening, the frame is brought into contact with the finished board surface and the frame positioning board, and is temporarily fastened and held by an L-shaped clamp fixing jig. The angle member was abutted and fixed to the wall opening reinforcing member with a screw member. Further, from the opposite side, the front end of the I-shaped fitting part of the substantially J-shaped attached frame is inserted into the U-shaped fitting part of the main frame, built into the opening, and the pasted board surface and frame The frame was brought into contact with the positioning board, temporarily fastened with an L-shaped clamp fixing jig, and fixed in this state with a screw member. Finally, the door was hung on the main frame portion of the integrated frame, and it was confirmed that the frame was stable.

また扉開閉時の扉重心の移動により枠体にかかるひずみ力及びねじれ力や扉閉鎖時の衝撃力に対して強度を確保できた。最後に金物取り付け及び開閉状態の調整を行い、作業を終了した。軽量鉄骨間仕切り壁のボード貼り進行中の出入り口開口部に対して短時間で扉枠体取り付け及び扉の吊り込み、開閉調整が完了した。後日、壁業者のボード貼りが完了を確認した。問題の発生は無かった。 In addition, the strength of the strain and twisting force applied to the frame body and the impact force when the door was closed were secured by the movement of the center of gravity of the door when the door was opened and closed. Finally, the hardware was attached and the open / closed state was adjusted, and the work was completed. The door frame body attachment, door suspension, and opening / closing adjustment were completed in a short time with respect to the entrance / exit opening part where the boarding of the lightweight steel partition wall was in progress. At a later date, it was confirmed that the wall supplier had finished pasting the board. There was no problem.

F1 上部スラブ
F2 下部スラブ
SM1 上部墨出しライン
SM2 下部墨出しライン
SM3 壁部墨出しライン
SM4 壁部墨出しライン
SM5 支柱部墨出しライン
SM6 支柱部墨出しライン
K1 壁(右)
K2 壁(左)
BK1 スラブ用ブラケット部材
BK2 無目用ブラケット部材
ST1 スラブ間支柱(左)
ST2 スラブ間支柱(右)
ST3 支柱用まぐさ材
KW1 主要枠体上枠
KW2 主要枠体縦枠(右)
KW3 主要枠体縦枠(左)
R1 上部ランナー
R2 下部ランナー
R3 下部ランナー
R4 欄間部ランナー
S1 スタッド
S2 欄間スタッド
KH1 開口部上補強
KH2 開口部縦補強(右)
KH3 開口部縦補強(左)
B1 壁ボード
B2 欄間部ボード
TW1 付属枠上枠
TW2 付属枠縦枠(右)
TW3 付属枠縦枠(左)
HW1 枠体位置決め盤固定型
HW2 枠体位置決め盤固定型
M1 枠体位置決め盤当接面
M2 枠体位置決め盤当接面
HW3 枠体位置決め盤取り外し型本体(調整可能式)
EN1 枠体位置決め盤電磁石本体
H1 枠体用位置決め盤当接部
LK1 L字クランプ固定治具
AG1 アングル部材
NJ1 トラス頭ねじ部材
NJ2 皿頭ねじ部材
TU1 扉本体
T1 扉吊り金物 蝶番
J1 扉錠前
F1 Upper slab F2 Lower slab SM1 Upper inking line SM2 Lower inking line SM3 Wall inking line SM4 Wall inking line SM5 Prop inking line SM6 Prop inking line K1 Wall (right)
K2 wall (left)
BK1 Bracket member for slab BK2 Bracket member for eyeless ST1 Post between slabs (left)
ST2 Slab post (right)
ST3 Support lintel KW1 Main frame upper frame KW2 Main frame vertical frame (right)
KW3 Main frame vertical frame (left)
R1 Upper runner R2 Lower runner R3 Lower runner R4 Cross section runner S1 Stud S2 Cross section stud KH1 Opening top reinforcement KH2 Opening vertical reinforcement (right)
KH3 Opening vertical reinforcement (left)
B1 Wall board B2 Cross board TW1 Attached frame upper frame TW2 Attached frame vertical frame (right)
TW3 Attached frame vertical frame (left)
HW1 Frame body positioning board fixed type HW2 Frame body positioning board fixed type M1 Frame body positioning board contact surface M2 Frame body positioning board contact surface HW3 Frame body positioning board removal type main body (adjustable type)
EN1 Frame positioning board electromagnet body H1 Frame positioning board contact part LK1 L-shaped clamp fixing jig AG1 Angle member NJ1 Truss head screw member NJ2 Countersunk head screw member TU1 Door body T1 Door hanging hardware Hinge J1 Door lock

Claims (5)

軽量鉄骨間仕切り壁に計画される出入り口ドアにおいて、軽量鉄骨間仕切り壁の施工状況に影響を受けずに扉枠体の施工を可能にするために、嵌合部の接合により一体枠可能な分割扉枠体と、壁施工前の計画空間に開口部を形成する扉枠体固定用スラブ間支柱部材と、計画位置に扉枠体を保持する枠体位置決め盤とで構成され、施工時に枠体位置決め盤に枠体裏面を当接させた両扉枠体と開口部構成部材とをL字クランプ固定治具により一時締着し、アングル部材とねじ部材により固着することを特徴とする無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法。   In the entrance door planned for the lightweight steel partition wall, in order to enable the construction of the door frame body without being affected by the construction status of the lightweight steel partition wall, a split door frame that can be integrated into the frame by joining the fitting parts Body, a slab strut member for fixing the door frame body that forms an opening in the planned space before wall construction, and a frame body positioning board that holds the door frame body at the planned position. Non-weld dry assembly type, characterized in that both door frame bodies and the opening portion constituting member that are in contact with the back surface of the frame body are temporarily fastened by an L-shaped clamp fixing jig and fixed by an angle member and a screw member. Simple installation method for door frame structure. 強固な一体化枠体に溶接無しで組み立てでき、軽量鉄骨壁工事の進捗状況に影響を受けずに施工するために、
前記分割扉枠体は、扉本体を支持する主要枠体と主要枠体固着空間を塞ぐ付属枠体で構成し、前記主要枠体は、U字状の嵌合部を持つ2本の縦枠部材と1本の上枠部材及び1本の下枠部材とからなるビス固定型組み立て式枠体構造にし、前記出入り口開口部のスラブ間支柱部材及び前記壁開口部補強部材に先付けした枠体位置決め盤に枠体の裏面を当接させて建て込み、前記主要枠体と前記支柱部材及び前記開口補強部材との間にL字クランプ固定治具を利用して一時的に挟持させた状態で、アングル部材とねじ部材によって固着して、
前記付属枠体は、I字状嵌合部を持つ2本の縦枠部材と1本の上枠部材とからなるビス固定型組み立て式枠体構造にし、I字状嵌合部先端を前記主要枠体のU字状嵌合部に挿入でき、枠体の裏面と枠体位置決め盤とが当接するまで、前記開口部に建て込み、前記両枠体間にL字クランプ固定治具を利用して一時的に挟持させた状態で、嵌合可能箇所でビス止めにて挟着することを特徴とする請求項1に記載の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法。
In order to be able to assemble without welding to a strong integrated frame, and to work without being affected by the progress of lightweight steel wall construction,
The divided door frame is composed of a main frame that supports the door main body and an attached frame that closes the main frame fixing space, and the main frame has two vertical frames having U-shaped fitting portions. Positioning of the frame body in a screw-fixed assembling frame structure composed of a member, one upper frame member, and one lower frame member, prior to the inter-slab strut member of the entrance / exit opening and the wall opening reinforcement member In the state where the back surface of the frame body is brought into contact with the board, and is temporarily sandwiched between the main frame body, the support column member and the opening reinforcing member using an L-shaped clamp fixing jig, Adhered by angle member and screw member,
The accessory frame has a screw-fixed assembling frame structure composed of two vertical frame members having an I-shaped fitting portion and one upper frame member, and the leading end of the I-shaped fitting portion is the main portion. It can be inserted into the U-shaped fitting part of the frame body, and it is built in the opening until the back surface of the frame body and the frame body positioning board abut, and an L-shaped clamp fixing jig is used between the frame bodies. The simple attachment construction method of the non-welded dry assembly type door frame structure according to claim 1, wherein in a state of being temporarily clamped, clamping is performed by screwing at a fitting position.
枠体位置決め盤は、軽量鉄骨間仕切り壁の仕上げ材位置を仮決めできる部材であり、前記主要枠体及び前記付属枠体の建て込み時に、両枠体の裏面に当接させ、仕上げ材の厚さ変化に対応した所定の位置に保持し、前記開口部材にねじ部材により固着して、前記両枠体を所望の位置に建て込み、前記L字クランプ固定治具を利用して一時締着し、前記分割扉枠体を所定の枠見込みとでき、又施工条件に応じて使い分けができるように、固定型と取り外し型の二種あり
固定型は、厚さ1.2〜6mm、幅20〜100mm、当接面5〜50mm形状L字型、コ字型またはI字型の金属板、取り外し型は、電磁石の座部と当接面位置調整可能な当接面部を持つ構造体としていることを特徴とする請求項1及び請求項2のいずれかに記載の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法。
The frame positioning board is a member that can temporarily determine the finishing material position of the lightweight steel partition wall, and when the main frame and the accessory frame are built, they are brought into contact with the back surfaces of both frames, and the thickness of the finishing material It is held at a predetermined position corresponding to the change in height, fixed to the opening member with a screw member, the both frame bodies are built in a desired position, and temporarily tightened using the L-shaped clamp fixing jig. There are two types of fixed molds: a fixed mold and a detachable mold so that the divided door frame body can be a predetermined frame prospect and can be used properly according to the construction conditions. The fixed mold has a thickness of 1.2 to 6 mm and a width of 20 to 100mm, contact surface 5-50mm shape L-shaped, U-shaped or I-shaped metal plate, detachable type shall be a structure with a seat part of electromagnet and a contact surface part whose contact surface position can be adjusted. The non-welded dry according to claim 1 or 2, wherein Simple mounting construction method of assembly-type door frame structure.
壁下地施工前の分割扉枠体施工において、出入り口計画位置にスラブ間支柱部材を利用し、開口部形成し、前記開口部に扉枠体位置決め盤を先付けし、壁計画位置に所定の開口、仕上げ厚、空間を形成し、前記開口部空間に前記主要枠体と前記付属枠体を施工順に建て込み、前記L字クランプ固定治具を利用して、アングル部材とねじ部材によって固着し、前記分割扉枠体を所定の枠見込み位置に設定できることを特徴とする請求項1〜請求項3のいずれかに記載の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法。 In split door frame construction before wall foundation construction, use strut members between slabs at the entrance planned position, form an opening, precede the door frame positioning board to the opening, a predetermined opening at the wall planned position, Finishing thickness, forming a space, building the main frame and the attached frame in the opening space in the order of construction, using the L-shaped clamp fixing jig, fixed by an angle member and a screw member, The method for easily attaching and installing a non-welded dry assembly type door frame structure according to any one of claims 1 to 3, wherein the divided door frame body can be set at a predetermined frame prospective position. 前記L字クランプ固定治具は、所望の位置に組み立て、無溶接で固着できるようにするために、前記開口部での部材に先付けされた枠体位置決め盤に前記両枠体裏面を当接させて建て込み、前記主要枠体と前記開口部での部材間とを所定の位置を保持した状態で挟持でき、さらに前記主要枠体に前記付属枠体を接合し、所定の枠幅を確保した状態の前記両枠体間をも挟持できる、100〜300mmの間隔を挟持できる万力式クランプ型であって、所定の位置で一体枠体の幅を保持できるような固定可能な型式であることを特徴とする請求項1〜請求項4に記載の無溶接乾式組み立て型扉枠構造体の簡易取り付け施工方法。
In order to assemble the L-shaped clamp fixing jig at a desired position and fix it without welding, the rear surfaces of both frame bodies are brought into contact with a frame body positioning disk that is attached to a member at the opening. The main frame and the members at the opening can be held in a predetermined position, and the accessory frame is joined to the main frame to ensure a predetermined frame width. It is a vise clamp type that can hold the gap between the two frames in a state and can hold a gap of 100 to 300 mm, and can be fixed so that the width of the integral frame can be held at a predetermined position. The simple attachment construction method of the non-welded dry assembly type door frame structure according to claim 1, wherein:
JP2017174933A 2017-06-12 2017-09-12 Simple installation method of non-welding dry assembly type door frame structure. Active JP6544599B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017114971 2017-06-12
JP2017114971 2017-06-12

Publications (2)

Publication Number Publication Date
JP2019002263A true JP2019002263A (en) 2019-01-10
JP6544599B2 JP6544599B2 (en) 2019-07-17

Family

ID=65007729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017174933A Active JP6544599B2 (en) 2017-06-12 2017-09-12 Simple installation method of non-welding dry assembly type door frame structure.

Country Status (1)

Country Link
JP (1) JP6544599B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4868431U (en) * 1971-11-29 1973-08-30
JPS4835307B1 (en) * 1968-12-04 1973-10-26
JPS57125887U (en) * 1981-01-30 1982-08-05
JPH0315982U (en) * 1989-06-30 1991-02-18
JPH05280126A (en) * 1992-02-14 1993-10-26 Fujita Corp Execution method of partition wall including door
JPH1122315A (en) * 1997-07-02 1999-01-26 Sanwa Shutter Corp Structure of door frame
JP2002303081A (en) * 2001-04-10 2002-10-18 Toda Constr Co Ltd Construction method for mounting door frame
JP2011080305A (en) * 2009-10-09 2011-04-21 Nissho Kogyo Kk Method for mounting door frame

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4835307B1 (en) * 1968-12-04 1973-10-26
JPS4868431U (en) * 1971-11-29 1973-08-30
JPS57125887U (en) * 1981-01-30 1982-08-05
JPH0315982U (en) * 1989-06-30 1991-02-18
JPH05280126A (en) * 1992-02-14 1993-10-26 Fujita Corp Execution method of partition wall including door
JPH1122315A (en) * 1997-07-02 1999-01-26 Sanwa Shutter Corp Structure of door frame
JP2002303081A (en) * 2001-04-10 2002-10-18 Toda Constr Co Ltd Construction method for mounting door frame
JP2011080305A (en) * 2009-10-09 2011-04-21 Nissho Kogyo Kk Method for mounting door frame

Also Published As

Publication number Publication date
JP6544599B2 (en) 2019-07-17

Similar Documents

Publication Publication Date Title
JP2879392B2 (en) Frame structure and frame fitting for wooden building
US7882665B2 (en) Construction configurations and construction methods of steel houses
US8069622B2 (en) Systems and methods for finishing a penetration in a concrete structure during construction
JP2019002263A (en) Simple fitting construction method of non-welding dry assembly type door frame structure
JP5380686B2 (en) Installation method of door frame
KR100615037B1 (en) Manufacturing method of architectural beam
KR100579702B1 (en) Architectural beam with differ materials
JPH03244733A (en) Structure of connecting outer wall
JPH05230913A (en) Form made of precast concrete and concrete placing method
JP7213375B1 (en) How to install interior doors with sleeve glass
JPH01256644A (en) Fixture for floor panel
KR200288722Y1 (en) Fixtures for building door frames
JP2000336748A (en) Erection method of two-story house
JPH04131451A (en) Joint construction for small wall with inorganic facing material lining panel
JP2839844B2 (en) Construction method of partition wall and base panel for partition wall
JPH10311089A (en) Framework frame wall panel construction method for aseismatic wooden building
KR200279210Y1 (en) Fixtures for building door frames
JP6692722B2 (en) Sash mounting structure and sash mounting method
JPH03187438A (en) Metallic material for joining structural member and its joining method
JP2003247275A (en) Framework structure for wooden building
JP2017031747A (en) Easy-to-assemble facility inspection opening structure for light-weight steel structure wall
JPH04343946A (en) Connecting structure of constructing structure member
JPH1136719A (en) Unit execution method at partition opening of wooden frame in building
AU2007202364B2 (en) Construction mount
JP3913345B2 (en) Frame with joinery and attachment method of joinery

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190312

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190528

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190605

R150 Certificate of patent or registration of utility model

Ref document number: 6544599

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150