JP2018114551A5 - - Google Patents

Download PDF

Info

Publication number
JP2018114551A5
JP2018114551A5 JP2017008827A JP2017008827A JP2018114551A5 JP 2018114551 A5 JP2018114551 A5 JP 2018114551A5 JP 2017008827 A JP2017008827 A JP 2017008827A JP 2017008827 A JP2017008827 A JP 2017008827A JP 2018114551 A5 JP2018114551 A5 JP 2018114551A5
Authority
JP
Japan
Prior art keywords
welding
cable
management
measurement information
current value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017008827A
Other languages
English (en)
Other versions
JP2018114551A (ja
JP6748584B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2017008827A priority Critical patent/JP6748584B2/ja
Priority claimed from JP2017008827A external-priority patent/JP6748584B2/ja
Priority to PCT/JP2017/042030 priority patent/WO2018135129A1/ja
Publication of JP2018114551A publication Critical patent/JP2018114551A/ja
Publication of JP2018114551A5 publication Critical patent/JP2018114551A5/ja
Application granted granted Critical
Publication of JP6748584B2 publication Critical patent/JP6748584B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (13)

  1. 溶接装置に対応して設けられた磁気センサと、
    溶接作業に関する処理を行う管理装置とを備え、
    前記磁気センサは、前記溶接装置に接続される第1のケーブルに流れる電流、により生じる磁場を計測し、計測結果を示す計測情報を前記管理装置へ送信し、
    前記管理装置は、前記磁気センサから送信された前記計測情報を受信し、受信した前記計測情報に基づいて前記処理を行い、
    前記磁気センサは、前記第1のケーブルの周方向において局所的に設置可能であり、
    前記第1のケーブルは、電源装置と前記溶接装置とを接続し、
    前記溶接装置と溶接トーチとを接続し、かつ前記第1のケーブルを介した前記電源装置からの電力を伝送する電源ケーブルを含む複数のケーブルが収容される第2のケーブルが設けられる、管理システム。
  2. 前記管理装置は、前記計測情報に基づいて、前記処理として、前記ケーブルに電流が流れているか否かを判断する、請求項1に記載の管理システム。
  3. 前記管理装置は、前記計測情報に基づいて、前記処理として、前記溶接作業の作業時間を算出する、請求項1または請求項2に記載の管理システム。
  4. 前記管理装置は、前記計測情報に基づいて、前記処理として、前記電流の電流値を算出する、請求項1から請求項のいずれか1項に記載の管理システム。
  5. 前記管理装置は、前記電流値に基づいて、前記処理として、さらに、溶接材料の溶着量を算出する、請求項に記載の管理システム。
  6. 前記管理装置は、線状の前記溶接材料の種類、前記溶接材料の径の大きさ、および前記電流値に基づいて、前記溶着量を算出する、請求項に記載の管理システム。
  7. 前記管理装置は、前記種類、前記径の大きさ、および前記電流値に基づいて、前記溶接材料の溶着速度を特定し、特定した前記溶着速度に基づいて前記溶着量を算出する、請求項に記載の管理システム。
  8. 前記管理装置は、前記電流値に基づいて、前記処理として、作業者の溶接姿勢を特定する、請求項から請求項のいずれか1項に記載の管理システム。
  9. 溶接装置に接続されるケーブルに流れる電流、により生じる磁場の計測結果を示す計測情報を取得する取得部と、
    前記取得部により取得された前記計測情報に基づいて、前記電流の電流値を算出し、算出した前記電流値に基づいて、溶接材料の溶着量を算出する処理部とを備える、管理装置。
  10. 前記取得部は、電源装置と前記溶接装置とを接続する前記ケーブルに設置された磁気センサによる前記計測結果を示す前記計測情報を取得する、請求項に記載の管理装置。
  11. 溶接装置に対応して設けられた磁気センサと、
    前記磁気センサによる計測結果に基づいて、溶接作業に関する処理を行う管理装置とを備える管理システムにおけるセンサ設置方法であって、
    電源装置と前記溶接装置とを接続する第1のケーブルが設けられ、
    前記溶接装置と溶接トーチとを接続し、かつ前記第1のケーブルを介した前記電源装置からの電力を伝送する電源ケーブルを含む複数のケーブルが収容される第2のケーブルが設けられ、
    前記磁気センサおよび前記管理装置を準備するステップと、
    前記第1のケーブルの周方向において局所的に前記磁気センサを設置するステップとを含む、センサ設置方法。
  12. 溶接作業に関する処理を行う管理装置における管理方法であって、
    溶接装置に接続されるケーブルに流れる電流、により生じる磁場の計測結果を示す計測情報を取得するステップと、
    取得した前記電流の電流値を算出するステップと、
    算出した前記電流値に基づいて、溶接材料の溶着量を算出するステップとを含む、管理方法。
  13. 管理装置において用いられる管理プログラムであって、
    コンピュータを、
    溶接装置に接続されるケーブルに流れる電流、により生じる磁場の計測結果を示す計測情報を取得する取得部と、
    前記取得部により取得された前記計測情報に基づいて、前記電流の電流値を算出し、算出した前記電流値に基づいて、溶接材料の溶着量を算出する処理部、
    として機能させるための、管理プログラム。
JP2017008827A 2017-01-20 2017-01-20 管理システムおよびセンサ設置方法 Active JP6748584B2 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017008827A JP6748584B2 (ja) 2017-01-20 2017-01-20 管理システムおよびセンサ設置方法
PCT/JP2017/042030 WO2018135129A1 (ja) 2017-01-20 2017-11-22 管理システム、管理装置、センサ設置方法、管理方法および管理プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017008827A JP6748584B2 (ja) 2017-01-20 2017-01-20 管理システムおよびセンサ設置方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2019089909A Division JP6743941B2 (ja) 2019-05-10 2019-05-10 管理システム、管理装置、センサ設置方法、管理方法および管理プログラム

Publications (3)

Publication Number Publication Date
JP2018114551A JP2018114551A (ja) 2018-07-26
JP2018114551A5 true JP2018114551A5 (ja) 2018-09-06
JP6748584B2 JP6748584B2 (ja) 2020-09-02

Family

ID=62908729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017008827A Active JP6748584B2 (ja) 2017-01-20 2017-01-20 管理システムおよびセンサ設置方法

Country Status (2)

Country Link
JP (1) JP6748584B2 (ja)
WO (1) WO2018135129A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115121912B (zh) * 2022-06-27 2023-08-22 湘潭大学 一种用于多极磁控gtaw电弧传感器的励磁电流标定方法
CN117548928B (zh) * 2024-01-12 2024-04-12 杭州峰景科技有限公司 一种焊机物联设备的芯片调度方法及装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS561275A (en) * 1979-06-20 1981-01-08 Susumu Nishikawa Welding defect supervising unit of automatic welding machine
JPS59193764A (ja) * 1983-04-18 1984-11-02 Matsushita Electric Ind Co Ltd ア−ク溶接機の溶接電流検出装置
JPS60255288A (ja) * 1984-05-30 1985-12-16 Dengensha Mfg Co Ltd 通電有無検出装置
JPH0811293B2 (ja) * 1985-06-17 1996-02-07 新キャタピラ−三菱株式会社 測定装置
US10449614B2 (en) * 2014-12-18 2019-10-22 Illinois Tool Works Inc. Systems and methods for solid state sensor measurements of welding cables
DE102015225043A1 (de) * 2015-12-14 2017-06-14 Robert Bosch Gmbh Schweißgerät mit Erfassungsvorrichtung zur Erfassung magnetischer Felder

Similar Documents

Publication Publication Date Title
CN105377493B (zh) 用于确定焊接行进速度的系统和方法
CA2951039C (en) Welding system and method with orientation sensing system for gravity-based weld orientation determination
MX2019004412A (es) Sistema y metodo para seleccionar parametros de soldadura.
JP2018515706A5 (ja)
CN204359270U (zh) 一种基于玻璃表面参数的激光检测系统
CN107743428B (zh) 利用惯性测量单元的手动工具跟踪和引导
PH12019501655A1 (en) Power distribution network monitoring system and power distribution network monitoring device
JP2018114551A5 (ja)
WO2017171352A3 (ko) 공작기계의 열변위 보정 파라메터 자동 변환 장치 및 변환 방법
EP2808133A3 (en) Robot system and method for producing to-be-processed material
JP2015014600A5 (ja)
JP2016516236A (ja) 溶接リソースの追跡及び解析のシステム及び方法
MY197939A (en) Distribution network monitoring system and distribution network monitoring device
JP2018059400A5 (ja)
CN207395645U (zh) 一种tbm滚刀全状态实时在线监测系统
CN104279995A (zh) 驻车拉索行程变化量测试装置
KR20120053266A (ko) 용접기 관리 시스템 및 관리 방법
MX2014004615A (es) Procedimiento para el monitoreo de al menos una maquina-herramienta.
WO2018135129A1 (ja) 管理システム、管理装置、センサ設置方法、管理方法および管理プログラム
JP2017523045A5 (ja)
CN105215788A (zh) 用于铣床铣刀磨损状态监测的监控装置
CN105389416B (zh) 一种精确求取减速器减速比的方法
CN211412210U (zh) 一种用于检测磨机衬板磨损量的数据采集与发射装置
KR101473580B1 (ko) 절삭 가공 장치의 상태 진단 방법
TW201424895A (zh) 電化學加工系統及其間隙檢測裝置與間隙檢測方法