JP2017514247A5 - - Google Patents

Download PDF

Info

Publication number
JP2017514247A5
JP2017514247A5 JP2017502918A JP2017502918A JP2017514247A5 JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5 JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5
Authority
JP
Japan
Prior art keywords
project
projects
resource
dependent
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017502918A
Other languages
English (en)
Japanese (ja)
Other versions
JP2017514247A (ja
JP6564015B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/US2015/022448 external-priority patent/WO2015148641A1/en
Publication of JP2017514247A publication Critical patent/JP2017514247A/ja
Publication of JP2017514247A5 publication Critical patent/JP2017514247A5/ja
Application granted granted Critical
Publication of JP6564015B2 publication Critical patent/JP6564015B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2017502918A 2014-03-25 2015-03-25 時間、資源および予算の制約下での構造化経営組織内のプロジェクトの選択および資源の割り当てを最適化する方法およびシステム Expired - Fee Related JP6564015B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201461967714P 2014-03-25 2014-03-25
US61/967,714 2014-03-25
PCT/US2015/022448 WO2015148641A1 (en) 2014-03-25 2015-03-25 A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints

Publications (3)

Publication Number Publication Date
JP2017514247A JP2017514247A (ja) 2017-06-01
JP2017514247A5 true JP2017514247A5 (https=) 2018-04-19
JP6564015B2 JP6564015B2 (ja) 2019-08-21

Family

ID=54190907

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017502918A Expired - Fee Related JP6564015B2 (ja) 2014-03-25 2015-03-25 時間、資源および予算の制約下での構造化経営組織内のプロジェクトの選択および資源の割り当てを最適化する方法およびシステム

Country Status (6)

Country Link
US (1) US20150278736A1 (https=)
EP (1) EP3123417A4 (https=)
JP (1) JP6564015B2 (https=)
KR (1) KR102376755B1 (https=)
AU (1) AU2015236099A1 (https=)
WO (1) WO2015148641A1 (https=)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170220974A1 (en) * 2016-01-29 2017-08-03 Sap Se Resource optimization for production efficiency
US10489204B2 (en) * 2017-01-31 2019-11-26 Samsung Electronics Co., Ltd. Flexible in-order and out-of-order resource allocation
US10789208B2 (en) * 2017-08-02 2020-09-29 Sap Se Dependency mapping in a database environment
KR102298999B1 (ko) * 2018-03-02 2021-09-07 (주) 빌트온 웹브라우저에 입력된 이벤트에 대응하는 빅데이터분석결과와 경영정보를 통합하여 제공하는 토탈경영정보제공장치
US10810524B1 (en) * 2018-05-21 2020-10-20 Amazon Technologies, Inc. Dynamic resource prediction simulation
CN112136109B (zh) * 2019-04-24 2024-04-09 创新先进技术有限公司 分布式资源分配
CN112136111B (zh) * 2019-04-24 2024-04-16 创新先进技术有限公司 分布式资源分配
EP3746889A4 (en) * 2019-04-24 2020-12-09 Alibaba Group Holding Limited ALLOCATION OF DISTRIBUTED RESOURCES
DE102020203716B4 (de) * 2020-03-23 2025-07-24 Zf Friedrichshafen Ag Computerimplementiertes Verfahren für eine Produktionsplanung und/oder -steuerung eines Produktionssystems und Produktionsplanung und/oder-steuerungssystem
KR102349118B1 (ko) * 2021-09-07 2022-01-11 주식회사 디케이브라더스 프로젝트 중개 플랫폼 서비스 제공 방법 및 장치
KR102791062B1 (ko) * 2022-03-15 2025-04-02 현대오토에버 주식회사 오피스 공간 관리 방법 및 장치
US20230410011A1 (en) * 2022-06-09 2023-12-21 Abductive Services LLC Systems, Devices, and/or Methods for Managing Projects
US20240311763A1 (en) * 2023-03-13 2024-09-19 Engineer.ai Corp. Systems and methods for determining overlapping features between one or more projects
CN117648179A (zh) * 2023-11-23 2024-03-05 北京菱云科技有限公司 一种资源分配方法、装置、电子设备和存储介质
KR102669893B1 (ko) 2024-02-19 2024-05-28 주식회사 똑똑한개발자 스마트 업무일지를 활용한 it프로젝트별 손익 금액 자동 계산 시스템
CN119250411B (zh) * 2024-09-11 2025-05-02 深圳市智汇奇策科技有限公司 一种物流园区的智慧管理平台及管理方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630070A (en) * 1993-08-16 1997-05-13 International Business Machines Corporation Optimization of manufacturing resource planning
US5408663A (en) * 1993-11-05 1995-04-18 Adrem Technologies, Inc. Resource allocation methods
US7496886B2 (en) * 2004-09-30 2009-02-24 Microsoft Corporation Method and system for providing cross project commitments
JP5172354B2 (ja) * 2005-02-11 2013-03-27 ヴォルト インフォメーション サイエンシズ インコーポレーテッド プロジェクト作業の計画/範囲変更の運営情報およびビジネス情報シナジーシステムおよび方法
US8281313B1 (en) * 2005-09-29 2012-10-02 Hewlett-Packard Development Company, L.P. Scheduling computer processing jobs that have stages and precedence constraints among the stages
US20080255910A1 (en) * 2007-04-16 2008-10-16 Sugato Bagchi Method and System for Adaptive Project Risk Management
US20090119144A1 (en) * 2007-11-02 2009-05-07 International Business Machines Corporation Method, system and program product for optimal project selection and tradeoffs
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
JP2010211364A (ja) * 2009-03-09 2010-09-24 Hitachi Ltd プロジェクトのシミュレーション方法及びシミュレーションシステム
US7991632B1 (en) * 2011-01-28 2011-08-02 Fmr Llc Method and system for allocation of resources in a project portfolio
JP5749561B2 (ja) * 2011-05-10 2015-07-15 株式会社竹中工務店 スケジューリング装置及びプログラム
US20140032256A1 (en) * 2012-07-27 2014-01-30 International Business Machines Corporation Multi-project portfolio optimization

Similar Documents

Publication Publication Date Title
JP2017514247A5 (https=)
EP3438821B1 (en) Task-resource scheduling method and device
CN111108480B (zh) 一种用于分布式资源需求及分配的系统和方法
JP6799947B2 (ja) スライディングタイムウィンドウを用いてタスクをスケジュール設定するためのシステムおよび方法
US20140019987A1 (en) Scheduling map and reduce tasks for jobs execution according to performance goals
EP2631798B1 (en) Long-term resource provisioning with cascading allocations
CN105487930B (zh) 一种基于Hadoop的任务优化调度方法
US8943353B2 (en) Assigning nodes to jobs based on reliability factors
US20130290972A1 (en) Workload manager for mapreduce environments
CN111813523A (zh) 时长预估模型生成方法、系统资源调度方法、装置、电子设备和存储介质
US20130212594A1 (en) Method of optimizing performance of hierarchical multi-core processor and multi-core processor system for performing the method
US9374314B2 (en) QoS aware balancing in data centers
CN106980532A (zh) 一种作业调度方法和装置
US10846144B2 (en) Multistep automated scaling for cluster containers
JP2011258119A5 (https=)
CN110866687A (zh) 任务分配方法及装置
CN114265679A (zh) 数据处理方法、装置和服务器
CN110196773B (zh) 统一调度计算资源的多时间尺度安全校核系统及方法
CN106569891A (zh) 一种存储系统中任务调度执行的方法和装置
US20150277980A1 (en) Using predictive optimization to facilitate distributed computation in a multi-tenant system
US20140137122A1 (en) Modified backfill scheduler and a method employing frequency control to reduce peak cluster power requirements
US12217094B1 (en) Method of resource adjustment for service cluster, electronic device and storage medium
US20160139959A1 (en) Information processing system, method and medium
CN107203256B (zh) 一种网络功能虚拟化场景下的节能分配方法与装置
US9170839B2 (en) Method for job scheduling with prediction of upcoming job combinations