JP2016180642A - Laser analysis device - Google Patents

Laser analysis device Download PDF

Info

Publication number
JP2016180642A
JP2016180642A JP2015060409A JP2015060409A JP2016180642A JP 2016180642 A JP2016180642 A JP 2016180642A JP 2015060409 A JP2015060409 A JP 2015060409A JP 2015060409 A JP2015060409 A JP 2015060409A JP 2016180642 A JP2016180642 A JP 2016180642A
Authority
JP
Japan
Prior art keywords
tube
insertion tube
supported
peripheral wall
laser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015060409A
Other languages
Japanese (ja)
Other versions
JP6451438B2 (en
Inventor
直樹 古河
Naoki Furukawa
直樹 古河
晴雄 上瀧
Haruo Uetaki
晴雄 上瀧
春光 堀
Harumitsu Hori
春光 堀
寛樹 渡邉
Hiroki Watanabe
寛樹 渡邉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to JP2015060409A priority Critical patent/JP6451438B2/en
Publication of JP2016180642A publication Critical patent/JP2016180642A/en
Application granted granted Critical
Publication of JP6451438B2 publication Critical patent/JP6451438B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analysing Materials By Optical Means (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a laser analysis device in which the optical axis deviation occurs uneasily even if the device is provided in a pipe or the like where the vibration or the displacement may occur.SOLUTION: The laser analysis device includes: a first insertion tube and a second insertion tube that are loosely inserted to one end of a pipe or a peripheral wall of a furnace; a light emission unit that irradiates the internal space of the peripheral wall with a laser beam through the first insertion tube; and a light reception unit that receives the laser beam transmitted through the internal space through the second insertion tube. The first insertion tube is supported by a shell supported by a first frame. The second insertion tube is supported by a shell supported by a second frame. The first frame and the second frame are supported by the foundation separate from the peripheral wall. The gap formed in the portion where the insertion tube is loosely inserted through the penetration hole is covered with a shielding mechanism provided with an expandable pipe externally inserted into the insertion tube.SELECTED DRAWING: Figure 1

Description

本発明は、配管や炉の周壁に接続して設けられ、レーザー光を照射することにより配管内や炉内のガス分析を行うレーザー分析装置に関する。   The present invention relates to a laser analyzer that is connected to a peripheral wall of a pipe or a furnace and performs gas analysis in the pipe or the furnace by irradiating laser light.

転炉で発生した排ガスを集塵し、非燃焼で可燃性ガスを回収する装置および回収方法が知られている。転炉精錬時に発生する排ガスは、一酸化炭素を高濃度に含むガスとなる。この転炉排ガスを処理する装置として、従来、一酸化炭素を燃焼させずに回収する非燃焼型排ガス処理装置が利用されている。
この非燃焼型排ガス処理装置として例えば、非特許文献1に記載のOG方式転炉排ガス回収装置が用いられている。
An apparatus and a collection method for collecting exhaust gas generated in a converter and collecting noncombustible combustible gas are known. The exhaust gas generated during converter refining is a gas containing carbon monoxide at a high concentration. As an apparatus for treating the converter exhaust gas, conventionally, a non-combustion type exhaust gas treatment apparatus that collects carbon monoxide without burning is used.
As this non-combustion type exhaust gas treatment device, for example, an OG type converter exhaust gas recovery device described in Non-Patent Document 1 is used.

転炉における精錬においては、転炉に溶銑を装入し、転炉吹錬によって主に脱炭精錬を行う。精錬完了後に溶鋼を出鋼するとともにスラグを排滓し、次の精錬のために溶銑を装入する。以上のような転炉精錬サイクルの中で高濃度の一酸化炭素を含む排ガスが多量に発生するのは吹錬中であり、非吹錬時に排ガスは発生しない。また、吹錬開始直後において、排ガス発生量が急激に増大するが、吹錬開始直後の排ガス中には高濃度の酸素が含まれ、一酸化炭素濃度は高くない。吹錬開始から時間が経過するにつれて排ガス中の酸素濃度は低下し、一酸化炭素濃度が増大する。
吹錬開始後、排ガス中の一酸化炭素濃度が高くない時点から排ガスを回収すると、回収した排ガスの燃料ガスとしての品位が低下するので好ましくない。このため、通常、以下の特許文献1に記載のように、転炉吹錬開始時の排ガスを大気中に放散し、転炉炉頂の輻射部の排ガス経路にガス中CO濃度分析計(炉頂CO分析計)を設け、排ガス中の一酸化炭素濃度を測定し、一酸化炭素濃度が所定濃度以上に上昇した時点で排ガス回収を開始している。
In refining in a converter, hot metal is charged into the converter, and decarburization refining is mainly performed by converter blowing. After the refining is completed, the molten steel is discharged and the slag is discharged, and the molten iron is charged for the next refining. It is during blowing that a large amount of exhaust gas containing a high concentration of carbon monoxide is generated in the converter refining cycle as described above, and no exhaust gas is generated during non-blowing. In addition, the amount of exhaust gas generated increases immediately after the start of blowing, but the exhaust gas immediately after the start of blowing contains a high concentration of oxygen and the carbon monoxide concentration is not high. As time elapses from the start of blowing, the oxygen concentration in the exhaust gas decreases and the carbon monoxide concentration increases.
If the exhaust gas is recovered from the time when the concentration of carbon monoxide in the exhaust gas is not high after the start of blowing, the quality of the recovered exhaust gas as a fuel gas is not preferable. For this reason, normally, as described in Patent Document 1 below, exhaust gas at the start of converter blowing is diffused into the atmosphere, and a CO concentration analyzer in the gas (furnace) is connected to the exhaust gas path of the radiant section at the top of the converter furnace. (Top CO analyzer) is provided, the carbon monoxide concentration in the exhaust gas is measured, and the exhaust gas recovery is started when the carbon monoxide concentration rises above a predetermined concentration.

上述のように吹錬開始直後は排ガス中の酸素濃度が高いが、排ガス経路中に破損などが生じて排ガスに外気が混入すると排ガス中の酸素濃度が増大することがある。排ガス中の酸素濃度が高いときに排ガスを回収すると、排ガスの成分が爆発限界を超える可能性がある。このため、安全性の観点から、転炉炉頂輻射部の排ガス経路にガス中酸素濃度分析計(炉頂酸素分析計)を設けるとともに、湿式集塵後の煙道にもガス中酸素濃度分析計(炉下酸素分析計)を設け、これら2箇所の排ガス中の酸素濃度がいずれも所定値以下となった場合のみ排ガスを回収している。
例えば、吹錬開始後、炉頂CO分析計で計測した一酸化炭素濃度が例えば25%以上、かつ、炉頂酸素分析計と炉下酸素分析計で計測した2箇所の排ガス中酸素濃度が一定濃度以下、例えば、2%以下となる条件が成立した場合に初めて排ガスの回収を開始する。
As described above, the oxygen concentration in the exhaust gas is high immediately after the start of blowing, but the oxygen concentration in the exhaust gas may increase if outside air enters the exhaust gas due to damage in the exhaust gas path. If the exhaust gas is recovered when the oxygen concentration in the exhaust gas is high, the components of the exhaust gas may exceed the explosion limit. For this reason, from the viewpoint of safety, a gas oxygen concentration analyzer (furnace top oxygen analyzer) is provided in the exhaust gas path of the converter furnace top radiation section, and gas oxygen concentration analysis is also performed in the flue after wet dust collection. A meter (an in-furnace oxygen analyzer) is provided, and the exhaust gas is recovered only when the oxygen concentration in the exhaust gas at these two locations is not more than a predetermined value.
For example, after the start of blowing, the carbon monoxide concentration measured by the furnace CO analyzer is, for example, 25% or more, and the oxygen concentration in the exhaust gas at two locations measured by the furnace oxygen analyzer and the furnace oxygen analyzer is constant. The exhaust gas recovery is started only when the condition of less than the concentration, for example, 2% or less is satisfied.

前述の転炉排ガス中の酸素濃度分析においては、煙道(排ガス経路)内のガスをサンプリングし、分析する方法が一般的になされている。例えば、湿式サンプラを用いた磁気式酸素分析計が用いられる。水流を用いて煙道からガスをサンプリングし、ドレンセパレーター、ガスクーラー、さらにドレンセパレーターを経由して磁気式酸素分析計にサンプリングガスを導入し、サンプルガス中の酸素濃度を測定することができる。
このような従来の分析方法では、炉下酸素分析計の分析応答遅れが存在するため、転炉吹錬開始後、排ガスを回収開始する時期が遅れる問題があり、可燃性ガスである転炉排ガスを十分に有効利用できていない問題があった。
In the above-described oxygen concentration analysis in the converter exhaust gas, a method of sampling and analyzing the gas in the flue (exhaust gas path) is generally used. For example, a magnetic oxygen analyzer using a wet sampler is used. The gas can be sampled from the flue using a water flow, and the oxygen concentration in the sample gas can be measured by introducing the sampling gas into the magnetic oxygen analyzer via the drain separator, the gas cooler, and the drain separator.
In such a conventional analysis method, since there is a delay in the analysis response of the furnace oxygen analyzer, there is a problem that the timing of starting the recovery of exhaust gas after the start of converter blowing is delayed, and the converter exhaust gas that is a combustible gas There was a problem that could not be used effectively.

また、ガス分析計として測定ガス中にレーザー光を集光照射し、該レーザー光の光量変化からガス濃度を測定するレーザー式ガス分析計が例えば以下の特許文献2、3に開示されている。   Further, for example, Patent Documents 2 and 3 below disclose laser gas analyzers that collect and irradiate laser light into a measurement gas as a gas analyzer and measure the gas concentration based on a change in the amount of the laser light.

特開平5−209212号公報JP-A-5-209212 特開2002−277391号公報JP 2002-277391 A 特開2007−170841号公報JP 2007-170841 A 国際公開第2013/179432号International Publication No. 2013/179432

日本鉄鋼協会編「第3版鉄鋼便覧II製銑・製鋼」第462頁Edited by the Japan Iron and Steel Institute, “Third Edition Steel Manual II

これまで転炉ガス回収装置に上記のようなレーザー式ガス分析計を適用した例がなかったので、本願発明者らは特許文献4に開示したようにレーザー式ガス分析計を適用し、排ガス経路におけるガス中酸素分析の分析応答遅れを低減し、転炉排ガス回収量の増大を図った。   Until now, there has been no example of applying the laser gas analyzer as described above to the converter gas recovery device, so the inventors of the present application applied the laser gas analyzer as disclosed in Patent Document 4, and the exhaust gas path. The analysis response delay of the oxygen analysis in gas was reduced, and the recovery amount of converter exhaust gas was increased.

図7(A)は特許文献4に記載したレーザー式ガス分析計の第1の例を示すもので、煙道を構成する配管100に設けられたレーザー照射部101およびレーザー受光部102と演算処理装置103を備えてガス分析装置105が構成されている。この図の構成において配管100の周壁の一側を貫通した導入管106の外側にレーザー照射部101が接続され、周壁の他側を貫通した検出管107の外側にレーザー受光部102が接続され、導入管106の先端と検出管107の先端が対向配置されている。   FIG. 7A shows a first example of the laser type gas analyzer described in Patent Document 4, and the laser irradiation unit 101 and the laser light receiving unit 102 provided in the pipe 100 constituting the flue and the arithmetic processing. A gas analyzer 105 is configured including the apparatus 103. In the configuration of this figure, the laser irradiation unit 101 is connected to the outside of the introduction tube 106 penetrating one side of the peripheral wall of the pipe 100, and the laser light receiving unit 102 is connected to the outside of the detection tube 107 penetrating the other side of the peripheral wall. The leading end of the introduction tube 106 and the leading end of the detection tube 107 are arranged to face each other.

図7(B)は特許文献4に記載したレーザー式ガス分析計の第2の例を示すもので、配管100に設けられたレーザー照射部101とレーザー受光部102と演算処理装置103を備えてガス分析装置105が構成されている点は同等構造である。この図の構成において、配管100の周壁の一側を貫通した導入管108は先の例の導入管106よりも長く形成され、配管10の他側を貫通した検出管109は先の例の検出管107よりも長く形成されている。導入管108の一部と検出管109の一部にパージガスの供給装置110が接続され、導入管108の先端と検出管109の先端から配管100内にパージガスを供給しつつガス中酸素濃度の測定が出来るようになっている。   FIG. 7B shows a second example of the laser gas analyzer described in Patent Document 4, which includes a laser irradiation unit 101, a laser light receiving unit 102, and an arithmetic processing unit 103 provided in the pipe 100. The point where the gas analyzer 105 is configured is an equivalent structure. In the configuration of this figure, the introduction pipe 108 penetrating one side of the peripheral wall of the pipe 100 is formed longer than the introduction pipe 106 of the previous example, and the detection pipe 109 penetrating the other side of the pipe 10 is the detection of the previous example. It is formed longer than the tube 107. A purge gas supply device 110 is connected to a part of the introduction pipe 108 and a part of the detection pipe 109, and the oxygen concentration in the gas is measured while supplying the purge gas into the pipe 100 from the front end of the introduction pipe 108 and the front end of the detection pipe 109. Can be done.

図7(A)、(B)に示す構成のレーザーガス分析装置105を備えることで、煙道を構成する配管100内を流れる排ガス中の酸素濃度について分析応答遅れを生じることなく計測することが可能となった。また、配管100の内径が大きくなった場合、排ガス中に含まれるダストや水滴などの異物の存在によりレーザー光の散乱や反射を起こすので、図7(B)に示す如く配管100の中央部側まで延出する長い導入管108と検出管109を用いる構成によりそれらの影響を抑制することができる。   By providing the laser gas analyzer 105 configured as shown in FIGS. 7A and 7B, it is possible to measure the oxygen concentration in the exhaust gas flowing through the pipe 100 constituting the flue without causing a delay in the analysis response. It has become possible. Further, when the inner diameter of the pipe 100 is increased, laser light is scattered or reflected due to the presence of foreign matters such as dust and water droplets contained in the exhaust gas. These effects can be suppressed by the configuration using the long introduction tube 108 and the detection tube 109 extending to the end.

ところが、転炉に接続される配管100には、転炉の稼動や周辺設備の稼動あるいは内部を通過するガスの有無などに応じ、微振動あるいは変形が発生する。そして、配管100を貫通するように設けられている導入管106、108、検出管107、109に長期的微振動が作用し、配管100の変形等の影響が加わると、レーザー照射部101とレーザー受光部102の対向位置がずれることがありレーザー光の光軸ずれに伴う光量の低下により、測定誤差が大きくなるか、場合によっては測定不能となる問題があった。
このため、定期的にレーザー式ガス分析装置のメンテナンスが必要であり、メンテナンスの度にレーザー照射部101とレーザー受光部102の光軸ずれを修正する必要があった。
However, in the pipe 100 connected to the converter, slight vibration or deformation occurs depending on the operation of the converter, the operation of peripheral equipment, or the presence or absence of gas passing through the inside. When long-term microvibration acts on the introduction pipes 106 and 108 and the detection pipes 107 and 109 provided so as to penetrate the pipe 100 and the influence of deformation of the pipe 100 is applied, the laser irradiation unit 101 and the laser The facing position of the light receiving unit 102 may be displaced, and there has been a problem that the measurement error increases due to a decrease in the light amount due to the optical axis shift of the laser light, or the measurement becomes impossible in some cases.
For this reason, it is necessary to periodically maintain the laser gas analyzer, and it is necessary to correct the optical axis misalignment between the laser irradiation unit 101 and the laser light receiving unit 102 at every maintenance.

本発明は、前記従来の問題点に鑑みなされたものであって、配管や炉の周壁が振動あるいは変形することがあってもレーザー光の光軸ずれや位置ずれを生じ難い構成とすることができ、光軸ずれや位置ずれに伴う測定精度の低下を防止できるとともに、光軸ずれや位置ずれを抑制することでメンテナンス時の作業性を向上させたレーザー分析装置の提供を目的とする。   The present invention has been made in view of the above-described conventional problems, and has a configuration in which an optical axis shift or a positional shift of a laser beam hardly occurs even when a peripheral wall of a pipe or a furnace is vibrated or deformed. An object of the present invention is to provide a laser analyzer capable of preventing a decrease in measurement accuracy due to an optical axis deviation or a positional deviation and improving workability during maintenance by suppressing the optical axis deviation or the positional deviation.

本発明は、前記課題を解決する手段として、以下の構成を有する。
(1)本発明のレーザー分析装置は、配管または炉の周壁の一側に形成された挿通孔を遊挿して設けられた第1のインサーションチューブと、前記周壁の他側に形成された挿通孔を遊挿して設けられ、前記第1のインサーションチューブに対向するように設けられた第2のインサーションチューブと、前記第1のインサーションチューブを介しレーザー光を前記周壁の内側空間に照射する発光部と、前記内側空間を通過した前記レーザー光を前記第2のインサーションチューブを介し受光する受光部とを備え、前記第1のインサーションチューブが第1の架台に支持された管体に接続され、前記第2のインサーションチューブが第2の架台に支持された管体に接続され、前記第1の架台と前記第2の架台が前記周壁とは別個に基礎に支持されるとともに、前記インサーションチューブが前記挿通孔を遊挿した部分に形成されている隙間が前記インサーションチューブに外挿された伸縮管によって覆われたことを特徴とする。
The present invention has the following configuration as means for solving the above problems.
(1) The laser analyzer of the present invention includes a first insertion tube provided by loosely inserting an insertion hole formed on one side of a peripheral wall of a pipe or a furnace, and an insertion formed on the other side of the peripheral wall. A hole is inserted loosely, and a second insertion tube is provided so as to face the first insertion tube, and laser light is irradiated to the inner space of the peripheral wall via the first insertion tube And a light receiving portion that receives the laser light that has passed through the inner space via the second insertion tube, and the first insertion tube is supported by the first frame. The second insertion tube is connected to a tube supported by a second frame, and the first frame and the second frame are supported by a foundation separately from the peripheral wall. Together, characterized in that gap which the insertion tube is formed in a portion that loosely inserted to the insertion hole is covered with telescopic tube extrapolated to the insertion tube.

周壁の挿通孔を遊挿した第1と第2のインサーションチューブが周壁とは別個に基礎に支持された管体に接続されているため、第1と第2のインサーションチューブは周壁の振動や変形による影響を受けない。このため、長期間の使用によってもインサーションチューブの位置ずれや角度ずれを生じることがなく、インサーションチューブに接続された発光部と受光部の位置ずれや角度ずれも生じない。従って、レーザー光の光軸の位置ずれや角度ずれを引き起こすことなくガス分析を行うことができ、測定誤差を生じ難く、測定不能の状態に陥ることがないレーザー分析装置を提供できる。また、光軸ずれや位置ずれを生じ難いので、受光部と発光部の光軸ずれや位置ずれの修正作業が不要となりメンテナンス時の作業性が向上する。
また、インサーションチューブが周壁の挿通孔を遊挿した部分の隙間は伸縮管を備えた遮蔽機構が覆うので、隙間の部分を外部から遮断することができ、配管や炉などの内側空間に存在するガスを外部に出すことは無い。
Since the first and second insertion tubes loosely inserted through the insertion holes of the peripheral wall are connected to the tube body supported by the foundation separately from the peripheral wall, the first and second insertion tubes are vibrations of the peripheral wall. Not affected by or deformation. For this reason, even if it is used for a long time, the positional displacement and the angular displacement of the insertion tube do not occur, and the positional displacement and the angular displacement between the light emitting unit and the light receiving unit connected to the insertion tube do not occur. Therefore, it is possible to provide a laser analyzer that can perform gas analysis without causing a positional deviation or an angular deviation of the optical axis of the laser light, hardly causes a measurement error, and does not fall into an incapable measurement state. Further, since it is difficult to cause an optical axis shift or a positional shift, it is not necessary to correct the optical axis shift or the positional shift between the light receiving unit and the light emitting unit, and the workability during maintenance is improved.
In addition, the gap where the insertion tube is loosely inserted through the insertion hole of the peripheral wall is covered by a shielding mechanism with an expansion tube, so the gap can be blocked from the outside and exists in the inner space of piping, furnaces, etc. There is no gas going out.

(2)本発明において、前記周壁の外側に出された前記第1のインサーションチューブの外周部および前記発光部が前記周壁の外側に設置された前記第1の架台によって支持された管体に接続され、前記周壁の外側に出された前記第2のインサーションチューブの外周部および前記受光部が前記周壁の外側に設置された前記第2の架台によって支持された管体に接続された構成を採用できる。
周壁の外側に位置するインサーションチューブの外周部と発光部または受光部をそれぞれの架台によって支持された管体によって支持し、各架台を基礎で支持することにより周壁とは別個にインサーションチューブと発光部および受光部を安定支持できる。このため、配管や炉の周壁に振動あるいは位置ずれを生じることがあってもインサーションチューブと発光部および受光部の位置ずれは起こり難く、角度ずれも生じ難い。このため、測定誤差を生じ難く、測定不能の状態に陥ることがないレーザー分析装置を提供できる。
(2) In the present invention, a tube body in which an outer peripheral portion of the first insertion tube and the light emitting portion, which are placed outside the peripheral wall, are supported by the first frame installed outside the peripheral wall. A configuration in which the outer peripheral portion of the second insertion tube and the light receiving portion, which are connected to the outside of the peripheral wall and connected to the tubular body supported by the second frame installed on the outer side of the peripheral wall, are connected. Can be adopted.
The outer periphery of the insertion tube located outside the peripheral wall and the light emitting part or the light receiving part are supported by tubes supported by the respective bases, and by supporting each base on the basis, the insertion tube is separated from the peripheral wall. The light emitting unit and the light receiving unit can be stably supported. For this reason, even if vibrations or positional deviations occur in the piping or the peripheral wall of the furnace, positional deviations between the insertion tube, the light emitting part, and the light receiving part hardly occur, and angular deviations hardly occur. For this reason, it is possible to provide a laser analyzer that hardly causes measurement errors and does not fall into an unmeasurable state.

(3)本発明において、前記インサーションチューブに外挿した前記伸縮管の一端側が前記挿通孔の開口周縁部に接続され、前記伸縮管の他端側が閉じられて前記隙間が外部から隔離されるとともに、前記伸縮管の他端が前記架台で支持された構成を採用できる。
伸縮管の一端側で挿通孔の開口周縁部に接続し、伸縮管の他端側を閉じることによりインサーションチューブの挿通孔遊挿部分の隙間を外部から隔離できる。このため、伸縮管内を流れる排ガスが前記隙間を介し外部に出ることはない。また、周壁の振動や位置ずれは伸縮管に伝わるが、伸縮管の他端側は架台に支持され、インサーションチューブと分離されているので、伸縮管の振動や位置ずれはインサーションチューブには伝わらない。
(3) In the present invention, one end side of the expansion tube externally inserted into the insertion tube is connected to the opening peripheral edge of the insertion hole, and the other end side of the expansion tube is closed to isolate the gap from the outside. And the structure by which the other end of the said expansion-contraction tube was supported by the said mount frame is employable.
By connecting to the opening periphery of the insertion hole on one end side of the expansion tube and closing the other end side of the expansion tube, the clearance of the insertion hole loose insertion portion of the insertion tube can be isolated from the outside. For this reason, the exhaust gas flowing through the telescopic tube does not go outside through the gap. In addition, the vibration and displacement of the peripheral wall are transmitted to the telescopic tube, but the other end of the telescopic tube is supported by the mount and separated from the insertion tube. I don't get it.

(4)本発明において、前記伸縮管の一端側が延長管を介し前記挿通孔の開口周縁部に接続された構成を採用できる。
(5)本発明において、前記伸縮管の外側開口部が前記管体の一端側に接続され、前記管体に前記インサーションチューブが挿通されるとともに、前記インサーションチューブの外側端に一体化された封止板が前記管体の外側開口部を覆って設けられた構成を採用できる。
伸縮管に接続された管体の外側開口部を封止板で覆うことにより、管体の外側端を封止板で閉じることができる。これにより、インサーションチューブの外側に伸縮管と管体により覆われて形成される空間部を封止板で閉じることができ、インサーションチューブの挿通孔遊挿部分の隙間を外部から隔離できる。
(6)本発明において、前記挿通孔に対する前記インサーションチューブの遊挿部分にパージガスを供給するガス供給手段が接続された構成を採用できる。
インサーションチューブの遊挿部分にパージガスを供給することで遊挿部分を介して外部に出ようとするガスを阻止することができ、配管内や炉内からのガスの漏洩を防止できる。
(4) In this invention, the structure by which the one end side of the said expansion-contraction tube was connected to the opening peripheral part of the said insertion hole via the extension pipe | tube is employable.
(5) In the present invention, an outer opening of the telescopic tube is connected to one end side of the tubular body, and the insertion tube is inserted into the tubular body and integrated with an outer end of the insertion tube. It is possible to adopt a configuration in which the sealed plate is provided so as to cover the outer opening of the tubular body.
By covering the outer opening of the tubular body connected to the telescopic tube with the sealing plate, the outer end of the tubular body can be closed with the sealing plate. Thereby, the space part formed by being covered with the expansion and contraction tube and the tubular body outside the insertion tube can be closed with the sealing plate, and the gap in the insertion hole loose insertion portion of the insertion tube can be isolated from the outside.
(6) In this invention, the structure by which the gas supply means which supplies purge gas to the loose insertion part of the said insertion tube with respect to the said insertion hole was connected is employable.
By supplying the purge gas to the insertion portion of the insertion tube, it is possible to block the gas that is about to go outside through the insertion portion, and it is possible to prevent leakage of gas from the inside of the pipe or the furnace.

本発明は、周壁に形成された挿通孔を遊挿する第1のインサーションチューブと、周壁に形成された他の挿通孔を遊挿して前記第1のインサーションチューブに対向する第2のインサーションチューブを周壁とは別に基礎に支持させたので、インサーションチューブが周壁の振動や変形の影響を受け難く、発光部と受光部に接続されたインサーションチューブに位置ずれや角度ずれを生じ難い。このため、長期間使用してもレーザー光の照射と受光の位置関係に角度ずれや位置ずれを生じることが無く、光軸ずれによる光量の低下を抑制し、優れた分析精度を長期間維持できるレーザー分析装置を提供できる効果がある。
また、レーザー光の発光部と受光部の位置関係において光軸ずれや位置ずれを生じ難いので、長期間使用してもメンテナンス時の修正作業が不要となり、メンテナンス時の作業性を向上できる効果がある。
The present invention includes a first insertion tube that loosely inserts an insertion hole formed in a peripheral wall, and a second insert that loosely inserts another insertion hole formed in the peripheral wall and faces the first insertion tube. Since the insertion tube is supported by the foundation separately from the peripheral wall, the insertion tube is not easily affected by vibration or deformation of the peripheral wall, and the insertion tube connected to the light emitting part and the light receiving part is less likely to be displaced or angularly displaced. . For this reason, even if it is used for a long time, there is no angle shift or position shift in the positional relationship between laser light irradiation and light reception, and a decrease in the amount of light due to the optical axis shift can be suppressed, and excellent analysis accuracy can be maintained for a long time. There is an effect that a laser analyzer can be provided.
In addition, since the optical axis and position are unlikely to be misaligned in the positional relationship between the laser light emitting part and the light receiving part, there is no need for correction work during maintenance even if it is used for a long period of time, thus improving workability during maintenance. is there.

本発明に係る第1実施形態のレーザー分析装置が適用される転炉排ガス回収装置の一例を示す概略図。Schematic which shows an example of the converter exhaust gas collection | recovery apparatus with which the laser analyzer of 1st Embodiment which concerns on this invention is applied. 同転炉排ガス回収装置に設置された第1実施形態のレーザー分析装置を示す側面図。The side view which shows the laser analyzer of 1st Embodiment installed in the converter exhaust gas collection | recovery apparatus. 同レーザー分析装置の一部構成を示すもので、(A)は図2の矢印EE’に沿う第1の架台の側面図、(B)は図2の矢印FF’に沿う第2の架台の側面図、(C)は図2の矢印GG’に沿う第1のインサーションチューブ支持部分を示す側面図。FIG. 2 shows a partial configuration of the laser analyzer, in which (A) is a side view of the first gantry along the arrow EE ′ in FIG. 2, and (B) is the second gantry along the arrow FF ′ in FIG. A side view and (C) are side views which show the 1st insertion tube support part which followed the arrow GG 'of FIG. 同レーザー分析装置の要部を示す断面図。Sectional drawing which shows the principal part of the same laser analyzer. 同レーザー分析装置の一部構成を示すもので、(A)は図4の矢印LL’に沿うフランジ板の側面図、(B)はインサーションチューブ支持部分を示す平面図。FIGS. 5A and 5B show a partial configuration of the laser analyzer, in which FIG. 5A is a side view of a flange plate along an arrow LL ′ in FIG. 4, and FIG. 同レーザー分析装置の一部構成を示すもので、(A)は図4の矢印MM’に沿う封止板の側面図、(B)は図4の矢印NN’に沿う蓋板の側面図。FIGS. 5A and 5B show a partial configuration of the laser analyzer, in which FIG. 5A is a side view of a sealing plate along an arrow MM ′ in FIG. 4, and FIG. 5B is a side view of a lid plate along an arrow NN ′ in FIG. 従来のレーザー分析装置を示すもので、(A)は第1の例を示す断面図、(B)は第2の例を示す断面図。The conventional laser analyzer is shown, (A) is sectional drawing which shows a 1st example, (B) is sectional drawing which shows a 2nd example.

以下、第1実施形態に係るレーザー分析装置を転炉排ガス回収装置に適用した例を挙げて本発明の詳細について説明する。
本実施形態のレーザー分析装置を採用したOG方式転炉排ガス回収装置の全体構成を図1に示す。
転炉1の炉頂部分にフード2が接続され、このフード2に輻射部3を介して2段のベンチュリースクラバー(集塵装置)4が接続され、2段目のベンチュリースクラバー4の後段に誘引送風機5を介し煙道を構成するための配管11が接続されている。配管11の途中部分に順に分岐路11Aと分岐路11Bが形成され、分岐路11Bには放散塔8が接続されている。分岐路11Aは分岐路11Bの途中部分に接続されている。分岐路11Bにおいて配管11から分岐された部分に第1の三方弁6Aが設けられ、配管11において分岐路11Bの分岐部分より若干下流側に第2の三方弁6Bが設けられ、分岐路11Aの内部に第3の三方弁7が設けられている。
配管11の下流端側に回収弁9が設けられ、その下流側に接続管12を介しガスホルダー10が接続されている。
Hereinafter, the details of the present invention will be described with reference to an example in which the laser analyzer according to the first embodiment is applied to a converter exhaust gas recovery device.
FIG. 1 shows the overall configuration of an OG-type converter exhaust gas recovery apparatus that employs the laser analyzer of this embodiment.
A hood 2 is connected to the furnace top portion of the converter 1, and a two-stage venturi scrubber (dust collector) 4 is connected to the hood 2 via a radiating section 3, and is attracted to the subsequent stage of the second-stage venturi scrubber 4. A pipe 11 for constituting a flue is connected via the blower 5. A branch path 11A and a branch path 11B are formed in order in the middle of the pipe 11, and a diffusion tower 8 is connected to the branch path 11B. The branch path 11A is connected to an intermediate portion of the branch path 11B. A first three-way valve 6A is provided at a portion branched from the pipe 11 in the branch passage 11B, and a second three-way valve 6B is provided slightly downstream from the branch portion of the branch passage 11B in the pipe 11, and the branch passage 11A A third three-way valve 7 is provided inside.
A recovery valve 9 is provided on the downstream end side of the pipe 11, and a gas holder 10 is connected to the downstream side via a connection pipe 12.

三方弁6Bで配管11の流路を閉じ、三方弁7で分岐路11Aを閉じ、三方弁6Aを開放して分岐路11Bの流路を開放することで配管11に流入された排ガスは放散塔8を介し大気中に放散される。三方弁6Bで配管11の流路を開放し、三方弁6Aで分岐路11Bの流路を閉じることで配管11内の排ガスは回収弁9と接続管12を経由してガスホルダー10に至る。
以上のように三方弁6A、6Bを操作することにより、転炉1から排出された排ガスをガスホルダー10に導くか、あるいは放散塔8から大気中に放散するかを選択することができる。
上述の通り、転炉1からの排ガスは上流側である転炉1から下流側である放散塔8あるいはガスホルダー10に向かって流される。以下、転炉1から放散塔8あるいはガスホルダー10までの排ガスの流れる経路を総称して排ガス経路という。
The three-way valve 6B closes the flow path of the pipe 11, the three-way valve 7 closes the branch path 11A, the three-way valve 6A is opened, and the flow path of the branch path 11B is opened. 8 is released into the atmosphere via The flow path of the pipe 11 is opened by the three-way valve 6B, and the flow path of the branch path 11B is closed by the three-way valve 6A, whereby the exhaust gas in the pipe 11 reaches the gas holder 10 via the recovery valve 9 and the connection pipe 12.
By operating the three-way valves 6 </ b> A and 6 </ b> B as described above, it is possible to select whether the exhaust gas discharged from the converter 1 is guided to the gas holder 10 or diffused into the atmosphere from the stripping tower 8.
As described above, the exhaust gas from the converter 1 flows from the converter 1 on the upstream side toward the diffusion tower 8 or the gas holder 10 on the downstream side. Hereinafter, a path through which the exhaust gas flows from the converter 1 to the stripping tower 8 or the gas holder 10 is collectively referred to as an exhaust gas path.

転炉1の炉頂側において、1段目のベンチュリースクラバー4が設けられている位置より上流側の排ガス経路である輻射部3に、第1のガス中酸素濃度分析計(以下炉頂酸素分析計という)21とガス中CO濃度分析計(以下炉頂CO分析計という)22が組み込まれている。また、2段目のベンチュリースクラバー4より下流側の排ガス経路である配管11に第2のガス中酸素濃度分析計(以下炉下酸素分析計という)23が組み込まれている。この炉下酸素分析計23は誘引送風機5の下流側の配管11に組み込まれている。   On the furnace top side of the converter 1, a first gas oxygen concentration analyzer (hereinafter referred to as “top furnace oxygen analysis”) is connected to the radiation section 3, which is an exhaust gas path upstream from the position where the first stage venturi scrubber 4 is provided. 21) and a gas CO concentration analyzer (hereinafter referred to as furnace top CO analyzer) 22 are incorporated. In addition, a second gas oxygen concentration analyzer (hereinafter referred to as an in-furnace oxygen analyzer) 23 is incorporated in a pipe 11 that is an exhaust gas path downstream of the second-stage venturi scrubber 4. This in-furnace oxygen analyzer 23 is incorporated in the pipe 11 on the downstream side of the induction fan 5.

転炉排ガスをガスホルダー10に回収するか、あるいは放散塔8を経由して大気中に放散するのかの判断については、排ガスのガス分析結果によって行う。例えば、炉頂CO分析計22で分析した排ガス中の一酸化炭素濃度が25%以上であって、炉頂酸素分析計21と炉下酸素分析計23で分析した排ガス中酸素濃度がいずれも2%以下であることを回収条件とし、回収条件が成立した場合に排ガスをガスホルダー10に回収する。
条件が1つでも外れた場合は回収条件が非成立となり、排ガスを放散塔8から大気中に放散する。なお、上記回収条件は一例であり、設備ごとに適宜変更することができる。
Whether the converter exhaust gas is collected in the gas holder 10 or diffused into the atmosphere via the diffusion tower 8 is determined based on the gas analysis result of the exhaust gas. For example, the carbon monoxide concentration in the exhaust gas analyzed by the furnace top CO analyzer 22 is 25% or more, and the oxygen concentrations in the exhaust gas analyzed by the furnace top oxygen analyzer 21 and the furnace oxygen analyzer 23 are both 2. % Is less than or equal to%, and the exhaust gas is recovered in the gas holder 10 when the recovery condition is satisfied.
When even one of the conditions is not met, the recovery condition is not established, and the exhaust gas is diffused from the radiation tower 8 into the atmosphere. In addition, the said collection conditions are an example and can be suitably changed for every installation.

上述したように、転炉吹錬開始時には転炉排ガス中の酸素濃度が高く、一酸化炭素濃度が低いため、転炉排ガスを放散塔8から放散する。
吹錬の経過とともに、炉頂酸素分析計21、炉下酸素分析計23で分析するガス中の酸素濃度が低下し、炉頂CO分析計22で分析する排ガス中の一酸化炭素濃度が上昇する。そして、分析したガス成分が回収条件成立に至ったときに、三方弁6A、6Bを回収側に操作するとともに回収弁9を開とし、ガスホルダー10への排ガス回収を開始する。
As described above, since the oxygen concentration in the converter exhaust gas is high and the carbon monoxide concentration is low at the start of converter blowing, the converter exhaust gas is diffused from the diffusion tower 8.
With the progress of blowing, the oxygen concentration in the gas analyzed by the furnace top oxygen analyzer 21 and the furnace oxygen analyzer 23 decreases, and the carbon monoxide concentration in the exhaust gas analyzed by the furnace CO analyzer 22 increases. . When the analyzed gas component reaches the recovery condition, the three-way valves 6A and 6B are operated to the recovery side, the recovery valve 9 is opened, and exhaust gas recovery to the gas holder 10 is started.

本実施形態では、炉下酸素分析計23として、配管11の排ガス中にレーザー光を照射し、そのレーザー光の光吸収による光量変化からガス濃度を測定する方式であって、図2に詳細構造を示すレーザー分析装置が設けられている。
本実施形態のレーザー分析装置23は、詳細には、図2に示すように煙道を構成する水平配置された配管11の途中部分を横断面視した場合、周壁11aの直径方向一側に形成された挿通孔11bを若干の隙間dをあけて遊挿し、水平に設置された第1のインサーションチューブ25と、第1のインサーションチューブ25の外端部に接続された発光部26を備えている。また、図2の周壁11aの直径方向他側に形成された挿通孔11cを遊挿して水平に設置された第2のインサーションチューブ27と、第2のインサーションチューブ27の外端部に接続された受光部28と、受光部28に接続された演算処理装置29が設けられている。
In this embodiment, the in-furnace oxygen analyzer 23 is a method of irradiating the exhaust gas in the pipe 11 with laser light and measuring the gas concentration from the change in the amount of light due to the light absorption of the laser light. A laser analyzer is provided.
In detail, the laser analyzer 23 of the present embodiment is formed on one side in the diameter direction of the peripheral wall 11a when the middle part of the horizontally arranged pipe 11 constituting the flue is viewed in cross section as shown in FIG. The inserted insertion hole 11b is loosely inserted with a slight gap d, and includes a first insertion tube 25 installed horizontally, and a light emitting unit 26 connected to the outer end of the first insertion tube 25. ing. Further, the insertion hole 11c formed on the other side in the diameter direction of the peripheral wall 11a in FIG. 2 is loosely inserted and connected to the second insertion tube 27 installed horizontally and the outer end portion of the second insertion tube 27. The light receiving unit 28 and an arithmetic processing unit 29 connected to the light receiving unit 28 are provided.

前記発光部26は測定したい空間に向けて測定用レーザー光30を照射する機能を有し、受光部28は前記測定したい空間を透過した測定用レーザー光30を検出する機能を有する。発光部28から発するレーザー光30の波長を連続的に変化させながら測定空間に照射し、この結果得られる受光部28からの出力信号を演算処理装置29で分析および演算することにより検出対象である分子や原子の平均濃度および平均温度のデータを得ることができる。
本実施形態では配管11の内側空間Sを転炉1からの排ガスが通過するので、測定用レーザー光30は第1のインサーションチューブ25の先端部25aから内側空間Sに出た後、第2のインサーションチューブ27の先端部27aに入るまでの間に、排ガスの影響を受け、その後、受光部28に至る。
The light emitting unit 26 has a function of irradiating the measurement laser light 30 toward the space to be measured, and the light receiving unit 28 has a function of detecting the measurement laser light 30 that has passed through the space to be measured. The laser beam 30 emitted from the light emitting unit 28 is irradiated with the measurement space while continuously changing the wavelength, and the output signal from the light receiving unit 28 obtained as a result is analyzed and calculated by the arithmetic processing unit 29 to be detected. Data on average concentration and temperature of molecules and atoms can be obtained.
In the present embodiment, since the exhaust gas from the converter 1 passes through the inner space S of the pipe 11, the measurement laser light 30 is emitted from the distal end portion 25 a of the first insertion tube 25 to the inner space S and then second. Until it enters the distal end portion 27 a of the insertion tube 27, it is affected by the exhaust gas, and then reaches the light receiving portion 28.

第1のインサーションチューブ25は、配管11の半径より若干長いチューブから構成され、その先端部25aを配管11の中心部近くに望ませ、その基端部25bを配管11の外側に突出させて水平に設置されている。第1のインサーションチューブ25はその基端部25bを配管11とは別個の基礎Gに支持されている鉄骨組構造の架台33により支持されている管体24に接続されている。   The first insertion tube 25 is composed of a tube slightly longer than the radius of the pipe 11, and its distal end 25 a is desired near the center of the pipe 11, and its base end 25 b protrudes outside the pipe 11. It is installed horizontally. The first insertion tube 25 is connected at its base end portion 25 b to a tube body 24 supported by a steel frame structure base 33 supported by a foundation G separate from the pipe 11.

架台33の上端部において管体24側に矩形状の枠材33aを介し門型フレーム33Aが立設され、この門型フレーム33Aの頂部中央に互いに離間した支持片33B、33Bが設けられ、これらの支持片33B、33B間に挟まれるように管体24が支持されている。対になる支持片33B、33Bは門型フレーム33Aの上面側において配管11に近い位置と配管11から遠い位置にそれぞれ形成され、合計4つの支持片33Bにより管体24が位置決めされている。
従って、管体24は門型フレーム33Aの頂部中央に設置されるとともに、4つの支持片33Bに挟まれた状態で固定され、水平に支持されており、第1のインサーションチューブ25は管体24に接続され、水平に片持支持されている。
第1のインサーションチューブ25の一端側は管体24を挿通して管体24の外側に延在され、管体24の外側端に一体化されているフランジ板44Aを挿通して該フランジ板44Aに隣接されている封止板44Bに接合されている。この接合構造については後に詳述する。
At the upper end of the gantry 33, a portal frame 33A is erected on the tube body 24 side through a rectangular frame member 33a, and support pieces 33B and 33B spaced apart from each other are provided at the center of the top of the portal frame 33A. The tube body 24 is supported so as to be sandwiched between the support pieces 33B and 33B. The pair of support pieces 33B and 33B are respectively formed at a position close to the pipe 11 and a position far from the pipe 11 on the upper surface side of the portal frame 33A, and the tube body 24 is positioned by a total of four support pieces 33B.
Accordingly, the tube body 24 is installed at the center of the top of the portal frame 33A, is fixed in a state sandwiched between the four support pieces 33B, and is supported horizontally, and the first insertion tube 25 is the tube body. 24 and cantilevered horizontally.
One end side of the first insertion tube 25 extends through the tube body 24 through the tube body 24, and passes through the flange plate 44 </ b> A integrated with the outer end of the tube body 24. It is joined to a sealing plate 44B adjacent to 44A. This junction structure will be described in detail later.

第1のインサーションチューブ25が配管11の挿通孔11bを遊挿した部分の外側には、周壁11aの外面に密着して挿通孔11bの開口周縁部を覆う蓋板35が設けられている。この蓋板35は図6(B)に示すように正面視正方形状であり、その中央に形成されている透孔35aに第1のインサーションチューブ25が若干の隙間をあけて遊挿されている。
蓋板35の外側には第1のインサーションチューブ25の外径よりも内径の若干大きな短尺の延長管36が設けられ、この延長管36が第1のインサーションチューブ25に外挿されている。延長管36の一端側は蓋板35の透孔35aを通過して挿通孔11bの開口周縁部に接続され、延長管36の他端側にはリング板状の接続板37が取り付けられている。なお、図4に第1のインサーションチューブ25の挿通部分の拡大構造を示すが、図4は図2に示す第1のインサーションチューブ25を見る方向と反対方向から第1のインサーションチューブ25とその周囲部分を描いている。
On the outer side of the portion where the first insertion tube 25 loosely inserts the insertion hole 11b of the pipe 11, a cover plate 35 is provided that is in close contact with the outer surface of the peripheral wall 11a and covers the opening peripheral edge of the insertion hole 11b. As shown in FIG. 6B, the cover plate 35 has a square shape when viewed from the front, and the first insertion tube 25 is loosely inserted into the through hole 35a formed in the center thereof with a slight gap. Yes.
A short extension tube 36 having an inner diameter slightly larger than the outer diameter of the first insertion tube 25 is provided outside the cover plate 35, and the extension tube 36 is extrapolated to the first insertion tube 25. . One end side of the extension pipe 36 passes through the through hole 35a of the lid plate 35 and is connected to the opening peripheral edge of the insertion hole 11b. A ring plate-like connection plate 37 is attached to the other end side of the extension pipe 36. . 4 shows an enlarged structure of the insertion portion of the first insertion tube 25. FIG. 4 shows the first insertion tube 25 from a direction opposite to the direction of viewing the first insertion tube 25 shown in FIG. And the surrounding area.

前記接続板37の外側に金属製の蛇腹管からなる伸縮管38が接続されている。伸縮管38はその両端開口部にリング板状のフランジ板39、40が接続され、伸縮管38は一方のフランジ板39を延長管36側の接続板37に突き合わせて第1のインサーションチューブ25に外挿されている。突き合わせて重ねられた接続板37とフランジ板39は両者を貫通して一体化する図示略の複数の連結ボルトにより接合されている。なお、伸縮管38の一例としてステンレス鋼製の蛇腹管を例示できる。   An expansion / contraction tube 38 made of a metal bellows tube is connected to the outside of the connection plate 37. Ring plate-like flange plates 39 and 40 are connected to both ends of the expansion tube 38, and the expansion tube 38 abuts one flange plate 39 against the connection plate 37 on the extension tube 36 side to insert the first insertion tube 25. Has been extrapolated to. The connecting plate 37 and the flange plate 39 which are overlapped with each other are joined together by a plurality of coupling bolts (not shown) which penetrate and integrate both. As an example of the telescopic tube 38, a stainless steel bellows tube can be exemplified.

延長管36、接続板37、フランジ板39、伸縮管38、フランジ板40、41は、いずれも第1のインサーションチューブ25に対し若干の隙間をあけて外挿されている。このため、第1のインサーションチューブ25の外周側には、挿通孔11bの開口周縁部から延長管36の内周部と接続板37の内周部と伸縮管38の内周部と管体24の内周部、フランジ板44Aの内周部と封止板44Bに至る空間部Kが形成されている。この空間部Kは、配管11側において、挿通孔11cを介し配管11の内側空間に連通されているが、配管11から離れた側において、第1のインサーションチューブ25に一体化されている封止板44Bにより閉じられている。
以上の構成において、蓋板35、延長管36、接続板37、フランジ板39、伸縮管38、フランジ板40、41、管体24、フランジ板44A、封止板44Bにより、挿通孔11bの開口部の隙間dを外部から隔離するための遮蔽機構Hが構成されている。
The extension tube 36, the connection plate 37, the flange plate 39, the telescopic tube 38, and the flange plates 40 and 41 are all inserted with a slight gap with respect to the first insertion tube 25. For this reason, on the outer peripheral side of the first insertion tube 25, from the opening peripheral part of the insertion hole 11b, the inner peripheral part of the extension pipe 36, the inner peripheral part of the connecting plate 37, the inner peripheral part of the telescopic pipe 38, and the tubular body The space part K which reaches the inner peripheral part of 24, the inner peripheral part of 44 A of flange plates, and the sealing board 44B is formed. The space K is communicated with the inner space of the pipe 11 through the insertion hole 11c on the pipe 11 side, but is sealed with the first insertion tube 25 on the side away from the pipe 11. It is closed by a stop plate 44B.
In the above configuration, the opening of the insertion hole 11b is formed by the lid plate 35, the extension tube 36, the connection plate 37, the flange plate 39, the telescopic tube 38, the flange plates 40 and 41, the tube body 24, the flange plate 44A, and the sealing plate 44B. A shielding mechanism H for isolating the gap d of the part from the outside is configured.

なお、前記空間部Kにはパージガスを流しておくことが好ましいので、一例として、延長管36の外周壁の一部にパージガス供給装置34に接続される供給管34aを接続し、窒素ガスなどのパージガスを空間部Kに供給する構成とされている。   In addition, since it is preferable to flow purge gas through the space K, as an example, a supply pipe 34a connected to the purge gas supply device 34 is connected to a part of the outer peripheral wall of the extension pipe 36, and nitrogen gas or the like is connected. The purge gas is supplied to the space K.

フランジ板40、41と封止板44Bの下方に第1の架台33の上部側から延出形成された支持台33Cが形成され、図6(A)に示すようにフランジ板40とフランジ板41が支持台33Cの上に載置され、支持台33Cに連結された索条体42によってフランジ板40とフランジ板41が固定されている。
第1のインサーションチューブ25の基端部側には観測用レーザー光の中継器43が複数枚のフランジ板44A、封止板44B、フランジ板44Cを介し接続されている。そして、この中継器43の外側に観測用レーザー光の発光部(発光ユニット)26が接続されている。
また、周壁11aにおいて第1のインサーションチューブ25が外側に突出された部分の上方に第1のインサーションチューブ25とその基端側の部分および中継器43と発光部26を覆うように庇型のカバーユニット46が設置されている。
A support base 33C extending from the upper side of the first mount 33 is formed below the flange plates 40 and 41 and the sealing plate 44B. As shown in FIG. 6A, the flange plate 40 and the flange plate 41 are formed. Is mounted on the support base 33C, and the flange plate 40 and the flange plate 41 are fixed by the cable body 42 connected to the support base 33C.
An observation laser beam repeater 43 is connected to the base end side of the first insertion tube 25 via a plurality of flange plates 44A, sealing plates 44B, and flange plates 44C. A light emitting unit (light emitting unit) 26 for observation laser light is connected to the outside of the repeater 43.
Also, the peripheral wall 11a has a saddle type shape so as to cover the first insertion tube 25, the base end portion thereof, the repeater 43, and the light emitting portion 26 above the portion where the first insertion tube 25 protrudes outward. The cover unit 46 is installed.

ここまで、図2に示す周壁11aの一側に設けられている第1のインサーションチューブ25と発光部26およびそれらの周辺機器の構造について説明したが、周壁11aの他側に第2のインサーションチューブ27と受光部28およびそれらの周辺機器が設けられている。第2のインサーションチューブ27とその支持構造並びにその周辺構造については、第1のインサーションチューブ25とその支持構造並びにその周辺構造と方向が異なるのみで構造は同等である。よって、方向のみが異なるが、同一の構成要素については同一の符号を付してそれらの説明を簡略化する。   Up to this point, the structure of the first insertion tube 25 and the light emitting section 26 and their peripheral devices provided on one side of the peripheral wall 11a shown in FIG. 2 has been described. Tube 27, light receiving unit 28, and peripheral devices thereof. The second insertion tube 27, its supporting structure and its peripheral structure are the same except that the first insertion tube 25, its supporting structure and its peripheral structure are different in direction. Therefore, although only the directions are different, the same components are denoted by the same reference numerals, and the description thereof is simplified.

第2のインサーションチューブ27は、第1のインサーションチューブ25と同等の長さに構成され、その先端部27aを配管11の中心部近くに望ませ、その基端部27bを配管11の外側に突出させて水平に設置されている。第2のインサーションチューブ27は第1のインサーションチューブ25と対向するように周壁11aを遊挿して水平に配置されている。
第2のインサーションチューブ27はその基端部27bを配管11とは別個の基礎Gに支持されている鉄骨組構造の架台33により支持されている管体24に接続されている。この架台33は先の例の架台33と同等構造で設置位置と設置方向のみが異なる。即ち、門型フレーム33Aと支持片33B、33Bを備えこれらにより管体24が支持されている。
The second insertion tube 27 is configured to have a length equivalent to that of the first insertion tube 25, the distal end portion 27 a is desired near the center of the pipe 11, and the base end portion 27 b is disposed outside the pipe 11. It is installed horizontally with protruding. The second insertion tube 27 is horizontally disposed by loosely inserting the peripheral wall 11a so as to face the first insertion tube 25.
The second insertion tube 27 is connected at its base end portion 27 b to a tube body 24 supported by a steel frame structure base 33 supported on a foundation G separate from the pipe 11. The gantry 33 is equivalent in structure to the gantry 33 in the previous example, and only the installation position and the installation direction are different. That is, a portal frame 33A and support pieces 33B and 33B are provided, and the tube body 24 is supported by these.

第2のインサーションチューブ27が周壁11の挿通孔11cに遊挿されている構造についても第1のインサーションチューブ25の構造と同等であり、蓋板35、延長管36、接続板37、伸縮管38、フランジ板39、40、41、フランジ板44A、封止板44B、フランジ板44Cが設けられている点についても第1のインサーションチューブ25の周辺構造と同等である。
第2のインサーションチューブ27においては、その基端部側に中継器43を介して受光部28が接続されている点が異なり、受光部28に演算処理装置29が接続されている点が異なるが、その他の構造は先の第1のインサーションチューブ25の周辺構造と同等である。
以上の構成において、第2のインサーションチューブ27に対し、蓋板35、延長管36、接続板37、フランジ板39、伸縮管38、フランジ板40、41、44A、封止板44Bが設けられているので、これらにより、挿通孔11bの開口部の隙間を外部から隔離するための遮蔽機構Hが構成されている。
The structure in which the second insertion tube 27 is loosely inserted in the insertion hole 11c of the peripheral wall 11 is also the same as the structure of the first insertion tube 25, and the cover plate 35, the extension tube 36, the connection plate 37, and the expansion / contraction The point where the tube 38, the flange plates 39, 40, 41, the flange plate 44A, the sealing plate 44B, and the flange plate 44C are provided is the same as the peripheral structure of the first insertion tube 25.
The second insertion tube 27 is different in that the light receiving unit 28 is connected to the base end side of the second insertion tube 27 via the repeater 43 and the arithmetic processing unit 29 is connected to the light receiving unit 28. However, other structures are equivalent to the peripheral structure of the first insertion tube 25 described above.
In the above configuration, the second insertion tube 27 is provided with a cover plate 35, an extension tube 36, a connection plate 37, a flange plate 39, a telescopic tube 38, flange plates 40, 41, 44A, and a sealing plate 44B. Therefore, the shielding mechanism H for isolating the clearance gap of the opening part of the penetration hole 11b from the exterior is comprised by these.

以上説明の構造によれば、配管11とは個別に基礎Gに設けた架台33に支持された管体24によって第1のインサーションチューブ25が片持支持され、同じく基礎Gに設けた他の架台33に支持された管体24によって第2のインサーションチューブ27が片持支持されている。このため、第1のインサーションチューブ25を支持した管体24を支持した架台33を第1の架台と呼称し、第2のインサーションチューブ27を支持した管体24を支持した架台33を第2の架台と呼称できる。
第1のインサーションチューブ25を挿通孔11bに遊挿し、第2のインサーションチューブ27を挿通孔11cに遊挿しているので、配管11が振動または微小位置ずれることがあっても、配管11とインサーションチューブ25、27が相互干渉することがなく、インサーションチューブ25、27が配管11の影響を受けて位置ずれや角度ずれを起こすことがない。第1のインサーションチューブ25と第2のインサーションチューブ27は配管11とは個別の基礎Gに支持された第1の架台33と第2の架台33により支持されているので、配管11が振動し、位置ずれしてもインサーションチューブ25、27の位置ずれ、角度ずれは生じない。
また、長期間の使用によってもインサーションチューブ25、27に位置ずれや角度ずれを生じない。インサーションチューブ25、27の位置ずれや角度ずれが生じないので、発光部26と受光部28の相対位置ずれ、相対角度ずれも生じない。
According to the structure described above, the first insertion tube 25 is cantilevered by the pipe body 24 supported by the gantry 33 provided on the foundation G separately from the pipe 11, The second insertion tube 27 is cantilevered by the tube body 24 supported by the gantry 33. Therefore, the gantry 33 that supports the tube body 24 that supports the first insertion tube 25 is referred to as a first gantry, and the gantry 33 that supports the tube body 24 that supports the second insertion tube 27 is the first gantry. It can be referred to as a 2 frame.
Since the first insertion tube 25 is loosely inserted into the insertion hole 11b and the second insertion tube 27 is loosely inserted into the insertion hole 11c, the piping 11 The insertion tubes 25 and 27 do not interfere with each other, and the insertion tubes 25 and 27 are not affected by the piping 11 and do not cause a positional shift or an angular shift. Since the first insertion tube 25 and the second insertion tube 27 are supported by the first frame 33 and the second frame 33 supported by the separate foundation G, the pipe 11 vibrates. However, even if the position is shifted, there is no position shift or angle shift of the insertion tubes 25 and 27.
Further, the insertion tubes 25 and 27 are not displaced or angularly displaced even after long-term use. Since the positional displacement and the angular displacement of the insertion tubes 25 and 27 do not occur, neither the relative positional displacement nor the relative angular displacement between the light emitting unit 26 and the light receiving unit 28 occurs.

従って、レーザー光の光軸の位置ずれや角度ずれを引き起こすことなくガス分析を長期間行うことができ、測定誤差を生じ難く、測定不能の状態に陥ることがないレーザー分析装置23を提供できる。また、長期間使用しても光軸ずれや位置ずれを生じ難いので、光軸ずれや位置ずれの修正作業が不要となり、メンテナンス時の作業性が向上する。
一般市販のレーザー分析装置においては、光軸が3度程度ずれた場合でも計測値が変わるか計測不能となる場合があるので、上述の構造は極めて有効である。
Therefore, it is possible to provide a laser analyzer 23 that can perform gas analysis for a long period of time without causing a positional deviation or an angular deviation of the optical axis of the laser light, hardly causes a measurement error, and does not fall into an unmeasurable state. In addition, since the optical axis deviation and the positional deviation hardly occur even when used for a long period of time, the correction work for the optical axis deviation and the positional deviation becomes unnecessary, and the workability at the time of maintenance is improved.
In a general commercially available laser analyzer, the above-described structure is extremely effective because the measured value may change or become impossible to measure even when the optical axis is shifted by about 3 degrees.

次に、インサーションチューブ25を挿通孔11bに遊挿し、インサーションチューブ27を挿通孔11cに遊挿した構造としていると、これら挿通孔11b、11cとインサーションチューブ25、27の間に隙間dを生じる。そして、これらの隙間dを介し、配管11内を流れる排ガスが配管11の外側に出るおそれを有するが、これら隙間dの外側は空間部Kに連通され、空間部Kは封止板41で閉じられているので、配管11の外部に排ガスが漏れることはない。
また、延長管36の外周壁にパージガスの供給管34aを接続すると、空間部Kにパージガスを満たすことができ、このパージガスを空間部K側から挿通孔11b、11cを介し配管11の内側に流すようにするならば、配管11の内側空間に存在している排ガスが空間部K側に流れ込まないようにパージガスでブロックすることができ、排ガスの外部漏洩を確実に防止できる。
Next, when the insertion tube 25 is loosely inserted into the insertion hole 11b and the insertion tube 27 is loosely inserted into the insertion hole 11c, a gap d is formed between the insertion holes 11b and 11c and the insertion tubes 25 and 27. Produce. The exhaust gas flowing in the pipe 11 may be discharged to the outside of the pipe 11 through these gaps d. The outside of the gaps d communicates with the space K, and the space K is closed by the sealing plate 41. Therefore, the exhaust gas does not leak outside the pipe 11.
Further, when the purge gas supply pipe 34a is connected to the outer peripheral wall of the extension pipe 36, the purge gas can be filled in the space K, and the purge gas flows from the space K side to the inside of the pipe 11 through the insertion holes 11b and 11c. If it does so, it can block with purge gas so that the exhaust gas which exists in the inner space of the piping 11 may not flow into the space part K side, and can prevent external leakage of exhaust gas reliably.

また、前記の構造において、インサーションチューブ25、27のそれぞれの外側に伸縮管38を設けているので、基礎Gに支持された架台33、33によってインサーションチューブ25、27を安定支持した状態で、配管11に振動や位置ずれなどを生じても、伸縮管38がこれら振動や位置ずれを吸収し、インサーションチューブ25、27側に振動や位置ずれによる影響を与えない。即ち、配管11に振動や位置ずれを生じると、これらが伸縮管38までは伝わるが、伸縮管38が変形することでこれらの振動や位置ずれを吸収し、インサーションチューブ25、27に振動や位置ずれによる影響を与えない。
伸縮管38の外側の端部に接続されているフランジ板40、41、封止板44Bは支持台33Cを介し架台33により支持されるので、伸縮管38の外側端部も安定支持される。
In the above-described structure, since the expansion tube 38 is provided outside each of the insertion tubes 25, 27, the insertion tubes 25, 27 are stably supported by the gantry 33, 33 supported by the foundation G. Even if vibration or displacement occurs in the pipe 11, the telescopic tube 38 absorbs the vibration or displacement and does not affect the insertion tubes 25 and 27 due to vibration or displacement. That is, when vibration or displacement occurs in the pipe 11, these are transmitted to the expansion tube 38, but the expansion tube 38 is deformed to absorb these vibrations and displacement, and the insertion tubes 25 and 27 are subjected to vibration and displacement. Does not affect the position shift.
Since the flange plates 40 and 41 and the sealing plate 44B connected to the outer end portion of the telescopic tube 38 are supported by the gantry 33 via the support base 33C, the outer end portion of the telescopic tube 38 is also stably supported.

ところで、先の実施形態では配管11に取り付けるインサーションチューブ25、27を配管11の中央部近くまで延出する長尺のチューブとしたが、本実施形態の構造は、インサーションチューブ25、27を図7(A)に示す短尺のインサーションチューブとした場合に適用することもできる。図7(A)に示すように配管100の周壁を貫通して配管100の内側に若干突出する短尺のインサーションチューブであっても、本発明を適用することが可能であり、配管100の外側に突出するインサーションチューブを図7(A)に示す構成より若干長く形成して配管100とは別個の基礎に支持された管体24に支持させてインサーションチューブを支持する構造に適用できる。   By the way, in the previous embodiment, the insertion tubes 25 and 27 attached to the pipe 11 are long tubes extending to the vicinity of the central portion of the pipe 11, but the structure of the present embodiment includes the insertion tubes 25 and 27. It can also be applied to the case of a short insertion tube shown in FIG. As shown in FIG. 7A, the present invention can be applied even to a short insertion tube that penetrates the peripheral wall of the pipe 100 and slightly protrudes to the inside of the pipe 100. The insertion tube that protrudes in the direction shown in FIG. 7A is formed to be slightly longer than the structure shown in FIG. 7A, and is supported by a tube body 24 supported on a foundation separate from the pipe 100, and can be applied to a structure that supports the insertion tube.

また、先の実施形態では配管11にインサーションチューブ25、27を取り付けた構造について説明したが、配管11に本発明を適用する代わりに、燃焼炉や焼鈍炉あるいは冷間圧延用調質炉などの周壁あるいはこれらの炉から雰囲気ガスを抜き出す配管に対し一側にインサーションチューブ25を遊挿し、他側にインサーションチューブ27を遊挿する構造とすることによって、配管以外の炉の周壁に本発明構造を適用することができる。
燃焼炉や調質炉などにおいても、炉内雰囲気中に含まれる酸素や一酸化炭素などの量に応じて炉の制御を行う場合があるので、本発明構造を適用し、レーザー光を用いて炉内雰囲気中のガス濃度や温度を計測することができる。
In the previous embodiment, the structure in which the insertion tubes 25 and 27 are attached to the pipe 11 has been described. Instead of applying the present invention to the pipe 11, a combustion furnace, an annealing furnace, a tempering furnace for cold rolling, and the like. The insertion tube 25 is loosely inserted on one side and the insertion tube 27 is loosely inserted on the other side of the peripheral wall of the furnace or the piping for extracting the atmospheric gas from these furnaces. Inventive structure can be applied.
Even in a combustion furnace or a tempering furnace, the furnace may be controlled depending on the amount of oxygen, carbon monoxide, etc. contained in the atmosphere in the furnace, so the structure of the present invention is applied and laser light is used. The gas concentration and temperature in the furnace atmosphere can be measured.

H…遮蔽機構、G…基礎、K…空間部、1…転炉、2…フード、3…輻射部、4…ベンチュリースクラバー、6A、6B…三方弁、8…放散塔、10…ガスホルダー、11…配管、23…炉下酸素分析計(レーザー分析装置)、25…第1のインサーションチューブ、25a…先端部、25b…基端部、26…発光部、27…第2のインサーションチューブ、27a…先端部、27b…基端部、28…受光部、29…演算処理装置、30…測定用レーザー光、33…架台、36…延長管、38…伸縮管、39、40、41、44A、44C…フランジ板、44B…封止板。   H ... shielding mechanism, G ... foundation, K ... space part, 1 ... converter, 2 ... hood, 3 ... radiation part, 4 ... venturi scrubber, 6A, 6B ... three-way valve, 8 ... diffusion tower, 10 ... gas holder, DESCRIPTION OF SYMBOLS 11 ... Piping, 23 ... Furnace oxygen analyzer (laser analyzer), 25 ... 1st insertion tube, 25a ... Tip part, 25b ... Base end part, 26 ... Light emission part, 27 ... 2nd insertion tube 27a ... distal end portion, 27b ... proximal end portion, 28 ... light receiving portion, 29 ... arithmetic processing device, 30 ... laser beam for measurement, 33 ... mount, 36 ... extension tube, 38 ... telescopic tube, 39, 40, 41, 44A, 44C ... flange plate, 44B ... sealing plate.

Claims (6)

配管または炉の周壁の一側に形成された挿通孔を遊挿して設けられた第1のインサーションチューブと、前記周壁の他側に形成された挿通孔を遊挿して設けられ、前記第1のインサーションチューブに対向するように設けられた第2のインサーションチューブと、前記第1のインサーションチューブを介しレーザー光を前記周壁の内側空間に照射する発光部と、前記内側空間を通過した前記レーザー光を前記第2のインサーションチューブを介し受光する受光部とを備え、
前記第1のインサーションチューブが第1の架台に支持された管体に支持され、前記第2のインサーションチューブが第2の架台に支持された管体に支持され、前記第1の架台と前記第2の架台が前記周壁とは別個に基礎に支持されるとともに、
前記インサーションチューブが前記挿通孔を遊挿した部分に形成されている隙間が前記インサーションチューブに外挿された伸縮管によって覆われたことを特徴とするレーザー分析装置。
A first insertion tube provided by loosely inserting an insertion hole formed on one side of the peripheral wall of the pipe or the furnace, and an insertion hole formed on the other side of the peripheral wall; A second insertion tube provided to face the insertion tube, a light emitting unit for irradiating the inner space of the peripheral wall with laser light through the first insertion tube, and the inner space passed A light receiving portion for receiving the laser light through the second insertion tube,
The first insertion tube is supported by a tube supported by a first gantry, the second insertion tube is supported by a tube supported by a second gantry, and the first gantry and The second frame is supported by a foundation separately from the peripheral wall,
A laser analyzing apparatus, wherein a gap formed in a portion where the insertion tube is loosely inserted into the insertion hole is covered with a telescopic tube externally inserted into the insertion tube.
前記周壁の外側に出された前記第1のインサーションチューブの外周部および前記発光部が前記周壁の外側に設置された前記第1の架台によって支持された管体に支持され、前記周壁の外側に出された前記第2のインサーションチューブの外周部および前記受光部が前記周壁の外側に設置された前記第2の架台によって支持された管体に支持されたことを特徴とする請求項1に記載のレーザー分析装置。   The outer peripheral part of the first insertion tube and the light emitting part that are placed outside the peripheral wall are supported by a tubular body supported by the first frame installed on the outer side of the peripheral wall, and the outer side of the peripheral wall 2. The outer peripheral portion of the second insertion tube and the light receiving portion that are placed on the tube are supported by a tubular body that is supported by the second frame installed outside the peripheral wall. The laser analyzer described in 1. 前記インサーションチューブに外挿した前記伸縮管の一端側が前記挿通孔の開口周縁部に接続され、前記伸縮管の他端側が閉じられて前記隙間が外部から隔離されるとともに、前記伸縮管の他端が前記架台で支持されたことを特徴とする請求項1または請求項2に記載のレーザー分析装置。   One end side of the expansion tube externally inserted into the insertion tube is connected to the peripheral edge of the opening of the insertion hole, and the other end side of the expansion tube is closed to isolate the gap from the outside. The laser analyzer according to claim 1, wherein an end is supported by the mount. 前記伸縮管の一端側が延長管を介し前記挿通孔の開口周縁部に接続されたことを特徴とする請求項3に記載のレーザー分析装置。   The laser analyzer according to claim 3, wherein one end side of the telescopic tube is connected to an opening peripheral edge of the insertion hole via an extension tube. 前記伸縮管の外側開口部が前記管体の一端側に接続され、前記管体に前記インサーションチューブが挿通されるとともに、前記インサーションチューブの外側端に一体化された封止板が前記管体の外側開口部を覆って設けられたことを特徴とする請求項3または請求項4に記載のレーザー分析装置。   An outer opening of the telescopic tube is connected to one end of the tube, the insertion tube is inserted through the tube, and a sealing plate integrated with the outer end of the insertion tube is the tube. The laser analyzer according to claim 3 or 4, wherein the laser analyzer is provided so as to cover an outer opening of the body. 前記挿通孔に対する前記インサーションチューブの遊挿部分にパージガスを供給するガス供給手段が接続されたことを特徴とする請求項1〜請求項5のいずれか一項に記載のレーザー分析装置。   The laser analyzer according to any one of claims 1 to 5, wherein a gas supply means for supplying a purge gas is connected to a loose insertion portion of the insertion tube with respect to the insertion hole.
JP2015060409A 2015-03-24 2015-03-24 Laser analyzer Active JP6451438B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015060409A JP6451438B2 (en) 2015-03-24 2015-03-24 Laser analyzer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015060409A JP6451438B2 (en) 2015-03-24 2015-03-24 Laser analyzer

Publications (2)

Publication Number Publication Date
JP2016180642A true JP2016180642A (en) 2016-10-13
JP6451438B2 JP6451438B2 (en) 2019-01-16

Family

ID=57131301

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015060409A Active JP6451438B2 (en) 2015-03-24 2015-03-24 Laser analyzer

Country Status (1)

Country Link
JP (1) JP6451438B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019066419A (en) * 2017-10-04 2019-04-25 東邦チタニウム株式会社 Gas concentration measurement system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57151551U (en) * 1981-03-18 1982-09-22
JPS588147U (en) * 1981-07-09 1983-01-19 株式会社東芝 Flue gas analyzer
JP2012102367A (en) * 2010-11-10 2012-05-31 Nippon Steel Corp Device and method for recovering converter exhaust gas
WO2013179432A1 (en) * 2012-05-30 2013-12-05 新日鐵住金株式会社 Exhaust gas recovery device for converter furnace and method for recovering exhaust gas for converter furnace
JP2014092381A (en) * 2012-10-31 2014-05-19 Mitsubishi Heavy Ind Ltd Device for multi-point measuring gas component concentration in gas

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57151551U (en) * 1981-03-18 1982-09-22
JPS588147U (en) * 1981-07-09 1983-01-19 株式会社東芝 Flue gas analyzer
JP2012102367A (en) * 2010-11-10 2012-05-31 Nippon Steel Corp Device and method for recovering converter exhaust gas
WO2013179432A1 (en) * 2012-05-30 2013-12-05 新日鐵住金株式会社 Exhaust gas recovery device for converter furnace and method for recovering exhaust gas for converter furnace
JP2014092381A (en) * 2012-10-31 2014-05-19 Mitsubishi Heavy Ind Ltd Device for multi-point measuring gas component concentration in gas

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"排ガスを監視する環境計測システム", 富士時報, vol. Vol. 82, No. 5, JPN7018003000, 10 September 2009 (2009-09-10), JP, pages pp. 49-53 *
坂中正雄(富士電機): "直接挿入レーザ方式ガス分析計<高速応答・メンテナンスフリーを実現したガス分析計>", 計測技術, vol. Vol. 41, No. 2, JPN7018002998, 10 January 2013 (2013-01-10), JP, pages pp. 128-132 *
宇野正裕(富士電機システムズ): "排ガスの濃度分析計の開発", 産業と電気, vol. No. 665, JPN7018002999, 5 February 2008 (2008-02-05), JP, pages pp. 11-13 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019066419A (en) * 2017-10-04 2019-04-25 東邦チタニウム株式会社 Gas concentration measurement system

Also Published As

Publication number Publication date
JP6451438B2 (en) 2019-01-16

Similar Documents

Publication Publication Date Title
JP5527168B2 (en) Converter exhaust gas recovery device and converter exhaust gas recovery method
EP2695952B1 (en) Exhaust gas recovery device for converter furnace and method for recovering exhaust gas for converter furnace
ES2920279T3 (en) Method and apparatus for acoustically detecting fluid leaks
JP6462710B2 (en) Gas analyzer
JP2017527795A (en) System and method for analyzing chemical constituents of dusty industrial off-gas
JP6451438B2 (en) Laser analyzer
RU2008131904A (en) DECREASING CONCENTRATION OF THE SAMPLER AND METHOD FOR SELECTING AND REDUCING THE CONCENTRATION OF A GAS SAMPLE
JP2009270917A (en) Mounting structure of laser type gas analysis meter
US7654160B2 (en) Sampling probe enabling the measurement of gaseous species in particle-laden flue gas
JP6716893B2 (en) Gas sampling device, gas analysis device, gas sampling method, and gas analysis method
US20220397476A1 (en) Process for detecting water leaks from smelting furnaces in metal or alloy production plants and related plant
US6943886B2 (en) Method for enhanced gas monitoring in high particle density flow streams
US11921036B2 (en) In situ apparatus for furnace off-gas constituent and flow velocity measurement
CN104569004B (en) A kind of method of detection of water screen tube
US9052110B2 (en) Converter exhaust gas recovery apparatus and converter exhaust gas recovery method
WO2016174759A1 (en) Laser-type gas analyzer
JP4875531B2 (en) Ion beam irradiation equipment
JP2011185801A (en) Sampling nozzle mounting method to steel tower support type exhaust stack
CN1846127B (en) Method for measuring discharged gaseous matter
Zuliani Next Generation off-gas analysis
KR102074727B1 (en) Apparatus for measuring gas concentration
BR112019020917B1 (en) SYSTEM FOR DETECTING FLUID LEAKS ACOUSTICALLY
JP2014115194A (en) Pipe for gas measurement, and method of manufacturing the same
KR20050013552A (en) Device and method for spectroscopically measuring a gas concentration by determining a single absorption line
TW202234039A (en) High temperature gas sampling equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171106

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180829

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180904

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20181019

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181102

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181113

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181126

R151 Written notification of patent or utility model registration

Ref document number: 6451438

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350