JP2016050378A - Slope stabilization structure - Google Patents
Slope stabilization structure Download PDFInfo
- Publication number
- JP2016050378A JP2016050378A JP2014174307A JP2014174307A JP2016050378A JP 2016050378 A JP2016050378 A JP 2016050378A JP 2014174307 A JP2014174307 A JP 2014174307A JP 2014174307 A JP2014174307 A JP 2014174307A JP 2016050378 A JP2016050378 A JP 2016050378A
- Authority
- JP
- Japan
- Prior art keywords
- slope
- improved body
- ground
- stabilization structure
- improvement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
本発明は、斜面安定化構造に関する。 The present invention relates to a slope stabilization structure.
沢や谷等に盛土を行う場合や、土砂等が堆積した沢等では、沢等の下流部に堰堤を形成し、盛土や堆積物等(以下、単に「堆積物等」という)をせき止めるのが一般的である。 When embankment is carried out in rivers or valleys, or in rivers where sediment has accumulated, weirs are formed in the downstream area of rivers, etc., and embankments and sediments (hereinafter simply referred to as “sediments”) are blocked. Is common.
ところが、斜面に堆積した堆積物が液状化すると、重力により流動して、堰堤を乗り越えて流出するおそれがある。
このような斜面部の流動対策工としては、例えば、堆積物等に対して液状化対策工を施す方法や、堰堤等を嵩上げする方法が採用されている。
However, when the sediment deposited on the slope liquefies, it may flow due to gravity and flow over the dam.
For example, a method of applying a liquefaction countermeasure to a deposit or a method of raising a dam or the like is adopted as such a countermeasure against the flow of the slope portion.
液状化対策工としては、例えば特許文献1の造成方法のように、格子状に地盤改良を行うことで、斜面全域の液状化を防止するものがある。
斜面において格子状の改良体を形成する場合には、斜面の勾配方向と平行および直交する向き(平面的に0度および90度の角度をなす向き)に、壁状の地盤改良を行うのが一般的である。
As a liquefaction countermeasure work, there is one that prevents liquefaction of the entire slope by performing ground improvement in a lattice shape, for example, as in the construction method of
In the case of forming a grid-like improvement body on the slope, the wall-like ground improvement is performed in a direction parallel to and orthogonal to the slope direction of the slope (a direction that makes an angle of 0 degrees and 90 degrees in a plane). It is common.
一方、堰堤の嵩上げは、鉱さいや土砂等の全てが液状化して流動した場合であっても、流出することがない高さになるまでロック材料や土材料等を盛りたてることにより行う。 On the other hand, raising of the dam is carried out by adding rock material, earth material, etc. until it reaches a height where it does not flow out even when all of slag, earth and sand, etc. liquefy and flow.
格子状に地盤改良を行う場合は、斜面勾配下流方向に作用する滑動力または流動力に対して直交方向の壁状改良体により抵抗する必要がある。しかしながら、この場合には、壁状改良体に大きな曲げモーメントが作用するので、壁状改良体が曲げ破壊を起こさないように、壁状改良体の引張強度または壁厚を大きくする必要があり、費用および手間がかかる。 When the ground improvement is performed in a lattice shape, it is necessary to resist the sliding force or the fluid force acting in the downstream direction of the slope gradient by the wall-like improvement body in the orthogonal direction. However, in this case, since a large bending moment acts on the wall-like improvement body, it is necessary to increase the tensile strength or wall thickness of the wall-like improvement body so that the wall-like improvement body does not cause bending fracture. Expensive and time-consuming.
また、堰堤の嵩上げによる流動対策工は、現地の沢の地形が堰堤の嵩上げに適している必要がある。すなわち、堰堤の両脇の尾根(山)がかさ上げされた堰堤よりも低いと、流動した鉱さいや土砂等の流出を防止することができない。
また、堰堤をかさ上げするには、嵩上げ用の材料(ロック材料や土材料)の調達等に費用がかかってしまう。
In addition, the flow control work by raising the dam needs to be suitable for raising the dam because of the local topography. That is, if the ridges (mountains) on both sides of the dam are lower than the raised dam, it is not possible to prevent the outflow of fluid slag and earth and sand.
Moreover, in order to raise the dam, it is expensive to procure materials for raising the bulk (locking material or earth material).
このような観点から、本発明は、簡易かつ安価に、斜面上の堆積物等の滑動または崩壊を防止することができる斜面安定化構造を提案することを課題とする。 From such a viewpoint, it is an object of the present invention to propose a slope stabilization structure that can prevent sliding or collapse of deposits or the like on a slope in a simple and inexpensive manner.
前記課題を解決するために、本発明は、沢地形の斜面に堆積した堆積物を地盤改良することにより形成された壁状の改良体を備える斜面安定化構造であって、前記改良体は、前記斜面を横断するとともに、端部が当該端部以外の部分よりも下流側において、先端が原地盤に当接するように形成されていることで、原地盤にすり付くように形成されていることを特徴としている。
なお、前記改良体は、平面視V字状、格子状または円弧状に形成されているのが望ましい。
In order to solve the above-mentioned problem, the present invention is a slope stabilization structure comprising a wall-like improvement body formed by improving the ground of a deposit deposited on a slope of a lot of terrain, the improvement body comprising: Crossing the slope, and the end is formed so that the tip is in contact with the original ground on the downstream side of the portion other than the end, so that the end touches the original ground. It is characterized by.
The improved body is preferably formed in a V shape, a lattice shape or an arc shape in plan view.
かかる斜面安定化構造によれば、改良体の端部が端部以外の部分よりも下流側において原地盤にすり付くように形成されているため、堆積物が液状化した場合であっても、斜面の安定化を図ることができる。すなわち、改良体は、液状化した堆積物の滑動力および流動力を、軸圧縮力として地山に伝達することで斜面の安定性を保持する。改良体に軸圧縮力が作用すれば、改良体積(改良厚)を最小限に抑えることが可能となり、施工の手間や費用の低減化を図ることができる。
改良体は、原地盤と改良体との間に未改良の堆積物が介在することがないように、改良体の端部が原地盤にすり付くように形成されているため、改良体に作用する力を確実に地山に伝達できる。また、法面との密着性を確保しているため、有効面積(投影面積)に対して所定の軸力を地山に伝達することができる。
According to such a slope stabilizing structure, since the end of the improved body is formed so as to rub against the original ground on the downstream side of the portion other than the end, even when the deposit is liquefied, It is possible to stabilize the slope. That is, the improved body maintains the stability of the slope by transmitting the sliding force and fluid force of the liquefied sediment to the natural ground as axial compression force. If the axial compression force acts on the improved body, the improved volume (improved thickness) can be minimized, and the labor and cost of construction can be reduced.
The improved body is formed so that the end of the improved body is rubbed against the original ground so that unimproved deposits are not interposed between the original ground and the improved body. The power to do can be reliably transmitted to the natural ground. Moreover, since the adhesiveness with the slope is ensured, a predetermined axial force can be transmitted to the natural ground with respect to the effective area (projected area).
本発明の斜面安定化構造によれば、簡易かつ安価に、斜面上の堆積物等の滑動または崩壊を防止することが可能となる。 According to the slope stabilization structure of the present invention, it is possible to prevent the deposits or the like on the slope from sliding or collapsing easily and inexpensively.
<第一の実施形態>
第一の実施形態では、図1の(a)および(b)に示すように、山間部等の沢地形の斜面(原地盤)上に堆積する堆積物10の安定化を図る斜面安定化構造1について説明する。
堆積物10は、斜面部11と平場部12とを有した状態で堆積されている。
斜面安定化構造1は、堰堤2と改良体3とを備えている。
<First embodiment>
In the first embodiment, as shown in FIGS. 1 (a) and 1 (b), a slope stabilization structure for stabilizing the
The
The
堰堤2は、堆積物10をせき止めるために、堆積物10の下流側に設けられている。
本実施形態の堰堤2は、岩石を積み上げてなる、いわゆるロックフィルダムである。なお、堰堤2の構造は限定されるものではなく、例えば、土を盛りたてることにより形成する、いわゆるアースダムであってもよいし、コンクリートダムであってもよい。
The
The
堰堤2は、図1の(b)に示すように、断面視台形状に形成されている。なお、堰堤2の高さは、原地形と堆積物10の量に応じて適宜設定する。また、堰堤2の断面形状は台形に限定されない。
The
改良体3は、堆積物10に対して固結工法による地盤改良を行って構築したものであり、壁状に形成されている。なお、堆積物10の地盤改良方法は限定されるものではなく、例えば、セメント等の固化材を堆積物10に撹拌混合することにより形成してもよい。
改良体3は、原地盤Gに着底している。なお、改良体3は、原地盤Gに根入れされていてもよい。
The improved
The improved
本実施形態の改良体3は、図1の(a)に示すように、メイン改良体31とサブ改良体32とが一体に形成されることにより、平面視格子状を呈している。
また、本実施形態では、斜面部11の上端(斜面部11と平場部12との境界部)に、上端部改良体33が形成されている。なお、上端部改良体33は、必要に応じて形成すればよい。
As shown in FIG. 1A, the improved
Moreover, in this embodiment, the upper end
メイン改良体31は、斜面を横断するとともに、端部が端部以外の部分よりも下流側において原地盤にすり付くように形成されている。本実施形態のメイン改良体31は、平面視V字状を呈していて、メイン改良体31の端部は、メイン改良体31の頂部よりも下流側で原地盤Gにすり付いている。
すなわち、メイン改良体31の端部は、底面が原地盤Gの形状に応じて先端に向かうに従って高さが小さくなるように傾斜しているとともに、上面が原地盤Gの地表面に先端が一致するように形成されていることで、未改良部分が介在することなく、原地盤Gに当接している。
The main improved
That is, the end of the main improved
メイン改良体31は、斜面勾配に沿う基準線BLに対して平面的に45°の角度をなす向きに各片が形成されている。また、各片同士の内角は90°である。
本実施形態では、複数のメイン改良体31が、基準線BLに沿って間隔をあけて配設されている。本実施形態では、複数のメイン改良体31の頂部同士を結ぶ線と、基準線BLとが同一直線状にある場合について説明するが、基準線BLの位置は限定されない。
The
In the present embodiment, a plurality of
サブ改良体32は、V字状に形成されたメイン改良体31の二つの片の交点(頂部)から、一方の片の延長線に沿って上流側に延びるように形成されている。
すなわち、サブ改良体32は、下流側のメイン改良体31の頂部から上流側に延びるように形成されていることで、下流側のメイン改良体31と上流側のメイン改良体31とを連結している。
The
That is, the
本実施形態の斜面安定化構造1によれば、格子状の改良体3が、地震等により堆積物10が液状化した場合や、集中豪雨等により地下水位が上昇して堆積物10が不安定になった場合等の滑動力または流動力に抵抗するため、斜面の安定性を確保することができる。
すなわち、改良体3は、上方から作用する堆積物10の滑動力および流動力(図中のP)を、軸圧縮力Nとして原地盤G(改良体3の端部がすり付く原地盤G)に伝達することで斜面の安定性を保持する。改良体3に作用する力Pによって、改良体3に軸圧縮力Nを作用させることで、改良体積(改良厚)を最小限に抑えることが可能となり、施工の手間や費用の低減化を図ることができる。
According to the
That is, the improved
改良体3は、平面視して基準線BLに対して45°傾斜しているため、滑動力または流動力の分力(0.7P程度)に抵抗し得る強度または壁厚に設計すればよい(図2の(a)参照)。
なお、図2の(b)に示す従来の改良体のように、平面的に、基準線BLに対して90°および0°格子状の改良体103を形成した場合には、滑動力または流動力Pを勾配直交方向(90°)の改良体により負担する構造となるため、改良体の強度または壁厚を大きくする必要がある。
Since the
In addition, when the 90 ° and 0 ° lattice-
また、改良体3では、滑動力または流動力によって、改良体3(壁体)に軸圧縮力が作用することとなる。改良体3に軸圧縮力が作用すると、側圧(上流側から作用する応力)に対する強度が増強する。そのため、改良体3の強度または壁厚を従来の方法に比べて小さくすることができ、施工費および施工時の手間を抑えることが可能となる。
Moreover, in the
このように、本実施形態の斜面安定化構造1は、沢地形の側部の地山形状が、斜面下流方向に向かうに従って幅が狭くなることと、改良体3が引張強度は小さいが圧縮強度が大きいという特徴とを利用するものである。斜面安定化構造1によれば、斜面に堆積する堆積物10の滑動力または流動力を改良体内部の軸圧縮力に変換して、側方の地山へ伝達し、側方の地山から反力を利用することで、改良体の強度や壁厚を従来の改良体よりも小さくすることを可能としている。
Thus, in the
また、改良体3は、端部が原地盤にすり付くように形成されていて、原地盤Gと改良体3との間に未改良部分が介在していないため、改良体3に作用する力を確実に地山に伝達できる。また、改良体3と法面との密着性を確保しているため、有効面積(投影面積)に対して所定の軸力を地山に伝達することができる。
Further, the
<第二の実施形態>
第二の実施形態の斜面安定化構造1は、図3の(a)および(b)に示すように、堰堤2と改良体3とを備えている。堆積物10は、斜面部11と平場部12とを有した状態で堆積されている。
第二の実施形態の堰堤2の詳細は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。
<Second Embodiment>
The
Since the details of the
改良体3は、堆積物10に対して固結工法による地盤改良を行って構築したものであり、壁状に形成されている。なお、堆積物10の地盤改良方法は限定されるものではなく、例えば、セメント等の固化材を堆積物10に撹拌混合することにより形成してもよい。
改良体3は、原地盤Gに着底している。なお、改良体3は、原地盤Gに根入れされていてもよい。
The
The
本実施形態の改良体3は、図3の(a)に示すように、平面視円弧状を呈している。
改良体3は、斜面を横断するとともに、端部が端部以外の部分よりも下流側において原地盤Gにすり付くように形成されている。
すなわち、改良体3の端部は、底面が原地盤Gの法面の形状に応じて先端に向かうに従って高さが小さくなるように傾斜していて、上面が原地盤Gの地表面に先端が一致するように形成されていることで、未改良部分が介在することなく、原地盤Gに当接している。
As shown in FIG. 3A, the
The
That is, the end portion of the
本実施形態の斜面安定化構造1によれば、円弧状の改良体3の端部が端部以外の部分よりも下流側において原地盤Gにすり付くように形成されているため、地震等により堆積物10が液状化した場合や、集中豪雨等により地下水位が上昇して堆積物10が不安定になった場合等であっても、斜面の安定化を図ることができる。
すなわち、改良体3は、その上方(上流側)から作用する堆積物10の滑動力および流動力Pを、軸圧縮力Nとして原地盤Gに伝達することで斜面の安定性を保持する。このように改良体3に作用する力Pによって改良体3に軸圧縮力を作用させることで、改良体積(改良厚)を最小限に抑えることが可能となり、施工の手間や費用の低減化を図ることができる。
According to the
That is, the
また、改良体3に軸圧縮力Nが作用すると、側圧(上流側から作用する応力)に対する強度が増強する。そのため、改良体3の強度または壁厚を従来の方法に比べて小さくすることができ、施工費および施工時の手間を抑えることが可能となる。
Further, when the axial compressive force N acts on the
このように、本実施形態の斜面安定化構造1も、沢地形の側部の地山形状が、斜面下流方向に向かうに従って幅が狭くなることと、改良体3が引張強度は小さいが圧縮強度が大きいという特徴とを利用するものである。斜面安定化構造1によれば、斜面に堆積する堆積物10の滑動力または流動力を改良体内部の軸圧縮力として、側方の地山へ伝達し、側方の地山から反力を利用することで、改良体の強度や壁厚を従来の改良体よりも小さくすることを可能としている。
As described above, the
また、改良体3は、端部が原地盤にすり付くように形成されていて、原地盤Gと改良体3との間に未改良部分が介在していないため、改良体3に作用する力を確実に地山に伝達できる。また、改良体3と法面との密着性を確保しているため、有効面積(投影面積)に対して所定の軸力を地山に伝達することができる。
Further, the
以上、本発明の実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。 The embodiment of the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and the above-described components can be appropriately changed without departing from the spirit of the present invention.
例えば、斜面安定化構造を形成する場所は、限定されるものではなく、例えば、鉱さい堆積場や盛土斜面等であってもよい。
堰堤は必要に応じて形成すればよい。
For example, the place where the slope stabilization structure is formed is not limited, and may be, for example, a mine deposit site or a bank slope.
What is necessary is just to form a dam as needed.
改良体の平面形状は、前記各実施形態で示した形状に限定されるものではなく、例えば、平面視V字状であってもよい。
斜面の基準線に対する改良体の傾斜角は限定されるものではなく、適宜設定すればよい。
各改良体は、位置に応じて壁厚や強度を変化させてもよい。
The planar shape of the improved body is not limited to the shape shown in each of the above embodiments, and may be, for example, a V shape in plan view.
The inclination angle of the improved body with respect to the reference line of the slope is not limited and may be set as appropriate.
Each improvement body may change wall thickness and intensity | strength according to a position.
1 斜面安定化構造
10 堆積物
2 堰堤
3 改良体
31 メイン改良体
32 サブ改良体
DESCRIPTION OF
Claims (4)
前記改良体は、前記斜面を横断するとともに、端部が当該端部以外の部分よりも下流側において原地盤にすり付くように形成されていることを特徴とする、斜面安定化構造。 A slope stabilization structure comprising a wall-like improvement body formed by improving the ground of sediment deposited on a slope of swamp terrain,
The improved body has a slope stabilizing structure characterized in that the improved body is formed so as to traverse the slope and to have its end portion rubbed to the original ground downstream from a portion other than the end portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014174307A JP6438711B2 (en) | 2014-08-28 | 2014-08-28 | Slope stabilization structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014174307A JP6438711B2 (en) | 2014-08-28 | 2014-08-28 | Slope stabilization structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016050378A true JP2016050378A (en) | 2016-04-11 |
JP6438711B2 JP6438711B2 (en) | 2018-12-19 |
Family
ID=55658098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014174307A Active JP6438711B2 (en) | 2014-08-28 | 2014-08-28 | Slope stabilization structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6438711B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016108805A (en) * | 2014-12-05 | 2016-06-20 | 大成建設株式会社 | Slope stabilization structure |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6245809A (en) * | 1985-08-21 | 1987-02-27 | Tomoharu Ishiwata | Construction for dam |
JPH0633464A (en) * | 1992-07-17 | 1994-02-08 | Ohbayashi Corp | Landslide preventive structure |
WO1994013888A1 (en) * | 1992-12-10 | 1994-06-23 | Yit-Yhtymä Oy | A method and means for soil consolidation and their use |
JPH06264439A (en) * | 1993-03-10 | 1994-09-20 | Takenaka Komuten Co Ltd | Excavation of deep shaft by self-standing retaining wall |
JPH11229391A (en) * | 1998-02-14 | 1999-08-24 | Kensetsu Kiso Eng Co Ltd | Method for reinforcing grooved slope |
JP2000160560A (en) * | 1998-11-26 | 2000-06-13 | Hazama Gumi Ltd | Banking structure for restraining and preventing oxydization of earth |
JP2002275864A (en) * | 2001-03-15 | 2002-09-25 | Taisei Corp | Surface sealed wall fill dam |
JP2003027491A (en) * | 2001-07-23 | 2003-01-29 | Ohta Geo-Research Co Ltd | Method of restricting slope failure by heterogeneously arranging resisting body in unstable ground distributed on slope |
JP2007239202A (en) * | 2006-03-06 | 2007-09-20 | Shimizu Corp | Aseismatic reinforcing structure of trough filling banking part |
JP2007255113A (en) * | 2006-03-24 | 2007-10-04 | Fudo Tetra Corp | Improved ground structure putting consideration on ground fluidization in liquefaction |
JP2008045352A (en) * | 2006-08-18 | 2008-02-28 | Kyokado Eng Co Ltd | Landslide prevention construction method of valley-filling banking |
JP2008075283A (en) * | 2006-09-19 | 2008-04-03 | Dam Gijutsu Center | Landslide prevention method |
JP2008303582A (en) * | 2007-06-06 | 2008-12-18 | Public Works Research Institute | Reinforcing structure of banking support ground |
JP2008303583A (en) * | 2007-06-06 | 2008-12-18 | Public Works Research Institute | Structure of artificial ground |
JP2009185546A (en) * | 2008-02-07 | 2009-08-20 | Shimizu Corp | Method of evaluating earth retaining wall deformation deterrent effect by soil improvement |
JP2011038302A (en) * | 2009-08-11 | 2011-02-24 | Hazama Corp | Structure and method for reinforcing sloped ground |
JP2012136898A (en) * | 2010-12-27 | 2012-07-19 | Takenaka Komuten Co Ltd | Earth retaining wall |
JP2013189804A (en) * | 2012-03-14 | 2013-09-26 | Maeda Corp | Soil improvement body |
JP2016003514A (en) * | 2014-06-18 | 2016-01-12 | 大成建設株式会社 | Flow countermeasure structure |
-
2014
- 2014-08-28 JP JP2014174307A patent/JP6438711B2/en active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6245809A (en) * | 1985-08-21 | 1987-02-27 | Tomoharu Ishiwata | Construction for dam |
JPH0633464A (en) * | 1992-07-17 | 1994-02-08 | Ohbayashi Corp | Landslide preventive structure |
WO1994013888A1 (en) * | 1992-12-10 | 1994-06-23 | Yit-Yhtymä Oy | A method and means for soil consolidation and their use |
JPH06264439A (en) * | 1993-03-10 | 1994-09-20 | Takenaka Komuten Co Ltd | Excavation of deep shaft by self-standing retaining wall |
JPH11229391A (en) * | 1998-02-14 | 1999-08-24 | Kensetsu Kiso Eng Co Ltd | Method for reinforcing grooved slope |
JP2000160560A (en) * | 1998-11-26 | 2000-06-13 | Hazama Gumi Ltd | Banking structure for restraining and preventing oxydization of earth |
JP2002275864A (en) * | 2001-03-15 | 2002-09-25 | Taisei Corp | Surface sealed wall fill dam |
JP2003027491A (en) * | 2001-07-23 | 2003-01-29 | Ohta Geo-Research Co Ltd | Method of restricting slope failure by heterogeneously arranging resisting body in unstable ground distributed on slope |
JP2007239202A (en) * | 2006-03-06 | 2007-09-20 | Shimizu Corp | Aseismatic reinforcing structure of trough filling banking part |
JP2007255113A (en) * | 2006-03-24 | 2007-10-04 | Fudo Tetra Corp | Improved ground structure putting consideration on ground fluidization in liquefaction |
JP2008045352A (en) * | 2006-08-18 | 2008-02-28 | Kyokado Eng Co Ltd | Landslide prevention construction method of valley-filling banking |
JP2008075283A (en) * | 2006-09-19 | 2008-04-03 | Dam Gijutsu Center | Landslide prevention method |
JP2008303582A (en) * | 2007-06-06 | 2008-12-18 | Public Works Research Institute | Reinforcing structure of banking support ground |
JP2008303583A (en) * | 2007-06-06 | 2008-12-18 | Public Works Research Institute | Structure of artificial ground |
JP2009185546A (en) * | 2008-02-07 | 2009-08-20 | Shimizu Corp | Method of evaluating earth retaining wall deformation deterrent effect by soil improvement |
JP2011038302A (en) * | 2009-08-11 | 2011-02-24 | Hazama Corp | Structure and method for reinforcing sloped ground |
JP2012136898A (en) * | 2010-12-27 | 2012-07-19 | Takenaka Komuten Co Ltd | Earth retaining wall |
JP2013189804A (en) * | 2012-03-14 | 2013-09-26 | Maeda Corp | Soil improvement body |
JP2016003514A (en) * | 2014-06-18 | 2016-01-12 | 大成建設株式会社 | Flow countermeasure structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016108805A (en) * | 2014-12-05 | 2016-06-20 | 大成建設株式会社 | Slope stabilization structure |
Also Published As
Publication number | Publication date |
---|---|
JP6438711B2 (en) | 2018-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2012007394A (en) | Embankment reinforcement structure | |
CN104612105B (en) | Reinforced concrete structural formula flood-control wall | |
JP6438711B2 (en) | Slope stabilization structure | |
JP6368555B2 (en) | Flow countermeasure structure | |
JP4310502B1 (en) | Reinforcement structure for embankment support ground | |
JP5095030B1 (en) | Slope forming block, slope structure and slope forming method | |
WO2014141679A1 (en) | Seawall and seawall reinforcement or construction method | |
JP2011214252A (en) | Structure for reinforcing embankment | |
CN104480897B (en) | Flood prevention wall with small land occupation and wide application range | |
JP6558890B2 (en) | Slope stabilization structure | |
CN103898844B (en) | A kind of slabstone buttress reinforced earth compound embankment culvert pipe structure | |
CN104099894B (en) | A kind of without anchor deep-cement sheet-pile wharf | |
JP2009250007A (en) | Countermeasure method for ground subsidence | |
JP5983436B2 (en) | Gravity breakwater | |
JP2010077639A (en) | Method for rapidly restoring damaged fill by combining large-sized sandbag with rod-like reinforcing material | |
Al-Obaydi et al. | Analytical Study of Load-Settlement Behavior of Soil Treated with Stone Columns have Different Sectional Shape | |
CN104594289B (en) | Pile foundation support table formula abnormity flood-control wall | |
JP2020117962A (en) | Levee body seepage destruction suppression structure | |
JP2016148196A (en) | Structure and method for reinforcing abutment | |
US20140010599A1 (en) | Retaining Module | |
Li et al. | Case study of ground improvement to Qianhai reclamation area, Qianhai Bay, Shenzhen | |
JP2010018956A (en) | Soil improvement structure | |
CN104114770B (en) | Z-shape steel sheet pile | |
JP2008057188A (en) | Earthquake resisting manhole structure and its manufacturing method | |
JP6628492B2 (en) | Liquefaction prevention structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170823 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180528 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180605 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180717 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180731 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180918 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20181113 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181119 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6438711 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |