CN104594289B - Pile foundation support table formula abnormity flood-control wall - Google Patents

Pile foundation support table formula abnormity flood-control wall Download PDF

Info

Publication number
CN104594289B
CN104594289B CN201410710002.XA CN201410710002A CN104594289B CN 104594289 B CN104594289 B CN 104594289B CN 201410710002 A CN201410710002 A CN 201410710002A CN 104594289 B CN104594289 B CN 104594289B
Authority
CN
China
Prior art keywords
wall
pile foundation
heel slab
flood
toe board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410710002.XA
Other languages
Chinese (zh)
Other versions
CN104594289A (en
Inventor
石永超
张琳琳
邬显晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201410710002.XA priority Critical patent/CN104594289B/en
Publication of CN104594289A publication Critical patent/CN104594289A/en
Application granted granted Critical
Publication of CN104594289B publication Critical patent/CN104594289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The invention discloses a kind of pile foundation support table formula abnormity flood-control wall, it comprises a wall body and multiple pile foundation, pile foundation is positioned at the below of wall body, wall body comprises a body of wall and a base plate, the both sides of body of wall are respectively pull in to shore side and side near water, base plate comprises a toe board and a heel slab, toe board and heel slab are all connected in the bottom of body of wall, toe board is distributed in the side of pulling in to shore of body of wall, heel slab comprises a heel slab body and a pile foundation connecting portion, heel slab body by the bottom of body of wall along the skew back near water of body of wall to downward-extension, the upper surface of heel slab body overlaps with the planning riverbed mud upper thread of the side near water of body of wall, pile foundation connecting portion is in the bottom of heel slab body, pile foundation connecting portion is for extending straight down, pile foundation is fixed in respectively the lower surface of toe board and the lower surface of pile foundation connecting portion. flood-control wall of the present invention has that land-based area takes up an area less, light-duty attractive in appearance, the advantage such as antiskid impact resistance by force, effectively prevents that base plate bottom from emptying, and also has advantages of that practical ranges is wide.

Description

Pile foundation support table formula abnormity flood-control wall
Technical field
The present invention relates to a kind of pile foundation support table formula abnormity flood-control wall.
Background technology
Flood-control wall is to overflow at the flood control quaywall of river course bank section build in order to resist tidewater. The version of flood-control wall is more, and low pile cap formula flood-control wall is to apply one of more type in flood-control wall type. Current flood-control wall structure, after mud face scour, easily causes base plate bottom to empty before its wall, forms hidden danger or dangerous situation. In addition, due to building next-door neighbour River Bank-Line, cause flood-control wall to build place and be restricted, cause conventional flood-control wall structural shape often cannot implement.
Summary of the invention
The technical problem to be solved in the present invention is the restriction in order not to be subject to narrow bank section place and overcomes the defect that base plate bottom is easily emptied, erosion-resisting characteristics is poor that prior art exists, and a kind of pile foundation support table formula abnormity flood-control wall is provided.
The present invention solves above-mentioned technical problem by following technical proposals:
A kind of pile foundation support table formula abnormity flood-control wall, it comprises a wall body and multiple pile foundation, described pile foundation is positioned at the below of described wall body, its feature is, described wall body comprises a body of wall and a base plate, the both sides of described body of wall are respectively pull in to shore side and side near water, described base plate comprises a toe board and a heel slab, described toe board and described heel slab are all connected in the bottom of described body of wall, described toe board is distributed in the side of pulling in to shore of described body of wall, described heel slab comprises a heel slab body and a pile foundation connecting portion, described heel slab body by the bottom of described body of wall along the skew back near water of described body of wall to downward-extension, the upper surface of described heel slab body overlaps with the planning riverbed mud upper thread of the side near water of described body of wall, described pile foundation connecting portion is in the bottom of described heel slab body, described pile foundation connecting portion is for extending straight down, described pile foundation is fixed in respectively the lower surface of described toe board and the lower surface of described pile foundation connecting portion, described wall body is 12~16m along the length on bank, place, and the width of described body of wall is 300~400mm, and the height of described body of wall is 2~5m, between adjacent described wall body, be provided with an expansion joint, in described expansion joint, be filled with pointing, the upper surface of described toe board is positioned at the underground of the side of pulling in to shore of described body of wall.
Preferably, a subsides pin is established in the side near water of described body of wall and the junction of described heel slab. Like this, can alleviate the stress concentration phenomenon of wall body.
Positive progressive effect of the present invention is:
1, it is downward-sloping that heel slab of the present invention is pressed river course planning mud upper thread, can protect the soil body after wall, serves as bank protection effect, reduced the risk that base plate bottom is emptied, and the heel slab that stretches into river course does not affect the planned section in whole river course.
2, heel slab end of the present invention is provided with vertical pile foundation connecting portion, contributes to improve the resistance to overturning of flood-control wall, can shorten the length of the pile foundation of this pile foundation connecting portion below simultaneously. If in the situation that not shortening pile foundation length, choose this flood-control wall structural shape, can effectively improve the overall structure performance of flood-control wall.
3, flood-control wall of the present invention is transferred to main force part the heel slab that is positioned at the side that borders on the river, toe board can be very short at the development length of the side of pulling in to shore, can approach zero even, like this, it is just very little that flood-control wall of the present invention takies land-based area area, therefore, the present invention can effectively solve the problem of narrow bank section place restriction, and its practical ranges is wider.
4, flood-control wall structural entity of the present invention is stable, can realize flood control dash task.
Brief description of the drawings
Fig. 1 is the schematic diagram of preferred embodiment of the present invention.
Detailed description of the invention
Lift a preferred embodiment below, and carry out by reference to the accompanying drawings the clearer the present invention that intactly illustrates.
As shown in Figure 1, a kind of pile foundation support table formula abnormity flood-control wall, it comprises wall body 1 and multiple pile foundation 4, pile foundation 4 is positioned at the below of wall body 1, wall body 1 comprises body of wall 2 and base plate 3, and the both sides of body of wall 2 are respectively pull in to shore side and side near water, and base plate 3 is fixed in the lower end of body of wall 2, base plate 3 comprises toe board 31 and heel slab 32, and toe board 31 and heel slab 32 are all connected in the bottom of body of wall 2. Toe board 31 is distributed in the side of pulling in to shore of body of wall 2, and the upper surface of toe board 31 is positioned under the ground 7 of the side of pulling in to shore of body of wall 2. Heel slab 32 comprises heel slab body 322 and pile foundation connecting portion 321, and heel slab body 322 is by the bottom of body of wall 2 along the skew back near water of body of wall 2 to downward-extension, and the upper surface of heel slab body 322 overlaps with the riverbed 8 mud upper threads of the side near water of body of wall 2; Pile foundation connecting portion 321 is positioned at the bottom of heel slab body 322, and pile foundation connecting portion 321 is for extending straight down, and pile foundation 4 is fixed in respectively the lower surface of toe board 31 and the lower surface of pile foundation connecting portion 321.
The side near water of body of wall 2 and the junction of heel slab 32 are provided with pastes pin (not marking on figure). Pasting pin is existing common components, just repeats no more at this. Paste pin and can alleviate the stress concentration phenomenon of wall body.
Wall body 1 is 15m along the length on bank, place, and the width of body of wall 2 is 0.4m, highly for 3.5m; Between adjacent wall body 1, be provided with expansion joint, expansion joint width is 20mm, in described expansion joint, is filled with pointing, and pointing comprises the low foamed board of polyethylene, between the low foamed board of polyethylene, embedding neoprene is in order to sealing, and adopts one-component polyurethane sealant sealing.
The width of toe board 31 is 1.6m, highly for 0.5m; The width of heel slab 32 along continuous straight runs is 1.6m; The height of pile foundation connecting portion 321 is 1m, and width is 1.2m.
Pile foundation can be determined according to actual place and geological condition. For example, pile foundation 4 can be the cast-in-situ bored pile of diameter 0.6m, and the length of pile foundation is 15m. Pile foundation has two rows, is connected to the below of toe board 31 and the below of heel slab 32. The spacing being connected between the pile foundation 4 of below of heel slab 32 is 2m, and the spacing being connected between the pile foundation 4 of below of toe board 31 is 2.5m. When practical application, the length of pile foundation and spacing are comprehensively determined by checking calculations such as flood-control wall monolithic stability, bearing capacity of pile foundation.
Under normal circumstances, before construction, need to carry out planning and designing to the flood-control wall on riverbank and riverbed. The planning mud upper thread in riverbed, the upper space in the riverbed marking on drawing when namely planning and designing, is called again planning riverbed mud upper thread. The upper surface of heel slab body 322 overlaps with the planning riverbed mud upper thread of the side near water of body of wall 2, and therefore, the gradient of heel slab body is consistent with the gradient of the mud upper thread in planning riverbed, for example, the gradient of planning riverbed mud upper thread is 1:25, and so, the gradient of heel slab body is also 1:25.
The material of body of wall 2 and base plate 3 is the armored concrete that strength grade is C30. Like this, can make wall body there is good intensity.
Construction period is the safety of protection next-door neighbour's building or road, between building or road and water front, buries 30# channel-section steel 5 underground, and channel-section steel 5 is 1m apart from the spacing of building 6.
In actual applications, according to actual site condition, be defined as low pile cap structure and limit conventional flood-control wall structural shape and be difficult to carry out due to place, should consider to select flood-control wall of the present invention. In addition, non-narrow bank section also can be applied the flood-control wall structural shape that the design provides. Calculate the permission length value of toe board according to site condition, in the length range allowing, in conjunction with actual conditions, increase as far as possible the length of toe board; On the basis of length of determining heel slab and toe board, selected suitable pile foundation, and then definite other size of flood-control wall structure, finally carry out the safe safety of checking to guarantee structure to this project organization.
Flood-control wall of the present invention has the following advantages:
1, it is downward-sloping that heel slab of the present invention is pressed river course planning mud upper thread, can protect the soil body after wall, serves as bank protection effect, reduced the risk that base plate bottom is emptied, and the heel slab that stretches into river course does not affect the planned section in whole river course.
2, heel slab end of the present invention is provided with vertical pile foundation connecting portion, contributes to improve the resistance to overturning of flood-control wall, can shorten the length of the pile foundation of this pile foundation connecting portion below simultaneously. If in the situation that not shortening pile foundation length, choose this flood-control wall structural shape, can effectively improve the overall structure performance of flood-control wall.
3, flood-control wall of the present invention is transferred to main force part the heel slab that is positioned at the side that borders on the river, toe board can be very short at the development length of the side of pulling in to shore, can approach zero even, like this, it is just very little that flood-control wall of the present invention takies land-based area area, therefore, the present invention can effectively solve the problem of narrow bank section place restriction, and its practical ranges is wider.
4, flood-control wall structural entity of the present invention is stable, realizes flood control dash task.
In description of the invention, it will be appreciated that, term " on ", orientation or the position relationship of the instruction such as D score, 'fornt', 'back', " left side ", " right side ", " vertically ", " level ", " top ", " end ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, construct and operation with specific orientation, therefore can not be interpreted as limitation of the present invention.
Although more than described the specific embodiment of the present invention, it will be understood by those of skill in the art that this only illustrates, protection scope of the present invention is limited by appended claims. Those skilled in the art is not deviating under the prerequisite of principle of the present invention and essence, can make various changes or modifications to these embodiments, but these changes and amendment all fall into protection scope of the present invention.

Claims (2)

1. a pile foundation support table formula abnormity flood-control wall, it comprises a wall body and multiple pile foundation, described pile foundation is positioned at the below of described wall body, it is characterized in that, described wall body comprises a body of wall and a base plate, the both sides of described body of wall are respectively pull in to shore side and side near water, described base plate comprises a toe board and a heel slab, described toe board and described heel slab are all connected in the bottom of described body of wall, described toe board is distributed in the side of pulling in to shore of described body of wall, described heel slab comprises a heel slab body and a pile foundation connecting portion, described heel slab body by the bottom of described body of wall along the skew back near water of described body of wall to downward-extension, the upper surface of described heel slab body overlaps with the planning riverbed mud upper thread of the side near water of described body of wall, described pile foundation connecting portion is in the bottom of described heel slab body, described pile foundation connecting portion is for extending straight down, described pile foundation is fixed in respectively the lower surface of described toe board and the lower surface of described pile foundation connecting portion, described wall body is 12~16m along the length on bank, place, and the width of described body of wall is 300~400mm, and the height of described body of wall is 2~5m, between adjacent described wall body, be provided with an expansion joint, in described expansion joint, be filled with pointing, the upper surface of described toe board is positioned at the underground of the side of pulling in to shore of described body of wall.
2. pile foundation support table formula abnormity flood-control wall as claimed in claim 1, is characterized in that, a subsides pin is established in the side near water of described body of wall and the junction of described heel slab.
CN201410710002.XA 2014-11-28 2014-11-28 Pile foundation support table formula abnormity flood-control wall Active CN104594289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410710002.XA CN104594289B (en) 2014-11-28 2014-11-28 Pile foundation support table formula abnormity flood-control wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410710002.XA CN104594289B (en) 2014-11-28 2014-11-28 Pile foundation support table formula abnormity flood-control wall

Publications (2)

Publication Number Publication Date
CN104594289A CN104594289A (en) 2015-05-06
CN104594289B true CN104594289B (en) 2016-05-11

Family

ID=53120316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410710002.XA Active CN104594289B (en) 2014-11-28 2014-11-28 Pile foundation support table formula abnormity flood-control wall

Country Status (1)

Country Link
CN (1) CN104594289B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220702A (en) * 2015-10-10 2016-01-06 上海市政工程设计研究总院(集团)有限公司 A kind of flood-control wall I shape precast concrete pile foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120079A (en) * 1998-10-16 2000-04-25 Ohbayashi Corp Base isolation structure of pile
CN201065526Y (en) * 2007-07-30 2008-05-28 中交上海航道勘察设计研究院有限公司 Starching and laying rock block fade and reinforced concrete wall combined shore-protection wall structure
CN202430681U (en) * 2011-12-20 2012-09-12 中国华冶科工集团有限公司 Bank protection structure
CN202450485U (en) * 2012-01-10 2012-09-26 上海友为工程设计有限公司 Sheet pile-reinforced flood control wall
CN103266622A (en) * 2013-06-09 2013-08-28 中铁第四勘察设计院集团有限公司 L-shaped retaining wall structure with cross-over type special-shaped counterfort

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120079A (en) * 1998-10-16 2000-04-25 Ohbayashi Corp Base isolation structure of pile
CN201065526Y (en) * 2007-07-30 2008-05-28 中交上海航道勘察设计研究院有限公司 Starching and laying rock block fade and reinforced concrete wall combined shore-protection wall structure
CN202430681U (en) * 2011-12-20 2012-09-12 中国华冶科工集团有限公司 Bank protection structure
CN202450485U (en) * 2012-01-10 2012-09-26 上海友为工程设计有限公司 Sheet pile-reinforced flood control wall
CN103266622A (en) * 2013-06-09 2013-08-28 中铁第四勘察设计院集团有限公司 L-shaped retaining wall structure with cross-over type special-shaped counterfort

Also Published As

Publication number Publication date
CN104594289A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
Liu et al. Bearing behavior of wide-shallow bucket foundation for offshore wind turbines in drained silty sand
CN104612105B (en) Reinforced concrete structural formula flood-control wall
CN204690573U (en) The oblique trestle of a kind of portable earthwork transportation
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN208309299U (en) A kind of Karst region railway bed substrate antidumping foundation reinforcing structure
CN207392233U (en) A kind of cushion cap balance weight retaining wall
CN104594289B (en) Pile foundation support table formula abnormity flood-control wall
CN204023520U (en) A kind of dam body water draining structure improving loose rock dam shock resistance
CN107090804B (en) A kind of flexible net debris flow dam and its construction method
CN104480897B (en) Flood prevention wall with small land occupation and wide application range
CN206052653U (en) A kind of rock stone-filled structure based on concrete-pile
CN104563057B (en) Low pile cap formula flood-control wall
CN104631453B (en) The assay method at side slope bolt anchorage optimum incidence inclination angle
CN103821164B (en) Mountain area cheuch backfill tunnel construction
CN104480898B (en) Abnormity flood-control wall
CN207525740U (en) A kind of barb-shaped prefabricated pile suitable for soft clay area
CN104532784B (en) It is applicable to the flood-control wall of narrow bank section
CN210049276U (en) Soil slope retaining wall system structure
CN202627020U (en) Gravity type anti-seismic retaining wall
CN106087861B (en) Discharging type T-type sheet-pile breakwater encloses low bank between fields
CN104372797B (en) Foundation pit structure
CN204238222U (en) Foundation pit structure
CN106013238B (en) A kind of big earthing open trench tunnel subsidence control method of soft stratum
CN207131405U (en) Deep cheuch cut-and-cover tunnel structure
CN104060605A (en) Folding-line-shaped pile foundation structure and foundation acting-force computing method as well as construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant