CN207525740U - A kind of barb-shaped prefabricated pile suitable for soft clay area - Google Patents
A kind of barb-shaped prefabricated pile suitable for soft clay area Download PDFInfo
- Publication number
- CN207525740U CN207525740U CN201721449020.2U CN201721449020U CN207525740U CN 207525740 U CN207525740 U CN 207525740U CN 201721449020 U CN201721449020 U CN 201721449020U CN 207525740 U CN207525740 U CN 207525740U
- Authority
- CN
- China
- Prior art keywords
- barb
- shaped convex
- shaped
- pile body
- convex wedge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of barb-shaped prefabricated pile suitable for soft clay area, including pile body and barb-shaped convex wedge;Barb-shaped convex wedge is attached to pile body surface;Barb-shaped convex wedge includes curve slope, groove and top surface, and curve slope is downward, and upward, top surface is plane to groove.The pile body surface of the utility model sets multiple barb-shaped convex wedges, offer frictional resistance that can be additional, and the trench design on barb-shaped convex wedge top can be firmly embedded in the soil body, can effectively reduce pile body lateral displacement.
Description
Technical field
The utility model is related to a kind of barb-shaped prefabricated piles suitable for soft clay area.
Background technology
Stake is the common method of basement process.Normal sequence of construction is first to drive piles, then do cushion cap, and be connected sheet
Cushion cap is commonly referred to as sole plate, column of then constructing, wall, the superstructures such as beam, until superstructure is completed, into normally making
With.Stake is embedded in underground, can only passively bear upper load, compared be more difficult to do over again for superstructure, reinforcement and strengthening, for
For ground, in case of differential settlement, the measure remedied further includes the weakening to local ground, such as small settling
Side is cut the earth, to promote its sedimentation.On the whole, the measure remedied is limited in current technology, after basement process failure, effect
Fruit is bad, cost is higher, geotechnical engineer is forced relatively to be guarded when carrying out basement process in terms of certain at this, stringent limitation sedimentation
Amount causes to determine that safety coefficient is excessively high during the bearing capacity of the bearing capacity of soil and stake, increases cost, waste more society's money
Source.
By changing stake vertical section, can be good at providing additional frictional resistance, while also can effectively lower material
The dosage of material, economizes on resources, this is beneficial to change the innovation of the vertical section of pile body with popularizing.
Invention content
The technical problem to be solved by the present invention is to provide a kind of barb-shaped prefabricated piles suitable for soft clay area.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is a kind of falling suitable for soft clay area
Hook-type prefabricated pile, including pile body and barb-shaped convex wedge;Barb-shaped convex wedge is attached to pile body surface;
Barb-shaped convex wedge includes curve slope, groove and top surface, and curve slope is downward, and upward, top surface is plane to groove.
Preferably, a plurality of barb-shaped convex wedges are distributed in pile body surface.
Further to be preferably, a plurality of barb-shaped convex wedges are evenly distributed with along pile body peripheral surface.
Further preferably a plurality of barb-shaped convex wedges are evenly distributed with along pile body axial surface, and positioned at the barb on upper strata
The convex wedge of shape is staggeredly arranged with the barb-shaped convex wedge positioned at lower floor.
Preferably, barb-shaped convex wedge is internally provided with bent-up bar, the bent-up bar and the bar connecting inside pile body,
And barb-shaped convex wedge is formed with pile body using concrete formed by integrally casting simultaneously.
The beneficial effects of the utility model are:
Pile body surface sets multiple barb-shaped convex wedges, offer frictional resistance that can be additional, the ditch on barb-shaped convex wedge top
Slot design can be firmly embedded in the soil body, can effectively reduce pile body lateral displacement.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the dimensional structure diagram for the barb-shaped prefabricated pile embodiment that the utility model is suitable for soft clay area.
Fig. 2 is the front view for the barb-shaped prefabricated pile embodiment that the utility model is suitable for soft clay area.
Fig. 3 is the vertical view for the barb-shaped prefabricated pile embodiment that the utility model is suitable for soft clay area.
Fig. 4 is the pile-soil interaction mechanism figure for the barb-shaped prefabricated pile embodiment that the utility model is suitable for soft clay area.
It is marked in figure:1- pile bodies, the barb-shaped convex wedge in 2- upper stratas, 201- upper stratas top surface, 202- upper stratas groove, 203- upper stratas arc
Shape inclined-plane, the barb-shaped convex wedge in 3- upper stratas, 301- upper stratas top surface, 302- upper stratas groove, 303- upper stratas curve slope, the 4- soil bodys.
Specific embodiment
Fig. 1 is a kind of barb-shaped prefabricated pile suitable for soft clay area, is made of pile body and barb-shaped convex wedge.There are multiple barbs
The convex wedge of shape is attached to pile body surface, and barb-shaped convex wedge is formed with pile body using concrete formed by integrally casting simultaneously.
Barb-shaped convex wedge is distributed on the surface of pile body 1 by following rule:
(1) 3 barb-shaped convex wedge forms one layer of barb-shaped convex wedge, and be evenly distributed with along pile body peripheral surface.
(2) along pile body axial surface by the barb-shaped convex wedge of spacing arranging multiplayer of setting, and the barb-shaped convex wedge 2 in upper strata is under
The barb-shaped convex wedge 3 of layer is staggeredly arranged up and down along pile body axial surface.
In fig. 2, the outer surface of the barb-shaped convex wedge 2 in upper strata is curve slope 203 directed downwardly, is had on barb-shaped convex wedge
One recessed groove 202, and top surface 201 is plane.
Equally, the outer surface of the barb-shaped convex wedge 3 of lower floor is curve slope 303 directed downwardly, has one on barb-shaped convex wedge
The recessed groove 302 of item, and top surface 301 is plane.
The distance of upper and lower two layers of barb-shaped convex spaced wedge setting.
In figure 3, it is just staggeredly arranged positioned at 3 barb-shaped convex wedges on upper strata and 3 barb-shaped convex wedges positioned at lower floor,
The angle that the upper and lower are staggered causes 3 barb-shaped convex wedges on upper strata and 3 barb-shaped convex wedge complementations of lower floor constitute it is whole
An a circumference.
To improve the intensity of barb-shaped convex wedge, used in the bent-up bar that is internally provided with of barb-shaped convex wedge, and when prefabricated
Concrete forms barb-shaped convex wedge with pile body formed by integrally casting.
The present embodiment sets multiple barb-shaped convex wedges on pile body surface, offer frictional resistance that can be additional, barb-shaped convex
The trench design on wedge top can be firmly embedded in the soil body 4, can effectively reduce pile body lateral displacement (Fig. 4).
Specifically, what design of the design of the curve slope of barb-shaped convex wedge compared to branch can be more easy to squeezes into soil
Body, and the design of upper groove so that a kind of inverted hook shape is integrally formed in barb-shaped convex wedge, greatly improves stake
Breakout capacity and frictional resistance.Stake is squeezed into after the soil body, and the part soil body has tamped the trench portions of barb-shaped convex wedge, barb-shaped convex
Wedge is preferably embedded within the soil body.When stake generates lateral displacement, the soil body in groove provides additional restraining force,
Reduce lateral displacement.
Above-described the utility model embodiment, does not form the restriction to scope of protection of the utility model.It is any
Modifications, equivalent substitutions and improvements made within spirit of the present utility model and principle etc., should be included in the utility model
Claims within.
Claims (5)
1. a kind of barb-shaped prefabricated pile suitable for soft clay area, it is characterised in that:Including pile body and barb-shaped convex wedge;The barb
The convex wedge of shape is attached to pile body surface;
The barb-shaped convex wedge includes curve slope, groove and top surface, and curve slope is downward, and upward, top surface is plane to groove.
2. barb-shaped prefabricated pile according to claim 1, it is characterised in that:A plurality of barb-shaped convex wedges are distributed in stake
Body surface.
3. barb-shaped prefabricated pile according to claim 2, it is characterised in that:A plurality of barb-shaped convex wedges are all along pile body
It is evenly distributed with to surface.
4. barb-shaped prefabricated pile according to claim 3, it is characterised in that:A plurality of barb-shaped convex wedges are along pile body axis
It is evenly distributed with to surface, and the barb-shaped convex wedge positioned at upper strata is staggeredly arranged with the barb-shaped convex wedge positioned at lower floor.
5. according to the barb-shaped prefabricated pile described in claim 1-4 any one, it is characterised in that:Inside the barb-shaped convex wedge
Equipped with bent-up bar, the bent-up bar and the bar connecting inside pile body, and barb-shaped convex wedge uses coagulation simultaneously with pile body
Native formed by integrally casting forms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721449020.2U CN207525740U (en) | 2017-11-02 | 2017-11-02 | A kind of barb-shaped prefabricated pile suitable for soft clay area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721449020.2U CN207525740U (en) | 2017-11-02 | 2017-11-02 | A kind of barb-shaped prefabricated pile suitable for soft clay area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207525740U true CN207525740U (en) | 2018-06-22 |
Family
ID=62572161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721449020.2U Expired - Fee Related CN207525740U (en) | 2017-11-02 | 2017-11-02 | A kind of barb-shaped prefabricated pile suitable for soft clay area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207525740U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110106759A (en) * | 2019-05-24 | 2019-08-09 | 东北大学 | A kind of coastal highway subgrade anti-floating pile system |
-
2017
- 2017-11-02 CN CN201721449020.2U patent/CN207525740U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110106759A (en) * | 2019-05-24 | 2019-08-09 | 东北大学 | A kind of coastal highway subgrade anti-floating pile system |
CN110106759B (en) * | 2019-05-24 | 2020-07-17 | 东北大学 | Coastal highway subgrade anti-floating pile system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203795465U (en) | Counterfort retaining wall structure suitable for deep and yielding ground foundation | |
CN204401385U (en) | A kind of road structure processing Deep Thick Soft Ground karst foundation | |
CN108277814A (en) | Stake top counterfort wall supporting construction and construction method | |
CN107476277A (en) | Huge karst cavity ruggedized construction and construction method in Railway Tunnel | |
CN104532714A (en) | Roadbed structure for treating deep soft soil karst foundation | |
CN202543966U (en) | Pile-supported cantilever retaining wall | |
CN104612105B (en) | Reinforced concrete structural formula flood-control wall | |
CN101418574B (en) | Construction method for reinforcing grade beam | |
CN207525740U (en) | A kind of barb-shaped prefabricated pile suitable for soft clay area | |
CN208309299U (en) | A kind of Karst region railway bed substrate antidumping foundation reinforcing structure | |
CN204435407U (en) | A kind of batter post group anchor formula rock foundation | |
CN208501731U (en) | One kind is for being classified retaining wall structure in thicker soft foundation | |
CN202247929U (en) | Plug-shaped bearing platform structure | |
CN206189447U (en) | Partly strut formula retaining wall | |
CN104480897B (en) | Flood prevention wall with small land occupation and wide application range | |
CN108130826A (en) | A kind of karst railway bed substrate antidumping foundation reinforcing structure | |
CN205420939U (en) | Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw | |
CN207017169U (en) | A kind of high-filled subgrade culvert off-loading structure | |
CN206858979U (en) | A kind of high embankment ruggedized construction in shallow buried type karst area | |
CN112832191A (en) | Dyke heightening and reinforcing structure | |
CN106120523B (en) | A kind of integrated application stake and the construction method of vertical earth working material processing highway soft foundation | |
CN207331747U (en) | A kind of multi-arch type tunnel plate-beam-wall-pile load transport system structure | |
CN101812847A (en) | Stepped conical pile foundation suitable for karst area and construction method thereof | |
CN104594289B (en) | Pile foundation support table formula abnormity flood-control wall | |
CN206173998U (en) | Pile adds muscle retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180622 Termination date: 20181102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |