CN206189447U - Partly strut formula retaining wall - Google Patents
Partly strut formula retaining wall Download PDFInfo
- Publication number
- CN206189447U CN206189447U CN201621226513.5U CN201621226513U CN206189447U CN 206189447 U CN206189447 U CN 206189447U CN 201621226513 U CN201621226513 U CN 201621226513U CN 206189447 U CN206189447 U CN 206189447U
- Authority
- CN
- China
- Prior art keywords
- retaining wall
- piles
- supporting
- pile
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型半支护式挡土墙,包括有上部混凝土挡土墙、下部支护桩、混凝土面板,其中下部支护桩根据其功能的不同,由纯起支护作用的短桩、兼起支护作用和承载作用的长桩组成。下部支护桩与上部混凝土挡土墙组成整体框架结构;上部挡土墙底板以下与前排的下部支护桩之间设置有混凝土面板。本实用新型结构简单、安全可靠、施工方便、永临结合、投资低廉。
The utility model semi-supporting retaining wall includes an upper concrete retaining wall, a lower supporting pile, and a concrete panel, wherein the lower supporting pile is composed of short piles purely for supporting and concurrently acting as It consists of long piles with supporting and bearing functions. The lower supporting piles and the upper concrete retaining wall form an integral frame structure; a concrete panel is arranged between the bottom plate of the upper retaining wall and the lower supporting piles in the front row. The utility model has the advantages of simple structure, safety and reliability, convenient construction, permanent combination and low investment.
Description
技术领域technical field
本实用新型涉及一种土木工程领域的挡土墙,尤其涉及一种软土地基上的半支护式挡土墙。The utility model relates to a retaining wall in the field of civil engineering, in particular to a semi-supporting retaining wall on a soft ground.
背景技术Background technique
在软土地基上修建挡土墙,为满足基坑的安全稳定,开挖坡比往往较缓,墙后形成的开挖面较大,因而需要较宽的临时征地,甚至还会对周边已有建筑物的安全产生影响,导致工程建设难度增大;如采用临时措施进行围护,如钢板桩、密排桩等,则临时支护费用将显著增加,工程建设工期也将延长,且当开挖基坑深度较大时,尚存在一定的安全风险。To build a retaining wall on a soft soil foundation, in order to meet the safety and stability of the foundation pit, the excavation slope ratio is often slow, and the excavation surface formed behind the wall is relatively large, so a wider temporary land acquisition is required, and even the surrounding existing The safety of some buildings will be affected, which will increase the difficulty of project construction; if temporary measures are used for enclosure, such as steel sheet piles, close-packed piles, etc., the temporary support costs will increase significantly, and the construction period will also be extended. When the excavation depth is large, there are still certain safety risks.
实用新型内容Utility model content
本实用新型所要解决的技术问题是针对软土地基上现有挡土墙技术中常规大开挖或纯基坑支护方案的不足,提供一种结构简单、安全可靠、施工方便、永临结合、投资低廉的半支护式挡土墙。The technical problem to be solved by the utility model is to provide a simple structure, safe and reliable, convenient construction, and permanent combination for the deficiencies of conventional large excavation or pure foundation pit support schemes in the existing retaining wall technology on soft soil foundations. , Low-investment semi-supporting retaining wall.
本实用新型的技术方案如下:The technical scheme of the utility model is as follows:
半支护式挡土墙,包括有上部混凝土挡土墙、下部支护桩和混凝土面板;下部支护桩根据其功能的不同,由单纯起支护作用的支护短桩、兼起支护作用和承载作用的支承长桩组成,其中下部支护桩的桩距、排距、排数、支护短桩、支承长桩的数量需根据挡土高度、土体性质、地下水情况等通过计算确定。下部支护桩即支护短桩和支承长桩组成深基础,支护短桩、支承长桩的主筋分别与上部混凝土挡土墙的底板受力钢筋焊接牢固;混凝土挡土墙底板前趾处需预留连接缺口并设置连接钢筋,同时对位于前排的下部支护桩沿桩体高度方向每隔一定间距设立支护桩植筋,在上部挡土墙底板下部与位于前排的下部支护桩之间设置混凝土面板,混凝土面板受力钢筋需与混凝土挡土墙连接钢筋、支护桩植筋焊接牢固;所述下部支护桩、上部混凝土挡土墙、混凝土面板三者形成整体框架结构。The semi-supported retaining wall includes the upper concrete retaining wall, the lower support pile and the concrete panel; the lower support pile is composed of short support piles that only play a supporting role and also play a supporting role according to their different functions. It is composed of supporting long piles with bearing function, among which the pile spacing, row spacing, number of rows, supporting short piles, and supporting long piles of the lower supporting piles need to be determined by calculation according to the height of retaining soil, soil properties, groundwater conditions, etc. The lower support piles, that is, the short support piles and the long support piles form the deep foundation. The main reinforcement of the short support piles and the long support piles are respectively welded firmly with the stressed steel bars of the bottom slab of the upper concrete retaining wall; the front toe of the bottom slab of the concrete retaining wall needs to be Leave connection gaps and set up connecting steel bars, and at the same time, set up support piles at regular intervals along the height direction of the piles in the front row. Concrete panels are arranged in between, and the reinforced steel bars of the concrete panels need to be welded firmly with the concrete retaining wall connecting steel bars and the supporting piles; the lower supporting piles, the upper concrete retaining walls, and the concrete panels form an overall frame structure.
本实用新型半支护式挡土墙的施工方案如下:先将地基整平至下部支护桩实施高程,在整平的地基上按设计要求施打下部支护桩;然后剥离出下部支护桩主筋,并与上部混凝土挡土墙的底板受力钢筋焊接,浇筑上部混凝土挡土墙,并在混凝土挡土墙底板前趾处预留连接缺口和连接钢筋;待上部混凝土挡土墙达到设计强度后,开挖前排的下部支护桩前土体至设计标高,并将开挖出的下部支护桩表面泥土清洗干净,再沿下部支护桩高度方向每隔一定间距进行植筋;将混凝土面板受力钢筋与混凝土挡土墙底板连接钢筋、下部支护桩植筋焊接牢固,然后浇筑混凝土面板;待混凝土面板施工完毕并达到设计强度后,可进行墙后土方回填。所述下部支护桩可以为混凝土灌注桩、混凝土预制桩或其他具备支护性能的桩基;所述上部混凝土挡土墙可以为重力式、悬臂式、扶臂式、空箱式或其他具备挡土功能的结构;此外,还可以根据地基土的性质,在前排的下部支护桩前增设地基处理桩,在前排的下部支护桩后增设止水桩。The construction scheme of the semi-supported retaining wall of the utility model is as follows: first level the foundation to the height of the lower support pile, and then lay the lower support pile on the leveled foundation according to the design requirements; then strip the lower support Pile main reinforcement, welded with the reinforced reinforcement of the bottom slab of the upper concrete retaining wall, pour the upper concrete retaining wall, and reserve a connection gap and connecting steel bars at the front toe of the bottom slab of the concrete retaining wall; when the upper concrete retaining wall reaches the design After strengthening, excavate the soil in front of the lower supporting piles in the front row to the design elevation, clean the soil on the surface of the excavated lower supporting piles, and then plant reinforcements at regular intervals along the height direction of the lower supporting piles; Weld the stressed steel bars of the concrete face with the connecting steel bars of the bottom plate of the concrete retaining wall, and the reinforcement of the lower support pile, and then pour the concrete face; after the construction of the concrete face is completed and reaches the design strength, the earthwork backfilling behind the wall can be carried out. The lower supporting piles can be concrete pouring piles, concrete prefabricated piles or other pile foundations with supporting performance; the upper concrete retaining wall can be gravity type, cantilever type, arm type, empty box type or other The structure of soil retaining function; in addition, according to the nature of the foundation soil, foundation treatment piles can be added in front of the lower supporting piles in the front row, and water-stop piles can be added behind the lower supporting piles in the front row.
本实用新型的有益效果是:结构简单、安全可靠、施工方便、永临结合、投资低廉。The beneficial effects of the utility model are: simple structure, safe and reliable, convenient construction, combination of permanent and temporary, and low investment.
附图说明Description of drawings
图1为本实用新型实施例1的结构剖视图;Fig. 1 is the structural sectional view of the utility model embodiment 1;
图2为本实用新型实施例2的结构剖视图;Fig. 2 is the structural sectional view of the utility model embodiment 2;
图3为图1、图2所示A-A方向的剖视图。Fig. 3 is a cross-sectional view along A-A direction shown in Fig. 1 and Fig. 2 .
图中:1-上部混凝土挡土墙;2-下部支护桩;3-混凝土面板;4-混凝土挡土墙底板连接钢筋;5-支护桩植筋;6-支护短桩;7-支承长桩;8-墙后土方;9-地基处理桩;10-止水桩。In the figure: 1-upper concrete retaining wall; 2-lower support pile; 3-concrete panel; 4-reinforcement connecting the bottom plate of concrete retaining wall; Long pile; 8-earthwork behind the wall; 9-foundation treatment pile; 10-water stop pile.
具体实施方式detailed description
下面结合附图对本实用新型作进一步详细描述:Below in conjunction with accompanying drawing, the utility model is described in further detail:
实施例1:半支护式挡土墙,包括有上部混凝土挡土墙1、下部支护桩2和混凝土面板3;下部支护桩2根据其功能的不同,由单纯起支护作用的支护短桩6、兼起支护作用和承载作用的支承长桩7组成,下部支护桩2的桩距、排距、排数以及其中的支护短桩6、支承长桩7的数量需根据挡土高度、土体性质、地下水情况等通过计算确定。支护短桩6和支承长桩7组成深基础,支护短桩6、支承长桩7的主筋分别与上部混凝土挡土墙1的底板受力钢筋焊接牢固;混凝土挡土墙1底板前趾处需预留连接缺口并设置混凝土挡土墙底板连接钢筋4,同时对位于前排的下部支护桩2沿桩体高度方向每隔一定间距设立支护桩植筋5,在上部挡土墙1底板以下与位于前排的下部支护桩2之间设置混凝土面板3,混凝土面板3的受力钢筋需与混凝土挡土墙底板连接钢筋4、支护桩植筋5焊接牢固。所述下部支护桩2、上部混凝土挡土墙1、混凝土面板3三者形成整体框架结构。Embodiment 1: semi-supported retaining wall, including upper concrete retaining wall 1, lower support pile 2 and concrete panel 3; Short protection piles 6 and supporting long piles 7 that also play a role in supporting and bearing. Soil height, soil properties, groundwater conditions, etc. are determined through calculation. Supporting short piles 6 and supporting long piles 7 form a deep foundation, and the main bars of supporting short piles 6 and supporting long piles 7 are respectively welded firmly with the reinforced steel bars of the bottom plate of the upper concrete retaining wall 1; the front toe of the bottom plate of concrete retaining wall 1 needs to be Reserve connection gaps and set the concrete retaining wall bottom plate connecting reinforcement 4, and at the same time, set up support pile reinforcements 5 at regular intervals along the pile height direction for the lower support piles 2 located in the front row, and set up support pile reinforcements 5 on the bottom plate of the upper retaining wall 1 Concrete panel 3 is arranged below and between the lower supporting piles 2 of the front row, and the stressed reinforcement of concrete panel 3 needs to be welded firmly with concrete retaining wall bottom plate connecting steel bar 4 and supporting pile planting bars 5. The lower support pile 2, the upper concrete retaining wall 1, and the concrete panel 3 form an integral frame structure.
实施例1的施工方案为:先将地基整平至下部支护桩2的实施高程,在整平的地基上按设计要求施打下部支护桩2;然后剥离出下部支护桩2主筋,并与上部混凝土挡土墙1的底板受力钢筋焊接,浇筑上部混凝土挡土墙1,并在混凝土挡土墙1的底板前趾处预留连接缺口和设置混凝土挡土墙底板连接钢筋4;待上部混凝土挡土墙1达到设计强度后,开挖前排的下部支护桩2前土体至设计标高,并将开挖出的下部支护桩2表面泥土清洗干净,再沿下部支护桩2高度方向每隔一定间距种植支护桩植筋5;将混凝土面板3的受力钢筋与混凝土挡土墙底板连接钢筋4、支护桩植筋5焊接牢固,然后浇筑混凝土面板3;待混凝土面板3施工完毕并达到设计强度后,进行墙后土方8回填。The construction scheme of embodiment 1 is: first level the foundation to the implementation elevation of the lower support pile 2, and then apply the lower support pile 2 according to the design requirements on the leveled foundation; then strip the main reinforcement of the lower support pile 2, And be welded with the reinforced reinforcement of the bottom plate of the upper concrete retaining wall 1, pour the upper concrete retaining wall 1, and reserve a connection gap at the front toe of the bottom plate of the concrete retaining wall 1 and set the connecting steel bar 4 for the bottom plate of the concrete retaining wall; After the upper concrete retaining wall 1 reaches the design strength, excavate the soil in front of the lower support piles 2 in the front row to the design elevation, clean the excavated soil on the surface of the lower support piles 2, and then move along the lower support piles. The height direction of the piles 2 is planted with supporting piles and reinforcements 5 at regular intervals; the stressed reinforcement of the concrete panel 3 is connected to the concrete retaining wall bottom plate with the reinforcement 4 and the reinforcements 5 of the support piles are welded firmly, and then the concrete panel 3 is poured; After the construction of the concrete panel 3 is completed and reaches the design strength, the backfilling of the earthwork 8 behind the wall is carried out.
实施例2:与实施例1不同的是,根据地基土的性质,在前排的下部支护桩2前设置有地基处理桩9,在前排的下部支护桩2后设置有止水桩10。Embodiment 2: Different from Embodiment 1, according to the nature of the foundation soil, a foundation treatment pile 9 is arranged in front of the lower supporting pile 2 in the front row, and a water stop pile is arranged behind the lower supporting pile 2 in the front row 10.
实施例2的施工方案为:在整平的地基上按设计要求施打下部支护桩2、地基处理桩9、止水桩10;然后剥离出下部支护桩2主筋,并与上部混凝土挡土墙1的底板受力钢筋焊接,浇筑上部混凝土挡土墙1,并在混凝土挡土墙1的底板前趾处预留连接缺口和混凝土挡土墙底板连接钢筋4;待上部混凝土挡土墙1达到设计强度后,开挖前排的下部支护桩2前土体至设计标高,并将开挖出的下部支护桩2表面泥土清洗干净,再沿下部支护桩2高度方向每隔一定间距设立支护桩植筋5;将混凝土面板3的受力钢筋与混凝土挡土墙底板连接钢筋4、支护桩植筋5焊接牢固,然后浇筑混凝土面板3;待混凝土面板3施工完毕并达到设计强度后,进行墙后土方8回填。The construction plan of embodiment 2 is: on the leveled foundation, according to the design requirements, the lower support pile 2, the foundation treatment pile 9, and the water stop pile 10 are laid; Weld the stressed steel bars of the bottom plate of the earth wall 1, pour the upper concrete retaining wall 1, and reserve a connection gap and the connecting steel bar 4 at the bottom plate of the concrete retaining wall 1 at the front toe of the bottom plate of the concrete retaining wall; 1 After reaching the design strength, excavate the front row of lower supporting piles 2 to the design elevation, and clean the soil on the surface of the excavated lower supporting piles 2, and then follow the height direction of the lower supporting piles 2 at intervals Set up support piles and plant bars 5 at a certain distance; weld the stressed steel bars of the concrete panel 3 to the concrete retaining wall bottom plate connecting steel bars 4 and support piles to plant bars 5 firmly, and then pour the concrete panels 3; After reaching the design strength, carry out the earthwork 8 backfilling behind the wall.
所述上部混凝土挡土墙1可以为重力式、悬臂式、扶臂式、空箱式或其他具备挡土功能的结构;所述支护桩2可以为混凝土灌注桩、混凝土预制桩或其他具备支护性能的桩基;所述地基处理桩9、止水桩10可以是水泥搅拌桩、高压旋喷桩或其他满足功能的桩基。The upper concrete retaining wall 1 can be gravity type, cantilever type, arm type, empty box type or other structure with soil retaining function; the support pile 2 can be concrete pouring pile, concrete prefabricated pile or other Pile foundation with support performance; the foundation treatment pile 9 and water stop pile 10 can be cement mixing piles, high-pressure rotary grouting piles or other pile foundations that meet the functions.
上述实施例结合附图对本实用新型进行了描述,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些均属于本实用新型的保护范围。The above embodiments describe the utility model in conjunction with the accompanying drawings, but it should not be understood as limiting the patent scope of the utility model. It should be pointed out that those skilled in the art can make several modifications and improvements without departing from the concept of the utility model, and these all belong to the protection scope of the utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621226513.5U CN206189447U (en) | 2016-11-15 | 2016-11-15 | Partly strut formula retaining wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621226513.5U CN206189447U (en) | 2016-11-15 | 2016-11-15 | Partly strut formula retaining wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206189447U true CN206189447U (en) | 2017-05-24 |
Family
ID=58725681
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621226513.5U Active CN206189447U (en) | 2016-11-15 | 2016-11-15 | Partly strut formula retaining wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206189447U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107476294A (en) * | 2017-06-25 | 2017-12-15 | 吴震 | A kind of friction pile is combined into one structure and construction method with structure pile |
| CN111622261A (en) * | 2020-06-22 | 2020-09-04 | 云南皓泰公路勘察设计有限公司 | Box retaining wall of pile foundation |
| CN112779853A (en) * | 2019-11-07 | 2021-05-11 | 中冶京诚工程技术有限公司 | Abutment and design and construction method thereof |
-
2016
- 2016-11-15 CN CN201621226513.5U patent/CN206189447U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107476294A (en) * | 2017-06-25 | 2017-12-15 | 吴震 | A kind of friction pile is combined into one structure and construction method with structure pile |
| CN112779853A (en) * | 2019-11-07 | 2021-05-11 | 中冶京诚工程技术有限公司 | Abutment and design and construction method thereof |
| CN111622261A (en) * | 2020-06-22 | 2020-09-04 | 云南皓泰公路勘察设计有限公司 | Box retaining wall of pile foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106499413B (en) | A kind of Shallow-buried section tunnel stratum consolidation construction method | |
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| CN205742213U (en) | Foundation pit supporting construction | |
| CN1837511B (en) | A double-row cofferdam and its manufacturing method | |
| CN100580190C (en) | Building foundation pit support structure | |
| CN211340808U (en) | Pile foundation pit supporting construction behind preceding wall | |
| CN203213124U (en) | Steel sheet pile and cement-mixed pile combined support | |
| CN105756091B (en) | A Construction Method of Subway Station Foundation Pit Controlling the Deformation of Adjacent Buildings | |
| CN207003499U (en) | A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit | |
| CN203729308U (en) | Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall | |
| CN103104102B (en) | Construction method for underground storey-addition reconstruction | |
| CN205975658U (en) | Steel platform tower crane foundation | |
| CN113585296B (en) | Artificial slope prefabricated flexible support ecological comprehensive treatment structure and its construction method | |
| CN202450485U (en) | Sheet pile-reinforced flood control wall | |
| CN118668715A (en) | Foundation pit water-stop supporting device and dewatering construction method thereof | |
| CN110080169A (en) | A kind of construction method reclaimed fields from the sea utilized based on basement | |
| CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
| CN203768914U (en) | Foundation pit bracing diagonal support pile structure | |
| CN211421139U (en) | A shield shaft crown beam support structure | |
| CN108005086A (en) | A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure | |
| CN219262379U (en) | A Double-Arch Tunnel Portal Structure Suitable for Biased Terrain | |
| CN111827312A (en) | A kind of slope reinforced retaining wall and construction method thereof | |
| CN217231894U (en) | Protective structure suitable for high roadbed of filling out of rock matter | |
| CN206693248U (en) | A kind of slope retaining structure in interim middle-size and small-size landslide control engineering | |
| CN205839765U (en) | A kind of soft soil foundation pit Retaining Structure with Double-row Piles considering soil arch and deformation space effect |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |