CN206052653U CN201621086965.8U CN201621086965U CN206052653U CN 206052653 U CN206052653 U CN 206052653U CN 201621086965 U CN201621086965 U CN 201621086965U CN 206052653 U CN206052653 U CN 206052653U
Authority
CN
China
Prior art keywords
horizontal
piles
rockfill
dam
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621086965.8U
Other languages
Chinese (zh)
Inventor
卢晓春
熊勃勃
乔雨
肖泽云
陈博夫
唐迎旭
万光义
吴银刚
杨君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University
Original Assignee
China Three Gorges University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University filed Critical China Three Gorges University
Priority to CN201621086965.8U priority Critical patent/CN206052653U/en
Application granted granted Critical
Publication of CN206052653U publication Critical patent/CN206052653U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种基于混凝土桩的面板堆石坝用堆石体结构,本实用新型主要由堆石料填筑而成,其特征在于,还包括水平横桩、水平纵桩、垂直桩。其中平横桩与水平纵桩沿堆石体高程分成若干层,每一层的水平横桩与水平纵桩相互搭接形成格栅结构,垂直桩位于水平横桩与水平纵桩所形成的格栅内部。水平横桩、水平纵桩及垂直桩均由堆石体内部的灌浆套管灌浆浇筑成型。本实用新型具有边坡稳定性好,抗滑稳定性高,堆石体的变形小,面板受拉压破坏风险低,结构抗震性高的优点。

The utility model discloses a rockfill body structure for a face rockfill dam based on concrete piles. The utility model is mainly filled with rockfill materials, and is characterized in that it also includes horizontal horizontal piles, horizontal vertical piles and vertical piles. Among them, the horizontal horizontal piles and horizontal vertical piles are divided into several layers along the elevation of the rockfill body. The horizontal horizontal piles and horizontal vertical piles of each layer are overlapped to form a grid structure, and the vertical piles are located in the grid formed by the horizontal horizontal piles and horizontal vertical piles. inside the grid. Horizontal horizontal piles, horizontal vertical piles and vertical piles are all formed by grouting casings inside the rockfill body. The utility model has the advantages of good slope stability, high anti-sliding stability, small deformation of the rockfill body, low damage risk of the panel under tension and compression, and high structural shock resistance.

Description

一种基于混凝土桩的面板堆石坝用堆石体结构A rockfill body structure for face rockfill dam based on concrete piles

技术领域technical field

本实用新型涉及面板堆石坝工程技术领域,更加具体地说,涉及混凝土面板堆石坝中堆石体的构造。The utility model relates to the technical field of face rockfill dam engineering, more specifically, relates to the structure of a rockfill body in a concrete face rockfill dam.

背景技术Background technique

面板堆石坝是一种以堆石体为支承结构,在其上游表面浇筑的面板作为防渗结构的堆石坝。该种坝型导流与度汛方便、施工时受气候条件的影响较小、填筑材料可就地取材、施工干扰少,因此其施工方便快捷,进度快;堆石体上游面的防渗面板承受水压的性能好、堆石体本身的透水性好,因此该坝受水渗透的影响小;坝体均有良好的抗震性能,且能适应各种地形,因此面板堆石坝作为一种经济适用的坝型得到了广泛的应用。Face rockfill dam is a kind of rockfill dam with rockfill body as supporting structure, and face poured on its upstream surface as anti-seepage structure. This type of dam is convenient for diversion and flood control, less affected by climate conditions during construction, filling materials can be obtained locally, and less construction interference, so its construction is convenient and fast, and the progress is fast; the seepage prevention of the upstream surface of the rockfill body The performance of the face plate to withstand water pressure is good, and the water permeability of the rockfill itself is good, so the dam is less affected by water seepage; the dam body has good seismic performance and can adapt to various terrains, so the face rockfill dam is used as a This economical and applicable dam type has been widely used.

但是面板堆石坝也有其不足:堆石体在自重及混凝土面板传递的水压力等荷载作用下会产生不均匀的沉降和位移,导致面板与堆石体之间产生部分脱空,改变了面板以承压为主的力学工作性态而产生裂缝。面板作为坝体的主要防渗结构,一旦破坏将会直接威胁大坝的安全。因此,堆石体的变形控制是制约混凝土面板堆石坝发展的一个重要因素。However, the face rockfill dam also has its disadvantages: the rockfill body will produce uneven settlement and displacement under the loads such as its own weight and the water pressure transmitted by the concrete face plate, resulting in a partial gap between the face plate and the rock fill body, which changes the face plate. Cracks are generated due to the mechanical working behavior mainly under pressure. As the main anti-seepage structure of the dam body, the face plate will directly threaten the safety of the dam if it is damaged. Therefore, the deformation control of rockfill body is an important factor restricting the development of concrete face rockfill dams.

实用新型内容Utility model content

本实用新型的目的旨在改善上述面板堆石坝存在的问题,特提出了一种基于混凝土桩的面板堆石坝用堆石体结构,本实用新型可以提高堆石体的边坡稳定性、抗滑稳定性;控制堆石体在蓄水期及运行期的变形,降低面板开裂破坏风险;同时还能提高坝体的抗震性能,降低溃坝损失。The purpose of this utility model is to improve the existing problems of the above-mentioned face rockfill dam, and a kind of rockfill body structure for a face rockfill dam based on concrete piles is specially proposed. The utility model can improve the slope stability of the rockfill body, Anti-sliding stability; control the deformation of the rockfill body during the impoundment period and operation period, reduce the risk of cracking and damage of the face plate; at the same time, it can also improve the seismic performance of the dam body and reduce the loss of dam failure.

为了解决上述技术问题,本实用新型提出以下技术方案:一种基于混凝土桩的面板堆石坝用堆石体结构,它包括它包多层钢架结构,每层钢架结构都包括多根水平横桩和水平纵桩,所述水平横桩和水平纵桩交叉垂直布置,形成栅格状结构,在多层水平横桩和水平纵桩构成的钢架结构中,垂直布置有多根垂直桩,所述水平横桩、水平纵桩和垂直桩构成三维立体空间结构,在立体空间结构中填充有堆石料;所述堆石料、水平横桩、水平纵桩以及垂直桩构成的堆石体结构构成面板堆石坝的主体,承担库水推力,维系大坝稳定,在堆石体结构的外部还设置有面板体系结构。In order to solve the above technical problems, the utility model proposes the following technical solutions: a rockfill body structure for a face rockfill dam based on concrete piles, which includes a multi-layer steel frame structure, and each layer of steel frame structure includes a plurality of horizontal Horizontal piles and horizontal vertical piles, the horizontal horizontal piles and horizontal vertical piles are vertically arranged to form a grid structure, and in the steel frame structure composed of multi-layer horizontal horizontal piles and horizontal vertical piles, there are many vertical piles vertically arranged , the horizontal horizontal piles, horizontal vertical piles and vertical piles constitute a three-dimensional space structure, and the three-dimensional space structure is filled with rockfill materials; Constituting the main body of the face rockfill dam, it bears the thrust of the reservoir water and maintains the stability of the dam. There is also a face plate system structure outside the rockfill structure.

所述面板体系结构包括面板、垫层、过渡层、趾板、防浪墙和防渗帷幕;所述面板构成大坝的主要防渗结构,能够阻止库水渗透过坝;所述防浪墙、趾板和防渗帷幕构成大坝防渗体系的组成部分,能阻止库水绕坝渗漏;所述垫层设置在面板的底层为面板提供平整、密实的基础;过渡层设置在保护垫层的外层。The panel architecture includes panel, cushion, transition layer, plinth, wave wall and anti-seepage curtain; the panel constitutes the main anti-seepage structure of the dam, which can prevent reservoir water from seeping through the dam; the wave wall , plinth and anti-seepage curtain constitute the components of the anti-seepage system of the dam, which can prevent the leakage of reservoir water around the dam; the cushion layer is arranged on the bottom of the panel to provide a flat and dense foundation for the panel; The outer layer of the layer.

所述每层水平纵桩的灌浆套管两端应该深入两岸山体2-3米。The two ends of the grouting sleeves of each layer of horizontal vertical piles should go deep into the mountains on both banks for 2-3 meters.

所述垂直桩的灌浆套管底部应该深入大坝地基2-3米。The bottom of the grouting casing of the vertical pile should go deep into the dam foundation by 2-3 meters.

本实用新型有如下有益效果:The utility model has the following beneficial effects:

由于水平横桩、水平纵桩及垂直桩的支承作用,蓄水期,堆石体在荷载作用下的变形较传统没有混凝土桩的推石体结构小,因此,堆石体上游面的面板与堆石体之间发生脱空现象的几率降低,这直接减少了面板发生挤压破坏或受弯开裂及止水拉裂破坏的风险;Due to the supporting effect of horizontal horizontal piles, horizontal vertical piles and vertical piles, the deformation of the rockfill body under load during the impoundment period is smaller than that of the traditional stone pushing body structure without concrete piles. The probability of hollowing out between rockfill bodies is reduced, which directly reduces the risk of extrusion damage or bending cracking and water-stop cracking damage of the panel;

在面板堆石坝运行期内堆石体的流动变形是导致面板与堆石体脱空的重要原因之一。混凝土桩本身的塑性流动变形量较小,因此堆石体在内部混凝土桩的约束下其运行期的流动变形会得到控制,降低了运行期内面板与堆石体之间脱空的风险;The flow deformation of the rockfill body during the operation period of the face rockfill dam is one of the important reasons leading to the void between the face plate and the rockfill body. The plastic flow deformation of the concrete pile itself is small, so the flow deformation of the rockfill body during the operation period will be controlled under the constraints of the internal concrete pile, reducing the risk of void between the face plate and the rockfill body during the operation period;

水平横桩、水平纵桩及垂直桩可以约束周围堆石料的位移,阻碍上下游边坡的滑动,因此该种堆石体结构的边坡稳定性好。甚是可以在满足稳定性要求的前提下,进一步缩小堆石体的坡度,节约筑坝石料;Horizontal horizontal piles, horizontal vertical piles and vertical piles can restrict the displacement of surrounding rockfill materials and hinder the sliding of upstream and downstream slopes. Therefore, this kind of rockfill structure has good slope stability. Even on the premise of meeting the stability requirements, the slope of the rockfill body can be further reduced to save dam building stones;

垂直桩底部深入坝体地基内部、水平纵桩两端深入两岸山体,因此该种堆石体结构在水推力的作用下具有较好的抗滑稳定性,安全度较传统不含混凝土桩的堆石体高;The bottom of the vertical pile goes deep into the foundation of the dam body, and the two ends of the horizontal vertical pile go deep into the mountains on both banks. Therefore, this kind of rockfill structure has better anti-sliding stability under the action of water thrust, and its safety is higher than that of traditional piles without concrete piles. stone height;

面板堆石坝本身的抗震性较好,混凝土桩能进一步加强堆石体结构在地震作用下的稳定性,因此该种含有混凝土桩的面板堆石坝在地震烈度高的西南地区更加具有竞争力;The face rockfill dam itself has good seismic performance, and concrete piles can further strengthen the stability of the rockfill structure under earthquake action. Therefore, this kind of face rockfill dam containing concrete piles is more competitive in the southwest region with high seismic intensity ;

不幸发生溃坝灾害后,混凝土桩可以降低堆石料被冲刷的速度,在一定程度上降低溃坝灾害的影响。After the unfortunate occurrence of a dam failure, concrete piles can reduce the rate at which the rockfill material is scoured, reducing the impact of the dam failure to a certain extent.

附图说明Description of drawings

下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是基于混凝土桩的面板堆石坝用堆石体结构的三维示意图;Fig. 1 is a three-dimensional schematic diagram of a rockfill structure for a face rockfill dam based on concrete piles;

图2是基于混凝土桩的面板堆石坝用堆石体结构剖面图;Fig. 2 is a cross-sectional view of a rockfill structure for a face rockfill dam based on concrete piles;

图中:1-堆石料,2-水平横桩,3-水平纵桩,4-垂直桩,5-坝顶道路,6-防浪墙,7-面板,8-垫层,9-过渡层,10-趾板,11-防渗帷幕。In the figure: 1-rockfill material, 2-horizontal horizontal pile, 3-horizontal vertical pile, 4-vertical pile, 5-crest road, 6-wave wall, 7-panel, 8-cushion, 9-transition layer , 10-toe board, 11-seepage-proof curtain.

具体实施方式detailed description

下面结合附图对本实用新型的实施方式做进一步的说明。Embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.

如图1-2,一种基于混凝土桩的面板堆石坝用堆石体结构,它包括它包多层钢架结构,每层钢架结构都包括多根水平横桩2和水平纵桩3,所述水平横桩2和水平纵桩3交叉垂直布置,形成栅格状结构,在多层水平横桩2和水平纵桩3构成的钢架结构中,垂直布置有多根垂直桩4,所述水平横桩2、水平纵桩3和垂直桩4构成三维立体空间结构,在立体空间结构中填充有堆石料1;所述堆石料1、水平横桩2、水平纵桩3以及垂直桩4构成的堆石体结构构成面板堆石坝的主体,承担库水推力,维系大坝稳定,在堆石体结构的外部还设置有面板体系结构。As shown in Figure 1-2, a rockfill body structure for a face rockfill dam based on concrete piles includes a multi-layer steel frame structure, and each layer of steel frame structure includes multiple horizontal horizontal piles 2 and horizontal vertical piles 3 , the horizontal horizontal piles 2 and the horizontal vertical piles 3 are vertically arranged to form a grid structure, and in the steel frame structure composed of the multi-layer horizontal horizontal piles 2 and the horizontal vertical piles 3, a plurality of vertical piles 4 are vertically arranged, The horizontal horizontal pile 2, the horizontal vertical pile 3 and the vertical pile 4 form a three-dimensional space structure, and the three-dimensional space structure is filled with a rockfill material 1; the rockfill material 1, the horizontal horizontal pile 2, the horizontal vertical pile 3 and the vertical pile The rockfill structure formed by 4 constitutes the main body of the face rockfill dam, which bears the thrust of the reservoir water and maintains the stability of the dam. There is also a face plate system structure outside the rockfill structure.

进一步的,所述面板体系结构包括面板7、垫层8、过渡层9、趾板10、防浪墙6和防渗帷幕11;所述面板7构成大坝的主要防渗结构,能够阻止库水渗透过坝;所述防浪墙6、趾板10和防渗帷幕11构成大坝防渗体系的组成部分,能阻止库水绕坝渗漏;所述垫层8设置在面板7的底层为面板7提供平整、密实的基础;过渡层9设置在保护垫层8的外层。Further, the panel architecture includes a panel 7, a cushion layer 8, a transition layer 9, a plinth 10, a wave wall 6 and an anti-seepage curtain 11; the panel 7 constitutes the main anti-seepage structure of the dam, which can prevent the The water seeps through the dam; the wave wall 6, the toe board 10 and the anti-seepage curtain 11 constitute the components of the dam anti-seepage system, which can prevent the reservoir water from leaking around the dam; the cushion layer 8 is arranged on the bottom layer of the panel 7 Provide a flat and dense foundation for the panel 7; the transition layer 9 is arranged on the outer layer of the protective cushion layer 8.

进一步的,所述每层水平纵桩3的灌浆套管两端应该深入两岸山体2-3米。通过深入一端距离长度提高了连接强度。Further, the two ends of the grouting sleeves of each layer of horizontal vertical piles 3 should go deep into the mountains on both banks for 2-3 meters. Increased connection strength by going deep into one end for a distance length.

进一步的,所述垂直桩4的灌浆套管底部应该深入大坝地基2-3米。过深入一端距离长度提高了连接强度。Further, the bottom of the grouting casing of the vertical pile 4 should go deep into the dam foundation by 2-3 meters. Going too far into one end increases the strength of the connection.

进一步的,所用的水平横桩、水平纵桩及垂直桩都是通过灌浆形成的。Further, the used horizontal horizontal piles, horizontal vertical piles and vertical piles are all formed by grouting.

进一步的,每一层的水平横桩及水平纵桩的灌浆套管是在堆石体填筑到相应高度时直接放置到堆石体内部地。Further, the grouting sleeves of the horizontal horizontal piles and horizontal vertical piles of each layer are directly placed inside the rockfill body when the rockfill body is filled to a corresponding height.

进一步的,所有垂直桩的灌浆套管是在堆石体填筑完成后通过钻孔放置到堆石体内部地。Further, the grouting sleeves of all vertical piles are placed inside the rockfill body through drilling holes after the rockfill body is filled.

进一步的,当堆石体结构填筑到预定高程后,使其自由沉降一段时间,完成堆石体在自重荷载下的大部分形变。然后在浇筑面板之前完成混凝土桩的灌浆及成型。Furthermore, after the rockfill body structure is filled to the predetermined height, it is allowed to settle freely for a period of time to complete most of the deformation of the rockfill body under the load of its own weight. The concrete piles are then grouted and formed before the panels are poured.

如图2所示的是本实用新型提出的基于混凝土桩的面板堆石坝用堆石体结构剖面图,旨在说明使用该种基于混凝土桩的堆石体的面板堆石坝的构造,包括面板7、垫层8、过渡层9、趾板10、防浪墙6、防渗帷幕11、坝顶道路5、堆石料1、水平横桩2、水平纵桩3及垂直桩4;堆石料1、水平横桩2、水平纵桩3以及垂直桩4构成的堆石体结构是面板堆石坝的主体,承担库水推力,维系大坝稳定;面板7是大坝的主要防渗结构,能阻止库水渗透过坝;防浪墙6、趾板10、防渗帷幕11是大坝防渗体系的组成部分,能阻止库水绕坝渗漏;垫层8能为面板提供平整、密实的基础,将面板承担的水推力均匀地传递给堆石体;过渡层9可以保护垫层8在高水头作用下不发生破坏。As shown in Figure 2 is the cross-sectional view of the rockfill body structure based on concrete piles for the face rockfill dam proposed by the utility model, which aims to illustrate the structure of the face rockfill dam using this kind of face rockfill dam based on concrete piles, including Panel 7, cushion 8, transition layer 9, plinth 10, wave wall 6, anti-seepage curtain 11, dam crest road 5, rockfill material 1, horizontal horizontal pile 2, horizontal vertical pile 3 and vertical pile 4; rockfill material 1. The rockfill body structure composed of horizontal horizontal piles 2, horizontal vertical piles 3 and vertical piles 4 is the main body of the face rockfill dam, which bears the thrust of the reservoir water and maintains the stability of the dam; the face plate 7 is the main anti-seepage structure of the dam. It can prevent the reservoir water from seeping through the dam; the anti-wave wall 6, the toe board 10 and the anti-seepage curtain 11 are the components of the dam anti-seepage system, which can prevent the reservoir water from seepage around the dam; the cushion layer 8 can provide smooth and compact foundation, which evenly transmits the water thrust borne by the panel to the rockfill body; the transition layer 9 can protect the cushion layer 8 from damage under the action of high water head.

如图1是本实用新型的一种基于混凝土桩的面板堆石坝用堆石体结构的三维示意图,实施过程包括如下步骤:Figure 1 is a three-dimensional schematic diagram of a rockfill structure for a face rockfill dam based on concrete piles of the present utility model, and the implementation process includes the following steps:

(1)根据坝址地质情况,对大坝地基进行基础处理,然后逐层填筑堆石料1。没当达到水平横桩2与水平纵桩3的设计高程时,在堆石体内部放置该层水平横桩2与水平纵桩3的灌浆套管。其中每层水平纵桩的灌浆套管两端应该深入两岸山体2-3米。(1) According to the geological conditions of the dam site, carry out basic treatment on the foundation of the dam, and then fill the rockfill material 1 layer by layer. When the design elevation of the horizontal horizontal pile 2 and the horizontal vertical pile 3 is reached, the grouting sleeves of the horizontal horizontal pile 2 and the horizontal vertical pile 3 are placed inside the rockfill body. The two ends of the grouting casing of each layer of horizontal vertical piles should go deep into the mountains on both sides of the bank for 2-3 meters.

(2)当堆石料1施工完毕后,将其放置一段时间,使堆石区7及过渡层6能在自重作用下自由沉降完成自重荷载的主要位移场。然后根据设计的垂直桩4的位置在堆石体上钻孔,将垂直桩4的灌浆套管放置在钻孔中。其中垂直桩4的灌浆套管底部应该深入大坝地基2-3米。(2) After the construction of the rockfill material 1 is completed, it is placed for a period of time, so that the rockfill area 7 and the transition layer 6 can settle freely under the action of self-weight to complete the main displacement field of self-weight load. Then drill holes on the rockfill body according to the position of the designed vertical pile 4, and place the grouting casing of the vertical pile 4 in the drilled hole. Wherein the bottom of the grouting casing of the vertical pile 4 should go deep into the dam foundation by 2-3 meters.

(3)按照灌浆设计,施工垂直桩4,控制灌浆压力与灌浆量,保证垂直桩4的直径及连续性。(3) According to the grouting design, construct the vertical pile 4, control the grouting pressure and grouting volume, and ensure the diameter and continuity of the vertical pile 4.

(4)待垂直桩4成形达到一定强度后,由坝底逐层施工水平横桩2与水平纵桩3。同样需要控制灌浆质量,且每层的水平横桩2与水平纵桩3应该通过灌浆搭接成水平格栅。(4) After the vertical pile 4 is formed and reaches a certain strength, the horizontal horizontal pile 2 and the horizontal vertical pile 3 are constructed layer by layer from the bottom of the dam. It is also necessary to control the grouting quality, and the horizontal horizontal piles 2 and horizontal vertical piles 3 of each layer should be overlapped by grouting to form a horizontal grid.

(5)自此本实用新型提出的基于混凝土桩的面板堆石用堆石体结构施工完成。可以施工面板堆石坝的其它部分。(5) Since then, the construction of the face rockfill body structure based on concrete piles proposed by the utility model has been completed. Other parts of the face rockfill dam can be constructed.

在采用以上方案后,本实用新型能提高面板堆石坝的边坡稳定性、抗滑稳定性;控制堆石体的变形,减少面板因为堆石体的不均匀变形而产生的破坏;同时该种堆石体结构较传统堆石体结构的抗震性能更好。因此实用新型是一种设计理想的堆石体结构,值得推广。After adopting the above scheme, the utility model can improve the slope stability and anti-sliding stability of the face rockfill dam; control the deformation of the rockfill body and reduce the damage of the face plate due to the uneven deformation of the rockfill body; at the same time, the The seismic performance of this kind of rockfill structure is better than that of the traditional rockfill structure. Therefore, the utility model is a well-designed rockfill structure and is worth popularizing.

通过上述的说明内容,本领域技术人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改都在本实用新型的保护范围之内。本实用新型的未尽事宜,属于本领域技术人员的公知常识。Through the above description, those skilled in the art can make various changes and modifications without departing from the technical idea of the utility model, all of which are within the protection scope of the utility model. Unfinished matters of the utility model belong to the common knowledge of those skilled in the art.

Claims (4)

1.一种基于混凝土桩的面板堆石坝用堆石体结构,其特征在于:它包括它包多层钢架结构,每层钢架结构都包括多根水平横桩(2)和水平纵桩(3),所述水平横桩(2)和水平纵桩(3)交叉垂直布置,形成栅格状结构,在多层水平横桩(2)和水平纵桩(3)构成的钢架结构中,垂直布置有多根垂直桩(4),所述水平横桩(2)、水平纵桩(3)和垂直桩(4)构成三维立体空间结构,在立体空间结构中填充有堆石料(1);所述堆石料(1)、水平横桩(2)、水平纵桩(3)以及垂直桩(4)构成的堆石体结构构成面板堆石坝的主体,承担库水推力,维系大坝稳定,在堆石体结构的外部还设置有面板体系结构。1. A rockfill body structure for a face rockfill dam based on concrete piles, characterized in that it includes a multi-layer steel frame structure, and each layer of steel frame structure includes a plurality of horizontal horizontal piles (2) and horizontal vertical piles The piles (3), the horizontal horizontal piles (2) and horizontal vertical piles (3) are arranged vertically and intersecting to form a grid structure, and the steel frame composed of multi-layer horizontal horizontal piles (2) and horizontal vertical piles (3) In the structure, a plurality of vertical piles (4) are vertically arranged, and the horizontal horizontal piles (2), horizontal vertical piles (3) and vertical piles (4) form a three-dimensional space structure, and the three-dimensional space structure is filled with rockfill materials (1); the rockfill body structure composed of the rockfill material (1), horizontal horizontal piles (2), horizontal vertical piles (3) and vertical piles (4) constitutes the main body of the face rockfill dam, which bears the thrust of the reservoir water, To maintain the stability of the dam, a panel system structure is also set outside the rockfill structure. 2.根据权利要求1所述的一种基于混凝土桩的面板堆石坝用堆石体结构,其特征在于:所述面板体系结构包括面板(7)、垫层(8)、过渡层(9)、趾板(10)、防浪墙(6)和防渗帷幕(11);所述面板(7)构成大坝的主要防渗结构,能够阻止库水渗透过坝;所述防浪墙(6)、趾板(10)和防渗帷幕(11)构成大坝防渗体系的组成部分,能阻止库水绕坝渗漏;所述垫层(8)设置在面板(7)的底层为面板(7)提供平整、密实的基础;过渡层(9)设置在保护垫层(8)的外层。2. The rockfill body structure for a face rockfill dam based on concrete piles according to claim 1, characterized in that: the face plate system structure includes a face plate (7), a cushion layer (8), a transition layer (9 ), plinth (10), anti-wave wall (6) and anti-seepage curtain (11); the panel (7) constitutes the main anti-seepage structure of the dam, which can prevent reservoir water from penetrating through the dam; the anti-wave wall (6), plinth (10) and anti-seepage curtain (11) constitute the components of the anti-seepage system of the dam, which can prevent the leakage of reservoir water around the dam; the cushion (8) is arranged on the bottom layer of the panel (7) A flat and dense foundation is provided for the panel (7); the transition layer (9) is arranged on the outer layer of the protective cushion layer (8). 3.根据权利要求1所述的一种基于混凝土桩的面板堆石坝用堆石体结构,其特征在于:所述每层水平纵桩(3)的灌浆套管两端应该深入两岸山体2-3米。3. The rockfill structure for a face rockfill dam based on concrete piles according to claim 1, characterized in that: the two ends of the grouting sleeves of each layer of horizontal vertical piles (3) should go deep into the mountains on both banks 2. -3 meters. 4.根据权利要求1所述的一种基于混凝土桩的面板堆石坝用堆石体结构,其特征在于:所述垂直桩(4)的灌浆套管底部应该深入大坝地基2-3米。4. The rockfill body structure for a face rockfill dam based on concrete piles according to claim 1, characterized in that: the bottom of the grouting casing of the vertical pile (4) should go deep into the dam foundation by 2-3 meters .
CN201621086965.8U 2016-09-28 2016-09-28 A kind of rock stone-filled structure based on concrete-pile Expired - Fee Related CN206052653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621086965.8U CN206052653U (en) 2016-09-28 2016-09-28 A kind of rock stone-filled structure based on concrete-pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621086965.8U CN206052653U (en) 2016-09-28 2016-09-28 A kind of rock stone-filled structure based on concrete-pile

Publications (1)

Publication Number Publication Date
CN206052653U true CN206052653U (en) 2017-03-29

Family

ID=58367696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621086965.8U Expired - Fee Related CN206052653U (en) 2016-09-28 2016-09-28 A kind of rock stone-filled structure based on concrete-pile

Country Status (1)

Country Link
CN (1) CN206052653U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236169A (en) * 2020-01-11 2020-06-05 河南华北水利水电勘察设计有限公司 Earth and rockfill dam reinforced anti-seismic structure and construction method thereof
CN113250149A (en) * 2021-05-31 2021-08-13 山东水总有限公司 Grid type concrete panel rock-fill dam
CN115506354A (en) * 2022-08-26 2022-12-23 中电建十一局工程有限公司 A system and construction method of anti-vacation grouting pipes applied to dam filling

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236169A (en) * 2020-01-11 2020-06-05 河南华北水利水电勘察设计有限公司 Earth and rockfill dam reinforced anti-seismic structure and construction method thereof
CN113250149A (en) * 2021-05-31 2021-08-13 山东水总有限公司 Grid type concrete panel rock-fill dam
CN113250149B (en) * 2021-05-31 2022-08-16 山东水总有限公司 Grid type concrete panel rock-fill dam
CN115506354A (en) * 2022-08-26 2022-12-23 中电建十一局工程有限公司 A system and construction method of anti-vacation grouting pipes applied to dam filling
CN115506354B (en) * 2022-08-26 2024-06-04 中电建十一局工程有限公司 A grouting pipe system and construction method for preventing degassing in dam filling

Similar Documents

Publication Publication Date Title
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN105002913B (en) A kind of highly permeable stratum deep basal pit back cover water sealing structure and its construction method
CN102605750B (en) Grouting reinforcement and earthquake resisting method for earth and rockfill dam
CN104099903B (en) High-base asphalt concrete core dam
CN102561271B (en) Polymer grout injected earth-rock dam and construction method thereof
CN106245595B (en) A kind of maintainable face dam of antiseepage wall bottom seepage control system
CN104652448A (en) Unbalanced foundation pit support design method
CN108457249A (en) A kind of structure design and construction method of novel composite panel sand-gravel dam
CN204551500U (en) Novel cofferdam in a kind of super thick soft foundation
CN110017155A (en) A kind of coal working face top plate rich water gravel layer grouting and reinforcing erection water-proof method
CN217580008U (en) Water retaining dam for pumped storage power station
CN212052626U (en) A concrete face rockfill dam with multiple anti-seepage structures
CN106837340B (en) The construction method of wall clearance grouting waterproof and reinforcing shaft wall structure under frost wall protection
CN113073681B (en) Narrow and long underground structure adapting to strong earthquake action and its construction method
CN111321706A (en) Clay core wall dam structure and construction method thereof
CN109944236A (en) Tree root pile active tracking layered grouting system and construction method
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN215715381U (en) Prefabricated ground of high water level stratum is wall guide wall even
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN112064590B (en) Anti-seismic structure of clay core wall rock-fill dam in high seismic region and construction method
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN203129094U (en) Surface water anti-seepage structure for mine channel
CN115992501B (en) Asphalt concrete core wall dam and construction method
CN113123358B (en) Ship pool deformation prevention and control structure under action of uneven settlement of coal mining and construction method
CN104895088A (en) A method of reducing foundation pit asymmetrical pressure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170928

CF01 Termination of patent right due to non-payment of annual fee