- Publication number
- CN104563057B CN104563057B CN201410714564.1A CN201410714564A CN104563057B CN 104563057 B CN104563057 B CN 104563057B CN 201410714564 A CN201410714564 A CN 201410714564A CN 104563057 B CN104563057 B CN 104563057B
- Authority
- CN
- China
- Prior art keywords
- wall
- pile foundation
- heel slab
- connecting portion
- toe board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 3
- 239000004698 Polyethylene Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- -1 polyethylene Polymers 0.000 description 2
- 229920000573 polyethylene Polymers 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000012512 characterization method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 229920001084 poly(chloroprene) Polymers 0.000 description 1
- 239000004588 polyurethane sealant Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses a kind of low pile cap formula flood-control wall, it comprises a wall body and multiple pile foundation, pile foundation is positioned at the below of wall body, wall body comprises a body of wall and a base plate, the both sides of body of wall are respectively pull in shore side and side near water, base plate comprises a toe board and a heel slab, toe board and heel slab are all connected to the bottom of body of wall, toe board is distributed in the side of pulling in shore of body of wall, heel slab comprises a heel slab body and a pile foundation connecting portion, heel slab body by the bottom of body of wall along the skew back near water of body of wall to downward-extension, the upper surface of heel slab body overlaps with the planning riverbed mud upper thread of the side near water of body of wall, pile foundation connecting portion is in the bottom of heel slab body, pile foundation connecting portion is for extend straight down, pile foundation is fixed in the lower surface of toe board and the lower surface of pile foundation connecting portion respectively.Flood-control wall of the present invention has that land-based area takes up an area less, light-duty attractive in appearance, the advantage such as antiskid impact resistance by force, effectively prevents that base plate bottom from emptying, and also has the advantage that practical ranges is wide.
Description
Technical field
The present invention relates to a kind of low pile cap formula flood-control wall.
Background technology
Flood-control wall is overflowed at the flood control quaywall of river course bank section build to resist tidewater.The form of structure of flood-control wall is more, and low pile cap formula flood-control wall applies one of more type in flood-control wall type.Current flood-control wall structure, before its wall after the scour of mud face, easily causes base plate bottom to empty, and forms hidden danger or dangerous situation.In addition, due to building next-door neighbour River Bank-Line, cause flood-control wall to build place and be restricted, cause conventional flood-control wall structural shape often cannot implement.
Summary of the invention
The technical problem to be solved in the present invention be in order to not by narrow bank section place restriction and overcome that the base plate bottom that prior art exists easily is emptied, the defect of erosion-resisting characteristics difference, a kind of low pile cap formula flood-control wall is provided.
The present invention solves above-mentioned technical problem by following technical proposals:
A kind of low pile cap formula flood-control wall, it comprises a wall body and multiple pile foundation, described pile foundation is positioned at the below of described wall body, its feature is, described wall body comprises a body of wall and a base plate, the both sides of described body of wall are respectively pull in shore side and side near water, described base plate comprises a toe board and a heel slab, described toe board and described heel slab are all connected to the bottom of described body of wall, described toe board is distributed in the side of pulling in shore of described body of wall, described heel slab comprises a heel slab body and a pile foundation connecting portion, described heel slab body by the bottom of described body of wall along the skew back near water of described body of wall to downward-extension, the upper surface of described heel slab body overlaps with the planning riverbed mud upper thread of the side near water of described body of wall, described pile foundation connecting portion is in the bottom of described heel slab body, described pile foundation connecting portion is for extend straight down, described pile foundation is fixed in the lower surface of described toe board and the lower surface of described pile foundation connecting portion respectively, the material of described body of wall and described base plate is the steel concrete that strength grade is C30, described wall body is 12 ~ 16m along the length on bank, place, and the width of described body of wall is 300 ~ 400mm, and the height of described body of wall is 2 ~ 5m, be provided with a shrinkage joint between adjacent described wall body, in described shrinkage joint, be filled with pointing.
Preferably, a subsides pin is established in the side near water of described body of wall and the junction of described heel slab.Like this, the stress concentration phenomenon of wall body can be alleviated.
Positive progressive effect of the present invention is:
1, to press river course planning mud upper thread downward-sloping for heel slab of the present invention, can protect the soil body after wall, serve as bank protection effect, reduce the risk that base plate bottom is emptied, and the heel slab stretching into river course not affect the planned section in whole river course.
2, heel slab end of the present invention is provided with vertical pile foundation connecting portion, contributes to the resistance to overturning improving flood-control wall, can shorten the length of the pile foundation below this pile foundation connecting portion simultaneously.If when not shortening pile foundation length, choose this flood-control wall structural shape, then effectively can improve the overall structure performance of flood-control wall.
3, the heel slab being positioned at the side that borders on the river is transferred in main force part by flood-control wall of the present invention, the development length of toe board in side of pulling in shore can be very short, even can close to zero, like this, it is just very little that flood-control wall of the present invention takies land-based area area, therefore, the present invention effectively can solve the problem of narrow bank section place restriction, and its practical ranges is wider.
4, flood-control wall structural entity of the present invention is stablized, and can realize flood control dash task.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of present pre-ferred embodiments.
Detailed description of the invention
Lift preferred embodiment below, and come by reference to the accompanying drawings clearlyer intactly the present invention to be described.
As shown in Figure 1, a kind of low pile cap formula flood-control wall, it comprises wall body 1 and multiple pile foundation 4, pile foundation 4 is positioned at the below of wall body 1, wall body 1 comprises body of wall 2 and base plate 3, and the both sides of body of wall 2 are respectively pull in shore side and side near water, and base plate 3 is fixed in the lower end of body of wall 2, base plate 3 comprises toe board 31 and heel slab 32, and toe board 31 and heel slab 32 are all connected to the bottom of body of wall 2.Toe board 31 is distributed in the side of pulling in shore of body of wall 2, and the upper surface of toe board 31 is positioned under the ground 7 of the side of pulling in shore of body of wall 2.Heel slab 32 comprises heel slab body 322 and pile foundation connecting portion 321, and heel slab body 322 is by the bottom of body of wall 2 along the skew back near water of body of wall 2 to downward-extension, and the upper surface of heel slab body 322 overlaps with the riverbed 8 mud upper thread of the side near water of body of wall 2; Pile foundation connecting portion 321 is positioned at the bottom of heel slab body 322, and pile foundation connecting portion 321 is for extend straight down, and pile foundation 4 is fixed in the lower surface of toe board 31 and the lower surface of pile foundation connecting portion 321 respectively.
The side near water of body of wall 2 and the junction of heel slab 32 are provided with pastes pin (figure does not mark).Pasting pin is existing common components, just repeats no more at this.Paste the stress concentration phenomenon that pin can alleviate wall body.
Wall body 1 is 15m along the length on bank, place, and the width of body of wall 2 is 0.4m, is highly 3.5m; Shrinkage joint is provided with between adjacent wall body 1, expansion joint width is 20mm, is filled with pointing in described shrinkage joint, and pointing comprises polyethylene low ratio foamed plate, between polyethylene low ratio foamed plate, embedding neoprene is in order to sealing, and adopts one-component polyurethane sealant to seal.
The width of toe board 31 is 1.6m, is highly 0.5m; Heel slab 32 width is in the horizontal direction 1.6m; The height of pile foundation connecting portion 321 is 1m, and width is 1.2m.
Pile foundation can be determined according to actual place and geological condition.Such as, pile foundation 4 can be the bored pile of diameter 0.6m, and the length of pile foundation is 15m.Pile foundation has two rows, is connected to the below of toe board 31 and the below of heel slab 32.Spacing between the pile foundation 4 being connected to the below of heel slab 32 is 2m, and the spacing between the pile foundation 4 being connected to the below of toe board 31 is 2.5m.During practical application, the length of pile foundation and spacing are comprehensively determined by checking calculations such as flood-control wall monolithic stability, bearing capacity of pile foundation.
Under normal circumstances, before construction, need to carry out planning and designing to the flood-control wall on riverbank and riverbed.The planning mud upper thread in riverbed, the upper space in the riverbed namely during planning and designing, drawing marked, is also called planning riverbed mud upper thread.The upper surface of heel slab body 322 overlaps with the planning riverbed mud upper thread of the side near water of body of wall 2, and therefore, the gradient of heel slab body is consistent with the gradient of the mud upper thread in planning riverbed, such as, the gradient of planning riverbed mud upper thread is 1:25, and so, the gradient of heel slab body is also 1:25.
The material of body of wall 2 and base plate 3 is the steel concrete that strength grade is C30.Like this, wall body can be made to have good intensity.
Construction period is protection proximate building or the safety of road, and at building or bury 30# channel-section steel 5 between road and water front underground, channel-section steel 5 is 1m apart from the spacing of building 6.
In actual applications, according to actual site condition, be defined as low pile cap structure and be difficult to carry out because place limits conventional flood-control wall structural shape, should consider to select flood-control wall of the present invention.In addition, non-narrow bank section also can apply the flood-control wall structural shape that the design provides.Calculate the permission length value of toe board according to site condition, in the length range allowed, in conjunction with actual conditions, increase the length of toe board as far as possible; On the basis of length determining heel slab and toe board, selected suitable pile foundation, and then determine other size of flood-control wall structure, finally the safety that safety checks to guarantee structure is carried out to this project organization.
Flood-control wall of the present invention has the following advantages:
1, to press river course planning mud upper thread downward-sloping for heel slab of the present invention, can protect the soil body after wall, serve as bank protection effect, reduce the risk that base plate bottom is emptied, and the heel slab stretching into river course not affect the planned section in whole river course.
2, heel slab end of the present invention is provided with vertical pile foundation connecting portion, contributes to the resistance to overturning improving flood-control wall, can shorten the length of the pile foundation below this pile foundation connecting portion simultaneously.If when not shortening pile foundation length, choose this flood-control wall structural shape, then effectively can improve the overall structure performance of flood-control wall.
3, the heel slab being positioned at the side that borders on the river is transferred in main force part by flood-control wall of the present invention, the development length of toe board in side of pulling in shore can be very short, even can close to zero, like this, it is just very little that flood-control wall of the present invention takies land-based area area, therefore, the present invention effectively can solve the problem of narrow bank section place restriction, and its practical ranges is wider.
4, flood-control wall structural entity of the present invention is stablized, and realizes flood control dash task.
In describing the invention, it will be appreciated that, term " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", the orientation of the instruction such as " outward " or position relationship be based on orientation shown in the drawings or position relationship, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as limitation of the present invention.
Although the foregoing describe the specific embodiment of the present invention, it will be understood by those of skill in the art that this only illustrates, protection scope of the present invention is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present invention and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection scope of the present invention.
Claims (2)
1. a low pile cap formula flood-control wall, it comprises a wall body and multiple pile foundation, described pile foundation is positioned at the below of described wall body, it is characterized in that, described wall body comprises a body of wall and a base plate, the both sides of described body of wall are respectively pull in shore side and side near water, described base plate comprises a toe board and a heel slab, described toe board and described heel slab are all connected to the bottom of described body of wall, described toe board is distributed in the side of pulling in shore of described body of wall, described heel slab comprises a heel slab body and a pile foundation connecting portion, described heel slab body by the bottom of described body of wall along the skew back near water of described body of wall to downward-extension, the upper surface of described heel slab body overlaps with the planning riverbed mud upper thread of the side near water of described body of wall, described pile foundation connecting portion is in the bottom of described heel slab body, described pile foundation connecting portion is for extend straight down, described pile foundation is fixed in the lower surface of described toe board and the lower surface of described pile foundation connecting portion respectively, the material of described body of wall and described base plate is the steel concrete that strength grade is C30, described wall body is 12 ~ 16m along the length on bank, place, and the width of described body of wall is 300 ~ 400mm, and the height of described body of wall is 2 ~ 5m, be provided with a shrinkage joint between adjacent described wall body, in described shrinkage joint, be filled with pointing.
2. low pile cap formula flood-control wall as claimed in claim 1, it is characterized in that, a subsides pin is established in the side near water of described body of wall and the junction of described heel slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410714564.1A CN104563057B (en) | 2014-11-28 | 2014-11-28 | Low pile cap formula flood-control wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410714564.1A CN104563057B (en) | 2014-11-28 | 2014-11-28 | Low pile cap formula flood-control wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104563057A CN104563057A (en) | 2015-04-29 |
CN104563057B true CN104563057B (en) | 2016-04-27 |
Family
ID=53080070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410714564.1A Active CN104563057B (en) | 2014-11-28 | 2014-11-28 | Low pile cap formula flood-control wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104563057B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201649038U (en) * | 2010-04-07 | 2010-11-24 | 上海市政工程设计研究总院 | Pile platform revetment with function of greening scenery |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2665144B2 (en) * | 1994-03-15 | 1997-10-22 | 強化土エンジニヤリング株式会社 | Reinforced soil structure |
-
2014
- 2014-11-28 CN CN201410714564.1A patent/CN104563057B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201649038U (en) * | 2010-04-07 | 2010-11-24 | 上海市政工程设计研究总院 | Pile platform revetment with function of greening scenery |
Also Published As
Publication number | Publication date |
---|---|
CN104563057A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612105B (en) | Reinforced concrete structural formula flood-control wall | |
CN104929142A (en) | Combined cofferdam structure and building construction method thereof | |
CN103821059A (en) | Lateral restraining and reinforcing structure for stabilizing high-fill embankment with soft oil foundation built on bed rock | |
CN104480897A (en) | Flood preventing wall with small occupied land area and wide application range | |
CN206052653U (en) | A kind of rock stone-filled structure based on concrete-pile | |
CN104594289B (en) | Pile foundation support table formula abnormity flood-control wall | |
CN107338770A (en) | The combination dam type and its method of construction of a kind of asphalt concrete core dam and concrete gravity dam | |
CN104563057B (en) | Low pile cap formula flood-control wall | |
CN104480898B (en) | Abnormity flood-control wall | |
CN104532784A (en) | Flood control wall suitable for narrow coastal segment | |
CN207017169U (en) | A kind of high-filled subgrade culvert off-loading structure | |
CN206553853U (en) | Filled-up ground on a kind of subway line | |
CN113221204B (en) | Expansion arm type drainage slide-resistant pile and structure calculation method thereof | |
CN205907692U (en) | Reinforced concrete arch ring structure for bridge main pier bearing platform foundation pit on river channel steep slope bedrock | |
CN106013238B (en) | A kind of big earthing open trench tunnel subsidence control method of soft stratum | |
CN108130826A (en) | A kind of karst railway bed substrate antidumping foundation reinforcing structure | |
CN109356101B (en) | Dam foundation seepage-proofing structure in ultra-deep coverage layer | |
CN210049276U (en) | Soil slope retaining wall system structure | |
CN209429054U (en) | Seepage prevention of dam founda structure in ultra-deep thick-covering | |
CN207525740U (en) | Be suitable for soft soil area's barb-shaped precast pile | |
CN209308066U (en) | Utility tunnel underground structure | |
CN106087861B (en) | Discharging type T-type sheet-pile breakwater encloses low bank between fields | |
CN202627020U (en) | Gravity type anti-seismic retaining wall | |
CN207295502U (en) | The deep existing bridge disturbance ruggedized construction of cheuch | |
CN204238222U (en) | Foundation pit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |