JP2016003475A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2016003475A5 JP2016003475A5 JP2014123736A JP2014123736A JP2016003475A5 JP 2016003475 A5 JP2016003475 A5 JP 2016003475A5 JP 2014123736 A JP2014123736 A JP 2014123736A JP 2014123736 A JP2014123736 A JP 2014123736A JP 2016003475 A5 JP2016003475 A5 JP 2016003475A5
- Authority
- JP
- Japan
- Prior art keywords
- bridge girder
- temperature
- height
- amount
- calculating step
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014123736A JP6432057B2 (ja) | 2014-06-16 | 2014-06-16 | 上げ越し量修正方法、上げ越し量修正装置、及びプログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014123736A JP6432057B2 (ja) | 2014-06-16 | 2014-06-16 | 上げ越し量修正方法、上げ越し量修正装置、及びプログラム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2016003475A JP2016003475A (ja) | 2016-01-12 |
| JP2016003475A5 true JP2016003475A5 (enExample) | 2017-07-06 |
| JP6432057B2 JP6432057B2 (ja) | 2018-12-05 |
Family
ID=55222968
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014123736A Expired - Fee Related JP6432057B2 (ja) | 2014-06-16 | 2014-06-16 | 上げ越し量修正方法、上げ越し量修正装置、及びプログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6432057B2 (enExample) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108677739B (zh) * | 2018-07-20 | 2021-04-16 | 长沙理工大学 | 斜拉桥和悬索桥索塔施工过程温度变形修正方法及系统 |
| JP7083129B2 (ja) * | 2018-08-30 | 2022-06-10 | 株式会社大林組 | 設置高さ管理システムおよび設置高さ管理方法 |
| JP7086010B2 (ja) * | 2019-01-25 | 2022-06-17 | 鹿島建設株式会社 | ワーゲン総重量計測方法、張出架設方法、及びワーゲン総重量計測システム |
| CN110184936A (zh) * | 2019-06-10 | 2019-08-30 | 中南大学 | 基于温度监控的大跨度曲线刚构桥变形控制方法及系统 |
| JP2021165491A (ja) * | 2020-04-07 | 2021-10-14 | 清水建設株式会社 | 構造物計測装置、構造物計測方法、及びプログラム |
| CN114776045B (zh) * | 2022-04-01 | 2023-06-20 | 中铁工程设计咨询集团有限公司 | 一种预制梁的安装方法、装置、设备及可读存储介质 |
| CN115075116B (zh) * | 2022-06-20 | 2024-08-20 | 中铁宝桥集团有限公司 | 无背索斜拉桥空间角度钢塔线型控制方法 |
| CN115748467A (zh) * | 2022-11-09 | 2023-03-07 | 中铁桥隧技术有限公司 | 一种悬臂施工桥梁的钢梁安装控制方法及系统 |
| CN117230732B (zh) * | 2023-10-07 | 2025-10-14 | 中铁二十一局集团有限公司 | 高铁超大跨度连续梁线形全过程控制方法 |
| CN118643411B (zh) * | 2024-08-19 | 2024-11-12 | 四川公路桥梁建设集团有限公司 | 一种主梁安装标高的确定方法 |
| CN119879830B (zh) * | 2025-03-31 | 2025-07-04 | 四川高速公路建设开发集团有限公司 | 一种桥墩形变度的检测方法 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2244870B1 (enExample) * | 1973-09-21 | 1978-03-17 | Campenon Bernard Europe | |
| JP4486656B2 (ja) * | 2007-02-27 | 2010-06-23 | 三菱重工業株式会社 | 橋梁の架設方法 |
| JP2009144410A (ja) * | 2007-12-13 | 2009-07-02 | Central Nippon Expressway Co Ltd | Pc橋の閉合方法 |
| JP2011132680A (ja) * | 2009-12-22 | 2011-07-07 | Shimizu Corp | 光ファイバセンサによる構造ヘルスモニタリングシステム |
| JP5649637B2 (ja) * | 2012-11-27 | 2015-01-07 | 三菱重工鉄構エンジニアリング株式会社 | 橋梁の架設装置および橋梁の架設方法 |
-
2014
- 2014-06-16 JP JP2014123736A patent/JP6432057B2/ja not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2016003475A5 (enExample) | ||
| JP2017014726A5 (enExample) | ||
| JP6432057B2 (ja) | 上げ越し量修正方法、上げ越し量修正装置、及びプログラム | |
| Li et al. | A size-dependent bilayered microbeam model based on strain gradient elasticity theory | |
| WO2014114737A3 (de) | Verfahren und vorrichtung zur bestimmung der geometrie von strukturen mittels computertomografie | |
| EP3358292A4 (en) | STRENGTH MEASURING STRIP, LOAD SENSOR AND METHOD FOR PRODUCING THE MECHANISM STRIP | |
| JP2014046433A5 (ja) | 情報処理システム、装置、方法及びプログラム | |
| JP2016524334A5 (enExample) | ||
| JP2014016817A5 (enExample) | ||
| EP3513490A4 (en) | SHAPED MEMORY ALLOY ACTUATOR WITH STRETCH SENSOR SENSOR AND POSITION ESTIMATION AND METHOD FOR PRODUCING THE SAME | |
| GB2516575A (en) | Variability aware wear leveling | |
| BR112012020766A2 (pt) | aparelho de soldagem e método de soldagem. | |
| EP2673589A4 (en) | TOLERANCE ASSESSMENT WITH REDUCED MEASURED POINTS | |
| JP2014169990A5 (enExample) | ||
| WO2014052246A3 (en) | Method for electronic temperature controlled curing of concrete and accelerating concrete maturity or equivalent age of precast concrete structures and objects and apparatus for same | |
| JP2012053756A5 (enExample) | ||
| WO2014041436A3 (en) | Processing user input pertaining to content movement | |
| MX2016013356A (es) | Sistema de calibracion de brazo. | |
| DE112016006304A5 (de) | Verfahren zum Bestimmen eines Kippzustandes eines Fahrzeugs und Computerprogramm | |
| Chiong et al. | Computation of dynamic stress intensity factors in cracked functionally graded materials using scaled boundary polygons | |
| FR2986864B1 (fr) | Methode de mesure de la deformation d'une aube de turbomachine au cours du fonctionnement de la turbomachine | |
| JP2018124780A5 (enExample) | ||
| JP2016197013A (ja) | 建物被災推定システムおよび方法 | |
| JP2015118541A5 (enExample) | ||
| WO2014064190A3 (en) | Method of calculation loads on a subsea component. |