JP2015175226A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2015175226A5 JP2015175226A5 JP2014055122A JP2014055122A JP2015175226A5 JP 2015175226 A5 JP2015175226 A5 JP 2015175226A5 JP 2014055122 A JP2014055122 A JP 2014055122A JP 2014055122 A JP2014055122 A JP 2014055122A JP 2015175226 A5 JP2015175226 A5 JP 2015175226A5
- Authority
- JP
- Japan
- Prior art keywords
- length adjusting
- bolt holes
- joint
- adjusting member
- adjusting material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000000149 penetrating Effects 0.000 claims description 6
- 230000002093 peripheral Effects 0.000 claims description 2
- 210000001015 Abdomen Anatomy 0.000 claims 5
- 239000002131 composite material Substances 0.000 claims 1
- 239000002184 metal Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 1
- 230000001808 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Description
本発明は、対向する腹起間に架設される切梁装置であって、角形鋼管からなる切梁本体と、当該切梁本体の両端部に取り付けられたH形鋼からなる第1の長さ調整材および第2の長さ調整材と、前記第1の長さ調整材の端部に取り付けられた第1の継手金物と、前記第2の長さ調整材の前記切梁本体と反対側の端部に取り付けられた軸力導入用のジャッキと、前記ジャッキの前記第2の長さ調整材と反対側の端部に取り付けられた第3の長さ調整材と、前記第3の長さ調整材の前記ジャッキと反対側の端部に取り付けられた第2の継手金物とを備え、前記切梁本体の両端部には前記切梁本体の外径より大きい外径のエンドプレートが取り付けられており、該エンドプレートの周縁部に形成された複数のボルト孔と、H形鋼からなる前記第1の長さ調整材および第2の長さ調整材のフランジに形成された複数のボルト孔を貫通する複数の接合ボルトによって、前記切梁本体と前記第1の長さ調整材および第2の長さ調整材が接合されていることを特徴とするものである。
切梁本体を角形鋼管から形成することにより切梁の座屈長さを長くして、火打梁や棚杭などの鋼材量(鋼材使用量)を減らし、コスト削減、工期短縮、さらには広い作業空間を確保できて作業効率の向上等を図れる。
The present invention provides a Setsuhari device bridges the wale facing a Setsuhari body of RHS, first length consisting of H-shaped steel which is attached to both ends of the Setsuhari body is an adjustment member and the second length adjusting member, the first second and first joint hardware that is attach to the ends of the length adjusting member, the second of said Setsuhari body length adjustment member An axial force introducing jack attached to the opposite end of the jack, a third length adjusting member attached to the opposite end of the jack to the second length adjusting member, and the first with three of the jack length adjustment member and a second coupling hardware attached to the opposite end, the end of the outer diameter larger than the outer diameter of the Setsuhari body at both end portions of the Setsuhari body A first plate comprising a plurality of bolt holes formed in a peripheral edge portion of the end plate and the H-shaped steel. The cut beam main body, the first length adjusting material, and the second length adjustment by a plurality of joint bolts penetrating a plurality of bolt holes formed in the flange of the length adjusting material and the second length adjusting material wood is one which is characterized that you have joined.
A switching beam body by increasing the buckling length of Setsuhari by forming a square tube, reducing steel quantities such as angle brace beams and Tanakui the (steel usage), cost reduction, shortening the construction period, more large working It can be ensured a space Ru Hakare the improvement of work efficiency.
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014055122A JP6381939B2 (en) | 2014-03-18 | 2014-03-18 | Cut beam device and retaining support |
PCT/JP2015/054920 WO2015141393A1 (en) | 2014-03-18 | 2015-02-23 | Brace device and earth-retaining falsework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014055122A JP6381939B2 (en) | 2014-03-18 | 2014-03-18 | Cut beam device and retaining support |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2015175226A JP2015175226A (en) | 2015-10-05 |
JP2015175226A5 true JP2015175226A5 (en) | 2018-01-18 |
JP6381939B2 JP6381939B2 (en) | 2018-08-29 |
Family
ID=54144371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014055122A Active JP6381939B2 (en) | 2014-03-18 | 2014-03-18 | Cut beam device and retaining support |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6381939B2 (en) |
WO (1) | WO2015141393A1 (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6799425B2 (en) * | 2016-09-23 | 2020-12-16 | 丸藤シートパイル株式会社 | Adapter member and Yamadome support structure |
JP6893789B2 (en) * | 2017-01-13 | 2021-06-23 | ジェコス株式会社 | Beam flint connection structure and beam flint connection piece |
JP6893799B2 (en) * | 2017-03-02 | 2021-06-23 | ジェコス株式会社 | Beam flint connection structure and beam flint connection piece |
JP6532908B2 (en) * | 2017-04-04 | 2019-06-19 | ジェコス株式会社 | Construction method of column cutting beam |
JP7005171B2 (en) * | 2017-05-25 | 2022-01-21 | 丸藤シートパイル株式会社 | Yamadome support structure |
JP7029901B2 (en) * | 2017-08-09 | 2022-03-04 | 株式会社竹中工務店 | Dismantling method |
KR102316011B1 (en) * | 2019-05-29 | 2021-10-21 | 김재승 | Construction method of sheathing temporary facility |
KR102071225B1 (en) * | 2019-07-30 | 2020-01-30 | 김재승 | Construction method of sheathing temporary facility using steel sheet pile |
JP6924999B1 (en) * | 2020-05-19 | 2021-08-25 | 公立大学法人大阪 | Joining structure of mountain retaining material |
CN112392051A (en) * | 2020-09-24 | 2021-02-23 | 云南建投第一勘察设计有限公司 | Foundation pit supporting and reinforcing structure and construction method |
JP7075558B1 (en) | 2020-12-16 | 2022-05-26 | 株式会社丸山工務店 | Cutting beam for mountain retaining |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS524727Y2 (en) * | 1972-04-25 | 1977-01-31 | ||
JPH0533562Y2 (en) * | 1986-01-23 | 1993-08-26 | ||
JPH02289721A (en) * | 1989-04-28 | 1990-11-29 | Marufuji Shiitopairu Kk | Detachable large bracing block |
JPH0468116A (en) * | 1990-07-07 | 1992-03-03 | Hirose & Co Ltd | Angle brace block for landslide protecting timbering |
JPH0684620B2 (en) * | 1990-07-07 | 1994-10-26 | ヒロセ株式会社 | Beam length adjustment structure |
JPH08120676A (en) * | 1994-10-21 | 1996-05-14 | Masaaki Mizuta | Earth retaining timbering detaching method and device therefor |
JP4820276B2 (en) * | 2006-12-13 | 2011-11-24 | ヒロセ株式会社 | Construction method and structure of mountain retaining support |
JP5555643B2 (en) * | 2011-02-03 | 2014-07-23 | 株式会社奥村組 | Structure and construction method of mountain retaining support |
-
2014
- 2014-03-18 JP JP2014055122A patent/JP6381939B2/en active Active
-
2015
- 2015-02-23 WO PCT/JP2015/054920 patent/WO2015141393A1/en active Application Filing
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2015175226A5 (en) | ||
JP6381939B2 (en) | Cut beam device and retaining support | |
US20190257053A1 (en) | Metal Plate Foundations with Integral Planar Fins | |
JP5906557B2 (en) | Column structure and base member | |
JP6389670B2 (en) | Member end structure | |
WO2015140893A1 (en) | Column structure | |
KR20140122460A (en) | Connecting Structure and Method of PHC Piles | |
JP5559123B2 (en) | Beam support rotating piece | |
JP6536323B2 (en) | Longitudinal structure of steel sheet pile and steel sheet pile wall | |
JP5579590B2 (en) | Steel joint structure | |
JP2015178708A (en) | Joining structure of split type buckling restraining brace | |
PE20191268A1 (en) | CORRUGATED STEEL BLADE HAVING AN INCLINED PORTION IN WHICH THE POSITION OF THE COUPLING HOLE IS ADJUSTED AND THE JOINT CORRUGATED STEEL BLADE STRUCTURE USING THE SAME | |
JP2017075485A (en) | Structure for reinforcing steel-pipe column | |
JP2019210781A (en) | Truss beam | |
JP6467267B2 (en) | Column joint structure | |
JP6893789B2 (en) | Beam flint connection structure and beam flint connection piece | |
JP2018145618A (en) | Strut beam and corner brace connection structure, and connection piece for strut beam and corner brace | |
JP2011174564A (en) | Split joint | |
CN203097273U (en) | Scaffold buckling plate | |
WO2015140894A1 (en) | Column structure and base member | |
JP2015045216A (en) | Earthquake control structure of building | |
JP2018172875A (en) | Floor structure | |
JP6949653B2 (en) | Board buckling suppression structure | |
TWI601872B (en) | Column structure | |
JP2021116832A (en) | High-power bolt friction joint structure |