JP2015070780A - エンジン発電システム - Google Patents
エンジン発電システム Download PDFInfo
- Publication number
- JP2015070780A JP2015070780A JP2013206312A JP2013206312A JP2015070780A JP 2015070780 A JP2015070780 A JP 2015070780A JP 2013206312 A JP2013206312 A JP 2013206312A JP 2013206312 A JP2013206312 A JP 2013206312A JP 2015070780 A JP2015070780 A JP 2015070780A
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- power
- time
- generation system
- control operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Control Of Turbines (AREA)
- Stand-By Power Supply Arrangements (AREA)
Abstract
Description
この場合には、作業員が、遠方操作盤の時間入力部に対して、例えば1日のうち午前0時を切換時間として予め入力しておく。これにより、毎日午前0時になると、台数制御運転で最初に発電する発電装置が自動で切換わる。このため、工事期間全体で見ると、複数の発電装置の中で各発電装置の稼働時間が平均化される。この結果、各発電装置の燃料補給及びメンテナンスのタイミングのバラツキを解消でき、整備性を向上させることができる。
この場合には、或る期間では、1番目の発電装置を予備の発電装置として停止して整備を行いつつ、その他の発電装置を並列運転させる。また、別の期間では、2番目の発電装置を予備の発電装置として整備を行いつつ、その他の発電装置を並列運転させる。こうして、複数の発電装置のうち、予備の発電装置を順番に停止させて、整備者の都合が良い時間で整備を行うことができる。
更に、複数の発電装置のうち或る発電装置が故障したときには、予備の発電装置で補うことができる。このため、複数の発電装置に対応してそれぞれ予備の発電装置を設ける必要がなくて、少なくとも1つの予備の発電装置で、複数の発電装置全体のバックアップができる。こうして、安価に信頼度が高いエンジン発電システムを構成できる。
この場合には、工事予定表や過去の工事の状況に基づいて、工事期間の各日にちにおいて、台数制御運転を行う時間帯と強制運転を行う時間帯の変動パターンが最適に決定されているとき、作業者は、この変動パターンを自動切換制御部に予め入力して記憶させておく。これにより、自動モードスイッチをオンに選択すれば、工事期間の各日にちにおいて、台数制御運転と強制運転とを最適なタイミングで自動に切換えることができる。
本発明に係るエンジン発電システムの各実施形態について、図面を参照しながら説明する。図1は、第1実施形態のエンジン発電システム1の全体構成図である。エンジン発電システム1は、図1に示すように、5台の発電装置10,20,30,40,50と遠方操作盤60とを備え、全体として大きな電力を発電可能なパワーステーションになっている。図2は、図1の各発電装置10〜50と各工事現場K1〜K5との関係を模式的に示した図である。
い時間で整備を行うことができる。更に、発電装置10〜50のうち或る発電装置が故障したときには、予備の発電装置で補うことができる。つまり、複数の発電装置10〜50に対応してそれぞれ予備の発電装置を設ける必要がなく、1台の予備の発電装置で、5台の発電装置10〜50全体のバックアップができる。こうして、安価に信頼度が高いエンジン発電システム1を構成できる。なお、以下では、状況を分かり易くするために、発電装置50を予備の発電装置として停止させている状況で説明する。
き、同期運転が完了するまでに所定時間が必要である。このため、同期運転が完了するま
での所定時間の間に、全体負荷電力が急上昇すると、運転中の発電装置10〜40が供給できる電力を超えるおそれがある。一方、予め強制運転を行っていれば、全体負荷電力の急上昇に対応できるが、強制運転を続けていると全体負荷電力の変動が緩やかになったときに過剰運転になるという問題点がある。
第1実施形態のエンジン発電システム1によれば、8時になると、自動切換制御部62が強制運転を行うように自動で切換えて、9時まで強制運転を続けた後、台数制御運転に自動で切換える。その後、13時になると、自動切換制御部62が強制運転を行うように自動で切換えて、14時まで強制運転を続けた後、台数制御運転に自動で切換える。
次に、第2実施形態について説明する。第2実施形態では、第1実施形態と異なる部分を中心に説明し、同様の部分についての説明は省略する。図7は、第2実施形態の遠方操作盤60Xの操作パネル60Yを示した正面図である。図7に示すように、操作パネル60Yには、自動モードのオンとオフを選択可能な自動モードスイッチ65が設けられている。
工事予定表や過去の工事の状況に基づいて、図9に示す変動パターンVPが最適に決定されているときに、作業者はこの変動パターンVPを自動切換制御部62に予め入力して記憶させておく。これにより、自動モードスイッチ65を「オン」に選択すれば、工事期間の各日にちにおいて、台数制御運転と強制運転とを最適なタイミングで自動に切換えることができる。この結果、遠方操作盤60Xの監視負担を減らすことができる。
例えば、各実施形態において、エンジン発電システム1が5台の発電装置10〜50を備えるように構成したが、発電装置の台数は6台であっても良く、適宜変更可能である。また、工事現場K1〜K5の数は5つに限定されるものではなく適宜変更可能であり、電力駆動装置の種類も各電力駆動装置71〜75に限定されるものではない。
また、第1実施形態において、予備の発電装置が1台であったが2台であっても良く、予備の発電装置の台数は適宜変更可能である。
また、第2実施形態において、図9の変動パターンVPは、あくまで例示として示したものであり、工事期間の各日にちにおける全体負荷電力の変動に応じて、変動パターンは4種類以上あっても良く、適宜変更可能である。
10〜50 発電装置
11〜51 エンジン
12〜52 発電機
14〜54 遮断機
15〜55 制御回路
15a 台数制御運転回路
15b 強制運転回路
60,60X 遠方操作盤
60A,60Y 操作パネル
60a 台数制御運転接点
60b 強制運転接点
62 自動切換制御部
63a 自動運転スイッチ
63b 強制運転スイッチ
63c 切換スイッチ
63d 選択スイッチ
64 時間入力部
65 自動モードスイッチ
70 電力駆動装置
K1〜K5 工事現場
L1 母線
VP 変動パターン
Claims (4)
- 複数の工事現場で用いる電力駆動装置に電力を供給するための供給ラインが設けられ、
エンジンで発電機を駆動して発電する複数の発電装置が前記供給ラインに並列的に接続され、
前記各発電装置には、複数の発電装置を並列運転させる制御回路が組み込まれていて、
前記各制御回路には、運転中の発電装置の負荷率に応じて発電させる発電装置の数を増減させる台数制御運転を行う台数制御運転回路と、運転中の発電装置を全て発電させる強制運転を行う強制運転回路とが設けられ、
前記各発電装置に接続されていて台数制御運転と強制運転とを手動で切換え可能な遠方操作盤が設けられているエンジン発電システムにおいて、
前記遠方操作盤には、強制運転を行う強制運転時間又は台数制御運転を行う台数制御運転時間を入力可能な時間入力部が設けられ、前記時間入力部に入力された強制運転時間又は台数制御運転時間に基づいて、台数制御運転と強制運転とを自動で切換え可能な自動切換制御部が設けられていることを特徴とするエンジン発電システム。 - 請求項1に記載されたエンジン発電システムにおいて、
前記時間入力部は、台数制御運転で前記複数の発電装置の中から最初に発電させる発電装置を切換えるための切換時間を入力できるように設定されていて、
前記自動切換制御部は、前記時間入力部に入力された切換時間毎に、台数制御運転で最初に発電させる発電装置を順番に切換えることを特徴とするエンジン発電システム。 - 請求項1又は請求項2に記載されたエンジン発電システムにおいて、
前記複数の発電装置は、少なくとも1つの予備の発電装置を有し、前記予備の発電装置が停止しているときに前記複数の工事現場で想定される最大負荷電力を供給できるように設けられていることを特徴とするエンジン発電システム。 - 請求項1乃至請求項3の何れかに記載されたエンジン発電システムにおいて、
前記遠方操作盤は、自動モードのオンとオフを選択可能な自動モードスイッチを有していて、
前記自動切換制御部は、工事期間の各日にちにおいて台数制御運転を行う時間帯と強制運転を行う時間帯の変動パターンを記憶していて、前記自動モードスイッチがオンに選択されると、前記変動パターンに基づいて台数制御運転と強制運転とを自動で切換えることを特徴とするエンジン発電システム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013206312A JP5661889B1 (ja) | 2013-10-01 | 2013-10-01 | エンジン発電システム |
CN201410475008.3A CN104518718B (zh) | 2013-10-01 | 2014-09-17 | 发动机发电系统 |
HK15105809.3A HK1205371A1 (en) | 2013-10-01 | 2015-06-18 | Generator power-generation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013206312A JP5661889B1 (ja) | 2013-10-01 | 2013-10-01 | エンジン発電システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP5661889B1 JP5661889B1 (ja) | 2015-01-28 |
JP2015070780A true JP2015070780A (ja) | 2015-04-13 |
Family
ID=52437554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013206312A Expired - Fee Related JP5661889B1 (ja) | 2013-10-01 | 2013-10-01 | エンジン発電システム |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP5661889B1 (ja) |
CN (1) | CN104518718B (ja) |
HK (1) | HK1205371A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101973647B1 (ko) * | 2017-11-13 | 2019-04-29 | 엘지전자 주식회사 | 가스엔진 발전 시스템 및 그 제어 방법 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6836444B2 (ja) * | 2017-03-30 | 2021-03-03 | 本田技研工業株式会社 | 発電機システム |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005117809A (ja) * | 2003-10-09 | 2005-04-28 | Yanmar Co Ltd | 発電システムの遠隔制御装置 |
JP2009153259A (ja) * | 2007-12-19 | 2009-07-09 | Nippon Sharyo Seizo Kaisha Ltd | 可搬式発電機の制御方法 |
JP2009201323A (ja) * | 2008-02-25 | 2009-09-03 | Chugoku Electric Power Co Inc:The | 発電機自動運転装置 |
JP2012178929A (ja) * | 2011-02-25 | 2012-09-13 | Fuji Electric Co Ltd | 発電機の経済負荷配分方法および発電機の経済負荷配分装置ならびに発電機の経済負荷配分システム |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1379526A (zh) * | 2001-03-29 | 2002-11-13 | 罗树林 | 三电源自切投转换监控屏 |
JP2004282892A (ja) * | 2003-03-14 | 2004-10-07 | Mitsubishi Heavy Ind Ltd | 発電機の運転制御装置 |
CN1619941B (zh) * | 2003-11-19 | 2012-04-18 | 松下电器产业株式会社 | 发电机控制系统和发电机控制方法 |
-
2013
- 2013-10-01 JP JP2013206312A patent/JP5661889B1/ja not_active Expired - Fee Related
-
2014
- 2014-09-17 CN CN201410475008.3A patent/CN104518718B/zh not_active Expired - Fee Related
-
2015
- 2015-06-18 HK HK15105809.3A patent/HK1205371A1/xx unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005117809A (ja) * | 2003-10-09 | 2005-04-28 | Yanmar Co Ltd | 発電システムの遠隔制御装置 |
JP2009153259A (ja) * | 2007-12-19 | 2009-07-09 | Nippon Sharyo Seizo Kaisha Ltd | 可搬式発電機の制御方法 |
JP2009201323A (ja) * | 2008-02-25 | 2009-09-03 | Chugoku Electric Power Co Inc:The | 発電機自動運転装置 |
JP2012178929A (ja) * | 2011-02-25 | 2012-09-13 | Fuji Electric Co Ltd | 発電機の経済負荷配分方法および発電機の経済負荷配分装置ならびに発電機の経済負荷配分システム |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101973647B1 (ko) * | 2017-11-13 | 2019-04-29 | 엘지전자 주식회사 | 가스엔진 발전 시스템 및 그 제어 방법 |
Also Published As
Publication number | Publication date |
---|---|
CN104518718B (zh) | 2017-05-03 |
CN104518718A (zh) | 2015-04-15 |
JP5661889B1 (ja) | 2015-01-28 |
HK1205371A1 (en) | 2015-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10243371B2 (en) | System, apparatus, and method for controlling load sharing of generator sets | |
JP2011055643A (ja) | 電力供給システム | |
JP5405534B2 (ja) | 貯蔵電力制御装置、貯蔵電力制御方法及びプログラム | |
JP5661889B1 (ja) | エンジン発電システム | |
JPWO2016051958A1 (ja) | 電力管理装置、電力管理方法、電力管理システム、及び、プログラム | |
JP2008245454A (ja) | 災害時対応電力供給方法およびシステム | |
JP2006230029A (ja) | 無停電電源装置 | |
CN207542868U (zh) | 一种配电冗余系统 | |
JP2012075216A (ja) | 電力供給システム | |
WO2015098004A1 (ja) | 原子力発電所用非常電源システムおよび非常用独立電源 | |
JP2013118722A (ja) | 地域エネルギー管理方法 | |
CN104977862A (zh) | 选择性激活发电系统中的多个发电机中的至少一个的发电机管理系统和方法 | |
JP2008168976A (ja) | エレベーター遠隔監視装置 | |
CN106089665B (zh) | 空压机控制方法和装置 | |
JP2015015893A (ja) | 太陽光発電装置 | |
JP2005117809A (ja) | 発電システムの遠隔制御装置 | |
JP2009153259A (ja) | 可搬式発電機の制御方法 | |
KR20230098431A (ko) | 정전시 가용 전력의 선별적인 공급시스템 | |
JP4117263B2 (ja) | 発電システム | |
CN113437905A (zh) | 一种备用装置的一键投用系统及其控制方法 | |
CN102545330A (zh) | 一种供电电路、工程机械及其供电系统 | |
CN111431271A (zh) | 一种不间断发电的氢燃料电池发电系统 | |
Umathe et al. | A study of automatic mains failure control panel (AMFC) | |
WO2018012060A1 (ja) | 管理装置、プログラム | |
JP2008301595A (ja) | 高信頼性補助電源装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20141202 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20141203 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5661889 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |