JP2014201927A - Reconstruction method for building - Google Patents

Reconstruction method for building Download PDF

Info

Publication number
JP2014201927A
JP2014201927A JP2013077827A JP2013077827A JP2014201927A JP 2014201927 A JP2014201927 A JP 2014201927A JP 2013077827 A JP2013077827 A JP 2013077827A JP 2013077827 A JP2013077827 A JP 2013077827A JP 2014201927 A JP2014201927 A JP 2014201927A
Authority
JP
Japan
Prior art keywords
floor
room
building
private room
private
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013077827A
Other languages
Japanese (ja)
Other versions
JP6166933B2 (en
Inventor
隼人 福島
Hayato Fukushima
隼人 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=52352628&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2014201927(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2013077827A priority Critical patent/JP6166933B2/en
Publication of JP2014201927A publication Critical patent/JP2014201927A/en
Application granted granted Critical
Publication of JP6166933B2 publication Critical patent/JP6166933B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a reconstruction method for a building, which can improve amenity of a dwelling space by providing an open ceiling space.SOLUTION: A building 1 has a living room R11 that is provided on a predetermined story, and a first nursery R21 that is provided on an upper story on the predetermined story and above the living room R11 and that faces an outer peripheral part of the building 1. A reconstruction method for the building 1 includes a step of removing a part of a floor 22 of a second story to provide an open ceiling space Z that makes the first nursery R21 communicate with the living room R11.

Description

本発明は、建物の改築方法に関する。   The present invention relates to a method for rebuilding a building.

標準的な構成(一般に、夫婦2人と子供2人の計4人)の家族の居住を想定した戸建住宅として、1階(所定階)に玄関、居間、台所、食堂、予備室、及び、水廻りを配置し、2階(上階)に、個室を3室(夫婦の主寝室、及び、2つの子供室)配置した2階建て住宅がある。このような住宅においては、2人の子供の独立後、採光の面で好条件な2階の2つ個室(子供室)があまり活用されず、採光の面で不利な1階の居間で生活を続けることが多い。   As a detached house that assumes the residence of a family with a standard structure (generally two couples and two children in total), the entrance, living room, kitchen, canteen, spare room on the first floor (predetermined floor), and There is a two-story house with a water area and three private rooms (the couple's master bedroom and two children's rooms) on the second floor (upper floor). In such a house, after the independence of the two children, the two-story private room (children's room) on the second floor, which is favorable in terms of lighting, is not used much, and living in the living room on the first floor, which is disadvantageous in terms of lighting. Often continue.

また、空室となった2階の個室を書斎或はホビールームとして使うことも想定される。このような場合、夫婦の一方が遮蔽された2階の個室に閉じこもることになり、コミュニケーションがとりづらいという問題や、孤独感が増すといった問題が生じる。例えば、特許文献1には、改築により居間の上方に吹抜け空間を設けることが記載され、これにより、1階と2階との一体感を高めている。   In addition, it is assumed that the private room on the second floor, which has become empty, is used as a study or hobby room. In such a case, one of the couple is confined in a private room on the 2nd floor, which causes problems such as difficulty in communication and increased loneliness. For example, Patent Document 1 describes that an open space is provided above the living room by renovation, thereby enhancing the sense of unity between the first floor and the second floor.

特開2008−133651号公報JP 2008-133651 A

特許文献1に記載された建物では、建物の中央部分に吹抜け空間を設けて、居間を開放的なものとしているが、このような位置に吹抜け空間を設けても、居間の採光性は向上せず、また、2階の個室も居間と遮蔽された状態のままであり、吹抜け空間が住空間の快適性の向上に寄与しない。   In the building described in Patent Document 1, an open space is provided in the center of the building so that the living room is open. However, even if the open space is provided at such a position, the daylighting of the living room is improved. In addition, the private rooms on the second floor remain shielded from the living room, and the atrium space does not contribute to the improvement of the comfort of the living space.

そこで、本発明は、吹抜け空間を設けることによって住空間の快適性を向上させることができる建物の改築方法を提供することを目的とする。   Then, an object of this invention is to provide the reconstruction method of the building which can improve the comfort of living space by providing a colonnade space.

本発明の一側面に係る建物の改築方法は、所定階に設けられた居間と、所定階の上階且つ居間の上方に設けられるとともに建物外周部に面する第一の上階個室とを有する建物の改築方法であって、上階の床の一部を除去し、第一の上階個室を居間と連通する吹抜け空間とする工程を含む。   A building renovation method according to one aspect of the present invention includes a living room provided on a predetermined floor, and a first upper-floor private room provided on the upper floor of the predetermined floor and above the living room and facing the outer periphery of the building. A method for renovating a building, including a step of removing a part of the floor on the upper floor and making the first upper-floor private room an atrium space communicating with the living room.

この方法では、上階の床の一部を除去する工程により、第一の上階個室が、居間と連通する吹抜け空間となる。第一の上階個室は建物外周部に面しているため、上階の床の一部を除去する工程によって形成される吹抜け空間も建物外周部に面する。このため、第一の上階個室の既存の採光窓、あるいは、建物外周壁に新たに設けた採光窓からの光を、吹抜け空間を通して居間に導くことができ、居間を明るく開放感のある空間とすることができる。これにより、建物の住空間の快適性を向上させることができる。   In this method, the first upper floor private room becomes an atrium space communicating with the living room by removing a part of the upper floor. Since the first upper floor private room faces the outer periphery of the building, the atrium space formed by the process of removing a part of the upper floor also faces the outer periphery of the building. For this reason, the light from the existing daylighting window of the first upper-floor private room or the daylighting window newly provided on the outer peripheral wall of the building can be guided to the living room through the atrium, and the living room is bright and open. It can be. Thereby, the comfort of the living space of a building can be improved.

建物の改築方法は、第一の上階個室に、第一の上階個室に設けられた既存の採光窓よりも高さ寸法の大きな採光窓を設置する工程を更に含んでいてもよい。この場合、採光窓を高さ寸法の大きなものにすることで、より効果的に採光することができる。   The method for renovating the building may further include a step of installing a daylighting window having a larger height than the existing daylighting window provided in the first upper-floor private room in the first upper-floor private room. In this case, daylighting can be more effectively performed by making the daylighting window large in height.

建物は第一の上階個室に隣接する第二の上階個室を有しており、建物の改築方法は、第二の上階個室と第一の上階個室とを仕切る仕切り壁を除去し、第二の上階個室を吹抜け空間に連通させる工程を更に含んでいてもよい。この場合には、第二の上階個室と居間とを適度につなぐことができ、居間にいる人と第二の上階個室にいる人とが互いに気配を感じつつもそれぞれの独立性を保つことができる。   The building has a second upper-floor private room adjacent to the first upper-floor private room, and the building renovation method removes the partition wall that separates the second upper-floor private room from the first upper-floor private room. The method may further include a step of communicating the second upper-floor private room with the atrium space. In this case, the second upper-floor private room and the living room can be connected appropriately, and the people in the living room and the person in the second upper-floor private room maintain their independence while feeling mutual attention. be able to.

建物は所定階に予備室を有すると共に上階に主寝室を有しており、建物の改築方法は、所定階の予備室を新たな主寝室に改装するとともに、上階の主寝室を新たな予備室とする工程を更に含んでいてもよい。この場合には、普段の生活に必要な部屋が所定階に配置されることとなり、普段の生活を1フロアで完結させることができる。   The building has a spare room on the predetermined floor and a main bedroom on the upper floor.The rebuilding method of the building is to convert the spare room on the predetermined floor to a new master bedroom and to change the main bedroom on the upper floor to a new one. It may further include a step of forming a preliminary chamber. In this case, rooms necessary for daily life are arranged on the predetermined floor, and normal life can be completed on one floor.

上階の床の一部を除去する工程では、上階の床の下面に沿った水平面に設置された水平ブレースを残して床を除去してもよい。この場合には、既存の構造部材に手を加えないので建物の構造の安全性を維持することができる。   In the step of removing a part of the upper floor, the floor may be removed while leaving a horizontal brace installed on a horizontal plane along the lower surface of the upper floor. In this case, since the existing structural member is not modified, the safety of the building structure can be maintained.

上階の床の一部を除去する工程では、上階の床を除去する領域内に位置するとともに上階の床高さの位置に設置された梁を残して床を除去してもよい。この場合には、既存の構造部材に手を加えないので建物の構造の安全性を維持することができる。   In the step of removing a part of the upper floor, the floor may be removed while leaving the beam located in the area where the upper floor is removed and at the level of the upper floor. In this case, since the existing structural member is not modified, the safety of the building structure can be maintained.

上階の床を、上階の床高さの位置に設置された梁に載置され目地モルタルで固定された複数の軽量気泡コンクリートパネルによって構成してもよい。この場合には、目地モルタルを斫り取るだけで容易に床を除去することができる。   The upper floor may be constituted by a plurality of lightweight cellular concrete panels placed on a beam installed at the floor height of the upper floor and fixed with joint mortar. In this case, the floor can be easily removed simply by scraping the joint mortar.

建物の改築方法は、建物の屋根に、太陽光発電装置を設置する工程を更に含んでいてもよい。この場合には、太陽光発電装置による荷重の増加分が、上階の床の荷重及び床に積載される積載荷重の減少分によって相殺され、建物の構造の安全性を確保しやすくなる。   The building remodeling method may further include a step of installing a solar power generation device on the roof of the building. In this case, the increase in the load due to the photovoltaic power generation apparatus is offset by the load on the floor on the upper floor and the decrease in the load loaded on the floor, which makes it easy to ensure the safety of the building structure.

本発明によれば、吹抜け空間を設けることによって住空間の快適性を向上させることができる。   According to the present invention, the comfort of the living space can be improved by providing the atrium space.

一実施形態に係る建物の改築前の1階の間取りを示す平面図である。It is a top view which shows the floor plan of the 1st floor before reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築前の2階の間取りを示す平面図である。It is a top view which shows the floor plan of the 2nd floor before the reconstruction of the building which concerns on one Embodiment. 図1のIII-III線に沿った断面図である。It is sectional drawing along the III-III line of FIG. 一実施形態に係る建物の改築後において1階に設けられたブレース位置を示す平面図である。It is a top view which shows the brace position provided in the 1st floor after the reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築後において2階に設けられたブレース位置を示す平面図である。It is a top view which shows the brace position provided in the 2nd floor after the reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築前の2階の床構造を示す平面図である。It is a top view which shows the floor structure of the 2nd floor before reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築後の1階の間取りを示す平面図である。It is a top view which shows the floor plan of the 1st floor after the reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築後の2階の間取りを示す平面図である。It is a top view which shows the floor plan of the 2nd floor after the reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築後の2階の床構造を示す平面図である。It is a top view which shows the floor structure of the 2nd floor after the reconstruction of the building which concerns on one Embodiment. 一実施形態に係る建物の改築後において1階のLDKから吹抜け空間を見上げた様子を示す図である。It is a figure which shows a mode that the atrium space was looked up from LDK of the 1st floor after renovation of the building which concerns on one Embodiment.

以下、本発明の一実施形態について図面を参照しながら説明する。なお、図面の説明において同一の要素には同一の符号を付し、重複する説明を省略する。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the description of the drawings, the same elements are denoted by the same reference numerals, and redundant description is omitted.

本実施形態では、改築により建物の間取りを変更する。まず、改築前の建物の構成について説明する。図1〜図6に示すように建物1は、2階建ての鉄骨造軸組からなる戸建住宅である。建物1は、構造躯体2と、構造躯体2によって支持される屋根とを有する。構造躯体2は、図3〜図5に示すように、基礎10から立ち上がる複数本の通し柱11と、隣り合う通し柱11間に架設される大梁(2階の床高さの大梁12及び2階の天井高さの大梁)と、大梁12間に架け渡された小梁13(図6参照)、及び、2階の天井高さの大梁間に架け渡された小梁等によって構成される。   In this embodiment, the floor plan of a building is changed by renovation. First, the structure of the building before renovation will be described. As shown in FIGS. 1-6, the building 1 is a detached house which consists of a two-story steel frame. The building 1 has a structural frame 2 and a roof supported by the structural frame 2. As shown in FIGS. 3 to 5, the structural frame 2 includes a plurality of through-pillars 11 rising from the foundation 10, and a large beam (a large beam 12 having a floor height of the second floor and a second floor of the second floor) installed between the adjacent through-pillars 11. A large beam with a ceiling height), a small beam 13 (see FIG. 6) spanned between the large beams 12, and a small beam spanned between the large beams with a ceiling height on the second floor.

基礎10は、直交する通りに沿って格子状に形成されたRC(鉄筋コンクリート)製の布基礎である。この通りは、予め定められた平面モジュール(基準単位)寸法の整数倍の間隔で直交する2方向に沿って設定される。通し柱11は、格子状に形成された基礎10の交点上に立設される。通し柱11は、例えば、角形鋼管から成り、大梁12及び小梁13はH形鋼から成る。   The foundation 10 is an RC (steel reinforced concrete) cloth foundation formed in a lattice shape along an orthogonal street. This street is set along two orthogonal directions at an interval that is an integral multiple of a predetermined planar module (reference unit) dimension. The through pillar 11 is erected on the intersection of the foundation 10 formed in a lattice shape. The through column 11 is made of, for example, a square steel pipe, and the large beam 12 and the small beam 13 are made of H-shaped steel.

また、図4及び図5に示すように、構造躯体2には、壁等を設置するために用いられる間柱14が設けられる。また、建物1の1階及び2階のそれぞれにおいて、間柱14同士の間、及び、通し柱11と間柱14との間に、ブレース(筋交)15が複数設けられる。
ブレース15は、直交する通りに沿って複数設けられる。一例として、通りの方向に沿って見たときに、この通りの方向に沿って配置された複数のブレース15の合計長さが、建物1の半分以上の長さとなるように設けることができる。なお、図4及び図5において、白抜き四角印が通し柱11を示し、白抜き丸印が間柱14を示す。
As shown in FIGS. 4 and 5, the structural housing 2 is provided with a stud 14 used for installing a wall or the like. Further, in each of the first floor and the second floor of the building 1, a plurality of braces (bars) 15 are provided between the studs 14 and between the through pillars 11 and the studs 14.
A plurality of braces 15 are provided along the orthogonal street. As an example, when viewed along a street direction, the total length of the plurality of braces 15 arranged along the street direction can be provided so as to be more than half the length of the building 1. 4 and 5, white square marks indicate the through pillars 11, and white circle marks indicate the spacers 14.

図3に示すように、基礎10には、複数枚のALC(軽量気泡コンクリート)パネル21aが並べて載置される。ALCパネル21aの目地部には目地モルタル21bが充填され、1枚の面が形成される。これら複数枚のALCパネル21aによって1階床21が構成される。   As shown in FIG. 3, a plurality of ALC (lightweight aerated concrete) panels 21 a are placed side by side on the foundation 10. The joint portion of the ALC panel 21a is filled with joint mortar 21b to form one surface. The first floor 21 is constituted by the plurality of ALC panels 21a.

図3及び図6に示すように、大梁12及び小梁13には、複数枚のALC(軽量気泡コンクリート)パネル22aが並べて載置される。ALCパネル22aの目地部には目地モルタル22bが充填され、1枚の面が形成される。これら複数枚のALCパネル22aによって2階床22が構成される。また、大梁12の下側には、2階床22の下面に沿った水平面内に水平ブレース24が設けられる。水平ブレース24は、地震力等の水平力が作用した際の床面のねじれ変形を防止するものであり、2階床22の剛床仮定を成立させる。   As shown in FIGS. 3 and 6, a plurality of ALC (lightweight cellular concrete) panels 22 a are placed side by side on the large beam 12 and the small beam 13. The joint portion of the ALC panel 22a is filled with joint mortar 22b to form one surface. The second floor 22 is constituted by the plurality of ALC panels 22a. In addition, a horizontal brace 24 is provided below the girder 12 in a horizontal plane along the lower surface of the second floor 22. The horizontal brace 24 prevents torsional deformation of the floor surface when horizontal force such as seismic force is applied, and establishes the rigid floor assumption of the second floor 22.

図3に示すように、外壁16は、平面モジュール寸法に基づく幅寸法を有する複数のALCパネルからなり、建物1の外周に位置する梁(大梁12等)によって、受け金物を介して固定される。   As shown in FIG. 3, the outer wall 16 is composed of a plurality of ALC panels having a width dimension based on a planar module dimension, and is fixed via a receiving metal by a beam (such as a large beam 12) located on the outer periphery of the building 1. .

次に、改築前の建物1の間取りについて説明する。まず、1階の間取りについて、図1を用いて説明する。なお、以下の説明において、間取りの説明を容易とするために、図1の上方向を北として方向を説明する(間取りを示す他の平面図においても同様とする)。図1に示すように、建物1の1階には、台所・食堂R10、居間(所定階の居間)R11、和室(予備室)R12、玄関R13、ホールR14、階段室R15、トイレR16、洗面室R17、及び、浴室R18が設けられる。   Next, the floor plan of the building 1 before renovation will be described. First, the floor plan of the first floor will be described with reference to FIG. In the following description, in order to facilitate the description of the floor plan, the direction will be described with the upper direction in FIG. 1 being north (the same applies to other plan views showing the floor plan). As shown in FIG. 1, on the first floor of the building 1, there are a kitchen / dining room R10, a living room (living room on the predetermined floor) R11, a Japanese-style room (spare room) R12, an entrance R13, a hall R14, a staircase R15, a toilet R16, and a washbasin. Room R17 and bathroom R18 are provided.

台所・食堂R10、居間R11及び和室R12は、建物1の南側において、東側から西側に向かって順に設けられる。台所・食堂R10には、壁付けのキッチンセット等が設けられる。居間R11にはソファーやテレビ等が設けられる。和室R12は、畳敷きの部屋となっている。   The kitchen / dining room R10, the living room R11, and the Japanese-style room R12 are provided in order from the east side to the west side on the south side of the building 1. The kitchen / dining room R10 is provided with a wall-mounted kitchen set. The living room R11 is provided with a sofa, a television, and the like. The Japanese-style room R12 is a tatami-mat room.

玄関R13は、建物1の東側の面の北側の位置に設けられる。ホールR14、階段室R15、トイレR16、洗面室R17及び浴室R18は、建物1の北側の位置において、東側から西側に向かって順に設けられる。廊下R19は、ホールR14から西側に向かって延び、台所・食堂R10、居間R11、和室R12、ホールR14、階段室R15、トイレR16、及び、洗面室R17につながる。   The entrance R13 is provided at a position on the north side of the east side surface of the building 1. The hall R14, the staircase R15, the toilet R16, the washroom R17, and the bathroom R18 are provided in order from the east side to the west side at the north side of the building 1. The corridor R19 extends westward from the hall R14 and is connected to the kitchen / dining room R10, the living room R11, the Japanese-style room R12, the hall R14, the staircase R15, the toilet R16, and the washroom R17.

次に、2階の間取りについて図2を用いて説明する。図2に示すように、建物1の2階には、主寝室R20、第一の子供室(第一の上階個室)R21、第二の子供室(第二の上階個室)R22、トイレR23、納戸R24、廊下R25、ベランダR26、及び、階段室R15が設けられる。   Next, the floor plan of the second floor will be described with reference to FIG. As shown in FIG. 2, on the second floor of the building 1, there are a main bedroom R20, a first children's room (first upper-floor private room) R21, a second children's room (second upper-floor private room) R22, a toilet. R23, storage room R24, corridor R25, veranda R26, and staircase R15 are provided.

主寝室R20は、建物1の東側に設けられる。第一の子供室R21は、建物1の南側において、主寝室R20の西側に設けられる。即ち、第一の子供室R21は、建物1の外周部に面している。第一の子供室R21は、西側の位置に収納R21aを有する。第二の子供室R22は、建物1の南側において、第一の子供室R21の西側に隣接して設けられる。第二の子供室R22は、東側の位置に収納R22aを有する。また、第一の子供室R21と第二の子供室R22の収納R22aとが、建物1の1階の居間R11の直上に位置する。   The main bedroom R20 is provided on the east side of the building 1. The first child room R21 is provided on the west side of the main bedroom R20 on the south side of the building 1. That is, the first child room R21 faces the outer periphery of the building 1. The first child room R21 has a storage R21a at a west position. The second child room R22 is provided on the south side of the building 1 and adjacent to the west side of the first child room R21. The second child room R22 has a storage R22a at the position on the east side. Further, the storage R22a of the first child room R21 and the second child room R22 is located immediately above the living room R11 on the first floor of the building 1.

トイレR23は、建物1の北側において、階段室R15の西側の位置に設けられる。納戸R24は、建物1の北側の位置において、トイレR23の西側に設けられる。廊下R25は、東西方向に延在し、主寝室R20、第一の子供室R21、第二の子供室R22、トイレR23、納戸R24、及び、階段室R15につながる。ベランダR26は、主寝室R20、第一の子供室R21及び第二の子供室R22から南側に向かって張り出した片持ち式のベランダである。   The toilet R23 is provided on the west side of the staircase R15 on the north side of the building 1. The storage room R24 is provided on the west side of the toilet R23 at the position on the north side of the building 1. The corridor R25 extends in the east-west direction and is connected to the main bedroom R20, the first child room R21, the second child room R22, the toilet R23, the storage room R24, and the staircase room R15. The veranda R26 is a cantilever type veranda protruding toward the south side from the main bedroom R20, the first child room R21 and the second child room R22.

次に、図1〜図6を用いて説明した建物1の間取りを変更する改築の詳細について説明する。まず、1階の改築について説明する。なお、改築の前後において変更が無い部屋や構成要素については、改築前と同一の符号を付して詳細な説明を省略する。図7に示すように、改築によって建物1の1階の南側には、LDK(リビング・ダイニング・キッチン)R30、及び、主寝室R31が設けられる。   Next, the details of the reconstruction for changing the floor plan of the building 1 described with reference to FIGS. 1 to 6 will be described. First, the renovation of the first floor will be described. In addition, about the room and component which do not change before and after reconstruction, the same code | symbol as before reconstruction is attached | subjected, and detailed description is abbreviate | omitted. As shown in FIG. 7, an LDK (living / dining / kitchen) R30 and a main bedroom R31 are provided on the south side of the first floor of the building 1 by renovation.

LDK R30は、改築前における台所・食堂R10、居間R11及び廊下R19を区画する間仕切り壁及び建具を除去することにより形成される。居間R11と廊下R19とを区画する間仕切り壁及び建具を除去することで露わになる通し柱11、間柱14及びブレース15は残存させる。この残存させる通し柱11、間柱14及びブレース15には、改築後の内装色に合った塗装を施す、或は、ボード材で覆う等の仕上げを行う。LDK R30に設けるキッチンセットR30aは、吊戸棚を設けないペニンシュラ型とする。このように、LDK R30は、改築前の廊下R19も取り込んだ大空間とする。   The LDK R30 is formed by removing partition walls and joinery that divide the kitchen / dining room R10, the living room R11, and the hallway R19 before the reconstruction. By removing the partition walls and joinery that divide the living room R11 and the corridor R19, the through pillars 11, the pillars 14, and the braces 15 that are exposed are left. The through pillars 11, the intermediate pillars 14, and the braces 15 to be left are subjected to a finish such as coating according to the interior color after the reconstruction, or covering with a board material. The kitchen set R30a provided in the LDK R30 is a peninsula type that does not have a hanging cupboard. In this way, LDK R30 is a large space that also incorporates corridor R19 prior to reconstruction.

主寝室R31は、改築前の和室R12に相当する。主寝室R31は、畳敷きであった和室R12を、改築によりフローリング仕上げの洋室に改装する。また、改築前に設けられていた、和室R12と居間R11とを区画する引き違い形式の建具R12a(図1参照)を除去して間仕切り壁R31aにする(予備室を新たな主寝室に改装する工程)。これにより、主寝室R31の独立性を高めることができる。   The master bedroom R31 corresponds to the Japanese-style room R12 before renovation. In the main bedroom R31, the Japanese-style room R12, which was tatami-mat, is renovated to a Western-style room with flooring. Also, the drawing-type fitting R12a (see FIG. 1) that partitions the Japanese-style room R12 and the living room R11, which was provided before the renovation, is removed to form a partition wall R31a (the spare room is renovated to a new main bedroom). Process). Thereby, the independence of the main bedroom R31 can be enhanced.

次に、2階の改築について説明する。図8に示すように、改築前の主寝室R20、第一の子供室R21、第二の子供室R22、及び、廊下R25に替えて、建物1の2階に、ゲストルーム(予備室)R40、吹抜け空間Z、及び、2階小リビングR41を設ける。ゲストルームR40は、改築前の主寝室R20に相当する部屋であり、収納の形式変更等を行う(主寝室を新たな予備室とする工程)。このゲストルームR40は、例えば、子が帰省した場合等に使用される。   Next, the renovation of the second floor will be described. As shown in FIG. 8, in place of the main bedroom R20, the first children's room R21, the second children's room R22, and the hallway R25 before renovation, a guest room (spare room) R40 is provided on the second floor of the building 1. The atrium space Z and the second floor small living room R41 are provided. The guest room R40 is a room corresponding to the main bedroom R20 before the reconstruction, and the storage type is changed (step of making the main bedroom a new spare room). This guest room R40 is used, for example, when a child returns home.

吹抜け空間Zは、1階のLDK R30の直上に設けられた空間である。吹抜け空間Zは、改築前における2階床22のうち、1階の居間R11の直上に位置する領域(図6の床パネル除去領域W)のALCパネル22a、2階の床仕上げ材及び1階の天井仕上げ材等を除去することにより形成される(第一の上階個室を居間と連通する吹抜け空間とする工程)。床パネル除去領域W内のALCパネル22aは、目地モルタル22b(図3参照)を斫り取ることで容易に除去することができる。   The atrium space Z is a space provided immediately above the LDK R30 on the first floor. The atrium space Z is the ALC panel 22a in the area (floor panel removal area W in FIG. 6) located immediately above the living room R11 on the first floor of the second floor 22 before renovation, the floor finishing material on the second floor, and the first floor It is formed by removing the ceiling finishing material (the process of making the first upper-floor private room an atrium space communicating with the living room). The ALC panel 22a in the floor panel removal region W can be easily removed by scraping the joint mortar 22b (see FIG. 3).

床パネル除去領域W内のALCパネル22a等を除去する際に、床パネル除去領域W内に位置する小梁13のうち、図9及び図10に示すように、主としてALCパネル22aを支持するために設けられていた小梁13b(図6参照)は除去する。また、床パネル除去領域W内に位置する小梁13のうち、張り出し形式のベランダR26を支持する梁13の基端部に連続する小梁13aは、残存させる。この小梁13aは、ベランダR26を支持する小梁13が接続される大梁12の接合部のねじれ変形を防止してベランダR26の「垂れ」を防止する機能を有する。   When removing the ALC panel 22a and the like in the floor panel removal region W, as shown in FIGS. 9 and 10, mainly for supporting the ALC panel 22a among the small beams 13 located in the floor panel removal region W. The small beam 13b (refer to FIG. 6) provided in is removed. In addition, among the small beams 13 located in the floor panel removal region W, the small beams 13a that continue to the base end portion of the beam 13 that supports the overhanging veranda R26 remain. The small beam 13a has a function of preventing “sagging” of the veranda R26 by preventing torsional deformation of the joint portion of the large beam 12 to which the small beam 13 supporting the veranda R26 is connected.

また、床パネル除去領域W内に位置する水平ブレース24は、残存させる。床パネル除去領域W内において露出する水平ブレース24及び小梁13aには、改築後の内装色に合った塗装を施す、或は、ボード材で覆う等の仕上げを行う。改築前の第一の子供室R21に設けられていた引き違い形式の掃出し窓(採光窓)R21b及び引き違い形式の腰高窓(採光窓)R21cを除去し、それぞれ、複数の縦長の嵌め殺し窓Zaに置き換える。嵌め殺し窓Zaとして、改築前に設けられていた掃出し窓R21b及び腰高窓R21cの高さ寸法よりも大きい高さ寸法を有するものを用いる(既存の採光窓よりも高さ寸法の大きな採光窓を設置する工程)。縦長の嵌め殺し窓(高さ寸法の大きな採光窓)Zaを設けることで、吹抜け空間Z内により多くの光を取り込み、LDK R30へ光を導くことができる。   Further, the horizontal braces 24 located in the floor panel removal region W are left. The horizontal brace 24 and the small beam 13a that are exposed in the floor panel removal region W are subjected to finishing such as coating that matches the interior color after reconstruction or covering with a board material. The sliding-type sweep window (lighting window) R21b and the sliding-type waist-high window (lighting window) R21c provided in the first child room R21 before the renovation are removed, and a plurality of vertically long fitting windows are provided. Replace with Za. As the fitting window Za, one having a height dimension larger than the height dimension of the sweep window R21b and the waist high window R21c provided before the reconstruction is used (a daylighting window having a larger height dimension than the existing daylighting window). Installation step). By providing a vertically long fitting window (lighting window having a large height) Za, more light can be taken into the atrium space Z and guided to the LDK R30.

2階小リビングR41は、改築前における第二の子供室R22及び廊下R25に相当する。2階床22の残存部と床パネル除去領域Wとの境界に沿って設けられていた間仕切り壁R21d、収納(第二の上階個室と第一の上階個室とを仕切る仕切り壁)R21a及びR22a、及び、建具等を除去した後、新たに、図8及び図10に示すように、2階小リビングR41と床パネル除去領域Wとの境界線に沿って、上端が天井まで達していない高腰壁R41aを設ける(第二の上階個室を吹抜け空間に連通させる工程)。高腰壁R41aには複数のスリットR41bを略等間隔に設ける。2階小リビングR41は、例えば、書斎やホビールーム等として使用される。その他、上述した主な個所以外にも、建物1内の各部の改築を行うことができる。   The second-floor small living room R41 corresponds to the second child room R22 and the hallway R25 before the reconstruction. A partition wall R21d provided along the boundary between the remaining portion of the second floor 22 and the floor panel removal region W, storage (partition wall partitioning the second upper floor private room and the first upper floor private room) R21a, and After removing R22a and joinery etc., the upper end does not reach the ceiling along the boundary line between the second-floor small living room R41 and the floor panel removal region W as shown in FIGS. A high waist wall R41a is provided (step of communicating the second upper-floor private room with the atrium space). The high waist wall R41a is provided with a plurality of slits R41b at substantially equal intervals. The second-floor small living room R41 is used as, for example, a study or a hobby room. In addition to the main parts described above, each part in the building 1 can be renovated.

以上のように、本実施形態に係る改築方法では、建物1の2階の床のうち、床パネル除去領域W内の床を除去することで、改築前の第一の子供室R21が改築後にはLDK R30を連通する吹抜け空間Zとなる。第一の子供室R21は建物1の外周部に面しているため、吹抜け空間Zも建物1の外周部に面する。このため、吹抜け空間Zに設けた嵌め殺し窓Zaからの光を、吹抜け空間Zを通してLDK R30に導くことができ、LDK R30を明るく開放感のある空間とすることができる。これにより、建物1の住空間の快適性を向上させることができる。   As described above, in the renovation method according to the present embodiment, by removing the floor in the floor panel removal area W from the second floor of the building 1, the first child room R21 before the renovation is reconstructed. Becomes an atrium space Z communicating with the LDK R30. Since the first child room R21 faces the outer periphery of the building 1, the atrium space Z also faces the outer periphery of the building 1. For this reason, the light from the fitting window Za provided in the atrium space Z can be guided to the LDK R30 through the atrium space Z, and the LDK R30 can be made a bright and open space. Thereby, the comfort of the living space of the building 1 can be improved.

改築の際に、第一の子供室R21に設けられていた既存の掃出し窓R21b及び腰高窓R21cよりも高さ寸法の大きな縦長の嵌め殺し窓Zaを設ける。このように、嵌め殺し窓Zaを高さ寸法の大きなものにすることで、より効果的に採光することができる。   At the time of renovation, a vertical insertion window Za having a larger height than the existing sweep window R21b and waist height window R21c provided in the first child room R21 is provided. In this way, it is possible to perform daylighting more effectively by making the fitting window Za have a large height.

2階小リビングR41と吹抜け空間Zとを区画する壁を、上端が天井まで達していない高腰壁R41aとする。この場合には、2階小リビングR41とLDK R30とを適度につなぐことができ、LDK R30にいる人と2階小リビングR41にいる人とが互いに気配を感じつつもそれぞれの独立性を保つことができる。   A wall that partitions the second-floor small living room R41 and the atrium space Z is a high waist wall R41a whose upper end does not reach the ceiling. In this case, the second-floor small living room R41 and the LDK R30 can be appropriately connected, and the person in the LDK R30 and the person in the second-floor small living room R41 maintain their independence while feeling the signs of each other. be able to.

建物1の1階に設けられていた和室R12を主寝室R31に改築することで、普段の生活に必要な部屋が建物1の1階に配置されることとなり、普段の生活を1フロアで完結させることができる。   By remodeling the Japanese-style room R12 on the first floor of the building 1 into the main bedroom R31, the rooms necessary for everyday life will be placed on the first floor of the building 1, and the daily life will be completed on the first floor. Can be made.

また、床パネル除去領域W内のALCパネル22a等を除去する際に、小梁13a及び水平ブレース24を残しておく。この場合には、既存の構造部材に手を加えないので建物1の構造の安全性を維持することができる。   Further, when removing the ALC panel 22a and the like in the floor panel removal region W, the small beam 13a and the horizontal brace 24 are left. In this case, since the existing structural member is not modified, the safety of the structure of the building 1 can be maintained.

建物1の2階の床を形成する際に、複数枚のALCパネル22aを設置し、これらを目地モルタル22bで固定する。この構成とすることで、2階床22の床の一部を除去(床パネル除去領域W内のALCパネル22a等を除去)する際に、目地モルタル22bを斫り取るだけで容易に床を除去することができる。   When the second floor of the building 1 is formed, a plurality of ALC panels 22a are installed and fixed with joint mortar 22b. With this configuration, when removing a part of the floor of the second-floor floor 22 (removing the ALC panel 22a and the like in the floor panel removal region W), the floor can be easily removed only by scraping the joint mortar 22b. Can be removed.

以上、本発明の一実施形態について説明したが、本発明は、上記実施形態に限定されるものではない。例えば、上述の建物1内の改築に伴い、建物1の屋根面に太陽光発電装置を設置(太陽光発電装置を設置する工程)してもよい。この場合には、太陽光発電装置による荷重の増加分が、2階の床パネル除去領域W内の床の荷重及び床に積載される積載荷重の減少分によって相殺され、建物1の構造の安全性を確保しやすくなる。   Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment. For example, a solar power generation device may be installed on the roof surface of the building 1 (a step of installing the solar power generation device) in accordance with the renovation in the building 1 described above. In this case, the increase in the load due to the photovoltaic power generation apparatus is offset by the decrease in the load on the floor in the floor panel removal area W on the second floor and the decrease in the load loaded on the floor. It becomes easy to secure sex.

なお、2階の床の一部を除去して、2階の部屋を1階の部屋と連通する吹抜け空間に改築したが、例えば、3階の床の一部を除去して、3階の部屋を2階の部屋と連通する吹抜け空間に改築することもできる。また、建物1の間取りは、上述したものに限定されず、本発明の趣旨を逸脱しない範囲で変更することができる。   In addition, a part of the floor on the second floor was removed, and the room on the second floor was renovated into an atrium space that communicated with the room on the first floor. For example, a part of the floor on the third floor was removed, The room can be renovated into an atrium space that communicates with the room on the second floor. Moreover, the floor plan of the building 1 is not limited to the one described above, and can be changed without departing from the spirit of the present invention.

1…建物、13…小梁(上階の床高さの位置に設置された梁)、22…2階床(上階の床)、22a…ALCパネル(軽量気泡コンクリート)、22b…目地モルタル、24…水平ブレース、R11…居間(所定階に設けられた居間)、R12…和室(予備室)、R20…主寝室、R21…第一の子供室(第一の上階個室)、R21a,R22a…収納(第二の上階個室と第一の上階個室とを仕切る仕切り壁)、R21b…掃出し窓(既存の採光窓)、R21c…腰高窓(既存の採光窓)、R22…第二の子供室(第二の上階個室)、R31…主寝室、R40…ゲストルーム(予備室)、Z…吹抜け空間、Za…嵌め殺し窓(採光窓)。   DESCRIPTION OF SYMBOLS 1 ... Building, 13 ... Small beam (beam installed in the position of the floor height of the upper floor), 22 ... Second floor (upper floor), 22a ... ALC panel (lightweight cellular concrete), 22b ... Joint mortar , 24 ... horizontal braces, R11 ... living room (living room provided on a predetermined floor), R12 ... Japanese-style room (spare room), R20 ... main bedroom, R21 ... first child room (first upper floor private room), R21a, R22a ... Storage (partition wall separating the second upper floor private room and the first upper private room), R21b ... sweep window (existing daylighting window), R21c ... waist high window (existing daylighting window), R22 ... secondary Child room (second upper floor private room), R31 ... master bedroom, R40 ... guest room (spare room), Z ... atrium space, Za ... fitting window (lighting window).

Claims (8)

所定階に設けられた居間と、前記所定階の上階且つ前記居間の上方に設けられるとともに建物外周部に面する第一の上階個室とを有する建物の改築方法であって、
前記上階の床の一部を除去し、前記第一の上階個室を前記居間と連通する吹抜け空間とする工程を含む、建物の改築方法。
A renovation method for a building having a living room provided on a predetermined floor, and a first upper-floor private room that is provided above the predetermined floor and above the living room and faces the outer periphery of the building,
A method for renovating a building, including a step of removing a part of the floor on the upper floor to make the first upper-floor private room an open space communicating with the living room.
前記第一の上階個室に、前記第一の上階個室に設けられた既存の採光窓よりも高さ寸法の大きな採光窓を設置する工程を更に含む、請求項1に記載の建物の改築方法。   The renovation of a building according to claim 1, further comprising a step of installing a daylighting window having a height dimension larger than that of an existing daylighting window provided in the first upper-floor private room in the first upper-floor private room. Method. 前記建物は前記第一の上階個室に隣接する第二の上階個室を有しており、
前記第二の上階個室と前記第一の上階個室とを仕切る仕切り壁を除去し、前記第二の上階個室を前記吹抜け空間に連通させる工程を更に含む、
請求項1又は2に記載の建物の改築方法。
The building has a second upper floor private room adjacent to the first upper floor private room;
A step of removing a partition wall separating the second upper-floor private room and the first upper-floor private room, and further including the step of communicating the second upper-floor private room with the atrium space;
The method of renovating a building according to claim 1 or 2.
前記建物は前記所定階に予備室を有すると共に前記上階に主寝室を有しており、
前記所定階の予備室を新たな主寝室に改装するとともに、前記上階の主寝室を新たな予備室とする工程を更に含む、
請求項1〜3のいずれか一項に記載の建物の改築方法。
The building has a spare room on the predetermined floor and a main bedroom on the upper floor,
Refurbishing the spare room on the predetermined floor into a new master bedroom, and further comprising the step of making the master bedroom on the upper floor a new spare room,
The method for renovating a building according to any one of claims 1 to 3.
前記上階の床の一部を除去する工程では、前記上階の床の下面に沿った水平面に設置された水平ブレースを残して床を除去する、請求項1〜4のいずれか一項に記載の建物の改築方法。   The step of removing a part of the floor of the upper floor removes the floor leaving a horizontal brace installed on a horizontal plane along the lower surface of the floor of the upper floor. How to renovate the building. 前記上階の床の一部を除去する工程では、前記上階の床を除去する領域内に位置するとともに前記上階の床高さの位置に設置された梁を残して床を除去する、請求項1〜5のいずれか一項に記載の建物の改築方法。   In the step of removing a part of the floor of the upper floor, the floor is removed while leaving a beam installed at a position of the floor height of the upper floor and located in a region where the floor of the upper floor is removed. The method for renovating a building according to any one of claims 1 to 5. 前記上階の床は、前記上階の床高さの位置に設置された梁に載置され目地モルタルで固定された複数の軽量気泡コンクリートパネルによって構成される、請求項1〜6のいずれか一項に記載の建物の改築方法。   The floor of the upper floor is configured by a plurality of lightweight cellular concrete panels placed on a beam installed at a floor height position of the upper floor and fixed with joint mortar. How to renovate the building according to one item. 前記建物の屋根に、太陽光発電装置を設置する工程を更に含む、請求項1〜7のいずれか一項に記載の建物の改築方法。   The method for renovating a building according to any one of claims 1 to 7, further comprising a step of installing a solar power generation device on the roof of the building.
JP2013077827A 2013-04-03 2013-04-03 Building renovation method and building Active JP6166933B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013077827A JP6166933B2 (en) 2013-04-03 2013-04-03 Building renovation method and building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013077827A JP6166933B2 (en) 2013-04-03 2013-04-03 Building renovation method and building

Publications (2)

Publication Number Publication Date
JP2014201927A true JP2014201927A (en) 2014-10-27
JP6166933B2 JP6166933B2 (en) 2017-07-19

Family

ID=52352628

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013077827A Active JP6166933B2 (en) 2013-04-03 2013-04-03 Building renovation method and building

Country Status (1)

Country Link
JP (1) JP6166933B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673794A (en) * 1992-08-27 1994-03-15 Misawa Homes Co Ltd Housing unit
JP2001182329A (en) * 1999-12-27 2001-07-06 Onoda Co Method for constructing floor structure of floor panel made of concrete, and joint filter nozzle used for the method
JP2002167986A (en) * 2000-12-04 2002-06-11 Sekisui House Ltd Residence building
JP2004353227A (en) * 2003-05-28 2004-12-16 Sekisui House Ltd Open ceiling floor structure
JP2005097849A (en) * 2003-09-22 2005-04-14 Asahi Kasei Homes Kk Multiple dwelling house

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673794A (en) * 1992-08-27 1994-03-15 Misawa Homes Co Ltd Housing unit
JP2001182329A (en) * 1999-12-27 2001-07-06 Onoda Co Method for constructing floor structure of floor panel made of concrete, and joint filter nozzle used for the method
JP2002167986A (en) * 2000-12-04 2002-06-11 Sekisui House Ltd Residence building
JP2004353227A (en) * 2003-05-28 2004-12-16 Sekisui House Ltd Open ceiling floor structure
JP2005097849A (en) * 2003-09-22 2005-04-14 Asahi Kasei Homes Kk Multiple dwelling house

Also Published As

Publication number Publication date
JP6166933B2 (en) 2017-07-19

Similar Documents

Publication Publication Date Title
US20070074465A1 (en) Combinational housing structure
JP2007071008A (en) Extension method of staircase type apartment house and building extended by this method
KR20160092603A (en) multi-unit dwelling type building structure, Overhanging outside of indoor residential space
KR20090114703A (en) Adaptable building system
JP2015083755A (en) Building
JP4044408B2 (en) Extension method of staircase type apartment house and building extended using this method
JP6291152B2 (en) Detached house and its design method
JP6166933B2 (en) Building renovation method and building
JPH11324204A (en) Structure of building
JP5886778B2 (en) Unit building
KR20110107047A (en) Prefabricated house
JP2015083754A (en) Building
CN205444981U (en) Ocean green human living system
JP6689021B2 (en) building
JP6541304B2 (en) Balcony structure and housing
JP5198670B1 (en) Wooden house and design method of wooden house
JP2017193836A (en) House built for sale
JP7040720B2 (en) Narrow building
JP5627069B2 (en) Multistory building
KR100928054B1 (en) Fabricated houses in combination type of unit-spaces
JP2010255280A (en) Multifunctional sash
JP2005264610A (en) Unit type building and execution method for the same
KR101281853B1 (en) Method for constructing building by space utilization
JP2015203292A (en) Housing
RU133154U1 (en) MULTI-APARTMENT RESIDENTIAL BUILDING WITH TUNED ATTIC FLOOR

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160329

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161206

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170626

R150 Certificate of patent or registration of utility model

Ref document number: 6166933

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R157 Certificate of patent or utility model (correction)

Free format text: JAPANESE INTERMEDIATE CODE: R157

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350