JP2014168348A - 電流センサ検出方法 - Google Patents
電流センサ検出方法 Download PDFInfo
- Publication number
- JP2014168348A JP2014168348A JP2013039539A JP2013039539A JP2014168348A JP 2014168348 A JP2014168348 A JP 2014168348A JP 2013039539 A JP2013039539 A JP 2013039539A JP 2013039539 A JP2013039539 A JP 2013039539A JP 2014168348 A JP2014168348 A JP 2014168348A
- Authority
- JP
- Japan
- Prior art keywords
- power
- current sensor
- current
- power line
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 19
- 238000005259 measurement Methods 0.000 claims abstract description 34
- 238000000034 method Methods 0.000 claims abstract description 27
- 230000008569 process Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 6
- 238000010248 power generation Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000011895 specific detection Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
【解決手段】電流センサ検出方法は、電力系統と分電盤との間を接続する第1電力ラインまたは分電盤と負荷との間を接続する第2電力ラインに取り付けられた、電力ラインを流れる電流の向きを検出する電流センサと、分電盤に接続された第3電力ラインを介して第1電力ラインまたは第2電力ラインに送電する太陽電池装置とを備えた電力制御システムにおいて、第1電力ラインおよび第2電力ラインのどちらに電流センサが取り付けられているかを検出する。太陽電池装置が発電していない状態で電流値を測定し(第1測定値)、太陽電池装置が発電している状態で電流値を測定し(第2測定値)、第1および第2測定値を用いて電流センサ取り付け位置を判定する。
【選択図】図4
Description
電力制御システムXは、図1に示すように、蓄電装置1、太陽電池装置2および制御装置3を備えている。また、以下の説明においては、図2に示すように、分電盤4と商用電力系統(以下、電力系統5)との間を接続する送電線を第1電力ラインL1、分電盤4と負荷6との間を接続する送電線を第2電力ラインL2、分電盤4と太陽電池装置2との間を接続する送電線を第3電力ラインL3、分電盤4と蓄電装置1との間を接続する送電線を第4電力ラインL4とする。
電力系統5から負荷6に消費電力を送電する買電を交互に行なうシステムである。
図2および図3は、電力制御システムXの押上げあり制御の場合と押上げなし制御の場合の各電流センサの配置を模式的に示した配線図である。ここで、図2では、太陽電池装置2の発電電力が無いときの各電流センサにおける電流の流れる方向を示している。なお、本実施形態において、太陽電池装置2の発電電力が無いときとは、太陽電池装置2において発電電力がパワーコンディショナ21から交流電力として出力されなかった状態を示す。それゆえ、微弱な太陽光によって太陽電池20が発電していたとしても、パワーコンディショナ21から出力されなかった場合には、発電電力は無いものとみなす。また、図3では、発電電力が有るときの各電流センサにおける電流の流れる方向を示す。なお、図3において、発電電力が有るときとは、太陽電池装置2において発電電力がパワーコンディショナ21から交流電力として出力された状態を示す。
本実施形態では、STEP6以降のフローが実施形態1と異なっている。具体的に、本実施形態では、図5に示すように、STEP6において第1測定値と第2測定値との変動
値(第2測定値の減少の有無)の有無に応じて判定された電流センサの位置を記憶するステップを備えている。
本実施形態では、電流センサの向きの誤配置を検出するフローを備えている点で実施形態1と相違する。具体的に、本実施形態では、図6に示すように、実施形態1のSTEP2をSTEP22〜STEP27、実施形態1のSTEP3をSTEP28に置き換えている。なお、本実施形態において、STEP21は、実施形態1のSTEP1に相当し、
STEP29〜STEP35は、実施形態1のSTEP4〜STEP10に相当する。よって、STEP21およびSTEP29〜STEP35の説明は省略する。
上記実施形態において、太陽電池装置2の発電電力の有無は、例えば、1日の太陽の周期を利用しているが、これに限られない。例えば、制御装置3で太陽電池装置2の発電電力を強制的にゼロにする制御を行なうことで、STEP1およびSTEP21を実現してもよい。これにより、比較的短時間でSTEP1およびSTEP21を終了させることができる。このような制御の方法としては、例えば、太陽電池20が発電している場合であっても、電力ラインL3に発電電力を出力させない制御を行なえばよい。他の制御の方法としては、リレーまたは半導体スイッチ等を用いて一部の電路を開放してもよい。
矛盾しない範囲で組み合わせ可能であることは、言うまでもない。
1:蓄電装置
2:太陽電池装置
3:制御装置
4:分電盤
5:電力系統
6:負荷
7:表示装置
10:蓄電池
20:太陽電池
11、21:パワーコンディショナ
A〜E:電流センサ
L1〜L4:第1〜第4電力ライン
Claims (3)
- 電力系統と分電盤との間を接続する第1電力ラインまたは前記分電盤と負荷との間を接続する第2電力ラインに取り付けられた、電力ラインを流れる電流の向きを検出する電流センサと、
前記分電盤に接続された第3電力ラインを介して前記第1電力ラインまたは前記第2電力ラインに発電電力を送電する太陽電池装置とを備えた電力制御システムにおいて、
前記電流センサに電流が流れているときに前記第1電力ラインおよび前記第2電力ラインのどちらに取り付けられているかを検出する電流センサ検出方法であって、
前記太陽電池装置の前記発電電力が無い状態で前記ラインを流れている電流値および電力値の少なくとも一方を測定して第1測定値を取得するステップAと、
前記太陽電池装置の前記発電電力が出力している状態で前記ラインを流れている電流値および電力値の少なくとも一方を測定して第2測定値を取得するステップBと、
前記電力ラインを流れる電流方向が、前記電力系統から前記分電盤を介して前記負荷に向かって前記第1電力ラインおよび前記第2電力ラインを流れる第1方向、または該第1方向と逆方向の第2方向であるか判定するステップCと、
該ステップCにおいて判定された前記電流方向が第1方向であった場合に、前記第1測定値からの前記第2測定値の変動値を測定するステップDとを備えた電流センサ検出方法。 - 前記ステップB、前記ステップCおよび前記ステップDを含むステップを少なくとも2回以上行なうことで測定された複数の変動値が、所定時間内で連続して同じ値になるまで前記ステップを繰り返す、請求項1に記載の電流センサ検出方法。
- 前記ステップAにおいて、前記ラインを流れる電流方向を判定し、前記ラインを流れる電流方向が第2方向であると判定された場合に、前記電流センサの極性を反転させるステップEをさらに備えた請求項1に記載の電流センサ検出方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013039539A JP6114068B2 (ja) | 2013-02-28 | 2013-02-28 | 電流センサ検出方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013039539A JP6114068B2 (ja) | 2013-02-28 | 2013-02-28 | 電流センサ検出方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2014168348A true JP2014168348A (ja) | 2014-09-11 |
JP6114068B2 JP6114068B2 (ja) | 2017-04-12 |
Family
ID=51617728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013039539A Active JP6114068B2 (ja) | 2013-02-28 | 2013-02-28 | 電流センサ検出方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6114068B2 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105207273A (zh) * | 2015-10-23 | 2015-12-30 | 河南柴油机重工有限责任公司 | 一种垃圾填埋气体发电机功率管理装置及方法 |
JP2018038144A (ja) * | 2016-08-30 | 2018-03-08 | 京セラ株式会社 | 電力管理装置 |
WO2020255351A1 (ja) * | 2019-06-20 | 2020-12-24 | 東芝三菱電機産業システム株式会社 | 直流直流変換システムおよび太陽光発電システム |
WO2021015769A1 (en) * | 2019-07-24 | 2021-01-28 | Motoyama Dean Hatsuo | Device and process for detecting and mitigating reverse power-flow |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11225441A (ja) * | 1998-02-05 | 1999-08-17 | Matsushita Electric Works Ltd | 太陽光発電システム |
WO2011070792A1 (ja) * | 2009-12-10 | 2011-06-16 | パナソニック株式会社 | 分散型電源システム |
JP2012095507A (ja) * | 2010-10-29 | 2012-05-17 | Noritz Corp | 電流センサの誤施工判定方法および複合型発電システム |
-
2013
- 2013-02-28 JP JP2013039539A patent/JP6114068B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11225441A (ja) * | 1998-02-05 | 1999-08-17 | Matsushita Electric Works Ltd | 太陽光発電システム |
WO2011070792A1 (ja) * | 2009-12-10 | 2011-06-16 | パナソニック株式会社 | 分散型電源システム |
JP2012095507A (ja) * | 2010-10-29 | 2012-05-17 | Noritz Corp | 電流センサの誤施工判定方法および複合型発電システム |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105207273A (zh) * | 2015-10-23 | 2015-12-30 | 河南柴油机重工有限责任公司 | 一种垃圾填埋气体发电机功率管理装置及方法 |
JP2018038144A (ja) * | 2016-08-30 | 2018-03-08 | 京セラ株式会社 | 電力管理装置 |
WO2020255351A1 (ja) * | 2019-06-20 | 2020-12-24 | 東芝三菱電機産業システム株式会社 | 直流直流変換システムおよび太陽光発電システム |
JPWO2020255351A1 (ja) * | 2019-06-20 | 2021-12-23 | 東芝三菱電機産業システム株式会社 | 直流直流変換システムおよび太陽光発電システム |
JP7127741B2 (ja) | 2019-06-20 | 2022-08-30 | 東芝三菱電機産業システム株式会社 | 直流直流変換システムおよび太陽光発電システム |
US11502539B2 (en) | 2019-06-20 | 2022-11-15 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | DC/DC converter system and photovoltaic system |
WO2021015769A1 (en) * | 2019-07-24 | 2021-01-28 | Motoyama Dean Hatsuo | Device and process for detecting and mitigating reverse power-flow |
Also Published As
Publication number | Publication date |
---|---|
JP6114068B2 (ja) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6227885B2 (ja) | 電力制御システム、電力制御装置、電力制御システムの制御方法 | |
JP6121816B2 (ja) | 電力表示装置 | |
JP6114068B2 (ja) | 電流センサ検出方法 | |
JP6170183B2 (ja) | 電力制御システム及び電力制御システムの制御方法 | |
JP6393787B2 (ja) | 電力管理装置及び蓄電装置 | |
JP5938679B2 (ja) | 双方向コンバータ | |
JP6050111B2 (ja) | 電流センサ検出方法および電力制御システム | |
JP6620937B2 (ja) | 蓄電システム、運転方法 | |
JP6216066B2 (ja) | 電力制御システムの制御方法、電力制御システム、及び電力制御装置 | |
JP6022980B2 (ja) | センサ位置判定方法 | |
JP6581881B2 (ja) | 情報処理装置及び情報処理方法 | |
WO2014010025A1 (ja) | 充電システム及び充電方法 | |
JP2014217177A (ja) | 電力供給システムおよび蓄電装置 | |
JP6167756B2 (ja) | パワーコンディショナおよび発電システム | |
JP2015056983A (ja) | 逆電力検出装置 | |
JP6054807B2 (ja) | センサ位置判定方法及びセンサ位置判定装置 | |
EP3627657A1 (en) | Controller, electricity storage system, and program | |
JP6731417B2 (ja) | 電力制御システム及び電力制御システムの制御方法 | |
JPWO2019082431A1 (ja) | 系統連系蓄電システム及び電流センサの取り付け異常検出方法 | |
JP2017022860A (ja) | 電力供給システム、充放電制御装置及び充放電制御方法 | |
JP2018207786A (ja) | 電力制御システムの制御方法、電力制御システム、及び電力制御装置 | |
JP6204258B2 (ja) | 電力制御システムの制御方法、電力制御装置、および電力制御システム | |
JP2014171369A (ja) | 電力供給システム | |
JP7259742B2 (ja) | 蓄電池システム、及び電力表示装置 | |
JP6735507B2 (ja) | 電力変換システム、電源システム、電力管理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150715 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160527 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160621 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160822 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20161206 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170201 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170214 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170316 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6114068 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |