JP2013042652A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2013042652A5 JP2013042652A5 JP2012177624A JP2012177624A JP2013042652A5 JP 2013042652 A5 JP2013042652 A5 JP 2013042652A5 JP 2012177624 A JP2012177624 A JP 2012177624A JP 2012177624 A JP2012177624 A JP 2012177624A JP 2013042652 A5 JP2013042652 A5 JP 2013042652A5
- Authority
- JP
- Japan
- Prior art keywords
- period
- over
- power
- power generation
- estimating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010248 power generation Methods 0.000 claims 24
- 238000004590 computer program Methods 0.000 claims 2
- 238000005259 measurement Methods 0.000 claims 1
Claims (12)
- 定義された期間(302)を確立するステップと、
前記期間(302)にわたる電力利用可能量を推定するステップと、
前記期間(302)にわたる電力消費量(310)を推定するステップと、
コンピューティングデバイス(108)を用いて、前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて、前記期間(302)にわたって需要事象をスケジュールするステップと、
を含み、
前記需要事象は、需要家の電気サービスの承認された削減を含む、
方法。 - 前記期間(302)にわたる電力利用可能量を推定するステップが、前記期間(302)にわたる公益事業体によって制御される内部発電量(304)を推定するステップと、前記公益事業体によって制御されない供給源から購入することができる取得電力利用可能量を推定するステップとを含む、請求項1に記載の方法。
- 前記公益事業体によって制御される前記内部発電量(304)が、固定発電量(306)と、可変発電量(308)とを含む、請求項2に記載の方法。
- 前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて、前記期間(302)にわたって需要事象をスケジュールするステップは、前記期間(302)にわたる前記公益事業体による電力の販売からの収益を最大化するように前記需要事象をスケジュールするステップと、前記期間(302)にわたる固定発電量(306)、可変発電量(308)、および取得発電量の前記公益事業体に対するコストを最小化するステップとを含む、請求項3に記載の方法。
- 前記コンピューティングデバイス(108)により、期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づく、前記期間(302)にわたる前記需要事象のスケジューリングに基づいて、1つまたは複数のレポートを生成するステップをさらに含み、
前記1つまたは複数のレポートは、前記内部発電量(304)を用いた前記需要事象の最良適合使用についてのレポート、前記内部発電量(304)および前記取得電力利用可能量を用いた前記需要事象の最良適合使用についてのレポート、ならびに前記公益事業体が前記内部発電量(304)または前記取得電力利用可能量を販売する機会についてのレポートの1つまたは複数を含む、
請求項2に記載の方法。 - 前記期間(302)にわたる電力消費量(310)を推定するステップが、前記期間(302)にわたる複数の電力需要家のそれぞれに対する負荷プロファイルを求めるステップと、前記複数の負荷プロファイルを合計するステップとを含む、請求項1に記載の方法。
- 需要事象は、所定の持続時間の間、前記複数の電力需要家の1つの電気負荷のすべてまたは一部への電力サービスを中断する権限を有する公益事業体を含み、前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて、前記期間(302)にわたって需要事象をスケジュールするステップは、前記推定電力消費量(310)を減少するように、または前記推定電力利用可能量を増加するように前記需要事象をスケジュールするステップを含む、請求項6に記載の方法。
- メモリ(712)と、
前記メモリ(712)に動作可能に接続されたプロセッサ(703)であって、
定義された期間(302)を確立するステップであって、前記定義された期間の少なくとも一部は将来的に発生する、ステップと、
前記期間(302)にわたる電力利用可能量を推定するステップと、
前記期間(302)にわたる電力消費量(310)を推定するステップと、
前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて前記期間(302)にわたってメモリ(712)に記憶された需要事象をスケジュールするステップと、
を行うように構成されたプロセッサ(703)と、
を備える、システム。 - 前記電力利用可能量を推定するステップが、前記期間(302)にわたる公益事業体によって制御される内部発電量(304)を推定し、前記公益事業体によって制御されない供給源から購入することができる取得電力利用可能量を推定するステップを含む、請求項8に記載のシステム。
- 前記公益事業体によって制御される前記内部発電量(306)は、固定発電量(306)と可変発電量(308)とを含む、請求項9に記載のシステム。
- 前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて前記期間(302)にわたって需要事象をスケジュールするように構成されたプロセッサ(703)は、プロセッサ(703)であって、推定電力消費量(310)を上回る推定電力利用可能量の販売をスケジュールすることによって前記公益事業体に対する収益を最大化するように前記需要事象をスケジュールし、取得発電のコストが内部発電(304)のコストを上回るときは取得発電の購入を最小化し、可変発電(308)のコストが固定発電(306)のコストを上回るときは可変発電(308)の使用を最小化することによって前記公益事業体へのコストを最小化するように需要事象をスケジュールするように構成された、プロセッサ(703)を備える、請求項10に記載のシステム。
- 非一時的なコンピュータ可読媒体上のコンピュータ実行可能コードから構成されるコンピュータプログラム製品であって、前記コンピュータ実行可能コードは、
定義された期間(302)を確立するステップと、
前記期間(302)にわたる電力利用可能量を推定するステップであって、前記期間にわたる電力利用可能量を推定するステップは、前記期間(302)にわたる公益事業体によって制御される内部発電量(304)を推定するステップおよび前記公益事業体によって制御されない供給源から購入することができる取得電力利用可能量を推定するステップを含み、前記公益事業体によって制御される前記内部発電量(304)は固定発電量(306)と可変発電量(308)とを含む、前記期間(302)にわたる電力利用可能量を推定するステップと、
電気メータから得られた測定量に少なくとも部分的に基づいて、前記期間(302)にわたる電力消費量(310)を推定するステップであって、前記電気メータは需要事象を実施するように構成されている、ステップと、
コンピューティングデバイス(108)を用いて、前記期間(302)内の様々な時点での前記推定電力利用可能量と前記推定電力消費量(310)の差に基づいて、前記期間(302)にわたって需要事象をスケジュールするステップと、
を実行するためのものである、コンピュータプログラム製品。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/210,614 US8689020B2 (en) | 2011-08-16 | 2011-08-16 | Method, system and computer program product for scheduling demand events |
US13/210,614 | 2011-08-16 |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2013042652A JP2013042652A (ja) | 2013-02-28 |
JP2013042652A5 true JP2013042652A5 (ja) | 2015-09-24 |
JP6262934B2 JP6262934B2 (ja) | 2018-01-17 |
Family
ID=46801304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012177624A Active JP6262934B2 (ja) | 2011-08-16 | 2012-08-10 | 需要事象をスケジュールするための方法、システム、およびコンピュータプログラム製品 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8689020B2 (ja) |
EP (1) | EP2560136A1 (ja) |
JP (1) | JP6262934B2 (ja) |
AU (1) | AU2012211435A1 (ja) |
BR (1) | BR102012018606A2 (ja) |
CA (1) | CA2784548C (ja) |
Families Citing this family (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9721210B1 (en) * | 2013-11-26 | 2017-08-01 | Invent.ly LLC | Predictive power management in a wireless sensor network |
US9137050B2 (en) | 2009-07-17 | 2015-09-15 | Honeywell International Inc. | Demand response system incorporating a graphical processing unit |
US9124535B2 (en) | 2009-07-17 | 2015-09-01 | Honeywell International Inc. | System for using attributes to deploy demand response resources |
US9818073B2 (en) | 2009-07-17 | 2017-11-14 | Honeywell International Inc. | Demand response management system |
US8457802B1 (en) | 2009-10-23 | 2013-06-04 | Viridity Energy, Inc. | System and method for energy management |
US9367825B2 (en) | 2009-10-23 | 2016-06-14 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US8892264B2 (en) | 2009-10-23 | 2014-11-18 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US9159042B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from data shifting by data centers |
US9159108B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets |
US9153001B2 (en) | 2011-01-28 | 2015-10-06 | Honeywell International Inc. | Approach for managing distribution of automated demand response events in a multi-site enterprise |
WO2013039553A1 (en) * | 2011-09-17 | 2013-03-21 | Narayam Amit | Load forecasting from individual customer to system level |
JP5776487B2 (ja) * | 2011-10-13 | 2015-09-09 | ソニー株式会社 | 電力制御装置およびプログラム |
KR101500304B1 (ko) * | 2011-12-26 | 2015-03-11 | 주식회사 케이티 | 에너지 저장장치의 충방전 제어 방법 및 시스템 |
US20130232151A1 (en) * | 2012-03-05 | 2013-09-05 | Green Charge Networks Llc | Aggregation of Load Profiles for Consumption Management Systems |
WO2013172431A1 (ja) * | 2012-05-16 | 2013-11-21 | 京セラ株式会社 | 電力管理装置、電力管理システム及び電力管理方法 |
US9270118B2 (en) * | 2012-07-19 | 2016-02-23 | Solarcity Corporation | Techniques for controlling energy generation and storage systems |
US9831677B2 (en) | 2012-07-19 | 2017-11-28 | Solarcity Corporation | Software abstraction layer for energy generation and storage systems |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US8849715B2 (en) * | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US20140081704A1 (en) | 2012-09-15 | 2014-03-20 | Honeywell International Inc. | Decision support system based on energy markets |
US9389850B2 (en) | 2012-11-29 | 2016-07-12 | Honeywell International Inc. | System and approach to manage versioning of field devices in a multi-site enterprise |
JP2014143835A (ja) * | 2013-01-24 | 2014-08-07 | Toshiba Corp | 電力系統の制御システム |
EP2965273A1 (en) * | 2013-03-08 | 2016-01-13 | NEC Europe Ltd. | System and method for distributing electrical power |
US9595070B2 (en) | 2013-03-15 | 2017-03-14 | Google Inc. | Systems, apparatus and methods for managing demand-response programs and events |
US9810442B2 (en) | 2013-03-15 | 2017-11-07 | Google Inc. | Controlling an HVAC system in association with a demand-response event with an intelligent network-connected thermostat |
US9807099B2 (en) * | 2013-03-15 | 2017-10-31 | Google Inc. | Utility portals for managing demand-response events |
US9171276B2 (en) * | 2013-05-06 | 2015-10-27 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based model |
US9098876B2 (en) * | 2013-05-06 | 2015-08-04 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US9989937B2 (en) | 2013-07-11 | 2018-06-05 | Honeywell International Inc. | Predicting responses of resources to demand response signals and having comfortable demand responses |
US9691076B2 (en) | 2013-07-11 | 2017-06-27 | Honeywell International Inc. | Demand response system having a participation predictor |
US10346931B2 (en) | 2013-07-11 | 2019-07-09 | Honeywell International Inc. | Arrangement for communicating demand response resource incentives |
US9471080B2 (en) | 2013-10-21 | 2016-10-18 | Restore Nv | Portfolio managed, demand-side response system |
US20150186904A1 (en) * | 2013-12-27 | 2015-07-02 | International Business Machines Corporation | System And Method For Managing And Forecasting Power From Renewable Energy Sources |
US9665078B2 (en) | 2014-03-25 | 2017-05-30 | Honeywell International Inc. | System for propagating messages for purposes of demand response |
SG10201406883UA (en) * | 2014-10-23 | 2016-05-30 | Sun Electric Pte Ltd | "Power Grid System And Method Of Consolidating Power Injection And Consumption In A Power Grid System" |
US20160292205A1 (en) * | 2015-03-30 | 2016-10-06 | General Electric Company | System and methods for improved demand response management system (drms) |
WO2016158028A1 (ja) * | 2015-03-30 | 2016-10-06 | オムロン株式会社 | 管理装置、管理システム、管理装置の制御方法および制御プログラム |
JP6453707B2 (ja) * | 2015-05-15 | 2019-01-16 | 株式会社東芝 | 発電所システム、及び発電所システムのサーバ |
CN107925601A (zh) * | 2015-07-03 | 2018-04-17 | 南非大学 | 用于基于计时和计价数据进行住户能源控制的电子控制器 |
EP3716182A1 (en) | 2015-09-17 | 2020-09-30 | Laundry 2.0, LLC | System for commercial laundry services and facilities |
US10191506B2 (en) * | 2016-09-29 | 2019-01-29 | Enel X North America, Inc. | Demand response dispatch prediction system including automated validation, estimation, and editing rules configuration engine |
US10541556B2 (en) | 2017-04-27 | 2020-01-21 | Honeywell International Inc. | System and approach to integrate and manage diverse demand response specifications for multi-site enterprises |
WO2018206993A1 (en) * | 2017-05-11 | 2018-11-15 | Bull Sas | Method of managing electricity providing in a computers cluster |
US10999652B2 (en) | 2017-05-24 | 2021-05-04 | Engie Storage Services Na Llc | Energy-based curtailment systems and methods |
US10658841B2 (en) | 2017-07-14 | 2020-05-19 | Engie Storage Services Na Llc | Clustered power generator architecture |
US20190123580A1 (en) * | 2017-10-23 | 2019-04-25 | Sigora International Inc. | Management of a power-distribution system |
KR102665459B1 (ko) * | 2020-09-14 | 2024-05-13 | 한국전자통신연구원 | 주택 단지용 태양광 발전을 위한 용량 설계 장치 및 용량 설계 방법 |
JP2023178053A (ja) * | 2022-06-03 | 2023-12-14 | パナソニックIpマネジメント株式会社 | 制御システム、制御方法、プログラム及び連系システム |
CN115276125A (zh) * | 2022-09-07 | 2022-11-01 | 福建水口发电集团有限公司 | 一种水光储混合式抽蓄电站联合调度方法 |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3602703A (en) | 1969-10-20 | 1971-08-31 | Ibm | Power demand predicting control system |
US4464724A (en) | 1981-06-17 | 1984-08-07 | Cyborex Laboratories, Inc. | System and method for optimizing power shed/restore operations |
US4916328A (en) | 1988-12-08 | 1990-04-10 | Honeywell Inc. | Add/shed load control using anticipatory processes |
US5414640A (en) | 1991-07-05 | 1995-05-09 | Johnson Service Company | Method and apparatus for adaptive demand limiting electric consumption through load shedding |
JP2001318970A (ja) * | 2000-05-12 | 2001-11-16 | Nippon Steel Corp | 電力の需給制御方法、電力の需給制御装置、電力の需給制御システム及び記憶媒体 |
US6519509B1 (en) | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
JP3779151B2 (ja) * | 2000-12-08 | 2006-05-24 | 株式会社日立製作所 | インセンティブ電力負荷制御方法およびシステム |
US7136725B1 (en) | 2001-06-21 | 2006-11-14 | Paciorek Ronald R | Load shed notification method, product, and apparatus |
JP2005284420A (ja) * | 2004-03-26 | 2005-10-13 | Tokyo Electric Power Co Inc:The | 電力資源取引システムおよび電力資源取引管理サーバ |
JP2006352933A (ja) * | 2005-06-13 | 2006-12-28 | Hitachi Ltd | 電力供給制御方法および電力供給制御システム |
GB0809235D0 (en) * | 2008-05-21 | 2008-06-25 | Poweroasis Ltd | Supervisory system controller for use with a renewable energy powered radio telecommunications site |
WO2010008479A2 (en) | 2008-06-25 | 2010-01-21 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
US8548638B2 (en) * | 2008-09-15 | 2013-10-01 | General Electric Company | Energy management system and method |
US8509954B2 (en) | 2009-08-21 | 2013-08-13 | Allure Energy, Inc. | Energy management system and method |
JP5685715B2 (ja) * | 2009-09-28 | 2015-03-18 | パナソニックIpマネジメント株式会社 | 系統連系形給電システム |
US8457802B1 (en) | 2009-10-23 | 2013-06-04 | Viridity Energy, Inc. | System and method for energy management |
US8401709B2 (en) | 2009-11-03 | 2013-03-19 | Spirae, Inc. | Dynamic distributed power grid control system |
JP2011114945A (ja) * | 2009-11-26 | 2011-06-09 | Fuji Electric Systems Co Ltd | 供給電力計画作成装置、そのプログラム |
US9412082B2 (en) | 2009-12-23 | 2016-08-09 | General Electric Company | Method and system for demand response management in a network |
US8386086B2 (en) | 2010-04-26 | 2013-02-26 | Accenture Global Services Limited | Methods and systems for analyzing energy usage |
US8521337B1 (en) | 2010-07-20 | 2013-08-27 | Calm Energy Inc. | Systems and methods for operating electrical supply |
US8417391B1 (en) | 2011-12-15 | 2013-04-09 | Restore Nv | Automated demand response energy management system |
US8965594B2 (en) | 2012-01-19 | 2015-02-24 | General Compression, Inc. | System and method for conserving energy resources through storage and delivery of renewable energy |
-
2011
- 2011-08-16 US US13/210,614 patent/US8689020B2/en active Active
-
2012
- 2012-07-26 BR BR102012018606-3A patent/BR102012018606A2/pt not_active IP Right Cessation
- 2012-08-02 CA CA2784548A patent/CA2784548C/en active Active
- 2012-08-08 AU AU2012211435A patent/AU2012211435A1/en not_active Abandoned
- 2012-08-10 JP JP2012177624A patent/JP6262934B2/ja active Active
- 2012-08-13 EP EP12180278A patent/EP2560136A1/en not_active Ceased
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2013042652A5 (ja) | ||
CN103164279B (zh) | 云计算资源分配方法和系统 | |
CA2784548C (en) | Method, system and computer program product for scheduling demand events | |
CA2872453C (en) | Methods and systems for improved time cost and accuracy of energy usage baselining | |
SG11201808447RA (en) | Method, apparatus, and system for scheduling logistic resources | |
JP2012110218A5 (ja) | ||
WO2013121291A3 (en) | Electric vehicle distributed intelligence | |
EP2899673A1 (en) | Demand response event assessment | |
WO2014078672A3 (en) | Methods and systems for the sale of consumer services | |
JP2012152100A5 (ja) | ||
KR20150001102A (ko) | 가상 머신을 이용한 서버 전력 예측 장치 및 그 방법 | |
US20150066225A1 (en) | Generating a demand response for an energy-consuming facility | |
US20150262316A1 (en) | Power rate calculation method and power rate calculation device | |
JP2017011905A5 (ja) | ||
MY178111A (en) | Intelligent load handling in cloid infrastructure using trend analysis | |
JP2015097334A5 (ja) | ||
JP2015099492A5 (ja) | ||
JP6246041B2 (ja) | デマンドレスポンスシステム、デマンドレスポンス方法及びデマンドレスポンスプログラム | |
WO2015064024A1 (ja) | 特典情報決定装置および特典情報決定システム | |
JP2014039422A (ja) | 節電要求ユーザを選択し、ユーザ電力使用量を抑制するシステム | |
WO2014081795A3 (en) | Systems and methods to determine a price | |
JP2016206944A5 (ja) | ||
JP2017207887A (ja) | 電力消費量用途分解装置 | |
RU2018138111A (ru) | Устройство установления тарифа на каршеринг, способ и система | |
Biggar et al. | The smart grid and efficient pricing of distribution networks |