JP2011518278A5 - - Google Patents

Download PDF

Info

Publication number
JP2011518278A5
JP2011518278A5 JP2011504487A JP2011504487A JP2011518278A5 JP 2011518278 A5 JP2011518278 A5 JP 2011518278A5 JP 2011504487 A JP2011504487 A JP 2011504487A JP 2011504487 A JP2011504487 A JP 2011504487A JP 2011518278 A5 JP2011518278 A5 JP 2011518278A5
Authority
JP
Japan
Prior art keywords
wind turbine
configuration
management system
data
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011504487A
Other languages
English (en)
Japanese (ja)
Other versions
JP2011518278A (ja
JP5431454B2 (ja
Filing date
Publication date
Priority claimed from EP08011961A external-priority patent/EP2141359A1/en
Application filed filed Critical
Publication of JP2011518278A publication Critical patent/JP2011518278A/ja
Publication of JP2011518278A5 publication Critical patent/JP2011518278A5/ja
Application granted granted Critical
Publication of JP5431454B2 publication Critical patent/JP5431454B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2011504487A 2008-07-02 2009-06-08 風力タービンの構成管理システムおよびその中央コンピュータシステム Expired - Fee Related JP5431454B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP08011961A EP2141359A1 (en) 2008-07-02 2008-07-02 Wind turbine configuration management system, and central computer system therefor
EP08011961.3 2008-07-02
PCT/EP2009/057044 WO2010000570A2 (en) 2008-07-02 2009-06-08 Wind turbine configuration management system, and central computer system therefor

Publications (3)

Publication Number Publication Date
JP2011518278A JP2011518278A (ja) 2011-06-23
JP2011518278A5 true JP2011518278A5 (enExample) 2012-12-13
JP5431454B2 JP5431454B2 (ja) 2014-03-05

Family

ID=40352370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011504487A Expired - Fee Related JP5431454B2 (ja) 2008-07-02 2009-06-08 風力タービンの構成管理システムおよびその中央コンピュータシステム

Country Status (7)

Country Link
US (1) US8509956B2 (enExample)
EP (1) EP2141359A1 (enExample)
JP (1) JP5431454B2 (enExample)
CN (1) CN102016298B (enExample)
CA (1) CA2729702C (enExample)
NZ (1) NZ588302A (enExample)
WO (1) WO2010000570A2 (enExample)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10761526B2 (en) * 2017-11-06 2020-09-01 General Electric Company Systems and method for robotic industrial inspection system
BRPI0715737A2 (pt) * 2006-09-01 2013-05-07 Vestas Wind Sys As sistema de pelo menos duas turbinas eàlicas distribuÍdas, turbina eàlica compreendendo pelo menos um ponto de interseÇço uso da prioridade, e acionador de dispositivo de um ponto de interseÇço de uma turbina eàlica em uma rede de comunicaÇço de dados
AU2007291689B2 (en) * 2006-09-01 2010-08-05 Vestas Wind Systems A/S System and method of controlling a wind turbine in a wind powerplant
ES2320401B1 (es) * 2007-11-20 2010-02-26 Acciona Windpower S.A. Parque eolico.
US20090212563A1 (en) * 2008-02-21 2009-08-27 General Electric Company System and method for improving performance of power constrained wind power plant
DE102008028568A1 (de) * 2008-06-16 2009-12-31 Nordex Energy Gmbh Verfahren zur Steuerung einer Windenergieanlage
DE102009037237A1 (de) * 2009-08-12 2011-02-17 Repower Systems Ag Verfahren und Anordnung zur automatischen Konfigurationsparameterkontrolle bei Windenergieanlagen
US8162788B2 (en) * 2009-08-27 2012-04-24 General Electric Company System, device and method for wind turbine control based on operating profiles
US20110298213A1 (en) * 2010-02-12 2011-12-08 Mitsubishi Heavy Industries, Ltd. Handy terminal for wind turbine generator, wind turbine generator and wind power site
BRPI1000025A2 (pt) * 2010-02-18 2018-02-14 Mitsubishi Heavy Industries, Ltd. terminal portátil para um gerador de turbina eólica
DE102011000823A1 (de) * 2011-02-18 2012-08-23 Dewind Europe Gmbh Wartungsdatenspeicherung von Energieumwandlungsanlagen
EP2515506A1 (en) * 2011-04-19 2012-10-24 Siemens Aktiengesellschaft Auto-configuration of network devices
EP2515507A1 (en) * 2011-04-19 2012-10-24 Siemens Aktiengesellschaft Auto-configuration of network devices
WO2013021049A1 (de) 2011-08-11 2013-02-14 Peter Karl Verfahren zum betreiben, insbesondere zum kalibrieren von windkrafträdern, und windenergiepark mit mehreren windkrafträdern
DE102012204446A1 (de) * 2012-03-20 2013-09-26 Wobben Properties Gmbh Verfahren zum Konfigurieren einer Windenergieanlage, sowie Windenergieanlage
DE102012006259A1 (de) * 2012-03-29 2013-10-02 Repower Systems Se Chopperverstärkter Umrichter für Windenergieanlagen
DK201200260A (en) * 2012-04-13 2013-10-14 Electronic As Kk A configuration system for a wind turbine control system
WO2013182197A1 (en) * 2012-06-04 2013-12-12 Vestas Wind Systems A/S Control system for a wind turbine
EP2940295B1 (en) 2014-04-29 2018-04-11 General Electric Company System and method for controlling a wind farm
US10352299B2 (en) * 2016-08-05 2019-07-16 General Electric Company System and method for automatically updating wind turbine data based on component self-identification
CN106523268B (zh) * 2016-11-04 2019-06-04 京电能源科技有限公司 扇叶可转向的风力发电风车
DE102018009549A1 (de) * 2018-12-10 2020-06-10 Senvion Gmbh Verfahren und System zum Parametrieren eines Reglers einer Windenergieanlage und/oder Betreiben einer Windenergieanlage
CN110259636B (zh) * 2019-06-24 2020-12-15 华润新能源(忻州)风能有限公司 一种风机控制方法
EP4036401A1 (en) * 2021-01-27 2022-08-03 Vestas Wind Systems A/S A method for transferring data from a wind farm to a data centre

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4534216A (en) * 1983-05-31 1985-08-13 United Technologies Corporation Method and apparatus for determining the accuracy of wind tunnel test data
US6035423A (en) 1997-12-31 2000-03-07 Network Associates, Inc. Method and system for providing automated updating and upgrading of antivirus applications using a computer network
US20020029097A1 (en) 2000-04-07 2002-03-07 Pionzio Dino J. Wind farm control system
DE10115267C2 (de) * 2001-03-28 2003-06-18 Aloys Wobben Verfahren zur Überwachung einer Windenergieanlage
KR100693540B1 (ko) * 2001-07-17 2007-03-14 주식회사 아도반테스토 입출력 회로, 및 시험 장치
US7099800B2 (en) * 2001-09-28 2006-08-29 Neg Micon Control Systems A/S Method and a computer for handling operational data of wind power plants
FI114170B (fi) 2002-03-14 2004-08-31 Metso Automation Oy Kunnonvalvontajärjestelmä koneenohjausjärjestelmällä varustettuja pyöriviä kone-elimiä sisältäviä koneita varten
US6975925B1 (en) * 2002-03-19 2005-12-13 Windlynx Systems, B.V. Forecasting an energy output of a wind farm
US6925385B2 (en) * 2003-05-16 2005-08-02 Seawest Holdings, Inc. Wind power management system and method
US7318154B2 (en) * 2003-09-29 2008-01-08 General Electric Company Various methods and apparatuses to provide remote access to a wind turbine generator system
US7013203B2 (en) 2003-10-22 2006-03-14 General Electric Company Wind turbine system control
EP1571746B1 (en) * 2004-03-05 2018-09-12 Gamesa Innovation & Technology, S.L. Active power regulating system of a wind farm
DE102005017054B4 (de) * 2004-07-28 2012-01-05 Igus - Innovative Technische Systeme Gmbh Verfahren und Vorrichtung zur Überwachung des Zustandes von Rotorblättern an Windkraftanlagen
US7298059B2 (en) 2004-12-17 2007-11-20 General Electric Company System and method for operating a wind farm under high wind speed conditions
US7363808B2 (en) * 2005-12-05 2008-04-29 General Electric Company Method, system and computer program product for nacelle wind speed correction
BRPI0715737A2 (pt) * 2006-09-01 2013-05-07 Vestas Wind Sys As sistema de pelo menos duas turbinas eàlicas distribuÍdas, turbina eàlica compreendendo pelo menos um ponto de interseÇço uso da prioridade, e acionador de dispositivo de um ponto de interseÇço de uma turbina eàlica em uma rede de comunicaÇço de dados
US7895016B2 (en) * 2009-08-31 2011-02-22 General Electric Company System and method for wind turbine health management

Similar Documents

Publication Publication Date Title
JP2011518278A5 (enExample)
JP5431454B2 (ja) 風力タービンの構成管理システムおよびその中央コンピュータシステム
JP2018106686A5 (enExample)
US9921882B2 (en) Information processing system, deployment method, processing device, and deployment device
US12213042B2 (en) System of actions for IOT devices
US9432244B2 (en) Management device, information processing device and control method that use updated flags to configure network switches
US20170039501A1 (en) Workflow management apparatus, workflow management method, and workflow management program
US10567476B2 (en) Rule-based action triggering in a provider network
US9519537B2 (en) Apparatus, system and method for application log data processing
US8266178B2 (en) Management apparatus, information processing apparatus, and method therefor
JP6421866B1 (ja) センサ管理ユニット、センサ装置、センサ管理方法及びセンサ管理プログラム
JP2011159011A (ja) ジョブ監視システム及びジョブ監視プログラム
CN103577200A (zh) 更新服务器的方法
JP7274438B2 (ja) 資産情報管理システム、及び資産情報管理方法
US8738943B2 (en) Controlling and minimizing electrical power consumed by electrical components connected to a networked computing environment
US20160127253A1 (en) Routing handler for rule-based action triggering
JP2011014036A (ja) 周辺機器管理装置および周辺機器管理プログラム
JP5936901B2 (ja) データ収集システム、及びデータ収集方法
JP2008097498A5 (enExample)
US8819465B2 (en) Information processing device and data distribution method
Schaaf et al. The OM4SPACE Activity Service-A semantically well-defined cloud-based event notification middleware
JP5669970B1 (ja) 情報管理システム及び配信装置及び情報管理方法
JP5435103B2 (ja) 機器管理システム、機器管理装置及びプログラム
JP5835090B2 (ja) 複数装置の誤動作防止装置及び複数装置の誤動作防止方法
JP2009282791A (ja) 耐障害業務情報システム