JP2011246227A - Method of installing elevator car - Google Patents

Method of installing elevator car Download PDF

Info

Publication number
JP2011246227A
JP2011246227A JP2010120606A JP2010120606A JP2011246227A JP 2011246227 A JP2011246227 A JP 2011246227A JP 2010120606 A JP2010120606 A JP 2010120606A JP 2010120606 A JP2010120606 A JP 2010120606A JP 2011246227 A JP2011246227 A JP 2011246227A
Authority
JP
Japan
Prior art keywords
car
hoistway
installation
lifting device
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2010120606A
Other languages
Japanese (ja)
Inventor
Tomoro Miki
智朗 三木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2010120606A priority Critical patent/JP2011246227A/en
Publication of JP2011246227A publication Critical patent/JP2011246227A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of installing an elevator car in a short construction period, without handling a robust stand.SOLUTION: The method includes: a shaft installation step for installing a shaft 5 in a structure 3; a car assembling step for assembling the car 11; a lifting device installation step for installing a lifting device 33 for inserting the car in the shaft at a construction site; and a car installation step for inserting the assembled car in the shaft. The shaft providing step and the car assembling step are performed in parallel. The car assembling step is performed at the construction site. In the car assembling step, a temporary guide rail is arranged on the ground of the construction site and thereafter, the car is assembled depending on the temporary guide rail. In the car installation step, the assembled car is lifted up by the lifting device to be pulled out from the temporary guide rail, after completion of the car assembling step, and is suspended so as to be inserted into the shaft.

Description

本発明は、エレベータのかご据付方法に関するものである。   The present invention relates to an elevator car installation method.

エレベータは、上下に延びる昇降路内を昇降するかごを備えている。通常、かごは、構造物内で昇降路がほぼ完成した後、その昇降路内に部品を運び込み、昇降路内で徐々に組み上げられて、最終的に昇降路内に据付けられていた。   The elevator includes a car that moves up and down in a hoistway that extends vertically. Usually, after a hoistway is almost completed in a structure, a car carries parts into the hoistway, is gradually assembled in the hoistway, and is finally installed in the hoistway.

一方、近年の工期短縮の要望に応えるべく、昇降路の設置工事と並行して、かごの組立作業を工場内で進行させておく工事手法もある。この手法では、昇降路の完成にあわせて、組み上がったかごを工場から構造物現場へと運搬し、遅滞なく昇降路内にかごを据付ける。すなわち、かごの組立作業を、昇降路の完成を待つことなく開始し、昇降路の設置工事とかごの組立作業とを並行して行うことで、工期を短縮することができた。   On the other hand, in order to meet the recent demand for shortening the construction period, there is also a construction method in which the assembly work of the car is advanced in the factory in parallel with the installation work of the hoistway. In this method, as the hoistway is completed, the assembled car is transported from the factory to the structure site, and the car is installed in the hoistway without delay. That is, the car assembly work was started without waiting for completion of the hoistway, and the work period could be shortened by performing the hoistway installation work and the car assembling work in parallel.

また、上記工事手法では、工場で精度よく組み上がったかごを現場へと運搬する際、かごを保護する措置が必要であった。そこで、特許文献1に例示されるようなかご組構台が考案されている。この構台は、直方体の各辺に配置されたような複数の鋼材によって檻状に構成されており、かごは、それら鋼材に包囲された内側空間で組み立てられ、そのまま構台に収められた状態で運搬される。   In the construction method described above, it was necessary to take measures to protect the car when the car assembled with high precision at the factory was transported to the site. Therefore, a car assembly base as exemplified in Patent Document 1 has been devised. This gantry is formed in a bowl shape with a plurality of steel materials arranged on each side of the rectangular parallelepiped, and the cage is assembled in the inner space surrounded by these steel materials and transported in the state of being stored in the gantry as it is Is done.

しかしながら、上述したような構台は、運搬に耐える頑強な構造を得るべく非常に重量が大きな構造物となっていた。このため、かごを収めた構台を、工場から運搬トレーラ荷台に載せる作業や、トレーラで現場まで運ばれてきた構台を、トレーラ荷台から昇降路上部の据付入口に移送する作業は、大変困難な作業となっていた。特に、積み下ろしや移送に際して、トレーラ荷台上あるいは昇降路の据付入口近傍で、構台の姿勢を、立て位置と寝かせ位置との間で変更する必要があり、このことが更に作業を困難なものにさせていた。   However, the gantry as described above has a very heavy structure in order to obtain a robust structure that can withstand transportation. For this reason, it is very difficult work to place the gantry containing the car on the transport trailer carrier from the factory or to transfer the gantry transported to the site by the trailer from the trailer carrier to the installation entrance at the upper part of the hoistway. It was. In particular, when loading and unloading, it is necessary to change the posture of the gantry between the standing position and the laying position on the trailer platform or near the installation entrance of the hoistway, which further complicates the work. It was.

特開平6−219669号公報JP-A-6-219669

本発明は、上述した事情に鑑みてなされたものであり、工期短縮を図ることが可能でありながら、頑強な構台のハンドリング作業を強いられずに済む、エレベータのかご据付方法を提供することを目的とする。   The present invention has been made in view of the above-described circumstances, and provides an elevator car installation method that can reduce the work period but is not forced to handle a robust gantry. Objective.

上述した目的を達成するための本発明は、昇降路を有する構造物にエレベータのかごを据付ける、かご据付方法であって、前記昇降路を前記構造物に設ける昇降路設置工程と、前記かごを組立てるかご組立工程と、前記かごを前記昇降路に挿入するための揚重装置を、前記構造物の建設現場に設置する揚重装置設置工程と、組み上がった前記かごを前記昇降路に挿入するかご据付工程とを備え、前記昇降路設置工程と、前記かご組立工程とは、並行して行われ、前記かご組立工程は、前記構造物の建設現場で行われるものであり、前記かご組立工程では、前記建設現場の地上に仮ガイドレールを配置した後、該仮ガイドレールに依拠してかごの組立てが行われ、前記かご据付工程は、前記かご組立工程の終了後に、前記揚重装置によって、組み上がった前記かごを吊り上げて、前記仮ガイドレールから抜き、前記昇降路上部の据付入口から、該昇降路に挿入するように前記かごを吊り下ろす。   The present invention for achieving the above-described object is a car installation method in which an elevator car is installed in a structure having a hoistway, the hoistway installation process for providing the hoistway in the structure, and the car A car assembling step, a lifting device installation step for installing the lifting device for inserting the car into the hoistway at the construction site of the structure, and inserting the assembled car into the hoistway A car installation process, wherein the hoistway installation process and the car assembly process are performed in parallel, and the car assembly process is performed at a construction site of the structure, and the car assembly In the process, after the temporary guide rail is arranged on the ground of the construction site, the car is assembled based on the temporary guide rail, and the car installation process is performed after the car assembly process is completed. By pair By lifting the rose said car, disconnect from the temporary guide rails, from installation inlet of the hoistway portion, down hanging the cage to be inserted into the hoistway.

本発明のエレベータのかご据付方法によれば、工期短縮を図ることが可能でありながら、頑強な構台のハンドリング作業を強いられずに済むという利点が得られる。   According to the elevator car installation method of the present invention, it is possible to shorten the construction period, but it is possible to obtain an advantage that it is not necessary to be forced to handle a robust gantry.

本発明の実施の形態が適用されるエレベータを側方から示す概略図である。It is the schematic which shows the elevator with which embodiment of this invention is applied from a side. 図1のエレベータに関し矢印IIに沿って正面側からみた図である。It is the figure seen from the front side along the arrow II regarding the elevator of FIG. 本実施の形態に係るかご据付方法の一過程を示す図である。It is a figure which shows one process of the cage | basket | car installation method which concerns on this Embodiment. 本実施の形態に係るかご据付方法における、図3の次の過程を示す図である。It is a figure which shows the next process of FIG. 3 in the cage | basket | car installation method which concerns on this Embodiment. かご組立工程におけるかごの側面図である。It is a side view of the car in a car assembly process. 図5の矢印VIからみた、かごの正面図である。FIG. 6 is a front view of a car as seen from an arrow VI in FIG. 5. 図5の矢印VIIからみた、かごの平面図である。FIG. 7 is a plan view of the car as seen from the arrow VII in FIG. 5. 本実施の形態に係るかご据付方法における、図4の次の過程を示す図である。It is a figure which shows the next process of FIG. 4 in the cage | basket | car installation method which concerns on this Embodiment. 本実施の形態に係るかご据付方法における、図8の次の過程を示す図である。It is a figure which shows the next process of FIG. 8 in the cage | basket | car installation method which concerns on this Embodiment.

以下、本発明に係るエレベータのかご据付方法の実施の形態について添付図面に基づいて説明する。なお、図中、同一符号は同一又は対応部分を示すものとする。   Embodiments of an elevator car installation method according to the present invention will be described below with reference to the accompanying drawings. In the drawings, the same reference numerals indicate the same or corresponding parts.

図1は、エレベータの概略を側方から示す図であり、図2は、図1のエレベータに関し矢印IIに沿って正面側からみた図である。   FIG. 1 is a diagram schematically showing the elevator from the side, and FIG. 2 is a diagram of the elevator of FIG. 1 as viewed from the front side along the arrow II.

エレベータ1は、構造物3において上下に延びる昇降路5を備える。昇降路5内には、左右一対のかごガイドレール7やおもりガイドレール9が立設されている。一対のかごガイドレール7の間には、かご11が昇降可能に設けられている。かご11は、かごガイドレール7によって昇降方向に案内される。同様に、一対のおもりガイドレール9の間には、釣り合いおもり13が昇降可能に設けられており、釣り合いおもり13は、おもりガイドレール9によって昇降方向に案内される。かご11と釣り合いおもり13との間には、ロープ等の主索15が渡されており、かご11と釣り合いおもり13は、相互に反対方向へと昇降する。   The elevator 1 includes a hoistway 5 that extends vertically in the structure 3. In the hoistway 5, a pair of left and right car guide rails 7 and weight guide rails 9 are erected. A car 11 is provided between the pair of car guide rails 7 so as to be movable up and down. The car 11 is guided in the ascending / descending direction by the car guide rail 7. Similarly, a counterweight 13 is provided between the pair of weight guide rails 9 so as to be able to move up and down, and the counterweight 13 is guided by the weight guide rails 9 in the up-and-down direction. A main rope 15 such as a rope is passed between the car 11 and the counterweight 13, and the car 11 and the counterweight 13 move up and down in opposite directions.

昇降路5の下部には、ピット17が形成されている。ピット17には、図示省略する周知の緩衝器等が設けられている。また、昇降路5内には、上記の他、例えば、駆動綱車、巻上機、そらせ車、調速機等、様々な周知の構成要素(図示省略)が設けられている。構造物3において、昇降路5の正面側(図1紙面左側)には、各階の乗場19が設けられており、利用者は、これら各階の乗場19から、かご11に対して乗り降りする。   A pit 17 is formed in the lower part of the hoistway 5. The pit 17 is provided with a well-known shock absorber (not shown). In addition, the hoistway 5 is provided with various well-known components (not shown) such as a driving sheave, a hoist, a deflector, and a governor in addition to the above. In the structure 3, a landing 19 on each floor is provided on the front side of the hoistway 5 (left side in FIG. 1), and a user gets on and off the car 11 from the landing 19 on each floor.

次に、上記に例示したような構成のエレベータにおける、かご据付方法について説明する。本実施の形態に係るエレベータのかご据付方法は、少なくとも、昇降路設置工程と、かご組立工程と、揚重装置設置工程と、かご据付工程とを備える。   Next, a car installation method in the elevator configured as described above will be described. The elevator car installation method according to the present embodiment includes at least a hoistway installation process, a car assembly process, a lifting device installation process, and a car installation process.

昇降路設置工程は、構造物3に対してエレベータ1の昇降路5を形成する工程である。また、かご組立工程は、最終的には昇降路5に収容されるエレベータ1のかご11を組立てる工程である。   The hoistway installation process is a process of forming the hoistway 5 of the elevator 1 with respect to the structure 3. The car assembly process is a process of finally assembling the car 11 of the elevator 1 accommodated in the hoistway 5.

本発明におけるかご組立工程は、対象となる構造物3の建設現場(構造物近傍)の地上で行われ、換言するならば、建設現場から離れた工場や逆に昇降路5内部で行われるものではない。より好適には、かご組立工程は、建設現場における、後述する揚重装置が直接、届く領域で行われる。   The car assembling process in the present invention is performed on the ground of the construction site (the vicinity of the structure) of the target structure 3, in other words, performed in the factory away from the construction site or, conversely, in the hoistway 5. is not. More preferably, the car assembling process is performed in a construction site in an area where a lifting device described later can reach directly.

また、かご組立工程は、昇降路設置工程と並行して行われる。ここで、並行して行われるとは、両工程が同時に開始されるか、または、少なくとも部分的に重なって行われている期間があることをいうものとする。   The car assembly process is performed in parallel with the hoistway installation process. Here, “performed in parallel” means that both processes are started at the same time or there is a period in which they are performed at least partially overlapping.

図3〜図7に基づいて、昇降路設置工程及びかご組立工程について説明する。図3に示されるように、昇降路設置工程において構造物3内に、昇降路5を構成する空間が設けられる。さらに、昇降路5内には、図4に示されるように、かごガイドレール7が設けられる。一方、建設現場21の地上21aでは、かご組立工程が行われる。   The hoistway installation process and the car assembly process will be described based on FIGS. As FIG. 3 shows, the space which comprises the hoistway 5 is provided in the structure 3 in the hoistway installation process. Further, a car guide rail 7 is provided in the hoistway 5 as shown in FIG. On the other hand, a car assembly process is performed on the ground 21 a of the construction site 21.

かご組立工程は、まず、建設現場21の地上21aに、仮ガイドレール23を配置した後、仮ガイドレール23に依拠してかご11の組立てが行われる。図5〜図7に基づいて更に詳細に説明する。図5は、かご組立工程におけるかごの側面図である。図6及び図7はそれぞれ、図5の矢印VI及び矢印VIIからみた、かごの正面図及び平面図である。   In the car assembly process, first, the temporary guide rail 23 is arranged on the ground 21 a of the construction site 21, and then the car 11 is assembled based on the temporary guide rail 23. This will be described in more detail with reference to FIGS. FIG. 5 is a side view of the car in the car assembling process. 6 and 7 are respectively a front view and a plan view of the car as seen from the arrows VI and VII in FIG.

図5〜図7に示されるように、かご組立工程においては、まず、建設現場21の地上21aに、受け台25が載置される。受け台25は、本実施の形態では、鋼材を平面視、H字状をなすように構成したものである。受け台25は、左右一対の端部材25aと、中央材25bとを含んでいる。一対の端部材25aは、それぞれ前後方向(図7紙面上下方向)に延びている。中央材25bは、一対の端部材25aの前後方向中間部分を接続するように左右方向に延びている。   As shown in FIGS. 5 to 7, in the car assembling process, first, the cradle 25 is placed on the ground 21 a of the construction site 21. In the present embodiment, the cradle 25 is configured such that a steel material has an H shape in plan view. The cradle 25 includes a pair of left and right end members 25a and a central member 25b. The pair of end members 25a extend in the front-rear direction (vertical direction in FIG. 7). The center member 25b extends in the left-right direction so as to connect the middle portions in the front-rear direction of the pair of end members 25a.

一対の端部材25aの前後方向中間部分、もしくは、端部材25aの左右両端部分には、左右一対の仮ガイドレール23が立設されている。これら仮ガイドレール23は、ターンバックル27によって支持されている(図6及び図7では図示省略)。また、左右一対の仮ガイドレール23の間には、左右一対の支持部材29が設けられている。支持部材29は、かご組立工程においてかご11の床を支えるものであり、例えば、ジャッキ機構を備えていたり、あるいは、正規のピット17に設けられる緩衝器のような構成を備えていたりするとよい。   A pair of left and right temporary guide rails 23 is erected on the middle part in the front-rear direction of the pair of end members 25a or on both left and right ends of the end member 25a. These temporary guide rails 23 are supported by a turnbuckle 27 (not shown in FIGS. 6 and 7). A pair of left and right support members 29 are provided between the pair of left and right temporary guide rails 23. The support member 29 supports the floor of the car 11 in the car assembling process, and may include, for example, a jack mechanism or a configuration like a shock absorber provided in the regular pit 17.

かご11は、仮ガイドレール23を、正規のかごガイドレール7にみたてて組立が行われる。よって、かご11は、ガイドシュー31を介して仮ガイドレール23に支持されており、図示しない非常止め等を外すと、仮ガイドレール23に沿ってスライドするように組立てられている。   The car 11 is assembled by viewing the temporary guide rail 23 with the regular car guide rail 7. Therefore, the car 11 is supported by the temporary guide rail 23 via the guide shoe 31 and is assembled so as to slide along the temporary guide rail 23 when an emergency stop (not shown) is removed.

図8に示されるように、建設現場21には、揚重装置設置工程において設けられた揚重装置33が用意されている。揚重装置33には、通常、クレーンが用いられる。また、揚重装置設置工程の実施タイミングは、特に限定されず、昇降路設置工程やかご組立工程の開始前でもよいし、開始後でもよいが、後述するかご据付工程の開始前に揚重装置33の配置が完了していればよい。これに関連し、揚重装置33は、かごの据付だけに用いられる装置である必要は無く、様々な資材を移動させるための装置が兼用されていてもよい。   As shown in FIG. 8, a lifting device 33 provided in the lifting device installation step is prepared at the construction site 21. A crane is usually used as the lifting device 33. Moreover, the implementation timing of the lifting device installation process is not particularly limited, and may be before or after the start of the hoistway installation process or the car assembly process, or after the start, but before the start of the car installation process described later It is only necessary that arrangement of 33 is completed. In this connection, the lifting device 33 does not have to be used only for the installation of the car, and may be used as a device for moving various materials.

揚重装置設置工程、昇降路設置工程及びかご組立工程の終了後に、かご据付工程が行われる。図8に示されるように、まず、揚重装置33によって、かご組立工程で組み上げられたかご11を吊り上げ、かご11を仮ガイドレール23から抜き上げる。そして、揚重装置33によって、かご11を、昇降路5上部(例えば構造物3屋上)の据付入口まで移送する。   After the lifting device installation process, the hoistway installation process, and the car assembly process are completed, a car installation process is performed. As shown in FIG. 8, first, the car 11 assembled in the car assembling process is lifted by the lifting device 33, and the car 11 is pulled out from the temporary guide rail 23. Then, the car 11 is transferred by the lifting device 33 to the installation entrance at the upper part of the hoistway 5 (for example, the roof of the structure 3).

さらに、図9に示されるように、揚重装置33によって、かご11を、据付入口から昇降路5内に挿入するように、吊り下ろす。より詳細には、ガイドシュー31がかごガイドレール7に係合するようにかご11を下ろし、かご11を昇降路5内に昇降可能に据付ける。以上のようにして、エレベータのかごの据付が行われる。   Further, as shown in FIG. 9, the car 11 is suspended by the lifting device 33 so as to be inserted into the hoistway 5 from the installation entrance. More specifically, the car 11 is lowered so that the guide shoe 31 engages with the car guide rail 7, and the car 11 is installed in the hoistway 5 so as to be able to move up and down. As described above, the elevator car is installed.

上述した本実施の形態に係るエレベータのかご据付方法によれば、まず、昇降路の設置工事と並行して、昇降路横の現場でかごの組立作業が進められるため、昇降路の完成にあわせて、組み上がったかごを遅滞なく昇降路内に据付けることができる。すなわち、かごの組立作業が、昇降路の完成を待つことなく開始され、工期を短縮することができる。さらに加えて、かご組立工程は、建設現場にて行われるので、組み上がったかごを工場等からトレーラ等で現場まで運搬する作業は不要となる。このように、本実施の形態では、工期短縮を図ることが可能でありながら、これまでは避けられなかった頑強な構台のハンドリング作業を強いられずに済むという有益な利点がある。   According to the elevator car installation method according to the present embodiment described above, the car assembly work is first carried out at the site next to the hoistway in parallel with the hoistway installation work. Thus, the assembled car can be installed in the hoistway without delay. That is, the assembly work of the car is started without waiting for completion of the hoistway, and the construction period can be shortened. In addition, since the car assembly process is performed at the construction site, it is not necessary to transport the assembled car from the factory or the like to the site by a trailer or the like. As described above, the present embodiment has a beneficial advantage that it is possible to shorten the work period, but it is not necessary to handle a robust gantry handling work that has been unavoidable until now.

さらに、工場等から現場までの運搬が不要となるため、頑強で重量が非常に大きな構台も必要なくなり、すなわち、図5〜図7に例示したような仮ガイドレールを支え、そして、かごを支えておける程度の受け台があれば足りるという利点もある。   Further, since transportation from the factory to the site is not required, a robust and extremely heavy gantry is not required. That is, the temporary guide rails illustrated in FIGS. 5 to 7 are supported, and the cage is supported. There is also an advantage that it is sufficient if there is a cradle that can be stored.

また、本実施の形態では、作業スペースの狭い昇降路内ではなくスペースの制約が少ない建設現場でかごを組み上げるので、かごの組み立てがやりやすく、効率よく作業を行うことができる。加えて、組立作業は建設現場の地上で行われるので、昇降路内でかごを組み立てるときのように、部品落下のおそれがなく、組み立てに集中しやすく、それによっても、効率よく作業を行うことができる。   In the present embodiment, the car is assembled not at a narrow hoistway in the work space but at a construction site with less space restrictions, so that the car can be easily assembled and the work can be performed efficiently. In addition, since the assembly work is performed on the ground of the construction site, there is no risk of parts falling like when assembling the car in the hoistway, and it is easy to concentrate on the assembly, so that the work can be done efficiently Can do.

また、組立作業を建設現場の地上で行うことは、昇降路内でかごの組み立てを行うときのように部品をいったん高所に搬送する必要をなくすことに帰結する。よって、部品を高所に搬送するための装置を確保するための手間や費用、当該装置に関する管理等を省くことができる。   Also, performing assembly work on the ground of the construction site results in eliminating the need to transport the parts to a high place once, such as when assembling a car in a hoistway. Therefore, it is possible to save labor and cost for securing a device for conveying parts to a high place, management related to the device, and the like.

さらに、かごの組み立てを、建設現場のなかでも、揚重装置が届く領域で行うようにすれば、組み上がったかごを、直接、揚重装置で吊り上げ、そのまま昇降路内に挿入することができる。よって、前述したように組み上がったかごの運搬を不要としたことと相俟って、作業効率の向上及び移動用機器の省略をより一層推し進めることができる。また、その際、仮ガイドレールを上下に指向させて設けておけば、組立から据付けを完了するまで、かごを寝かせたり立たせたりという姿勢変更作業が強いられず、そのままの姿勢で吊り上げ昇降路内への挿入に移行でき、さらに作業効率を向上させることができる。   Furthermore, if the car is assembled in the construction site in an area where the lifting device can reach, the assembled car can be lifted directly by the lifting device and inserted into the hoistway as it is. . Therefore, coupled with the fact that it is not necessary to carry the assembled car as described above, it is possible to further improve the work efficiency and omit the moving device. At that time, if the temporary guide rail is oriented vertically, it will not be forced to lay or stand the car until assembly is completed, and it will not be forced to change the position in the hoistway. It is possible to shift to the insertion into the work area and further improve the work efficiency.

以上、好ましい実施の形態を参照して本発明の内容を具体的に説明したが、本発明の基本的技術思想及び教示に基づいて、当業者であれば、種々の改変態様を採り得ることは自明である。   Although the contents of the present invention have been specifically described with reference to the preferred embodiments, various modifications can be made by those skilled in the art based on the basic technical idea and teachings of the present invention. It is self-explanatory.

1 エレベータ、3 構造物、5 昇降路、11 かご、21 建設現場、23 仮ガイドレール、33 揚重装置。   1 elevator, 3 structure, 5 hoistway, 11 car, 21 construction site, 23 temporary guide rail, 33 lifting device.

Claims (2)

昇降路を有する構造物にエレベータのかごを据付ける、かご据付方法であって、
前記昇降路を前記構造物に設ける昇降路設置工程と、
前記かごを組立てるかご組立工程と、
前記かごを前記昇降路に挿入するための揚重装置を、前記構造物の建設現場に設置する揚重装置設置工程と、
組み上がった前記かごを前記昇降路に挿入するかご据付工程とを備え、
前記昇降路設置工程と、前記かご組立工程とは、並行して行われ、
前記かご組立工程は、前記構造物の建設現場で行われるものであり、
前記かご組立工程では、前記建設現場の地上に仮ガイドレールを配置した後、該仮ガイドレールに依拠してかごの組立てが行われ、
前記かご据付工程は、前記かご組立工程の終了後に、前記揚重装置によって、組み上がった前記かごを吊り上げて、前記仮ガイドレールから抜き、前記昇降路上部の据付入口から、該昇降路に挿入するように前記かごを吊り下ろす
エレベータのかご据付方法。
A car installation method for installing an elevator car on a structure having a hoistway,
A hoistway installation step of providing the hoistway in the structure;
A car assembly process for assembling the car;
A lifting device for installing the lifting device for inserting the car into the hoistway at a construction site of the structure; and
A car installation step of inserting the assembled car into the hoistway,
The hoistway installation process and the car assembly process are performed in parallel,
The car assembly process is performed at the construction site of the structure,
In the car assembly process, after the temporary guide rail is arranged on the ground of the construction site, the car is assembled based on the temporary guide rail,
In the car installation process, after the car assembly process is completed, the assembled car is lifted by the lifting device, removed from the temporary guide rail, and inserted into the hoistway from the installation entrance at the upper part of the hoistway. An elevator car installation method for suspending the car as described above.
前記かご組立工程は、前記建設現場の地上における前記揚重装置の届く領域で行われる、請求項1のエレベータのかご据付方法。   The elevator car installation method according to claim 1, wherein the car assembling step is performed in an area where the lifting device reaches on the ground of the construction site.
JP2010120606A 2010-05-26 2010-05-26 Method of installing elevator car Withdrawn JP2011246227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010120606A JP2011246227A (en) 2010-05-26 2010-05-26 Method of installing elevator car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010120606A JP2011246227A (en) 2010-05-26 2010-05-26 Method of installing elevator car

Publications (1)

Publication Number Publication Date
JP2011246227A true JP2011246227A (en) 2011-12-08

Family

ID=45411996

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010120606A Withdrawn JP2011246227A (en) 2010-05-26 2010-05-26 Method of installing elevator car

Country Status (1)

Country Link
JP (1) JP2011246227A (en)

Similar Documents

Publication Publication Date Title
TWI361793B (en) Method and device for installation of guide rails in a lift shaft
CN105384035A (en) Guide rail installation arrangement and method for installing guide rails
CN103303771A (en) A method for constructing an elevator and an elevator arrangement
CN106144843A (en) The parallel apparatus and method transported and install for elevator components
CN102094106A (en) Quick installation method for large four-point suspended type converter
CN104066670A (en) Method and elevator arrangement
CN104192735B (en) A kind of minor crane
CN104310195A (en) Hoisting cage for hoisting electromechanical device
KR102117142B1 (en) Method for carrying elevator counterweight
KR101160273B1 (en) Straddle carrier for bridge construction
CN206581150U (en) A kind of automatic lifting encloses formula hanging basket mounting platform device entirely
JP4984493B2 (en) Blast furnace demolition method and blast furnace construction method
JP6375124B2 (en) Concrete placing system and concrete placing method used in construction of concrete structure using slip form method
JP4694859B2 (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
JP2015016941A (en) Elevator heavy substance lifting method, and elevator hoist lifting method
JP2011246227A (en) Method of installing elevator car
CN109516409A (en) Flooring construction tower crane turns device for hoisting
JP6439880B1 (en) Elevator long object carrying jig, elevator guide rail removal method and elevator guide rail installation method
CN104328920B (en) Construction material carrying method
CN105084195B (en) Spud leg displacement method
JP2018003506A (en) Reinforcement assembling equipment for tunnel
JP2018084101A (en) Stacking device and stacking method
JP2012001894A (en) Continuous lifting device
RU2662500C2 (en) Method of moving component or material to and within level of shaft boring system
CN205222407U (en) Novel cage hoist and mount conveyor system

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20130806