KR102117142B1 - Method for carrying elevator counterweight - Google Patents

Method for carrying elevator counterweight Download PDF

Info

Publication number
KR102117142B1
KR102117142B1 KR1020160004257A KR20160004257A KR102117142B1 KR 102117142 B1 KR102117142 B1 KR 102117142B1 KR 1020160004257 A KR1020160004257 A KR 1020160004257A KR 20160004257 A KR20160004257 A KR 20160004257A KR 102117142 B1 KR102117142 B1 KR 102117142B1
Authority
KR
South Korea
Prior art keywords
counterweight
balance weight
bogie
platform
hoistway
Prior art date
Application number
KR1020160004257A
Other languages
Korean (ko)
Other versions
KR20160088810A (en
Inventor
무기헤이 다나카
Original Assignee
미쓰비시 덴키 빌딩 테크노 서비스 가부시키 가이샤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 미쓰비시 덴키 빌딩 테크노 서비스 가부시키 가이샤 filed Critical 미쓰비시 덴키 빌딩 테크노 서비스 가부시키 가이샤
Publication of KR20160088810A publication Critical patent/KR20160088810A/en
Application granted granted Critical
Publication of KR102117142B1 publication Critical patent/KR102117142B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/12Counterpoises
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/068Cable weight compensating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/12Checking, lubricating, or cleaning means for ropes, cables or guides

Abstract

[과제] 기설(旣設)의 균형추를 승강로로부터 승강장으로 반출하는 작업 효율을 향상시킬 수 있는 엘리베이터 균형추 반출입 방법을 얻는다.
[해결 수단] 피트(101) 내에 발판(12)을 설치하는 발판 설치 공정과, 균형추용 가이드 레일 장치(102)에 지지된 체인 블록(22)을 이용하여 균형추(103)를 지지하는 균형추 지지 공정과, 발판 설치 공정 및 균형추 지지 공정 후, 발판(12)에 설치된 제1 대차(31A)에 균형추(103)의 제1 단부를 얹은 상태에서, 체인 블록(22)의 구동에 의해서 균형추(103)를 강하시키면서, 제1 대차(31A)를 승강장(104)을 향해 이동시키고, 균형추(103)의 위치를 기립 위치로부터 경도 위치로 변위시키는 균형추 강하 공정과 균형추 강하 공정 후, 제1 대차(31A)를 승강장(104)으로 이동시키는 것에 의해서 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출하는 균형추 반출 공정을 구비하고 있다.
[Task] Obtain a method for carrying in and out of an elevator counterweight, which can improve the efficiency of carrying out the existing counterweight from the hoistway to the platform.
[Solutions] Step mounting step of installing the step 12 in the pit 101, and step of supporting the counter weight 103 using the chain block 22 supported by the guide rail device 102 for the counter weight And, after the step of installing the scaffold and the balance weight support process, the first weight 31A of the balance on the scaffold 12, the first end of the balance weight 103 is placed on the balance weight 103 by driving the chain block 22. While moving the first balance (31A) toward the platform 104 while lowering, the balance weight drop process for displacing the position of the balance weight 103 from the standing position to the longitudinal position and the balance weight drop process, the first balance (31A) It is provided with a balance weight taking-out process for moving the counterweight 103 from the hoistway 100 to the platform 104 by moving the to the platform 104.

Description

엘리베이터 균형추 반출입 방법{METHOD FOR CARRYING ELEVATOR COUNTERWEIGHT}METHOD FOR CARRYING ELEVATOR COUNTERWEIGHT

본 발명은, 균형추를 승강로에 대해서 반출입하는 엘리베이터 균형추 반출입 방법에 관한 것이다.The present invention relates to a method for carrying in and out an elevator counterweight, which carries a counterweight into and out of a hoistway.

종래, 승강로에 지지된 양중(揚重) 장치를 이용하여 기설(旣設)의 균형추를 승강로의 피트(pit)까지 매달아 내리는 공정과, 매달아 내려진 균형추를 피트 내에서 해체하는 공정과, 해체된 균형추를 피트로부터 승강장으로 반출하는 공정을 구비한 엘리베이터 균형추 반출입 방법이 알려져 있다(예를 들면, 특허 문헌 1 참조).Conventionally, the process of suspending the existing counterweight to the pit of the hoistway using a double weight device supported on the hoistway, the process of dismantling the suspended counterweight within the pit, and the disassembled balance weight A method for carrying in and out of an elevator balance weight having a step of carrying out a pit from a pit to a platform is known (for example, see Patent Document 1).

특허 문헌 1 : 일본특허공개 평11-349255호 공보Patent Document 1: Japanese Patent Publication No. Hei 11-349255

그렇지만, 피트까지 매달아 내려진 균형추를 피트 내에서 해체하는 공정과, 해체된 균형추를 피트로부터 승강장으로 반출하는 공정을 구비하고 있으므로, 기설의 균형추를 승강로로부터 승강장으로 반출하는 작업 효율이 나쁘다는 문제점이 있었다. However, since there is a process of dismantling the counterweight suspended from the pit to the pit and the process of taking the disassembled counterweight out of the pit into the platform, there is a problem in that the work efficiency of removing the existing balance weight from the platform into the platform is poor. .

본 발명은, 기설의 균형추를 승강로로부터 승강장으로 반출하는 작업 효율을 향상시킬 수 있는 엘리베이터 균형추 반출입 방법을 제공하는 것이다. The present invention is to provide a method for carrying in and out an elevator counterweight that can improve the work efficiency of taking an existing counterweight from a hoistway into a platform.

본 발명에 관한 엘리베이터 균형추 반출입 방법은, 승강로의 피트(pit) 내에 승강장에 서로 이웃하는 발판을 설치하는 발판 설치 공정과, 상기 승강로에 대해서 고정된 고정 부재에 지지된 양중(揚重) 장치를 이용하여 균형추를 지지하는 균형추 지지 공정과, 상기 발판 설치 공정 및 상기 균형추 지지 공정 후, 상기 발판에 설치된 제1 대차(台車)에 상기 균형추의 하단부인 제1 단부를 얹은 상태에서, 상기 양중 장치의 구동에 의해서 상기 균형추를 강하(降下)시키면서, 상기 제1 대차를 상기 승강장을 향해 이동시키고, 상기 균형추의 위치를 기립 위치로부터 경도(傾倒) 위치로 변위시키는 균형추 강하 공정과, 상기 균형추 강하 공정 후, 상기 경도 위치에 있는 상기 균형추에서의 상기 제1 단부 보다도 상기 승강장의 안쪽 방향에 대해 상기 승강장으로부터 떨어진 단부인 제2 단부를 제2 대차에 지지시키고, 상기 제1 대차 및 상기 제2 대차를 상기 승강장으로 이동시키는 것에 의해서 상기 균형추를 상기 승강로로부터 상기 승강장으로 반출하는 균형추 반출 공정을 구비하고 있다. The elevator balance weight carrying-in and out method according to the present invention uses a footrest installation process in which feet adjacent to each other are installed in a platform in a pit of a hoistway, and a lifting device supported by a fixed member fixed to the hoistway. The balance weight supporting process for supporting the balance weight, and after the step of installing the scaffold and the balance weight support process, driving the lifting device in a state where the lower end of the balance weight is placed on the first bogie installed on the scaffold. By lowering (降下) the balance weight by, by moving the first bogie toward the platform, the balance weight dropping process for displacing the position of the balance weight from the standing position to the longitudinal (傾倒) position, and after the balance weight dropping process, The second bogie is supported by the second bogie, which is an end away from the bogie with respect to the inside direction of the hoisting platform relative to the first end at the balance weight at the longitudinal position, and the first bogie and the second bogie are supported by the bogie. It is provided with a balance weight taking-out process for moving the balance weight from the hoistway to the platform by moving to.

본 발명에 관한 엘리베이터 균형추 반출입 방법에 의하면, 피트 내에 설치된 발판에 제1 대차를 설치하고, 제1 대차에 균형추를 얹어, 균형추를 승강로로부터 승강장으로 반출하므로, 기설의 균형추를 승강로로부터 승강장으로 반출하는 작업 효율을 향상시킬 수 있다. According to the elevator balance weight carrying-in and out method according to the present invention, the first balance is installed on the scaffold installed in the pit, the balance weight is placed on the first balance, and the balance weight is taken out from the hoistway to the platform, so the existing balance weight is taken out from the hoistway to the platform. Work efficiency can be improved.

도 1은 본 발명의 실시 형태 1에 관한 엘리베이터 균형추 반출입 장치를 나타내는 정면도이다.
도 2는 도 1의 엘리베이터 균형추 반출입 장치를 나타내는 측면도이다.
도 3은 도 1의 대차 유닛을 이용하여 균형추를 승강로로부터 승강장으로 반출한 상태를 나타내는 측면도이다.
도 4는 도 3의 제1 대차를 나타내는 정면도이다.
도 5는 도 4의 제1 대차를 나타내는 측면도이다.
도 6은 도 4의 제1 대차를 나타내는 평면도이다.
도 7은 도 3의 제2 대차를 나타내는 정면도이다.
도 8은 도 7의 제2 대차를 나타내는 측면도이다.
도 9는 도 7의 제2 대차를 나타내는 평면도이다.
도 10은 도 1의 제1 대차를 승강장을 향해 이동시킨 상태를 나타내는 측면도이다.
도 11은 도 10의 제1 대차를 승강장을 향해 더 이동시킨 상태를 나타내는 측면도이다.
도 12는 도 11의 발판에 제2 대차를 배치한 상태를 나타내는 측면도이다.
도 13은 도 12의 균형추로부터 서스펜딩(susepnding) 장치를 떼어낸 상태를 나타내는 측면도이다.
도 14는 본 발명의 실시 형태 2에 관한 엘리베이터 균형추 반출 장치의 제1 대차를 나타내는 정면도이다.
도 15는 도 14의 제1 대차를 나타내는 측면도이다.
도 16은 도 14의 제1 대차를 나타내는 평면도이다.
도 17은 본 발명의 실시 형태 2에 관한 엘리베이터 균형추 반출 장치의 제2 대차를 나타내는 정면도이다.
도 18은 도 17의 제2 대차를 나타내는 측면도이다.
도 19는 도 17의 제2 대차를 나타내는 평면도이다.
1 is a front view showing an elevator counterweight carrying-in and out device according to a first embodiment of the present invention.
FIG. 2 is a side view showing the balance weight carrying-in and out device of FIG. 1.
3 is a side view showing a state in which the balance weight is taken out from the hoistway to the platform using the bogie unit of FIG. 1.
4 is a front view showing the first bogie of FIG. 3.
FIG. 5 is a side view showing the first bogie of FIG. 4.
6 is a plan view showing the first bogie of FIG. 4.
7 is a front view showing the second bogie of FIG. 3.
8 is a side view showing the second truck of FIG. 7.
9 is a plan view showing the second truck of FIG. 7.
10 is a side view showing a state in which the first truck of FIG. 1 is moved toward the platform.
FIG. 11 is a side view showing a state in which the first bogie of FIG. 10 is further moved toward the platform.
12 is a side view showing a state in which the second truck is disposed on the scaffolding of FIG. 11.
FIG. 13 is a side view showing a state in which the suspension device is removed from the counterweight of FIG. 12.
It is a front view which shows the 1st bogie of the elevator balance weight carrying-out device which concerns on Embodiment 2 of this invention.
15 is a side view showing the first bogie of FIG. 14.
16 is a plan view showing the first bogie of FIG. 14.
It is a front view which shows the 2nd bogie of the elevator balance weight carrying-out device which concerns on Embodiment 2 of this invention.
18 is a side view showing the second truck of FIG. 17.
19 is a plan view showing the second truck of FIG. 17.

실시 형태 1.Embodiment 1.

도 1은 본 발명의 실시 형태 1에 관한 엘리베이터 균형추 반출입 장치를 나타내는 정면도, 도 2는 도 1의 엘리베이터 균형추 반출입 장치를 나타내는 측면도이다. 도면에서, 엘리베이터 균형추 반출입 장치는, 승강로(100)의 피트(101) 내에 설치되는 발판 장치(1)와, 승강로(100)에 대해서 고정된 균형추용 가이드 레일 장치(고정 부재)(102)에 지지되고, 균형추(103)를 매달려 내려지는 서스펜딩 장치(2)와, 균형추(103)가 얹어지는 대차(台車) 유닛(3)을 구비하고 있다. 1 is a front view showing an elevator balance weight carry-in and out device according to a first embodiment of the present invention, and FIG. 2 is a side view showing the elevator balance weight carry-in and out device of FIG. 1. In the drawing, the elevator counterweight carrying-in / out device is supported by a scaffolding device 1 installed in the pit 101 of the hoistway 100 and a guide rail device (fixing member) 102 for a counterweight fixed to the hoistway 100. It is provided with a suspension unit (2) that is suspended from the balance weight (103) and a balance unit (3) on which the balance weight (103) is placed.

발판 장치(1)는, 승강로(100)의 높이 방향으로 신축 가능한 복수의 서포트(11)와, 서포트(11)에 지지되며, 승강장(104)에 안쪽 방향으로 서로 이웃하는 발판(12)과, 서로 이웃하는 서포트(11)에 걸쳐서 걸려진 보강 부재(13)를 가지고 있다. The scaffolding device 1 includes a plurality of supports 11 expandable in the height direction of the hoistway 100 and supports 11, and the scaffold 12 adjacent to each other in the inward direction of the platform 104, It has a reinforcing member 13 hanging over the support 11 adjacent to each other.

균형추용 가이드 레일 장치(102)는, 높이 방향으로 연장하는 한 쌍의 가이드 레일(105)과, 각각의 가이드 레일(105)에 마련되며, 승강로(100)에 대해서 고정되는 복수의 레일 브라켓(106)을 가지고 있다. 각각의 레일 브라켓(106)은, 높이 방향으로 떨어져 배치되어 있다. The guide rail device 102 for the counterweight is provided with a pair of guide rails 105 extending in the height direction, and a plurality of rail brackets 106 provided on each guide rail 105 and fixed to the hoistway 100 ). Each rail bracket 106 is arrange | positioned apart in the height direction.

균형추(103)는, 높이 방향으로 연장한 균형추 프레임(107)과, 균형추 프레임(107)에 지지되는 복수의 추판(108)을 가지고 있다. 추판(108)은, 높이 방향으로 겹쳐서 배치되어 있다. The counterweight 103 has a counterweight frame 107 extending in the height direction and a plurality of weight plates 108 supported by the counterweight frame 107. The weight plate 108 is superimposed in the height direction.

균형추 프레임(107)의 상단부인 제2 단부에서의 폭방향 양단부에는, 가이드 슈(guide shoe)(도시하지 않음)가 마련되어 있다. 가이드 슈에는, 가이드 레일(105)이 삽입되는 홈(도시하지 않음)이 높이 방향으로 연장하여 형성되어 있다. 균형추 프레임(107)의 제2 단부에서의 폭방향 양단부에는, 볼트(도시하지 않음)가 삽입되는 볼트 구멍(도시하지 않음)이 형성되어 있다. 볼트를 볼트 구멍에 삽입하는 것에 의해서, 가이드 슈가 균형추 프레임(107)의 제2 단부에 고정된다. Guide shoes (not shown) are provided at both ends in the width direction at the second end, which is the upper end of the counterweight frame 107. In the guide shoe, a groove (not shown) into which the guide rail 105 is inserted is formed extending in the height direction. Bolt holes (not shown) into which bolts (not shown) are inserted are formed at both ends in the width direction at the second end of the counterweight frame 107. The guide shoe is fixed to the second end of the counterweight frame 107 by inserting the bolt into the bolt hole.

균형추 프레임(107)의 하단부인 제1 단부에서의 폭방향 양단부에는, 가이드 슈(도시하지 않음)가 마련되어 있다. 가이드 슈에는, 가이드 레일(105)이 삽입되는 홈(도시하지 않음)이 높이 방향으로 연장하여 형성되어 있다. 균형추 프레임(107)의 제1 단부에서의 폭방향 양단부에는, 볼트(도시하지 않음)가 삽입되는 볼트 구멍(도시하지 않음)이 형성되어 있다. 볼트를 볼트 구멍에 삽입하는 것에 의해서, 가이드 슈가 균형추 프레임(107)의 제1 단부에 고정된다. Guide shoes (not shown) are provided at both ends in the width direction at the first end, which is the lower end of the counterweight frame 107. In the guide shoe, a groove (not shown) into which the guide rail 105 is inserted is formed extending in the height direction. Bolt holes (not shown) into which bolts (not shown) are inserted are formed at both ends in the width direction at the first end of the counterweight frame 107. The guide shoe is fixed to the first end of the counterweight frame 107 by inserting the bolt into the bolt hole.

서스펜딩 장치(2)는, 한 쌍의 가이드 레일(105)의 사이에 걸쳐 걸려지는 와이어(21)와, 와이어(21)에 지지되는 체인 블록(양중(揚重) 장치)(22)과, 체인 블록(22)과 균형추 프레임(107)을 연결하는 와이어(23)를 가지고 있다. 또, 도 2에서는, 와이어(21), 체인 블록(22) 및 와이어(23)를 생략하고 있다. The suspending device 2 includes a wire 21 hung between a pair of guide rails 105 and a chain block (double weight device) 22 supported by the wire 21. , Has a wire 23 connecting the chain block 22 and the counterweight frame 107. 2, the wire 21, the chain block 22, and the wire 23 are omitted.

체인 블록(22)은, 상단부에 마련되며 와이어(21)에 걸려지는 후크부(221)를 가지고 있다. 후크부(221)가 와이어(21)에 걸려지는 것에 의해서, 체인 블록(22)은, 와이어(21)에 지지된다. 또, 체인 블록(22)은, 하단부에 마련되며 와이어(23)가 걸려지는 후크부(222)를 가지고 있다. 와이어(23)가 후크부(222)에 걸려지는 것에 의해서, 와이어(23)가 체인 블록(22)에 지지된다. 후크부(222)는, 체인 블록(22)이 구동하는 것에 의해서, 상하 방향으로 이동한다. 후크부(222)가 상하 방향으로 이동하는 것에 의해서, 와이어(23)가 상하 방향으로 이동한다. The chain block 22 is provided at the upper end portion and has a hook portion 221 hooked on the wire 21. The chain block 22 is supported by the wire 21 by the hook part 221 being hooked to the wire 21. In addition, the chain block 22 is provided at the lower end portion and has a hook portion 222 through which the wire 23 is hung. The wire 23 is supported by the chain block 22 by the wire 23 being hooked to the hook portion 222. The hook portion 222 moves in the vertical direction by the chain block 22 being driven. As the hook portion 222 moves in the vertical direction, the wire 23 moves in the vertical direction.

도 3은 도 1의 대차 유닛(3)을 이용하여 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출한 상태를 나타내는 측면도이다. 대차 유닛(3)은, 균형추(103)의 제1 단부를 지지하는 제1 대차(31A)와, 균형추(103)의 제2 단부를 지지하는 제2 대차(32A)를 가지고 있다. 3 is a side view showing a state in which the balance weight 103 is taken out of the hoistway 100 from the hoistway 100 to the platform 104 using the bogie unit 3 of FIG. 1. The bogie unit 3 has a first bogie 31A that supports the first end of the counterweight 103 and a second bogie 32A that supports the second end of the counterweight 103.

도 4는 도 3의 제1 대차(31A)를 나타내는 정면도, 도 5는 도 4의 제1 대차(31A)를 나타내는 측면도, 도 6은 도 4의 제1 대차(31A)를 나타내는 평면도이다. 제1 대차(31A)는, 복수의 롤러를 포함하는 대차 본체부(311)와, 대차 본체부(311)에 지지되는 한 쌍의 지지부(312)와, 균형추(103)의 폭방향으로 연장하여 지지부(312)에 지지되는 회동축(313)과, 회동축(313)을 중심으로 회동 가능하게 지지부(312)에 지지되고, 균형추(103)의 제1 단부를 받는 제1 단부용 받이부(314)를 가지고 있다. 4 is a front view showing the first bogie 31A in FIG. 3, FIG. 5 is a side view showing the first bogie 31A in FIG. 4, and FIG. 6 is a plan view showing the first bogie 31A in FIG. The first bogie 31A extends in the width direction of the bogie body portion 311 including a plurality of rollers, a pair of support portions 312 supported by the bogie body portion 311, and the counterweight 103 Rotation shaft 313 supported by the support portion 312 and a support portion for a first end supported by the support portion 312 so as to be rotatable around the rotation shaft 313 and receiving the first end of the counterweight 103 ( 314).

각각의 지지부(312)는, 볼트를 이용하여 대차 본체부(311)에 고정되어 있다. Each support part 312 is fixed to the bogie body part 311 using a bolt.

제1 단부용 받이부(314)는, 균형추(103)의 제1 단부의 폭방향 외측에 배치되는 한 쌍의 측벽부(315)와, 균형추(103)의 제1 단부의 하면에 대향하는 하벽부(316)를 가지고 있다. 하벽부(316)에는, 제1 단부에 가이드 슈를 장착하기 위한 볼트가 삽입되는 한 쌍의 긴 구멍(구멍)(317)이 형성되어 있다. 볼트를 긴 구멍(317)에 삽입하는 것에 의해서, 균형추 프레임(107)의 제1 단부가 지지부(312)에 고정된다. The first end receiving portion 314 includes a pair of side wall portions 315 disposed on the outer side in the width direction of the first end of the counterweight 103, and a lower wall facing the lower surface of the first end of the counterweight 103 It has a wealth 316. In the lower wall portion 316, a pair of long holes (holes) 317 into which bolts for mounting the guide shoe are inserted at the first end is formed. By inserting the bolt into the long hole 317, the first end of the counterweight frame 107 is fixed to the support portion 312.

도 7은 도 3의 제2 대차(32A)를 나타내는 정면도, 도 8은 도 7의 제2 대차(32A)를 나타내는 측면도, 도 9는 도 7의 제2 대차(32A)를 나타내는 평면도이다. 제2 대차(32A)는, 복수의 롤러를 포함하는 대차 본체부(321)와, 대차 본체부(321)에 지지되는 한 쌍의 제2 단부용 받이부(322)를 가지고 있다. 7 is a front view showing the second bogie 32A of FIG. 3, FIG. 8 is a side view showing the second bogie 32A of FIG. 7, and FIG. 9 is a plan view showing the second bogie 32A of FIG. The second bogie 32A has a bogie body portion 321 including a plurality of rollers, and a pair of second end receiving portions 322 supported by the bogie body portion 321.

제2 단부용 받이부(322)는, 볼트를 이용하여 대차 본체부(321)에 고정되어 있다. 제2 단부용 받이부(322)는, 균형추(103)의 제2 단부의 폭방향 외측에 배치되는 한 쌍의 측벽부(323)와, 측벽부(323)에 일체로 형성되며, 균형추(103)의 제2 단부의 상면에 대향하는 한 쌍의 상벽부(324)를 가지고 있다. 각각의 상벽부(324)에는, 제2 단부에 가이드 슈를 장착하기 위한 볼트가 삽입되는 긴 구멍(구멍)(325)이 형성되어 있다. 볼트를 긴 구멍(325)에 삽입하는 것에 의해서, 균형추 프레임(107)의 제2 단부가 제2 단부용 받이부(322)에 고정된다. The second end receiving portion 322 is fixed to the bogie main body portion 321 using a bolt. The second end receiving portion 322 is integrally formed with the pair of side wall portions 323 and the side wall portions 323 disposed outside the width direction of the second end of the counter weight 103, and the balance weight 103 ) Has a pair of upper wall portions 324 facing the upper surface of the second end. Each upper wall portion 324 is formed with a long hole (hole) 325 into which a bolt for mounting the guide shoe is inserted at the second end. By inserting the bolt into the long hole 325, the second end of the counterweight frame 107 is fixed to the receiving portion 322 for the second end.

다음으로, 엘리베이터 균형추 반출입 장치를 이용한 엘리베이터 균형추 반출입 방법에 대해 설명한다. 먼저, 도 1에 나타내는 바와 같이, 균형추(103)가 최하층의 승강장(104) 보다도 소정 거리만큼 높은 위치에 배치되도록, 엘리베이터 칸(도시하지 않음)을 승강로(100)의 상부에 배치시키고, 고정 장치(도시하지 않음)를 이용하여 엘리베이터 칸을 엘리베이터 칸용 가이드 레일 장치(도시하지 않음)에 대해서 고정한다. 엘리베이터 칸용 가이드 레일 장치는, 승강로(100)의 벽에 고정되어 있다. Next, a method for carrying in and out of an elevator counterweight using an elevator counterweight import and export device will be described. First, as shown in FIG. 1, the car (not shown) is placed on the upper part of the hoistway 100 so that the counterweight 103 is disposed at a position higher than the lowermost platform 104 by a predetermined distance, and the fixing device Fix the car with a guide rail device (not shown) for the car using (not shown). The guide rail device for a car is fixed to the wall of the hoistway 100.

그 후, 승강로(100)의 피트(101) 내에 승강장(104)에 서로 이웃하도록 발판(12)을 설치한다(발판 설치 공정).Thereafter, the footrests 12 are installed in the feet 101 of the hoistway 100 so as to be adjacent to the landing stations 104 (footrest installation process).

그 후, 가이드 레일(105)에 체인 블록(22)을 지지시키고, 이 체인 블록(22)을 이용하여 균형추(103)를 지지하며(균형추 지지 공정), 체인 블록(22)을 구동시켜 균형추(103)를 약간 들어 올린다. 이 때, 균형추 프레임(107)으로부터 추판(108)을 떼어내어도 괜찮다. Thereafter, the chain block 22 is supported on the guide rail 105, the balance weight 103 is supported using the chain block 22 (balance weight support process), and the chain block 22 is driven to drive the balance weight ( 103) slightly lifted. At this time, the weight plate 108 may be removed from the balance weight frame 107.

그 후, 엘리베이터 칸과 균형추(103)에 접속된 로프를 엘리베이터 칸 및 균형추(103)로부터 떼어내고, 균형추(103)에서의 제1 단부에 장착되어 있는 가이드 슈를 떼어내며, 도 1에 나타내는 바와 같이, 발판(12)에 설치된 제1 대차(31A)에 균형추(103)의 제1 단부를 얹고, 가이드 슈를 균형추(103)의 제1 단부에 고정하기 위해서 이용되는 볼트 및 너트를 이용하여, 균형추(103)를 제1 대차(31A)의 제1 단부용 받이부(314)에 고정한다. 이 때, 볼트는, 제1 단부용 받이부(314)의 긴 구멍(317)에 삽입된다. Then, the rope connected to the car and the counterweight 103 is removed from the car and the counterweight 103, the guide shoe attached to the first end of the counterweight 103 is removed, as shown in FIG. Similarly, the first end of the counterweight 103 is placed on the first bogie 31A installed on the footrest 12, and bolts and nuts used to fix the guide shoe to the first end of the counterweight 103 are used, The counterweight 103 is fixed to the receiving portion 314 for the first end of the first truck 31A. At this time, the bolt is inserted into the long hole 317 of the first end receiving portion 314.

도 10은 도 1의 제1 대차(31A)를 승강장(104)을 향해 이동시킨 상태를 나타내는 측면도이다. 그 후, 균형추(103)에서의 제2 단부에 장착되어 있는 가이드 슈를 떼어내고, 균형추(103)의 제1 단부를 제1 대차(31A)에 얹은 상태에서, 체인 블록(22)의 구동에 의해서 균형추(103)를 강하시키면서, 제1 대차(31A)를 승강장(104)을 향해 이동시키고, 균형추(103)의 위치를 기립 위치로부터 경도(傾倒) 위치로 변위시킨다(균형추 강하 공정). 여기서, 기립 위치는, 균형추(103)가 높이 방향으로 연장하여 배치되어 있는 경우의 균형추(103)의 위치이며, 경도 위치는, 승강장 출입구의 높이 방향의 치수 보다도 균형추(103)의 높이 방향의 치수가 작게 되도록 균형추(103)의 길이 방향이 높이 방향에 대해서 교차하는 방향으로 연장하는 경우의 균형추(103)의 위치이고, 균형추(103)가 승강로(100)로부터 승강장(104)으로 반출될 때의 균형추(103)의 위치이다. 이 예에서는, 경도 위치는, 균형추(103)가 수평 방향으로 연장하여 배치된 경우의 균형추(103)의 위치이다. FIG. 10 is a side view showing a state in which the first truck 31A of FIG. 1 is moved toward the platform 104. Thereafter, the guide shoe attached to the second end of the counterweight 103 is removed, and the first end of the counterweight 103 is placed on the first bogie 31A, and the chain block 22 is driven. As the balance weight 103 is lowered, the first bogie 31A is moved toward the platform 104, and the position of the balance weight 103 is displaced from the standing position to the longitudinal position (balance weight reduction process). Here, the standing position is the position of the counterweight 103 when the counterweight 103 is extended and arranged in the height direction, and the longitudinal position is the dimension of the counterweight 103 in the height direction rather than the height direction of the platform doorway. It is the position of the counterweight 103 when the longitudinal direction of the counterweight 103 extends in a direction intersecting with respect to the height direction so as to be small, and when the counterweight 103 is taken out from the hoistway 100 to the platform 104 It is the position of the counterweight 103. In this example, the longitudinal position is the position of the counterweight 103 when the counterweight 103 extends in the horizontal direction.

도 11은 도 10의 제1 대차(31A)를 승강장을 향해 더 이동시킨 상태를 나타내는 측면도이다. 균형추(103)의 위치가 기립 위치로부터 경도 위치로 변위함에 따라, 제1 대차(31A)의 제1 단부용 받이부(314)가 대차 본체부(311)에 대해서 회동축(313)을 중심으로 회동한다. FIG. 11 is a side view showing a state in which the first truck 31A of FIG. 10 is further moved toward the platform. As the position of the counterweight 103 is displaced from the standing position to the longitudinal position, the receiving portion 314 for the first end of the first bogie 31A is centered around the pivot shaft 313 with respect to the bogie body portion 311. Rotate.

도 12는 도 11의 발판(12)에 제2 대차(32A)를 배치한 상태를 나타내는 측면도이다. 그 후, 균형추(103)의 위치가 경도 위치가 되면, 제2 대차(32A)를 발판(12)에 얹고, 제2 대차(32A)에 균형추(103)의 제2 단부를 얹으며, 가이드 슈를 균형추(103)의 제2 단부에 고정하기 위해서 이용되는 볼트 및 너트를 이용하여, 균형추(103)를 제2 대차(32A)의 제2 단부용 받이부(322)에 고정한다. 이 때, 볼트는, 제2 단부용 받이부(322)의 긴 구멍(325)에 삽입된다. FIG. 12 is a side view showing a state in which the second cart 32A is disposed on the footrest 12 of FIG. 11. Then, when the position of the counterweight 103 becomes a longitudinal position, the second bogie 32A is placed on the footrest 12, the second bogie 32A is placed on the second end of the counterweight 103, and the guide shoe The balance weight 103 is fixed to the receiving portion 322 for the second end of the second bogie 32A by using bolts and nuts used to fix the balance weight to the second end of the balance weight 103. At this time, the bolt is inserted into the long hole 325 of the receiving portion 322 for the second end.

도 13은 도 12의 균형추(103)로부터 서스펜딩 장치(2)를 떼어낸 상태를 나타내는 측면도이다. 그 후, 제1 대차(31A) 및 제2 대차(32A)를 승강장(104)으로 이동시키는 것에 의해서 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출한다(균형추 반출 공정). 이상에 의해, 승강로(100)로부터 승강장(104)으로의 균형추(103)의 반출이 종료한다. 승강장(104)으로부터 승강로(100)으로의 신규의 균형추(103)의 반입은, 기설의 균형추(103)의 반출의 반대의 순서가 된다. 13 is a side view showing a state in which the suspension device 2 is removed from the counterweight 103 of FIG. 12. Thereafter, the counterweight 103 is taken out of the hoistway 100 from the hoistway 100 to the platform 104 by moving the first bogie 31A and the second bogie 32A to the platform 104 (balanced weight taking-out process). As described above, the carrying out of the counterweight 103 from the hoistway 100 to the hoistway 104 ends. The bringing in of the new counterweight 103 from the platform 104 to the hoistway 100 is in the reverse order of carrying out the existing counterweight 103.

이상 설명한 바와 같이, 본 발명의 실시 형태 1에 관한 엘리베이터 균형추 반출입 방법에 의하면, 승강로(100)의 피트(101) 내에 승강장(104)에 서로 이웃하는 발판(12)을 설치하는 발판 설치 공정과, 승강로(100)에 대해서 고정된 균형추용 가이드 레일 장치(102)에 지지된 체인 블록(22)을 이용하여 균형추(103)를 지지하는 균형추 지지 공정과, 발판 설치 공정 및 균형추 지지 공정 후, 발판(12)에 설치된 제1 대차(31A)에 균형추(103)의 제1 단부를 얹은 상태에서, 체인 블록(22)의 구동에 의해서 균형추(103)를 강하시키면서, 제1 대차(31A)를 승강장(104)을 향해 이동시키고, 균형추(103)의 위치를 기립 위치로부터 경도 위치로 변위시키는 균형추 강하 공정과, 균형추 강하 공정 후, 제1 대차(31A)를 승강장(104)으로 이동시키는 것에 의해서 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출하는 균형추 반출 공정을 구비하고 있으므로, 기설의 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출하는 작업 효율을 향상시킬 수 있다. As described above, according to the elevator balance weight carrying-in and out method according to the first embodiment of the present invention, a footrest installation step of installing adjacent footrests 12 to the landing platform 104 in the feet 101 of the hoistway 100, The balance weight support process for supporting the balance weight 103 using the chain block 22 supported on the guide rail device 102 for the balance weight fixed to the hoistway 100, and after the step installation process and the balance weight support process, the scaffolding ( In the state where the first end of the counterweight 103 is placed on the first cart 31A installed on 12), the first cart 31A is lifted up and down while the counterweight 103 is lowered by driving the chain block 22. Balance weight by moving toward the platform 104, and moving the first balance (31A) to the platform 104 after the balance weight lowering process to move the position of the balance weight 103 from the standing position to the longitudinal position, and the balance weight lowering process ( Since the 103 is provided with a balance weight taking-out process for taking out the hoistway 100 from the hoistway 100, it is possible to improve the work efficiency of taking out the existing counterweight 103 from the hoistway 100 to the hoistway 104.

또, 균형추 강하 공정에서는, 균형추(103)의 위치가 기립 위치로부터 경도 위치로 변화하는 것에 따라 회동축(313)을 중심으로 제1 단부용 받이부(314)를 회동시키므로, 균형추(103)를 제1 단부용 받이부(314)에 얹은 상태를 유지하면서, 균형추(103)의 위치를 기립 위치로부터 경도 위치로 용이하게 변화시킬 수 있다. In the counterweight lowering step, the counterweight 103 is rotated by rotating the first end receiving portion 314 around the pivot shaft 313 as the position of the counterweight 103 changes from the standing position to the longitudinal position. The position of the counterweight 103 can be easily changed from the standing position to the longitudinal position while maintaining the state placed on the first end receiving portion 314.

또, 균형추 강하 공정에서는, 볼트를 긴 구멍(317)에 삽입하고, 볼트에 너트를 장착하는 것에 의해서, 균형추(103)의 제1 단부와 제1 단부용 받이부(314)를 고정하므로, 기설의 볼트 및 너트를 이용하여, 균형추(103)와 제1 단부용 받이부(314)를 확실히 고정할 수 있다. In the counterweight lowering step, the first end of the counterweight 103 and the receiving portion 314 for the first end are fixed by inserting the bolt into the long hole 317 and attaching the nut to the bolt. Using the bolts and nuts of the balance weight 103 and the receiving portion 314 for the first end can be securely fixed.

또, 균형추 강하 공정에서는, 균형추(103)의 제2 단부를 제2 대차(32A)에 지지시키고, 균형추 반출 공정에서는, 제1 대차(31A) 및 제2 대차(32A)를 승강장(104)으로 이동시키는 것에 의해서 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출하므로, 안정적으로, 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출할 수 있다. In the counterweight dropping step, the second end of the counterweight 103 is supported by the second cart 32A, and in the counterweight carrying out process, the first cart 31A and the second cart 32A are brought to the platform 104. By moving the balance weight 103 from the hoistway 100 to the platform 104, the balance weight 103 can be stably taken out from the hoistway 100 to the platform 104.

또, 균형추 강하 공정에서는, 볼트를 긴 구멍(325)에 삽입하고, 볼트에 너트를 장착하는 것에 의해서, 균형추(103)의 제2 단부와 제2 단부용 받이부(322)를 고정하므로, 기설의 볼트 및 너트를 이용하여, 균형추(103)와 제2 단부용 받이부(322)를 확실히 고정할 수 있다. In the counterweight lowering step, the second end portion and the second end receiving portion 322 of the counterweight 103 are fixed by inserting a bolt into the long hole 325 and attaching a nut to the bolt. By using the bolts and nuts of the balance weight 103 and the receiving portion 322 for the second end can be securely fixed.

실시 형태 2.Embodiment 2.

도 14는 본 발명의 실시 형태 2에 관한 엘리베이터 균형추 반출 장치의 제1 대차(31B)를 나타내는 정면도, 도 15는 도 14의 제1 대차(31B)를 나타내는 측면도, 도 16은 도 14의 제1 대차(31B)를 나타내는 평면도이다. 제1 대차(31B)는, 복수의 롤러를 포함하는 대차 본체부(311)와, 대차 본체부(311)의 상부에 마련된 베어링(318)과, 대차 본체부(311)로부터 높이 방향으로 연장하여 마련되며, 베어링(318)을 매개로 하여 대차 본체부(311)에 대해서 회동 가능한 회동축(319)과, 회동축(319)에 지지되고, 회동축(319)을 중심으로 회동하는 지지부(312)와, 균형추(103)의 폭방향으로 연장하여 지지부(312)에 지지되는 회동축(313)과, 회동축(313)을 중심으로 회동 가능하게 지지부(312)에 지지되고, 균형추(103)의 제1 단부를 받는 제1 단부용 받이부(314)를 가지고 있다. 14 is a front view showing a first bogie 31B of an elevator balance weight taking-out device according to a second embodiment of the present invention, FIG. 15 is a side view showing a first bogie 31B in FIG. 14, and FIG. It is a top view showing one truck 31B. The first bogie 31B extends in a height direction from the bogie body portion 311 including a plurality of rollers, a bearing 318 provided on an upper portion of the bogie body portion 311, and a bogie body portion 311. It is provided, and supported by a rotating shaft 319 rotatable with respect to the bogie body part 311 via a bearing 318, and a rotating shaft 319, and a supporting portion 312 that rotates around the rotating shaft 319 ), And the pivot shaft 313 extending in the width direction of the counterweight 103 and supported by the support portion 312, and supported by the support portion 312 so as to be pivotable around the pivot shaft 313, and the counterweight 103 It has a receiving portion 314 for the first end receiving the first end of the.

도 17은 본 발명의 실시 형태 2에 관한 엘리베이터 균형추 반출 장치의 제2 대차(32B)를 나타내는 정면도, 도 18은 도 17의 제2 대차(32B)를 나타내는 측면도, 도 19는 도 17의 제2 대차(32B)를 나타내는 평면도이다. 제2 대차(32B)는, 복수의 롤러를 포함하는 대차 본체부(321)와, 대차 본체부(321)의 상부에 마련된 베어링(326)과, 대차 본체부(321)로부터 높이 방향으로 연장하여 마련되며, 베어링(326)을 매개로 하여 대차 본체부(321)에 대해서 회동 가능한 회동축(327)과, 회동축(327)에 지지되고, 회동축(327)을 중심으로 회동하는 제2 단부용 받이부(322)를 가지고 있다. 그 외의 구성은, 실시 형태 1과 동일하다. Fig. 17 is a front view showing the second bogie 32B of the elevator counterweight carrying out device according to the second embodiment of the present invention, Fig. 18 is a side view showing the second bogie 32B of Fig. 17, and Fig. 19 is a view of Fig. 17 It is the top view which shows two bogies 32B. The second bogie 32B extends in a height direction from the bogie body portion 321 including a plurality of rollers, a bearing 326 provided on an upper portion of the bogie body portion 321, and a bogie body portion 321. It is provided, and the second stage which is supported by the rotating shaft 327 and the rotating shaft 327 which is rotatable with respect to the bogie body part 321 via the bearing 326, and rotates around the rotating shaft 327 It has a bouillon receiving portion (322). Other configurations are the same as in the first embodiment.

다음으로, 엘리베이터 균형추 반출입 장치를 이용한 엘리베이터 균형추 반출입 방법에 대해 설명한다. 균형추 지지 공정 후, 균형추(103)를 제1 대차(31B)의 제1 단부용 받이부(314)에 고정하고, 균형추(103)에서의 제2 단부에 장착되어 있는 일방의 가이드 슈를 떼어낸다. 이 상태에서, 균형추(103)를 폭방향으로 흔들거나, 회동축(319)을 중심으로 균형추(103)를 회동시키거나 하는 것에 의해서, 균형추(103)에서의 제2 단부에 장착되어 있는 타방의 가이드 슈와 가이드 레일(105)과의 맞물림을 해제한다(가이드 슈 맞물림 해제 공정). 그 외의 엘리베이터 균형추 반출입 방법은, 실시 형태 1과 동일하다. Next, a method for carrying in and out of an elevator counterweight using an elevator counterweight import and export device will be described. After the counterweight support process, the counterweight 103 is fixed to the first end receiving portion 314 of the first truck 31B, and one guide shoe attached to the second end of the counterweight 103 is removed. . In this state, the counterweight 103 is shaken in the width direction, or the counterweight 103 is rotated around the pivot shaft 319, so that the other end attached to the second end of the counterweight 103 is The guide shoe and the guide rail 105 are disengaged (guide shoe disengagement process). The other methods of bringing in and out the balance weight of an elevator are the same as those in the first embodiment.

이상 설명한 바와 같이, 본 발명의 실시 형태 2에 관한 엘리베이터 균형추 반출입 방법에 의하면, 균형추 지지 공정 후, 균형추(103)에서의 제2 단부에 장착되어 있는 타방의 가이드 슈와 가이드 레일(105)과의 맞물림을 해제하는 가이드 슈 맞물림 해제 공정)을 구비하고 있으므로, 타방의 가이드 슈를 균형추(103)의 제2 단부에 장착한 상태에서, 균형추 강하 공정을 행할 수 있다. As described above, according to the method for carrying in and out of the elevator counterweight according to the second embodiment of the present invention, after the counterweight support step, the other guide shoe and the guide rail 105 attached to the second end of the counterweight 103 Since it is equipped with a guide shoe disengagement process (which releases the engagement), the counterweight drop process can be performed while the other guide shoe is attached to the second end of the counterweight 103.

또, 각 상기 실시 형태에서는, 기립 위치에 있는 균형추(103)의 하부로까지 발판(12)이 연장한 구성에 대해 설명했지만, 기립 위치에 있는 균형추(103)의 하부로까지 발판(12)이 연장하고 있지 않은 구성이라도 좋다. 이 경우, 제1 대차에 균형추(103)의 제1 단부를 얹을 때에, 균형추(103)의 제1 단부를 승강장(104) 측으로 이동시킨다. In addition, in each of the above-described embodiments, the configuration in which the scaffold 12 extends to the lower portion of the counterweight 103 in the standing position has been described, but the scaffold 12 extends to the lower portion of the counterweight 103 in the standing position. It may be a configuration that is not extended. In this case, when the first end of the counterweight 103 is placed on the first bogie, the first end of the counterweight 103 is moved to the platform 104 side.

또, 각 상기 실시 형태에서는, 제1 대차 및 제2 대차를 이용하여 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출입하는 엘리베이터 균형추 반출입 방법에 대해 설명했지만, 제2 대차를 이용하지 않고, 제1 대차를 이용하여 균형추(103)를 승강로(100)로부터 승강장(104)으로 반출입하는 엘리베이터 균형추 반출입 방법이라도 좋다. In addition, in each of the above-described embodiments, a method for carrying in and out of an elevator balance weight using the first and second bogies to transfer the balance weight 103 from the hoistway 100 into the platform 104 is described, but the second bogie is not used. Alternatively, the balance weight 103 may be carried out by using the first bogie to move the balance weight 103 from the hoistway 100 into the platform 104.

또, 각 상기 실시 형태에서는, 양중 장치로서, 체인 블록(22)을 예로 설명했지만, 체인 블록(22)에 한정하지 않고, 예를 들면, 호이스트(hoist)라도 좋다. In addition, in each of the above-described embodiments, the chain block 22 has been described as an example as a dual device, but is not limited to the chain block 22, and may be, for example, a hoist.

1 : 발판 장치 2 : 서스펜딩 장치
3 : 대차 유닛 11 : 서포트
12 : 발판 13 : 보강 부재
21 : 와이어 22 : 체인 블록(양중 장치)
23 : 와이어 31A, 31B : 제1 대차
32A, 32B : 제2 대차 100 : 승강로
101 : 피트
102 : 균형추용 가이드 레일 장치(고정 부재)
103 : 균형추 104 : 승강장
105 : 가이드 레일 106 : 레일 브라켓
107 : 균형추 프레임 108 : 추판
221 : 후크부 222 : 후크부
311 : 대차 본체부 312 : 지지부
313 : 회동축 314 : 제1 단부용 받이부
315 : 측벽부 316 : 하벽부
317 : 긴 구멍(구멍) 318 : 베어링
319 : 회동축 321 : 대차 본체부
322 : 제2 단부용 받이부 323 : 측벽부
324 : 상벽부 325 : 긴 구멍(구멍)
326 : 베어링 327 : 회동축
1: Scaffolding device 2: Suspending device
3: Bogie unit 11: Support
12: footrest 13: reinforcement member
21: wire 22: chain block (dual device)
23: wire 31A, 31B: first bogie
32A, 32B: Second bogie 100: hoistway
101: feet
102: guide rail device for balance weight (fixed member)
103: counterweight 104: platform
105: guide rail 106: rail bracket
107: counterweight frame 108: weight plate
221: hook portion 222: hook portion
311: bogie body portion 312: support portion
313: pivot shaft 314: first end receiving portion
315: side wall portion 316: lower wall portion
317: long hole (hole) 318: bearing
319: rotating shaft 321: bogie body portion
322: second end receiving portion 323: side wall portion
324: upper wall portion 325: long hole (hole)
326: bearing 327: rotating shaft

Claims (5)

승강로의 피트(pit) 내에 승강장에 서로 이웃하는 발판을 설치하는 발판 설치 공정과,
상기 승강로에 대해서 고정된 고정 부재에 지지된 양중(揚重) 장치를 이용하여 균형추를 지지하는 균형추 지지 공정과,
상기 발판 설치 공정 및 상기 균형추 지지 공정 후, 상기 발판에 설치된 제1 대차(台車)에 상기 균형추의 하단부인 제1 단부를 얹은 상태에서, 상기 양중 장치의 구동에 의해서 상기 균형추를 강하(降下)시키면서, 상기 제1 대차를 상기 승강장을 향해 이동시키고, 상기 균형추의 위치를 기립 위치로부터 경도(傾倒) 위치로 변위시키는 균형추 강하 공정과,
상기 균형추 강하 공정 후, 상기 경도 위치에 있는 상기 균형추에서의 상기 제1 단부 보다도 상기 승강장의 안쪽 방향에 대해 상기 승강장으로부터 떨어진 단부인 제2 단부를 제2 대차에 지지시키고, 상기 제1 대차 및 상기 제2 대차를 상기 승강장으로 이동시키는 것에 의해서 상기 균형추를 상기 승강로로부터 상기 승강장으로 반출하는 균형추 반출 공정을 구비한 것을 특징으로 하는 엘리베이터 균형추 반출입 방법.
A footrest installation process in which feet adjacent to each other are installed on a platform within a pit of a hoistway;
A balance weight support process for supporting a balance weight by using a double weight device supported on a fixed member fixed to the hoistway;
After the step of installing the scaffold and the step of supporting the counterweight, while dropping the counterweight by driving of the lifting device, the first end, which is the lower end of the counterweight, is placed on the first bogie installed on the scaffold. , A balance weight drop process for moving the first bogie toward the platform and displacing the position of the balance weight from a standing position to a hardness position,
After the balance weight dropping process, a second end, which is an end away from the platform with respect to the inside direction of the platform relative to the first end in the balance weight at the longitudinal position, is supported by the second cart, and the first cart and the And a balance weight taking-out process for moving the balance weight from the hoistway to the platform by moving a second bogie to the platform.
청구항 1에 있어서,
상기 제1 대차는, 복수의 롤러를 포함하는 대차 본체부와, 상기 대차 본체부에 지지되는 지지부와, 상기 균형추의 폭방향으로 연장한 회동축을 중심으로 회동 가능하게 상기 지지부에 지지되고, 상기 균형추의 상기 제1 단부를 받는 제1 단부용 받이부를 가지고 있으며,
상기 균형추 강하 공정에서는, 상기 균형추가 상기 기립 위치로부터 상기 경도 위치로 변위하는 것에 따라 상기 회동축을 중심으로 상기 제1 단부용 받이부를 회동시키는 것을 특징으로 하는 엘리베이터 균형추 반출입 방법.
The method according to claim 1,
The first bogie is supported by the bogie body portion including a plurality of rollers, a support portion supported by the bogie body portion, and the support portion so as to be rotatable about a pivot axis extending in the width direction of the counterweight, and It has a first receiving portion for receiving the first end of the counterweight,
In the balance weight dropping step, the balance weight carrying-in and out method, characterized in that, as the balance weight is displaced from the standing position to the longitudinal position, the receiving part for the first end is rotated about the rotation axis.
청구항 2에 있어서,
상기 제1 단부용 받이부에는, 상기 균형추의 상기 제1 단부와의 사이의 고정에 이용되는 볼트가 통과하는 구멍이 형성되어 있고,
상기 균형추 강하 공정에서는, 상기 볼트를 상기 구멍에 삽입하고, 상기 볼트에 너트를 장착하는 것에 의해서, 상기 균형추의 상기 제1 단부와 상기 제1 단부용 받이부를 고정하는 것을 특징으로 하는 엘리베이터 균형추 반출입 방법.
The method according to claim 2,
A hole through which a bolt used for fixing between the first end of the counterweight passes is formed in the receiving portion for the first end,
In the counterweight dropping step, the elevator counterweight carrying method is characterized in that the first end of the counterweight and the first end receiving portion for the counterweight are fixed by inserting the bolt into the hole and attaching a nut to the bolt. .
청구항 1 내지 청구항 3 중 어느 하나의 항에 있어서,
상기 제2 대차는, 복수의 롤러를 포함하는 대차 본체부와, 상기 대차 본체부에 지지되며, 상기 균형추의 상기 제2 단부를 받는 제2 단부용 받이부를 가지고 있고,
상기 제2 단부용 받이부에는, 상기 균형추의 상기 제2 단부와의 사이의 고정에 이용되는 볼트가 통과하는 구멍이 형성되어 있으며,
상기 균형추 반출 공정에서는, 상기 볼트를 상기 구멍에 삽입하고, 상기 볼트에 너트를 장착하는 것에 의해서, 상기 균형추의 상기 제2 단부와 상기 제2 단부용 받이부를 고정하는 것을 특징으로 하는 엘리베이터 균형추 반출입 방법.
The method according to any one of claims 1 to 3,
The second bogie has a bogie body portion including a plurality of rollers, a bogie portion supported by the bogie body portion, and a second end receiving portion receiving the second end of the counterweight,
A hole through which a bolt used for fixing between the second end of the counterweight passes is formed in the receiving portion for the second end,
In the balance weight taking-out step, an elevator balance weight carry-in method is characterized in that the bolt is inserted into the hole and a nut is attached to the bolt to fix the second end and the second end portion of the balance weight. .
삭제delete
KR1020160004257A 2015-01-16 2016-01-13 Method for carrying elevator counterweight KR102117142B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015006605A JP6141338B2 (en) 2015-01-16 2015-01-16 Elevator balancing weight loading / unloading method
JPJP-P-2015-006605 2015-01-16

Publications (2)

Publication Number Publication Date
KR20160088810A KR20160088810A (en) 2016-07-26
KR102117142B1 true KR102117142B1 (en) 2020-05-29

Family

ID=56437326

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160004257A KR102117142B1 (en) 2015-01-16 2016-01-13 Method for carrying elevator counterweight

Country Status (4)

Country Link
JP (1) JP6141338B2 (en)
KR (1) KR102117142B1 (en)
CN (1) CN105800417B (en)
TW (1) TWI649251B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6105097B1 (en) * 2016-01-12 2017-03-29 三菱電機ビルテクノサービス株式会社 Counterweight transport rail and counterweight transport method
JP1566776S (en) * 2016-02-23 2017-01-16
JP6409915B1 (en) * 2017-06-27 2018-10-24 三菱電機ビルテクノサービス株式会社 Adjusting weight take-out method and adjusting weight support device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004010175A (en) * 2002-06-03 2004-01-15 Mitsubishi Electric Corp Lifting device for elevator guide rail

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2774902B2 (en) * 1992-06-17 1998-07-09 三菱電機ビルテクノサービス株式会社 Elevator counterweight installation method
JPH07291550A (en) * 1994-04-28 1995-11-07 Takenaka Komuten Co Ltd Installation of elevator rail
JPH11349255A (en) 1998-06-08 1999-12-21 Hitachi Building Systems Co Ltd Counter weight of elevator and method for changing counter rail
JP2000344445A (en) * 1999-06-04 2000-12-12 Hitachi Building Systems Co Ltd Method and device for loading elevator counterweight
JP4043338B2 (en) * 2002-10-17 2008-02-06 三菱電機ビルテクノサービス株式会社 Elevator falling object collection device
JP2005008414A (en) * 2003-06-18 2005-01-13 Inventio Ag Lift installation, method for operating lift installation, and method for realizing modernizing lift installation
CN103420231B (en) * 2008-09-30 2016-03-16 日本电产三协株式会社 Card takes out of moves into device and hair fastener regenerative apparatus
JP5595788B2 (en) * 2010-05-17 2014-09-24 東芝エレベータ株式会社 How to renew an elevator
JP5902405B2 (en) * 2011-06-15 2016-04-13 日本オーチス・エレベータ株式会社 Elevator equipment
CN102372216A (en) * 2011-09-30 2012-03-14 快意电梯有限公司 Layout structure of machine-room-free sightseeing elevator
JP2014015275A (en) * 2012-07-06 2014-01-30 Hitachi Ltd Elevator device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004010175A (en) * 2002-06-03 2004-01-15 Mitsubishi Electric Corp Lifting device for elevator guide rail

Also Published As

Publication number Publication date
JP6141338B2 (en) 2017-06-07
CN105800417A (en) 2016-07-27
TW201632447A (en) 2016-09-16
TWI649251B (en) 2019-02-01
KR20160088810A (en) 2016-07-26
JP2016132514A (en) 2016-07-25
CN105800417B (en) 2019-03-15

Similar Documents

Publication Publication Date Title
EP2043938B1 (en) Elevators
FI119232B (en) A method of installing a lift hoisting rope
CN105384035A (en) Guide rail installation arrangement and method for installing guide rails
JP5951104B2 (en) Elevator repair method
KR102117142B1 (en) Method for carrying elevator counterweight
KR20160046717A (en) A machine room-less elevator refurbishing method
JP6537720B2 (en) Elevator hoist installation method
JP6113206B2 (en) Elevator balancing weight loading / unloading device
JP2009137695A (en) Elevator
TWI486300B (en) A material lift platform and its method of use.
JP5278364B2 (en) Renewal method of hydraulic elevator and rope type elevator renewed by the method
JP2015013699A (en) Sash hanger device of elevator and method for repairing same
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
CN201817243U (en) Platform and device for replacing conductor rail
JP2012201497A (en) Machine bed and lifting device
JP6605411B2 (en) Lifting bracket and hoist
JP2015157676A (en) Elevator device
JP4312590B2 (en) Lower assembly method for elevator upper equipment
JP3444816B2 (en) How to replace the main elevator cable
JP2015030559A (en) Main rope fixing device for elevator, and repair method for elevator
JP5930842B2 (en) Elevator installation method and installation jig
JP2008189410A (en) Device and method for installing elevator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant