CN206581150U - A kind of automatic lifting encloses formula hanging basket mounting platform device entirely - Google Patents

A kind of automatic lifting encloses formula hanging basket mounting platform device entirely Download PDF

Info

Publication number
CN206581150U
CN206581150U CN201720075226.7U CN201720075226U CN206581150U CN 206581150 U CN206581150 U CN 206581150U CN 201720075226 U CN201720075226 U CN 201720075226U CN 206581150 U CN206581150 U CN 206581150U
Authority
CN
China
Prior art keywords
hanging basket
mounting platform
bridge pier
automatic lifting
platform device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720075226.7U
Other languages
Chinese (zh)
Inventor
张腾辉
茅欢明
赖建昌
陈恒刚
吕晓宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Original Assignee
China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd filed Critical China Railway 24th Bureau Group Zhejiang Engineering Testing Co Ltd
Priority to CN201720075226.7U priority Critical patent/CN206581150U/en
Application granted granted Critical
Publication of CN206581150U publication Critical patent/CN206581150U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Formula hanging basket mounting platform device is enclosed entirely the utility model discloses a kind of automatic lifting, including the mounting platform coordinated with bridge pier cross section position girth, it is characterized in that being provided with elevating mechanism in pier coping portion, described elevating mechanism includes sole plate, sole plate is provided with several electric blocks, several electric blocks are distributed in the different directions of corresponding site around bridge pier, the synchronous operation of several electric blocks;Mounting platform is made up of some monomers.Formula hanging basket is enclosed along one week arrangement of bridge pier outline entirely to be made up of several monomers, factory can be achieved and makes in-site installation, power set are lifted by crane in comprehensive setting, lifting is steady, it is safe and reliable, and simple in construction, installing/dismounting convenient transfer, it is particularly in same engineering reusable in same specification bridge pier operation.

Description

A kind of automatic lifting encloses formula hanging basket mounting platform device entirely
Technical field
The utility model is related to building equipment technology, and especially a kind of automatic lifting encloses formula hanging basket mounting platform device entirely.
Background technology
It is the operation being commonly encountered in modern construction engineering that high-altitude handling, which is installed, and engineers and technicians are according to different architectural entities The handling apparatus of different structure, difference in functionality is devised, a kind of fortune brick is hung as disclosed in patent publication No. is CN105035943A Basket, including hanging basket body, hanging basket body are linked up with and a buffering are fixedly connected with suspension ring, suspension ring for hanging over provided with hook Bag, hanging basket body is located in bumping bag.A kind of rail hanging basket that and for example patent publication No. designs for CN105113779A, for many Layer building, its structure includes wall-attached supporting seat, guide rail, anti-fall device, hanging basket suspension platform and gondola-hanging mechanism;It is plurality of attached Wall bearing, which is arranged above and below, to be fixed in building structure, and guide rail is fixedly connected with wall-attached supporting seat;Hanging basket is set between adjacent rails Platform body, hanging basket platform body is slidably connected between anti-fall device and guide rail;Hanging basket suspension platform is pin-connected panel platform;It is middle Mounting bracket, which moves up hoisting mechanism, is easy to workman to pass through, and hanging basket platform is installed by middle mounting bracket can set multiple liftings to fill Put, hanging basket platform is not limited by length, construction purpose is reached by splicing multiple section length.For another example patent announcement number is A kind of CN204899183U hanging basket, including hanging basket slide rail, for the cuboid framework structure with first receiving space, by one Four chutes of shaping and two rectangular frames are constituted, and four chutes are included under two upper hopper chutes and two of opposing parallel setting Chute, the two ends of four end points of two rectangular frames respectively with four chutes connect;Hanging basket body, it is rectangular parallelepiped structure, In the first receiving space for being arranged on hanging basket slide rail, the top difference on its two first side adjacent and parallel with two upper hopper chutes Provided with least two guide wheel devices, the bottom on its two second side adjacent and parallel with two gliding grooves is respectively equipped with least three The guide wheel device of individual handstand, so that hanging basket body is fastened in four chutes, and is connected with four slides;Two hanging dresses Put, to support hanging basket slide rail to be fixed on steel support structure.The not competent bridge pier work high above the ground requirement of the above device.
The content of the invention
The purpose of this utility model is when enclosing formula ancillary works project construction entirely to solve pier coping portion pallet position, to need Will from flooring-safe conveying articles and installation personnel the problem of there is provided a kind of reasonable in design, it is easy to operate, it is practical Automatic lifting encloses formula hanging basket mounting platform device entirely.
Above-mentioned technical problem of the present utility model is mainly what is be addressed by following technical proposals:A kind of automatic lifting It is complete to enclose formula hanging basket mounting platform device, including the mounting platform coordinated with bridge pier cross section position girth, it is characterized in that in bridge pier Top is provided with elevating mechanism, and described elevating mechanism includes sole plate, and sole plate is provided with several electric blocks, some Individual electric block is distributed in the different directions of corresponding site around bridge pier, the synchronous operation of several electric blocks;Described installation Platform is made up of some monomers.The technical program is long oval structure according to general overhead bridge pier cross section(Track type)Spy Point, sets mounting platform for one week, mounting platform is using split type, typically by two straightways and two arc section groups in bridge pier Into facilitating batch production manufacture, small size transport and live quick assembling, whole mounting platform coordinates pallet position to enclose formula auxiliary entirely The construction of engineering project, by multiple electric blocks in elevating mechanism simultaneously operation, make whole mounting platform evenly above and below Operation, elevating mechanism is directly installed on pallet, convenient at the end of engineering to remove.
Preferably, described pier coping portion is pallet, elevating mechanism is arranged on pallet.
Preferably, described sole plate is parallel to each other including two and length is more than the main beam of pallet width, it is main Crossbeam two ends are respectively equipped with electric block;Tray edge is extended to from main beam middle part to pallet length direction to be externally provided with Main longitudinal grider, main longitudinal grider end is installed by electric block.Electric block driving steel wire rope operation high up in the air, it is to avoid connect with any object friction Touch.
Preferably, being provided with steel pad between described sole plate and pallet.Steel pad is generally supported on pinner, is made Whole elevating mechanism basic plane is smooth.
Preferably, described mounting platform includes hanging basket, hanging basket has safety guide rail, and hanging basket is provided with suspension ring, electricity Steel wire rope on dynamic cucurbit connects hanging basket by suspension ring.
Preferably, described hanging basket is provided with anticollision buffering body with the side that bridge pier coordinates.Although hanging basket is to arrange for one week, But occur in lifting process with bridge pier collision phenomenon, rocked so as to cause.
Preferably, described hanging basket is provided with electric hoist control switch, the side that hanging basket coordinates with bridge pier is provided with tight Bring to a halt device.Improve security when transporting operating personnel, equipment.
Preferably, provided with connection lacing wire between described two main beams being parallel to each other.
Preferably, described mounting platform is provided with some place's directive wheels towards the inner side in bridge pier direction, directive wheel position is set Flexible governor motion.Make whole hanging basket is steadily mobile to reduce vibrations using flexible adjustment mechanism.
The beneficial effects of the utility model are:Formula hanging basket is enclosed by several monomer structures entirely along one week arrangement of bridge pier outline Into, factory can be achieved and makes in-site installation, power set are lifted by crane in comprehensive setting, lifts by crane steady, it is safe and reliable, and structure letter Single, installing/dismounting convenient transfer is particularly reusable in same specification bridge pier operation in same engineering.
Brief description of the drawings
Fig. 1 is a kind of main structure diagram of the present utility model.
Fig. 2 is the utility model Fig. 1 partial enlargement structural representation.
Fig. 3 is right side structural representation of the present utility model.
Fig. 4 is the utility model Fig. 1 top view.
Fig. 5 is a kind of elevating mechanism structural representation of the present utility model.
In figure:1. cushion cap, 2. bridge piers, 3. mounting platforms, 31. hanging baskets, 32. suspension ring, 4. pallets, 5. lifts Structure, 51. electric blocks, 52. pinners, 53. steel wire ropes, 54. batten plates, 55. steel pads, 56. connection lacing wires, 57. masters are vertical Beam, 58. main beams.
Embodiment
Below by embodiment, and with reference to accompanying drawing, the technical solution of the utility model is described in further detail.
Referring to Fig. 1, a kind of automatic lifting of the present embodiment encloses formula hanging basket mounting platform device entirely, as shown in figure 1, the bottom of bridge pier 2 Portion is cushion cap 1, and the top of bridge pier 2 is pallet 4, and the cross section of bridge pier 2 is elliptical racetrack shape, installs and rises in the top pallet 4 of bridge pier 2 Descending mechanism 5, is inner side plane of reference design and installation platform 3 by the section girth of bridge pier 2, as shown in Figures 2 to 4, elevating mechanism is set Have and sole plate, set 6 electric blocks 51 on sole plate altogether, be arranged in the not Tongfang of the surrounding corresponding site of bridge pier 2 To 6 electric blocks 51 are run simultaneously.
Specifically, the sole plate of elevating mechanism is parallel to each other including two and length is more than the main horizontal stroke of the width of pallet 4 Beam 58, as shown in figure 5, setting two connection lacing wires 56 between two main beams 58;The two ends of main beam 58 be respectively mounted one it is electronic Cucurbit 51;Installation main longitudinal grider 57 outside tray edge is extended to the length direction of pallet 4 from the centre position of main beam 58, two are constituted Individual T-shaped component, two ends of main longitudinal grider 57 are respectively mounted an electric block 51.Sole plate main bearing member is by Two bors d's oeuveres 10# I-steel is made, and is connected between Two bors d's oeuveres I-steel transverse direction by the thick batten plates 54 of 1cm, at interval of 80cm mono-.Sole plate with Bulit on stilts is carried out by steel pad 55 between pallet 4.
Mounting platform 3 includes hanging basket 31, and hanging basket 31 has safety guide rail, and hanging basket is provided with suspension ring 32, electric block 51 On steel wire rope 53 connect hanging basket by suspension ring.Mounting platform 3 is combined by four parts altogether during field fabrication, i.e., straight by two Line segment and two arc section composition elliptical racetrack shapes.Mounting platform is combined by round steel welding, and main bearing member is circle Steel is processed into U-shaped component, and with the wide planar tables of 1m, suspension ring 32 are respectively provided with each U-shaped top;Justify planar table part Steel is formed by welding netted with U-shaped bar-crossing.
In addition, in order that hanging basket 31 is run more steadily, the side coordinated in hanging basket 31 and bridge pier 2 is buffered provided with anticollision Body.The controlling switch of electric block 51 can also be installed on hanging basket 31, the side that hanging basket 31 coordinates with bridge pier 2 installs emergency brake additional Device.Towards the inner side in the direction of bridge pier 2 multiple directive wheels, and the flexible regulation machine of directive wheel can also be set in mounting platform 3 Structure.
Using when, first elevating mechanism and mounting platform 3 are processed in processing factory, be transported to job site;Then with hanging Elevating mechanism is hung in the top pallet 4 of bridge pier 2 by car, is erected by steel pad 55 in the top of pinner 52, horizontal two T-shaped components Between connection lacing wire 56 use the spiral joint connection in site of Φ 25.Next the mounting platform 3 of four part splits is hung to bridge Four parts, with connection rope connection suspension ring 32, are linked to be an entirety by pier bottom.Finally, the electric block 51 at the top of bridge pier 2 is hung Hook is transferred to the bottom of bridge pier 2, and installation personnel enters in mounting platform, electric block 51 and suspension ring 32 are fully connected fixation, opened The erection & lift platform of electric block 51 is opened to formula hanging basket installed position is enclosed entirely, starts to install and encloses formula hanging basket entirely.After installation terminates, Will be below mounting platform to pier bottom by electric block 51, removing connection rope decomposes mounting platform, then with loop wheel machine by 2 tops Elevating mechanism is removed.
Above-described embodiment and schema and the new product form of the non-limiting present invention and style, any art Appropriate change or modification that those of ordinary skill is done to it, all should be regarded as not departing from patent category of the present utility model.

Claims (9)

1. a kind of automatic lifting encloses formula hanging basket mounting platform device entirely, including with bridge pier(2)The peace that cross section position girth coordinates Assembling platform(3), it is characterized in that being provided with elevating mechanism in pier coping portion(5), described elevating mechanism includes sole plate, basic bottom Seat is provided with several electric blocks(51), several electric blocks are distributed in bridge pier(2)The different directions of surrounding corresponding site, Several electric blocks are run simultaneously;Described mounting platform is made up of some monomers.
2. a kind of automatic lifting according to claim 1 encloses formula hanging basket mounting platform device entirely, it is characterized in that described bridge Pier top portion is pallet(4), elevating mechanism(5)On pallet.
3. a kind of automatic lifting according to claim 2 encloses formula hanging basket mounting platform device entirely, it is characterised in that described Sole plate is parallel to each other including two and length is more than pallet(4)The main beam of width(58), main beam two ends are respectively equipped with Electric block(51);Tray edge is extended to pallet length direction be externally provided with main longitudinal grider from main beam middle part(57), Main longitudinal grider end is installed by electric block.
4. a kind of automatic lifting according to Claims 2 or 3 encloses formula hanging basket mounting platform device entirely, it is characterised in that described Sole plate and pallet(4)Between be provided with steel pad(55).
5. a kind of automatic lifting according to claim 1 or 2 or 3 encloses formula hanging basket mounting platform device entirely, it is characterised in that Described mounting platform(3)Including hanging basket(31), hanging basket has a safety guide rail, and hanging basket is provided with suspension ring(32), electric block (51)On steel wire rope(53)Hanging basket is connected by suspension ring.
6. a kind of automatic lifting according to claim 5 encloses formula hanging basket mounting platform device entirely, it is characterised in that described Hanging basket(31)With bridge pier(2)The side of cooperation is provided with anticollision buffering body.
7. a kind of automatic lifting according to claim 5 encloses formula hanging basket mounting platform device entirely, it is characterised in that described Hanging basket(31)It is provided with electric block(51)Controlling switch, hanging basket and bridge pier(2)The side of cooperation is provided with emergency brake arrangement.
8. a kind of automatic lifting according to claim 3 encloses formula hanging basket mounting platform device entirely, it is characterised in that described Two main beams for being parallel to each other(58)Between provided with connection lacing wire(56).
9. a kind of automatic lifting according to claim 1 or 2 or 3 encloses formula hanging basket mounting platform device entirely, it is characterised in that Described mounting platform(3)Towards bridge pier(2)The inner side in direction is provided with some place's directive wheels, and directive wheel position is provided with flexible adjustment machine Structure.
CN201720075226.7U 2017-01-21 2017-01-21 A kind of automatic lifting encloses formula hanging basket mounting platform device entirely Active CN206581150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720075226.7U CN206581150U (en) 2017-01-21 2017-01-21 A kind of automatic lifting encloses formula hanging basket mounting platform device entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720075226.7U CN206581150U (en) 2017-01-21 2017-01-21 A kind of automatic lifting encloses formula hanging basket mounting platform device entirely

Publications (1)

Publication Number Publication Date
CN206581150U true CN206581150U (en) 2017-10-24

Family

ID=60109744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720075226.7U Active CN206581150U (en) 2017-01-21 2017-01-21 A kind of automatic lifting encloses formula hanging basket mounting platform device entirely

Country Status (1)

Country Link
CN (1) CN206581150U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108342990A (en) * 2018-05-03 2018-07-31 广东冠粤路桥有限公司 A kind of bent cap holder installation jacking system and its application method
CN108824213A (en) * 2018-08-02 2018-11-16 中铁十二局集团有限公司 Protection operation hoistable platform for the installation of round end type solid pier hanging basket
CN109610325A (en) * 2018-12-14 2019-04-12 中铁七局集团第五工程有限公司 The construction method of high-speed railway bridge hanging basket mounting platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108342990A (en) * 2018-05-03 2018-07-31 广东冠粤路桥有限公司 A kind of bent cap holder installation jacking system and its application method
CN108824213A (en) * 2018-08-02 2018-11-16 中铁十二局集团有限公司 Protection operation hoistable platform for the installation of round end type solid pier hanging basket
CN109610325A (en) * 2018-12-14 2019-04-12 中铁七局集团第五工程有限公司 The construction method of high-speed railway bridge hanging basket mounting platform

Similar Documents

Publication Publication Date Title
US9193567B2 (en) Method in the manufacture of an elevator
US9845227B2 (en) Mobile crane
CN207348430U (en) High-building intelligent elevating safety operating platform
CN206581150U (en) A kind of automatic lifting encloses formula hanging basket mounting platform device entirely
CN103402901A (en) Method and elevator arrangement
CN104066670A (en) Method and elevator arrangement
WO2013175054A9 (en) Elevator arrangement and method
KR20120126673A (en) lifting heavy materials apparatus using pulley and method thereof
CN110104535A (en) Concrte sleeper townhouse hanging apparatus
JP2010228827A (en) Movable conveying device
CN105018115B (en) Dry quenching primary deduster fragment hoisting method
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN203247031U (en) Hoisting device for curtain board transporting
CN102963817A (en) Tailing force-free large equipment hoisting vertical tail removal method
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
CN201786010U (en) Elevating platform for construction use
CN203820331U (en) Material hoist with built-in steel wire rope
CN203795311U (en) Multi-leg high pier and slip form construction device
CN106044537B (en) A kind of truss of activity lifting level board shape thing
CN103743581B (en) Internal climbing tower crane test platform device and test method
CN102730585A (en) Series compensation platform hydraulic installation system with level adjustment function
CN202467145U (en) Discharging platform of whole lifting-lowering outer frame
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN207792466U (en) A kind of tool-type cage
CN101381057A (en) Large-sized gantry crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant