CN110104535A - Concrte sleeper townhouse hanging apparatus - Google Patents
Concrte sleeper townhouse hanging apparatus Download PDFInfo
- Publication number
- CN110104535A CN110104535A CN201910419726.1A CN201910419726A CN110104535A CN 110104535 A CN110104535 A CN 110104535A CN 201910419726 A CN201910419726 A CN 201910419726A CN 110104535 A CN110104535 A CN 110104535A
- Authority
- CN
- China
- Prior art keywords
- shackle
- townhouse
- hoisting
- snap
- hanging apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/125—Chain-type slings
Abstract
A kind of concrte sleeper townhouse hanging apparatus.It includes hoisting wirerope, plays hoisting shackle, hanging ring, crossbeam, stringer, lifting lug, suspention shackle, suspending steel wire rope and snap-gauge;Wherein hoisting wirerope and hoisting shackle composition lifting balance system, hanging ring, crossbeam and stringer Compositional balance trussing, lifting lug, suspention shackle, suspending steel wire rope and snap-gauge form Suspending fixation system;Compared with prior art, concrte sleeper townhouse hanging apparatus provided by the invention can meet construction requirement in anchoring base and section of track assembling production while reduce recruitment quantity, accelerate speed of application, effect is improved, cost is reduced, the concrte sleeper lifting especially suitable for having anchored is carried.
Description
Technical field
The invention belongs to Environment in Railway Engineering Construction auxiliary device technical fields, more particularly to a kind of anchoring base and section of track group
Concrte sleeper townhouse hanging apparatus in dress production.
Background technique
In Environment in Railway Engineering Construction, the concrete section of track need to carry out bolt anchoring in anchoring base before laying, then by design
It is required that length carries out track and concrte sleeper spelling.However because concrte sleeper weight is larger, need to generally be lifted up into using gantry
Row lifting, the hanging method of conventional are single lifting or the binding lifting of 3-5 root, and time-consuming for this method, mechanical service efficiency
Lowly, and the distance that is unable to control between concrte sleeper, it is easy to appear breakage of colliding with, leads to section of track overall package speed
Slowly, thus restrict the paving frame progress of entire engineering.
Summary of the invention
To solve the above-mentioned problems, the purpose of the present invention is to provide a kind of concrte sleeper townhouse hanging apparatus.
In order to achieve the above object, concrte sleeper townhouse hanging apparatus provided by the invention includes hoisting wirerope, rises
Hoisting shackle, hanging ring, crossbeam, stringer, lifting lug, suspention shackle, suspending steel wire rope and snap-gauge;Wherein hoisting wirerope and hoisting shackle
Composition lifting balance system, hanging ring, crossbeam and stringer Compositional balance trussing, lifting lug, suspention shackle, suspending steel wire rope and card
Board group is at Suspending fixation system;Two crossbeams and two stringers are welded into rectangular frame;Hanging ring is top steel plate with holes;Every
The upper end two sides position of stringer is connected with the lower end of a hanging ring respectively;The lower end of four hoisting wireropes passes through one respectively
It plays hoisting shackle to be connected in the hole of four hanging rings, upper end links together;Lifting lug is lower part steel plate with holes, multiple lifting lugs it is upper
Portion's spacing distance is fixed on the lateral surface of two stringers;Snap-gauge is top and the bottom steel plate with holes;The two of every suspending steel wire rope
End is connected in the hole an of lifting lug and the hole on one piece of snap-gauge top by a suspention shackle respectively, and the hole of snap-gauge lower part is used
Anchor bolt on connection sleeper.
The size of the rectangular frame is 1600mm*4500mm, is welded using 18# and 16# channel steel.
The rise hoisting shackle and suspention shackle is D type shackle, wherein 1/2 inch of model G209 of hoisting shackle is played,
1/4 inch of model G209 for suspending shackle in midair.
The specification of the lifting lug is 10mm*50mm*100mm, aperture 30mm.
The specification of the snap-gauge is 10mm*100mm*150mm, and aperture is 30mm.
The specification of the hoisting wirerope are as follows: 6*37+FC- Φ 8.7.
The specification of the suspending steel wire rope are as follows: 6*19+FC- Φ 7.7.
Compared with prior art, concrte sleeper townhouse hanging apparatus provided by the invention can be in anchoring base and the section of track
Meet construction requirement in assembling production while reducing recruitment quantity, accelerating speed of application, improves effect, reduce cost, it is especially suitable
Concrte sleeper for having anchored, which lifts, to be carried.
Detailed description of the invention
Fig. 1 is concrte sleeper townhouse hanging apparatus integral hoisting process schematic provided by the invention;
Fig. 2 is concrte sleeper townhouse hanging apparatus three-dimensional structure diagram provided by the invention;
Fig. 3 is lifting balance system figure in concrte sleeper townhouse hanging apparatus provided by the invention;
Fig. 4 is balance truss structure figure in concrte sleeper townhouse hanging apparatus provided by the invention;
Fig. 5 is suspension system structure chart in concrte sleeper townhouse hanging apparatus provided by the invention;
Fig. 6 is to connect system construction drawing in concrte sleeper townhouse hanging apparatus provided by the invention;
Fig. 7 is structure chart at hanging ring in concrte sleeper townhouse hanging apparatus provided by the invention.
Specific embodiment
Concrte sleeper townhouse hanging apparatus provided by the invention is described in detail with reference to the accompanying drawings and examples.
As shown in Fig. 1-Fig. 7, concrte sleeper townhouse hanging apparatus provided by the invention includes hoisting wirerope 1, lifting
Shackle 2, hanging ring 3, crossbeam 4, stringer 5, lifting lug 6, suspention shackle 7, suspending steel wire rope 8 and snap-gauge 9;Wherein 1 He of hoisting wirerope
Rise hoisting shackle 2 composition lifting balance system, 5 Compositional balance trussing of hanging ring 3, crossbeam 4 and stringer, lifting lug 6, suspention shackle 7,
Suspending steel wire rope 8 and snap-gauge 9 form Suspending fixation system;Two crossbeams 4 and two stringers 5 are welded into rectangular frame;Hanging ring 3 is
Top steel plate with holes;The upper end two sides position of every stringer 5 is connected with the lower end of a hanging ring 3 respectively;Four hoisting steels
The lower end of cord 1 passes through one hoisting shackle 2 respectively and is connected in the hole of four hanging rings 3, and upper end links together;Lifting lug 6 is
The top spacing distance of lower part steel plate with holes, multiple lifting lugs 6 is fixed on the lateral surface of two stringers 5;Snap-gauge 9 is top and the bottom
Steel plate with holes;The both ends of every suspending steel wire rope 8 pass through respectively one suspention shackle 7 be connected to a lifting lug 6 hole and
In the hole on one piece of 9 top of snap-gauge, the hole of 9 lower part of snap-gauge is used to connect the anchor bolt on sleeper.
The size of the rectangular frame is 1600mm*4500mm, is welded using 18# and 16# channel steel.
The rise hoisting shackle 2 and suspention shackle 7 is D type shackle, wherein playing 1/2 English of model G209 of hoisting shackle 2
It is very little, 1/4 inch of model G209 of suspention shackle 7.
The specification of the lifting lug 6 is 10mm*50mm*100mm, aperture 30mm.
The specification of the snap-gauge 9 is 10mm*100mm*150mm, and aperture is 30mm.
The specification of the hoisting wirerope 1 are as follows: 6*37+FC- Φ 8.7.
The specification of the suspending steel wire rope 8 are as follows: 6*19+FC- Φ 7.7.
Now concrte sleeper townhouse hanging apparatus application method provided by the invention is described below: when concrete crosstie wood snail
After bolt sulfur cement mortar anchorage, ordinary circumstance directly carries out the spelling section of track, but is influenced to be unable to the direct-assembling section of track by the other factors such as assembling
When, it just needs to consider to be lifted stacking, is lifted again after satisfying the requirements to track panel assembling machine and carry out spelling.Turn hanging code and lets off journey
It can be operated using the present apparatus, the present apparatus is fixed in the existing gantry crane equipment of track panel base, then manipulates gantry crane
Equipment, which rests in specify, needs lifting operation region.Suspension hook on gantry crane is connected to the hoisting wirerope in lifting balance system
On 1, this concrte sleeper townhouse hanging apparatus is integrally sling and is placed in right above sleeper to be lifted, adjustment gantry crane is hung oneself
The height of rope, it is ensured that snap-gauge 9 in Suspending fixation system is substantially equal with hung crosstie surface to be advisable, ready to balance trussing base
When this is steady, same root sleeper two is inserted in the hole of two on two stringers 5 corresponding 9 lower parts of snap-gauge respectively by operating personnel
On two anchor bolts at end, can formally it be hung after ensuring that every piece of snap-gauge 9 and the threaded engagement on anchor bolt are secured
Dress, to realize the batch lifting of concrte sleeper townhouse.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, several improvements and modifications, these improvements and modifications can also be made
Also it should be regarded as protection scope of the present invention.
Claims (7)
1. a kind of concrte sleeper townhouse hanging apparatus, it is characterised in that: the concrte sleeper townhouse hanging apparatus includes
Hoisting wirerope (1) plays hoisting shackle (2), hanging ring (3), crossbeam (4), stringer (5), lifting lug (6), suspention shackle (7), suspention steel
Cord (8) and snap-gauge (9);Wherein hoisting wirerope (1) and hoisting shackle (2) composition lifting balance system, hanging ring (3), crossbeam
(4) and stringer (5) Compositional balance trussing, lifting lug (6), suspention shackle (7), suspending steel wire rope (8) and snap-gauge (9) composition are outstanding
Hang fixed system;Two crossbeam (4) He Lianggen stringers (5) are welded into rectangular frame;Hanging ring (3) is top steel plate with holes;Often
The upper end two sides position of root stringer (5) is connected with the lower end of a hanging ring (3) respectively;The lower end of four hoisting wireropes (1)
It plays hoisting shackle (2) by one respectively to be connected in the hole of four hanging rings (3), upper end links together;Lifting lug (6) is lower bands
The top spacing distance of the steel plate in hole, multiple lifting lugs (6) is fixed on the lateral surface of two stringers (5);Snap-gauge (9) is top and the bottom
Steel plate with holes;The both ends of every suspending steel wire rope (8) pass through suspention shackle (7) respectively and are connected to a lifting lug (6)
In the hole on hole and one piece of snap-gauge (9) top, the hole of snap-gauge (9) lower part is used to connect the anchor bolt on sleeper.
2. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: the ruler of the rectangular frame
Very little is 1600mm*4500mm, is welded using 18# and 16# channel steel.
3. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: described plays hoisting shackle (2)
It is D type shackle with suspention shackle (7), wherein playing 1/2 inch of model G209 of hoisting shackle (2), suspends the type of shackle (7) in midair
Number be 1/4 inch of G209.
4. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: the rule of the lifting lug (6)
Lattice are 10mm*50mm*100mm, aperture 30mm.
5. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: the rule of the snap-gauge (9)
Lattice are 10mm*100mm*150mm, and aperture is 30mm.
6. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: the hoisting wirerope
(1) specification are as follows: 6*37+FC- Φ 8.7.
7. concrte sleeper townhouse hanging apparatus according to claim 1, it is characterised in that: the suspending steel wire rope
(8) specification are as follows: 6*19+FC- Φ 7.7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910419726.1A CN110104535A (en) | 2019-05-20 | 2019-05-20 | Concrte sleeper townhouse hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910419726.1A CN110104535A (en) | 2019-05-20 | 2019-05-20 | Concrte sleeper townhouse hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110104535A true CN110104535A (en) | 2019-08-09 |
Family
ID=67491172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910419726.1A Pending CN110104535A (en) | 2019-05-20 | 2019-05-20 | Concrte sleeper townhouse hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110104535A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111890547A (en) * | 2020-07-27 | 2020-11-06 | 中铁六局集团太原铁路建设有限公司 | Manufacturing process of elastic supporting block capable of being rapidly stripped |
CN112010156A (en) * | 2020-09-16 | 2020-12-01 | 中国五冶集团有限公司 | Super high-rise high-efficiency steel beam lifting appliance and lifting method thereof |
CN113562589A (en) * | 2021-07-06 | 2021-10-29 | 上海外高桥造船有限公司 | Frame type hanging beam for prefabricated cabin of luxury passenger liner |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201217608Y (en) * | 2008-04-23 | 2009-04-08 | 天津赛瑞机器设备有限公司 | Integral component suspending beam for hoisting |
CN201864449U (en) * | 2010-11-23 | 2011-06-15 | 中国海洋石油总公司 | Cement joint-row pressing block hoisting frame |
CN201923765U (en) * | 2010-12-23 | 2011-08-10 | 天津市飞马起重吊索具有限公司 | Steel rail lifting appliance |
CN202390072U (en) * | 2011-11-24 | 2012-08-22 | 霍山县登辉竹业有限公司 | Square stock mold lifting device |
CN203545443U (en) * | 2013-09-12 | 2014-04-16 | 漳平市万山竹业工贸有限公司 | Multiple-hook sling |
CN203946779U (en) * | 2014-06-20 | 2014-11-19 | 天津港第一港埠有限公司 | Loose steel pipe operation combined sling |
KR20150039941A (en) * | 2013-10-04 | 2015-04-14 | 삼성중공업 주식회사 | Heavy object lifting device |
CN104944276A (en) * | 2015-06-05 | 2015-09-30 | 郑州龙翔新型墙体材料有限公司 | Lightweight wall plate start shipment lifting frame |
CN208814490U (en) * | 2018-08-14 | 2019-05-03 | 中建五局土木工程有限公司 | A kind of novel drainage ditch cover plate hanging apparatus |
CN210103281U (en) * | 2019-05-20 | 2020-02-21 | 中铁六局集团有限公司 | Concrete sleeper gang hoisting device |
-
2019
- 2019-05-20 CN CN201910419726.1A patent/CN110104535A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201217608Y (en) * | 2008-04-23 | 2009-04-08 | 天津赛瑞机器设备有限公司 | Integral component suspending beam for hoisting |
CN201864449U (en) * | 2010-11-23 | 2011-06-15 | 中国海洋石油总公司 | Cement joint-row pressing block hoisting frame |
CN201923765U (en) * | 2010-12-23 | 2011-08-10 | 天津市飞马起重吊索具有限公司 | Steel rail lifting appliance |
CN202390072U (en) * | 2011-11-24 | 2012-08-22 | 霍山县登辉竹业有限公司 | Square stock mold lifting device |
CN203545443U (en) * | 2013-09-12 | 2014-04-16 | 漳平市万山竹业工贸有限公司 | Multiple-hook sling |
KR20150039941A (en) * | 2013-10-04 | 2015-04-14 | 삼성중공업 주식회사 | Heavy object lifting device |
CN203946779U (en) * | 2014-06-20 | 2014-11-19 | 天津港第一港埠有限公司 | Loose steel pipe operation combined sling |
CN104944276A (en) * | 2015-06-05 | 2015-09-30 | 郑州龙翔新型墙体材料有限公司 | Lightweight wall plate start shipment lifting frame |
CN208814490U (en) * | 2018-08-14 | 2019-05-03 | 中建五局土木工程有限公司 | A kind of novel drainage ditch cover plate hanging apparatus |
CN210103281U (en) * | 2019-05-20 | 2020-02-21 | 中铁六局集团有限公司 | Concrete sleeper gang hoisting device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111890547A (en) * | 2020-07-27 | 2020-11-06 | 中铁六局集团太原铁路建设有限公司 | Manufacturing process of elastic supporting block capable of being rapidly stripped |
CN112010156A (en) * | 2020-09-16 | 2020-12-01 | 中国五冶集团有限公司 | Super high-rise high-efficiency steel beam lifting appliance and lifting method thereof |
CN113562589A (en) * | 2021-07-06 | 2021-10-29 | 上海外高桥造船有限公司 | Frame type hanging beam for prefabricated cabin of luxury passenger liner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110104535A (en) | Concrte sleeper townhouse hanging apparatus | |
CN103243663A (en) | Construction process for using bridge girder erection machine to remove T-shaped cantilever continuous rigid frame box girders | |
CN109183629A (en) | A kind of great cantilever bent cap precast assembly method | |
CN206706584U (en) | Pier arch rib in the asymmetric button lashed cable cable system installation Multi-arch bridge of middle pier | |
CN106320182A (en) | Suspension bridge bank slope beam section long sling swing-shifting mounting device and method | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN208088097U (en) | A kind of three-tower suspension bridge erection of main beam constructing structure | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN105464456B (en) | Go straight up to method and suspender that unit founds UHV transmission steel tower | |
CN103061265B (en) | Construction method for lifting combined reinforcement cages | |
CN105018115B (en) | Dry quenching primary deduster fragment hoisting method | |
CN106315426B (en) | A kind of assembling flat-top tower crane for building is installed, jacking method | |
CN209508834U (en) | A kind of multispan continuously arranges CABLEWAY ERECTION SYSTEM | |
CN105776011B (en) | Blast furnace roof crane girder installation method | |
CN206581150U (en) | A kind of automatic lifting encloses formula hanging basket mounting platform device entirely | |
CN207749417U (en) | A kind of concrete king-post internal model stiff skeleton | |
CN105603882B (en) | Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method | |
CN202164030U (en) | Integrated box girder cradle | |
CN107060474A (en) | A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method | |
CN101695984B (en) | Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge | |
CN204039920U (en) | A kind of tower crane lifting reeving device | |
CN203639831U (en) | Special lifting apparatus for quickly hoisting steel trussed beam rod piece | |
CN110040632A (en) | A kind of segmental hoisting construction method of large span section steel beam | |
CN202936737U (en) | Continuous beam cradle hoisting structure for corrugated steel webs | |
CN211769762U (en) | Concrete box girder steel reinforcement cage integral hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |