CN201217608Y - Integral component suspending beam for hoisting - Google Patents
Integral component suspending beam for hoisting Download PDFInfo
- Publication number
- CN201217608Y CN201217608Y CNU2008200745033U CN200820074503U CN201217608Y CN 201217608 Y CN201217608 Y CN 201217608Y CN U2008200745033 U CNU2008200745033 U CN U2008200745033U CN 200820074503 U CN200820074503 U CN 200820074503U CN 201217608 Y CN201217608 Y CN 201217608Y
- Authority
- CN
- China
- Prior art keywords
- hanging beam
- chain
- lifting
- workpiece
- beam frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 2
- 239000000725 suspension Substances 0.000 description 5
- 230000005484 gravity Effects 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a lifting integral part lifting beam, which belongs to the lifting tool technique field. The lifting integral part lifting beam comprises chains connected with a crane, and is characterized in that: the chains are arranged at the upper part of a lifting beam frame to be connected with crane hooks, the lifting beam frame adopts a frame structure, and a plurality of chains symmetrically arranged and connected with workpieces are disposed at the lower part of the lifting beam frame. The utility model has the advantages of light and convenient structure, convenient use, stable lifting, safety and reliability.
Description
Technical field
The utility model belongs to the lifting device technical field, particularly relates to a kind of lifting global facility hanging beam.
Background technology
At present when the lifting workpiece, all be steel rope directly to be hung over carry out handling on crane hook and the workpiece, handling has a disadvantage like this, if when being exactly the global facility of workpiece length, its stationarity is not easy to grasp very much, is easy to produce variety of issue, very easily produce crooked as mounted axle in the global facility, ccasual hydraulic pipe, lubrication management, cable tube etc. are destroyed easily, even the also one-sided inclination of possibility, cause personal injury.
Summary of the invention
The utility model provides a kind of lifting global facility hanging beam for solving the problem that existing known technology exists.
The purpose of this utility model provides the lifting global facility hanging beam that a kind of structure is light, easy to use, lifting is steady, safe and reliable.
The utility model adopts following technical scheme:
Lifting global facility hanging beam comprises the chain that connects hoisting crane, is characterized in: hanging beam frame top is equipped with chain and is connected crane hook, and the hanging beam frame is a framed structure, and hanging beam frame bottom is provided with the chain of the connection workpiece of several symmetries.The global facility hanging beam arrives the linking part of the global facility of length as the suspension hook of hoisting crane, and a platform that enlarges the lifting area gradually is provided.
The utility model can also be taked following technical measures:
Described lifting global facility hanging beam is characterized in: the chain that hanging beam frame bottom is provided with connects workpiece with the bolt-type structure.
Described lifting global facility hanging beam is characterized in: chain connects the connector that is loaded on the workpiece with the bolt-type structure, realizes that chain is connected with workpiece.
Described lifting global facility hanging beam is characterized in: the hanging beam frame is a shaped steel lead frame structure.
Described lifting global facility hanging beam is characterized in: 4 on chain is equipped with on hanging beam frame top; Chain 4-14 bar is equipped with in hanging beam frame bottom.
Described lifting global facility hanging beam is characterized in: chain is a steel rope.。
Advantage that the utlity model has and good effect:
The global facility hanging beam has adopted the technical solution of the utility model, being connected and fixed of last chain and hanging beam frame, keep certain stability, lower chain all is detachable, adjustable with being connected of hanging beam frame and workpiece, many chains are symmetrically distributed, and guarantee the balance of pulling force and workpiece center of gravity, have improved the stability of the workpiece that lifts, and the angle of lower chain and center of gravity remains on 90 ° ± 8 °, can carry out the self adaptation adjustment by the size shape according to workpiece in certain angular range.The utlity model has advantages such as structure is light, easy to use, lifting is steady, safe and reliable.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is Fig. 1 left side TV structure scheme drawing;
Fig. 3 is a hanging beam shelf structure scheme drawing;
Fig. 4 is the interface structure scheme drawing of lower chain and workpiece.
Among the figure, the last chain of 1-, 2-shackle, 3-hanging beam frame, 4-lower chain, the little axle 2 of 5-, 6-locating dowel pin, 7-connector (being installed on the workpiece).
The specific embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, enumerate following example now, and conjunction with figs. is described in detail as follows:
With reference to accompanying drawing 1, Fig. 2, Fig. 3 and Fig. 4.
Lifting global facility hanging beam, its hanging beam frame top are equipped with 4 chains 1 and connect crane hook, and connection location is fixed.Chain 1 connects hanging beam frame 3 by shackle 2.Hanging beam frame 3 is several sections framed structures that H shaped steel is welded, and has 14 suspension centres, and the user can select suspension centre voluntarily according to the length of workpiece, and the distance of per two suspension centres is 1m on the length direction, and the distance of suspension centre is 2m on the Width.Lower chain 4 is connected with the hanging beam frame, and the pivot angle scope of chain is ± 8 °, and installation, convenient disassembly, and chain is replaceable simultaneously is steel rope.Hanging beam frame 3 bottoms are provided with the chain 4 of the connection workpiece of 8 symmetries.Chain 4 connects the connector 7 that is loaded on the workpiece with the bolt-type structure, realizes that chain 4 is connected with workpiece.Figure 4 shows that the interface of lower chain and workpiece, the end chain link of lower chain is put in the workpiece connector, with in little axle 5 patchholes, inserts locating dowel pin 6 and gets final product again.
This example working process: lower chain is installed on the hanging beam frame, by crane loading to certain altitude, the connector of the workpiece of then the end chain link of each lower chain being packed into as stated above, the hanging beam that progressively hoists can lift by crane, the movement workpiece.
Claims (6)
1. lifting global facility hanging beam, comprise the chain (1) that connects hoisting crane, it is characterized in that: hanging beam frame top is equipped with chain (1) and is connected crane hook, and hanging beam frame (3) is a framed structure, and hanging beam frame (3) bottom is provided with the chain (4) of the connection workpiece of several symmetries.
2. lifting global facility hanging beam according to claim 1 is characterized in that: the chain (4) that hanging beam frame (3) bottom is provided with connects workpiece with the bolt-type structure.
3. lifting global facility hanging beam according to claim 2 is characterized in that: chain (4) connects the connector (7) that is loaded on the workpiece with the bolt-type structure, realizes that chain (4) is connected with workpiece.
4. lifting global facility hanging beam according to claim 1 is characterized in that: hanging beam frame (3) is a shaped steel lead frame structure.
5. lifting global facility hanging beam according to claim 1 is characterized in that: (1) 4 on chain is equipped with on hanging beam frame (3) top; Chain (4) 4-14 bar is equipped with in hanging beam frame (3) bottom.
6. lifting global facility hanging beam according to claim 1 is characterized in that: chain is a steel rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200745033U CN201217608Y (en) | 2008-04-23 | 2008-04-23 | Integral component suspending beam for hoisting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200745033U CN201217608Y (en) | 2008-04-23 | 2008-04-23 | Integral component suspending beam for hoisting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201217608Y true CN201217608Y (en) | 2009-04-08 |
Family
ID=40540442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200745033U Expired - Fee Related CN201217608Y (en) | 2008-04-23 | 2008-04-23 | Integral component suspending beam for hoisting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201217608Y (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830392A (en) * | 2010-04-30 | 2010-09-15 | 中国核工业第五建设有限公司 | Special lifting tool for steel containment vessel of nuclear power station and lifting method |
CN102009909A (en) * | 2010-11-19 | 2011-04-13 | 太原重工股份有限公司 | Multi-lifting point hanger for lifting nuclear power station module |
CN102070071A (en) * | 2011-01-17 | 2011-05-25 | 化学工业岩土工程有限公司 | Steel reinforcement cage hoisting method |
CN102767288A (en) * | 2012-01-17 | 2012-11-07 | 中国建筑第四工程局有限公司 | Method and structure for mounting precast reinforced concrete stairs |
CN103193152A (en) * | 2013-04-08 | 2013-07-10 | 上海振华重工(集团)股份有限公司 | Hoisting device and method of chain bucket ship unloader |
CN103193151A (en) * | 2013-03-29 | 2013-07-10 | 江苏南车电机有限公司 | Special lifting tool for sleeving rotor of large-scale permanent magnetic direct-driven wind power generator |
CN103552910A (en) * | 2013-11-15 | 2014-02-05 | 上海电气电站设备有限公司 | Iron core section lifting structure |
CN103754750A (en) * | 2014-01-21 | 2014-04-30 | 亚洲铝业(中国)有限公司 | Spreader |
CN103921117A (en) * | 2014-04-30 | 2014-07-16 | 中冶天工集团有限公司 | Off-line assembly method for large flotation machine barrel module |
CN104444774A (en) * | 2014-12-03 | 2015-03-25 | 舟山长宏国际船舶修造有限公司 | 40-ton cabin module lifting bracket |
CN105314524A (en) * | 2014-06-26 | 2016-02-10 | 中天建设集团有限公司 | Skylight truss hanger |
CN105905781A (en) * | 2016-07-08 | 2016-08-31 | 中铁大桥局集团有限公司 | Hanger used for hoisting large-section steel truss girders and hoisting method |
CN108622797A (en) * | 2017-03-24 | 2018-10-09 | 五冶集团上海有限公司 | A kind of suspender |
CN110104535A (en) * | 2019-05-20 | 2019-08-09 | 中铁六局集团有限公司 | Concrte sleeper townhouse hanging apparatus |
CN114275660A (en) * | 2021-12-21 | 2022-04-05 | 中铁大桥局集团第五工程有限公司 | Simple hoisting device and rapid hoisting method for steel reinforcement cage |
-
2008
- 2008-04-23 CN CNU2008200745033U patent/CN201217608Y/en not_active Expired - Fee Related
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830392A (en) * | 2010-04-30 | 2010-09-15 | 中国核工业第五建设有限公司 | Special lifting tool for steel containment vessel of nuclear power station and lifting method |
CN102009909A (en) * | 2010-11-19 | 2011-04-13 | 太原重工股份有限公司 | Multi-lifting point hanger for lifting nuclear power station module |
CN102070071A (en) * | 2011-01-17 | 2011-05-25 | 化学工业岩土工程有限公司 | Steel reinforcement cage hoisting method |
CN102767288A (en) * | 2012-01-17 | 2012-11-07 | 中国建筑第四工程局有限公司 | Method and structure for mounting precast reinforced concrete stairs |
CN103193151A (en) * | 2013-03-29 | 2013-07-10 | 江苏南车电机有限公司 | Special lifting tool for sleeving rotor of large-scale permanent magnetic direct-driven wind power generator |
CN103193152B (en) * | 2013-04-08 | 2015-07-22 | 上海振华重工(集团)股份有限公司 | Hoisting device and method of chain bucket ship unloader |
CN103193152A (en) * | 2013-04-08 | 2013-07-10 | 上海振华重工(集团)股份有限公司 | Hoisting device and method of chain bucket ship unloader |
CN103552910A (en) * | 2013-11-15 | 2014-02-05 | 上海电气电站设备有限公司 | Iron core section lifting structure |
CN103754750A (en) * | 2014-01-21 | 2014-04-30 | 亚洲铝业(中国)有限公司 | Spreader |
CN103754750B (en) * | 2014-01-21 | 2017-01-04 | 广东铝遊家科技有限公司 | Suspender |
CN103921117A (en) * | 2014-04-30 | 2014-07-16 | 中冶天工集团有限公司 | Off-line assembly method for large flotation machine barrel module |
CN105314524A (en) * | 2014-06-26 | 2016-02-10 | 中天建设集团有限公司 | Skylight truss hanger |
CN104444774A (en) * | 2014-12-03 | 2015-03-25 | 舟山长宏国际船舶修造有限公司 | 40-ton cabin module lifting bracket |
CN105905781A (en) * | 2016-07-08 | 2016-08-31 | 中铁大桥局集团有限公司 | Hanger used for hoisting large-section steel truss girders and hoisting method |
CN105905781B (en) * | 2016-07-08 | 2018-05-08 | 中铁大桥局集团有限公司 | The hanging method of big segment steel truss girder |
CN108622797A (en) * | 2017-03-24 | 2018-10-09 | 五冶集团上海有限公司 | A kind of suspender |
CN110104535A (en) * | 2019-05-20 | 2019-08-09 | 中铁六局集团有限公司 | Concrte sleeper townhouse hanging apparatus |
CN114275660A (en) * | 2021-12-21 | 2022-04-05 | 中铁大桥局集团第五工程有限公司 | Simple hoisting device and rapid hoisting method for steel reinforcement cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201217608Y (en) | Integral component suspending beam for hoisting | |
CN101195460B (en) | Large box girder bottom-mounting hoisting device and method thereof | |
CN205381872U (en) | Aircraft fuselage turning device | |
CN202131007U (en) | Long and straight workpiece hoisting tool | |
CN202967866U (en) | Three-chain adjustable sling | |
CN201567146U (en) | Suspender for eccentric component | |
CN104326356A (en) | Construction platform hanger with clear stress and adjustable hanging point | |
CN204847764U (en) | Prefabricated component production is with hoist and mount frame | |
CN104495603B (en) | A kind of adjustable hoisting bracket | |
CN103979438B (en) | A kind of auxiliary device for removing tower crane attachment frame | |
CN109279499B (en) | Special self-balancing hanging beam for long object lifting and crane | |
CN106276615A (en) | A kind of crane may move driver's cabin | |
CN205397854U (en) | Gasifier hoist and mount hoisting device | |
CN202214131U (en) | Three-point lifting beam | |
CN202245692U (en) | Spreader device | |
CN206244301U (en) | A kind of architectural engineering tower crane anti-sway control device | |
CN201923771U (en) | Shoulder pole lifting appliance | |
CN104150401B (en) | Multifunctional double-wing multi-stage double-lazy-arm three-dimensional coordinate type cargo loading and unloading forklift | |
CN202829301U (en) | Steel rail hoisting tool | |
CN206051268U (en) | The vehicle frame boom hoisting of quick despatch | |
CN202029999U (en) | Helicopter hanger | |
CN202272664U (en) | Wire rod mill guide installation hoist | |
CN202193534U (en) | Special lifting appliance for hoisting large tower equipment by side shifting method | |
CN204038883U (en) | A kind of shoulder pole girder with swivel hook | |
CN201614230U (en) | Hoisting device for replacing torch heads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090408 Termination date: 20120423 |