CN201217608Y CNU2008200745033U CN200820074503U CN201217608Y CN 201217608 Y CN201217608 Y CN 201217608Y CN U2008200745033 U CNU2008200745033 U CN U2008200745033U CN 200820074503 U CN200820074503 U CN 200820074503U CN 201217608 Y CN201217608 Y CN 201217608Y
Authority
CN
China
Prior art keywords
hanging
chain
frame
lifting
workpiece
Prior art date
Application number
CNU2008200745033U
Other languages
Chinese (zh)
Inventor
刘峰
祖家乐
Original Assignee
天津赛瑞机器设备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 天津赛瑞机器设备有限公司 filed Critical 天津赛瑞机器设备有限公司
Priority to CNU2008200745033U priority Critical patent/CN201217608Y/en
Application granted granted Critical
Publication of CN201217608Y publication Critical patent/CN201217608Y/en

Links

Abstract

The utility model relates to a lifting integral part lifting beam, which belongs to the lifting tool technique field. The lifting integral part lifting beam comprises chains connected with a crane, and is characterized in that: the chains are arranged at the upper part of a lifting beam frame to be connected with crane hooks, the lifting beam frame adopts a frame structure, and a plurality of chains symmetrically arranged and connected with workpieces are disposed at the lower part of the lifting beam frame. The utility model has the advantages of light and convenient structure, convenient use, stable lifting, safety and reliability.

Description

A kind of lifting global facility hanging beam
Technical field
The utility model belongs to the lifting device technical field, particularly relates to a kind of lifting global facility hanging beam.
Background technology
At present when the lifting workpiece, all be steel rope directly to be hung over carry out handling on crane hook and the workpiece, handling has a disadvantage like this, if when being exactly the global facility of workpiece length, its stationarity is not easy to grasp very much, is easy to produce variety of issue, very easily produce crooked as mounted axle in the global facility, ccasual hydraulic pipe, lubrication management, cable tube etc. are destroyed easily, even the also one-sided inclination of possibility, cause personal injury.
Summary of the invention
The utility model provides a kind of lifting global facility hanging beam for solving the problem that existing known technology exists.
The purpose of this utility model provides the lifting global facility hanging beam that a kind of structure is light, easy to use, lifting is steady, safe and reliable.
The utility model adopts following technical scheme:
Lifting global facility hanging beam comprises the chain that connects hoisting crane, is characterized in: hanging beam frame top is equipped with chain and is connected crane hook, and the hanging beam frame is a framed structure, and hanging beam frame bottom is provided with the chain of the connection workpiece of several symmetries.The global facility hanging beam arrives the linking part of the global facility of length as the suspension hook of hoisting crane, and a platform that enlarges the lifting area gradually is provided.
The utility model can also be taked following technical measures:
Described lifting global facility hanging beam is characterized in: the chain that hanging beam frame bottom is provided with connects workpiece with the bolt-type structure.
Described lifting global facility hanging beam is characterized in: chain connects the connector that is loaded on the workpiece with the bolt-type structure, realizes that chain is connected with workpiece.
Described lifting global facility hanging beam is characterized in: the hanging beam frame is a shaped steel lead frame structure.
Described lifting global facility hanging beam is characterized in: 4 on chain is equipped with on hanging beam frame top; Chain 4-14 bar is equipped with in hanging beam frame bottom.
Described lifting global facility hanging beam is characterized in: chain is a steel rope.。
Advantage that the utlity model has and good effect:
The global facility hanging beam has adopted the technical solution of the utility model, being connected and fixed of last chain and hanging beam frame, keep certain stability, lower chain all is detachable, adjustable with being connected of hanging beam frame and workpiece, many chains are symmetrically distributed, and guarantee the balance of pulling force and workpiece center of gravity, have improved the stability of the workpiece that lifts, and the angle of lower chain and center of gravity remains on 90 ° ± 8 °, can carry out the self adaptation adjustment by the size shape according to workpiece in certain angular range.The utlity model has advantages such as structure is light, easy to use, lifting is steady, safe and reliable.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is Fig. 1 left side TV structure scheme drawing;
Fig. 3 is a hanging beam shelf structure scheme drawing;
Fig. 4 is the interface structure scheme drawing of lower chain and workpiece.
Among the figure, the last chain of 1-, 2-shackle, 3-hanging beam frame, 4-lower chain, the little axle 2 of 5-, 6-locating dowel pin, 7-connector (being installed on the workpiece).
The specific embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, enumerate following example now, and conjunction with figs. is described in detail as follows:
Embodiment 1
With reference to accompanying drawing 1, Fig. 2, Fig. 3 and Fig. 4.
Lifting global facility hanging beam, its hanging beam frame top are equipped with 4 chains 1 and connect crane hook, and connection location is fixed.Chain 1 connects hanging beam frame 3 by shackle 2.Hanging beam frame 3 is several sections framed structures that H shaped steel is welded, and has 14 suspension centres, and the user can select suspension centre voluntarily according to the length of workpiece, and the distance of per two suspension centres is 1m on the length direction, and the distance of suspension centre is 2m on the Width.Lower chain 4 is connected with the hanging beam frame, and the pivot angle scope of chain is ± 8 °, and installation, convenient disassembly, and chain is replaceable simultaneously is steel rope.Hanging beam frame 3 bottoms are provided with the chain 4 of the connection workpiece of 8 symmetries.Chain 4 connects the connector 7 that is loaded on the workpiece with the bolt-type structure, realizes that chain 4 is connected with workpiece.Figure 4 shows that the interface of lower chain and workpiece, the end chain link of lower chain is put in the workpiece connector, with in little axle 5 patchholes, inserts locating dowel pin 6 and gets final product again.
This example working process: lower chain is installed on the hanging beam frame, by crane loading to certain altitude, the connector of the workpiece of then the end chain link of each lower chain being packed into as stated above, the hanging beam that progressively hoists can lift by crane, the movement workpiece.

Claims (6)

1. lifting global facility hanging beam, comprise the chain (1) that connects hoisting crane, it is characterized in that: hanging beam frame top is equipped with chain (1) and is connected crane hook, and hanging beam frame (3) is a framed structure, and hanging beam frame (3) bottom is provided with the chain (4) of the connection workpiece of several symmetries.
2. lifting global facility hanging beam according to claim 1 is characterized in that: the chain (4) that hanging beam frame (3) bottom is provided with connects workpiece with the bolt-type structure.
3. lifting global facility hanging beam according to claim 2 is characterized in that: chain (4) connects the connector (7) that is loaded on the workpiece with the bolt-type structure, realizes that chain (4) is connected with workpiece.
4. lifting global facility hanging beam according to claim 1 is characterized in that: hanging beam frame (3) is a shaped steel lead frame structure.
5. lifting global facility hanging beam according to claim 1 is characterized in that: (1) 4 on chain is equipped with on hanging beam frame (3) top; Chain (4) 4-14 bar is equipped with in hanging beam frame (3) bottom.
6. lifting global facility hanging beam according to claim 1 is characterized in that: chain is a steel rope.
CNU2008200745033U 2008-04-23 2008-04-23 Integral component suspending beam for hoisting CN201217608Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200745033U CN201217608Y (en) 2008-04-23 2008-04-23 Integral component suspending beam for hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200745033U CN201217608Y (en) 2008-04-23 2008-04-23 Integral component suspending beam for hoisting

Publications (1)

Publication Number Publication Date
CN201217608Y true CN201217608Y (en) 2009-04-08

Family

ID=40540442

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200745033U CN201217608Y (en) 2008-04-23 2008-04-23 Integral component suspending beam for hoisting

Country Status (1)

Country Link
CN (1) CN201217608Y (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830392A (en) * 2010-04-30 2010-09-15 中国核工业第五建设有限公司 Special lifting tool for steel containment vessel of nuclear power station and lifting method
CN102009909A (en) * 2010-11-19 2011-04-13 太原重工股份有限公司 Multi-lifting point hanger for lifting nuclear power station module
CN102070071A (en) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 Hoisting method of steel reinforcement cage
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN103193151A (en) * 2013-03-29 2013-07-10 江苏南车电机有限公司 Special lifting tool for sleeving rotor of large-scale permanent magnetic direct-driven wind power generator
CN103193152A (en) * 2013-04-08 2013-07-10 上海振华重工(集团)股份有限公司 Hoisting device and method of chain bucket ship unloader
CN103552910A (en) * 2013-11-15 2014-02-05 上海电气电站设备有限公司 Iron core section lifting structure
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader
CN103921117A (en) * 2014-04-30 2014-07-16 中冶天工集团有限公司 Off-line assembling method for large flotation machine barrel module
CN104444774A (en) * 2014-12-03 2015-03-25 舟山长宏国际船舶修造有限公司 40-ton cabin module lifting bracket
CN105314524A (en) * 2014-06-26 2016-02-10 中天建设集团有限公司 Skylight truss hanger
CN105905781A (en) * 2016-07-08 2016-08-31 中铁大桥局集团有限公司 Hanger used for hoisting large-section steel truss girders and hoisting method
CN108622797A (en) * 2017-03-24 2018-10-09 五冶集团上海有限公司 A kind of suspender

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830392A (en) * 2010-04-30 2010-09-15 中国核工业第五建设有限公司 Special lifting tool for steel containment vessel of nuclear power station and lifting method
CN102009909A (en) * 2010-11-19 2011-04-13 太原重工股份有限公司 Multi-lifting point hanger for lifting nuclear power station module
CN102070071A (en) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 Hoisting method of steel reinforcement cage
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN103193151A (en) * 2013-03-29 2013-07-10 江苏南车电机有限公司 Special lifting tool for sleeving rotor of large-scale permanent magnetic direct-driven wind power generator
CN103193152B (en) * 2013-04-08 2015-07-22 上海振华重工(集团)股份有限公司 Hoisting device and method of chain bucket ship unloader
CN103193152A (en) * 2013-04-08 2013-07-10 上海振华重工(集团)股份有限公司 Hoisting device and method of chain bucket ship unloader
CN103552910A (en) * 2013-11-15 2014-02-05 上海电气电站设备有限公司 Iron core section lifting structure
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader
CN103754750B (en) * 2014-01-21 2017-01-04 广东铝遊家科技有限公司 Suspender
CN103921117A (en) * 2014-04-30 2014-07-16 中冶天工集团有限公司 Off-line assembling method for large flotation machine barrel module
CN105314524A (en) * 2014-06-26 2016-02-10 中天建设集团有限公司 Skylight truss hanger
CN104444774A (en) * 2014-12-03 2015-03-25 舟山长宏国际船舶修造有限公司 40-ton cabin module lifting bracket
CN105905781A (en) * 2016-07-08 2016-08-31 中铁大桥局集团有限公司 Hanger used for hoisting large-section steel truss girders and hoisting method
CN105905781B (en) * 2016-07-08 2018-05-08 中铁大桥局集团有限公司 The hanging method of big segment steel truss girder
CN108622797A (en) * 2017-03-24 2018-10-09 五冶集团上海有限公司 A kind of suspender

Similar Documents

Publication Publication Date Title
CN100400409C (en) Hydraulic automatic balanced crane installment
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN101195460B (en) Large-scale girder bottom hoisting device and method thereof
CN202643182U (en) Steel wire rope compensating system of single-boom gantry crane
CN205222428U (en) Interval adjustable balance hanger
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN202098976U (en) Device capable of freely adjusting sling length and overhead transverse posture of part
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN201545635U (en) Holding rod with double flat arms
CN201284180Y (en) Special sling for mud pump
CN102718121B (en) Construction method of lifting device for large cement pipe
CN201439475U (en) Multifunctional balance hanging beam
CN206447468U (en) A kind of frame suitable for building industrialization prefabricated part hanging slides suspender
CN206521197U (en) A kind of adjustable balance hoisting beam
CN103663142B (en) Tailing mechanism and translation tailing hoisting method
CN101020558A (en) Wheel excircle sling and its hoisting method
CN102733310B (en) Lifting construction method for arch rib segments of steel box handle-basket arch bridge
CN102718156A (en) Crane arm support system and crane
CN202131007U (en) Long and straight workpiece hoisting tool
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN201961956U (en) Frame lifting appliance with adjustable lifting center of gravity
CN103979438B (en) A kind of auxiliary device for removing tower crane attachment frame
CN201292201Y (en) Detachable frame sling
CN204224186U (en) Fork truck
CN204848013U (en) Liftable tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090408