CN203639831U - Special lifting apparatus for quickly hoisting steel trussed beam rod piece - Google Patents

Special lifting apparatus for quickly hoisting steel trussed beam rod piece Download PDF

Info

Publication number
CN203639831U
CN203639831U CN201320691031.7U CN201320691031U CN203639831U CN 203639831 U CN203639831 U CN 203639831U CN 201320691031 U CN201320691031 U CN 201320691031U CN 203639831 U CN203639831 U CN 203639831U
Authority
CN
China
Prior art keywords
rod piece
steel
girder member
steel girder
member bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320691031.7U
Other languages
Chinese (zh)
Inventor
余长虹
唐建运
律百军
周秀兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Road and Bridge Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Road and Bridge Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201320691031.7U priority Critical patent/CN203639831U/en
Application granted granted Critical
Publication of CN203639831U publication Critical patent/CN203639831U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a special lifting apparatus for quickly hoisting a steel trussed beam rod piece, and belongs to the field of road bridge construction. The technical scheme of the special lifting apparatus is as follows: lateral vertical plates are respectively fixed on two sides of a flat base plate; a transverse clamping plate is fixed in the middle of the lateral vertical plates; bolt holes are respectively formed in the flat base plate on the two sides of the transverse clamping plate; locating pins are fixed at the lower part of the flat base plate; the distance between the locating holes and the locating pins are respectively identical with those of the bolt holes in the steel trussed beam rod piece; a lifting hole is formed in the upper part of the transverse clamping plate. With the adoption of the special lifting apparatus provided by the utility model to hoist the steel trussed beam rod piece, in the hoisting process, the steel trussed beam rod piece is not released to slip, so that the rod piece cannot be polluted for the second time. The special lifting apparatus is short in hoisting time, strong in reliability, simple in operation, and quick in construction, requires a few of cooperating operators, effectively shortens the construction period, reduces the construction cost, can be applied to hoisting the steel trussed beam rod pieces with different specifications, and can be widely applied to hoisting engineering similar to the steel member.

Description

The special hanger of fast hoisting steel girder member bar
Technical field
The utility model relates to a kind of aid of steel member construction, and specifically a kind of special hanger of fast hoisting steel girder member bar, belongs to road and bridge construction field.
Background technology
Along with developing rapidly of road traffic, the phenomenon that overhead railway and sky way are crossed over Existing Railway Bridges or existing highway bridge gets more and more.Owing to being subject to works and the control of circuit overall height under line, overpass beam often adopts Steel truss structure, to meet the designing requirement of circuit.Steel truss girder is assembled by the steel rod elements of various models, and lightweight tens tons of rod member is heavy tens tons, how quick and stable steel girder member bar is lifted into design and installation position, just become a key link of steel truss girder construction.The construction method of steel girder member bar lifting is at present to adopt wire rope binding lifting, in the time of lifting steel girder member bar, in advance at steel girder member bar suspension centre place parcel polybag, with this prevent steel girder member bar in when lifting by wire rope greasy dirt, then bundle at suspension centre place with wire rope, adopt U-shaped ring to connect, then complete and lift by crane installation with lifting machine.In the time of construction, there is more hidden danger in such hanging method, because steel girder member bar adopts polybag parcel, in the time of lifting, steel girder member bar inevitably can be subject to the extruding of wire rope, cause polybag to break, still can cause greasy dirt to steel girder member bar, must carry out after-treatment to steel girder member bar; Next is that affected by manpower factor larger, before lifting, manpower can not guarantee that wire rope is by firm to parcel bag and steel girder member bar binding, in lifting process, easily cause that steel cable sliding even comes off, make steel girder member bar centre-of gravity shift, cause steel girder member bar collision loop wheel machine, the even mounted steel girder member bar of collision, cause construction accident, and need support staff more, generally need 4 ~ 6 people to wrap up steel girder member bar, cost is high, and efficiency is low.This area does not still have good aid available at present.
Utility model content
The purpose of this utility model is to overcome the existing defect of current lifting steel girder member bar, and a kind of special hanger that can lift effectively rapidly steel girder member bar is provided.
The utility model is achieved through the following technical solutions
At base slab both sides difference fixation side riser, Gu is Dinged on the base slab of Transverse clamping plate Transverse clamping plate both sides and is had two bolts hole in the middle of cant board, device set bolt in bolt hole, below flat-floored, fix two alignment pins, the spacing of two bolts hole and two alignment pins respectively with steel girder member bar to be hung on the top of bolt hole spacing , Transverse in full accord clamping plate have lifting eye;
Adopt the utility model lifting steel girder member bar, can there is not loosening landing in lifting process, and can not cause secondary pollution to rod member, and the lifting time is short, reliability is strong, simple to operate, fast, compounding practice personnel are few in construction, effectively shorten the construction period, reduce construction cost, and be suitable for the lifting of different size steel girder member bar, can on the hoisting engineering of the steely member of class, be widely used.Can also, by changing physical dimension, steel plate thickness, lifting eye size and the spacing of suspender, realize the requirement of lifting different size steel girder member bar.
Accompanying drawing explanation
Accompanying drawing 1 is the main TV structure schematic diagram of special hanger of the present invention;
Accompanying drawing 2 is left TV structure schematic diagrames of special hanger of the present invention;
Accompanying drawing 3 is plan structure schematic diagrames of special hanger of the present invention.
Description of reference numerals is as follows:
Base slab 1, cant board 2 , Transverse clamping plate 3, bolt hole 4, set bolt 5, alignment pin 6, lifting eye 7, steel girder member bar 8.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail:
At base slab (1) both sides difference fixation side risers (2), Gu is Dinged on the base slab of Transverse clamping plate (3) Transverse clamping plate (3) both sides and is had two bolts hole (4) in the middle of cant board (2), device set bolt (5) in bolt hole (4), below base slab (1), fix two alignment pins (6), the spacing of two bolts hole (4) and two alignment pins (6) respectively with steel girder member bar to be hung (8) on the top of bolt hole spacing , Transverse in full accord clamping plate (3) have lifting eye (7);
Steel girder member bar (8) weight is less than 20 tons, and the steel plate thickness of special hanger is selected 3cm, and steel girder member bar (8) weight is between 20 tons to 30 tons, and the steel plate thickness of special hanger is selected 5cm.
When use, be connected with the lifting eye of special hanger with the U-shaped ring of lifting machine wire rope, respectively two special hangers played to the two ends that winch to steel girder member bar, alignment pin is aimed at respectively in the bolt hole that inserts steel girder member bar end; Set bolt is penetrated respectively in the bolt hole of special hanger and steel girder member bar and fastening nut, make special hanger being fixed on steel girder member bar tightly, and guarantee that the base slab of special hanger and the surface of steel girder member bar be close to; Be connected with the lifting eye of two special hangers with the U-shaped ring of two wire rope of lifting machine, guarantee that the length of two wire rope is identical simultaneously, the steel girder member bar maintenance level of slinging, lifting machine plays steel girder member bar and winches to design and installation position stably; Adjust and determine that steel girder member bar installation site is fixed after accurate, then lay down set bolt, special hanger lifting is departed to steel girder member bar, fast hoisting steel girder member bar has been constructed.Repeat above flow process, start the lifting of next steel girder member bar.

Claims (2)

1. the special hanger of fast hoisting steel girder member bar, it is characterized in that being achieved through the following technical solutions: the fixation side risers (2) respectively in base slab (1) both sides, Gu is Dinged Transverse clamping plate (3) in the middle of cant board (2), on the base slab of Transverse clamping plate (3) both sides, have two bolts hole (4), device set bolt (5) in bolt hole (4), below base slab (1), fix two alignment pins (6), the spacing of two bolts hole (4) and two alignment pins (6) respectively with steel girder member bar to be hung (8) on bolt hole spacing in full accord, the top of Transverse clamping plate (3) has lifting eye (7).
2. the special hanger of fast hoisting steel girder member bar according to claim 1, it is characterized in that: steel girder member bar (8) weight is less than 20 tons, the steel plate thickness of special hanger is selected 3cm, and steel girder member bar (8) weight is between 20 tons to 30 tons, and the steel plate thickness of special hanger is selected 5cm.
CN201320691031.7U 2013-11-05 2013-11-05 Special lifting apparatus for quickly hoisting steel trussed beam rod piece Expired - Fee Related CN203639831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320691031.7U CN203639831U (en) 2013-11-05 2013-11-05 Special lifting apparatus for quickly hoisting steel trussed beam rod piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320691031.7U CN203639831U (en) 2013-11-05 2013-11-05 Special lifting apparatus for quickly hoisting steel trussed beam rod piece

Publications (1)

Publication Number Publication Date
CN203639831U true CN203639831U (en) 2014-06-11

Family

ID=50871089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320691031.7U Expired - Fee Related CN203639831U (en) 2013-11-05 2013-11-05 Special lifting apparatus for quickly hoisting steel trussed beam rod piece

Country Status (1)

Country Link
CN (1) CN203639831U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556574A (en) * 2013-11-05 2014-02-05 中铁二十一局集团路桥工程有限公司 Lifting device special for rapidly lifting steel truss girder rod piece and using method
CN107268449A (en) * 2017-08-08 2017-10-20 上海君威钢绳索具有限公司 A kind of offshore construction is with four suspension hook adjustable type steel truss girder suspenders
CN109487695A (en) * 2018-11-28 2019-03-19 四川路桥华东建设有限责任公司 A kind of construction method suitable for the quick location and installation of steel truss girder purlin piece and accurately adjusted

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556574A (en) * 2013-11-05 2014-02-05 中铁二十一局集团路桥工程有限公司 Lifting device special for rapidly lifting steel truss girder rod piece and using method
CN103556574B (en) * 2013-11-05 2016-01-20 中铁二十一局集团路桥工程有限公司 The using method of fast hoisting steel girder member bar
CN107268449A (en) * 2017-08-08 2017-10-20 上海君威钢绳索具有限公司 A kind of offshore construction is with four suspension hook adjustable type steel truss girder suspenders
CN109487695A (en) * 2018-11-28 2019-03-19 四川路桥华东建设有限责任公司 A kind of construction method suitable for the quick location and installation of steel truss girder purlin piece and accurately adjusted
CN109487695B (en) * 2018-11-28 2020-05-05 四川路桥华东建设有限责任公司 Construction method suitable for rapid positioning installation and accurate adjustment of steel truss girder pieces

Similar Documents

Publication Publication Date Title
CN103481892B (en) Urban traffic system with self-driven monorail hoist
CN109137744B (en) Asymmetric construction method and control method for main truss of large-span flexible suspension bridge
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN205223872U (en) Drag and hang novel string of basket structure of convolution
CN109797649B (en) Maintenance vehicle hoisting scheme without influence on bridge floor traffic
CN104131519B (en) A kind of bridging toughening equipment construction method
CN201276666Y (en) Rail panel hoisting apparatus
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN203639831U (en) Special lifting apparatus for quickly hoisting steel trussed beam rod piece
CN108639968A (en) Whole lateral moving formula cable crane
CN103669217A (en) Hanging basket with rear fulcrum and transverse moving method for integral range replacement of hanging basket with rear fulcrum
CN208995936U (en) S type steel box girder of cable stayed bridge on across ground rail traffic slides mounting bracket
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN110512517A (en) A kind of bridge construction platform
CN103556574B (en) The using method of fast hoisting steel girder member bar
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN202543799U (en) Hanging bracket hinging type bridge maintenance vehicle
CN206769343U (en) It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge
CN101695984A (en) Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN201619942U (en) Special hoisting tool for hoisting super large block of steel box girder
CN211815662U (en) Cable force conversion device for replacing suspender
CN208732480U (en) Prefabricated girder tensioning auxiliary hoisting device
CN106351123A (en) Single-cable and multi-box construction hanging basket applicable to corrugated steel web girder
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20141105

EXPY Termination of patent right or utility model