JP2011122385A - Pile driving method - Google Patents

Pile driving method Download PDF

Info

Publication number
JP2011122385A
JP2011122385A JP2009282378A JP2009282378A JP2011122385A JP 2011122385 A JP2011122385 A JP 2011122385A JP 2009282378 A JP2009282378 A JP 2009282378A JP 2009282378 A JP2009282378 A JP 2009282378A JP 2011122385 A JP2011122385 A JP 2011122385A
Authority
JP
Japan
Prior art keywords
pile
helicopter
ground
fighter
destination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009282378A
Other languages
Japanese (ja)
Other versions
JP5065365B2 (en
Inventor
Sadayuki Amiya
貞幸 網矢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2009282378A priority Critical patent/JP5065365B2/en
Publication of JP2011122385A publication Critical patent/JP2011122385A/en
Application granted granted Critical
Publication of JP5065365B2 publication Critical patent/JP5065365B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To solve a problem in conventional pile driving executed by a heavy machine such as a pile driver, but because the conventional pile driver cannot be used in a place where the heavy machine does not go in due to the soft ground or when there is an urgent need, piles are dropped instead of dropping bombs from an aircraft. <P>SOLUTION: This pile driving method is carried out by dropping the pile (2) carried to the sky by a fighter plane (1), as if dropping a bomb so that the pile (2) falls on a destination and sticks. A method of using a helicopter (4) guides a pile (2') by a guide cord (3). <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、航空機によって上空まで運ばれた杭は、切り離して目的地に落ち、刺さる杭打ち方法に関するものである。   The present invention relates to a pile driving method in which a pile carried to the sky by an aircraft is cut off and dropped to a destination.

従来の埋め込み杭工法の1つとして、特開2009−91801の名称・アースドリル機と杭打ち機とを併用した埋め込み杭工法のように、プレボウリング根固め工法が知られている。この工法では施工機械とした一般にオーガ駆動装置を装備した三点支持式杭打ち機が使用されている。施工は、オーガ駆動装置により駆動させるアースオーガにより所定深度まで掘削し、掘削後、オーガ先端から根固め液や杭周充填液を掘削穴に注入して掘削土砂と撹拌混合し、掘削孔に既製杭を建込んで回転圧入するという手順がとられているのが、一般の杭打ち方法である。   As one of conventional embedded pile construction methods, a pre-bowling consolidation method is known, such as an embedded pile construction method using a name drilling machine and a pile driving machine in combination with the name of JP2009-91801. In this construction method, a three-point support pile driver equipped with an auger drive device is generally used as a construction machine. Construction is carried out by excavating to a predetermined depth with an earth auger driven by an auger drive unit, and after excavation, rooting liquid and pile filling liquid are injected into the excavation hole from the auger tip, mixed with the excavated soil, and ready-made in the excavation hole. It is a general pile driving method that the procedure of building a pile and rotational press-fitting is taken.

また、ヘリコプターを使用して杭を打ち込む方法として特開2004−169294の名称、富士山の崩壊予防方法のように、ヘリコプターを使用して杭を打つ方法が公開されている。
その方法は、各支持杭は鉄筋コンクリート製の柱体の下端には、下部に尖端を備えた鉄製の基部を固定してなるものであり、柱体に比べて基部の重量が重たい。従って、支持杭をヘリコプターにより空中から傾斜地に投下して支持杭の基部を地中に埋入させ、柱体を地上に突出させた状態で支持杭を傾斜地に立設することができる。ヘリコプターは、支持杭の鉄製基部が傾斜地に埋入するに足る高度から傾斜地に支持杭を勢いよく投下し、打ち込む。その他、防護板もヘリコプターにより吊り下げて運ぶものである。
Moreover, as a method of driving a pile using a helicopter, a method of hitting a pile using a helicopter is disclosed, such as the name of Japanese Patent Application Laid-Open No. 2004-169294 and a method for preventing the collapse of Mt. Fuji.
In this method, each supporting pile is formed by fixing an iron base portion having a pointed portion at the lower end of a reinforced concrete column body, and the weight of the base portion is heavier than that of the column body. Therefore, the support pile can be erected on the sloping ground in a state where the support pile is dropped from the air onto the sloping ground by the helicopter, the base of the supporting pile is buried in the ground, and the columnar body is projected to the ground. The helicopter drops the drive pile into the sloping ground from an altitude sufficient to allow the steel base of the support pile to be embedded in the sloping ground. In addition, the protective plate is also carried by a helicopter.

特開2009−91801JP2009-91801A 特開2004−169295JP2004-169295 特開2004−76371JP 2004-76371 A

従来の杭打ち工法では、アースドリル機と杭打ち機とを併用した埋め込み杭工法のように、重機が必要で、重機が入らない所には使用できず、また時間もかかっていた。そこで、重機の変わりにヘリコプターを使用する方法があったが、支持杭をヘリコプターにより空中から傾斜地に投下して支持杭の基部を地中に埋入させ、柱体を地上に突出させた状態で支持杭を傾斜地に立設することができる。ヘリコプターは、支持杭の鉄製基部が傾斜地に埋入するに足る高度から傾斜地に支持杭を勢いよく投下し、打ち込む。
しかし、傾斜地に埋入するに足る高度から傾斜地に支持杭を勢いよく投下するためには、最低100メートルの高度が必要で、その高度からの投下で目的地に杭を設置するには、高度な技術がいった。
In the conventional pile driving method, heavy machinery is required as in the embedded pile method using both an earth drill machine and a pile driving machine, and it cannot be used where heavy machinery does not enter, and it takes time. Therefore, there was a method of using a helicopter instead of heavy machinery. Support piles can be erected on slopes. The helicopter drops the drive pile into the sloping ground from an altitude sufficient to allow the steel base of the support pile to be embedded in the sloping ground.
However, in order to drop support piles on sloping ground from an altitude sufficient to be embedded in sloping ground, an altitude of at least 100 meters is required. Technology.

そこで、本発明の杭打ち方法は、飛行機などによって上空まで運ばれた杭(2)は、切り離して目的地に落ち、刺さる方法と、ヘリコプター(4)を利用する方法は、誘導紐(3)を使用して杭(2´)を打つ、杭打ち方法を提供するものである。   Therefore, in the pile driving method of the present invention, the method of using the helicopter (4) and the method of using the helicopter (4) are the following methods: A pile driving method is provided in which a pile (2 ′) is hit using

上記目的を達成するために、本発明の杭打ち方法は、飛行機などによって上空まで運ばれた杭(2)は、急降下して、地上ぎりぎりで切り離して目的地に落ち、刺さることで目的を達成した。   In order to achieve the above object, the pile driving method of the present invention achieves the object by suddenly descending the pile (2) transported to the sky by an airplane, etc. did.

請求項2は、ヘリコプター(4)などによって上空まで運ばれた杭(2´)は、誘導紐(3)によって誘導し、投下して目的地に落ち、地面に刺さることで目的を達成した。   Claim 2 achieved the object by guiding the pile (2 ') carried to the sky by a helicopter (4) and the like, guiding it by the guiding string (3), dropping it to the destination, and piercing it into the ground.

本発明の杭打ち方法は、次のような効果がある。
(イ)裏山が崖崩れを起こす危険があるとき、飛行機からの杭打ちで、地盤の崩落を止めることができる。
(ロ)もし、住宅に当たった場合は、30センチの孔が開くだけであるから、その孔を補修する。
(ハ)ヘリコプターを使用する場合は、誘導紐(3)を使って目的地に命中さすことができるので、飛行機よりは正確に杭打ちできる。
(ニ)飛行機は、60度の斜めに杭打ちするときに使用し、ヘリコプター(4)は鉛直に杭打ちするときに使用する。
(ホ)とくに、飛行機の杭打ち方法は、緊急のときが得意で、1時間以内に杭打ちができる。
(へ)重機が入らない所にでも、杭打ちができる。
The pile driving method of the present invention has the following effects.
(B) When there is a danger that the back mountain will cause a landslide, you can stop the collapse of the ground by stakeout from the plane.
(B) If it hits a house, only a 30 cm hole is opened, so the hole is repaired.
(C) When using a helicopter, you can hit the destination using the guide string (3), so you can stake more accurately than an airplane.
(D) The airplane is used when staking 60 degrees diagonally, and the helicopter (4) is used when staking vertically.
(E) In particular, airplane stakeout methods are good at times of emergency, and stakeout can be done within one hour.
(F) You can stake out even where heavy machinery does not enter.

図は、本発明の模式図である。The figure is a schematic diagram of the present invention. 図は、本発明のヘリコプターを使用した模式図である。The figure is a schematic view using the helicopter of the present invention. 図は、誘導紐を使用した杭の断面図である。The figure is a cross-sectional view of a pile using a guide string. 図は、打ち込んだ杭を、フラットバーでとめたところである。The figure shows the pile piled in with a flat bar.

本発明の杭打ち方法は、飛行機で杭を打つのに、最も優れているのが戦闘機(1)で、戦闘機(1)よって上空まで運ばれた杭(2)は、切り離して目的地に落ち、刺さることで地盤を固めることができる。そこで、戦闘機(1)を持っているのは自衛隊しかなく、また、目的地に正確に投下できるのは自衛隊である。   In the pile driving method of the present invention, the fighter plane (1) is the best for hitting a pile with an airplane, and the pile (2) carried to the sky by the fighter plane (1) is separated from the destination. You can solidify the ground by falling and sticking. Therefore, only the Self-Defense Forces have the fighter plane (1), and it is the Self-Defense Forces that can accurately drop it at their destination.

自衛隊は、都道府県の要請を受け、裏山に杭(2)を打つと決まったら、戦闘機(1)のミサイルを杭(2)に積み替えて、目的地の上空まで行く。地上は、レーザーで打ち込む角度と場所を指示し、その指示にしたがって、急降下して爆弾を投下するように杭(2)を投下する。戦闘機(1)によって、時速2000キロに加速された杭(2)は、大部分が地中に刺さる。
もし、完全に土の中に入ったときは、杭(2)の後部に雌捩子を切っており、その雌捩子に雄捩子の付いたパイプを継ぎたし、目的を果たすことができる。
そのような方法であるから、杭(2)を打つ時間の30分間は、半径500メートルの住民は避難しなければならない。
When the SDF receives a request from the prefectural government and decides to hit a pile (2) on the back mountain, the missile of the fighter (1) is transferred to the pile (2) and goes over the destination. On the ground, the angle and location of the laser are instructed, and in accordance with the instruction, the pile (2) is dropped so as to suddenly descend and drop the bomb. Most of the pile (2) accelerated to 2000 km / h by the fighter (1) is stuck in the ground.
If it is completely in the soil, a female screw is cut at the rear of the pile (2), and a pipe with a male screw is connected to the female screw to serve the purpose. it can.
Because of this method, residents with a radius of 500 meters have to evacuate for 30 minutes to hit the pile (2).

請求項2の、ヘリコプター(4)を使用する場合は、誘導紐(3)を使って目的地に命中さすことができる。
杭(2´)は、真ん中に穴の開いたパイプで、その穴の中に誘導紐(3)を通し、ヘリコプター(4)に繋ぎ、杭(2´)を吊るための紐(7)で杭(2´)の羽(10)に具備した穴で吊し、上空4329メートルまで上がり、そこから紐(7)を切り投下する。
When using the helicopter (4) according to claim 2, it is possible to hit the destination using the guide string (3).
The pile (2 ') is a pipe with a hole in the middle, a guide string (3) is passed through the hole, connected to the helicopter (4), and a string (7) for hanging the pile (2') Hang in the hole provided in the wing (10) of the pile (2 '), rise up to 4329 meters above the sky, and cut and drop the string (7) from there.

誘導紐(3)のもう一方の端は、杭(2´)を打つ目標地点から張るのだが、現場としては杭(2´)を打つ所に近寄ると危険な場所は、安全な場所2点からロープ(8)を張り、目的地へ誘導紐(3)の一端を誘導すればよい。
上空から投下された杭(2´)は、誘導紐(3)によって誘導されるが、鉛直でないと誘導紐(3)にかかる摩擦が多くなるので、ヘリコプター(4)を使用して杭(2´)を打つときは、斜めには打てない。
The other end of the guide string (3) is stretched from the target point where the pile (2 ') is struck. The rope (8) may be stretched from the cable, and one end of the guide string (3) may be guided to the destination.
The pile (2 ') dropped from the sky is guided by the guide string (3), but if it is not vertical, the friction applied to the guide string (3) will increase, so the pile (2) using the helicopter (4) When hitting ´), you can't hit it diagonally.

以下、本発明の実施例について図面を参照して説明する。
図1は、飛行機の戦闘機(1)を利用して崖崩れを防ぐ模式図である。
もし、裏山に亀裂がいき、何時崩れるか分からない状態にあるとき、避難命令が出て、そこに住めないとき、住んでいる人は究極の選択をせまられる。
その一つは、何もしないでその住宅を放置するか、最悪のとき家に30センチの穴が開いても住宅を守かであり、杭(2)を打つ場合を説明する。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a schematic diagram for preventing a landslide by using an airplane fighter (1).
If there is a crack in the back mountain and you don't know when it will collapse, the evacuation order will be issued, and if you can't live there, you will be made the ultimate choice.
One of them is to leave the house without doing anything, or to protect the house even if a hole of 30 centimeters is opened in the worst case, and will explain the case where the pile (2) is hit.

そこで、都道府県の要請を受け、裏山に杭(2)を打つと決まったら、自衛隊の戦闘機(1)のミサイルを、杭(2)に積み替えて、目的地の上空まで行く。
戦闘機(1)は、全長20メートル、φ100、重量1トンの、ミサイル型の杭(2)を目的地上空まで運び、地上は鏡(5)を使用してレーザー光(6)を、60度の角度で照射し、幅は5度の広角で照射する。戦闘機(1)は、照射されたレーザー光(6)の範囲に入ったら急降下し、そのレーザー光(6)に向かって更に降下し、目的地に杭(2)を打ち込む。
Therefore, when it is decided to hit the pile (2) on the back mountain in response to the request of the prefecture, the missile of the Self-Defense Force fighter (1) is transferred to the pile (2) and goes over the destination.
The fighter plane (1) carries a missile-type pile (2) with a total length of 20 meters, φ100, and a weight of 1 ton to the air above the target ground, and the ground uses a mirror (5) to send laser light (6) to 60 Irradiate at an angle of degrees, and irradiate at a wide angle of 5 degrees. The fighter aircraft (1) descends rapidly when entering the range of the irradiated laser beam (6), further descends toward the laser beam (6), and drives the pile (2) to the destination.

したがって、戦闘機(1)は8トンの積載能力を持つものであるから、一度に8本の杭(2)を打つのが望ましいが、戦闘機(1)を複数用意して、時間をおかずに打ち込む方が、杭(2)を打った衝撃で崖が崩落することもありえるので、最初の杭(2)打ちから、最後の杭(2)までの時間は10秒以内が望ましい。
打ち込む速度は、時速2000キロに達し、理想は18メートル埋まるのが良いが、地盤が軟弱なときは、速度を遅くして投下しなければならない。
Therefore, since the fighter plane (1) has a loading capacity of 8 tons, it is desirable to hit eight piles (2) at a time, but it takes time to prepare multiple fighter planes (1). Since the cliff may collapse due to the impact of hitting the pile (2), the time from the first pile (2) hit to the last pile (2) is preferably within 10 seconds.
The driving speed reaches 2000 km / h and ideally it should be buried 18 meters, but when the ground is soft, it must be dropped at a slower speed.

そのとき、打った杭(2)がきっかけになって崩落しかけている崖が、崩落するといけないので、その崖の崩落を止めるだけの杭(2)を時間を置かずに打つため、3機が数秒単位で打ち、まず第1機目が杭(2)を投下する。
もし、その崖が崩れかかっても、崩落するより早く第2機の杭(2)や、第3機の杭(2)が崩落する前に杭(2)を打って崩落を止める。
図1は、戦闘機(1)が3機で杭(2)を打っているところで、第1機目の戦闘機(1)が杭(2)を投下して、戦闘機(1)は上昇しているところである。第2機目の戦闘機(1)は投下する直前で、第3機目は地上より誘導レーザー光(6)に誘導されるところであり、戦闘機(1)はレーザー光(6)の中に入って、戦闘機(1)が急降下する前の図である。
At that time, the cliff that is about to collapse due to the struck pile (2) should not collapse, so the three aircraft will hit the pile (2) just to stop the collapse of the cliff without taking time. First, the first machine drops the pile (2).
If the cliff is about to collapse, the pile (2) of the second machine and the pile (2) of the third machine will fall before the pile collapses by hitting the pile (2) before the collapse.
Figure 1 shows that the first fighter (1) drops the stake (2) and the fighter (1) rises when the fighter (1) is hitting three piles (2). I am doing it. The second fighter (1) is just before being dropped, the third fighter is being guided to the guided laser beam (6) from the ground, and the fighter (1) is in the laser beam (6). It is a figure before entering and before a fighter plane (1) descends rapidly.

最初の戦闘機(1)が杭(2)を打ってから、第3機目の戦闘機(1)が杭(2)打つまでに約10秒以内で、成功か崖が崩落してしまうか、はっきりするので良い。
また、レーザー光(6)は、鏡(5)を使用した方が、もしレーザー発射放置に当たったら高価なので、鏡(5)を使用する。
図4の斜視図は、杭(2)を打った地盤は、それだけで安定するが、その杭(2)を足場にして、土砂を取り除いたり、杭(2)どうしをフラットバーなどによって固定し、コンクリートで固めると良い。
After the first fighter (1) hits the stake (2), it takes about 10 seconds before the third fighter (1) hits the stake (2). Because it is clear, it is good.
Further, the laser beam (6) is more expensive if the mirror (5) is used if it is left to emit a laser beam, so the mirror (5) is used.
The perspective view of Fig. 4 shows that the ground on which the pile (2) is struck is stable, but the pile (2) can be used as a scaffold to remove earth and sand, or the piles (2) can be fixed with a flat bar. Harden with concrete.

図2は請求項2の、ヘリコプターを使用する場合で、民間にもできる方法であり、誘導紐(3)を使って目的地に、命中さすことができる模式図である。
誘導紐(3)のもう一方の端は、杭(2´)を打つ目標地点から張るのだが、現場としては杭(2´)を打つ場所に近寄ると危険な場所は、安全な場所2点からロープ(8)を張り、目的地へ誘導紐(3)の一端を誘導すればよい。
FIG. 2 is a schematic diagram of the method according to claim 2 in which the helicopter is used and can be used by the private sector, and can be hit at the destination using the guide string (3).
The other end of the guide string (3) is stretched from the target point where the pile (2 ') is struck. The rope (8) may be stretched from the cable, and one end of the guide string (3) may be guided to the destination.

そして、もう一方の端を、杭(2´)を通してヘリコプター(4)に結び、杭(2´)はロープ(8)でヘリコプター(4)に吊り下げ、上空4329メータまで運び、そこから投下すると、1トンの杭(2´)を吊っていたのが軽くなり、ヘリコプター(4)は上昇しようと上昇するが、誘導紐(3)が付いているので、誘導紐(3)を張るだけで、杭(2´)は30秒後には、時速959キロになって地上に刺さる。
そのとき、誘導紐(3)で誘導すれば杭(2´)は誤差なしに打ち込まれる。
And the other end is tied to the helicopter (4) through the pile (2 '), and the pile (2') is hung on the helicopter (4) by the rope (8), carried to the sky 4329 meters, and dropped from there 1 ton of pile (2 ') is lighter and helicopter (4) is going to rise, but with a guide string (3), just pull the guide string (3) The stake (2 ') is 959 km / h after 30 seconds and pierces the ground.
At that time, if guided by the guide string (3), the pile (2 ') is driven without error.

図3は、ヘリコプター(4)用の杭(2´)の断面図で、杭(2´)はパイプのようになっており、その中を誘導紐(3)が通っている。羽(10)には吊り下げるための紐(7)が付いており、その紐(7)を切ることで杭(2´)は落下する。誘導紐(3)は、杭(2´)を投下することでヘリコプター(4)は、杭(2´)の重さが無くなり上に上昇して誘導紐(3)を張る。
ピンと張った誘導紐(3)に誘導されて落ちるが、誘導紐(3)に負担をかけると良くないので飛行を安定さすための羽(10)が付いている。
FIG. 3 is a cross-sectional view of the pile (2 ′) for the helicopter (4). The pile (2 ′) is like a pipe through which the guide string (3) passes. The wing (10) has a string (7) for hanging, and the pile (2 ') falls by cutting the string (7). When the guide string (3) drops the pile (2 ′), the helicopter (4) is lifted up without the weight of the pile (2 ′) and stretches the guide string (3).
Although it is guided and falls by the taut guide string (3), there is a wing (10) for stabilizing the flight because it is not good if a load is applied to the guide string (3).

図4の斜視図は、杭(2´)を打った地盤は、それだけで安定するが、その杭(2´)を足場にして土砂を撤去し、杭(2´)どうしをフラットバーなどによって固定し、コンクリートで固めるとなお良い。   The perspective view of FIG. 4 shows that the ground on which the pile (2 ′) is struck is stabilized by itself, but the soil is removed using the pile (2 ′) as a scaffold, and the piles (2 ′) are separated by a flat bar or the like. It is better to fix and harden with concrete.

また、戦闘機(1)が投下する杭(2)に、レーザー探知装置を取り付ける方法も考えられるが、コストがかかるので、実用体ではない。   Moreover, although the method of attaching a laser detection apparatus to the pile (2) which a fighter (1) drops is also considered, since it costs, it is not a practical body.

1 航空機 2 杭 3 誘導紐 4 ヘリコプター 5 鏡 6 レーザー光 7 紐 8 ロープ 9 山 10 羽   1 Aircraft 2 Pile 3 Guide String 4 Helicopter 5 Mirror 6 Laser Light 7 String 8 Rope 9 Mountain 10 Wings

Claims (2)

飛行機によって上空まで運ばれた杭(2)は、投下して目的地に落ち、地面に刺さることを特徴とする杭打ち方法。   A pile driving method characterized in that a pile (2) carried to the sky by an airplane is dropped, dropped to a destination, and stuck in the ground. ヘリコプター(4)によって上空まで運ばれた杭(2´)は、誘導紐(3)によって誘導されながら、目的地に投下し、地面に刺さることを特徴とする杭打ち方法。   A pile driving method characterized in that a pile (2 ') carried to the sky by a helicopter (4) is dropped by a destination and guided to the ground while being guided by a guide string (3).
JP2009282378A 2009-12-14 2009-12-14 Pile driving method Expired - Fee Related JP5065365B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009282378A JP5065365B2 (en) 2009-12-14 2009-12-14 Pile driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009282378A JP5065365B2 (en) 2009-12-14 2009-12-14 Pile driving method

Publications (2)

Publication Number Publication Date
JP2011122385A true JP2011122385A (en) 2011-06-23
JP5065365B2 JP5065365B2 (en) 2012-10-31

Family

ID=44286518

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009282378A Expired - Fee Related JP5065365B2 (en) 2009-12-14 2009-12-14 Pile driving method

Country Status (1)

Country Link
JP (1) JP5065365B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018189434A (en) * 2017-04-28 2018-11-29 三菱重工機械システム株式会社 Flying type drawing device
CN110468854A (en) * 2019-07-16 2019-11-19 重庆大学 A kind of quick emergence control method in landslide

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0923757A (en) * 1995-07-10 1997-01-28 Yoshio Hanayama Cylinder for growing seedling and tree-planting using the same
JPH1142003A (en) * 1997-07-25 1999-02-16 Kazumi Miyawaki Tree-planting stake
JP2003063773A (en) * 2001-08-28 2003-03-05 Nec Corp Method/system for detecting displacement angle of suspended cable
JP2004169294A (en) * 2002-11-18 2004-06-17 Seiichi Ozawa Method for preventing collapse of mt. fuji

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0923757A (en) * 1995-07-10 1997-01-28 Yoshio Hanayama Cylinder for growing seedling and tree-planting using the same
JPH1142003A (en) * 1997-07-25 1999-02-16 Kazumi Miyawaki Tree-planting stake
JP2003063773A (en) * 2001-08-28 2003-03-05 Nec Corp Method/system for detecting displacement angle of suspended cable
JP2004169294A (en) * 2002-11-18 2004-06-17 Seiichi Ozawa Method for preventing collapse of mt. fuji

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018189434A (en) * 2017-04-28 2018-11-29 三菱重工機械システム株式会社 Flying type drawing device
CN110468854A (en) * 2019-07-16 2019-11-19 重庆大学 A kind of quick emergence control method in landslide

Also Published As

Publication number Publication date
JP5065365B2 (en) 2012-10-31

Similar Documents

Publication Publication Date Title
CN109297803B (en) Submarine sediment mechanical property measuring system suitable for full sea depth
JP5065365B2 (en) Pile driving method
CN106638693A (en) Dismantling construction method of immersed tunnel steel-pipe pile concrete wall by drilling and blasting
US12006038B2 (en) Device and method for blasting avalanches
US20170058480A1 (en) Earth anchor
RU2393312C1 (en) Method of decreasing dynamic impacts of volcano on environment at its eruption
BRPI0405799B1 (en) TORPED CUTTING WITH INCREASED GRIP POWER AND TABS FOR PERMANENT OR TEMPORARY ANCHORAGE OF FLOATING STRUCTURES AND INSTALLATION METHOD
US9366051B1 (en) Impact sand anchor
BRPI0903371A2 (en) ballast-induced pile
CN105888663A (en) Hard rock blasting construction method combining wire sawing with carbon dioxide cracking
US7104733B2 (en) Avalanche protection system
GB2482181A (en) Preventing and ameliorating leakage from a subsea well in the event of failure
JP5210954B2 (en) Soil anchor
CN210766455U (en) Formula of falling danger rock mass combined protection structure
WO2021163842A1 (en) Combined power anchor having folding anchor shank and method for controlling perpendicularity of the combined power anchor having folding anchor shank during dropping in water
CA2507344C (en) Explosive-activated ground anchor assembly
CN106194025B (en) Marine rock drilling construction technology and equipment
CN208235539U (en) A kind of deep footing groove enclosing structure Zhuan Qin circle processing structure
RU2668441C2 (en) Marine geological pipe-sampling collector
RU132460U1 (en) REINFORCED CONCRETE DRIVING PILES
TWI747063B (en) Point defense and capturing of guided missile to earth and penetrating bomb, ground retracting and lowering machine, apparatus and preparation method of rocket and airship in the navigation
CN103924607B (en) Landslide self-adaptive anchoring system
Hu et al. From Offshore Flexible Flowlines to Dynamically Installed Anchors–A Concept Study
CN215526156U (en) Stable weather station
JPH10298986A (en) Installation method for steel pipe anchor and explosive for the method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120327

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120731

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150817

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150817

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees