Prior art keywords
sampan
energy
frame
layer
rod
Prior art date
Application number
TW108137684A
Other languages
Chinese (zh)
Other versions
TW202022205A (en
Inventor
蔣理中
Original Assignee
蔣理中
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 蔣理中 filed Critical 蔣理中
Publication of TW202022205A publication Critical patent/TW202022205A/en
Application granted granted Critical
Publication of TWI747063B publication Critical patent/TWI747063B/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F41WEAPONS
    • F41HARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
    • F41H11/00Defence installations; Defence devices
    • F41H11/02Anti-aircraft or anti-guided missile or anti-torpedo defence installations or systems

Abstract

本發明公開一項載能器具的空地撞擊中擊發的解除和衝擊性能量釋放的緩解技術,以地球的靜止能量收融人類科技產品的運動勢能,把局域對抗中一獻而就的爆發、損毀變成漸行漸遠的漏泄;以其提供的圩卯山設施、固杆式機具、卯舢式交具的機制為導彈、鑽地彈、火箭、飛船、衛星的收降提供智能化和程序性措施,把對地攻擊的導彈、鑽地彈雨傘式捕俘:把火箭、飛船、衛星等航天器從空間著地中無損性收降。 The invention discloses a technology for the release of firing and the release of impact energy in the air-to-ground impact of an energy-carrying appliance, which uses the static energy of the earth to melt the motion potential energy of human science and technology products, and contributes to the explosion, The damage becomes a gradual leakage; with its provided Wei Maoshan facilities, rod-type equipment, and a sampan delivery mechanism, it provides intelligence and procedures for the recovery and landing of missiles, ground penetrating bombs, rockets, spacecraft, and satellites. Sexual measures are used to capture ground-attack missiles and ground-piercing bombs with umbrellas: rockets, spacecrafts, satellites and other spacecraft are brought down non-destructively from the ground.

Description

一種地面防禦、捕俘、收降設施及製備方法 Ground defense, capture, collection and landing facility and preparation method

彈道導彈、巡航導彈、鑽地彈的守方防禦、捕俘技術;宇航火箭、飛船、衛星的地面收降技術。 Defensive defense and capture technology for ballistic missiles, cruise missiles, and ground penetrating bombs; ground recoil technology for aerospace rockets, spacecraft, and satellites.

對戰爭中攻方的智能導彈拒之門外;使攻擊中的程序導彈頻頻被俘;讓“飽和式”攻擊的導彈遭遇雨傘式收彈;攻方對指揮樞紐突然襲擊戰術流產;對空間導彈防禦體系漏網的導彈轉成地面俘獲。 Keep out the smart missiles of the attacking side in the war; make the program missiles in the attack be captured frequently; let the "saturation" attack missile encounter the umbrella-style retraction; the attacking party's sudden attack on the command hub tactically aborts; defense against space missiles Missiles that have slipped through the system are turned into ground capture.

建設中,使火箭、飛船、衛星等航天器具變身航天飛機效能而收降、重複使用。 During construction, aerospace instruments such as rockets, spacecrafts, and satellites will be transformed into space shuttles, which will be lowered and reused.

這種機具或非機具的技術收降方法適用於多種航天器的多種形式、不同方位的各個空天飛行。 This tool or non-tool technical method of landing and landing is suitable for various aerospace flights in various forms and different azimuths of a variety of spacecraft.

鼎承卯浮解震建築結構,專利號:ZL201310465498.4。 Dingcheng Mao floating earthquake relief building structure, patent number: ZL201310465498.4.

有鑑於此,吾等發明人乃潛心進一步研究,並著手進行研發及改良,期以一較佳設作以解決上述問題,且在經過不斷試驗及修改後而有本發明之問世。 In view of this, our inventors devoted themselves to further research and proceeded to develop and improve, hoping to develop a better design to solve the above-mentioned problems, and after continuous experimentation and modification, the present invention came out.

以地球原貯惰性力與人類科技開發的導彈、鑽地彈、火箭、飛船等活體器具產品的活性力局域中對抗時彼此交融、互接。從過程上規避了炸彈撞擊起爆程序,渙散了撞擊集束的能量,並改變了器具運行的原軌跡,使智能彈導出原戰術目標,使程序彈耗盡能量被俘,使火箭、飛船的撞擊性損毀免於發生而被收降。 The active force of the missiles, ground penetrating bombs, rockets, spacecrafts and other living equipment products developed by human science and technology with the original storage inertia of the earth blends and interacts with each other during local confrontation. In the process, it evaded the bomb impact initiation procedure, dissipated the energy of the impact cluster, and changed the original trajectory of the device's operation, so that the smart bomb was led out of the original tactical target, the program bomb was exhausted and captured, and the rocket and spacecraft were more impactful. The damage was prevented from happening and was taken down.

以本發明的機具調適機制及圩卯山設施的微量的體表張力、卯及卯石間的輕微的摩擦係數承繼、對接導彈、鑽地彈、火箭、飛船的強大衝擊波,使其衝擊波所攜帶的動能在上述承繼、對接過程中產生自耗,在本機具的協調過程和圩卯山的摩擦係數和體表張力中被楞替、消散。以靜止的地球能量中和器件的科技勢能,達到對上述工器的變軌性收降。 With the machine tool adjustment mechanism of the present invention, the slight body surface tension of the Wei Maoshan facility, the slight friction coefficient between Mao and Maoshi, the strong shock waves of missiles, ground penetrating bombs, rockets, and spacecraft are inherited and carried by the shock waves. The kinetic energy is consumed in the above-mentioned inheritance and docking process, and is lost and dissipated in the coordination process of the machine and the friction coefficient and body surface tension of Wei Maoshan. Neutralize the technological potential energy of the device with the energy of the stationary earth to achieve the reduction of orbital change of the above-mentioned tools.

〔本發明〕 〔this invention〕

1:托軸、框支架固杆 1: Support shaft, frame bracket fixed rod

2:軸承套 2: bearing sleeve

3:托軸軸承 3: Support shaft bearing

4:軸承固 4: Bearing solid

5:軸承螺帽 5: Bearing nut

6:導向杆 6: Guide rod

7:導杆軸承 7: Guide rod bearing

8:導杆掛片 8: Guide rod hanger

9:斜滑孔(蓋片) 9: Oblique sliding hole (cover sheet)

10:掛墜固 10: Pendant solid

11:承彈框、變彈框、承箭框 11: Bullet frame, variable bullet frame, arrow frame

12:框支架杆、框支架座杆、框支架固 12: Frame support rod, frame support seat post, frame support fixed

13:支架套管 13: Bracket casing

14:支架頂蓋 14: Bracket top cover

15:圩卯山座卯層 15: Wei Mao Mountain Block Mao Layer

16:圩卯山隔卯板層 16: Weimao Mountain Separate Layer

17:圩卯山遞級卯層 17: Wei Maoshan Grade Mao layer

18:圩卯山遞級隔卯板層 18: Wei Maoshan hand-level partition layer

19:圩卯山許可隔卯板層 19: Wei Maoshan permits the separation of the slabs

20:圩卯山 20: Wei Mao Mountain

21:落點導彈、觸點導彈、落點鑽地彈、觸點鑽地彈、同體力拋彈、巡航導彈、火箭 21: Landing missiles, contact missiles, land-piercing bombs, contact land-piercing bombs, same-strength projectiles, cruise missiles, rockets

22:樞紐護坪 22: Hub protection

23:戰略樞紐、偽樞紐 23: Strategic Hub, Pseudo Hub

24:舢舨 24: Sampan

25:舢梢 25: Sampan

26:行舢浮卯板、行舢(底面)浮卯板 26: Line sampan floating board, line sampan (bottom surface) floating board

27:吊索孔 27: Sling hole

28:舢輪軸 28: sampan axle

29:舢舵、舢舵溝 29: sampan rudder, sampan rudder trench

30:傘骨輪 30: Umbrella Bone Wheel

31:導能杆 31: Energy guide rod

32:止逆環、導能輪 32: Non-return ring, energy guide wheel

33:銳角撬 33: Acute Angle Pry

33:銳角撬錘 33: Acute Angle Crowbar

34:長短錘 34: long and short hammer

35:齊杆錘 35: Full Hammer

36:平展犁 36: Flat Plow

37:尖展犁 37: Pointed Plow

38:禿展犁 38: Bald Plow

39:平角撬、平角撬耙 39: Flat angle prying, flat angle prying rake

40:披卯耙 40: Phi Mao rake

41:梳卯耙 41: comb and rake

42:分卯錘 42: Sub-Mao Hammer

43:差杆錘 43: Poor Hammer

44:短杆錘 44: Short pole hammer

45:卯舢、卯舢網 45: 卯药, 卯药 net

46:導能連杆、導能輪 46: Energy guiding link, energy guiding wheel

47:舢梢網支架固杆 47: sampan net bracket fixed pole

48:舢梢網 48: Sampan Net

49:貯備掛索圈 49: reserve lanyard

50:導航樞紐 50: Navigation Hub

圖1-圖13是固杆式機具的配套部件圖,其中包括:1.托軸2.軸承套3.托軸軸承4.軸承固5.軸承螺帽6.導向杆7.導杆軸承8.導杆掛片9.斜滑孔(蓋片)10.掛墜固11.承彈框12.框支架杆13.支架套管14.支架頂蓋。 Figure 1-Figure 13 is a diagram of the supporting parts of the fixed rod type machine, including: 1. Support shaft 2. Bearing sleeve 3. Support shaft bearing 4. Bearing fixed 5. Bearing nut 6. Guide rod 7. Guide rod bearing 8. .Guide rod hanging piece 9. Inclined sliding hole (cover piece) 10. Hanging and fixing 11. Bullet-bearing frame 12. Frame bracket rod 13. Bracket casing 14. Bracket top cover.

圖14-圖26是圩卯山設施中各遞級卯層及各層隔卯板中的板塊組合狀況圖,其中包括15.圩卯山座卯層16.圩卯山隔卯板層17.圩卯山遞級卯層18.圩卯山遞級隔卯板層10.圩卯山許可隔卯板層。 Figures 14-26 are diagrams of the plate assembly status of each level and each floor of the Weimao Mountain facility, including 15. Weimao Mountain Block Layer 16. Weimao Mountain Block Layer 17. Wei Maoshan sub-level layer 18. Wei Maoshan sub-level layer 10. Wei Maoshan permission to separate the layer.

圖27-圖39是圩卯山設施和固杆式承彈框組合成體後,接承、收捕不同區位、不同體位、不同方位攻入的巡航導彈、彈道導彈、鑽地彈的承彈框機具機制和圩卯山設施的不同功能和綜合收效的效果圖。 Figures 27-39 show that the Weimaoshan facility and the solid-rod-type bullet-bearing frame are combined into a body to receive and capture cruise missiles, ballistic missiles, and ground-penetrating projectiles that have penetrated in different locations, positions, and azimuths. Frame machine mechanism and Wei Maoshan facility's different functions and comprehensive effect renderings.

圖40是對固杆的支架、套管、框支架座及螺栓固架的放大型裸示。圖中預置隔卯板稱平滑板,現澆隔卯板稱疙瘩板。 Fig. 40 is an enlarged naked view of the bracket, sleeve, frame bracket seat and bolt fixing frame of the fixed rod. In the picture, the pre-set partition board is called smooth board, and the cast-in-place partition board is called knot board.

圖41-圖46是卯隱山的對彈攻防,針對續航能量未盡的導彈和鑽地彈的防禦圖。 Figures 41-46 are the defense diagrams of Maoyin Mountain’s defense against missiles and ground-burrowing projectiles with inadequate battery life.

圖47-圖65是行舢式交具的配套部件圖,其中包括45卯舢,卯舢中的24.舢舨25.舢梢28.舢輪軸29.舢舵32.止逆環10.掛墜固11.承箭框12.框支架杆26.行舢浮卯板27.吊索孔30.傘骨輪31.導能杆32.導能輪33.銳角撬34.長短錘35.齊杆錘36.平展犁37.尖展犁38.禿展犁39.平角撬40.披卯耙41.梳卯耙42.分卯錘43.差杆錘44.短杆錘46.導能連杆47.舢梢網支架固杆48.舢梢網。 Figure 47-Figure 65 is a diagram of the matching parts of the sampan, including 45 sampan, sampan 24. sampan 25. sampan tip 28. sampan axle 29. sampan rudder 32. anti-reverse ring 10. pendant Solid 11. Arrow frame 12. Frame support rod 26. Line sampan floating plate 27. Sling hole 30. Umbrella wheel 31. Energy guide rod 32. Energy guide wheel 33. Acute angle pry 34. Long and short hammer 35. Uniform rod Hammer 36. Flat plow 37. Pointed plow 38. Bald plow 39. Flat angle pry 40. Phi-mao rake 41. Comb-mao rake 42. Sub-mao hammer 43. Poor rod hammer 44. Short rod hammer 46. Energy guiding connecting rod 47. The sampan net support rod 48. The sampan net.

圖66-圖79是卯舢在圩卯山具體收降火箭包括飛船、衛星等航天器的舢行各狀況;預先安置的49.貯備掛索圈50.導航樞紐及因導航失誤而未入卯舢的圩卯山火箭之行圖。 Figures 66-79 show the specific conditions of the sampan for the sampan, including spacecrafts, satellites, and other spacecraft, which have been retracted and landed at Weimao Mountain; pre-installed 49. Reserve cable loop 50. Navigation hub and failed to enter Mao due to navigation errors A trip to the Wei Maoshan Rocket of the sampan.

本附圖中主要功能部件及功能構有數字標識,圖中細實線是功能標注線;圖底細實線是合圖線;虛線箭頭是拋彈線;中實線箭頭是行彈、行舢、行箭線;虛線圖是失位物體形;圖中粗虛線是飛行器邏輯線,而非幾何線;圖中彈、箭的飛行線、拋彈線均是邏輯線而非實測線。 The main functional components and functional structures in this figure are marked with numbers. The thin solid lines in the figure are the function marking lines; the thin solid lines at the bottom of the figure are the combined line; the dashed arrows are the bomb-throwing lines; the middle solid arrows are the line bombs and sampans. , Arrow line; the dashed line is the shape of the out-of-position object; the thick dashed line in the figure is the logical line of the aircraft, not the geometric line; the flying and ejection lines of the bullets and arrows in the figure are logical lines instead of actual measurement lines.

關於吾等發明人之技術手段,茲舉數種較佳實施例配合圖式於下文進行詳細說明,俾供 鈞上深入瞭解並認同本發明。 Regarding the technical means of our inventors, several preferred embodiments are described in detail below in conjunction with the drawings, so as to provide a thorough understanding and approval of the present invention.

固杆式機具圩卯山,按來彈承接概要,實施彈、框、山一致的原則,框為正方形的概率。彈長與框的長、寬相同。設定框的長為Nm,相應框托軸直徑亦為N#,導杆鋼管為0.4/N#,作為量的參考數值。 The fixed rod type machine tool Wei Maoshan, according to the summary of the incoming bullets, implements the principle of the same bullet, frame, and mountain, and the probability that the frame is square. The length of the bomb is the same as the length and width of the frame. The length of the set frame is Nm, the diameter of the corresponding frame support shaft is also N#, and the guide rod steel pipe is 0.4/N#, as the reference value of the quantity.

配製框托軸系列的鋼管、托軸軸承、軸承套、軸承固、軸承螺帽;對托軸鋼管的兩端加工螺紋。 Prepare the steel pipes of the frame supporting shaft series, supporting shaft bearings, bearing sleeves, bearing fixtures, and bearing nuts; process threads on both ends of the supporting shaft steel pipes.

配製與框寬一致的0.4/N#導杆鋼管,並與其配套的導杆軸承、導杆掛片、斜滑孔蓋片、掛墜固。 Prepare 0.4/N# guide rod steel pipe with the same frame width, and matched guide rod bearing, guide rod hanger, oblique sliding hole cover, and hang down.

以高強度防火樹脂、高質量纖維布模制承彈框,承彈框的支架固板與框承板同厚,製作時先支架後框板。框支架固板的寬、上緣高均是框長的十分之一,下緣高是框長的十分之零點六,上、下兩部均與框承板聯體,框支架杆模具的高應同時包括框承板的厚。框支架下滑孔的上園心在上緣沿中線向下4/10處;下園心在上沿向下9/10處、左側向內3/10處;兩園聯通成斜滑孔。托軸孔在下緣下沿中線向上2/3處,二孔均以托軸端徑作直徑。 The bullet-bearing frame is molded with high-strength fire-retardant resin and high-quality fiber cloth. The supporting plate of the bullet-bearing frame is the same thickness as the frame supporting plate, and the frame is first supported and then the frame plate is made. The width and height of the upper edge of the frame bracket are one-tenth of the length of the frame, and the height of the lower edge is 0.6/10 of the frame length. The upper and lower parts are connected with the frame bearing plate. The height of the mold should also include the thickness of the frame bearing plate. The upper center of the lower hole of the frame bracket is 4/10 down from the upper edge along the center line; the lower center is 9/10 down from the upper edge and 3/10 inward on the left side; the two gardens are connected to form an oblique sliding hole. The supporting shaft hole is located 2/3 upwards along the middle line at the bottom of the lower edge, and the diameter of the two holes is the diameter of the supporting shaft end.

框支架固板製作完成,及時套入托軸鋼管,兩端定相定位後,對托軸的聯架聯框部位刷裹樹脂、纖維布至原直徑的兩倍。模制承彈框面板,浮向側邊有排向固孔;及時撤去側模板將托軸定位入框,並對框支架固板、框底板、托軸之間加纖維、樹脂塗刷成聯體。 After the frame bracket is finished, the steel pipe of the supporting shaft is inserted in time. After the two ends are phased and positioned, the joint frame part of the supporting shaft is brushed with resin and fiber cloth to twice the original diameter. Molded bullet-bearing frame panel, floating to the side with fixed holes; remove the side template in time to position the support shaft into the frame, and add fiber and resin between the frame support fixed plate, frame bottom plate, and support shaft to form a joint body.

用預製的彈簧窄鋼板固定到框兩側浮面的前後端,彈簧鋼板與框支架固板前、後縱間其彼此左、右橫間立面及浮面有園孔,作網固定點在其四周。 Prefabricated spring narrow steel plates are used to fix the front and rear ends of the floating surfaces on both sides of the frame. The spring steel plates and the frame support fixed plate have circular holes on the left and right horizontal elevations and floating surfaces between the front and rear sides of the spring steel plate and the frame support fixed plate.

扼蓋導杆鋼管兩端的軸承、掛片、銷釘部位後,以同樣的樹脂、纖維對其圍裹性加固加實,至原直徑的兩倍時止。許可有表由粗糙。固化後配 套掛片、軸承入杆並銷釘固定。餘位偏向掛片;掛片與軸承間用牛油封堵;安裝入承彈框的斜滑孔蓋上斜滑孔蓋片。承彈框支架固板固上掛墜固;掛墜固與斜滑孔同側。四周以框上支架固板、彈簧鋼板、框浮向孔為支點用高效能尼龍繩編聯網兜。 After the bearing, hanger, and pin at both ends of the choke cover guide rod steel pipe, use the same resin and fiber to reinforce and reinforce the enclosing property until it is twice the original diameter. Licensing is rough by the table. After curing Set the hanger piece and the bearing into the rod and fix it with a pin. The remaining position is biased toward the hanger; the hanger and the bearing are sealed with butter; the inclined sliding hole cover installed into the bullet frame is covered with an inclined sliding hole cover. The bullet-bearing frame bracket is fixed on the fixed plate, and the hanging is fixed on the same side as the inclined sliding hole. The surrounding pockets are knitted with high-efficiency nylon ropes around the frame with the support fixed plate, spring steel plate, and frame floating holes as the fulcrums.

模制帶座的框支架杆、支架杆套管、支架杆、支架杆頂蓋。彼此間應有固孔。 Molding frame bracket rod, bracket rod sleeve, bracket rod, bracket rod top cover with seat. There should be solid holes between each other.

隔卯板有預製和現澆兩種,選用材料有高強度防火玻璃鋼板,雙層鋼筋混凝土砼板。選擇性厚度玻璃鋼板為3-5cm,混凝土砼板為7-12cm,單板塊面積以4平方米為參考數據,同平面板塊間不對稱、不雷同、接壤互補。 There are two kinds of partitions: prefabricated and cast-in-place. The materials used are high-strength fireproof glass steel plate and double-layer reinforced concrete concrete slab. The selective thickness of the glass steel plate is 3-5cm, the concrete concrete slab is 7-12cm, and the area of the single plate is 4 square meters as the reference data. The plates on the same plane are asymmetrical, not identical, and complementary.

戰略樞紐防“落彈”的圩卯山,以樞紐為中心,周邊以圓狀取形,在內圈自裏向外鋪堆φ12cm的同標號卯;外圍以1m為寬作圩埂。以φ12cm、φ8cm、φ4cm、麥料卯等四種卯石遞次30cm分層疊加;裏單外綜的圩卯山至3m高後,架起腳手架;操作人員除常規防護外,著浮卯撬鞋入卯操作。撬鞋是撬與鞋的結合,撬與鞋之間除趾蹼部有緊密性結合外,跟腱部有伸松性聯結;撬前後、左右均是鞋的3倍面積,鞋在撬的正中部安裝。 Wei Mao Mountain, a strategic hub to prevent "bulleting", is centered on the hub, and the periphery is rounded. The inner circle is piled with the same number of φ12cm from the inside to the outside; the periphery is 1m wide as a 圩圩. The four kinds of Maoshi, such as φ12cm, φ8cm, φ4cm, and wheat material Mao, are layered and stacked in layers of 30cm; the 圯卯山 of the inner single and outer comprehensive is 3m high, and the scaffolding is erected; in addition to the conventional protection, the operator uses the floating sledge The shoe enters the Mao operation. The prying shoe is a combination of prying and shoes. In addition to the tight connection between the toe web and the Achilles tendon between the prying and the shoe, the area of the prying shoe is three times the area of the shoe before and after the prying. Central installation.

平整好座卯層後,輸入預製或現澆隔卯板入卯;其中鋼筋混凝土現澆部份分

Figure 108137684-A0305-02-0006-1
板塊式現澆,先外圍以三夾板圍固,平整卯層並對其整鋪展塑料膜後,先四周後中心,輸混凝土入卯,初步平整,置放底層鋼筋;追加混凝土、追加浮層鋼筋、追加浮層混凝土;平整後用滾筒加壓,然後用平板震動機壓實,養護後按原板塊面設計進行切割;切割十分之九後餘底由其自然斷裂。
Figure 108137684-A0305-02-0006-2
模塊式現澆,按設定的模塊用木條隔開並作聯繫性固定;對隔開模塊包括木條整體覆膜並逐個依次整卯後多層全流域聯澆,統一平整;平整、滾筒加壓、震動加 固後,任木條自然降解性斷裂。
Figure 108137684-A0305-02-0007-3
網格化現澆,把草繩按設定要求編成網格後移入浮卯,進行適當的三夾板木條托繩後,整卯、整體覆膜,全流域以繩線為先導輸混凝土入模,平整,安放底層鋼筋、追加混凝土、追加浮層鋼筋、追加浮層混凝土,高度不夠可二次加繩並用扎絲扎固,再次繩覆膜並追加澆鑄。
Figure 108137684-A0305-02-0007-4
補差化現澆,以預置板塊隔卯板交錯性入卯,對缺位處以木條相隔後整卯、覆膜,鋼筋混凝土加澆。後三款現澆不需要切割。 After leveling the seat layer, enter the prefabricated or cast-in-situ partition board into the base; the cast-in-situ reinforced concrete part is divided into
Figure 108137684-A0305-02-0006-1
Block cast-in-situ, first surround the periphery with three plywood, level the layer and spread the plastic film on it, and then put the concrete into the hole first and then the center, initially level it, and place the bottom steel bar; add concrete, add floating layer steel bar , Add floating layer concrete; after leveling, pressurize with a roller, then compact with a flat vibrating machine, and cut according to the original plate surface design after curing; after cutting nine tenths of it, the remaining bottom is naturally broken.
Figure 108137684-A0305-02-0006-2
Modular cast-in-situ, separated by wooden strips according to the set modules and fixed in conjunction; the partitioned modules include wooden strips as a whole, and they are layered one by one, and then multi-layered and whole watershed are poured together, uniformly leveled; leveled, roller pressurized , After vibration reinforcement, the wood strips are naturally degradable and fractured.
Figure 108137684-A0305-02-0007-3
Grid cast-in-place, weave the straw rope into a grid according to the set requirements and then move it into the floating frame, after carrying out the appropriate three-ply wooden strips to support the rope, the whole area, the whole is covered with a film, the whole basin is guided by the rope and the concrete is injected into the mold. Level, place bottom reinforcement, additional concrete, additional floating layer reinforcement, and additional floating layer concrete. If the height is not enough, you can add rope twice and tie it with ties, and then rope again and add casting.
Figure 108137684-A0305-02-0007-4
Fill the difference and cast-in-place, use pre-set plates to separate the slabs into the slabs interlacedly, and use wooden strips to separate the missing places and then complete and cover them, and add reinforced concrete. The last three cast-in-place do not require cutting.

同層中拒絕無縫聯塊,上、下板塊交錯性毗爿。若干層後,把底座框支架杆移上隔卯板並按設定位固定。逐層上遞時需要校正框支架杆架位,直至頂端圈綜卯層;框支架杆的高度不足時用套管聯結。 In the same layer, seamless connection is rejected, and the upper and lower plates adjoin each other in a staggered manner. After several layers, move the base frame support rod to the partition board and fix it according to the set position. It is necessary to correct the position of the frame support rod when it is delivered layer by layer, until the top circle heald layer; when the height of the frame support rod is insufficient, use the casing to connect.

玻璃鋼隔卯板的操作與此相同,現澆時應平地澆鑄,固化三至五成時移入。預置的隔卯板是平滑板,現澆的隔卯板是疙瘩板。常規中平滑板與疙瘩板交替,或同層缺窟互補。 The operation of the glass fiber reinforced plastic partition board is the same. It should be cast on the ground when it is cast in place, and moved in when it has solidified 30 to 50%. The pre-installed partition board is a smooth board, and the cast-in-place partition board is a knot board. Normally, the smooth plates alternate with the pimple plates, or the cavities in the same layer complement each other.

按不同設定對框支架杆中輸入高沉澱率的江沙,並對杆口注水促澱;或調成漿料的建築石粉混泥土入灌;或按比例的混凝土並鋼筋:後二者需要震動棒加震。 Input high sedimentation rate of river sand into the frame support rod according to different settings, and pour water into the rod mouth to promote sedimentation; or mix building stone powder concrete into slurry; or proportional concrete and steel bars: the latter two need to be shaken The stick is shocked.

吊裝,座固承彈框後,對框支架杆口加蓋支架頂蓋,用吊塊吊懸導向杆於斜滑孔上端。用四根同長索帶,從框掛圈處限量彙集後懸掛合力墜對框定向。 After hoisting and fixing the bullet-bearing frame, cover the frame support rod opening with the support top cover, and use the hanging block to suspend the guide rod on the upper end of the inclined sliding hole. Use four cables of the same length to gather a limited amount from the frame hanging loop and then hang together to align the frame.

從機具圩卯山進入承彈框的來彈,彈的衝擊能撞擊框的任何部分,框隨即觸為變彈框,把彈的直行能量變換成圓周運動,把受到的彈頭撞擊能從尾羽部送還給來彈,促使彈尾速超越彈身、彈頭,成斤斗形拋出;原本彈頭撞擊中觸發的起爆程序撤免,彈從圩卯山順坡溜滑、墜落,其尾羽犁出的圈 綜卯中的φ12cm、φ8cm大號標卯裸出並隨墜,浮托著彈的回落,消散著落彈摩擦而轉換的熱量;小號卯沉澱,成為彈的犁溝。圖27、圖34。 An incoming projectile that enters the bullet frame from the Weimao Mountain of the machine tool can hit any part of the frame. The frame will then touch into a variable bullet frame, transforming the straight energy of the bullet into a circular motion, and the impact of the bullet can be from the tail feathers. Return the incoming bullets, prompting the tail of the bullet to surpass the body and the warhead, and throw it out into a catty bucket; the detonation procedure triggered by the original bullet impact was withdrawn, and the bullet slipped and fell down the hill from Weimao, and its tail feathers plowed out of the circle. The φ12cm and φ8cm large size marks in the comprehensive frame are exposed and fall, floating while supporting the bullets to fall, dissipating the heat converted by the friction of the falling bullets; the small horns precipitate and become the furrows of the bullets. Figure 27, Figure 34.

未觸承彈框直入圩卯山的落點彈,沿坡圈綜卯的鬆散摩擦中受到遞增的摩擦係數的增阻和彈體後力的推擁,彈頭被彈尾超越,同樣斤斗形變軌,沿坡犁滑和撤免觸爆。圖28、圖29。 The projectile that did not touch the bearing frame went straight into the drop point of Wei Mao Mountain. The loose friction along the slope circle heddle was increased by the increasing friction coefficient and pushed by the rear force of the projectile. The warhead was surpassed by the projectile tail, and the bucket was deformed in the same way. , Sliding along the slope and withdrawing to avoid hitting. Figure 28, Figure 29.

垂直向襲擊圩卯山的巡航導彈,穿越圩卯鬆散卯層,並被平滑的隔卯板和疙瘩的隔卯板組成的夾巷變軌、迫行和摩擦耗能,順圩卯山的既定結構鑽出,程序中失去撞擊而撤免起爆。圖30、圖31、圖32。 The cruise missile that strikes Weimao Mountain vertically, passes through the loose layer of Weimao, and is composed of smooth partitions and knotty partitions. It dissipates energy, compulsively and frictionally, following the established Weimao Mountain. The structure was drilled out, and the impact was lost during the procedure, and it was withdrawn to avoid detonation. Figure 30, Figure 31, Figure 32.

攜帶重力波並彈尾噴加速度的鑽地彈直落圩卯山坡,受圩卯山圈綜卯層的摩擦係數降速、變軌後,彈尾噴推行鑽地彈穿棱圩卯山隔卯板的溜卯層而免爆。圖35。 The ground penetrating projectile carrying gravity waves and the acceleration of the jet's tail jet fell straight down the Weimao mountain slope. After being affected by the friction coefficient of the Weimao mountain circle complex layer and changing its orbit, the projectile's tail jet pushed the penetrating projectile through the Weimao mountain barrier. The slippery layer of the board avoids bursting. Figure 35.

高能量直擊承彈框沿的鑽地彈,彈能量把承彈框無間隙地變成圓周運動,至能量耗盡後自動墜落、免爆。圖36。 High-energy hits the ground penetrating projectile directly at the edge of the bullet frame. The bullet energy turns the bullet frame into a circular motion without gaps. When the energy is exhausted, it will fall automatically and avoid explosion. Figure 36.

直擊承彈框面受框滑溜的鑽地彈被拋向圩卯山圈綜卯坡上,無撞擊而免爆。圖37。 The ground penetrating projectile, which hit the surface of the bomb-bearing frame and was slippery, was thrown onto the comprehensive slope of the Wei Maoshan circle, without impact, without exploding. Figure 37.

直擊承彈框正中,無同體力回贈的觸點導彈,彈頭被導向杆導向側邊並獲得同體力補續、拋彈,失去撞擊而免爆。圖38、圖39。 Directly hit the center of the bullet-bearing frame, and there is no contact missile with the same physical strength. The warhead is guided to the side by the guide rod and obtains the same physical strength. Figure 38, Figure 39.

與承彈框擦肩而過的導彈順坡溜墜觸坡及地坪面耗能後被俘。圖33。 The missile that passed by the bomb frame slipped down the slope and hit the slope and the ground surface and was captured after consuming energy. Figure 33.

卯隱式設施圩卯山,去除承彈框和框支架杆,以相同的程序在圩卯山設施中,碎片式隔卯板;以鋼板或廢鋼板防銹處理後作平滑板鋪作隔卯層,其次以現澆砼板或玻璃鋼板輔作填窟式、隔層式疙瘩板,必要時可對鋼板邊緣 加帶鋼縱向加厚並補窟同厚,組壘起圩卯山設施。轉移戰略樞紐,仍舊輸入戰略樞紐的信息流和信號源,繁星式密布於非戰略防禦地作戰術欺騙和誘惑,鑽地彈,巡航導彈,彈道導彈組成的飽和式攻擊的彈雨被雨傘式收降;非但解除了戰術攻擊,而且直接破譯了其捕彈的全部的技術參數。 Concealed facility Wei Maoshan, remove the bullet-bearing frame and frame support rods, use the same procedure in the Wei Maoshan facility, fragment partitions; use steel plates or scrap steel plates after anti-rust treatment and use smooth plates to pave the partitions Layer, secondly, cast-in-situ concrete board or glass steel plate is used as a supplementary hole filling type and interlayer type knot board. If necessary, the edge of the steel plate can be Add strip steel to thicken longitudinally and fill the cave with the same thickness, and build up the Wei Maoshan facility. Transfer to the strategic hub, and still input the information flow and signal source of the strategic hub. Stars are densely distributed on non-strategic defense areas for tactical deception and temptation. The saturated attack bombs composed of ground penetrating bombs, cruise missiles, and ballistic missiles are collected by umbrellas. Descending; not only relieved the tactical attack, but also directly deciphered all the technical parameters of its bombing.

從山頂擊入圩卯山的鑽地彈,被隔卯板的不規則承彈和提卯摩擦阻擋,卯的張力的外泄和隔卯板的漂移導致彈的隨漂並改變軌跡,引入隔卯層鑽出。圖41。 The ground penetrating projectile that hit the Wei Mao Mountain from the top of the mountain was blocked by the irregular bearing of the spacer and the friction of the lift. The leakage of the tension and the drift of the spacer caused the projectile to drift and change its trajectory.卯 layer drilled out. Figure 41.

擊中圩卯山坡腳圈綜卯層的鑽地彈變軌後被彈尾噴能量沿地坪與隔卯板層的巷道中推擁、迫行,從巷道中鑽出而被俘。圖42。 The ground penetrating projectile that hit the comprehensive layer at the foot circle of the Weimao hill changed its orbit and was pushed and forced by the projectile jet energy along the ground and the roadway separating the slab layer, drilling out of the roadway and being captured. Figure 42.

擦坡而下的巡航彈沿坡轉地坪滑行,能量耗盡後被俘。圖43。 The cruise bomb that swept down the slope glided along the slope to the ground, and was captured after running out of energy. Figure 43.

插擊圩卯山側頂的巡航導彈被圈綜卯層摩阻,尾、首失重中掉頭後攜彈尾噴再向飛行。圖44。 The cruise missile that hit the side top of Weimao Mountain was dragged by the circle layer and turned around in weightlessness at the tail and forehead, and then carried the missile with its tail jet and flew forward. Figure 44.

同部位垂直擊入圩卯山的側頂而無續航能量的彈道導彈被圈綜卯層、芯標溜卯層摩阻後尾首倒拋,成落彈續滑行後能量耗盡被俘。圖45。 The ballistic missile that hits the side roof of Wei Mao Mountain vertically at the same position without endurance energy was dragged by the loop layer and the core mark slip layer and then thrown upside down, and the energy was exhausted and captured after the falling bomb continued to slide. Figure 45.

以垂直面擊入圩卯山隔卯層的導彈受隔卯板迫行、變軌後穿越溜卯後滑行,耗盡能量後被俘。圖46。 The missile that hit the barrier layer of Wei Mao Mountain in a vertical plane was forced by the barrier, changed its orbit, and then traversed the slide before sliding, and was captured after exhausting its energy. Figure 46.

卯舢式交具圩卯山,按設定制作卯舢及圩卯山設施系列的圖47-圖65的全部系列部件。根據收降飛行器的概要,參考固杆式承彈框的機理,製作組裝卯舢,保留框支架杆及承彈框的基礎和程序,變承彈框為承箭框。 The sampan-style handing over Wei Maoshan, and all the series components of Figure 47-Figure 65 of the Maoshan and Wei Maoshan facility series are made according to the settings. According to the outline of the retractable aircraft, refer to the mechanism of the fixed rod type bullet-bearing frame, make and assemble the sampan, retain the foundation and procedures of the frame bracket rod and the bullet-bearing frame, and change the bullet-bearing frame to an arrow frame.

模制左、右舢舨。舢的上舷長以框的1.15倍作參考數,舢的下底長以框長的1.05倍作參考,舢舨底、舷的高度略高於框高。舢舨上沿以框高的2 倍作半徑圓為梢翹參考,舢舨下沿以框高的2.7倍作半徑圓為梢翹參考:兩圓弧相交處為舢梢尖,舢的內寬是框寬的1.08倍。 Molded left and right sampans. The upper side length of the sampan is 1.15 times the frame length as a reference number, and the lower bottom length of the sampan is 1.05 times the frame length as a reference. The height of the bottom and side of the sampan is slightly higher than the frame height. The upper edge of the sampan is framed 2 The double radius circle is the tip warping reference, and the lower edge of the sampan is 2.7 times the frame height as the tip warping reference: the intersection of the two arcs is the tip of the sampan, and the inner width of the sampan is 1.08 times the frame width.

取固化的兩舢舨浮相左、右固定,用三夾板密封性托底式圈梢,在舢舵溝和吊索孔處留置相應的模芯後,覆上膠衣,對舢的底全方位進行反復塗刷樹脂、纖維布,與左、右舢舨聯結,至設定的規範。固化後翻轉舢舨,揭去托底夾板並用腳馬支撐舢倉的四平角並吊索孔和舢舵溝部,使其除了穩固外,吊索孔模具和舢舵溝模具,原浮突的模芯反向底突,再次底向全方位補加樹脂和纖維布展複塗刷至達標為止。 Take the two solidified sampans floating and fix them on the left and right, use the three splint to seal the bottom ring tips, leave the corresponding mold cores in the sampan rudder groove and the sling hole, and cover the bottom of the sampan with a rubber coat. Repeatedly paint resin and fiber cloth, and connect with the left and right sampans to the set specifications. After curing, turn the sampan over, remove the supporting plate and use the foot horse to support the four flat corners of the sampan and the sling hole and the sampan rudder groove to make it stable, the sling hole mold and the sampan rudder groove mold, the original embossed mold core Reverse the bottom protrusion, once again add resin and fiber cloth to the bottom to reach the standard.

同時製作單拋邊座腳的框支架座杆。以防銹鋼板或金屬板製作舶舵;舢舵上沿有舢固孔,側沿有輪固孔。舢舵的長、厚與舢舵溝一致;舢舵的高是舢舨的1.6倍,包括入舢溝部份;舢舵的下沿厚低於2-3cm,並作適當處理消除棱角;舢舵的底長是全長的十分之一;舶舵的上斜角約12°,兩端對稱。 At the same time, the frame support seatpost with single-throw seat legs is produced. The rudder is made of anti-rust steel or metal plate; the upper edge of the sampan rudder has sampan fixing holes, and the side edge has wheel fixing holes. The length and thickness of the sampan rudder are the same as those of the sampan rudder groove; the height of the sampan rudder is 1.6 times that of the sampan, including the part that enters the sampan; The bottom length of the rudder is one-tenth of the full length; the upward oblique angle of the rudder is about 12°, and the two ends are symmetrical.

模制傘骨輪;傘骨輪外緣薄,無棱角,內骨輻及輪轂厚;輪輻的傘骨向外沿放射狀擴展。輪的半徑不得超過舢舨高;由玻璃鋼製作。 Molded rib wheel; the outer edge of the rib wheel is thin, without edges and corners, and the inner bone spokes and hub are thick; the ribs of the spokes extend radially outward. The radius of the wheel shall not exceed the height of the sampan; it is made of glass steel.

傘骨輪在傘輪軸上由墊片、軸承、螺帽、銷釘固定後,軸的正中處安兩箍靈活箍片。箍裸端有固孔,對裸出了抱箍固孔的舢輪軸圍裹性刷塗樹脂、纖維布加固加實至軸直徑的兩倍為止。把舢舵兩端與舢輪軸的抱箍相聯結,及時移上舢舨,舢舵入溝。用樹脂纖維布對舢舨、舢輪軸、底面浮面板、舢舵、舢舵溝粘固。固化後翻轉卯舢體,仍舊用腳馬支承四角。用園短鋼作銷插入舢舵的固孔,對裸出的舢舵上沿兩邊置放木模條並覆膠衣,對上銷的舢舵上沿口以樹脂、纖維布刷填舵模直至滿荷,固化後撤模,舢舵與舢輪軸,卯舢成一體。 After the umbrella rim wheel is fixed on the umbrella wheel shaft by gaskets, bearings, nuts, and pins, two flexible hoops are installed in the middle of the shaft. The naked end of the hoop has a fixing hole, and the sampan axle with the naked hoop fixing hole is coated with resin and reinforced with fiber cloth until the shaft diameter is doubled. Connect both ends of the sampan rudder with the hoop of the sampan wheel shaft, move the sampan in time, and put the sampan into the ditch. Use resin fiber cloth to cement the sampan, sampan axle, bottom floating panel, sampan rudder, and sampan rudder groove. After curing, turn the sampan over and still use the feet to support the four corners. Use short steel as a pin to insert into the fixed hole of the sampan, place wooden mold strips on both sides of the exposed sampan and cover with gel coat, and fill the sampan with resin and fiber cloth on the upper edge of the pinned sampan. When the load is full, the mold is removed after curing, and the sampan rudder and the sampan axle are integrated.

安裝框支架杆座固入卯舢,除了底部的座固外,對框支架杆與舢舨用樹脂、纖維布加以粘固。 The mounting frame bracket rod seat is fixed into the sampan, in addition to the bottom seat fixing, the frame bracket rod and the sampan are glued with resin and fiber cloth.

吊裝承箭框上卯舢固定;裝上框支架頂蓋;對框掛圈掛環內側加焊短園鋼成止逆環。 The upper sampan of the lifting bearing frame is fixed; the top cover of the frame bracket is installed; the inner side of the frame hanging ring is welded with short round steel to form a non-return ring.

其次,同步製作、安裝玻璃鋼導能輪金屬導能杆,以導向杆的同#鋼管並舢內徑的長度,製作導能連杆;以纖維布、樹脂雙料加固至原直徑兩倍,固聯上兩側導能輪。 Secondly, synchronously fabricate and install the metal energy guide rod of the glass fiber reinforced plastic energy guide wheel, and use the same # steel pipe of the guide rod and the length of the inner diameter of the sampan to make the energy guide connecting rod; Energy guide wheels on both sides.

舢梢上舷園弧起處以導能杆的同料鋼橫加制舢梢網支架固杆,固杆與梢尖之間尼龍繩編聯舢梢網。 The sampan tip net bracket is made of the same material steel of the energy guiding rod at the arc starting point of the sampan tip, and the sampan tip net is braided with nylon rope between the fixed rod and the tip.

卯舢式圩卯山去消隔卯板程序,根據設定需要,對銳角撬加安長短錘或齊杆錘、平展犁、尖展犁、禿撬犁的一種,構成銳角撬犁(錘)或對平角撬加安披卯耙及梳卯耙、分卯錘、差杆錘、短杆錘的一種,構成平角撬耙(錘)。在圩卯山的堆壘中預先逐層或單層安置;在多層撬及撬與舢之間留出貯備掛索圈,抽出掛索;臨山巔時,置導航樞紐器材入山頂卯中;直升機或吊杆吊裝卯舢上峁頂安座。從吊索孔中伸出掛索,穿透掛墜固,吊起導向杆,卯舢由卯的浮載及對舵的摩擦支承。圖66、圖67。 The sampan-style sampan removes the partition board program. According to the setting needs, add a long and short hammer or a full-stroke hammer, a flat plow, a pointed plow, and a bald plow to form an acute-angle plow (hammer) or One of the flat-angle prying and prying rake and combing rake, split hammer, differential hammer, and short-stem hammer, constitutes a flat-angle prying rake (hammer). Place in advance layer by layer or single layer in the stacks of Wei Mao Mountain; leave a storage lanyard ring between the multi-layer skid and the skid and the sampan, and withdraw the lanyard; when approaching the top of the mountain, set the navigation hub equipment into the top of the mountain; The sampan is lifted by a helicopter or boom to be seated on the roof. The sling is extended from the sling hole, penetrating the hanging fixture, and the guide rod is lifted, and the sampan is supported by the floating load and the friction of the rudder. Figure 66, Figure 67.

卯舢承箭後成了行舢,圩卯山的圈綜卯、芯標溜卯對舢的摩擦製造了舢的承載,卯中銳角撬犁(錘)對卯的摩擦加承,信馬由韁式從山坡到平地耗盡能量後被收降;或者由多組平角撬耙(錘)逐段遞增負荷,在指定的局域中耗盡能量而被收降。 After the sampan bears the arrow, it becomes a sampan. The friction between the loop and the core mark slip of the sampan creates the load of the sampan. The sharp-angled plow (hammer) in Maozhong supports the friction of the sampan. The hillside reaches the flat ground and the energy is exhausted and then it is lowered; or the load is increased step by step by multiple sets of flat-angle prying rake (hammers), and the energy is exhausted in the designated area and then lowered.

火箭落點卯舢框左向時,卯舢向左傾斜,舢舵沒入圈綜卯層中掌舵、摩擦,行舢而下。圖68、圖69。 When the rocket falls to the left of the sampan frame, the sampan tilts to the left, the sampan rudder is submerged in the circle layer to steer, rub against, and sampan down. Figure 68, Figure 69.

火箭落點卯舢正中,導向杆下滑導走火箭頭及身、尾,右向傾斜,舢舵沒入圈綜卯層中摩擦、耗能,行舢而下。圖70、圖71。 The rocket hit the center of the sampan, the guide rod slides down to guide the rocket's nose, body, and tail, and tilts to the right. Figure 70, Figure 71.

導航失准,火箭落點左向舢梢網,卯舳承受箭的勢能快速左向行舢而下。圖72、圖73。 The navigation was inaccurate, and the rocket landed on the sampan net to the left, and Maofang quickly sampaned leftward under the potential energy of the arrow. Figure 72, Figure 73.

導航失准,火箭左向斜落卯舢承箭框,卯舶承箭框先行向舶梢傳遞能量後,全舢左向犁卯而行。圖74、圖75。 When the navigation was inaccurate, the rocket dropped to the left side of the sampan bearing frame, and after the sampan bearing frame first transferred energy to the ship, the full sampan moved leftward towards the plow. Figure 74, Figure 75.

導航失誤,火箭落入卯舶左前圩卯山坡,沿卯石坡犁卯溜行,由山坡入平地。圖76、圖77。 A navigation error caused the rocket to fall into the left front Wei Mao hillside of Maobo, and plow along the Maoshi slope, from the hillside to the flat ground. Figure 76, Figure 77.

導航失誤,火箭垂向落入圩卯山前坡,箭行改狀圩卯山原態及卯舢的穩定,鑽破圩卯山卯石溜體,踽踽而出。圖78、圖79。 A navigation error caused the rocket to fall vertically into the front slope of Weimao Mountain. The arrow changed to the original state of Weimao Mountain and the stability of the sampan. It slid through the body of Weimao Mountain and stumbled out. Figure 78, Figure 79.

上述三組圩卯山收尾後,表面鋪灑薄層的四、六、八、大拷、建築石子覆蓋,短期防禦滂沱雨的水流聚束沖溝水運輸卯,山腳處種植爬山虎植物漫山保護作長期覆蓋養護;使用時切斷植物根部並用硫酸灼燒,待乾枯後用無人機揭網。 After the above-mentioned three groups of Wei Maoshan are finished, the surface is covered with thin layers of four, six, eight, big kao, and building stones to prevent rainy water from gathering gullies for water transportation. At the foot of the mountain, creeper plants are planted to protect the mountain. For long-term mulching and maintenance; cut off the roots of the plant and burn it with sulfuric acid when using it, and use a drone to uncover the net after it dries up.

一個火箭、一個導彈,可建成千上萬的圩卯山及其機具、交具、圍護守方戰略保障和戰術安全。 One rocket and one missile can build thousands of Wei Maoshan and its machinery, delivery equipment, and guarding strategic guarantees and tactical security.

四兩撥千斤,一種中國武術的放大板,戰具化、體系化在導彈器具攻、防、收、捕技術上的應用。卯石堆以自身的沉積平衡穩定成一個內能臨界的群體。其導彈、鑽地彈、火箭、飛船的來襲打破了這種平衡,以山式卯石堆依來襲勢能轉化成另一種勢能,呈高山流水、泥石流或雪崩溝態。高山流水、泥石流或雪崩溝以其自身的蓄能或勢兼並來襲的勢能,來襲彈成了卯石流的俘虜。所有來襲外力都將被其內力同化。 The four-two-handed-thousand-jins, a kind of magnifying board of Chinese martial arts, is a weaponized and systematic application of missile weapon attack, defense, capture, and capture technology. The mortar pile stabilizes into a group with critical internal energy by its own sedimentary balance. The attack of its missiles, ground penetrating bombs, rockets, and spacecraft broke this balance, and the potential energy of the mountain-like mortar pile was transformed into another kind of potential energy, which was in the form of mountain water, debris flow or avalanche ditch. High mountain water, mudslides or avalanche ditch with their own energy storage or potential merging potential energy, the incoming bombs become the prisoners of Maoshi Liu. All incoming external forces will be assimilated by their internal forces.

其實大號卯石以直徑加入運勢,呈滑動或跳動;小號卯石以周長參加運勢,呈滾動,大號卯浮上“水溝”或“泥溝”表層,隔於沉彈、箭、船和卯流之間,隔開摩擦生熱,加護彈藥的溫度安全。 In fact, the large 卯石 is added to the fortune by its diameter, showing sliding or beating; the small 卯卯 participates in the fortune by the circumference, and it is rolling. Between the ship and Maoliu, friction and heat are separated, and the temperature of the ammunition is safe.

一種原能量對後能量的同化技術結構及設施;以無形的預貯能量對有形的攜能器具的同化。 A technical structure and facility for the assimilation of the original energy to the post-energy; the assimilation of tangible energy-carrying appliances with invisible pre-stored energy.

綜上所述,本發明所揭露之技術手段確能有效解決習知等問題,並達致預期之目的與功效,且申請前未見諸於刊物、未曾公開使用且具長遠進步性,誠屬專利法所稱之發明無誤,爰依法提出申請,懇祈 鈞上惠予詳審並賜准發明專利,至感德馨。 To sum up, the technical means disclosed in the present invention can effectively solve the problems of the prior art and achieve the expected purpose and effect. It has not been seen in the publications, has not been used publicly, and has long-term progress before the application. The patent law claims that the invention is correct. Yan filed an application in accordance with the law and prayed for the detailed examination and grant of the invention patent.

惟以上所述者,僅為本發明之數種較佳實施例,當不能以此限定本發明實施之範圍,即大凡依本發明申請專利範圍及發明說明書內容所作之等效變化與修飾,皆應仍屬本發明專利涵蓋之範圍內。 However, the above are only a few preferred embodiments of the present invention, and should not be used to limit the scope of implementation of the present invention, that is, all equivalent changes and modifications made in accordance with the scope of the patent application of the present invention and the content of the description of the invention are all It should still fall within the scope of the patent for this invention.

11:變彈框 11: Changeable frame

20:圩卯山 20: Wei Mao Mountain

21:觸點導彈 21: Contact missile

22:樞紐護坪 22: Hub protection

23:戰略樞紐 23: Strategic Hub

Claims (5)

一種地面防禦、捕俘、收降設施,其特徵在於:包括設定地域的固杆式機具圩卯山、卯隱式設施圩卯山、卯舢式交具圩卯山:所述固杆式,包括帶座框支架杆、框支架杆、支架套管、支架頂蓋,自下而上支架支承機具;所述機具,包括承彈框及組成承彈框的全套托軸、軸承套、托軸軸承、軸承固、軸固螺帽、導向杆、導杆軸承、導杆掛片,斜滑孔蓋片、掛墜固、框支架固板、承彈框底板、彈簧鋼窄板、尼龍繩網運轉承彈、變彈、受理巡航導彈、彈道導彈、鑽地彈的接彈和拋出性變軌;所述圩卯山,包括圈綜卯、芯標卯、隔卯板;所述圈綜卯,外圍以φ12cm、φ8cm、φ4cm、麥粒卯每30cm一層綜疊加覆蓋於圩卯山表層的卯石;所述芯標卯,是內圈以φ12cm每3m為一層逐層疊加於圩卯山裏層的卯石;所述隔卯板,即橫亙於各級卯層間的模塊化高強度雙層鋼筋的混凝土砼板或高強度的防火玻璃鋼板;以圩卯山的方式接承變彈框拋出的彈或直接來襲的彈;設定的隔卯板各層上、下不同縫,左、右不對稱,大、小不雷同,同層不聯體的模塊化互接的逐層迭合;所述卯隱式設施,包括防銹處理的模塊性廢鋼板、補窟性彌合的混凝土疙瘩隔卯板或玻璃鋼疙瘩隔卯板;去除承彈框和框支架杆的圩卯山,直接收捕來襲彈;所述卯舢式交具,包括卯舢、銳角撬犁(錘)或平角撬耙(錘)、導航樞紐、貯備掛索圈;所述卯舢,包括承(變)箭框、框支架杆,還包括止逆環、導能杆、導能連杆、舢舵、導能輪、傘骨輪、傘輪軸及其配套墊片、軸承、螺帽、銷釘、抱箍、舢舨及備有舢舵溝、吊索孔的行舢(底面)浮卯板、舢梢、舢梢網、舢梢網支架固杆的製備組成;所述銳角撬犁(錘),包括銳角撬與長短錘、齊杆錘、平展犁、尖展犁、禿展犁的選擇性合成;所述平角撬耙(錘),包括平角撬與披卯耙、梳卯耙、分卯 錘、差杆錘、短杆錘的選擇性合成;所述圩卯山,去除隔卯板,由卯舢承箭圩卯山成行舢並受銳角撬犁(錘)或平角撬耙(錘)通過預留貯備索圈的逐段提供的卯間摩擦能的傳遞,把箭在設定的地域收降,或圩卯山直接收降誤導中的火箭;所述圩卯山技術設施,還包括浮卯撬鞋、爬山爪鞋、套;所述固杆式機具、卯隱式設施、卯舢式交具與各自圩卯山自成一體,一付為彈而生的姿態,一種擁抱來箭的常態,通過各自機造結構及機制與本發明的卯的體表張力和體內摩擦係數一統,耗去所承航天器的載能,完成捕俘、收降。 A ground defense, capture, and retreat facility, which is characterized in that it includes a fixed pole type machine tool Wei Maoshan, a hidden facility Wei Maoshan, and a sampan handover Wei Maoshan in a set area: the fixed pole type, Including bracket rod with seat frame, frame bracket rod, bracket sleeve, bracket top cover, bottom-up bracket supporting machine tools; the machine tools, including the ball bearing frame and a complete set of supporting shafts, bearing sleeves and supporting shafts forming the supporting frame Bearings, bearing fixings, shaft fixing nuts, guide rods, guide rod bearings, guide rod hangers, oblique sliding hole cover pieces, hanging fixings, frame bracket fixing plates, bottom plate of bullet-bearing frame, spring steel narrow plate, nylon rope net Operate missiles, change bombs, accept cruise missiles, ballistic missiles, ground penetrating projectiles, and throw off orbital changes; the Weimao Mountain includes the ring heddle, the core mark and the partition plate; the ring heddle卯, the outer periphery is φ12cm, φ8cm, φ4cm, and every 30cm layer of wheat grains are superimposed on the surface layer of Wei Maoshan; the core mark is the inner circle with φ12cm every 3m as a layer and layer by layer on Wei Maoshan. The inner layer of stone; the partition plate, that is, the modular high-strength double-layer reinforced concrete concrete slab or high-strength fire-resistant glass steel plate that traverses between the layers of the various layers; accept the variable bullet frame in the way of 圩卯山Projectiles thrown or directly attacked; each layer of the set partition board has different seams on the upper and lower sides, left and right asymmetrical, large and small are different, and the same layer is not connected with modular interconnection layer by layer. ; The hidden facilities include rust-proof modular waste steel plates, concrete slabs or glass fiber reinforced plastic slabs that bridge the hole; remove the bullet-bearing frame and frame support rods, and directly collect Catching incoming bombs; the sampan delivery tools, including sampans, acute-angle plows (hammers) or flat-angle plows (hammers), navigation hubs, and reserve lanyards; the sampans include bearing (change) arrows Frame, frame bracket rod, also including non-return ring, energy guiding rod, energy guiding connecting rod, sampan rudder, energy guiding wheel, umbrella bone wheel, umbrella wheel shaft and its matching gaskets, bearings, nuts, pins, hoop, The preparation composition of sampan and sampan (bottom) floating plate, sampan tip, sampan tip net, and sampan tip net support rod with sampan rudder groove and sling hole; the acute-angle prying plough (hammer) includes an acute-angled prying Selective synthesis with long and short hammers, full-rod hammers, flat plows, pointed plows, and bald plows; the flat-angle prying rake (hammer) includes flat-angle prying and plowing rake, comb rake, and split rake Selective synthesis of hammers, differential hammers, and short-stem hammers; the 圩卯山, the partition plate is removed, the sampan is carried by the sampan, and the sampan is carried by an acute angle plow (hammer) or a flat-angle plow (hammer) Through the transmission of frictional energy provided segment by segment of the reserved cable ring, the arrow can be retracted in the set area, or the rocket that is misleading can be directly retracted by Weimao Mountain; the technical facilities of Weimao Mountain also include floating Prying shoes, climbing claw shoes, covers; the said fixed-rod machine tools, hidden facilities, and sampan handing tools are integrated with their respective Wei Maoshan, a posture born for bullets, a kind of embracing the arrow Normally, through the respective mechanical structures and mechanisms, the body surface tension and the body friction coefficient of the present invention are unified, and the load energy of the supported spacecraft is consumed to complete capture and recovery. 一種如請求項1所述之地面防禦、捕俘、收降設施的製備方法,其中,以借形現澆疙瘩隔卯板交錯性疊差弱化圩卯山的無遮鑭坍塌,以板銜面的加大增強卯的聚合,以模塊化的板差交互提供圩卯山的構成;以平板式和模塊式現澆完成上述工序;首先以隔板對初層卯浮面圍裹固定後,平整卯層的坑窪以較厚的塑料膜平覆初卯層後,輸入混凝土鋪底,在鋪底混凝土上加入底層鋼筋;追加混凝土並平整後,再加面層鋼筋及面層混凝土,平整後先用滾筒加壓,後用平板振動機加固;養護後按設定板塊要求進行切割;或者以木條隔塊或草繩網、覆膜後隔塊模塊化澆鑄,同樣全流域逐層添加而非逐塊澆鑄,逐層累加整合結具。 A method for preparing a ground defense, capture, and retreat facility as described in claim 1, wherein the uncovered lanthanum collapse of Weimao Mountain is weakened by the staggered stacking difference of the cast-in-situ lump-in-situ lumps, and the unshielded lanthanum collapse of the Weimao Mountain is weakened by the slab. Increase and strengthen the aggregation of the 卯, and provide the structure of Wei Maoshan with modular plate difference interaction; the above process is completed by flat plate and modular cast-in-place; firstly, the first layer buoyant surface is wrapped and fixed with a partition, and then flattened. After the potholes of the layer are covered with a thicker plastic film, the concrete paving is fed into the bottom of the paving, and the bottom reinforcement is added to the paving concrete; after the concrete is added and leveled, the surface reinforcement and surface concrete are added, and the roller is used first after leveling Pressurized and then reinforced with a plate vibrating machine; after curing, cut according to the requirements of the set plate; or modularly cast with wooden strip spacers or straw rope nets, and membrane-covered spacers, and also add layer by layer instead of casting block by block in the whole basin , Accumulate the integration structure layer by layer. 一種如請求項1所述之地面防禦、捕俘、收降設施的製備方法,其中,以空杆實澱的方法加實、加固、強化框支架固杆的強度,提高機具的承彈能力並毀後再次使用;在承彈框安裝後,在框支架杆的上口加輸高沉澱率的江沙填杆,並向杆中注水促澱;或向杆口中加輸砌灰混泥土或鋼筋混凝土,提供框支架固杆的承受力和重複使用效率,後二者需要用震動棒加震。 A method for preparing ground defense, capture, and retreat facilities as described in claim 1, wherein the method of solid deposition with empty poles is used to reinforce, reinforce, and strengthen the strength of the frame support rods to improve the bomb-bearing capacity of the equipment and Use it again after it is destroyed; after the bullet-bearing frame is installed, add a high sedimentation rate of river sand filling rod to the upper mouth of the frame support rod, and inject water into the rod to promote sedimentation; or add lime concrete or steel bar to the mouth of the rod Concrete provides the endurance and repeated use efficiency of the frame support rods. The latter two need to be vibrated with vibrating rods. 一種如請求項1所述之地面防禦、捕俘、收降設施的製備方法,其中,以同步導、交具耗、分步耙的持續性疊加連鎖耗能機制,耗散空間來箭的載能,使空間器具無損性收降;首先製備止逆環、導能杆、導能輪,導能杆與導能輪合長值略高於框下底與舢倉底間的值;以轂厚、緣薄模制傘骨輪,傘骨輻成放射狀擴展,輪緣邊無稜角;製備銳角撬及長短錘、齊杆錘,平展犁、尖展犁、禿展犁/或平角撬及披卯耙、梳卯耙、分卯錘、差杆錘、短杆錘,配製成銳角撬犁(錘)或平角撬耙(錘〉,將其中之一或迭複預置入圩卯山中,圩卯山去除隔卯板,並預留貯備掛索圈將其與卯舢相聯;安裝導能杆、導能輪、傘骨輪入卯舢:攜能火箭的衝擊使承箭框沿下傾,把能量先後傳給導能杆和荒山底,其時導能杆前展,推導能輪前滾,把該部分能量遞給舢梢,舢梢下傾牽動全舢沿圩卯山坡向下,舢舵、傘骨輪入卯摩擦,行舢初穩後,貯備索圈盡,銳角撬犁(錘)或平角撬耙(錘〉向舢傳遞摩擦耗換能量,至此行舢或興馬由韁式負撬犁由坡臨地後收降或坡上載能耗盡而收降。 A method for preparing ground defense, capture, and retreat facilities as described in claim 1, wherein the continuous superimposed chain energy dissipation mechanism of synchronous guidance, handover consumption, and step-by-step rake is used to dissipate the space and the load of arrows. First, prepare the non-return ring, the energy guiding rod, and the energy guiding wheel. The combined length of the energy guiding rod and the energy guiding wheel is slightly higher than the value between the bottom of the frame and the bottom of the sampan; Thick, thin-rimmed mold rib wheel, ribs spread radially, no edges or corners on the rim; preparation of acute angle prying, long and short hammers, straight hammers, flat plows, pointed plows, bald plows/or flat-angle plows and Plowing rakes, combing rakes, splitting hammers, differential hammers, short rod hammers, configured as acute-angle plowing plows (hammers) or flat-angle prying plows (hammers), one of them or multiple presets is placed in the Wei Maoshan , Wei Maoshan removes the partition board, and reserves a reserve cable ring to connect it with the sampan; install energy guide rods, energy guide wheels, and umbrella skeletal wheels into the sampan: the impact of the energy-carrying rocket makes the frame edge of the arrow Tilt down and transfer the energy to the energy guide rod and the barren mountain bottom. At this time, the energy guide rod stretches forward, deriving the energy wheel to roll forward, and transfers this part of the energy to the sampan. When the sampan rudder and the rim wheel enter the sampan for friction, after the sampan is initially stable, the reserve cable circle is exhausted, and the sharp-angled plow (hammer) or the flat-angled rake (hammer) transfers frictional energy to the sampan. The rein type negative skid plow is retracted after reaching the ground on the slope or when the energy consumption of the loading on the slope is exhausted. 一種如請求項1所述之地面防禦、捕俘、收降設施的製備方法,其中,上述各組圩卯山的施工結束後,山坡四周外表加撒薄層鋒面建築用大拷、四、六、八石子的混合層,防滂沱雨的水流運走外圈綜卯石,短期防護;種植爬山虎植物漫坡作長期養護;使用時切斷根部並用硫酸灼燒,枯萎後用無人機揭網。 A method for preparing ground defense, capture, and retreat facilities as described in claim 1, wherein after the completion of the construction of the above-mentioned groups of Wei Maoshan, a thin layer of frontal construction is sprinkled on the surface of the hillside, four and six The mixed layer of eight stones prevents the torrential rainwater from transporting the outer ring stone for short-term protection; planting creeper plants over the slope for long-term maintenance; cutting off the roots and burning them with sulfuric acid when in use, and uncovering the nets with drones after wilting.
TW108137684A 2018-10-19 2019-10-18 Point defense and capturing of guided missile to earth and penetrating bomb, ground retracting and lowering machine, apparatus and preparation method of rocket and airship in the navigation TWI747063B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811275119 2018-10-19
CN201811275119.4 2018-10-19

Publications (2)

Publication Number Publication Date
TW202022205A TW202022205A (en) 2020-06-16
TWI747063B true TWI747063B (en) 2021-11-21

Family

ID=70849996

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108137684A TWI747063B (en) 2018-10-19 2019-10-18 Point defense and capturing of guided missile to earth and penetrating bomb, ground retracting and lowering machine, apparatus and preparation method of rocket and airship in the navigation

Country Status (2)

Country Link
US (1) US20200173756A1 (en)
TW (1) TWI747063B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105079A (en) * 2006-06-08 2008-01-16 于鑫阳 Building design scheme
CN102561782A (en) * 2011-12-30 2012-07-11 张维中 Artificial hilly blindage
CN104295144A (en) * 2014-03-05 2015-01-21 秦赵修 Bomb-shaped bunker
CN106401258A (en) * 2016-10-20 2017-02-15 傅黎明 Peacetime and wartime aboveground and underground automatic house
CN106468106A (en) * 2015-08-17 2017-03-01 杜松涛 A kind of grottoes hotel

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1240495A (en) * 1917-04-21 1917-09-18 Emil Scheelke Torpedo-net.
US1272680A (en) * 1917-08-20 1918-07-16 Alfred M Lane Torpedo-snare.
US2592873A (en) * 1950-01-16 1952-04-15 Dallas B Driskill Apparatus for landing rockets and rocket ships
US4109910A (en) * 1976-07-14 1978-08-29 Gleason Theodore J Weighted tennis net support post
US4775120A (en) * 1980-04-07 1988-10-04 Marwick Edward F Extraterrestrial transportation apparatus and method
US4768417A (en) * 1987-10-13 1988-09-06 Wright James E Detonator net weapon
US5367503A (en) * 1993-10-04 1994-11-22 Carl J. Lowrance Turnstile game
US20050189467A1 (en) * 2002-11-26 2005-09-01 Harrison Wilbur E. Harrison gyroscopes-stabilized free standing towers and missile defense systems
CN101038143A (en) * 2007-04-11 2007-09-19 杨海洋 Flexible hold-up interception method of missile and equipment
US8434711B2 (en) * 2008-12-31 2013-05-07 Joel F. Berman Unguided missile and projectile defense shield supported by tethered balloons
CN102087083A (en) * 2009-12-03 2011-06-08 高建中 Rope course type short-range missile intercepting device
CN203132432U (en) * 2013-03-21 2013-08-14 张淮 Guided missile arresting net
CN105509570A (en) * 2014-09-13 2016-04-20 杨宗福 Missile defense system
US20160363422A1 (en) * 2015-06-10 2016-12-15 Mcy Consulting Llc Defense system for changing the course of an incoming propelled munition
US20180164080A1 (en) * 2016-08-22 2018-06-14 Richard Chi-Hsueh Land and air defense system having drones
CN212477800U (en) * 2020-05-13 2021-02-05 马克菲尔(长沙)新型支档科技开发有限公司 Anchoring gabion retaining wall
CN214168807U (en) * 2020-11-02 2021-09-10 中铁第一勘察设计院集团有限公司 Rolling stone energy consumption slope body protection system
CN213805481U (en) * 2020-12-03 2021-07-27 西南科技大学 Gabion retaining wall
CN213805480U (en) * 2020-12-03 2021-07-27 西南科技大学 Gabion retaining wall
KR102307192B1 (en) * 2021-04-01 2021-09-30 허지윤 Shooting range protective structure and construction and maintenance method of shooting range protective structure
CN113250240A (en) * 2021-05-24 2021-08-13 中国电建集团贵阳勘测设计研究院有限公司 Combined side slope protection structure and process of layered net type gabion and concrete
CN113585296B (en) * 2021-08-05 2022-11-08 长沙理工大学 Artificial slope assembly type flexible support ecological comprehensive treatment structure and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105079A (en) * 2006-06-08 2008-01-16 于鑫阳 Building design scheme
CN102561782A (en) * 2011-12-30 2012-07-11 张维中 Artificial hilly blindage
CN104295144A (en) * 2014-03-05 2015-01-21 秦赵修 Bomb-shaped bunker
CN106468106A (en) * 2015-08-17 2017-03-01 杜松涛 A kind of grottoes hotel
CN106401258A (en) * 2016-10-20 2017-02-15 傅黎明 Peacetime and wartime aboveground and underground automatic house

Also Published As

Publication number Publication date
US20200173756A1 (en) 2020-06-04
TW202022205A (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN113279622B (en) Method for dismantling thin-wall reinforced concrete chimney through high-notch blasting
CN105401742A (en) Blasting demolition construction key technology and construction method of intersecting-parallels-shaped high-rise building
Purton A history of the late medieval siege, 1200-1500
JP2006342648A5 (en)
ES2331662T3 (en) PROCEDURE FOR THE ANCHORAGE OF FLOATING BODY DEVICES.
TWI747063B (en) Point defense and capturing of guided missile to earth and penetrating bomb, ground retracting and lowering machine, apparatus and preparation method of rocket and airship in the navigation
Turnbull The Great Wall of China 221 BC–AD 1644
Mahan A Complete Treatise on Field Fortification: With the General Outlines of the Principles Regulating the Arrangement, the Attack, and the Defence of Permanent Works
Ussishkin The Assyrian attack on Lachish: the archaeological evidence from the southwest corner of the site
Aviam The archaeological illumination of Josephus’ narrative of the battles at Yodefat and Gamla
Wilkins et al. Roman artillery balls from Qasr Ibrim, Egypt
Ussishkin Sennacherib's campaign in Judah: the conquest of Lachish
Baker To Build and destroy
Hippensteel Sand, Science, and the Civil War: Sedimentary Geology and Combat
Viollet-le-Duc Castles and warfare in the middle ages
Latham Bridges and Tunnels: Investigate Feats of Engineering with 25 Projects
Viele Hand-book of field fortifications and artillery
Rottman Soviet Field Fortifications 1941–45
Ussishkin Area R and the Assyrian siege
Roy Siege War Before the Gunpowder Age
Straith Treatise on Fortification...
Meyer Roman Siege Machinery and the Siege of Masada
Rottman Vietnam War Booby Traps
Fulton 7 Mamluk Period