CN213805480U - Gabion retaining wall - Google Patents

Gabion retaining wall Download PDF

Info

Publication number
CN213805480U
CN213805480U CN202022860204.6U CN202022860204U CN213805480U CN 213805480 U CN213805480 U CN 213805480U CN 202022860204 U CN202022860204 U CN 202022860204U CN 213805480 U CN213805480 U CN 213805480U
Authority
CN
China
Prior art keywords
gabion
retaining wall
stone cage
grouting
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022860204.6U
Other languages
Chinese (zh)
Inventor
孔超
古松
顾颖
任松波
杨莉琼
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest University of Science and Technology
Original Assignee
Southwest University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest University of Science and Technology filed Critical Southwest University of Science and Technology
Priority to CN202022860204.6U priority Critical patent/CN213805480U/en
Application granted granted Critical
Publication of CN213805480U publication Critical patent/CN213805480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a check guest retaining wall and construction method thereof relates to retaining wall technical field, and check guest retaining wall includes: the side grouting stone cage comprises a bottom grouting stone cage and a plurality of layers of stone cage retaining wall blocks arranged on the bottom grouting stone cage, wherein the plurality of layers of stone cage retaining wall blocks are arranged in a step shape in the longitudinal direction, and a side grouting stone cage is arranged between two adjacent stone cage retaining wall blocks on the same layer; the ladder department that adjacent gabion retaining wall block formed is equipped with encloses the purlin, and the both ends that enclose the purlin extend to side slip casting gabion respectively in, check guest retaining wall still is equipped with the anchor rope, and the one end of anchor rope is passed the soil layer of side slip casting gabion downward sloping setting behind check guest retaining wall, and the other end of anchor rope passes side slip casting gabion and encloses the purlin and be connected, the utility model provides a present retaining wall basis expose, poor stability, durability low, economic benefits low, restore difficult scheduling problem.

Description

Gabion retaining wall
Technical Field
The utility model relates to a retaining wall technical field, concretely relates to check guest retaining wall.
Background
The Gabion retaining wall is also called a Gabion retaining wall, and is a flexible retaining wall formed by filling discrete materials such as soil or rock blocks in a net cage woven by a Gabion net. In China, the gabion structure is mainly applied to slope protection of riverways, but also shows excellent performance in highway application, and the novel structure shows better superiority than a rigid and semi-rigid structure in engineering application. The retaining walls with similar purposes are mainly classified into the following 5 types:
1. gravity type retaining wall
The gravity type retaining wall is generally made of rock blocks, bricks or plain concrete, is kept stable by the gravity of self-bearing, has high rigidity, is used in a good field of foundation soil, has the height of less than 5m, and has the characteristics of simple structure, easy material taking and convenient construction. However, in the environment of weak foundation soil and complex field, especially in the roadbed flushed by river water, the range is limited because the foundation soil is often subjected to uneven settlement or even collapse due to the fact that the foundation soil is emptied by flood.
2. Cantilever (wall) type retaining wall
The cantilever (wall) type retaining wall is made of reinforced concrete, its stability is mainly maintained by the gravity borne by the soil above the cantilever of the wall heel, the tension of the cantilever part is born by the steel bar, its advantage is that the wall body cross-section size is small, the requirement for bearing capacity of the foundation is not high, the construction is simple, the wall height can be greater than 5m, it belongs to the semi-flexible semi-rigid structure, when used in the ordinary working site, it has very good deformation resistance and non-uniform settlement resistance. However, when the water-saving anti-overturning water-saving device is used for water-saving water. In severe cases, the wall body can be greatly displaced, and collapse accidents are likely to happen when the wall body exceeds a certain height.
3. Buttress retaining wall
The counterfort retaining wall is made of reinforced concrete as the cantilever type retaining wall, the height of the wall is generally more than 10m, in order to increase the bending rigidity of the wall, one counterfort is arranged at intervals of 0.8-1 m in the longitudinal direction of the wall, the engineering quantity of the counterfort retaining wall is small, the requirement on the bearing capacity of a foundation is not high, but the construction process is complex, the construction cost is higher than that of other retaining walls, once the counterfort retaining wall is damaged, the counterfort retaining wall is difficult to repair, and the counterfort retaining wall is uneconomical when used for protecting a water-damaged roadbed.
4. Anchor rod and anchoring plate type retaining wall
The anchor plate retaining wall is composed of prefabricated reinforced concrete wall panels, upright posts, steel pull rods and anchor plates buried in the filled soil, and the anchor plate retaining wall is a light retaining structure generally composed of the upright posts, the wall panels and anchor rods. The retaining wall has the advantages of light structure, high flexibility, small engineering quantity, low counterfeiting and suitability for engineering with lower foundation bearing capacity. However, the construction process is complex, corresponding construction conditions are not provided in a plurality of water-damaged roadbed sections, the flexibility is large, the out-of-plane rigidity is low, large plastic deformation can be generated under the impact action of water flow and the action of uneven soil pressure, the repairing is difficult, the impact resistance is weak, the durability is poor, and the water-damaged roadbed is not suitable for working in the water-damaged roadbed fields.
5. Ordinary gabion retaining wall
The common gabion is also called a gabion retaining wall, and is a flexible retaining wall formed by filling discrete materials such as soil bodies or block stones in net cages woven by a gabion net. Ordinary gabion retaining wall cost is low, simple manufacture, and limited few, the practicality is strong. But its disadvantages are: the novel stone cage is formed by simply piling up a gabion net, is stable only by self gravity, is less in restraint, is easy to displace when impacted by water flow, and can be unevenly settled or collapsed due to the fact that a bottom soil layer is emptied by flood. In addition, fillers such as stones, filling soil and the like in the gabion mesh are easily taken out when flushed by flood to cause the inner part of the wall body to form a cavity, and the strength and stability of the wall body are affected.
In summary, five types of retaining walls commonly used at present have the following disadvantages when used in a water-damaged roadbed field: 1. the rigidity is high, and the method is not suitable for water-damaged roadbed and other soft soil layers; 2. the wall base is exposed under the washing of flood, so that the instability phenomenon is easily caused; 3. the drainage capacity of the wall body is poor, and rainwater is easily accumulated in the soil body behind the wall, so that the soil pressure on the wall body is increased and instability occurs. 4. The wall body is made of a material with low plane external rigidity and poor deformation resistance, and is easy to generate plastic deformation under the direct impact of water flow and difficult to repair. 5. The concrete retaining wall generally undergoes construction links such as reinforcing steel bar binding, formwork erecting and pouring, and the laying and ramming of roadbed seasonings behind the wall can be carried out only when the concrete reaches a certain strength, so that the construction period is long, and a certain technical threshold is provided, so that the concrete retaining wall cannot meet the requirements of quick, efficient and economic restoration of a water-damaged roadbed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a gabion retaining wall to solve present retaining wall basis expose, poor stability, durability are low, economic benefits is low, the efficiency of construction is low, repair difficult scheduling problem.
The utility model provides an above-mentioned technical problem's technical scheme as follows:
a gabion retaining wall comprising: the multi-layer gabion retaining wall blocks are arranged in a stepped manner in the longitudinal direction, and a side grouting gabion is arranged between every two adjacent gabion retaining wall blocks in the transverse direction; the step department that two adjacent gabion retaining wall blocks on longitudinal direction formed is equipped with encloses the purlin, and the both ends of enclosing the purlin extend to side slip casting gabion respectively in, and check guest retaining wall still includes the anchor rope, and the one end of anchor rope is passed side slip casting gabion downward sloping and is set up in the soil layer behind check guest retaining wall, and the other end of anchor rope with enclose the purlin and be connected.
The gabion retaining wall is provided with the bottom grouting gabion and the side grouting gabion, so that the bottom and two sides of the retaining wall are high in rigidity and good in integrity, deformation of the retaining wall can be reduced when the retaining wall is impacted by water flow, and the retaining wall is prevented from collapsing; enclose the purlin and have the constraint effect to gabion retaining wall piece, solved the gabion net poor stability of piling up, produce the problem that slides easily, the anchor rope can further strengthen the fixed to enclosing the purlin.
Further, in the preferred embodiment of the present invention, the bottom grouting gabion and the side grouting gabion respectively include: the stone cage comprises a stone cage net and gravel and mortar arranged in the stone cage net.
The bottom slip casting gabion adopts the gabion net to fill rubble and mortar in the gabion net, the rubble and mortar can be obtained locally, the cost is low, the manufacturing process is simple, the mortar can fill the gap of the rubble, and the rubble can be bonded into a whole, so that the rigidity of the bottom slip casting gabion is enhanced.
Further, in the preferred embodiment of the present invention, the gabion retaining wall block comprises: the stone cage comprises a stone cage net and gravels arranged in the stone cage net.
Further, in the preferred embodiment of the present invention, the maximum diameter of the gabion mesh is smaller than the minimum diameter of the crushed stone.
The aperture of the gabion mesh is smaller than the minimum diameter of the crushed stones, so that the crushed stones are prevented from leaking out of the gabion mesh.
Further, in the preferred embodiment of the present invention, a permeable soil retaining layer is provided in the gabion mesh, and the gravel are disposed in the permeable soil retaining layer.
The stone cage is internally wrapped with a permeable retaining layer, the permeable retaining layer does not influence the drainage effect of the wall body when filling in the filter wall, the problem that the wall body filling is brought out by water flow washing to form a cavity is solved, and the problem that soil pressure is increased due to accumulated water in soil behind the wall is also solved.
Further, in the preferred embodiment of the present invention, the permeable soil-retaining layer is a permeable geotextile.
The utility model discloses following beneficial effect has:
the utility model provides a gabion retaining wall, the gabion retaining wall is provided with a bottom grouting gabion, a side grouting gabion and a gabion retaining wall block, the bottom grouting gabion and the side grouting gabion can enhance the rigidity of the bottom and the side of the wall body, enhance the integrity of the wall body, and when the retaining wall is impacted by water flow, the deformation of the retaining wall can be reduced, and the retaining wall is prevented from collapsing; the lower end of the bottom grouting gabion is arranged in the riverbed, so that direct washing of the bottom grouting gabion by water flow can be avoided, the instability problem caused by hollowing of a soil layer under a wall is avoided, and the stability of the wall body is ensured; the transverse enclosing purlin has a restraint effect on the gabion retaining wall blocks, and the problems that the piled gabion retaining wall blocks are poor in stability and easy to slip are solved; set up ventilative fender soil layer behind this retaining wall, can effectively slow down rivers to the washing away of filling behind the wall, avoid behind the wall soil particle to run off. In addition, the gabion retaining wall is simple to manufacture, convenient to construct, capable of obtaining local materials, few in limited factors and low in cost, the construction technology threshold of the retaining wall is low, workers with technical advantages can construct the retaining wall, the construction speed of the retaining wall is high, the efficiency is high, the water-damaged roadbed filler and the retaining wall can be constructed simultaneously, and the requirements of quick and efficient repair of the water-damaged roadbed can be met; because this retaining wall efficiency of construction is high, so even take place to damage and also can repair rapidly, solved the problem of complicated district road bed restoration slow, difficulty.
Drawings
Fig. 1 is a schematic view of a front view structure of the gabion retaining wall of the present invention;
figure 2 is the utility model discloses the vertical sectional structure schematic diagram of gabion retaining wall.
Wherein: 1-grouting a gabion at the bottom; 2-gabion retaining wall blocks; 3-grouting a gabion on the side surface; 4-enclosing purlin; 5, anchor cable; 6-water permeable soil retaining layer; 7-roadbed water damage line; 8-roadbed filling; 9-riverbed; 10-throwing stones; 11-a steel backing plate; 12-water line.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Examples
Referring to fig. 1 and 2, a gabion retaining wall, comprising: the bottom grouting gabion 1 and the multiple layers of gabion retaining wall blocks 2 arranged on the bottom grouting gabion 1 in the transverse direction and the longitudinal direction are arranged in a step shape in the longitudinal direction, and a side grouting gabion 3 is arranged between every two adjacent gabion retaining wall blocks 2 in the transverse direction; in the embodiment, five layers of gabion retaining wall blocks 2 are arranged on the bottom grouting gabion 1; referring to fig. 2, ladder department that adjacent gabion retaining wall block 2 formed is equipped with encloses purlin 4 on vertical, refer to fig. 1, the both ends that enclose purlin 4 extend to respectively in the side slip casting gabion 3, refer to fig. 2, gabion retaining wall still is equipped with anchor rope 5, the one end of anchor rope 5 is passed in the soil layer of 3 downward sloping settings of side slip casting gabion behind gabion retaining wall, the other end of anchor rope 5 passes side slip casting gabion 3 and is connected with enclosing purlin 4, in this embodiment, anchor rope 5 is twisted by several steel cables, the section is circular.
Bottom slip casting gabion 1 and side slip casting gabion 3 include respectively: the stone cage comprises a stone cage net and gravels and mortar arranged in the stone cage net; the gabion retaining wall block 2 includes: the stone cage comprises a stone cage net and gravels arranged in the stone cage net; the maximum aperture of the gabion mesh is smaller than the minimum diameter of the crushed stone; in this embodiment, the gabion mesh is a gabion mesh with regular hexagonal meshes; be equipped with the fender soil layer 6 that permeates water in the gabion net, the fender soil layer 6 that permeates water is the geotechnological cloth that permeates water, and rubble and grit setting are in the fender soil layer 6 that permeates water.
The construction method of the gabion retaining wall comprises the following steps:
s1, filling roadbed filling 8 along a roadbed water damage line 7, and repairing a roadbed corresponding to the bottom grouting space-time 1;
s2, wrapping broken stones with a gabion net, grouting to form a bottom grouting gabion 1, placing the bottom grouting gabion 1 into a riverbed 9 on the inner side of the roadbed, wherein the lower end of the bottom grouting gabion 1 is arranged in the riverbed 9, and the upper end of the bottom grouting gabion 1 is higher than the riverbed 9, wherein in the embodiment, the height of the bottom grouting gabion 1 arranged in the riverbed 9 is 600 mm;
s3, filling roadbed filling 8 along a roadbed water damage line 7, and repairing a roadbed corresponding to the lowermost gabion retaining wall block;
s4, wrapping gravels and gravels with a gabion net to form a gabion retaining wall block 2, further arranging a permeable soil retaining layer 6 in the gabion retaining wall block 2 to wrap the gravels and the gravels, and longitudinally and transversely arranging the lowermost gabion retaining wall block 2 on the bottom grouting gabion 1;
s5, wrapping broken stones with a gabion net, grouting to form a side grouting gabion 3, and arranging the side grouting gabion 3 between the transversely adjacent gabion retaining wall blocks 2 on the lowest layer;
s6, driving an anchor rope 5 into the side grouting gabion 3, anchoring the anchor rope 5 in a soil layer behind the gabion retaining wall, arranging an enclosing purlin 4 at a step of the adjacent gabion retaining wall block 2 in the longitudinal direction, fixedly connecting two ends of the enclosing purlin 4 with the anchor rope 5 in the side grouting gabion 3 respectively, and arranging a steel backing plate 11 for reinforcing fixation between the anchor rope 5 and the enclosing purlin 4;
s7, repeating the steps S3-S6, sequentially arranging a plurality of layers of gabion retaining wall blocks 2, wherein the side, close to the river, of each gabion retaining wall block 2 is arranged in a ladder shape in the longitudinal direction; in the embodiment, five gabion retaining wall blocks 2 are longitudinally arranged, the five gabion retaining wall blocks 2 are arranged close to the inner side of a river in a step shape, the top three gabion retaining wall blocks 2 are arranged in a step shape on one side, far away from the river, of the gabion retaining wall blocks 2, the last two gabion retaining wall blocks 2 are vertically overlapped, the strength of the bottom of the wall body can be enhanced, and referring to fig. 2, the width of a bottom grouting gabion 1 is larger than that of an upper gabion retaining wall block 2, so that the bottom grouting gabion 1 can well support the upper gabion retaining wall block 2;
s8, stacking riprap 10 at the corner formed by the gabion retaining wall and the river bed 9, wherein in the embodiment, the height of the riprap 10 exceeds the height of the two layers of gabion retaining wall blocks 2 at the lowest end, so that the step formed by the two layers of gabion retaining wall blocks 2 at the lowest end is not provided with the surrounding purlin 4, and the riprap 10 can be directly adopted to achieve the fixing effect.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (6)

1. A gabion retaining wall, comprising: the concrete retaining wall comprises a bottom grouting gabion (1) and a plurality of layers of gabion retaining wall blocks (2) arranged on the bottom grouting gabion (1) in the transverse direction and the longitudinal direction, wherein the plurality of layers of gabion retaining wall blocks (2) are arranged in a step shape in the longitudinal direction, and a side grouting gabion (3) is arranged between every two transversely adjacent gabion retaining wall blocks (2); adjacent on vertical the ladder department that gabion retaining wall piece (2) formed is equipped with encloses purlin (4), the both ends that enclose purlin (4) extend to respectively in side slip casting gabion (3), check guest retaining wall still includes anchor rope (5), the one end of anchor rope (5) is passed side slip casting gabion (3) downward sloping setting is in the soil layer behind the check guest retaining wall, the other end of anchor rope (5) with enclose purlin (4) and connect.
2. A gabion retaining wall according to claim 1, characterised in that the bottom grouted gabion (1) and the side grouted gabion (3) each comprise: the stone cage comprises a stone cage net and gravel and mortar arranged in the stone cage net.
3. A gabion retaining wall according to claim 1, characterised in that the gabion retaining wall block (2) comprises: the stone cage comprises a stone cage net and gravels arranged in the stone cage net.
4. A gabion retaining wall according to claim 2 or claim 3, characterised in that the maximum pore size of the gabion mesh is less than the minimum diameter of the macadam.
5. A gabion retaining wall according to claim 3, characterised in that a water-permeable soil barrier layer (6) is provided within the gabion mesh, and gravel and sand are provided within the water-permeable soil barrier layer (6).
6. A gabion retaining wall according to claim 5, characterised in that the water-permeable soil-retaining layer (6) is a water-permeable geotextile.
CN202022860204.6U 2020-12-03 2020-12-03 Gabion retaining wall Active CN213805480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022860204.6U CN213805480U (en) 2020-12-03 2020-12-03 Gabion retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022860204.6U CN213805480U (en) 2020-12-03 2020-12-03 Gabion retaining wall

Publications (1)

Publication Number Publication Date
CN213805480U true CN213805480U (en) 2021-07-27

Family

ID=76942225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022860204.6U Active CN213805480U (en) 2020-12-03 2020-12-03 Gabion retaining wall

Country Status (1)

Country Link
CN (1) CN213805480U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200173756A1 (en) * 2018-10-19 2020-06-04 Lizhong JIANG Implement and facility for capturing grounding missiles and penetrating missiles in a fixed point and collecting guiding rockets and aircrafts and manufacture method thereof
CN112411620A (en) * 2020-12-03 2021-02-26 西南科技大学 Gabion retaining wall and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200173756A1 (en) * 2018-10-19 2020-06-04 Lizhong JIANG Implement and facility for capturing grounding missiles and penetrating missiles in a fixed point and collecting guiding rockets and aircrafts and manufacture method thereof
CN112411620A (en) * 2020-12-03 2021-02-26 西南科技大学 Gabion retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
AU2016221315B2 (en) A retaining wall method of precast block to prevent landslide
CN213805480U (en) Gabion retaining wall
CN201158826Y (en) Earth work grille reinforced retaining wall
CN111778793B (en) Cavity collapse prevention and control structure and construction method
CN102031760A (en) Anti-rockfall method for subgrade in rock deposit zone
CN213805481U (en) Gabion retaining wall
CN210482362U (en) Assembled rigid and flexible combined elastic anti-seismic reinforced earth retaining wall
CN112411620A (en) Gabion retaining wall and construction method thereof
CN212223948U (en) Multi-stage reinforced retaining wall comprehensive protection system suitable for large-scale abandoned slag yard
CN210216318U (en) Ecological river course side slope protective structure
CN114808583B (en) Submerged roadbed and construction method thereof
CN109610407B (en) Ecological barricade of landslide prevention based on dead weight is balanced
CN102561368B (en) Pre-compacted reinforced soil block flexible supporting structure
CN112411619A (en) Gabion retaining wall and construction method thereof
CN215165198U (en) A banket structure that is used for regional embankment cofferdam of strong tidal bore
CN101892675B (en) Flexible retaining wall with rigid support
CN213476933U (en) Ecological steel sheet pile island-building cofferdam structure
CN113502836A (en) Drainage geogrid and supporting structure and method
CN210507006U (en) High-strength steel wire mesh reinforced material filling structure of road embankment
CN109355990B (en) Ultra-fine sand roadbed structure for hydraulic filling in low-lying marsh areas
CN209816577U (en) Coastal soft soil foundation riverside embankment widening structure
CN112609731A (en) Flexible permeable cutting retaining wall and construction method
CN114086505A (en) River course slope protection structure for hydraulic engineering and laying construction method
CN111827030A (en) High-fill embankment structure and construction method
CN217710773U (en) Assembled gabion bank protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant