JP2010279151A - Device for detection of average reactor current - Google Patents

Device for detection of average reactor current Download PDF

Info

Publication number
JP2010279151A
JP2010279151A JP2009128853A JP2009128853A JP2010279151A JP 2010279151 A JP2010279151 A JP 2010279151A JP 2009128853 A JP2009128853 A JP 2009128853A JP 2009128853 A JP2009128853 A JP 2009128853A JP 2010279151 A JP2010279151 A JP 2010279151A
Authority
JP
Japan
Prior art keywords
reactor
period
current
average value
switching element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009128853A
Other languages
Japanese (ja)
Other versions
JP5534139B2 (en
Inventor
Toshihiko Minamii
俊彦 南井
Takahiko Hasegawa
貴彦 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2009128853A priority Critical patent/JP5534139B2/en
Publication of JP2010279151A publication Critical patent/JP2010279151A/en
Application granted granted Critical
Publication of JP5534139B2 publication Critical patent/JP5534139B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To improve reliability in averages of the amount of reactor current. <P>SOLUTION: A device includes: a decision unit (201) for determining whether a period when the amount of current in a reactor (L) changes nonlinearly exists in a period of switching control of a switching element (S1); and an average estimator (203) for estimating the average of the amount of current in the reactor in the period, based on an input voltage (VL) of a voltage converter 12, an output voltage (VH), the value of the reactor (L), and a ratio (D) of an ON period of the switching element (S1) to an OFF period when the decision unit (201) determines that the period when the amount of current changes nonlinearly exists. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、リアクトルとスイッチング素子とを備えた電圧変換器に関わる技術に関する。   The present invention relates to a technique related to a voltage converter including a reactor and a switching element.

電圧変換器として、直流(DC)電圧を昇圧及び/又は降圧するDC−DCコンバータが知られている。DC−DCコンバータは、パーソナルコンピュータや、AV機器、携帯電話機、電源システム等の、電気回路を含む電気機器に幅広く用いられている。近年では、燃料電池自動車、電気自動車、ハイブリッド自動車等の車両の電源システムにDC−DCコンバータが用いられる例もある。   A DC-DC converter that boosts and / or steps down a direct current (DC) voltage is known as a voltage converter. The DC-DC converter is widely used in electric devices including electric circuits, such as personal computers, AV devices, mobile phones, and power supply systems. In recent years, there is an example in which a DC-DC converter is used in a power supply system of a vehicle such as a fuel cell vehicle, an electric vehicle, and a hybrid vehicle.

国際公開2006/098376号International Publication No. 2006/098376

DC−DCコンバータは、例えば、スイッチング素子とリアクトルとを備え、スイッチング素子のスイッチング制御によって、入力DC電圧(例えば、燃料電池の出力電圧)を所定の出力DC電圧に変換(昇圧又は降圧)することができる。   The DC-DC converter includes, for example, a switching element and a reactor, and converts (steps up or steps down) an input DC voltage (for example, an output voltage of the fuel cell) to a predetermined output DC voltage by switching control of the switching element. Can do.

スイッチング制御は、例えば、リアクトルに電気エネルギーを蓄積する過程と、リアクトルに蓄積された電気エネルギーを放出する過程とが交互に繰り返されるように行なわれる。スイッチング素子がONの期間では、リアクトルに流れる電流(以下、「リアクトル電流」という。)は線形的に徐々に増加し、スイッチング素子がOFFの期間では、リアクトル電流は線形的に徐々に減少する。   For example, the switching control is performed such that a process of accumulating electric energy in the reactor and a process of discharging electric energy accumulated in the reactor are alternately repeated. The current flowing through the reactor (hereinafter referred to as “reactor current”) gradually increases linearly when the switching element is ON, and the reactor current gradually decreases linearly when the switching element is OFF.

したがって、スイッチング素子のON期間及びOFF期間を制御する制御信号(パルス信号)のデューティ比を制御することで、平均的なリアクトル電流量(電気エネルギーの蓄積/解放)を制御して、DC−DCコンバータの平均的な昇圧比又は降圧比を制御することができる。   Therefore, by controlling the duty ratio of the control signal (pulse signal) that controls the ON period and OFF period of the switching element, the average reactor current amount (accumulation / release of electric energy) is controlled, and the DC-DC The average step-up ratio or step-down ratio of the converter can be controlled.

このようなスイッチング制御においては、スイッチング素子に与えるスイッチングパターン(デューティ比)によってはリアクトル電流が線形的に変化しない期間が生じ得る。これを考慮せずにリアクトル電流量の平均値を求めてしまうと、平均値の信頼性が劣化する。その結果、信頼性の低い平均値に基づいてリアクトル電流量(デューティ比)がフィードバック制御されてしまい、コンバータの昇圧比又は降圧比の制御精度が劣化して制御が不安定になるおそれがある。   In such switching control, a period in which the reactor current does not change linearly may occur depending on the switching pattern (duty ratio) applied to the switching element. If the average value of the reactor current amount is obtained without taking this into consideration, the reliability of the average value deteriorates. As a result, the reactor current amount (duty ratio) is feedback-controlled based on an average value with low reliability, and the control accuracy of the step-up ratio or step-down ratio of the converter may be deteriorated and the control may become unstable.

そこで、本発明の目的の一つは、リアクトル電流が線形的に変化しない期間があったとしても、より信頼性の高いリアクトル電流の平均値を検出し、ひいてはリアクトル電流制御の安定性を向上できるようにすることにある。   Therefore, one of the objects of the present invention is to detect the average value of the reactor current with higher reliability even if there is a period in which the reactor current does not change linearly, thereby improving the stability of the reactor current control. There is in doing so.

なお、前記目的に限らず、後述する発明を実施するための形態に示す各構成により導かれる作用効果であって、従来の技術によっては得られない作用効果を奏することも本発明の他の目的の一つとして位置付けることができる。   In addition, the present invention is not limited to the above-described object, and other effects of the present invention can be achieved by the functions and effects derived from the respective configurations shown in the embodiments for carrying out the invention which will be described later. It can be positioned as one of

本発明の平均リアクトル電流検出装置の一態様は、リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記の入力電圧、出力電圧、前記リアクトルの値、および、前記スイッチング素子のON期間とOFF期間との比率に基づいて、前記周期におけるリアクトルの電流量の平均値を推定する平均値推定部と、を備える。   One aspect of the average reactor current detection device of the present invention includes a reactor and a switching element, and controls an amount of current flowing through the reactor by periodic switching control of the switching element to convert an input voltage into a predetermined output voltage. A determination unit that determines whether or not there is a period in which a current amount of the reactor changes nonlinearly in the period of the switching control, and the determination unit determines the nonlinearity If it is determined that there is a period that changes periodically, the input voltage, the output voltage, the value of the reactor, and the ratio between the ON period and the OFF period of the switching element, the reactor in the period An average value estimation unit that estimates an average value of the current amount.

ここで、当該平均リアクトル電流検出装置は、前記判定部にて前記非線形的に変化する期間が存在しないと判定された場合に、前記スイッチング素子のON期間又はOFF期間の中心タイミングにおける前記リアクトルの電流量を前記周期における平均値として検出する平均値検出部を備えてもよい。   Here, the average reactor current detection device is configured to detect the current of the reactor at the center timing of the ON period or the OFF period of the switching element when the determination unit determines that the non-linearly changing period does not exist. You may provide the average value detection part which detects quantity as an average value in the said period.

また、前記判定部は、前記の入力電圧、出力電圧及び比率に基づいて前記判定を行なうこととしてもよい。   Further, the determination unit may perform the determination based on the input voltage, the output voltage, and the ratio.

さらに、本発明の平均リアクトル電流検出装置の別の態様は、リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、前記リアクトルの電流量を検出する電流検出部と、前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記電流検出部の検出値を連続的にサンプリングして平均する、あるいは、前記検出値の積分値を得る、平均値実測部と、を備える。   Furthermore, another aspect of the average reactor current detection device of the present invention includes a reactor and a switching element, and controls an amount of current flowing through the reactor by periodic switching control of the switching element to output an input voltage to a predetermined output. A device used for a voltage converter for converting to voltage, wherein there is a current detection unit for detecting the current amount of the reactor, and a period in which the current amount of the reactor changes nonlinearly in the period of the switching control. A determination unit that determines whether or not, and when the determination unit determines that the non-linearly changing period exists, the detection value of the current detection unit is continuously sampled and averaged, or An average value measurement unit for obtaining an integrated value of the detection values.

また、本発明の平均リアクトル電流検出装置のさらに別の態様は、リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、前記スイッチング素子のON期間又はOFF期間の中心タイミングにおける前記リアクトルの電流量を前記周期における平均値として検出する平均値検出部と、前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記の入力電圧、出力電圧、前記リアクトルの値、および、前記スイッチング素子のON期間とOFF期間との比率に基づいて、前記平均値検出部で得られた平均値を補正する平均値補正部と、を備える。   Further, another aspect of the average reactor current detection device of the present invention includes a reactor and a switching element, and controls an amount of current flowing through the reactor by periodic switching control of the switching element to set an input voltage to a predetermined value. An apparatus used in a voltage converter for converting to an output voltage, the average value detection unit for detecting the current amount of the reactor at the center timing of the ON period or OFF period of the switching element as an average value in the period, and A determination unit that determines whether or not there is a period in which the current amount of the reactor changes nonlinearly in a period of the switching control; and a case in which the determination unit determines that there is a period in which the nonlinear change occurs , The input voltage, the output voltage, the value of the reactor, and the switching element Based on the ratio between the N period and OFF period, and an average value correcting unit for correcting the average value obtained by the average value detector.

本発明によれば、リアクトルの電流量が非線形的に変化する期間が存在する場合において、リアクトル電流量の平均値の信頼性を向上することができる。   ADVANTAGE OF THE INVENTION According to this invention, when there exists the period when the electric current amount of a reactor changes nonlinearly, the reliability of the average value of a reactor electric current amount can be improved.

一実施形態に係る電源システム及び当該電源システムを搭載した車両の構成例を模式的に示す図である。It is a figure showing typically an example of composition of a power supply system concerning one embodiment and vehicles carrying the power supply system. 図1に示すFC昇圧コンバータ及びECUの構成例を示す図である。It is a figure which shows the structural example of FC boost converter and ECU shown in FIG. 連続モードにおけるリアクトル電流量の時間変化の一例を示す図である。It is a figure which shows an example of the time change of the reactor electric current amount in a continuous mode. 不連続モードにおけるリアクトル電流量の時間変化の一例を示す図である。It is a figure which shows an example of the time change of the reactor electric current amount in discontinuous mode. 不連続モードにおけるリアクトル電流量の平均値推定方法を説明する図である。It is a figure explaining the average value estimation method of the reactor electric current amount in discontinuous mode. 連続モード及び不連続モードにおけるリアクトル電流量の平均値の偏差を例示するグラフである。It is a graph which illustrates the deviation of the average value of the reactor current amount in the continuous mode and the discontinuous mode. 連続/不連続モードの判定条件を説明する図であって、(A)は不連続モードにおけるリアクトル電流量の時間変化の一例、(B)は連続モードにおけるリアクトル電流量の時間変化の一例をそれぞれ示す。It is a figure explaining the determination conditions of continuous / discontinuous mode, (A) is an example of the time change of the reactor current amount in discontinuous mode, (B) is an example of the time change of the reactor current amount in continuous mode, respectively. Show. 図2に例示するECUの変形例を示すブロック図である。FIG. 4 is a block diagram illustrating a modification of the ECU illustrated in FIG. 2. 不連続モードにおけるリアクトル電流量の平均値補正方法を説明する図である。It is a figure explaining the average value correction method of the reactor electric current amount in discontinuous mode. 不連続モードにおけるリアクトル電流量の平均値補正量を説明すべく連続モード及び不連続モードにおけるリアクトル電流量の平均値の偏差を例示するグラフである。It is a graph which illustrates the deviation of the average value of the reactor current amount in the continuous mode and the discontinuous mode to explain the average value correction amount of the reactor current amount in the discontinuous mode.

以下、図面を参照して本発明の実施の形態を説明する。ただし、以下に説明する実施形態は、あくまでも例示であり、以下に明示しない種々の変形や技術の適用を排除する意図はない。即ち、本発明は、その趣旨を逸脱しない範囲で種々変形(各実施例を組み合わせる等)して実施することができる。また、以下の図面の記載において、同一又は類似の部分には同一又は類似の符号を付して表している。図面は模式的なものであり、必ずしも実際の寸法や比率等とは一致しない。図面相互間においても互いの寸法の関係や比率が異なる部分が含まれていることがある。   Embodiments of the present invention will be described below with reference to the drawings. However, the embodiment described below is merely an example, and there is no intention to exclude various modifications and technical applications that are not explicitly described below. In other words, the present invention can be implemented with various modifications (combining the embodiments, etc.) without departing from the spirit of the present invention. In the following description of the drawings, the same or similar parts are denoted by the same or similar reference numerals. The drawings are schematic and do not necessarily match actual dimensions and ratios. In some cases, the dimensional relationships and ratios may be different between the drawings.

〔1〕一実施形態
図1は、一実施形態に係る電源システム10及び当該電源システム10を搭載した車両1の構成例を模式的に示す図である。
[1] One Embodiment FIG. 1 is a diagram schematically illustrating a configuration example of a power supply system 10 according to an embodiment and a vehicle 1 equipped with the power supply system 10.

電源システム10は、例示的に、燃料電池(FC)11を有する燃料電池システムであり、車両1は、燃料電池システム10を駆動電力の供給源とする電気機器の一例としての燃料電池自動車である。ただし、車両1は、電気自動車やハイブリッド自動車であってもよい。   The power supply system 10 is illustratively a fuel cell system having a fuel cell (FC) 11, and the vehicle 1 is a fuel cell vehicle as an example of an electrical device that uses the fuel cell system 10 as a source of driving power. . However, the vehicle 1 may be an electric vehicle or a hybrid vehicle.

車両1は、駆動輪2を駆動するモータ16や、電子制御ユニット(ECU)20、アクセルペダルの開度を検出するアクセルペダルセンサ21等を備える。アクセルペダルセンサ21は、電子制御ユニット20に電気的に接続されており、例えば、検出したアクセスペダルの開度に応じてモータ16(駆動輪2)の回転速度がECU20によって制御される。   The vehicle 1 includes a motor 16 that drives the drive wheels 2, an electronic control unit (ECU) 20, an accelerator pedal sensor 21 that detects the opening of an accelerator pedal, and the like. The accelerator pedal sensor 21 is electrically connected to the electronic control unit 20. For example, the rotational speed of the motor 16 (drive wheel 2) is controlled by the ECU 20 according to the detected opening degree of the access pedal.

燃料電池システム10は、前記燃料電池(FC)11のほか、非限定的な一例として、FC昇圧コンバータ12、バッテリ13、バッテリ昇圧コンバータ14、インバータ15等を備える。   In addition to the fuel cell (FC) 11, the fuel cell system 10 includes, as a non-limiting example, an FC boost converter 12, a battery 13, a battery boost converter 14, an inverter 15, and the like.

FC11は、電気化学反応を利用して発電する装置である。FC11には、固体高分子型、燐酸型、溶融炭酸塩型、固体酸化物型、アルカリ電解質型等の種々のタイプの燃料電池が適用可能である。FC11が発電した電力は、車両1の駆動輪2を駆動するモータ16の駆動電力や、バッテリ13の充電に用いられる。   The FC 11 is a device that generates electricity using an electrochemical reaction. Various types of fuel cells such as solid polymer type, phosphoric acid type, molten carbonate type, solid oxide type, and alkaline electrolyte type can be applied to FC11. The power generated by the FC 11 is used to drive the motor 16 that drives the drive wheels 2 of the vehicle 1 and to charge the battery 13.

バッテリ13は、充放電可能な二次電池であり、リチウムイオン、ニッケル水素、ニッケルカドミウム等の種々のタイプの二次電池を適用可能である。バッテリ13は、車両1やFC11の運転時に使用される種々の電気機器に電力を供給することができる。ここでいう電気機器には、例えば、車両1の照明機器、空調機器、油圧ポンプ、FC11の燃料ガスや改質原料を供給するポンプ、改質器の温度を調整するヒータ等が含まれる。   The battery 13 is a chargeable / dischargeable secondary battery, and various types of secondary batteries such as lithium ion, nickel hydride, and nickel cadmium can be applied. The battery 13 can supply electric power to various electric devices used when the vehicle 1 or the FC 11 is operated. The electrical equipment here includes, for example, lighting equipment for the vehicle 1, air conditioning equipment, a hydraulic pump, a pump for supplying fuel gas and reforming material of FC11, a heater for adjusting the temperature of the reformer, and the like.

これらのFC11及びバッテリ13は、図1に例示するように、インバータ15に対して電気的に並列に接続されている。FC11からインバータ15に至る電気経路には、FC昇圧コンバータ12が設けられている。FC昇圧コンバータ12は、入力DC電圧を昇圧するDC−DCコンバータであり、FC11で発生したDC電圧を変換可能な範囲で所定のDC電圧に変換(例えば昇圧)して、インバータ15に印加することができる。このような昇圧動作により、FC11の出力電力が低くても、モータ16の駆動に要する駆動電力を確保することが可能となる。   The FC 11 and the battery 13 are electrically connected in parallel to the inverter 15 as illustrated in FIG. An FC boost converter 12 is provided in the electrical path from the FC 11 to the inverter 15. The FC boost converter 12 is a DC-DC converter that boosts an input DC voltage, converts the DC voltage generated by the FC 11 into a predetermined DC voltage within a convertible range (for example, boosts it), and applies it to the inverter 15. Can do. Such boosting operation makes it possible to secure the driving power required to drive the motor 16 even when the output power of the FC 11 is low.

一方、バッテリ13からインバータ15に至る電気経路には、バッテリ昇圧コンバータ14が、FC昇圧コンバータ12とインバータ15との間の電気経路に対して並列に接続されている。当該コンバータ14も、DC−DCコンバータであり、バッテリ13又はインバータ15から印加されたDC電圧を変換可能な範囲で所定のDC電圧に変換することができる。   On the other hand, the battery boost converter 14 is connected in parallel to the electrical path between the FC boost converter 12 and the inverter 15 in the electrical path from the battery 13 to the inverter 15. The converter 14 is also a DC-DC converter, and can convert the DC voltage applied from the battery 13 or the inverter 15 into a predetermined DC voltage within a convertible range.

コンバータ14には、昇圧及び降圧の双方が可能な昇降圧型のコンバータを適用でき、例えば、バッテリ13からの入力DC電圧を制御(昇圧)してインバータ15側に出力する一方、FC11又はモータ16からの入力DC電圧を制御(降圧)してバッテリ13に出力することが可能である。これにより、バッテリ13の充放電が可能となる。   The converter 14 can be a step-up / step-down converter capable of both boosting and stepping down. For example, the converter 14 controls (boosts) the input DC voltage from the battery 13 and outputs it to the inverter 15 side. The input DC voltage can be controlled (stepped down) and output to the battery 13. Thereby, charging / discharging of the battery 13 is attained.

また、コンバータ14は、出力電圧が制御されることで、インバータ15の端子電圧を制御することが可能である。当該制御は、インバータ15に対して並列に接続された各電源(FC11及びバッテリ13)の相対的な出力電圧差を制御して、両者の電力を適切に使い分けることを可能にする。   Moreover, the converter 14 can control the terminal voltage of the inverter 15 by controlling the output voltage. This control controls the relative output voltage difference between the power supplies (FC 11 and battery 13) connected in parallel to the inverter 15, and makes it possible to properly use both powers.

インバータ15は、FC11からコンバータ12を介して、また、バッテリ13からコンバータ14を介して、DC電圧の入力を受け、当該入力DC電圧を交流(AC)電圧に変換し、これをモータ16の駆動電圧として供給する。その際、ECU20は、要求動力に応じたAC電圧がモータ16に供給されるよう、インバータ15の動作(スイッチング)を制御する。   The inverter 15 receives DC voltage input from the FC 11 via the converter 12 and from the battery 13 via the converter 14, converts the input DC voltage into alternating current (AC) voltage, and drives the motor 16. Supply as voltage. At that time, the ECU 20 controls the operation (switching) of the inverter 15 so that an AC voltage corresponding to the required power is supplied to the motor 16.

ECU20は、既述の制御のほか、車両1及び燃料電池システム10の動作(運転)を統括的に制御する。ECU20は、例示的に、演算処理装置の一例としてのCPU、記憶装置の一例としてのRAM、ROM等を備えたマイクロコンピュータとして実現できる。ECU20は、モータ16や燃料電池システム10の各要素、種々のセンサ群と電気的に接続され、各種センサ値の受信、演算処理、指令(制御信号)の送信等を適宜に実施する。センサ群には、アクセルペダルセンサ21のほか、例示的に、バッテリ13の充電状態(SOC:State Of Charge)を検出するSOCセンサ、車速(モータ16の回転数)を検出する車速センサ、コンバータ12におけるリアクトル電流量を検出(モニタ)する電流センサ等が含まれ得る。   In addition to the control described above, the ECU 20 comprehensively controls the operation (operation) of the vehicle 1 and the fuel cell system 10. The ECU 20 can be exemplarily realized as a microcomputer including a CPU as an example of an arithmetic processing device, a RAM, a ROM as an example of a storage device, and the like. The ECU 20 is electrically connected to each element of the motor 16 and the fuel cell system 10 and various sensor groups, and appropriately receives various sensor values, performs arithmetic processing, transmits commands (control signals), and the like. In addition to the accelerator pedal sensor 21, the sensor group includes, for example, an SOC sensor that detects the state of charge (SOC) of the battery 13, a vehicle speed sensor that detects the vehicle speed (the number of rotations of the motor 16), and the converter 12. A current sensor or the like for detecting (monitoring) the reactor current amount at the can be included.

〔2〕昇圧コンバータ12
次に、昇圧コンバータ12の電気回路図の一例を図2に示す。図2に示す昇圧コンバータ12は、例示的に、リアクトル(コイル)Lと、出力ダイオードD1と、コンデンサC1及びC2と、ダイオードD2及びスイッチング素子S1を有するスイッチ回路SWと、を備える。なお、図2において、121は電流センサを表わし、122及び123はそれぞれ電圧センサを表わしており、いずれについても詳細は後述する。
[2] Boost converter 12
Next, an example of an electric circuit diagram of the boost converter 12 is shown in FIG. 2 includes, for example, a reactor (coil) L, an output diode D1, capacitors C1 and C2, and a switch circuit SW including a diode D2 and a switching element S1. In FIG. 2, reference numeral 121 denotes a current sensor, 122 and 123 denote voltage sensors, both of which will be described in detail later.

スイッチング素子S1には、非限定的な一例として、絶縁ゲートバイポーラトランジスタ(IGBT)を適用可能である。   As a non-limiting example, an insulating gate bipolar transistor (IGBT) can be applied to the switching element S1.

リアクトルLは、一端が直流電源(FC11)の正極に直列に接続されるとともに、他端が出力ダイオードD1のアノードに直列に接続されている。なお、図2において、電源電圧(FC11の出力電圧)は、VLで表わしている。   Reactor L has one end connected in series to the positive electrode of DC power supply (FC11) and the other end connected in series to the anode of output diode D1. In FIG. 2, the power supply voltage (the output voltage of FC11) is represented by VL.

リアクトルLとFC11との間には、コンデンサC1の一端が接続され、当該コンデンサC1の他端は、FC11の負極に接続されており、FC11の出力電圧VLが両端に印加される。コンデンサC1は、FC11の出力電流を平滑化してリプルを低減する入力平滑コンデンサとして機能する。   One end of the capacitor C1 is connected between the reactor L and the FC11, the other end of the capacitor C1 is connected to the negative electrode of the FC11, and the output voltage VL of the FC11 is applied to both ends. The capacitor C1 functions as an input smoothing capacitor that smoothes the output current of the FC 11 and reduces ripples.

リアクトルLとダイオードD1との間には、スイッチング素子S1のコレクタが接続され、スイッチング素子S1のエミッタは、FC11の負極に接続されている。また、スイッチング素子S1のコレクタには、ダイオードD2のカソードが接続され、スイッチング素子S1のエミッタには、ダイオードD2のアノードが接続されている。   The collector of the switching element S1 is connected between the reactor L and the diode D1, and the emitter of the switching element S1 is connected to the negative electrode of the FC11. The cathode of the diode D2 is connected to the collector of the switching element S1, and the anode of the diode D2 is connected to the emitter of the switching element S1.

ダイオードD1のカソードには、コンデンサC2の一端が接続され、当該コンデンサC2の他端は、FC11の負極に接続されている。コンデンサC2は、ダイオードD1からインバータ15を介してモータ16へ供給される出力電流を平滑化してリプルを低減する出力平滑コンデンサとして機能する。当該コンデンサC2の両端電圧(VH)が、昇圧後の電圧である。   One end of a capacitor C2 is connected to the cathode of the diode D1, and the other end of the capacitor C2 is connected to the negative electrode of the FC11. The capacitor C2 functions as an output smoothing capacitor that smoothes the output current supplied from the diode D1 to the motor 16 via the inverter 15 and reduces ripple. The voltage across the capacitor C2 (VH) is the boosted voltage.

スイッチング素子S1は、そのゲート電圧が例えばECU20から周期的にON/OFF制御される。スイッチングの周期(キャリア周波数)は、非限定的な一例として、100ms(10kHz)程度である。   The gate voltage of the switching element S1 is periodically ON / OFF controlled by the ECU 20, for example. The switching period (carrier frequency) is about 100 ms (10 kHz) as a non-limiting example.

スイッチング素子S1がONの期間、FC11の出力電流は、リアクトルL及びスイッチング素子S1を経由してFC11の負極へ還流し、リアクトルLに電気エネルギーが蓄積される。一方、スイッチング素子S1がOFFの期間では、それまでにリアクトルLに蓄積された電気エネルギーがFC11の出力電圧に重畳されて出力ダイオードD1経由で出力される。このようにしてコンバータ12は、昇圧動作を実施する。   During the period when the switching element S1 is ON, the output current of the FC 11 returns to the negative electrode of the FC 11 via the reactor L and the switching element S1, and electric energy is accumulated in the reactor L. On the other hand, during the period when the switching element S1 is OFF, the electric energy accumulated in the reactor L so far is superimposed on the output voltage of the FC11 and output via the output diode D1. In this way, converter 12 performs a boosting operation.

図3に、昇圧動作時のリアクトル電流の時間変化の一例を示す。図3に実線100で示すように、リアクトル電流は、スイッチング素子S1のON/OFF制御に応じて、線形的な増減(電気エネルギーの蓄積及び解放)を交互に繰り返す。すなわち、スイッチング素子S1がONの期間において、リアクトル電流は線形的に徐々に増加し、スイッチング素子S1がOFFの期間において、リアクトル電流は線形的に徐々に減少する。   FIG. 3 shows an example of a temporal change in the reactor current during the boosting operation. As indicated by a solid line 100 in FIG. 3, the reactor current alternately repeats linear increase / decrease (accumulation and release of electric energy) according to ON / OFF control of the switching element S1. That is, the reactor current gradually increases linearly when the switching element S1 is ON, and the reactor current gradually decreases linearly when the switching element S1 is OFF.

スイッチング周期の1周期においてON時間が占める割合を「デューティ(Duty)比」あるいは単に「デューティ」という。例えば、スイッチング素子S1のON時間をTON、OFF時間をTOFFでそれぞれ表わすと、デューティDは、D=TON/(TON+TOFF)で表わすことができる。 The ratio of the ON time in one switching period is referred to as “duty ratio” or simply “duty”. For example, when the ON time of the switching element S1 is represented by T ON and the OFF time is represented by T OFF , the duty D can be represented by D = T ON / (T ON + T OFF ).

ECU20は、スイッチング素子S1のゲートに与える制御信号のパルスパターン(デューティD)を制御することで、スイッチング周期における平均的なリアクトル電流量、ひいては、リアクトルLの平均的な蓄積及び解放エネルギー量を制御できる。当該制御によって、コンバータ12の昇圧比、すなわち、入力電圧VLに対する、インバータ15に印加されるコンバータ12の出力電圧VH、ひいては負荷(例えばモータ16)への平均的な供給電力を制御できる。   The ECU 20 controls the pulse pattern (duty D) of the control signal applied to the gate of the switching element S1, thereby controlling the average reactor current amount in the switching cycle, and hence the average accumulation and release energy amount of the reactor L. it can. With this control, it is possible to control the step-up ratio of the converter 12, that is, the output voltage VH of the converter 12 applied to the inverter 15 with respect to the input voltage VL, and thus the average power supplied to the load (for example, the motor 16).

〔3〕リアクトル電流量の平均値検出
当該制御は、例えば、スイッチング周期の1周期における平均的なリアクトル電流量をモニタしながら、要求される出力電圧(昇圧比)に応じて実施することができる。リアクトル電流のモニタには、例えば電流センサを用いることができる。
[3] Reactor current amount average value detection The control can be performed according to the required output voltage (step-up ratio) while monitoring the average reactor current amount in one switching cycle, for example. . For example, a current sensor can be used for monitoring the reactor current.

ここで、図3に例示したように、リアクトル電流はスイッチング素子S1のON/OFFに応じて線形的に増減を繰り返す三角波形(実線100参照)となるから、スイッチング周期の1周期あたりの平均リアクトル電流量(図3の点線300参照)は、スイッチング素子S1のON期間(又はOFF期間)の中心タイミングにおけるリアクトル電流量として等価的に扱うことができる。   Here, as illustrated in FIG. 3, the reactor current has a triangular waveform (see solid line 100) that linearly increases and decreases in accordance with ON / OFF of the switching element S <b> 1, so that the average reactor per switching period is averaged. The amount of current (see the dotted line 300 in FIG. 3) can be treated equivalently as the amount of reactor current at the center timing of the ON period (or OFF period) of the switching element S1.

したがって、図3に例示するように、スイッチング周期の中でリアクトル電流量が連続的に(線形的に)変化し零になる期間(換言すれば、非線形に変化する期間)がない場合(これを「連続モード」という)、ECU20は、スイッチング素子S1の前記中心タイミングにおける電流センサ値を等価的に平均値として平均リアクトル電流量の制御(フィードバック制御)に用いることができる。なお、「連続モード」は、例えば、スイッチング素子S1がOFFからONに切り替わる(スイッチング制御信号の立ち上がり)時のリアクトル電流量が非零となるような高出力電圧で負荷(例えばモータ16)を駆動(高出力運転)する場合に相当する。   Therefore, as illustrated in FIG. 3, there is no period in which the reactor current amount continuously changes (linearly) and becomes zero in the switching cycle (in other words, a period in which the reactor current changes nonlinearly) The ECU 20 can be used for the control (feedback control) of the average reactor current amount with the current sensor value at the center timing of the switching element S1 equivalently as an average value. In the “continuous mode”, for example, the load (for example, the motor 16) is driven with a high output voltage such that the reactor current amount becomes non-zero when the switching element S1 is switched from OFF to ON (rising of the switching control signal). This corresponds to the case of (high output operation).

具体的に、リアクトル電流量は、図2に例示するようにリアクトルLの入力側に電流センサ121を設けることで検出できる。電流センサ121は、電流検出部の一例であり、例示的に、磁気比例式のセンサを適用可能である。磁気比例式の電流センサは、測定すべき電流が導体を流れた時の磁界を測定することにより、電流の大きさを間接的に測定する。例えば、電流に応じた磁界をホール素子により電圧信号に変換し、その出力電圧を増幅回路にて増幅し、電流に応じた出力電圧をセンサ値として出力する。   Specifically, the reactor current amount can be detected by providing a current sensor 121 on the input side of the reactor L as illustrated in FIG. The current sensor 121 is an example of a current detection unit, and, for example, a magnetic proportional sensor can be applied. The magnetic proportional current sensor indirectly measures the magnitude of the current by measuring the magnetic field when the current to be measured flows through the conductor. For example, a magnetic field corresponding to the current is converted into a voltage signal by the Hall element, the output voltage is amplified by an amplifier circuit, and the output voltage corresponding to the current is output as a sensor value.

したがって、ECU20は、「連続モード」時では、スイッチング素子S1のON期間(又はOFF期間)の中心タイミングで電流センサ121のセンサ値(以下、「電流センサ値」ともいう。)をサンプリングすれば、リアクトル電流の平均値を得ることができる。   Therefore, in the “continuous mode”, the ECU 20 samples the sensor value of the current sensor 121 (hereinafter also referred to as “current sensor value”) at the center timing of the ON period (or OFF period) of the switching element S1. An average value of the reactor current can be obtained.

これに対して、例えば、モータ16が低出力運転される場合のように、「連続モード」でのスイッチングパターン(デューティ比)よりも平均的なリアクトル電流量が低下するスイッチングパターンを用いてコンバータ12が制御されることがある。   On the other hand, the converter 12 is used by using a switching pattern in which the average reactor current amount is lower than the switching pattern (duty ratio) in the “continuous mode”, for example, when the motor 16 is operated at a low output. May be controlled.

このような場合、図4に例示するように、スイッチング周期の中でリアクトル電流量が零になる期間が生じ、リアクトルLに間欠的に電流が流れる(これを「不連続モード」という)。「不連続モード」では、スイッチング周期内のリアクトル電流波形(三角波形)に非線形に変化する期間が存在するため、「連続モード」の場合と同じ方法、つまりスイッチング素子S1のON期間の中心タイミングでリアクトル電流をサンプリング(平均値モニタ)すると、実際の平均値(点線400参照)よりも大きな値(点線300参照)が平均値として検出されてしまう。その結果、実際の平均値とは異なる(信頼性の低い)平均値に基づいてコンバータ12のリアクトル電流制御が実施され、昇圧制御が不安定になるおそれがある。   In such a case, as illustrated in FIG. 4, a period in which the reactor current amount becomes zero occurs in the switching period, and current flows intermittently through the reactor L (this is referred to as “discontinuous mode”). In the “discontinuous mode”, there is a non-linearly changing period in the reactor current waveform (triangular waveform) within the switching period, so the same method as in the “continuous mode”, that is, the center timing of the ON period of the switching element S1. When the reactor current is sampled (average value monitor), a value (see dotted line 300) larger than the actual average value (see dotted line 400) is detected as the average value. As a result, the reactor current control of the converter 12 is performed based on an average value that is different from the actual average value (low reliability), and the boost control may become unstable.

そこで、本実施形態のECU20は、「不連続モード」では、「連続モード」における前記中心タイミングでの平均値モニタとは異なる方法でリアクトル電流量の平均値を検出する。その方法の一例としては、コンバータ12の入力電圧(昇圧前電圧)VL[V]、出力電圧(昇圧後電圧)VH[V]、リアクトル値L0[H]、デューティD及びキャリア周波数fを基に、「不連続モード」時の実際のリアクトル電流量の平均値を推定する方法が挙げられる。このような推定平均値を用いることで、「不連続モード」においても、リアクトル電流の平均値の信頼性を向上して、安定した電流制御が可能となる。   Therefore, in the “discontinuous mode”, the ECU 20 of the present embodiment detects the average value of the reactor current amount by a method different from the average value monitor at the center timing in the “continuous mode”. As an example of the method, based on the input voltage (voltage before boost) VL [V], the output voltage (voltage after boost) VH [V], the reactor value L0 [H], the duty D and the carrier frequency f. And a method of estimating an average value of the actual reactor current amount in the “discontinuous mode”. By using such an estimated average value, even in the “discontinuous mode”, the reliability of the average value of the reactor current is improved and stable current control becomes possible.

具体的に、「不連続モード」におけるリアクトル電流の平均値(Lavr)は、次式(1)により求める(推定する)ことができる。

Figure 2010279151
この式(1)の導出方法について、図5を参照しながら説明する。 Specifically, the average value (Lavr) of the reactor current in the “discontinuous mode” can be obtained (estimated) by the following equation (1).
Figure 2010279151
A method for deriving the equation (1) will be described with reference to FIG.

「不連続モード」においてリアクトル電流の平均値を求めるには、図5に示す領域(直角三角形)500及び600の面積の合計を求めて、1周期で平均すればよい。   In order to obtain the average value of the reactor current in the “discontinuous mode”, the total area of the regions (right triangles) 500 and 600 shown in FIG. 5 may be obtained and averaged over one period.

まず、直角三角形500の面積を求める。直角三角形500の高さに相当する、リアクトル電流のピーク値(di)は、次式(2)により求めることができる。

Figure 2010279151
First, the area of the right triangle 500 is obtained. The peak value (di) of the reactor current corresponding to the height of the right triangle 500 can be obtained by the following equation (2).
Figure 2010279151

直角三角形の底辺の長さに相当する、スイッチング素子S1のON時間(dt1)は、次式(3)により求めることができる。

Figure 2010279151
The ON time (dt1) of the switching element S1 corresponding to the length of the base of the right triangle can be obtained by the following equation (3).
Figure 2010279151

式(2)及び式(3)より、リアクトル電流のピーク値(di)は、次式(4)により求めることができる。なお、直角三角形500と直角三角形600とは高さを共通にするから、当該ピーク値(di)は、他方の直角三角形600の高さにも相当する。

Figure 2010279151
From the equations (2) and (3), the peak value (di) of the reactor current can be obtained by the following equation (4). Since the right triangle 500 and the right triangle 600 have the same height, the peak value (di) corresponds to the height of the other right triangle 600.
Figure 2010279151

一方、直角三角形600の底辺に相当する、スイッチング素子S1がOFFになった時からリアクトル電流が0[A]になるまでの時間(dt2)は、次式(5)により求めることができる。

Figure 2010279151
On the other hand, the time (dt2) from when the switching element S1 is turned OFF, corresponding to the bottom of the right triangle 600, until the reactor current becomes 0 [A] can be obtained by the following equation (5).
Figure 2010279151

したがって、リアクトル電流の平均値Lavrは、次式(6)により求めることができる。つまり、前記の式(1)が導出される。

Figure 2010279151
Therefore, the average value Lavr of the reactor current can be obtained by the following equation (6). That is, the above equation (1) is derived.
Figure 2010279151

ECU20は、「不連続モード」時には、式(1)によりリアクトル電流の平均値Lavrを求め、当該平均値Lavrを平均リアクトル電流量のフィードバック制御等に用いることができる。   In the “discontinuous mode”, the ECU 20 can obtain the average value Lavr of the reactor current by the equation (1), and can use the average value Lavr for feedback control of the average reactor current amount.

そのため、図2に例示するように、コンバータ12には、リアクトル電流量を検出する電流センサ121以外に、昇圧前電圧VLを検出する電圧センサ122、昇圧後電圧VHを検出する電圧センサ123が設けられる。   Therefore, as illustrated in FIG. 2, in addition to the current sensor 121 that detects the reactor current amount, the converter 12 includes a voltage sensor 122 that detects the pre-boosting voltage VL and a voltage sensor 123 that detects the post-boosting voltage VH. It is done.

各センサ122及び123は、いずれも電流センサ121と同様にECU20に電気的に接続されており、それぞれのセンサ値(VL及びVH)がECU20に入力される。リアクトル値L0は設計値として、デューティD及びキャリア周波数fは指令値として、ECU20においてそれぞれ既知の値である。   Each of the sensors 122 and 123 is electrically connected to the ECU 20 similarly to the current sensor 121, and the respective sensor values (VL and VH) are input to the ECU 20. Reactor value L0 is a known value in ECU 20 as a design value, and duty D and carrier frequency f are command values.

また、ECU20には、図2中に例示するように、モード判定部201、平均値検出部202、平均値推定部203及び電流制御部204としての機能をそれぞれ備える。   Further, as illustrated in FIG. 2, the ECU 20 includes functions as a mode determination unit 201, an average value detection unit 202, an average value estimation unit 203, and a current control unit 204.

モード判定部201は、所定の判定条件に基づいてコンバータ12のモードが「連続モード」及び「不連続モード」のいずれであるかを判定する。判定条件は、例示的に、昇圧前電圧VL、昇圧後電圧VH及びデューティDを基に決定できる。例えば図7(A)と図7(B)との比較で示すように、「連続モード」〔図8(B)参照〕においては、「dt1+dt2>1/f」の関係が成立する。   Mode determination unit 201 determines whether the mode of converter 12 is “continuous mode” or “discontinuous mode” based on a predetermined determination condition. For example, the determination condition can be determined based on the pre-boosting voltage VL, the post-boosting voltage VH, and the duty D. For example, as shown in a comparison between FIG. 7A and FIG. 7B, in the “continuous mode” (see FIG. 8B), the relationship “dt1 + dt2> 1 / f” is established.

ここで、dt1(スイッチング素子S1のON時間)は前記式(3)、dt2(スイッチング素子S1がOFFになってからリアクトル電流が0になるまでの時間)は前記式(5)でそれぞれ表わすことができるから、判定条件は、下記の式(7)で表わすことができる。

Figure 2010279151
Here, dt1 (ON time of the switching element S1) is expressed by the above expression (3), and dt2 (time from when the switching element S1 is turned OFF until the reactor current becomes 0) is expressed by the above expression (5). Therefore, the determination condition can be expressed by the following equation (7).
Figure 2010279151

したがって、モード判定部201は、電圧センサ122及び123のセンサ値VL及びVHとデューティDとをそれぞれパラメータとして、式(7)で表わされる条件が満たされる場合に「連続モード」と判定し、満たさない場合に「不連続モード」と判定する。   Therefore, the mode determination unit 201 determines the “continuous mode” when the sensor values VL and VH of the voltage sensors 122 and 123 and the duty D are parameters, respectively, and satisfies the condition expressed by the equation (7), and satisfies the condition. If not, it is determined as “discontinuous mode”.

平均値検出部202は、モード判定部201での判定結果が「連続モード」である場合に、スイッチング素子S1のON(又はOFF)期間の中心タイミングで電流センサ121にて得られたセンサ値をリアクトル電流の平均値として検出する。なお、図6の実線700で、デューティDに対する当該中心タイミングでのリアクトル電流の平均値の変化の一例を示す。   When the determination result in the mode determination unit 201 is “continuous mode”, the average value detection unit 202 calculates the sensor value obtained by the current sensor 121 at the center timing of the ON (or OFF) period of the switching element S1. It is detected as the average value of the reactor current. Note that a solid line 700 in FIG. 6 shows an example of a change in the average value of the reactor current at the center timing with respect to the duty D.

平均値推定部203は、モード判定部201での判定結果が「不連続モード」である場合に、上述したように式(1)による演算にて、リアクトル電流の平均値を推定する。なお、図6に実線800で、デューティDに対する推定平均値の変化の一例を示す。図6の実線700及び800で示す特性の差分が「連続モード」及び「不連続モード」におけるリアクトル電流量の平均値の偏差(点線900参照)に相当する。   The average value estimation unit 203 estimates the average value of the reactor current by the calculation according to the equation (1) as described above when the determination result in the mode determination unit 201 is “discontinuous mode”. FIG. 6 shows an example of a change in the estimated average value with respect to the duty D by a solid line 800. The difference between the characteristics indicated by the solid lines 700 and 800 in FIG. 6 corresponds to the deviation of the average value of the reactor current amount in the “continuous mode” and the “discontinuous mode” (see the dotted line 900).

電流制御部204は、「連続モード」では平均値検出部202で得られた平均値、「不連続モード」では平均値推定部203で得られた平均値に基づいて、平均リアクトル電流のフィードバック制御(デューティDの制御)等を実施する。   The current control unit 204 performs feedback control of the average reactor current based on the average value obtained by the average value detection unit 202 in the “continuous mode” and the average value obtained by the average value estimation unit 203 in the “discontinuous mode”. (Duty D control) and the like are performed.

以上のように、本例によれば、「不連続モード」において、スイッチング素子S1の前記中心タイミングで得られた電流センサ値がリアクトル電流の平均値として信頼できない場合に、他のパラメータ(コンバータ12の昇圧前電圧VL、昇圧後電圧VH、リアクトル値L0、デューティD及びキャリア周波数f)を基に、電流センサ値よりも信頼性の高い平均値を推定できるので、不連続モードにおいても安定した電流制御が可能となる。   As described above, according to this example, in the “discontinuous mode”, when the current sensor value obtained at the center timing of the switching element S1 is not reliable as the average value of the reactor current, other parameters (converter 12 Can be estimated on the basis of the pre-boosting voltage VL, post-boosting voltage VH, reactor value L0, duty D and carrier frequency f), so that a stable current can be obtained even in the discontinuous mode. Control becomes possible.

〔4〕変形例
(4.1)変形例1
「不連続モード」において、ECU20は、上述した平均値推定部203に代えて、電流センサ121のセンサ値をサンプリング速度やCPUの処理能力が許容される範囲で複数サンプリングし、各サンプリング値をソフトウェアにてスイッチング周期の1周期で平均する平均値実測部203a(図2参照)を備えてもよい。これにより、「不連続モード」において、リアクトル電流量の平均値を正確に実測することができる。したがって、スイッチング素子S1のON(又はOFF)期間の中心タイミングで得られる平均値よりも信頼性の高い平均値を得ることが可能である。
[4] Modification (4.1) Modification 1
In the “discontinuous mode”, the ECU 20 samples a plurality of sensor values of the current sensor 121 within a range where the sampling speed and the processing capability of the CPU are allowed instead of the above-described average value estimation unit 203, and sets each sampling value as software. An average value measurement unit 203a (see FIG. 2) that averages over one switching period may be provided. Thereby, in the “discontinuous mode”, the average value of the reactor current amount can be accurately measured. Therefore, it is possible to obtain an average value with higher reliability than the average value obtained at the center timing of the ON (or OFF) period of the switching element S1.

(4.2)変形例2
また、「不連続モード」において、平均値実測部203aによる実測は、代替的に、電流センサ121のセンサ値を、電流の過渡応答特性が劣化し制御性が悪化しない程度にフィルタリング処理(例えば、ローパスフィルタ処理)することで行なってもよい。これにより、リアクトル電流の振幅成分を積分して、図5に例示した領域500及び600の面積、つまりはリアクトル電流量の平均値を得ることができる。したがって、スイッチング素子S1のON(又はOFF)期間の中心タイミングで得られる平均値よりも信頼性の高い平均値を得ることが可能である。
(4.2) Modification 2
In the “discontinuous mode”, the actual measurement by the average value actual measurement unit 203a is alternatively performed by filtering the sensor value of the current sensor 121 to the extent that the transient response characteristic of the current is deteriorated and the controllability is not deteriorated (for example, You may carry out by performing a low-pass filter process. Thereby, the amplitude component of the reactor current can be integrated to obtain the areas of the regions 500 and 600 illustrated in FIG. 5, that is, the average value of the reactor current amount. Therefore, it is possible to obtain an average value with higher reliability than the average value obtained at the center timing of the ON (or OFF) period of the switching element S1.

ローパスフィルタ(積分)処理は、電流センサ121からECU20に至る電気経路にハードウェアのローパスフィルタを設けることで実施してもよいし、ECU20内でソフトウェアによる処理で実施してもよい。ハードウェアのローパスフィルタを用いれば、ECU20(CPU)の処理負荷を軽減可能である。   The low-pass filter (integration) process may be performed by providing a hardware low-pass filter in the electrical path from the current sensor 121 to the ECU 20, or may be performed by software processing in the ECU 20. If a hardware low-pass filter is used, the processing load on the ECU 20 (CPU) can be reduced.

(変形例3)
さらに、ECU20は、「不連続モード」において、「連続モード」の場合と同様にスイッチング素子S1のON(又はOFF)期間の中心タイミングで電流センサ121のセンサ値をサンプリングし、そのサンプリング値を補正して実際のリアクトル電流量の平均値を求めるようにしてもよい。
(Modification 3)
Further, in the “discontinuous mode”, the ECU 20 samples the sensor value of the current sensor 121 at the center timing of the ON (or OFF) period of the switching element S1 as in the “continuous mode”, and corrects the sampling value. Then, the average value of the actual reactor current amount may be obtained.

この場合、ECU20は、図8に例示するように、モード判定部201、平均値検出部202、平均値補正部205及び電流制御部204としての機能をそれぞれ備える。   In this case, as illustrated in FIG. 8, the ECU 20 has functions as a mode determination unit 201, an average value detection unit 202, an average value correction unit 205, and a current control unit 204.

モード判定部201は、前記の式(9)で表わされる判定条件に従って連続/不連続モードを判定する。   The mode determination unit 201 determines the continuous / discontinuous mode according to the determination condition represented by the above equation (9).

平均値検出部202は、モード判定部201での判定結果が連続モード及び不連続モードのいずれであるかに関わらず(いずれの場合であっても)、図9に例示するように、スイッチング素子S1のON(又はOFF)期間の中心タイミングで電流センサ121のセンサ値をサンプリングし、そのサンプリング値をリアクトル電流量の平均値として検出する。   Regardless of whether the determination result in the mode determination unit 201 is the continuous mode or the discontinuous mode (in any case), the average value detection unit 202 is a switching element as illustrated in FIG. The sensor value of the current sensor 121 is sampled at the center timing of the ON (or OFF) period of S1, and the sampled value is detected as an average value of the reactor current amount.

平均値補正部205は、モード判定部201での判定結果が「不連続モード」であった場合に、平均値検出部202で検出された電流センサ値(平均値)Xを実際の平均リアクトル電流量Zに補正する(図10の矢印910参照)。当該補正は、図6にて既述の特性700及び800の差分に相当する偏差を無くす方向に特性700を補正することに相当する。   The average value correction unit 205 uses the current sensor value (average value) X detected by the average value detection unit 202 as the actual average reactor current when the determination result by the mode determination unit 201 is “discontinuous mode”. The amount is corrected to Z (see arrow 910 in FIG. 10). The correction corresponds to correcting the characteristic 700 in a direction that eliminates a deviation corresponding to the difference between the characteristics 700 and 800 described above in FIG.

ここで、実際の平均リアクトル電流量Zは、補正量をYとすると、Z=X−Yで求めることができ、補正量Yは、スイッチング素子S1のON期間の中心タイミングにおける推定リアクトル電流値をY1、推定リアクトル平均電流Y2として、Y=Y1−Y2により求めることができる。   Here, the actual average reactor current amount Z can be obtained by Z = X−Y, where Y is the correction amount, and the correction amount Y is the estimated reactor current value at the center timing of the ON period of the switching element S1. Y1 and the estimated reactor average current Y2 can be obtained by Y = Y1-Y2.

推定リアクトル電流値Y1は、既述の式(4)で表わされるリアクトル電流のピーク値(di)の1/2と考えることができるから、次式(8)により求めることができ、推定リアクトル平均電流Y2は、前記の式(1)で求めることができる。

Figure 2010279151
The estimated reactor current value Y1 can be considered to be 1/2 of the peak value (di) of the reactor current represented by the above-described equation (4), and therefore can be obtained by the following equation (8), and the estimated reactor average The current Y2 can be obtained by the above equation (1).
Figure 2010279151

したがって、補正量Yは、次式(9)により求めることができる。

Figure 2010279151
Therefore, the correction amount Y can be obtained by the following equation (9).
Figure 2010279151

なお、モード判定部201での判定結果が「連続モード」であった場合、平均値補正部205は、上記補正量Yによる補正は実施せず、平均値検出部202で検出された平均値をそのまま出力する。また、平均値補正部205は、式(9)の実際に演算してもよいし、各入力パラメータを可変した場合のYの値をECU20内のメモリ等に予めテーブル形式やマップ形式のデータとして記憶しておき、必要に応じて当該データを参照することで、補正処理の高速化を図ってもよい。   When the determination result in the mode determination unit 201 is “continuous mode”, the average value correction unit 205 does not perform the correction by the correction amount Y, and the average value detected by the average value detection unit 202 is used. Output as is. Further, the average value correction unit 205 may actually calculate the equation (9), and the Y value when each input parameter is changed is stored in advance in the memory or the like in the ECU 20 as data in a table format or a map format. The speed of the correction process may be increased by storing the data and referring to the data as necessary.

電流制御部204は、「連続モード」時には平均値検出部202で得られた平均値、「不連続モード」時には平均値補正部205により補正された前記平均値に基づいて、リアクトル電流のフィードバック制御(デューティDの制御)等を実施する。   The current control unit 204 performs feedback control of the reactor current based on the average value obtained by the average value detection unit 202 in the “continuous mode” and the average value corrected by the average value correction unit 205 in the “discontinuous mode”. (Duty D control) and the like are performed.

以上のように、本例によれば、「不連続モード」において信頼性の低い電流センサ121のセンサ値を、他のパラメータ(コンバータ12の昇圧前電圧VL、昇圧後電圧VH、リアクトル値L0、デューティD及びキャリア周波数f)に基づいて補正することができる。したがって、より信頼性の高いリアクトル電流の平均値を得ることができ、「不連続モード」においても安定した電流制御が可能となる。   As described above, according to the present example, the sensor value of the current sensor 121 having low reliability in the “discontinuous mode” is set to other parameters (the pre-boosting voltage VL, the boosting voltage VH, the reactor value L0, the converter 12). Correction can be made based on the duty D and the carrier frequency f). Therefore, a more reliable average value of the reactor current can be obtained, and stable current control can be performed even in the “discontinuous mode”.

〔5〕その他
上述した実施形態は、降圧コンバータに適用してもよい。降圧コンバータの場合、昇圧コンバータの出力電圧(昇圧後電圧)VHが降圧コンバータの入力電圧(降圧前電圧)、昇圧コンバータの入力電圧(昇圧前電圧)VLが降圧コンバータの出力電圧(降圧後電圧)とそれぞれ考えればよい。また、上述した実施形態は、車載のDC−DCコンバータに限らず、パーソナルコンピュータや、オーディオビジュアル(AV)機器、携帯端末等の電気機器に搭載されているDC−DCコンバータに適用することも可能である。
[5] Others The embodiment described above may be applied to a step-down converter. In the case of a step-down converter, the output voltage (voltage after boost) VH of the boost converter is the input voltage (voltage before step-down) of the step-down converter, and the input voltage (voltage before boost) VL of the boost converter is the output voltage (voltage after step-down) of the step-down converter. You can think of each. Further, the above-described embodiment is not limited to the on-vehicle DC-DC converter, but can also be applied to a DC-DC converter mounted on an electric device such as a personal computer, an audio visual (AV) device, or a portable terminal. It is.

1 車両
2 駆動輪
10 電源システム(燃料電池システム)
11 燃料電池(FC)
12 昇圧コンバータ
13 バッテリ
14 バッテリ昇圧コンバータ
15 インバータ
16 モータ
20 電子制御ユニット(ECU)
21 アクセルペダルセンサ
121 電流センサ
122,123 電圧センサ
201 モード判定部
202 平均値検出部
203 平均値推定部
204 電流制御部
205 平均値補正部
C1,C2 コンデンサ
D1,D2 ダイオード
S1 スイッチング素子
SW スイッチ回路
1 Vehicle 2 Drive Wheel 10 Power Supply System (Fuel Cell System)
11 Fuel cell (FC)
12 Booster Converter 13 Battery 14 Battery Booster Converter 15 Inverter 16 Motor 20 Electronic Control Unit (ECU)
DESCRIPTION OF SYMBOLS 21 Accelerator pedal sensor 121 Current sensor 122,123 Voltage sensor 201 Mode determination part 202 Average value detection part 203 Average value estimation part 204 Current control part 205 Average value correction part C1, C2 Capacitor D1, D2 Diode S1 Switching element SW Switch circuit

Claims (5)

リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、
前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、
前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記の入力電圧、出力電圧、前記リアクトルの値、および、前記スイッチング素子のON期間とOFF期間との比率に基づいて、前記周期におけるリアクトルの電流量の平均値を推定する平均値推定部と、
を備えた、平均リアクトル電流検出装置。
A device comprising a reactor and a switching element, and used in a voltage converter that controls an amount of current flowing through the reactor by periodic switching control of the switching element and converts an input voltage into a predetermined output voltage,
A determination unit that determines whether or not there is a period in which the current amount of the reactor changes nonlinearly in the period of the switching control;
Based on the input voltage, the output voltage, the value of the reactor, and the ratio between the ON period and the OFF period of the switching element when the determination unit determines that the period that changes nonlinearly exists. An average value estimating unit for estimating an average value of the current amount of the reactor in the cycle,
An average reactor current detection device.
前記判定部にて前記非線形的に変化する期間が存在しないと判定された場合に、前記スイッチング素子のON期間又はOFF期間の中心タイミングにおける前記リアクトルの電流量を前記周期における平均値として検出する平均値検出部を備えた、請求項1記載の平均リアクトル電流検出装置。   An average for detecting, as an average value in the period, the current amount of the reactor at the center timing of the ON period or the OFF period of the switching element when it is determined by the determination unit that the non-linearly changing period does not exist The average reactor current detection device according to claim 1, comprising a value detection unit. 前記判定部は、
前記の入力電圧、出力電圧及び比率に基づいて前記判定を行なう、請求項1又は2に記載の平均リアクトル電流検出装置。
The determination unit
The average reactor current detection device according to claim 1, wherein the determination is performed based on the input voltage, the output voltage, and the ratio.
リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、
前記リアクトルの電流量を検出する電流検出部と、
前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、
前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記電流検出部の検出値を連続的にサンプリングして平均する、あるいは、前記検出値の積分値を得る、平均値実測部と、
を備えた、平均リアクトル電流検出装置。
A device comprising a reactor and a switching element, and used in a voltage converter that controls an amount of current flowing through the reactor by periodic switching control of the switching element and converts an input voltage into a predetermined output voltage,
A current detector for detecting the current amount of the reactor;
A determination unit that determines whether or not there is a period in which the current amount of the reactor changes nonlinearly in the period of the switching control;
When the determination unit determines that the non-linearly changing period exists, the detection value of the current detection unit is continuously sampled and averaged, or the integral value of the detection value is obtained. A value measurement unit;
An average reactor current detection device.
リアクトルとスイッチング素子とを備え、前記スイッチング素子の周期的なスイッチング制御によって前記リアクトルに流れる電流量を制御して入力電圧を所定の出力電圧に変換する電圧変換器に用いられる装置であって、
前記スイッチング素子のON期間又はOFF期間の中心タイミングにおける前記リアクトルの電流量を前記周期における平均値として検出する平均値検出部と、
前記スイッチング制御の周期において前記リアクトルの電流量が非線形的に変化する期間が存在するか否かを判定する判定部と、
前記判定部にて前記非線形的に変化する期間が存在すると判定された場合に、前記の入力電圧、出力電圧、前記リアクトルの値、および、前記スイッチング素子のON期間とOFF期間との比率に基づいて、前記平均値検出部で得られた平均値を補正する平均値補正部と、
を備えた、平均リアクトル電流検出装置。
A device comprising a reactor and a switching element, and used in a voltage converter that controls an amount of current flowing through the reactor by periodic switching control of the switching element and converts an input voltage into a predetermined output voltage,
An average value detection unit that detects the current amount of the reactor at the center timing of the ON period or the OFF period of the switching element as an average value in the period;
A determination unit that determines whether or not there is a period in which the current amount of the reactor changes nonlinearly in the period of the switching control;
Based on the input voltage, the output voltage, the value of the reactor, and the ratio between the ON period and the OFF period of the switching element when the determination unit determines that the period that changes nonlinearly exists. An average value correction unit for correcting the average value obtained by the average value detection unit,
An average reactor current detection device.
JP2009128853A 2009-05-28 2009-05-28 Average reactor current detector Active JP5534139B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009128853A JP5534139B2 (en) 2009-05-28 2009-05-28 Average reactor current detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009128853A JP5534139B2 (en) 2009-05-28 2009-05-28 Average reactor current detector

Publications (2)

Publication Number Publication Date
JP2010279151A true JP2010279151A (en) 2010-12-09
JP5534139B2 JP5534139B2 (en) 2014-06-25

Family

ID=43425586

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009128853A Active JP5534139B2 (en) 2009-05-28 2009-05-28 Average reactor current detector

Country Status (1)

Country Link
JP (1) JP5534139B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012143154A (en) * 2012-04-12 2012-07-26 Mitsubishi Electric Corp Dc power supply, refrigeration cycle device equipped with the same, and air conditioner and refrigerator mounting the same
JP2013207915A (en) * 2012-03-28 2013-10-07 Toyota Motor Corp Controller of voltage converter
JP2013207914A (en) * 2012-03-28 2013-10-07 Toyota Motor Corp Controller of voltage converter
JP2015019448A (en) * 2013-07-09 2015-01-29 トヨタ自動車株式会社 Converter device, fuel cell system having the same, and method and device for controlling converter device
JP2015146699A (en) * 2014-02-04 2015-08-13 三菱電機株式会社 Power supply unit
JP2016073030A (en) * 2014-09-27 2016-05-09 サンケン電気株式会社 AC-DC converter
JP2016195476A (en) * 2015-03-31 2016-11-17 株式会社東芝 Thermoelectric generator
JP2019054571A (en) * 2017-09-13 2019-04-04 三菱電機株式会社 Power conversion device
JP2020127282A (en) * 2019-02-04 2020-08-20 富士電機株式会社 Drive signal generation circuit and power supply circuit
JP2021170934A (en) * 2017-07-13 2021-10-28 住友電気工業株式会社 DC voltage conversion circuit
DE102021116882A1 (en) 2020-08-24 2022-02-24 Toyota Jidosha Kabushiki Kaisha POWER SUPPLY SYSTEM, CONTROL SYSTEM AND METHOD OF MEASURING AN INCORRECT CURRENT

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715965A (en) * 1993-06-22 1995-01-17 Mitsubishi Electric Corp Switching mode rectification circuit
JP2000193687A (en) * 1998-12-25 2000-07-14 Toyota Autom Loom Works Ltd Current detection circuit and dc/dc converter provided with current detection circuit
JP2006087261A (en) * 2004-09-17 2006-03-30 Diamond Electric Mfg Co Ltd Digital converter and its control method
JP2008104244A (en) * 2006-10-17 2008-05-01 Meidensha Corp Dc chopper
WO2009004847A1 (en) * 2007-06-29 2009-01-08 Murata Manufacturing Co., Ltd. Switching power unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715965A (en) * 1993-06-22 1995-01-17 Mitsubishi Electric Corp Switching mode rectification circuit
JP2000193687A (en) * 1998-12-25 2000-07-14 Toyota Autom Loom Works Ltd Current detection circuit and dc/dc converter provided with current detection circuit
JP2006087261A (en) * 2004-09-17 2006-03-30 Diamond Electric Mfg Co Ltd Digital converter and its control method
JP2008104244A (en) * 2006-10-17 2008-05-01 Meidensha Corp Dc chopper
WO2009004847A1 (en) * 2007-06-29 2009-01-08 Murata Manufacturing Co., Ltd. Switching power unit

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013207915A (en) * 2012-03-28 2013-10-07 Toyota Motor Corp Controller of voltage converter
JP2013207914A (en) * 2012-03-28 2013-10-07 Toyota Motor Corp Controller of voltage converter
CN103368386A (en) * 2012-03-28 2013-10-23 丰田自动车株式会社 Apparatus for controlling voltage converting apparatus
JP2012143154A (en) * 2012-04-12 2012-07-26 Mitsubishi Electric Corp Dc power supply, refrigeration cycle device equipped with the same, and air conditioner and refrigerator mounting the same
JP2015019448A (en) * 2013-07-09 2015-01-29 トヨタ自動車株式会社 Converter device, fuel cell system having the same, and method and device for controlling converter device
JP2015146699A (en) * 2014-02-04 2015-08-13 三菱電機株式会社 Power supply unit
JP2016073030A (en) * 2014-09-27 2016-05-09 サンケン電気株式会社 AC-DC converter
JP2016195476A (en) * 2015-03-31 2016-11-17 株式会社東芝 Thermoelectric generator
JP2021170934A (en) * 2017-07-13 2021-10-28 住友電気工業株式会社 DC voltage conversion circuit
JP2019054571A (en) * 2017-09-13 2019-04-04 三菱電機株式会社 Power conversion device
JP2020127282A (en) * 2019-02-04 2020-08-20 富士電機株式会社 Drive signal generation circuit and power supply circuit
DE102021116882A1 (en) 2020-08-24 2022-02-24 Toyota Jidosha Kabushiki Kaisha POWER SUPPLY SYSTEM, CONTROL SYSTEM AND METHOD OF MEASURING AN INCORRECT CURRENT
US11588388B2 (en) 2020-08-24 2023-02-21 Toyota Jidosha Kabushiki Kaisha Power supply system, control device, and method for measuring reactor current

Also Published As

Publication number Publication date
JP5534139B2 (en) 2014-06-25

Similar Documents

Publication Publication Date Title
JP5534139B2 (en) Average reactor current detector
US8248033B2 (en) Secondary battery temperature-increasing control apparatus and vehicle including the same, and secondary battery temperature-increasing control method
US9327611B2 (en) Temperature elevating apparatus of secondary battery and vehicle equipped with same
US8241802B2 (en) Fuel cell system with constantly accurate impedance measurement
JP5278837B2 (en) Converter output diode short-circuit detection device
US20090051346A1 (en) Voltage Conversion Device and Vehicle
JP5488097B2 (en) Current estimation device and DCDC converter control system
CN102449893B (en) Converter control device
CN109314461B (en) Power supply device, apparatus, and control method
JP2008182839A (en) Voltage converter, and control method for vehicle and voltage converter
JP6565436B2 (en) Fuel cell system
JP2009207239A (en) Charging controller for solar cells
JP2010279150A (en) Device for detecting change in capacity of reactor
JP5226475B2 (en) DC / DC converter device and fault detection method for current sensor of the device
JP7291085B2 (en) fuel cell system
WO2013042200A1 (en) Impedance measurement device
JP5822779B2 (en) Power storage system and charge / discharge control method thereof
JP2012115018A (en) Power controller
JP2017224546A (en) Fuel cell system
JP2008172912A (en) Voltage converter and vehicle
JP2010288366A (en) Converter controller
JP2011004466A (en) Device for detecting capacitance drop of capacitor in resonance type converter
US8797774B2 (en) Manufacturing method for chopper circuit, chopper circuit, DC/DC converter, fuel cell system, and control method
JP5687431B2 (en) Power supply circuit and power supply system
JP2011067042A (en) Switching control device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130814

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130814

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131203

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140131

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140402

R151 Written notification of patent or utility model registration

Ref document number: 5534139

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140415