JP2010106487A - Work determination system for construction machine - Google Patents

Work determination system for construction machine Download PDF

Info

Publication number
JP2010106487A
JP2010106487A JP2008277873A JP2008277873A JP2010106487A JP 2010106487 A JP2010106487 A JP 2010106487A JP 2008277873 A JP2008277873 A JP 2008277873A JP 2008277873 A JP2008277873 A JP 2008277873A JP 2010106487 A JP2010106487 A JP 2010106487A
Authority
JP
Japan
Prior art keywords
work
control
oil
determination
stick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008277873A
Other languages
Japanese (ja)
Other versions
JP5240843B2 (en
Inventor
Keisuke Shironi
啓介 白仁
Atsushi Wada
篤志 和田
Katsuharu Kenmori
克治 権守
Fumio Takahashi
文生 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Japan Ltd
Original Assignee
Caterpillar Japan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caterpillar Japan Ltd filed Critical Caterpillar Japan Ltd
Priority to JP2008277873A priority Critical patent/JP5240843B2/en
Publication of JP2010106487A publication Critical patent/JP2010106487A/en
Application granted granted Critical
Publication of JP5240843B2 publication Critical patent/JP5240843B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To avoid a control not intended by the operator from being performed by an erroneous determination by providing a work determination system for determining a work by a construction machine and controlling the construction machine to suit to the work. <P>SOLUTION: This work determination system comprises a work determination part 56 which stores detected data in a buffer 57, always calculates the average value of the detected data within a predetermined time, and determines an excavating operation based on the average value of the detected data. A first determination reference S1 capable of estimating the start of the excavating operation and a second determination reference S2 capable of defining that a specific operation is performed are set as a reference for determining the excavating operation. When the operation conforms to the second determination reference, a control for excavating operation suitable for the excavating operation is performed. When the operation conforms to the first determination reference but does not conform to the second determination reference, a preliminary control for excavating operation which is a control performed preliminarily for the control for excavating operation is performed. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、油圧ショベル等の建設機械において、作業の判定に基づいて該作業に適した油圧制御やエンジン出力制御を行なう場合に用いられる建設機械における作業判定システムの技術分野に属するものである。   The present invention belongs to a technical field of a work determination system in a construction machine that is used in a construction machine such as a hydraulic excavator when performing hydraulic control or engine output control suitable for the work based on the determination of the work.

一般に、油圧ショベル等の建設機械は、掘削や積込み等の各種作業を行なうためにの複数の油圧アクチュエータを備えると共に、該油圧アクチュエータを作動させるべく、油圧ポンプ、油タンク、バルブ等の各種油圧機器や、オペレータが操作する油圧アクチュエータ用操作具(操作レバーや操作ペダル)等を備えているが、この様な建設機械において、従来、油圧アクチュエータ用操作具の操作や油圧ポンプの吐出圧、或いは油圧アクチュエータの圧力を検出し、これら検出結果に基づいて建設機械の作業条件や動作を判断すると共に、該判断に基づいて、エンジンの出力制御や油圧制御を行なうようにした技術が知られている(例えば、特許文献1、2参照。)
前記特許文献1のものは、各種油圧アクチュエータ用操作具の操作や油圧ポンプの吐出圧に基づいて作業条件を判別し、該作業条件に応じて、エンジンの出力トルクや油圧ポンプの吸収トルクを切り換えるように構成されている。
また、前記特許文献2のものは、燃費低減を図るべく、油圧ショベルのブームシリンダからの排出油をアキュムレータに蓄圧する一方、該アキュムレータの蓄圧油を再利用できるようにしたものであって、このものにおいて、ブームシリンダのヘッド側圧力とロッド側圧力との差圧に基づいて油圧ショベルが機体持ち上げ動作時であるか否かを判断し、該判断に応じて、ブームシリンダのヘッド側油室からの排出油をアキュムレータに蓄圧するか或いは油タンクに排出するかを切換えるように構成されている。
再公表特許WO2005/098148号公報 特開2008−101414号公報
Generally, a construction machine such as a hydraulic excavator includes a plurality of hydraulic actuators for performing various operations such as excavation and loading, and various hydraulic devices such as a hydraulic pump, an oil tank, and a valve in order to operate the hydraulic actuators. And a hydraulic actuator operating tool (operating lever or operating pedal) operated by an operator. In such a construction machine, conventionally, a hydraulic actuator operating tool, a hydraulic pump discharge pressure, or a hydraulic pressure is used. A technique is known in which the pressure of the actuator is detected, the working conditions and operation of the construction machine are determined based on the detection results, and the engine output control and hydraulic control are performed based on the determination ( (For example, see Patent Documents 1 and 2.)
In Patent Document 1, the working conditions are determined based on the operation of various hydraulic actuator operating tools and the discharge pressure of the hydraulic pump, and the output torque of the engine and the absorption torque of the hydraulic pump are switched according to the working conditions. It is configured as follows.
Further, in Patent Document 2, in order to reduce fuel consumption, the discharged oil from the boom cylinder of the hydraulic excavator is accumulated in the accumulator, while the accumulated oil in the accumulator can be reused. The hydraulic excavator is in a lifting operation based on the pressure difference between the head pressure of the boom cylinder and the rod side pressure, and in response to the determination, from the head side oil chamber of the boom cylinder. It is configured to switch whether the discharged oil is accumulated in the accumulator or discharged to the oil tank.
Republished patent WO2005 / 098148 JP 2008-101414 A

ところで、前記従来のものは、建設機械の作業条件や動作を判断するにあたり、油圧ポンプの吐出圧や操作具の操作量、或いはブームシリンダのロッド側圧力とヘッド側圧力との差圧等の検出値が、予め設定される閾値(所定圧、或いは所定量)を越えたか否かによって判断し、該判断に基づいてエンジン出力制御や油圧制御を切換えるように構成されている。しかるに、この様に検出値が閾値を越えたか否かによって判断を行なうと、作業の遷移期における油圧回路の過渡的な圧力変動や、オペレータの手ぶれ等により一時的に検出値が振れた場合に、誤判断が生じてオペレータの意図しない制御が実行されてしまう惧れがある。そこで、所定時間継続して閾値を越えることを条件にして判断することが提唱されるが、このようにした場合には、応答遅れが生じて操作性に劣るという問題があり、ここに本発明が解決しようとする課題がある。   By the way, in the prior art, when judging the working condition and operation of the construction machine, detection of the discharge pressure of the hydraulic pump, the operation amount of the operation tool, the differential pressure between the rod side pressure of the boom cylinder and the head side pressure, etc. Judgment is made based on whether or not the value exceeds a preset threshold value (predetermined pressure or predetermined amount), and engine output control or hydraulic control is switched based on the determination. However, when the determination is made based on whether or not the detected value exceeds the threshold value in this way, when the detected value fluctuates temporarily due to a transient pressure fluctuation of the hydraulic circuit in the transitional period of the work or an operator's camera shake, etc. There is a possibility that a misjudgment occurs and control unintended by the operator is executed. Therefore, it is proposed to make a determination on the condition that the threshold value is continuously exceeded for a predetermined time, but in this case, there is a problem that response delay occurs and the operability is inferior, and the present invention is here. There is a problem to be solved.

本発明は、上記の如き実情に鑑みこれらの課題を解決することを目的として創作されたものであって、請求項1の発明は、各種作業を行なうべく操作具操作に基づいて作動する油圧アクチュエータを備えてなる建設機械において、該建設機械の行なう特定の作業を判定して該特定作業に適した油圧制御やエンジン出力制御を行なうための作業判定システムを設けるにあたり、該作業判定システムは、油圧アクチュエータの負荷を検出する負荷検出手段と、操作具の操作状態を検出する操作検出手段と、これら負荷検出手段および操作検出手段の検出データをバッファに記憶して該検出データの所定時間内の平均値或いは積分値を常時演算し、該検出データの平均値或いは積分値に基づいて特定作業の判定を行なう作業判定手段とを備えると共に、該作業判定手段における特定作業の判定の基準として、特定作業の開始を推定できる第一判定基準と、特定作業が行なわれていると確定できる第二判定基準とを設定し、第二判定基準に適合する場合には特定作業に適した特定作業用制御を行なう一方、第一判定基準には適合するが第二判定基準に適合しない場合は、特定作業用制御の予備の制御である特定作業用予備制御を行なうことを特徴とする建設機械における作業判定システムである。
請求項2の発明は、建設機械の油圧回路に、建設機械に設けられる何れかの油圧アクチュエータの排出油の有する油エネルギーを蓄圧するアキュムレータと、該アキュムレータの蓄圧油を前記油圧アクチュエータ或いは他の油圧アクチュエータに供給して再利用する再生回路とを設ける一方、前記作業判定システムは、作業判定手段による特定作業の判定に基づいて、前記アキュムレータへの蓄圧、或いはアキュムレータの蓄圧油の再利用を制御することを特徴とする建設機械における作業判定システムである。
The present invention was created in view of the above-described circumstances to solve these problems, and the invention of claim 1 is a hydraulic actuator that operates based on operation tool operation to perform various operations. In a construction machine comprising: a work determination system for determining a specific work performed by the construction machine and performing hydraulic control and engine output control suitable for the specific work, Load detection means for detecting the load of the actuator, operation detection means for detecting the operation state of the operating tool, and the detection data of these load detection means and operation detection means are stored in a buffer and the average of the detection data within a predetermined time A work determination means for constantly calculating a value or an integral value and determining a specific work based on an average value or an integral value of the detected data. The first determination criterion that can estimate the start of the specific operation and the second determination criterion that can be determined that the specific operation is being performed are set as the determination criterion for the specific operation in the operation determination unit, and the second determination criterion If it conforms to, the specific work control suitable for the specific work is performed. On the other hand, if it conforms to the first criterion but does not conform to the second criterion, the specific work is a preliminary control for the specific work control. It is the work determination system in the construction machine characterized by performing preliminary control.
According to a second aspect of the present invention, there is provided an accumulator for accumulating oil energy of oil discharged from any hydraulic actuator provided in the construction machine in a hydraulic circuit of the construction machine, and the accumulated pressure oil of the accumulator as the hydraulic actuator or other hydraulic pressure. The work determination system controls the pressure accumulation in the accumulator or the reuse of the pressure accumulation oil in the accumulator based on the determination of the specific work by the work determination means. This is a work determination system for a construction machine.

請求項1の発明とすることにより、油圧回路の過渡的な圧力変動や、オペレータの手ぶれ等による一時的な検出データの振れがあっても、特定作業の判定は、常時演算される検出データの平均値或いは積分値に基づいて行なわれることになるから、上記一時的な検出データの振れを排除できることになって、信頼性の高い正確な判定を行うことができる。しかも、特定作業に適した特定作業用制御は、第一判定基準により特定作業の開始が推定されるだけでは実行されず、第二判定基準により特定作業が行なわれていると確定できた場合に実行されることになるから、誤判定により特定作業用制御が実行されてしまうことを確実に回避できると共に、上記第一判定基準により掘削作業の開始が推定される場合には、特定作業用制御の予備の制御である掘削作業用予備制御が実行されることで、掘削作業用制御に応答遅れなくスムーズに移行できることになり、而して、作業性、操作性の向上に大きく貢献することができる。
請求項2の発明とすることにより、油圧アクチュエータの排出油の有する油エネルギーをアキュムレータに回収して再利用することができる油圧回路において、該アキュムレータへの蓄圧、或いはアキュムレータの蓄圧油の再利用を、建設機械の行なう特定作業に応じて適切に制御することができる。
According to the first aspect of the present invention, even if there is a transient fluctuation of the hydraulic circuit pressure or a temporary fluctuation of the detection data due to an operator's camera shake or the like, the determination of the specific work is performed on the detection data that is constantly calculated. Since the determination is performed based on the average value or the integral value, the temporary fluctuation of the detection data can be eliminated, and a highly reliable and accurate determination can be performed. Moreover, the control for specific work suitable for the specific work is not executed only by estimating the start of the specific work based on the first determination criterion, but when it can be determined that the specific operation is being performed based on the second determination criterion. Therefore, it is possible to reliably avoid the execution of the specific work control due to the erroneous determination, and when the start of the excavation work is estimated based on the first determination criterion, the specific work control is performed. By executing the excavation work preliminary control, which is the preliminary control of the excavation work, it is possible to smoothly shift to the excavation work control without delay in response, thus greatly contributing to improvement in workability and operability. it can.
According to the invention of claim 2, in the hydraulic circuit that can collect and reuse the oil energy of the oil discharged from the hydraulic actuator in the accumulator, the accumulator pressure accumulation or the accumulator pressure accumulation oil reuse It is possible to appropriately control according to the specific work performed by the construction machine.

次に、本発明の実施の形態について、図面に基づいて説明する。図1において、1は建設機械の一例である油圧ショベルであって、該油圧ショベル1は、クローラ式の下部走行体2、該下部走行体2の上方に旋回自在に支持される上部旋回体3、該上部旋回体3のフロントに装着される作業部4等の各部から構成され、さらに該作業部4は、基端部が上部旋回体3に上下揺動自在に支持されるブーム5、該ブーム5の先端部に前後揺動自在に支持されるスティック6、該スティック6の先端部に取付けられるバケット7、上記ブーム5、スティック6、バケット7をそれぞれ揺動せしめるブームシリンダ8、スティックシリンダ9、バケットシリンダ10等から構成されている。   Next, embodiments of the present invention will be described with reference to the drawings. In FIG. 1, reference numeral 1 denotes a hydraulic excavator that is an example of a construction machine. The hydraulic excavator 1 is a crawler-type lower traveling body 2 and an upper revolving body 3 that is rotatably supported above the lower traveling body 2. The working unit 4 is composed of various parts such as a working unit 4 mounted on the front of the upper swing body 3, and the working unit 4 further includes a boom 5 whose base end portion is supported by the upper swing body 3 so as to swing up and down, A stick 6 supported at the front end of the boom 5 so as to freely swing back and forth, a bucket 7 attached to the front end of the stick 6, a boom cylinder 8 for swinging the boom 5, the stick 6 and the bucket 7, and a stick cylinder 9 respectively. And a bucket cylinder 10 and the like.

図2は、前記油圧ショベル1に設けられる油圧回路を示す図であって、該図2において、11、12はエンジンEにより駆動される容量可変型の第一、第二メインポンプ、13はパイロット油圧源となるパイロットポンプ、14は油タンク、15は左側走行モータ、16は右側走行モータ、17は旋回モータ、さらに8、9、10は前記ブームシリンダ、スティックシリンダ、バケットシリンダである。   FIG. 2 is a diagram showing a hydraulic circuit provided in the hydraulic excavator 1. In FIG. 2, 11 and 12 are variable displacement type first and second main pumps driven by the engine E, and 13 is a pilot. A pilot pump serving as a hydraulic pressure source, 14 is an oil tank, 15 is a left side traveling motor, 16 is a right side traveling motor, 17 is a turning motor, and 8, 9, and 10 are the boom cylinder, stick cylinder, and bucket cylinder.

ここで、前記ブームシリンダ8は、ヘッド側油室8aの圧力によって作業部4の重量を保持すると共に、該ヘッド側油室8aへの圧油供給およびロッド側油室8bからの油排出により伸長してブーム5を上昇せしめ、また、ロッド側油室8bへの圧油供給およびヘッド側油室8aからの油排出により縮小してブーム5を下降せしめるように構成されている。そして、該ブーム5の昇降に伴って作業部4全体が昇降すると共に、ブーム5の上昇に伴い作業部4の有する位置エネルギーが増加するが、該位置エネルギーは、後述するようにアキュムレータ18に回収されて再利用されるようになっている。尚、該ブームシリンダ8は、本発明の請求項2における油圧アクチュエータに相当する。   Here, the boom cylinder 8 holds the weight of the working unit 4 by the pressure of the head side oil chamber 8a, and extends by supplying pressure oil to the head side oil chamber 8a and discharging oil from the rod side oil chamber 8b. Then, the boom 5 is raised, and the boom 5 is lowered by being contracted by pressure oil supply to the rod side oil chamber 8b and oil discharge from the head side oil chamber 8a. The working unit 4 as a whole moves up and down as the boom 5 moves up and down, and the potential energy of the working unit 4 increases as the boom 5 moves up. The potential energy is collected in the accumulator 18 as will be described later. Has been reused. The boom cylinder 8 corresponds to a hydraulic actuator according to claim 2 of the present invention.

また、前記スティックシリンダ9は、ヘッド側油室9aへの圧油供給およびロッド側油室9bからの油排出により伸長してスティック6をイン側(上部旋回体3に近接する方向)に揺動せしめ、また、ロッド側油室9bへの圧油供給およびヘッド側油室9aからの油排出により縮小してスティック6をアウト側(上部旋回体3から遠ざかる方向)に揺動せしめるように構成されている。尚、該スティックシリンダ9は、本発明の請求項1における油圧アクチュエータに相当する。   The stick cylinder 9 is extended by pressure oil supply to the head side oil chamber 9a and oil discharge from the rod side oil chamber 9b to swing the stick 6 inward (in the direction close to the upper swing body 3). In addition, the stick 6 is reduced by the pressure oil supply to the rod-side oil chamber 9b and the oil discharge from the head-side oil chamber 9a to swing the stick 6 outward (in the direction away from the upper swing body 3). ing. The stick cylinder 9 corresponds to a hydraulic actuator according to claim 1 of the present invention.

さらに、図2において、19はコントロールバルブユニットであって、該コントロールバルブユニット19には、前記左側走行モータ15、右側走行モータ16、旋回モータ17、ブームシリンダ8、スティックシリンダ9、バケットシリンダ10に対する油給排制御をそれぞれ行なう左側走行用、右側走行用、旋回用、ブーム用、スティック用、バケット用のコントロールバルブ20、21、22、23、24、25や、走行直進弁26、メインリリーフ弁27等が配されている。   Further, in FIG. 2, reference numeral 19 denotes a control valve unit. The control valve unit 19 includes a left traveling motor 15, a right traveling motor 16, a turning motor 17, a boom cylinder 8, a stick cylinder 9, and a bucket cylinder 10. Control valves 20, 21, 22, 23, 24, 25 for left-side traveling, right-side traveling, turning, boom, stick, and bucket for performing oil supply / discharge control, traveling straight-travel valve 26, main relief valve 27 etc. are arranged.

前記ブーム用コントロールバルブ23は、上昇側、下降側パイロットポート23a、23bを備えた三位置切換弁であって、両パイロットポート23a、23bにパイロット圧が入力されていない状態では、ブームシリンダ8に対する油給排を行なわない中立位置Nに位置しているが、上昇側パイロットポート23aにパイロット圧が入力されることにより、第一メインポンプ11の吐出油をブームシリンダ8のヘッド側油室8aに供給する一方、ロッド側油室8bからの排出油を油タンク14に流す上昇側位置Xに切換り、また、下降側パイロットポート23bにパイロット圧が入力されることにより、第一メインポンプ11の吐出油をブームシリンダ8のロッド側油室8bに供給する下降側位置Yに切換る。この場合、上昇側位置X、下降側位置Yにおけるブーム用コントロールバルブ23の開口面積は、各パイロットポート23a、23bに入力されるパイロット圧の増減に応じて増減するように構成されている。尚、後述するように、ブーム用コントロールバルブ23は、ブーム用操作具がブーム上昇側に操作された場合に上昇側パイロットポート23aにパイロット圧が入力されて上昇側位置Xに切換わるが、この場合、第一メインポンプ11の吐出油には、アキュムレータ18の蓄圧油が合流するように構成されている。   The boom control valve 23 is a three-position switching valve having ascending and descending pilot ports 23a and 23b. When the pilot pressure is not input to both the pilot ports 23a and 23b, the boom control valve 23 is connected to the boom cylinder 8. Although it is located at the neutral position N where oil supply / discharge is not performed, the discharge pressure of the first main pump 11 is supplied to the head side oil chamber 8a of the boom cylinder 8 when the pilot pressure is input to the ascending pilot port 23a. On the other hand, switching to the ascending position X where the oil discharged from the rod-side oil chamber 8b flows to the oil tank 14 is performed, and the pilot pressure is input to the descending pilot port 23b. The position is switched to the lower position Y where the discharged oil is supplied to the rod side oil chamber 8b of the boom cylinder 8. In this case, the opening area of the boom control valve 23 at the ascending position X and the descending position Y is configured to increase or decrease in accordance with the increase or decrease of the pilot pressure input to each pilot port 23a, 23b. As will be described later, the boom control valve 23 is switched to the ascending position X when pilot pressure is input to the ascending pilot port 23a when the boom operating tool is operated to the ascending boom side. In this case, the pressure-accumulated oil from the accumulator 18 is combined with the oil discharged from the first main pump 11.

また、スティック用コントロールバルブ24は、イン側、アウト側パイロットポート24a、24bを備えた三位置切換弁であって、両パイロットポート24a、24bにパイロット圧が入力されていない状態では、スティックシリンダ9に対する油給排を行なわない中立位置Nに位置しているが、イン側パイロットポート24aにパイロット圧が入力されることにより、第二メインポンプ12の吐出油をスティックシリンダ9のヘッド側油室9aに供給する一方、ロッド側油室9bからの排出油を油タンク14に流すイン側位置Xに切換り、また、アウト側パイロットポート24bにパイロット圧が入力されることにより、第二メインポンプ12の吐出油をスティックシリンダ9のロッド側油室9bに供給する一方、ヘッド側油室9aからの排出油を油タンク14に流すアウト側位置Yに切換る。この場合、イン側位置X、アウト側位置Yにおけるスティック用コントロールバルブ24の開口面積は、各パイロットポート24a、24bに入力されるパイロット圧の増減に応じて増減するように構成されている。   The stick control valve 24 is a three-position switching valve provided with in-side and out-side pilot ports 24a and 24b. When no pilot pressure is input to the pilot ports 24a and 24b, the stick cylinder 9 However, when the pilot pressure is input to the in-side pilot port 24a, the oil discharged from the second main pump 12 is supplied to the head-side oil chamber 9a of the stick cylinder 9. On the other hand, the second main pump 12 is switched to the in-side position X where the oil discharged from the rod-side oil chamber 9b flows into the oil tank 14 and the pilot pressure is input to the out-side pilot port 24b. Is supplied to the rod side oil chamber 9b of the stick cylinder 9, while from the head side oil chamber 9a. Setsu換Ru the out position Y to flow discharge oil to the oil tank 14. In this case, the opening area of the stick control valve 24 at the in-side position X and the out-side position Y is configured to increase / decrease in accordance with the increase / decrease of the pilot pressure input to each pilot port 24a, 24b.

さらに、前記左側走行用、右側走行用、旋回用、バケット用のコントロールバルブ20、21、22、25は、前述したブーム用コントロールバルブ23やスティック用コントロールバルブ24と同様に、パイロットポート20a、20b、21a、21b、22a、22b、25a、25bを備えた三位置切換弁であって、パイロット圧の入力に基づいて、左側走行用モータ15、右側走行用モータ16、旋回モータ17、バケットシリンダ10に対する油給排制御をそれぞれ行なう作動位置XまたはYに切換わるように構成されている。   Further, the control valves 20, 21, 22, 25 for the left side traveling, right side traveling, turning, and bucket are the pilot ports 20 a, 20 b similarly to the boom control valve 23 and the stick control valve 24 described above. , 21a, 21b, 22a, 22b, 25a, 25b, and based on the input of pilot pressure, the left traveling motor 15, the right traveling motor 16, the turning motor 17, and the bucket cylinder 10 The oil supply / discharge control is switched to the operation position X or Y for performing the oil supply / discharge control.

一方、28、29はブーム上昇側、ブーム下降側電磁比例減圧弁であって、これらブーム上昇側、ブーム下降側電磁比例減圧弁28、29は、ブーム用操作具(操作レバー、図示せず)の上昇側、下降側操作に基づいて、前記ブーム用コントロールバルブ23の上昇側、下降側パイロットポート23a、23bにそれぞれパイロット圧を出力するように構成されている。この場合、パイロット圧は、ブーム用操作具の操作量に応じて増減するように制御される。   On the other hand, 28 and 29 are boom raising and boom lowering electromagnetic proportional pressure reducing valves. These boom raising and boom lowering electromagnetic proportional pressure reducing valves 28 and 29 are boom operating tools (operation lever, not shown). The pilot pressure is output to the ascending and descending pilot ports 23a and 23b of the boom control valve 23 based on the ascending and descending operations. In this case, the pilot pressure is controlled to increase or decrease in accordance with the operation amount of the boom operation tool.

また、30、31はスティックイン側、スティックアウト側電磁比例減圧弁であって、これらスティックイン側、スティックアウト側電磁比例減圧弁30、31は、スティック用操作具(操作レバー、図示せず)のイン側、アウト側操作に基づいて、前記スティック用コントロールバルブ24のイン側、アウト側パイロットポート24a、24bにそれぞれパイロット圧を出力するように構成されている。この場合、パイロット圧は、スティック用操作具の操作量に応じて増減するように制御される。   30 and 31 are stick-in side and stick-out side electromagnetic proportional pressure reducing valves. These stick-in and stick-out side electromagnetic proportional pressure reducing valves 30 and 31 are stick operating tools (operating lever, not shown). The pilot pressure is output to the in-side and out-side pilot ports 24a and 24b of the stick control valve 24 based on the in-side and out-side operations. In this case, the pilot pressure is controlled to increase or decrease according to the operation amount of the stick operation tool.

さらに、図2には図示しないが、油圧ショベル1の油圧回路には、対応する操作具(操作レバー或いは操作ペダル、図示せず)操作に基づいて、前記左側走行用、右側走行用、旋回用、バケット用のコントロールバルブ20、21、22、25のパイロットポート20a、20b、21a、21b、22a、22b、25a、25bにそれぞれパイロット圧を出力する左側走行用、右側走行用、旋回用、バケット用の電磁比例減圧弁が設けられている。そして、これら左側走行用、右側走行用、旋回用、バケット用の電磁比例減圧弁、および前記ブーム上昇側、ブーム下降側電磁比例減圧弁28、29、スティックイン側、スティックアウト側電磁比例減圧弁30、31は、共に、後述する制御装置34から出力される制御信号によって作動するように構成されている。   Further, although not shown in FIG. 2, the hydraulic circuit of the excavator 1 includes the left side travel, the right side travel, and the turn based on the operation of a corresponding operation tool (operation lever or operation pedal, not shown). , Control valve 20, 21, 22, 25 for bucket, pilot port 20a, 20b, 21a, 21b, 22a, 22b, 25a, 25b for outputting pilot pressure to left side, right side, turning, bucket An electromagnetic proportional pressure reducing valve is provided. And the electromagnetic proportional pressure reducing valves for left side traveling, right side traveling, turning, and bucket, and the boom raising side, boom lowering side electromagnetic proportional pressure reducing valves 28, 29, stick-in side, stick-out side electromagnetic proportional pressure reducing valves Both 30 and 31 are configured to operate in accordance with a control signal output from a control device 34 described later.

一方、36は前記ブームシリンダ8のヘッド側油室8aからアキュムレータ18に至る回収油路であって、該回収油路36には、回収バルブ37が配設されている。   On the other hand, reference numeral 36 denotes a recovery oil passage from the head side oil chamber 8a of the boom cylinder 8 to the accumulator 18, and a recovery valve 37 is disposed in the recovery oil passage 36.

前記回収バルブ37は、後述する制御装置34からの制御信号が入力される回収バルブ用電油変換弁38の作動に基づいてスプールが移動する流量制御弁であって、回収バルブ用電油変換弁38が非作動の状態では、回収油路36を閉じる閉位置Nに位置しているが、回収バルブ用電油変換弁38が作動することによりスプールが移動して、回収油路36を開く開位置Xに切換わるように構成されている。さらに、該回収バルブ37には、ブームシリンダ8のヘッド側油室8aからアキュムレータ18への油の流れは許容するが、逆方向の流れは阻止するチェック弁39が内蔵されている。而して、回収バルブ37が開位置Xに切換わることによって、ブームシリンダ8のヘッド側油室8aからの排出油を、回収油路36を経由してアキュムレータ18に蓄圧することができるようになっている。   The recovery valve 37 is a flow rate control valve in which the spool moves based on the operation of the recovery valve electro-hydraulic conversion valve 38 to which a control signal from the control device 34 described later is input. In a non-actuated state 38, the recovery oil passage 36 is located at the closed position N. However, when the recovery valve electric oil conversion valve 38 is operated, the spool moves to open the recovery oil passage 36. It is configured to switch to position X. Further, the recovery valve 37 incorporates a check valve 39 that allows oil flow from the head-side oil chamber 8a of the boom cylinder 8 to the accumulator 18 but prevents reverse flow. Thus, by switching the recovery valve 37 to the open position X, the oil discharged from the head side oil chamber 8a of the boom cylinder 8 can be accumulated in the accumulator 18 via the recovery oil passage 36. It has become.

さらに、41は前記アキュムレータ18から第一メインポンプ11の吐出ライン11aに至る再生油路(本発明の再生回路に相当する)であって、該再生油路41には、再生バルブ42が配設されている。   Further, 41 is a regeneration oil passage (corresponding to the regeneration circuit of the present invention) from the accumulator 18 to the discharge line 11a of the first main pump 11, and the regeneration oil passage 41 is provided with a regeneration valve 42. Has been.

前記再生バルブ42は、制御装置34からの制御信号が入力される再生バルブ用電油変換弁43の作動に基づいてスプールが移動する流量制御弁であって、再生バルブ用電油変換弁43が非作動の状態では、再生油路41を閉じる閉位置Nに位置しているが、再生バルブ用電油変換弁43が作動することによりスプールが移動して、再生油路41を開く開位置Xに切換わるように構成されている。さらに、該再生油路41には、アキュムレータ18から第一メインポンプ11の吐出ライン11aへの油の流れは許容するが、逆方向の流れは阻止するチェック弁44が内蔵されている。而して、再生バルブ42が開位置Xに切換わることによって、アキュムレータ18の蓄圧油を、再生油路41を経由して第一メインポンプ11の吐出油に合流させることができるようになっている。   The regeneration valve 42 is a flow rate control valve in which the spool moves based on the operation of the regeneration valve electro-hydraulic conversion valve 43 to which a control signal from the control device 34 is input. In the non-operating state, it is located at the closed position N that closes the regenerative oil passage 41, but the open position X that opens the regenerated oil passage 41 when the regenerative valve electro-hydraulic conversion valve 43 is activated to move the spool. It is comprised so that it may switch to. Further, the regenerated oil passage 41 incorporates a check valve 44 that allows oil flow from the accumulator 18 to the discharge line 11a of the first main pump 11 but prevents reverse flow. Thus, when the regeneration valve 42 is switched to the open position X, the accumulated oil in the accumulator 18 can be merged with the discharge oil of the first main pump 11 via the regeneration oil passage 41. Yes.

また、45は前記ブームシリンダ8のヘッド側油室8aから油タンク14に至る排出油路であって、該排出油路45には、排出バルブ46が配設されている。   Reference numeral 45 denotes a discharge oil passage from the head side oil chamber 8a of the boom cylinder 8 to the oil tank 14, and a discharge valve 46 is disposed in the discharge oil passage 45.

前記排出バルブ46は、パイロットポート46aを備えた二位置切換弁であって、パイロットポート46aにパイロット圧が入力されていない状態では、排出油路45を閉じる閉位置Nに位置しているが、パイロットポート46aにパイロット圧が入力されることによりスプールが移動して、排出油路45を開く開位置Xに切換るように構成されている。而して、排出バルブ46が開位置Xに切換わることによって、ブームシリンダ8のヘッド側油室8aからの排出油を油タンク14に流すことができるようになっている。   The discharge valve 46 is a two-position switching valve provided with a pilot port 46a, and in a state where pilot pressure is not input to the pilot port 46a, the discharge valve 46 is positioned at a closed position N that closes the discharge oil passage 45. When the pilot pressure is input to the pilot port 46a, the spool moves to switch to the open position X where the drain oil passage 45 is opened. Thus, when the discharge valve 46 is switched to the open position X, the discharged oil from the head side oil chamber 8a of the boom cylinder 8 can be flowed to the oil tank 14.

さらに、47は排出バルブ用電磁比例減圧弁であって、該排出バルブ用電磁比例減圧弁47は、制御装置34から入力される制御信号に基づいて、前記排出バルブ46のパイロットポート46aにパイロット圧を出力するように構成されている。   Further, 47 is an electromagnetic proportional pressure reducing valve for the discharge valve. The electromagnetic proportional pressure reducing valve 47 for the discharge valve is connected to the pilot port 46a of the discharge valve 46 based on the control signal inputted from the control device 34. Is configured to output.

一方、前記制御装置34は、マイクロコンピュータ等を用いて構成されるものであって、図3のブロック図に示すごとく、左側走行用、右側走行用、旋回用、ブーム用、スティック用、バケット用操作具の操作状態(操作の有無、操作方向、操作量)をそれぞれ検出する左側走行用、右側走行用、旋回用、ブーム用、スティック用、バケット用操作検出手段48〜53、スティックシリンダ9のヘッド側油室9aの圧力を検出するスティックヘッド側圧力センサ54、アキュムレータ18の圧力を検出するアキュムレータ圧力センサ55等からの信号を入力し、これら入力信号に基づいて、前述のブーム上昇側、ブーム下降側電磁比例減圧弁28、29、スティックイン側、スティックアウト側電磁比例減圧弁30、31、左側走行用、右側走行用、旋回用、バケット用の電磁比例減圧弁、回収バルブ用電油変換弁38、再生バルブ用電油変換弁43、排出バルブ用電磁比例減圧弁47等に制御信号を出力するように構成されている。   On the other hand, the control device 34 is configured using a microcomputer or the like, and as shown in the block diagram of FIG. 3, for left side running, for right side running, for turning, for booms, for sticks, for buckets. The operation detection means 48 to 53 for the left traveling, the right traveling, the turning, the boom, the stick, and the bucket operation detecting means 48 to 53 for detecting the operation state (operation presence / absence, operation direction, operation amount) of the operation tool, respectively. Signals from a stick head side pressure sensor 54 for detecting the pressure of the head side oil chamber 9a, an accumulator pressure sensor 55 for detecting the pressure of the accumulator 18, and the like are input, and on the basis of these input signals, the above-described boom raising side, boom Decreasing side electromagnetic proportional pressure reducing valves 28, 29, stick-in side, stick-out side electromagnetic proportional pressure reducing valves 30, 31, for left side travel, right side A control signal is output to the electromagnetic proportional pressure reducing valve for the row, the turning, the bucket, the electro oil conversion valve 38 for the recovery valve, the electro oil conversion valve 43 for the regeneration valve, the electromagnetic proportional pressure reducing valve 47 for the discharge valve, etc. Has been.

さらに、56は前記制御装置34に設けられる作業判定部(本発明の作業判定手段に相当する)であって、該作業判定部56において特定作業が行なわれているか否かが判定されるが、本実施の形態では、特定作業として掘削作業が設定されていて、掘削作業が行なわれるか否かの判定が行なわれるように構成されている。   Furthermore, 56 is a work determination unit (corresponding to a work determination unit of the present invention) provided in the control device 34, and it is determined whether or not a specific work is being performed in the work determination unit 56. In this embodiment, the excavation work is set as the specific work, and it is configured to determine whether or not the excavation work is performed.

前記掘削作業の判定を行なうにあたり、作業判定部56は、まず、スティックヘッド側圧力センサ54およびスティック用操作検出手段52から入力される検出値に基づいて、スティックシリンダ9の作業負荷(後述する第一作業負荷Pw1および第二作業負荷Pw2)を求める。尚、掘削作業は、通常、ブーム5、スティック6、バケット7を連動操作して行うが、掘削作業が行われている場合と行なわれていない場合とではスティックシリンダ9の作業負荷が顕著に異なるため、本実施の形態では、スティックシリンダ9の作業負荷に基づいて掘削作業の判定を行なう構成になっている。また、本実施の形態では、上記スティックヘッド側圧力センサ54、スティック用操作検出手段52が、本発明の負荷検出手段、操作検出手段に相当する。   In determining the excavation work, the work determination unit 56 first determines the work load of the stick cylinder 9 based on the detection values input from the stick head side pressure sensor 54 and the stick operation detection means 52 (the first to be described later). One work load Pw1 and a second work load Pw2) are obtained. The excavation work is normally performed by operating the boom 5, the stick 6, and the bucket 7 in an interlocked manner, but the work load of the stick cylinder 9 is significantly different between when the excavation work is performed and when it is not performed. Therefore, in the present embodiment, the excavation work is determined based on the work load of the stick cylinder 9. In the present embodiment, the stick head side pressure sensor 54 and the stick operation detecting means 52 correspond to the load detecting means and the operation detecting means of the present invention.

前記スティックシリンダ9の作業負荷を求める制御手順について、図4に示す制御ブロック図に基づいて説明すると、作業判定部56は、まず、スティックヘッド側圧力センサ54により検出されるスティックシリンダ9のヘッド側油室9aの圧力Ps(以下、スティックヘッド側圧力Psと称する)と、スティック用操作検出手段52により検出されるスティック用操作具の操作量L(以下、スティック操作量Lと称するが、該スティック操作量Lは、スティック用操作具が中立位置のとき(操作されていないとき)を0%、フル操作されたときを100%とするパーセンテージで示すと共に、イン側操作された場合には(−)、アウト側に操作された場合には(+)とする)とを、バッファ57に入力する。該バッファ57は、検出データを予め設定される第一所定時間T1(任意に設定できるが、例えば、500〜1000msec)のあいだ時系列的に記憶すると共に、第一所定時間T1経過後のデータは順次消去されるように設定されている。   The control procedure for obtaining the work load of the stick cylinder 9 will be described based on the control block diagram shown in FIG. 4. The work determination unit 56 first detects the head side of the stick cylinder 9 detected by the stick head side pressure sensor 54. The pressure Ps of the oil chamber 9a (hereinafter referred to as the stick head side pressure Ps) and the operation amount L of the stick operating tool detected by the stick operation detecting means 52 (hereinafter referred to as the stick operation amount L). The operation amount L is expressed as a percentage in which 0% is set when the stick operating tool is in the neutral position (when it is not operated) and 100% when the stick operating tool is fully operated. ) And (+) when operated to the out side) is input to the buffer 57. The buffer 57 stores the detection data in a time-series manner for a preset first predetermined time T1 (which can be arbitrarily set, for example, 500 to 1000 msec), and data after the first predetermined time T1 has elapsed. It is set to be erased sequentially.

前記バッファ57に記憶された検出データは、平均値・積分値演算部58に入力される。該平均値・積分値演算部58は、バッファ57に記憶された検出データの所定時間内の平均値、或いは積分値を常時演算するが、本実施の形態では、現在より手前の第二所定時間T2内のスティックヘッド側圧力Psの平均値APs2およびスティック操作量Lの平均値AL2と、現在より手前の第三所定時間T3内のスティックヘッド側圧力Psの平均値APs3およびスティック操作量Lの平均値AL3(上記平均値APs2、AL2、APs3、AL3は、何れも現在値を含まず)とが演算されるようになっている。そして、該平均値・積分値演算部58において演算された平均値APs2、AL2、APs3、AL3は、後述する第一、第二作業負荷演算部59、60に出力されて、作業負荷の演算に用いられる。尚、前記第二、第三所定時間T2、T3は、第一所定時間T1よりも短い時間で任意に設定されるが、後述する第一、第二作業負荷Pw1、Pw2を求めるのに適した時間になるように設定される。   The detection data stored in the buffer 57 is input to the average / integral value calculator 58. The average value / integral value calculation unit 58 always calculates an average value or an integral value within a predetermined time of the detection data stored in the buffer 57, but in this embodiment, a second predetermined time before the present time. Average value APs2 of stick head side pressure Ps within T2 and average value AL2 of stick operation amount L, and average value APs3 of stick head side pressure Ps and stick operation amount L within a third predetermined time T3 before the present. A value AL3 (the average values APs2, AL2, APs3, and AL3 all do not include the current value) is calculated. The average values APs2, AL2, APs3, and AL3 calculated by the average / integral value calculation unit 58 are output to first and second workload calculation units 59 and 60, which will be described later, for calculating the workload. Used. The second and third predetermined times T2 and T3 are arbitrarily set to be shorter than the first predetermined time T1, but are suitable for obtaining first and second work loads Pw1 and Pw2 to be described later. Set to be time.

第一作業負荷演算部59は、前記平均値・積分値演算部58から出力される第二所定時間T2内のスティックヘッド側圧力Psの平均値APs2およびスティック操作量Lの平均値AL2と、スティックヘッド側圧力センサ54により検出される現在のスティックヘッド圧力Psとを入力し、下記の式(1)を用いて、現在より手前の第二所定時間T2内の作動負荷の平均値に対する現在の作業負荷の変動量Pw1を求める。
Pw1=(|AL2|/100)×(Ps−APs2)・・・(1)
尚、第二所定時間T2内のスティック操作量Lの平均値AL2が「0」以上の場合(AL2≧0、つまり、スティック用操作具が中立位置の場合、或いはアウト側に操作されている場合)には、作動負荷の変動量Pw1は「0」とする(Pw1=0)。
そして、前記式(1)により求められた作動負荷の変動量Pw1に基づいて、後述するように、掘削作業が開始された否かを推定する。つまり、掘削作業の開始時には、スティックシリンダ9のイン側の作業負荷が大きく増加するため、作動負荷の変動量Pw1を求めることによって、掘削作業が開始されたか否かを推定することができる。尚、前記式(1)により求められた作動負荷の変動量Pw1を、以下、第一作業負荷Pw1と称する。
The first work load calculation unit 59 includes the average value APs2 of the stick head side pressure Ps and the average value AL2 of the stick operation amount L within the second predetermined time T2 output from the average value / integration value calculation unit 58, the stick The current stick head pressure Ps detected by the head-side pressure sensor 54 is input, and the current work with respect to the average value of the operating load within the second predetermined time T2 before the present is calculated using the following equation (1). A load fluctuation amount Pw1 is obtained.
Pw1 = (| AL2 | / 100) × (Ps−APs2) (1)
When the average value AL2 of the stick operation amount L within the second predetermined time T2 is “0” or more (AL2 ≧ 0, that is, when the stick operation tool is in the neutral position, or is operated to the out side. ), The fluctuation amount Pw1 of the operating load is set to “0” (Pw1 = 0).
Then, based on the fluctuation amount Pw1 of the operating load obtained by the equation (1), it is estimated whether or not excavation work has been started, as will be described later. That is, when the excavation work is started, the work load on the in-side of the stick cylinder 9 is greatly increased. Therefore, it is possible to estimate whether or not the excavation work has been started by obtaining the operating load fluctuation amount Pw1. Hereinafter, the fluctuation amount Pw1 of the operating load obtained by the equation (1) will be referred to as a first work load Pw1.

一方、第二作業負荷演算部60は、前記平均値・積分値演算部58から出力される第三所定時間T3内のスティックヘッド側圧力Psの平均値APs3およびスティック操作量Lの平均値AL3を入力し、下記の式(2)を用いて、現在より手前の第三所定時間T3内の作業負荷の平均値Pw2を求める。
Pw2=(|AL3|/100)×APs3)・・・(2)
尚、第三所定時間T3内のスティック操作量Lの平均値AL3が「0」以上の場合(AL3≧0、つまり、スティック用操作具が中立位置の場合、或いはアウト側に操作されている場合)には、作動負荷の平均値Pw2は「0」とする(Pw2=0)。
そして、前記式(2)により求められた作動負荷の平均値Pw2に基づいて、後述するように、掘削作業であるか否かの判定を行なう。つまり、掘削作業が行なわれている場合には、スティックシリンダ9のイン側の作業負荷が大きくなるため、作動負荷の平均値Pw2を求めることによって、掘削作業の確実な判定を行うことができる。尚、前記式(2)により求められた作動負荷の平均値Pw2を、以下、第二作業負荷Pw2と称する。
On the other hand, the second workload calculation unit 60 calculates the average value APs3 of the stick head side pressure Ps and the average value AL3 of the stick operation amount L within the third predetermined time T3 output from the average value / integration value calculation unit 58. The average value Pw2 of the work load within the third predetermined time T3 before the present is obtained using the following equation (2).
Pw2 = (| AL3 | / 100) × APs3) (2)
When the average value AL3 of the stick operation amount L within the third predetermined time T3 is “0” or more (AL3 ≧ 0, that is, when the stick operation tool is in the neutral position, or is operated to the out side. ), The average value Pw2 of the operating load is set to “0” (Pw2 = 0).
Then, based on the average value Pw2 of the operating load obtained by the equation (2), it is determined whether or not the excavation work is performed, as will be described later. That is, when the excavation work is being performed, the work load on the in-side of the stick cylinder 9 is increased. Therefore, the determination of the excavation work can be made reliably by obtaining the average value Pw2 of the operating load. In addition, the average value Pw2 of the working load calculated | required by the said Formula (2) is hereafter called 2nd work load Pw2.

次いで、作業判定部56における掘削作業の判定の制御手順について、図5に示すフローチャート図に基づいて説明する。
まず、システムスタートすると、前述したように、スティックヘッド側圧力Psおよびスティック操作量Lの検出データがバッファ57に入力される(ステップS1)。
Next, the control procedure for determining the excavation work in the work determination unit 56 will be described with reference to the flowchart shown in FIG.
First, when the system is started, as described above, detection data of the stick head side pressure Ps and the stick operation amount L are input to the buffer 57 (step S1).

前記バッファ57に入力された検出データは、前述したように、平均値・積分値演算部58において平均値APs2、AL2、APs3、AL3が演算されると共に、これら平均値APs2、AL2、APs3、AL3を用いて、第一、第二作業負荷演算部59、60において第一、第二作業負荷Pw1、Pw2が演算される(ステップS2)。   As described above, the average value APs2, AL2, APs3, AL3 is calculated from the detection data input to the buffer 57 by the average value / integration value calculator 58, and these average values APs2, AL2, APs3, AL3 are calculated. Are used to calculate the first and second workloads Pw1 and Pw2 in the first and second workload calculation units 59 and 60 (step S2).

次いで、作業判定部56は、スティック用操作具の操作を判断する(ステップS3)。   Next, the work determination unit 56 determines the operation of the stick operation tool (step S3).

前記ステップS3の判断で、スティック用操作具がイン側に操作されている、或いは中立位置であると判断された場合には、続けて、掘削フラグFがセットされているか否かが判断される(ステップS4)。ここで、前記掘削フラグFは、後述する『掘削作業用制御』の実行中にセットされるフラグであって、該掘削フラグFの判断により、『掘削作業用制御』が実行中であるか否かが判断される。   If it is determined in step S3 that the stick operating tool is operated inward or is in the neutral position, it is determined whether or not the excavation flag F is set. (Step S4). Here, the excavation flag F is a flag that is set during execution of “excavation work control” to be described later, and whether or not the “excavation work control” is being executed based on the determination of the excavation flag F. Is judged.

前記ステップS4の判断で「NO」、つまり、『掘削作業用制御』の実行中でない(掘削フラグFがセットされていない)と判断された場合には、続けて、第一作業負荷Pw1が予め設定される第一判定基準S1以上であるか否か(Pw1≧S1?)が判断される(ステップS5)。ここで、前記第一判定基準S1は、掘削作業の開始を推定するために設定された第一作業負荷Pw1の閾値(任意に設定できるが、例えば、10000〜15000kPa)であって、第一作業負荷Pw1が第一判定基準S1以上(Pw1≧S1)の場合には、掘削作業の開始時であると推定される。   If it is determined in step S4 that “NO”, that is, “excavation work control” is not being executed (the excavation flag F is not set), the first work load Pw1 is set in advance. It is determined whether or not the set first determination criterion S1 or more (Pw1 ≧ S1?) (Step S5). Here, the first determination criterion S1 is a threshold value of the first work load Pw1 set to estimate the start of excavation work (which can be arbitrarily set, for example, 10000 to 15000 kPa), and the first work When the load Pw1 is equal to or higher than the first determination criterion S1 (Pw1 ≧ S1), it is estimated that the excavation work is started.

前記ステップS5の判断で「YES」、つまり、第一作業負荷Pw1が第一判定基準S1以上(Pw1≧S1)であると判断された場合には、さらに続けて、第二作業負荷Pw2が予め設定される第二判定基準S2以上であるか否か(Pw2≧S2?)が判断される(ステップS6)。ここで、前記第二判定基準S2は、掘削作業が行なわれていることを確実に判定するために設定された第二作業負荷Pw2の閾値(任意に設定できるが、例えば、5000〜10000kPa)であって、第二作業負荷Pw2が第二判定基準S2以上の場合には、掘削作業が行なわれていると確定される。   If the determination in step S5 is “YES”, that is, if it is determined that the first work load Pw1 is greater than or equal to the first determination criterion S1 (Pw1 ≧ S1), then the second work load Pw2 is determined in advance. It is determined whether or not (Pw2 ≧ S2?) Whether or not the second determination criterion S2 is set (step S6). Here, the second determination criterion S2 is a threshold value of the second work load Pw2 that is set in order to reliably determine that excavation work is being performed (although it can be arbitrarily set, for example, 5000 to 10000 kPa). If the second work load Pw2 is equal to or greater than the second determination criterion S2, it is determined that the excavation work is being performed.

前記ステップS6の判断で「NO」、つまり、第二作業負荷Pw2が第二判定基準S2未満(Pw2<S2)の場合には、『掘削作業用制御』の予備の制御である『掘削作業用予備制御』が実行される(ステップS7)。即ち、第一作業負荷Pw1の値により掘削作業の開始が推定されるが、第二作業負荷Pw2の値により掘削作業が行なわれていると確定できない場合には、掘削作業の予備段階であると判定されて、制御装置34による『掘削作業用予備制御』が実行されるようになっている。尚、該『掘削作業用予備制御』については後述するが、『掘削作業用予備制御』の実行後は前記ステップS1に戻る。   If “NO” in the determination of step S6, that is, if the second work load Pw2 is less than the second determination criterion S2 (Pw2 <S2), “excavation work control” is a preliminary control for “excavation work control”. "Preliminary control" is executed (step S7). That is, the start of the excavation work is estimated based on the value of the first work load Pw1, but if it cannot be determined that the excavation work is being performed based on the value of the second work load Pw2, it is a preliminary stage of the excavation work. As a result of the determination, “preliminary control for excavation work” by the control device 34 is executed. The “excavation work preliminary control” will be described later, but after the “excavation work preliminary control” is executed, the process returns to step S1.

一方、前記ステップS6の判断で「YES」、つまり、第二作業負荷Pw2が第二判定基準S2以上(Pw2≧S2)の場合には、掘削フラグFがセットされる(ステップS8)と共に、『掘削作業用制御』が実行される(ステップS9)。即ち、第一作業負荷Pw1の値により掘削作業の開始が推定され、且つ、第二作業負荷Pw2の値により掘削作業が行なわれていると確定された場合、或いは、前記『掘削作業用予備制御』の実行中に第二作業負荷Pw2の値により掘削作業が行なわれていると確定された場合には、掘削作業であると判定されて、制御装置34による『掘削作業用制御』が実行されるようになっている。尚、該『掘削作業用制御』については後述するが、『掘削作業用制御』の実行後は前記ステップS1に戻る。   On the other hand, if “YES” is determined in step S6, that is, if the second work load Pw2 is equal to or greater than the second determination criterion S2 (Pw2 ≧ S2), the excavation flag F is set (step S8) and “ "Excavation control" is executed (step S9). That is, when the start of the excavation work is estimated based on the value of the first work load Pw1 and it is determined that the excavation work is being performed based on the value of the second work load Pw2, ”Is determined based on the value of the second work load Pw2, it is determined that the excavation work is being performed, and“ control for excavation work ”is executed by the control device 34. It has become so. The “digging work control” will be described later, but after the “digging work control” is executed, the process returns to step S1.

また、前記ステップS4の判断で「YES」、つまり、『掘削作業用制御』の実行中である(掘削フラグFがセットされている)と判断された場合には、続けて、第二作業負荷Pw2が第二判定基準S2以上であるか否か(Pw2≧S2?)が判断される(ステップS10)。   If it is determined in step S4 that "YES", that is, "excavation control" is being executed (excavation flag F is set), the second work load is continued. It is determined whether or not Pw2 is greater than or equal to the second determination criterion S2 (Pw2 ≧ S2?) (Step S10).

そして、前記ステップS10の判断で「YES」、つまり、第二作業負荷Pw2が第二判定基準S2以上(Pw2≧S2)の場合には、前記ステップS8に進んで、掘削フラグFがセットされる(ステップS8)と共に、『掘削作業用制御』が実行される(ステップS9)。即ち、『掘削作業用制御』の実行中は、第二作業負荷Pwの値により掘削作業が確定されることで、『掘削作業用制御』が続行されるようになっている。   If “YES” in the determination in step S10, that is, if the second work load Pw2 is equal to or greater than the second determination criterion S2 (Pw2 ≧ S2), the process proceeds to step S8 and the excavation flag F is set. Along with (Step S8), “control for excavation work” is executed (Step S9). That is, during the execution of “excavation work control”, the “excavation work control” is continued by determining the excavation work based on the value of the second work load Pw.

一方、前記ステップS10の判断で「NO」、つまり、第二作業負荷Pw2が第二判定基準S2未満(Pw2<S2)の場合には、掘削フラグFをリセットする(ステップS11)と共に、『非掘削作業用制御』が実行される(ステップS12)。即ち、『掘削作業用制御』の実行中に第二作業負荷Pw2の値により掘削作業が確定されない場合には、掘削作業が終了したと判定されて、『非掘削作業用制御』に移行するようになっている。尚、該『非掘削作業用制御』については後述するが、『非掘削作業用制御』の実行後は前記ステップS1に戻る。   On the other hand, if the determination in step S10 is “NO”, that is, if the second work load Pw2 is less than the second determination criterion S2 (Pw2 <S2), the excavation flag F is reset (step S11) and “non- "Excavation control" is executed (step S12). That is, when the excavation work is not determined by the value of the second work load Pw2 during the execution of the “excavation work control”, it is determined that the excavation work has ended, and the process proceeds to the “non-excavation work control”. It has become. The “non-digging work control” will be described later, but after the “non-digging work control” is executed, the process returns to step S1.

また、前記ステップS3の判断で、スティック用操作具がアウト側に操作されていると判断された場合、或いは、前記ステップS5の判断で「NO」、つまり、第一作業負荷Pw1が第一判定基準S1未満(Pw1<S1)であると判断された場合には、前記ステップS11に進んで、掘削フラグFがリセットされる(ステップS11)と共に、『非掘削作業用制御』が実行される(ステップS12)。即ち、スティック用操作具がアウト側に操作されている場合、或いは、イン側に操作されていても、『掘削作業用制御』の実行中でなく、且つ、第一作業負荷Pw1の値により掘削作業の開始を推定できない場合には、掘削作業が行なわれていないと判定されて、制御装置に34による『非掘削作業用制御』が実行されるようになっている。   If it is determined in step S3 that the stick operation tool is operated to the out side, or if the determination in step S5 is “NO”, that is, the first work load Pw1 is the first determination. If it is determined that it is less than the reference S1 (Pw1 <S1), the process proceeds to step S11, the excavation flag F is reset (step S11), and “non-excavation work control” is executed ( Step S12). That is, even when the stick operation tool is operated to the out side, or even if it is operated to the in side, “digging work control” is not being executed and excavation is performed according to the value of the first work load Pw1. When the start of work cannot be estimated, it is determined that excavation work is not being performed, and “control for non-digging work” by 34 is executed in the control device.

而して、スティック用操作具がイン側に操作された場合に、第一作業負荷Pw1の値により掘削作業の開始が推定されるが、第二作業負荷Pw2の値により掘削作業が行なわれていることが確定できない場合には、掘削作業の予備段階であると判定されて『掘削作業用予備制御』が実行される。一方、掘削作業の開始が推定されると共に、掘削作業であると確定できる場合、或いは『掘削作業用予備制御』の実行中に掘削作業が確定された場合には、掘削作業が行なわれていると判定されて『掘削作業用制御』が実行される。また、該『掘削作業用制御』の実行中は、第二作業負荷Pw2の値により掘削作業が確定されることで『掘削作業用制御』が続行される一方、掘削作業が確定されなくなれば『非掘削作業用制御』が実行されるようになっている。
尚、本実施の形態では、『非掘削作業用制御』から『掘削作業用予備制御』を経由することなく『掘削作業用制御』に移行する場合には、第一作業負荷Pw1の値による掘削作業の開始の推定と、第二作業負荷Pw2の値による掘削作業の確定とが条件になっているが、スティック用操作具の操作スピードや第一、第二判定基準S1、S2の値によっては、掘削作業の開始が推定される前に掘削作業が確定される場合も考えられ、この様な場合には、第二作業負荷Pw2の値による掘削作業の確定のみで、『非掘削作業用制御』から『掘削作業用予備制御』を経由することなく『掘削作業用制御』に移行する構成にすることもできる。
Thus, when the stick operating tool is operated inward, the start of the excavation work is estimated based on the value of the first work load Pw1, but the excavation work is performed based on the value of the second work load Pw2. If it cannot be determined that the excavation work is in progress, it is determined that the excavation work is in a preliminary stage, and “excavation work preliminary control” is executed. On the other hand, when the start of the excavation work is estimated and the excavation work can be confirmed, or when the excavation work is confirmed during the “preliminary control for excavation work”, the excavation work is performed. Is determined, and “control for excavation work” is executed. Further, while the “excavation work control” is being executed, the “excavation work control” is continued by confirming the excavation work by the value of the second work load Pw2, while if the excavation work is no longer confirmed, “Non-digging work control” is executed.
In the present embodiment, when the “control for excavation work” is shifted from the “control for non-excavation work” to the “control for excavation work” without going through the “preliminary control for excavation work”, the excavation by the value of the first work load Pw1 is performed. The estimation of the start of the work and the confirmation of the excavation work by the value of the second work load Pw2 are the conditions, but depending on the operation speed of the stick operation tool and the values of the first and second determination criteria S1 and S2. It is also conceivable that the excavation work is confirmed before the start of the excavation work is estimated. In such a case, only the confirmation of the excavation work based on the value of the second work load Pw2 is used. It is also possible to shift to “excavation work control” without going through “excavation work preliminary control”.

次いで、操作具操作に基づく制御装置34の制御について説明するが、前記『非掘削作業用制御』、『掘削作業用制御』、『掘削作業用予備制御』は、ブーム用操作具がブーム下降側に操作された場合(ブーム用操作具と他の油圧アクチュエータ用操作具との連動時を含む)に実行される制御であるため、まず、ブーム用操作具がブーム下降側に操作された場合について説明する。   Next, the control of the control device 34 based on the operation tool operation will be described. The “non-excavation work control”, “excavation work control”, and “excavation work preliminary control” are described as follows. First, when the boom operation tool is operated to the lowering side of the boom, the control is executed when the boom operation tool is operated (including when the boom operation tool is linked to another hydraulic actuator operation tool). explain.

制御装置34は、ブーム下降側に操作された場合、つまり、ブーム用操作検出手段51からブーム下降側の検出信号が入力された場合、ブーム下降側電磁比例減圧弁29に対し、ブーム用コントロールバルブ23の下降側パイロットポート23bにパイロット圧を出力するように制御信号を出力する。これにより、ブーム用コントロールバルブ23が下降側位置Yに切換わり、而して、第一メインポンプ11の吐出油がブーム用コントロールバルブ23を経由してブームシリンダ8のロッド側油室8bに供給される。該ブームシリンダ8のロッド側油室8bへの油供給制御は、『非掘削作業用制御』、『掘削作業用予備制御』、『掘削作業用制御』には関係なく、同様に行なわれる。   When the control device 34 is operated to the boom lowering side, that is, when a boom lowering detection signal is input from the boom operation detecting means 51, the boom control valve is controlled with respect to the boom lowering electromagnetic proportional pressure reducing valve 29. A control signal is output so as to output a pilot pressure to the descending pilot port 23b of the engine 23. As a result, the boom control valve 23 is switched to the lower side position Y, so that the oil discharged from the first main pump 11 is supplied to the rod side oil chamber 8b of the boom cylinder 8 via the boom control valve 23. Is done. The oil supply control to the rod side oil chamber 8b of the boom cylinder 8 is performed in the same manner regardless of the “non-excavation work control”, the “excavation operation preliminary control”, and the “excavation operation control”.

さらに、制御装置34は、ブーム下降側に操作された場合、ブームシリンダ8のヘッド側油室8aの油を排出する制御を行なうが、該油排出制御に前記『非掘削作業用制御』、『掘削作業用制御』、『掘削作業用予備制御』が実行される。まず、『非掘削作業用制御』について説明すると、制御装置34は、回収バルブ用電油変換弁38に対し、回収バルブ37を開位置Xに切換えるように作動信号を出力する。これにより回収バルブ37は、ブームシリンダ8のヘッド側油室8aからアキュムレータ18に至る回収油路36を開き、而して、ブームシリンダ8のヘッド側油室8aからの排出油がアキュムレータ18に蓄圧される。つまり、『非掘削作業用制御』の場合には、ブームシリンダ8のヘッド側油室8aからの排出油がアキュムレータ18に蓄圧されることになるが、この場合、ブームシリンダ8のヘッド側油室8aからの排出油は、作業部4の有する位置エネルギーによって高圧になっており、而して、排出油の有する高圧の油エネルギーを無駄にすることなく回収できるようになっている。尚、この場合のブーム5の下降速度は、回収バルブ37の開口面積によって制御される。また、『非掘削作業用制御』時には、排出バルブ用電磁比例減圧弁47に対してパイロット圧出力の制御信号は出力されず、これにより排出バルブ46は排出油路45を閉じる閉位置Nに位置していて、ブームシリンダ8のヘッド側油室8aからの排出油が油タンク14に流れないようになっている。   Further, when the control device 34 is operated to the boom lowering side, the control device 34 performs control to discharge the oil in the head side oil chamber 8a of the boom cylinder 8, and the above-mentioned “non-excavation work control”, “ “Excavation control” and “Excavation preliminary control” are executed. First, “non-excavation work control” will be described. The control device 34 outputs an operation signal to the recovery valve electro-hydraulic conversion valve 38 so as to switch the recovery valve 37 to the open position X. As a result, the recovery valve 37 opens the recovery oil passage 36 from the head side oil chamber 8 a of the boom cylinder 8 to the accumulator 18, and thus the discharged oil from the head side oil chamber 8 a of the boom cylinder 8 accumulates pressure in the accumulator 18. Is done. That is, in the case of “non-excavation work control”, the oil discharged from the head side oil chamber 8a of the boom cylinder 8 is accumulated in the accumulator 18, but in this case, the head side oil chamber of the boom cylinder 8 is stored. The oil discharged from 8a has a high pressure due to the potential energy of the working unit 4, so that the high-pressure oil energy of the discharged oil can be recovered without being wasted. In this case, the lowering speed of the boom 5 is controlled by the opening area of the recovery valve 37. Further, at the time of “control for non-excavation work”, a control signal for pilot pressure output is not output to the electromagnetic proportional pressure reducing valve 47 for the discharge valve, whereby the discharge valve 46 is positioned at the closed position N where the discharge oil passage 45 is closed. Thus, the oil discharged from the head side oil chamber 8 a of the boom cylinder 8 does not flow into the oil tank 14.

一方、『掘削作業用制御』の場合、制御装置34は、排出バルブ用電磁比例減圧弁47に対し、排出バルブ46のパイロットポート46aにパイロット圧を出力するよう制御信号を出力する。これにより排出バルブ46は、ブームシリンダ8のヘッド側油室8aから油タンク14に至る排出油路45を開き、而して、ブームシリンダ8のヘッド側油室8aからの排出油が油タンク14に排出される。つまり、『掘削作業用制御』の場合には、ブームシリンダ8のヘッド側油室8aからの排出油が油タンク14に排出され、これによりブームシリンダ8のヘッド側油室8aの圧力が低下して、ブーム5の下降に抗する力が働く掘削作業時のブーム5の下降作動をスムーズに行うことができるようになっている。尚、『掘削作業用制御』時には、回収バルブ用電油変換弁38に対して作動信号は出力されず、これにより回収バルブ37は回収油路36を閉じる閉位置Nに位置していて、ブームシリンダ8のヘッド側油室8aとアキュムレータ18とは遮断された状態になっている。   On the other hand, in the case of "control for excavation work", the control device 34 outputs a control signal to the pilot valve 46a of the discharge valve 46 so as to output the pilot pressure to the electromagnetic proportional pressure reducing valve 47 for the discharge valve. As a result, the discharge valve 46 opens the discharge oil passage 45 from the head side oil chamber 8 a of the boom cylinder 8 to the oil tank 14, so that the discharge oil from the head side oil chamber 8 a of the boom cylinder 8 is transferred to the oil tank 14. To be discharged. In other words, in the case of “control for excavation work”, the oil discharged from the head side oil chamber 8a of the boom cylinder 8 is discharged to the oil tank 14, thereby reducing the pressure in the head side oil chamber 8a of the boom cylinder 8. Thus, the lowering operation of the boom 5 during excavation work in which a force that resists the lowering of the boom 5 can be performed smoothly. At the time of “control for excavation work”, an operation signal is not output to the electro-hydraulic conversion valve 38 for the recovery valve, whereby the recovery valve 37 is located at the closed position N for closing the recovery oil passage 36 and the boom The head side oil chamber 8a of the cylinder 8 and the accumulator 18 are in a state of being shut off.

これに対し、『掘削作業用予備制御』の場合、制御装置34は、回収バルブ用電油変換弁38に対して、回収バルブ37のスプールを開位置Xになる直前の位置まで移動させるように作動信号を出力する。さらに、制御装置34は、排出バルブ用電磁比例減圧弁47に対し、排出バルブ46のスプールを開位置Xになる直前の位置まで移動させるパイロット圧を出力するように制御信号を出力する。この状態では、ブームシリンダ8のヘッド側油室8aからアキュムレータ18に至る回収油路36、およびヘッド側油室8aから油タンク14に至る排出油路45は共に閉じていて、ヘッド側油室8aから油は排出されないが、直ちに回収バルブ37或いは排出バルブ46を開位置Xに位置せしめることができるようになっている。つまり、『掘削作業用予備制御』の場合には、ブームシリンダ8のヘッド側油室8aからの油排出が一旦停止されると共に、該『掘削作業用予備制御』から『非掘削作業用制御』或いは『掘削作業用制御』に移行したときに、回収バルブ37或いは排出バルブ46を直ちに開位置Xにすることができるようになっている。   On the other hand, in the case of “preliminary control for excavation work”, the control device 34 moves the spool of the recovery valve 37 to the position immediately before the open position X with respect to the recovery valve electro-oil conversion valve 38. An operation signal is output. Further, the control device 34 outputs a control signal to the discharge valve electromagnetic proportional pressure reducing valve 47 so as to output a pilot pressure for moving the spool of the discharge valve 46 to a position immediately before the open position X. In this state, the recovery oil passage 36 from the head side oil chamber 8a of the boom cylinder 8 to the accumulator 18 and the discharge oil passage 45 from the head side oil chamber 8a to the oil tank 14 are both closed, and the head side oil chamber 8a. However, the recovery valve 37 or the discharge valve 46 can be immediately positioned at the open position X. That is, in the case of “preliminary control for excavation work”, the oil discharge from the head side oil chamber 8a of the boom cylinder 8 is temporarily stopped and the “preliminary control for excavation work” is changed to “control for non-excavation work”. Alternatively, the recovery valve 37 or the discharge valve 46 can be immediately set to the open position X when shifting to “excavation control”.

而して、ブーム5の下降時に、ブームシリンダ8のヘッド側油圧8aからの排出油は、作業判定部56により掘削作業が行なわれていないと判定されて『非掘削作業用制御』が実行された場合にはアキュムレータ18に蓄圧される一方、掘削作業が行なわれていると判定されて『掘削作業用制御』が実行された場合には油タンク14に排出される。また、掘削作業の予備段階であると判定されて『掘削作業用予備制御』が実行された場合には、ヘッド側油室8aからの油排出を一旦停止して、直ちに『非掘削作業用制御』或いは『掘削作業用制御』に移行できる状態になるように構成されている。   Thus, when the boom 5 is lowered, the oil discharged from the head-side hydraulic pressure 8a of the boom cylinder 8 is determined by the work determination unit 56 as not being excavated, and "non-excavation control" is executed. In the case where the pressure is accumulated in the accumulator 18, it is determined that excavation work is being performed, and when “control for excavation work” is executed, the pressure is discharged to the oil tank 14. Further, when it is determined that the preliminary stage of the excavation work is performed and the “preliminary control for excavation work” is executed, the oil discharge from the head-side oil chamber 8a is temporarily stopped, and immediately the “control for non-excavation work” is performed. Or “excavation control”.

次いで、前記ブーム下降側操作以外の操作具操作に基づく制御装置34の制御について説明するが、これらの制御は、前記『非掘削作業用制御』、『掘削作業用予備制御』、『掘削作業用制御』に関係なく、同様に行なわれる。まず、ブーム用操作具がブーム上昇側に操作された場合について説明すると、制御装置34は、再生バルブ用電油変換弁43に対し、再生バルブ42を開位置Xに切換えるように作動信号を出力する。これにより再生バルブ42は、アキュムレータ18から第一メインポンプ11の吐出ライン11aに至る再生油路41を開き、而して、アキュムレータ18の蓄圧油が第一メインポンプ11の吐出油に合流される。尚、この場合の合流量は、再生バルブ42の開口面積によって制御される。   Next, the control of the control device 34 based on the operation of the operation tool other than the operation of lowering the boom will be described. These controls are the “control for non-excavation work”, “preliminary control for excavation work”, and “for excavation work”. Regardless of “control”, the same operation is performed. First, the case where the boom operation tool is operated to the boom raising side will be described. The control device 34 outputs an operation signal to the regeneration valve electro-hydraulic conversion valve 43 so as to switch the regeneration valve 42 to the open position X. To do. As a result, the regeneration valve 42 opens the regeneration oil passage 41 from the accumulator 18 to the discharge line 11a of the first main pump 11, and the accumulated oil in the accumulator 18 is merged with the discharge oil of the first main pump 11. . In this case, the combined flow rate is controlled by the opening area of the regeneration valve 42.

さらに、ブーム上昇側に操作された場合、制御装置34は、ブーム上昇側電磁比例減圧弁28に対し、ブーム用コントロールバルブ23の上昇側パイロットポート23aにパイロット圧を出力するよう制御信号を出力する。これにより、ブーム用コントロールバルブ23が上昇側位置Xに切換わり、而して、第一メインポンプ11の吐出油がブームシリンダ8のヘッド側油室8aに供給される一方、ロッド側油室8bの油が油タンク14に排出されて、ブーム5が上昇する。この場合、前述したように、アキュムレータ18の蓄圧油が第一メインポンプ11の吐出油に合流されるようになっており、而して、ブーム5の下降時にアキュムレータ18に回収した油エネルギーを、ブームの上昇時に再利用することができて、省エネルギー化に大きく貢献することができる。尚、この場合に第一メインポンプ11の吐出流量は、図示しない容量可変手段によって、アキュムレータ18からの合流分に応じて低減するように制御される。また、アキュムレータ18の蓄圧油は、第一メインポンプ11の吐出油に合流されるから、例えば、ブーム上昇側操作とバケット操作とが同時に行なわれた場合に、ブームシリンダ8だけでなくバケットシリンダ10にも供給されるようになっている。   Further, when operated to the boom raising side, the control device 34 outputs a control signal to the boom raising side electromagnetic proportional pressure reducing valve 28 so as to output a pilot pressure to the raising side pilot port 23a of the boom control valve 23. . As a result, the boom control valve 23 is switched to the ascending position X, and thus the discharge oil from the first main pump 11 is supplied to the head side oil chamber 8a of the boom cylinder 8 while the rod side oil chamber 8b. The oil is discharged into the oil tank 14 and the boom 5 is raised. In this case, as described above, the accumulated oil of the accumulator 18 is merged with the discharged oil of the first main pump 11, and thus the oil energy recovered in the accumulator 18 when the boom 5 is lowered, It can be reused when the boom rises and can greatly contribute to energy saving. In this case, the discharge flow rate of the first main pump 11 is controlled so as to decrease according to the amount of merging from the accumulator 18 by a variable capacity unit (not shown). Further, since the accumulated oil in the accumulator 18 is merged with the discharge oil of the first main pump 11, for example, when the boom raising side operation and the bucket operation are performed simultaneously, not only the boom cylinder 8 but also the bucket cylinder 10. Is also being supplied.

また、スティック用操作具がイン側に操作された場合、制御装置34は、スティックイン側電磁比例減圧弁30に対し、スティック用コントロールバルブ24のイン側パイロットポート24aにパイロット圧を出力するよう制御信号を出力する。これにより、スティック用コントロールバルブ24がイン側位置Xに切換わり、而して、第二メインポンプ12の吐出油がスティックシリンダ9のヘッド側油室9aに供給される一方、ロッド側油室9bの油が油タンク14に排出されて、スティック6がイン側に揺動する。   Further, when the stick operation tool is operated to the in side, the control device 34 controls the stick-in side electromagnetic proportional pressure reducing valve 30 to output a pilot pressure to the in-side pilot port 24a of the stick control valve 24. Output a signal. As a result, the stick control valve 24 is switched to the in-side position X. Thus, the discharge oil from the second main pump 12 is supplied to the head-side oil chamber 9a of the stick cylinder 9, while the rod-side oil chamber 9b. The oil is discharged into the oil tank 14 and the stick 6 swings inward.

一方、スティック用操作具がアウト側に操作された場合、制御装置34は、スティックアウト側電磁比例減圧弁31に対し、スティック用コントロールバルブ24のアウト側パイロットポート24bにパイロット圧を出力するよう制御信号を出力する。これにより、スティック用コントロールバルブ24がアウト側位置Yに切換わり、而して、第二メインポンプ12の吐出油がスティックシリンダ9のロッド側油室9bに供給される一方、ヘッド側油室9aの油が油タンク14に排出されて、スティック6がアウト側に揺動する。   On the other hand, when the stick operation tool is operated to the out side, the control device 34 controls the stick-out side electromagnetic proportional pressure reducing valve 31 to output a pilot pressure to the out-side pilot port 24b of the stick control valve 24. Output a signal. As a result, the stick control valve 24 is switched to the out-side position Y, so that the oil discharged from the second main pump 12 is supplied to the rod-side oil chamber 9b of the stick cylinder 9, while the head-side oil chamber 9a. The oil is discharged into the oil tank 14 and the stick 6 swings outward.

さらに、左側走行用、右側走行用、旋回用、或いはバケット用操作具が操作された場合、制御装置34は、左側走行用、右側走行用、旋回用、バケット用電磁比例減圧弁に対し、左側走行用、右側走行用、旋回用、バケット用コントロールバルブ20、21、22、25のパイロットポート20a、20b、21a、21b、22a、22b、25a、25bにパイロット圧を出力するよう制御信号を出力する。これにより、左側走行用、右側走行用、旋回用、バケット用コントロールバルブ20、21、22、25が作動位置XまたはYに切換わって、左側走行用モータ15、右側走行用モータ16、旋回モータ17、バケットシリンダ10に圧油供給され、下部走行体2の前後進やターン、或いは上部旋回体3の左右旋回、或いはバケット10の揺動が行なわれるように構成されている。   Further, when the left side running, right side running, turning, or bucket operation tool is operated, the control device 34 is arranged on the left side with respect to the left side running, right side running, turning, and bucket electromagnetic proportional pressure reducing valves. Control signal is output so that pilot pressure is output to the pilot ports 20a, 20b, 21a, 21b, 22a, 22b, 25a, 25b of the control valves 20, 21, 22, 25 for traveling, right side traveling, turning, and bucket To do. As a result, the left-side travel, right-side travel, turning, and bucket control valves 20, 21, 22, and 25 are switched to the operating position X or Y, and the left-side traveling motor 15, right-side traveling motor 16, and turning motor 17. Pressure oil is supplied to the bucket cylinder 10 so that the lower traveling body 2 moves forward and backward, turns, the upper revolving body 3 turns left and right, or the bucket 10 swings.

叙述の如く構成された本形態において、制御装置34は、作業判定部56において掘削作業の判定を行ない、該掘削作業の判定に基づいて掘削作業に適した油圧制御を行なうことになるが、この場合に、上記作業判定部56は、スティックヘッド側圧力センサ54から入力されるスティックヘッド側圧力Psの検出データとスティック用操作検出手段52から入力されるスティック操作量Lの検出データとをバッファ57に記憶すると共に、平均値・積分値演算部58において上記バッファ57に記憶された最新の検出データの所定時間(第二所定時間T2、第三所定時間T3)内の平均値を常時演算し、該平均値に基づいて第一作業負荷(現在より手前の第二所定時間T2内の作動負荷の平均値に対する現在の作業負荷の変動量)Pw1と第二作業負荷(現在より手前の第三所定時間T3内の作業負荷の平均値)Pw2とを求める一方、作業判定部56における掘削作業の判定の基準として、掘削作業の開始を推定できる第一判定基準S1と、掘削作業が行なわれていると確定できる第二判定基準S2とが設定されており、そして、第二判定基準S2に適合した場合には、掘削作業に適した『掘削作業用制御』(アキュムレータ18への蓄圧を中止してブームシリンダ8のヘッド側油室8aの排出油を油タンク14に流す制御)が実行される一方、第一判定基準には適合するが第二判定基準には適合しない場合には、『掘削作業用制御』の予備の制御である『掘削作業用予備制御』(ブームシリンダ8のヘッド側油室8aからの油排出を一旦停止して、『掘削作業用制御』、或いは掘削作業以外の場合に実行される『非掘削作業用制御』に直ちに移行できる制御)が実行されることになる。   In the present embodiment configured as described, the control device 34 determines the excavation work in the work determination unit 56, and performs hydraulic control suitable for the excavation work based on the determination of the excavation work. In this case, the work determination unit 56 buffers the detection data of the stick head side pressure Ps input from the stick head side pressure sensor 54 and the detection data of the stick operation amount L input from the stick operation detection means 52. And the average value / integral value calculation unit 58 always calculates the average value within the predetermined time (second predetermined time T2, third predetermined time T3) of the latest detection data stored in the buffer 57, Based on the average value, the first work load (the amount of change in the current work load with respect to the average value of the working load within the second predetermined time T2 before the present time) Pw1 and First determination that can estimate the start of excavation work as a reference for determination of excavation work in the work determination unit 56 while obtaining two work loads (average value of the work load within the third predetermined time T3 before this) Pw2 A reference S1 and a second determination criterion S2 that can be determined that excavation work is being performed are set, and if the second determination criterion S2 is satisfied, the “control for excavation operation” is suitable. ”(Control to stop accumulator 18 accumulation and flow the oil in the head side oil chamber 8a of the boom cylinder 8 to the oil tank 14) is executed, while the second determination criterion is met. If it is not suitable, the “excavation work preliminary control” which is the preliminary control of the “excavation work control” (the oil discharge from the head side oil chamber 8a of the boom cylinder 8 is temporarily stopped and the “excavation work control” Control ”or Immediate transition to "non-drilling operation control" executed in the case of non-excavation work control) is to be executed.

この結果、油圧回路の過渡的な圧力変動や、オペレータの手ぶれ等による一時的な検出データの振れがあっても、掘削作業の判定は、常時演算される検出データの平均値に基づいて行なわれることになるから、上記一時的な検出データの振れを排除できることになって、信頼性の高い正確な判定を行うことができる。しかも、掘削作業に適した『掘削作業用制御』は、第一判定基準S1により掘削作業の開始が推定されるだけでは実行されず、第二判定基準S2により掘削作業が行なわれていると確定できた場合に実行されることになるから、誤判定により『掘削作業用制御』が実行されてしまうことを確実に回避できると共に、上記第一判定基準S1により掘削作業の開始が推定される場合には、『掘削作業用制御』の予備の制御である『掘削作業用予備制御』が実行されることで、『掘削作業用制御』に応答遅れなくスムーズに移行できることになり、而して、作業性、操作性の向上に大きく貢献することができる。   As a result, even if there is a transient pressure fluctuation in the hydraulic circuit or a temporary fluctuation of the detected data due to an operator shake or the like, the excavation work is determined based on the average value of the detected data that is always calculated. Therefore, the fluctuation of the temporary detection data can be eliminated, and a reliable and accurate determination can be performed. Moreover, “control for excavation work” suitable for excavation work is not executed only by estimating the start of the excavation work by the first determination criterion S1, and it is determined that the excavation operation is being performed by the second determination criterion S2. Since it will be executed if it can be done, it is possible to reliably avoid the execution of “excavation control” due to erroneous determination, and when the start of excavation work is estimated by the first determination criterion S1 In addition, by executing “excavation work preliminary control” which is a preliminary control of “excavation work control”, it is possible to smoothly shift to “excavation work control” without delay in response, It can greatly contribute to the improvement of workability and operability.

さらに、本実施の形態では、油圧ショベル1の油圧回路に、ブーム5の下降時にブームシリンダ8の排出油の有する油エネルギーを蓄圧するアキュムレータ18と、ブーム5の上昇時に該アキュムレータ18の蓄圧油をメインポンプ11の吐出油に合流させてブームシリンダ8に供給する再生油路41とが設けられていると共に、作業判定部56により掘削作業であると確定されて『掘削作業用制御』が実行された場合には、前記アキュムレータ18への蓄圧を中止してブームシリンダ8のヘッド側油室8aの排出油を油タンク14に流すことになる。この結果、掘削作業以外の場合には、ブームシリンダ8のヘッド油室8aからの排出油の有する高圧の油エネルギーを無駄にすることなくアキュムレータ18に回収できるものでありながら、ブーム5の下降に抗する力が作用する掘削作業時には、ブームシリンダ8のヘッド側油室8aの圧力を油タンク14に流して低圧にすることでブーム5の下降動作をスムーズに行うことができることになり、而して、アキュムレータ18への蓄圧の有無を、掘削作業の判定に基づいて適切に行うことができる。   Furthermore, in the present embodiment, the accumulator 18 that accumulates the oil energy of the oil discharged from the boom cylinder 8 when the boom 5 is lowered and the accumulated oil of the accumulator 18 when the boom 5 is raised are stored in the hydraulic circuit of the excavator 1. A reclaimed oil passage 41 that is joined to the oil discharged from the main pump 11 and supplied to the boom cylinder 8 is provided, and the work determination unit 56 determines that the work is excavation work and executes “control for excavation work”. In this case, the pressure accumulation in the accumulator 18 is stopped and the oil discharged from the head side oil chamber 8a of the boom cylinder 8 is caused to flow to the oil tank 14. As a result, in cases other than excavation work, the high pressure oil energy of the oil discharged from the head oil chamber 8a of the boom cylinder 8 can be recovered in the accumulator 18 without being wasted, and the boom 5 is lowered. At the time of excavation work in which a resisting force acts, the boom 5 can be smoothly lowered by flowing the pressure of the head side oil chamber 8a of the boom cylinder 8 to the oil tank 14 to make the pressure low. Thus, the presence or absence of pressure accumulation in the accumulator 18 can be appropriately performed based on the determination of the excavation work.

尚、本発明は、上記実施の形態に限定されないことは勿論であって、例えば、上記実施の形態では、掘削作業の判定に基づいてアキュムレータへの蓄圧の有無を制御する構成になっているが、各種特定作業の判定に基づいて、アキュムレータの蓄圧油の再利用の有無を制御するように構成することもできる。また、アキュムレータの蓄圧油を再利用するための再生回路としては、上記実施の形態のように、アキュムレータから第一メインポンプの吐出ラインに至る再生油路に限定されることなく、例えば、アキュムレータから直接油圧アクチュエータに至るように形成される再生回路や、或いは、アキュムレータの蓄圧油を増圧する増圧手段を介して油圧アクチュエータに供給するように形成される再生回路等、種々の再生回路を適宜採用することができる。
さらに、上記実施の形態では、特定作業として掘削作業が設定されていて、該掘削作業が行なわれているか否かの判定が行なわれる構成になっているが、これに限定されることなく、特定作業としては、積込作業や均し作業、クレーン作業、或いはブームの空中降下や機体持ち上げ動作(バケットを接地させた状態でブームを機体に対して相対的に下降せしめることで機体前部を持ち上げる動作)、或いはブレーカやリフティングマグネット装置を用いた作業等、建設機械の行なう各種作業を適宜設定することができる。また、特定作業を、重負荷作業或いは軽負荷作業というように負荷に応じて分類して設定することもできる。
また、特定作業を判定するにあたり、本実施の形態では、平均値・積分値演算部58において検出データの平均値を演算し、該平均値を用いて作業負荷を求める構成になっているが、平均値・積分値演算部58において検出データの積分値を演算し、該積分値に用いて作業負荷を演算するように構成しても良い。
さらに、特定作業を判定するための第一、第二判定基準として、それぞれの特定作業に適した判定基準を適宜設定できることは勿論である。
また、上記実施の形態では、第一判定基準により判定される第一作業負荷と、第二判定基準により判定される第二作業負荷とでは異なる作業負荷(上記実施の形態では、第一作業負荷Pw1は第二所定時間T2内の作動負荷の平均値に対する現在の作業負荷の変動量、第二作業負荷Pw2は第三所定時間T3内の作業負荷の平均値)であるが、判定される特定作業によっては、同一の作業負荷、或いは平均値や積分値の演算に用いられる所定時間が異なるだけのものであっても良い。
さらにまた、上記実施の形態では、掘削作業の判定に基づいてアキュムレータへの蓄圧の有無を制御する構成になっているが、本発明は、この様な制御に限定されないのは勿論であって、特定作業の判定に基づいて行なう油圧制御やエンジン出力制御としては、エンジンの回転数制御、エンジンから油圧ポンプへの供給トルク制御、油圧ポンプの吐出量制御、各種バルブの開閉による油路の切換え制御、油圧アクチュエータへの油給排制御を行なうコントロールバルブの開口制御等、種々の制御を実行できる。
また、油圧アクチュエータの負荷を検出する負荷検出手段として、上記実施の形態では、油圧アクチュエータの油室の圧力を検出する圧力センサ(スティックヘッド側圧力センサ)が用いられているが、これに限定されることなく、例えば、油圧ポンプの吐出圧を検出するセンサや、或いは油圧シリンダのシリンダ長を検出するセンサ等、判定される特定作業に応じて適宜負荷検出手段を用いることができる。
Of course, the present invention is not limited to the above-described embodiment. For example, in the above-described embodiment, the presence or absence of pressure accumulation in the accumulator is controlled based on the determination of the excavation work. Further, it can be configured to control whether or not the accumulated oil in the accumulator is reused based on the determination of various specific operations. Further, the regeneration circuit for reusing the accumulator pressure oil is not limited to the regeneration oil path from the accumulator to the discharge line of the first main pump as in the above embodiment, for example, from the accumulator Various regeneration circuits such as a regeneration circuit formed directly to the hydraulic actuator or a regeneration circuit formed to supply the hydraulic actuator via the pressure increasing means for increasing the pressure accumulation oil of the accumulator are appropriately adopted. can do.
Furthermore, in the above-described embodiment, the excavation work is set as the specific work, and it is determined whether or not the excavation work is performed. As work, loading work, leveling work, crane work, or boom lowering or airframe lifting operation (lifting the front of the airframe by lowering the boom relative to the airframe while the bucket is grounded) Operation), or various operations performed by the construction machine, such as operations using a breaker or a lifting magnet device, can be appropriately set. Also, the specific work can be classified and set according to the load, such as a heavy load work or a light load work.
Further, in determining the specific work, in the present embodiment, the average value / integral value calculation unit 58 calculates the average value of the detection data, and the average value is used to obtain the work load. The average value / integrated value calculation unit 58 may calculate the integrated value of the detected data and use the integrated value to calculate the work load.
Furthermore, as a first and second determination criteria for determining a specific task, it is needless to say that determination criteria suitable for each specific task can be set as appropriate.
In the above embodiment, the first workload determined by the first determination criterion and the second workload determined by the second determination criterion are different workloads (in the above embodiment, the first workload). Pw1 is the fluctuation amount of the current work load with respect to the average value of the working load within the second predetermined time T2, and the second work load Pw2 is the average value of the work load within the third predetermined time T3). Depending on the work, the same work load or a predetermined time used for calculating the average value or the integral value may be different.
Furthermore, in the above embodiment, it is configured to control the presence or absence of pressure accumulation in the accumulator based on the determination of the excavation work, but the present invention is of course not limited to such control, Hydraulic control and engine output control based on specific work determination include engine speed control, engine-to-hydraulic pump supply torque control, hydraulic pump discharge control, and oil path switching control by opening and closing various valves. Various controls such as opening control of a control valve that performs oil supply / discharge control to the hydraulic actuator can be executed.
Further, in the above embodiment, a pressure sensor (stick head side pressure sensor) for detecting the pressure of the oil chamber of the hydraulic actuator is used as the load detecting means for detecting the load of the hydraulic actuator. However, the present invention is not limited to this. Without limitation, for example, a load detection unit can be used as appropriate according to the determined specific work, such as a sensor for detecting the discharge pressure of the hydraulic pump or a sensor for detecting the cylinder length of the hydraulic cylinder.

油圧ショベルの側面図である。It is a side view of a hydraulic excavator. 油圧ショベルの油圧回路図である。It is a hydraulic circuit diagram of a hydraulic excavator. 制御装置の入出力を示すブロック図である。It is a block diagram which shows the input / output of a control apparatus. 作業判定部の制御手順を示す制御ブロック図である。It is a control block diagram which shows the control procedure of a work determination part. 作業判定部の制御手順を示すフローチャート図である。It is a flowchart figure which shows the control procedure of a work determination part.

符号の説明Explanation of symbols

8 ブームシリンダ
9 スティックシリンダ
18 アキュムレータ
34 制御装置
41 再生油路
52 スティック用操作検出手段
54 スティックヘッド側圧力センサ
56 作業判定部
57 バッファ
58 平均値・積分値演算部
DESCRIPTION OF SYMBOLS 8 Boom cylinder 9 Stick cylinder 18 Accumulator 34 Control apparatus 41 Reproduction | regeneration oil path 52 Operation detection means for sticks 54 Stick head side pressure sensor 56 Work determination part 57 Buffer 58 Average value / integral value calculation part

Claims (2)

各種作業を行なうべく操作具操作に基づいて作動する油圧アクチュエータを備えてなる建設機械において、該建設機械の行なう特定の作業を判定して該特定作業に適した油圧制御やエンジン出力制御を行なうための作業判定システムを設けるにあたり、該作業判定システムは、油圧アクチュエータの負荷を検出する負荷検出手段と、操作具の操作状態を検出する操作検出手段と、これら負荷検出手段および操作検出手段の検出データをバッファに記憶して該検出データの所定時間内の平均値或いは積分値を常時演算し、該検出データの平均値或いは積分値に基づいて特定作業の判定を行なう作業判定手段とを備えると共に、該作業判定手段における特定作業の判定の基準として、特定作業の開始を推定できる第一判定基準と、特定作業が行なわれていると確定できる第二判定基準とを設定し、第二判定基準に適合する場合には特定作業に適した特定作業用制御を行なう一方、第一判定基準には適合するが第二判定基準に適合しない場合は、特定作業用制御の予備の制御である特定作業用予備制御を行なうことを特徴とする建設機械における作業判定システム。   In a construction machine including a hydraulic actuator that operates based on operation of an operation tool to perform various works, a specific work performed by the construction machine is determined, and hydraulic control and engine output control suitable for the specific work are performed. In this work determination system, the work determination system includes a load detection unit that detects a load of the hydraulic actuator, an operation detection unit that detects an operation state of the operation tool, and detection data of the load detection unit and the operation detection unit. Is stored in a buffer, the average value or the integral value within a predetermined time of the detection data is always calculated, and the operation determination means for determining a specific operation based on the average value or the integral value of the detection data, As a criterion for determining the specific work in the work determination means, a first determination standard that can estimate the start of the specific work and the specific work are performed. Set the second criterion that can be determined to be determined, and if it meets the second criterion, it performs control for the specific task suitable for the specific task, while it conforms to the first criterion but the second criterion A work determination system in a construction machine that performs specific work preliminary control that is preliminary control of specific work control when the standard is not met. 建設機械の油圧回路に、建設機械に設けられる何れかの油圧アクチュエータの排出油の有する油エネルギーを蓄圧するアキュムレータと、該アキュムレータの蓄圧油を前記油圧アクチュエータ或いは他の油圧アクチュエータに供給して再利用する再生回路とを設ける一方、前記作業判定システムは、作業判定手段による特定作業の判定に基づいて、前記アキュムレータへの蓄圧、或いはアキュムレータの蓄圧油の再利用を制御することを特徴とする建設機械における作業判定システム。   An accumulator for accumulating the oil energy of the oil discharged from any hydraulic actuator provided in the construction machine in the hydraulic circuit of the construction machine, and the accumulated oil of the accumulator is supplied to the hydraulic actuator or another hydraulic actuator for reuse. And the work determination system controls pressure accumulation in the accumulator or reuse of pressure accumulation oil in the accumulator based on determination of specific work by the work determination means. Work determination system in Japan.
JP2008277873A 2008-10-29 2008-10-29 Work determination system for construction machinery Active JP5240843B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008277873A JP5240843B2 (en) 2008-10-29 2008-10-29 Work determination system for construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008277873A JP5240843B2 (en) 2008-10-29 2008-10-29 Work determination system for construction machinery

Publications (2)

Publication Number Publication Date
JP2010106487A true JP2010106487A (en) 2010-05-13
JP5240843B2 JP5240843B2 (en) 2013-07-17

Family

ID=42296200

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008277873A Active JP5240843B2 (en) 2008-10-29 2008-10-29 Work determination system for construction machinery

Country Status (1)

Country Link
JP (1) JP5240843B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013003047A2 (en) * 2011-06-28 2013-01-03 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
WO2013003046A3 (en) * 2011-06-28 2013-05-10 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
US8776511B2 (en) 2011-06-28 2014-07-15 Caterpillar Inc. Energy recovery system having accumulator and variable relief
US8919113B2 (en) 2011-06-28 2014-12-30 Caterpillar Inc. Hydraulic control system having energy recovery kit
US9139982B2 (en) 2011-06-28 2015-09-22 Caterpillar Inc. Hydraulic control system having swing energy recovery
JP2016008416A (en) * 2014-06-24 2016-01-18 古河ロックドリル株式会社 Attachment operation monitoring device, and program for monitoring attachment operation
US9382687B2 (en) 2012-12-21 2016-07-05 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US9518370B2 (en) 2012-12-21 2016-12-13 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
JP2018135704A (en) * 2017-02-22 2018-08-30 日立建機株式会社 Hydraulic Excavator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217702A (en) * 1996-02-15 1997-08-19 Yutani Heavy Ind Ltd Control device of hydraulic shovel
WO2006129399A1 (en) * 2005-06-03 2006-12-07 Komatsu Ltd. Work machine
JP2008075365A (en) * 2006-09-22 2008-04-03 Shin Caterpillar Mitsubishi Ltd Control system in working machine
JP2008101414A (en) * 2006-10-20 2008-05-01 Shin Caterpillar Mitsubishi Ltd Hydraulic control system in hydraulic excavator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217702A (en) * 1996-02-15 1997-08-19 Yutani Heavy Ind Ltd Control device of hydraulic shovel
WO2006129399A1 (en) * 2005-06-03 2006-12-07 Komatsu Ltd. Work machine
JP2008075365A (en) * 2006-09-22 2008-04-03 Shin Caterpillar Mitsubishi Ltd Control system in working machine
JP2008101414A (en) * 2006-10-20 2008-05-01 Shin Caterpillar Mitsubishi Ltd Hydraulic control system in hydraulic excavator

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9068575B2 (en) 2011-06-28 2015-06-30 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
US8919113B2 (en) 2011-06-28 2014-12-30 Caterpillar Inc. Hydraulic control system having energy recovery kit
WO2013003046A3 (en) * 2011-06-28 2013-05-10 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
CN103703255A (en) * 2011-06-28 2014-04-02 卡特彼勒公司 Hydraulic control system having swing motor energy recovery
WO2013003047A2 (en) * 2011-06-28 2013-01-03 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
US8850806B2 (en) 2011-06-28 2014-10-07 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
WO2013003047A3 (en) * 2011-06-28 2013-03-07 Caterpillar Inc. Hydraulic control system having swing motor energy recovery
EP2726747A4 (en) * 2011-06-28 2015-03-11 Caterpillar Inc Hydraulic control system having swing motor energy recovery
US8776511B2 (en) 2011-06-28 2014-07-15 Caterpillar Inc. Energy recovery system having accumulator and variable relief
US9139982B2 (en) 2011-06-28 2015-09-22 Caterpillar Inc. Hydraulic control system having swing energy recovery
US9382687B2 (en) 2012-12-21 2016-07-05 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US9518370B2 (en) 2012-12-21 2016-12-13 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US10087599B2 (en) 2012-12-21 2018-10-02 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US10132056B2 (en) 2012-12-21 2018-11-20 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel
JP2016008416A (en) * 2014-06-24 2016-01-18 古河ロックドリル株式会社 Attachment operation monitoring device, and program for monitoring attachment operation
JP2018135704A (en) * 2017-02-22 2018-08-30 日立建機株式会社 Hydraulic Excavator

Also Published As

Publication number Publication date
JP5240843B2 (en) 2013-07-17

Similar Documents

Publication Publication Date Title
JP5240843B2 (en) Work determination system for construction machinery
JP5928065B2 (en) Control device and construction machine equipped with the same
JP5013452B2 (en) Hydraulic control circuit in construction machinery
JP2010121726A (en) Hydraulic control system in work machine
JP2008014468A (en) Hydraulic control system in working machine
JP6453898B2 (en) Hydraulic drive system for work machines
JP6015157B2 (en) Construction machinery
WO2014054326A1 (en) Hydraulic circuit for construction machine
KR20140010066A (en) Hydraulic drive device of working machine
JP2009256891A (en) Hydraulic shovel with crane function
JP2019199881A (en) Hydraulic driving device of working machine
JP6033708B2 (en) Hydraulic circuit for construction machine and control method thereof
CN114555957A (en) Regeneration device, hydraulic drive system provided with regeneration device, and control device for hydraulic drive system
JP2007120004A (en) Hydraulic control device of work machine
JP4753307B2 (en) Hydraulic control system for work machines
JP4702894B2 (en) Hydraulic control system for hydraulic excavator
JP5844761B2 (en) Hydraulic drive device for hydraulic excavator
KR102138783B1 (en) Hydraulic drive of working machine
JP2008133914A (en) Hydraulic control system in working machine
JP4443483B2 (en) Hydraulic drive
US8997479B2 (en) Hydraulic control system having energy recovery
JP7171475B2 (en) working machine
JP4756600B2 (en) Hydraulic control system for work machines
JP5272211B2 (en) Hydraulic circuit for construction machinery
JP4831679B2 (en) Hydraulic control system for work machines

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20100713

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100817

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120315

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120604

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130328

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130328

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160412

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5240843

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250