JP2008165568A - System for automatically forming operation slip in service interruption operation - Google Patents

System for automatically forming operation slip in service interruption operation Download PDF

Info

Publication number
JP2008165568A
JP2008165568A JP2006355541A JP2006355541A JP2008165568A JP 2008165568 A JP2008165568 A JP 2008165568A JP 2006355541 A JP2006355541 A JP 2006355541A JP 2006355541 A JP2006355541 A JP 2006355541A JP 2008165568 A JP2008165568 A JP 2008165568A
Authority
JP
Japan
Prior art keywords
place
control station
slip
title
operations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006355541A
Other languages
Japanese (ja)
Other versions
JP4767161B2 (en
Inventor
Hirobumi Hashisaka
博文 橋酒
Kenichiro Nunogami
健一郎 布上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006355541A priority Critical patent/JP4767161B2/en
Publication of JP2008165568A publication Critical patent/JP2008165568A/en
Application granted granted Critical
Publication of JP4767161B2 publication Critical patent/JP4767161B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a system for automatically forming an operation slip in service interruption operation, capable of performing an efficient predetermined service interruption operation by eliminating duplicated operations of each control station. <P>SOLUTION: In the system for automatically forming an operation slip in service interruption operation in each of CC and DD substations mutually connected through a transmission line, electric equipment of the CC and DD substations being controlled by a plurality of A and B control stations, respectively, an operation slip formed by the control station A is received through a communication means, for an operation by only the control station A, the content of a procedure 32 corresponding to a title 31 is deleted while leaving only the title 31, and for an operation needing cooperation of the control stations A and B, each operation object and each content in a procedure 52 thereof are reversed and automatically converted to an operation for the control station B. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は停電操作時の操作票の自動作成システムに関し、特に複数の制御所に跨る各変電所の停電操作を行う場合に適用して有用なものである。   The present invention relates to an operation sheet automatic creation system at the time of a power outage operation, and is particularly useful when applied to a power outage operation at each substation across a plurality of control stations.

変電所における各種電気機器の停電操作を行う場合には、事故を未然に防止するため、前記電気機器の操作手順を記載した操作票を作成して操作の打ち合わせ及び操作を行っている。ここで、操作票は前記電気機器が設置されている各変電所を統括する制御所毎に作成している。このため、操作対象となる電気機器が設置され、且つ同一送電線で接続されている複数の変電所が複数の制御所に跨る場合、各制御所毎に前記操作票を作成し、続いて当事者となる制御所同士で前記操作票に基づく打ち合わせを行い、各制御所における操作手順を承認した後、各制御所における操作を実施している。ここで各制御所毎に作成する操作票は、自所のみならず、連携すべき他所の操作手順も考慮しなければならない。   When a power failure operation is performed on various electrical devices at a substation, in order to prevent an accident, an operation sheet that describes the operation procedure of the electrical device is created, and operations are arranged and performed. Here, the operation slip is created for each control station that supervises each substation in which the electrical equipment is installed. For this reason, when a plurality of substations connected to the same power transmission line are installed over a plurality of control stations, the operation slip is created for each control station, and then the parties After meeting with each other at the control stations based on the operation slip and approving the operation procedure at each control station, the operation at each control station is performed. Here, the operation slip created for each control station must consider not only the own site but also the operation procedures of other sites to be linked.

そこで、従来は重複した内容を含む打ち合わせのための操作票を各制御所でそれぞれ作成していた。すなわち、複数の制御所で内容的に重複する操作票を別々に作成していた。このため、複数の制御所に跨る停電操作が非効率的なものとなっていた。   Therefore, conventionally, operation sheets for meetings including duplicate contents have been created at each control station. That is, operation sheets that overlap in content are created separately at a plurality of control stations. For this reason, the power outage operation over a plurality of control stations has become inefficient.

なお、電力系統の監視対象の状況を取り込み、迅速に対応策を決定し得る監視制御システムとして特許文献1が存在する。   Patent Document 1 exists as a monitoring control system that can capture the status of a monitoring target of a power system and quickly determine a countermeasure.

特開2006−037697号公報JP 2006-037697 A

本発明は、上記従来技術に鑑み、各制御所毎の重複した作業をなくし効率的な所定の停電操作を行うことができる停電操作時の操作票の自動作成システムを提供することを目的とする。   An object of the present invention is to provide an automatic operation slip creation system at the time of a power failure operation capable of eliminating a redundant work for each control station and performing an efficient predetermined power failure operation. .

上記目的を達成するための本発明の第1の態様は、
送電線を介して接続されている複数の変電所の各電気機器を複数の制御所でそれぞれ管轄している場合の各変電所の停電操作の操作票の自動作成システムであって、
自所が管轄する変電所の停電操作を表す操作票を、自所のみの操作であるが他所の操作と手順的にリンクさせておく必要のある操作、他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある操作及び自所と他所とが協調して行う必要がある操作に分類して各操作毎に各操作を表すタイトルを付する一方、自所のみの前記操作及び自所と他所とが協調して行う必要がある前記操作の具体的な内容である手順を各タイトルに続けてそれぞれ作成するとともに他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある前記操作は前記タイトルのみとして作成し、このようにして作成した前記操作票を他所に通信手段を介して伝送する一つの制御所と、
前記一つの制御所で作成した前記操作票を通信手段を介して受信し、前記自所のみの操作の前記タイトルだけを残してこのタイトルに対応する手順の内容を削除するとともに、前記自所と他所とが協調して行う必要がある操作の手順における各操作の内容を逆にして自所の操作に変換する変換手段を具備する他の制御所とを有することを特徴とする停電操作の操作票の自動作成システムにある。
In order to achieve the above object, the first aspect of the present invention provides:
A system for automatically creating operation slips for power outage operations at each substation when each electrical equipment of a plurality of substations connected via a power transmission line has jurisdiction at a plurality of control stations.
An operation slip representing a power outage operation at a substation that is under its control is an operation only for the own site but must be linked in a procedural manner to an operation at another location. It is classified into operations that need to be linked to the operations in a procedural manner and operations that need to be performed in cooperation between the own place and other places, and a title that represents each operation is attached to each operation, while only the own place Procedures that are specific contents of the operations and the operations that need to be carried out in cooperation with the operation and the other place are created following the respective titles, and are operations only at other places, but the operations and procedures of the own place The operation that needs to be linked to is created only as the title, and one control station that transmits the operation slip thus created to other places via communication means,
The operation slip created at the one control station is received via communication means, and the contents of the procedure corresponding to the title are deleted while leaving only the title of the operation only at the own station. Operation of power outage operation characterized by having another control station having conversion means for reversing the contents of each operation in an operation procedure that needs to be performed in cooperation with another place and converting it to the operation at its own place It is in an automatic vote creation system.

本発明の第2の態様は、
上記第1の態様に記載する停電操作の操作票の自動作成システムにおいて、
前記他の制御所は、他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある操作として前記一つの制御所で、前記タイトルのみを作成しておいた前記タイトルに対応する操作の具体的な内容である手順を追加して自所での操作票を完成させる追加手段をさらに有することを特徴とする停電操作の操作票の自動作成システムにある。
The second aspect of the present invention is:
In the automatic creation system for an operation sheet for a power failure operation described in the first aspect,
The other control station is an operation of only the other place, but as an operation that needs to be linked in a procedural manner with the operation of its own place, the one control station, to the title that has created only the title There is provided an automatic power cut operation operation form creation system characterized by further including an additional means for adding a procedure which is a specific content of a corresponding operation and completing an operation form at the place.

本発明の第3の態様は、
上記第1の態様に記載する停電操作の操作票の自動作成システムにおいて、
自所と他所とが協調して行う必要がある前記操作の具体的な内容である前記手順のうち、操作の手順が他所との関係でリンクさせて定められるリンク操作と、自所乃至他所で並行して行うことができる並行操作とに分類して識別し得るようし、前記並行操作に関しては自所乃至他所での個別の操作を許容するとともに、その終了のみを相手方に伝送するように前記操作票を構成することを特徴とする停電操作の操作票の自動作成システムにある。
The third aspect of the present invention is:
In the automatic creation system for an operation sheet for a power failure operation described in the first aspect,
Among the procedures that are specific contents of the operation that need to be performed in cooperation between the own place and the other place, a link operation in which the operation procedure is determined by linking in relation to the other place, and the own place or the other place. It can be classified and identified as a parallel operation that can be performed in parallel, and with respect to the parallel operation, the individual operation at the own place or the other place is allowed and only the end is transmitted to the other party. There is an automatic creation system for an operation sheet for a power outage operation characterized by constituting an operation sheet.

本発明によれば、他所で作成した操作票の内容を自所の内容に自動的に変換することができるので、他所で作成した操作票に基づき自所の操作票も作成でき、従来、操作票の作成に自所と他所で重複して費やしていた労力を低減して操作票作成作業の合理化を図り得るばかりでなく、自所と他所の双方がリンクして操作することで、先行操作等の誤操作を未然に防止し得る。   According to the present invention, it is possible to automatically convert the contents of the operation slip created at another place into the contents of the own place. Therefore, the operation slip of the own place can also be created based on the operation slip created at the other place. Not only can you reduce the labor that was spent on the creation of the votes redundantly at your own place and other places to streamline the operation form creation work, but you can also perform operations by linking both your place and the other place. Such an erroneous operation can be prevented in advance.

以下本発明の実施の形態を図面に基づき詳細に説明する。
図1は本発明の実施の形態を含む二つの制御所と制御対象との関係を概念的に示す説明図である。同図に示すように、A制御所は、管轄分界線(図中に点線で示す)Lで区切られた図中左側の領域(図の場合にはCC変電所)の制御を管轄するもので、B制御所は、管轄分界線Lで区切られた右側の領域(図の場合にはDD変電所)の制御を管轄する。ここで、CC変電所及びDD変電所は遮断器101,201を介して送電線PL1で接続されるとともに、遮断器102,202を介して送電線PL2で接続されている。本例は送電線PL1,PL2の間に管轄分界線Lが存在する場合である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is an explanatory diagram conceptually showing the relationship between two control stations and an object to be controlled including the embodiment of the present invention. As shown in the figure, the A control station has jurisdiction over the control of the area on the left side of the figure (CC substation in the figure) divided by the jurisdiction demarcation line (indicated by the dotted line in the figure) L. , B control is responsible for the control of the right area (DD substation in the figure) delimited by the jurisdiction dividing line L. Here, the CC substation and the DD substation are connected by the power transmission line PL1 through the circuit breakers 101 and 201, and are also connected by the power transmission line PL2 through the circuit breakers 102 and 202. In this example, there is a jurisdiction dividing line L between the power transmission lines PL1 and PL2.

遮断器101,102を含むCC変電所の変圧器等の各電気機器は、その停電操作を含め、A制御所の操作制御部103を介して制御される。同様に、遮断器201,202を含むDD変電所の変圧器等の各電気機器は、その停電操作を含め、B制御所の操作制御部203を介して制御される。   Each electrical device such as a transformer of the CC substation including the circuit breakers 101 and 102 is controlled via the operation control unit 103 of the A control station including the power failure operation. Similarly, each electric device such as a transformer of the DD substation including the circuit breakers 201 and 202 is controlled via the operation control unit 203 of the B control station including the power failure operation.

本形態に係る停電操作時の操作票の自動作成システム100,200は、A制御所及びB制御所のそれぞれに配設してある。ここで、各自動作成システム100,200は入力装置10,20、出力装置11,21、表示装置12,22、送受信装置13,23、模擬操作部14,24、演算処理部15,25及び変換処理部16,26を有している。   The automatic operation slip creation systems 100 and 200 at the time of a power failure operation according to the present embodiment are arranged in each of the A control station and the B control station. Here, each automatic creation system 100, 200 includes input devices 10, 20, output devices 11, 21, display devices 12, 22, transmission / reception devices 13, 23, simulated operation units 14, 24, arithmetic processing units 15, 25, and conversion. The processing units 16 and 26 are included.

かかる、自動作成システム100,200を用いる停電操作の操作票の作成方法を図2に示すフローチャートを追加して説明する。   A method for creating an operation slip for a power failure operation using the automatic creation systems 100 and 200 will be described with reference to the flowchart shown in FIG.

1) 一方の制御所(本例ではA制御所)の操作票を作成する(ステップS1参照)。これは、入力装置10を用いて操作員が行う。また、ここで作成する操作票の具体的内容については後で詳説する。 1) An operation slip for one control station (A control station in this example) is created (see step S1). This is performed by an operator using the input device 10. The specific contents of the operation slip created here will be described in detail later.

2) A制御所の電気機器の模擬操作を行う(ステップS2参照)。具体的には、模擬操作部14を動作させ、ステップS1で作成した操作票に基づく操作を模擬して各操作の適否を検証する。 2) Perform a simulated operation of the electrical equipment at the A control station (see step S2). Specifically, the simulation operation unit 14 is operated to verify the suitability of each operation by simulating the operation based on the operation slip created in step S1.

3) ステップS2で「NG」となった場合、ステップS1に戻り操作票を訂正し、同様の模擬操作を繰り返す。ちなみに、「NG」は、ある操作をすることで予定外の停電が発生する場合や、予め定められた手順を踏襲していない場合等に発せられる。 3) If “NG” is determined in step S2, the process returns to step S1, the operation slip is corrected, and the same simulation operation is repeated. Incidentally, “NG” is issued when an unscheduled power failure occurs due to a certain operation or when a predetermined procedure is not followed.

4) ステップS2で「OK」となった場合、当該自動作成システム100を「承認待ち」のモードにする(ステップS3参照)。 4) If “OK” is determined in step S2, the automatic creation system 100 is set in a “waiting for approval” mode (see step S3).

5) 前記操作票を他方の制御所(本例ではB制御所)へ転送する(ステップS4参照)。これは、例えばDX(Data Exchenger)等を用い送受信装置13,23を介して行う。 5) The operation slip is transferred to the other control station (B control station in this example) (see step S4). This is performed through the transmission / reception devices 13 and 23 using, for example, DX (Data Exchanger).

6) B制御所の変換処理部26で、前記操作票の所定の変換処理を行う(ステップS5参照)。これは転送されてきたA制御所の操作票の各操作内容を自所(B制御所)の操作内容に変換する処理であるが、当該処理の詳細な内容は、変換処理後の具体的な操作票とともに後に詳説する。 6) The conversion processing unit 26 of the B control station performs a predetermined conversion process of the operation slip (see step S5). This is a process of converting each operation content of the operation sheet of the A control station transferred to the operation content of its own site (B control station). The detailed content of the process is a specific example after the conversion process. It will be explained in detail later along with the operation slip.

7) 変換後の操作票の手順を確認する(ステップS6参照)。具体的には、変換後の操作票の内容を出力装置21乃至表示装置22で可視化することにより操作員が確認する。この作業は、勿論自動化することもできる。 7) The procedure of the converted operation slip is confirmed (see step S6). Specifically, the operator confirms the contents of the converted operation slip by visualizing the contents with the output device 21 to the display device 22. This operation can of course be automated.

8) ステップS6で「NG」となった場合、A制御所に「NG」の操作が含まれていることを通知する(ステップS7参照)。この通知は送受信装置23,13を介して行う。 8) If “NG” is determined in step S6, the control station A is notified that the operation of “NG” is included (see step S7). This notification is performed via the transmission / reception devices 23 and 13.

この結果、ステップ1に戻り操作票を訂正し、同様の模擬操作を繰り返す。
9) ステップS6で「OK」となった場合、A制御所にその操作票を承認する旨の通知をする。この通知も送受信装置23,13を介して行う。
As a result, the process returns to step 1 to correct the operation slip, and the similar simulation operation is repeated.
9) If “OK” is determined in step S6, the control station A is notified that the operation slip is approved. This notification is also made through the transmission / reception devices 23 and 13.

A制御所では、「承認待ち」のモード(ステップS12参照)から所定の承認処理を行って(ステップS8参照)、実際の操作までの「操作待ち」モードとする(ステップS9参照)。   In the A control station, predetermined approval processing is performed from the “waiting for approval” mode (see step S12) (see step S8), and the “operation waiting” mode until the actual operation is set (see step S9).

10) ステップS6で「OK」となった場合、同時に、B制御所の単独操作分の操作を変換後の操作票に追加する(ステップS10参照)。A制御所で作成した操作票ではB制御所に固有の操作は記載されていないからである。この追加処理の詳細な内容は、追加処理後の具体的な操作票とともに後に詳説する。 10) If “OK” is determined in step S6, the operation for the single operation of the B control center is added to the converted operation slip at the same time (see step S10). This is because the operation slip created at the A control station does not describe an operation specific to the B control station. The detailed contents of the addition process will be described later together with a specific operation sheet after the addition process.

かかる追加作業は入力装置20を用いて操作員が行う。この追加作業によりB制御所における操作票が一応完成する。   Such additional work is performed by an operator using the input device 20. This additional work completes the operation slip at the B control station.

11) B制御所の電気機器の模擬操作を行う(ステップS11参照)。これはステップ2と同様の操作であり、模擬操作部24によりステップS10で追加・完成させた操作票に基づく操作を模擬して各操作の適否を検証する。 11) Perform a simulation operation of the electrical equipment at the B control station (see step S11). This is the same operation as in step 2, and the appropriateness of each operation is verified by simulating the operation based on the operation slip added / completed in step S10 by the simulation operation unit 24.

この結果、「NG」となった場合には、ステップ10に戻り操作票を訂正し、同様の模擬操作を繰り返す。   As a result, when it becomes “NG”, the process returns to step 10 to correct the operation slip, and the similar simulation operation is repeated.

12) ステップS11で「OK」となった場合には、当該自動作成システムを「承認待ち」のモードにし(ステップS3参照)、その後所定の承認処理を行って(ステップS13参照)、実際の操作までの「操作待ち」モードとする(ステップS14参照)。 12) If “OK” is determined in step S11, the automatic creation system is set in the “waiting for approval” mode (see step S3), and then a predetermined approval process is performed (see step S13). Until “operation waiting” mode (see step S14).

13) A制御所及びB制御所の両方が「操作待ち」モードとなった後、 各操作票に基づき操作制御部103,203を介してCC変電所及びDD変電所の各電気機器を指定された順序で操作して所定の停電操作を行う(ステップS15参照)。 13) After both the A control station and the B control station enter the “waiting for operation” mode, the electric devices of the CC substation and the DD substation are designated via the operation control units 103 and 203 based on the operation slips. The predetermined power failure operation is performed by operating in the specified order (see step S15).

図3は操作票の具体例を示す説明図で、(a)がA制御所で作成した操作票(ステップ1参照)、(b)がB制御所で変換された操作票(ステップS5参照)、(c)がB制御所で追加処理を行って完成させたB制御所用の操作票(ステップS10参照)である。同図に基づき操作票の作成、変換、追加の処理を具体的に説明する。   FIG. 3 is an explanatory diagram showing a specific example of the operation slip, where (a) is an operation slip created at the A control station (see step 1), and (b) is an operation slip converted at the B control station (see step S5). (C) is an operation slip for the B control station completed by performing additional processing at the B control station (see step S10). The operation sheet creation, conversion, and addition processing will be specifically described with reference to FIG.

図3(a)に示すように、操作票には操作内容を表わすタイトル31,41,51が時系列に記載してある。ここで、タイトル31は、「CC変電所の変圧器の停電操作」に関するものであることを表わしている。これはA制御所における単独操作であるので、その旨の情報(A制御所単独操作)も記載しておく。CC変電所の変圧器の停電操作に関する具体的な手順32はタイトル31に続けてその下方に記載されている。   As shown in FIG. 3A, titles 31, 41, and 51 representing operation contents are described in time series on the operation slip. Here, the title 31 indicates that it is related to “a power failure operation of the transformer of the CC substation”. Since this is a single operation at the A control station, information to that effect (A control station single operation) is also described. The specific procedure 32 regarding the power failure operation of the transformer in the CC substation is described below the title 31 and below.

タイトル41は、「DD変圧器の停電操作」に関するものであること及びこの操作がB制御所における単独操作であることを表わしている。これは、自所(この場合はA制御所)とは関係のない他所(この場合はB制御所)の操作ではあるが、この操作をB制御所で終了しない限り次の操作に進めないので、タイトル41のみを記載し、自所が権限のない操作となる具体的な手順は記載されていない。なお、他所での操作ではあるが、この操作を他所で終了しない限り次に進めない操作のことを、以下「手順的にリンクの必要がある操作」という。   The title 41 indicates that it is related to “DD transformer power failure operation” and that this operation is a single operation at the B control station. This is an operation at another place (in this case, the B control station) that is not related to its own place (in this case, the A control station), but this operation cannot proceed to the next operation unless it is terminated at the B control station. , Only the title 41 is described, and a specific procedure for an operation in which the user's place is unauthorized is not described. In addition, although it is an operation in another place, an operation that cannot be advanced to the next unless this operation is finished elsewhere is hereinafter referred to as an “operation that requires linking in a procedural manner”.

タイトル51は、「CCDD線停電操作」に関するものであることを表わしている。これは、送電線PL1,PL2の停電操作である。この操作はA制御所とB制御所との両方に関連するので、その旨の情報(AB制御所間操作)も記載しておく。CCDD線停電操作に関する具体的な手順52はタイトル51に続けてその下方に記載されている。ここで、手順52のうち遮断器201及び遮断器101の遮断はAB制御所での操作をリンクさせてこの順序で行う必要があるが、(並行操作)乃至(並行end)の各操作は相手側制御所の操作の完了を待つことなく並行した独立の操作として行うことができる。この結果、先に所定の処理が終了した場合には、相手方が「並行end」になるまで待機していれば良い。   The title 51 indicates that it relates to “CCDD line power failure operation”. This is a power failure operation of the transmission lines PL1 and PL2. Since this operation relates to both the A control station and the B control station, information to that effect (operation between AB control stations) is also described. A specific procedure 52 regarding the CCDD line power failure operation is described below the title 51 and below. Here, in the procedure 52, the circuit breaker 201 and the circuit breaker 101 must be disconnected in this order by linking the operations at the AB control station. It can be performed as a parallel independent operation without waiting for the completion of the operation of the side control station. As a result, when the predetermined processing is completed first, it is only necessary to wait until the other party becomes “parallel end”.

図3(a)に示す操作票は、B制御所に伝送された後、図3(b)に示すように変換される。すなわち、図3(b)に示すように、タイトル31の操作は他所(この場合はA制御所)の単独操作であるが、手順的にリンクの必要がある操作であるので、タイトル31のみを残し、手順32は削除する。   The operation slip shown in FIG. 3A is transmitted to the B control station and then converted as shown in FIG. 3B. That is, as shown in FIG. 3B, although the operation of the title 31 is a single operation at another place (in this case, the A control station), since it is an operation that requires linking in a procedure, only the title 31 is selected. The procedure 32 is deleted.

次の、タイトル41の操作は自所(この場合はB制御所)の操作であるので、後に説明する図3(c)の「追加」の処理で必要な手順42を記載する。   Since the next operation of the title 41 is the operation of the own place (in this case, the B control station), a procedure 42 necessary for the “addition” process of FIG.

タイトル51は、「CCDD線停電操作」に関するものであるので、各操作内容の必要な変換を行う。すなわち、A制御所側から見た操作票の内容をB制御所側から見たものに変換する。具体的には、他所の操作であることを表わす(他所制御)を自所の操作であることを表わす(制御)に変換する。   Since the title 51 relates to “CCDD line power failure operation”, necessary conversion of each operation content is performed. That is, the contents of the operation slip viewed from the A control station side are converted into those viewed from the B control station side. Specifically, it is converted to (control) indicating that it is an operation at another place (control of other place).

このようにしてB制御所用に変換された操作票は、図3(c)に示すように、B制御所に固有の操作を追加することで完成される。具体的には、図3(c)に示すように、自所に固有の操作であるタイトル41の操作の具体的な手順42を追加する。かくしてA制御所側で作成した操作票と対となるB制御所の操作票が作成される。   The operation slip converted for the B control station in this way is completed by adding a unique operation to the B control station as shown in FIG. Specifically, as shown in FIG. 3C, a specific procedure 42 for the operation of the title 41, which is an operation unique to the site, is added. In this way, an operation slip for the B control station that is paired with the operation slip created on the A control station side is created.

図4は、図3(b)に示す操作票を得るべく、B制御所で行う変換処理の手順を示すフローチャートである。同図に基づき操作票の変換処理を説明する。   FIG. 4 is a flowchart showing the procedure of the conversion process performed at the B control station in order to obtain the operation slip shown in FIG. The operation slip conversion process will be described with reference to FIG.

1) 変換処理を開始する(ステップS21参照)。 1) The conversion process is started (see step S21).

2) タイトルを判別する(ステップS22参照)。具体的には操作票の、例えばタイトル31の内容を判定して手順的にリンクの必要がある操作であるか否かを判定する。タイトル31は「手順的にリンクの必要がある操作」であるので、判定結果は「要」となる。 2) The title is determined (see step S22). Specifically, the contents of the operation slip, for example, the contents of the title 31 are determined, and it is determined whether the operation needs to be linked in a procedural manner. Since the title 31 is “an operation that needs to be linked in a procedural manner”, the determination result is “necessary”.

3) ステップS22の判定結果が「要」であった場合、その中に自所手順が有るか否かを判定する(ステップS23参照)。タイトル31の内容はA制御所の単独操作であるので、判定結果は「無」となる。 3) When the determination result of step S22 is “necessary”, it is determined whether or not there is a local procedure (see step S23). Since the content of the title 31 is a single operation of the A control station, the determination result is “none”.

4) ステップS23の判定結果が「無」であった場合には、自所の操作ではないので「リンクタイトルとして貼付け」を行う(ステップS24参照)。ここで、「リンクタイトル」とは、自所操作はないが手順的にリンクの必要がある操作を表わすタイトル、例えばB操作所におけるタイトル31をいう。ちなみに、本例の場合CC変電所が電源側(発電所側)にあるので、DD変電所の停電操作に先立ち停電操作を完了させておく必要がある。また、「リンクタイトルの貼付け」とは、タイトル31のみを残し、その手順32を削除する処理をいう。この手順32の処理は専らA制御所が管轄する機器に関するものであり、B制御所は関係ない。 4) If the determination result in step S23 is “None”, it is not an operation of the own place, so “Paste as a link title” is performed (see step S24). Here, the “link title” refers to a title indicating an operation that does not require an operation at its own place but needs to be linked in a procedural manner, for example, a title 31 at the B operation place. Incidentally, in the case of this example, since the CC substation is on the power supply side (power plant side), it is necessary to complete the power failure operation prior to the power failure operation of the DD substation. “Pasting link title” refers to a process of leaving only the title 31 and deleting the procedure 32. The processing of this procedure 32 is exclusively related to equipment under the control of the A control station, and does not relate to the B control station.

5) ステップS23の判定結果が「有」であった場合、ポジション貼付けを開始する(ステップS25参照)。ここで、「ポジション」とは、各手順、例えば手順52における具体的な操作に関する情報であり、自所で行う操作であるか、他所で行う操作であるかを示す情報も含んでいる。 5) If the determination result in step S23 is “Yes”, position pasting is started (see step S25). Here, the “position” is information regarding a specific operation in each procedure, for example, the procedure 52, and includes information indicating whether the operation is performed at the own place or the operation performed at another place.

6) ステップS25で貼付けたポジションが自所操作であるか否かを判定する(ステップS26参照)。すなわち、操作票の手順52に記載する各操作を何れの制御所で行うか判断する。この判断は、他所(この場合はA制御所)で作成した操作票に基づき行う。したがって、自所操作に関する操作であることを表わす表示である(制御)と、他所操作に関する操作であることを表わす表示である(他所制御)という表示が逆になる。そこで、(制御)の表示があるものは他所操作、(他所制御)の表示があるものは自所操作であると判断する。 6) It is determined whether or not the position pasted in step S25 is a local operation (see step S26). That is, it is determined at which control station each operation described in the procedure 52 of the operation slip is performed. This determination is made based on an operation slip created at another place (in this case, the A control place). Therefore, the display indicating that the operation is related to the operation at the own place (control) and the display indicating the operation related to the operation at the other place (control elsewhere) are reversed. Therefore, it is determined that an operation with a display of (control) is an operation at another place, and an operation with an display of (control at another place) is an operation at an own place.

7) ステップS26の判定の結果、自所操作でない場合は、他所操作であるので、被制御ポジションへ貼付けを行う(ステップS27参照)。すなわち、被制御ポジションの表示を(他所制御)とする。かくして、A制御所で作成した操作票で(制御)だったものが,B制御所の操作票では(他所制御)に変換される。 7) If the result of the determination in step S26 is not an operation at the own place, it is an operation at another place, so that it is pasted to the controlled position (see step S27). That is, the display of the controlled position is (remote control). Thus, the operation sheet created at the A control station that was (control) is converted to (other site control) in the operation sheet at the B control station.

8) ステップS26の判定の結果、自所操作である場合は、制御ポジションへ貼付けを行う(ステップS28参照)。すなわち、制御ポジションの表示を(制御)とする。かくして、A制御所で作成した操作票で(他所制御)だったものが,B制御所の操作票では(制御)に変換される。 8) As a result of the determination in step S26, if the operation is a local operation, it is pasted to the control position (see step S28). That is, the control position display is (control). In this way, the operation slip created at the A control station that was (remote control) is converted to (control) in the operation slip at the B control station.

なお、ステップ27、28の処理は他所(この場合はA制御所)のデータベース変換用データベース300のデータを参照して行う。このデータベース変換用データベース300は他所(この場合はA制御所)から伝送されたデータを自所ポジションへ変更するためのデータを格納するものである。   Note that the processing in steps 27 and 28 is performed with reference to the data in the database conversion database 300 in another place (in this case, the A control place). This database conversion database 300 stores data for changing data transmitted from another place (in this case, the A control place) to its own position.

9) ステップS27乃至ステップS28の処理が終了した後、手順、例えば手順52の終了した操作の次の操作があるか否かを判定する(ステップS29参照)。この結果、次の操作がある場合にはステップS26の処理に戻り、次の操作がなくなるまで同様の処理を繰り返す。 9) After the processing of step S27 to step S28 is completed, it is determined whether or not there is a procedure next to the procedure, for example, the operation for which procedure 52 has been completed (see step S29). As a result, if there is a next operation, the process returns to step S26, and the same process is repeated until there is no next operation.

10) ステップS29の判定で次の手順、例えば手順52における次の操作がなくなった場合に、次のタイトルがあるか否かを判定する(ステップS30参照)。この結果、次のタイトルがある場合にはステップS22の処理に戻り、次のタイトルがなくなるまで同様の処理を繰り返す。 10) If there is no next operation in the next procedure, for example, procedure 52 in the determination in step S29, it is determined whether there is a next title (see step S30). As a result, if there is a next title, the process returns to step S22, and the same process is repeated until there is no next title.

ステップS30の判定は、ステップS22の判定結果が「否」であった場合、及びステップS24の処理が終了した場合にも同様に行う。ここで、ステップS22の判定結果が「否」であった場合とは、手順リンクの必要がない場合、例えば自所(この場合はB制御所)操作を表わすタイトル41であった場合である。   The determination in step S30 is similarly performed when the determination result in step S22 is “No” and when the process in step S24 is completed. Here, the case where the determination result in step S22 is “No” is a case where there is no need for a procedure link, for example, a case where the title 41 represents an operation at the own place (in this case, the B control place).

11) ステップS30の判定で次のタイトルがなくなった場合に変換を完了する(ステップS31参照)。 11) The conversion is completed when there is no next title in the determination in step S30 (see step S31).

上述の如き手順で操作票を作成するが、A制御所における停電操作は、図3(a)示す操作票に基づき、図1に示す操作制御部103を介して遮断器101,102及びCC変電所の各電気機器を制御することにより行うとともに、B制御所における停電操作は、図3(c)示す操作票に基づき、図1に示す操作制御部203を介して遮断器201,202及びDD変電所の各電気機器を制御することにより行う。ここで、タイトル31の全操作が終了時点でこの終了を表わす情報がA制御所からB制御所へ送受信装置13を介して伝送される。送受信装置23を介して前記終了情報を受信したB制御所では、その後タイトル41の各操作を行い、全操作が終了時点でこの終了を表わす情報をB制御所からA制御所へ送受信装置23を介して伝送する。   The operation slip is created by the procedure as described above. The power failure operation at the control station A is based on the operation slip shown in FIG. 3A, and the circuit breakers 101 and 102 and the CC substation via the operation control unit 103 shown in FIG. The power failure operation at the control station B is performed by controlling each electrical device at the station, and the circuit breakers 201 and 202 and the DD via the operation control unit 203 shown in FIG. 1 based on the operation slip shown in FIG. This is done by controlling each electrical device in the substation. Here, when all operations of the title 31 are completed, information indicating the completion is transmitted from the A control station to the B control station via the transmission / reception device 13. At the B control station that has received the end information via the transmission / reception device 23, each operation of the title 41 is performed thereafter, and information indicating this end is sent from the B control station to the A control station when all operations are completed. Transmitted through.

タイトル52の操作はAB制御所間の操作であるので、その手順52に記載された操作のうち手順的に双方でリンクの必要があるものについては、双方での操作の終了を確認しながら所定の順序で操作を行う。すなわち、本形態の場合は、遮断器201の遮断操作及びこれに続く遮断器101の操作を行い、各操作が終了した後(並行操作)に記載された操作を行う。ここで、(並行操作)乃至(並行end)までの各操作は相手方の操作の完了を待たずに並行して操作できる。かくして、操作票に記載された順序で、双方が必要な情報を交換しつつCC変電所及びDD変電所の各電気機器の停電操作を行う。   Since the operation of the title 52 is an operation between AB control stations, among the operations described in the procedure 52, those that need to be linked in both procedures are determined while confirming the completion of the operations in both. Operate in the order of. In other words, in the case of this embodiment, the circuit breaker 201 and the subsequent circuit breaker 101 are operated, and the operation described after each operation is completed (parallel operation) is performed. Here, each operation from (parallel operation) to (parallel end) can be performed in parallel without waiting for completion of the other party's operation. Thus, in the order described in the operation slip, the power outage operation is performed on each electrical device in the CC substation and the DD substation while exchanging necessary information.

なお、上記実施の形態は2つの制御所に跨る場合について説明したが、2つ以上であっても勿論かまわない。2つの制御所の場合に行った処理と同様の処理を他の制御所との間で必要回数、順次繰り返せば良い。   In addition, although the said embodiment demonstrated the case where it straddled two control stations, of course, it does not matter even if it is two or more. What is necessary is just to repeat the process similar to the process performed in the case of two control stations to other control stations as many times as necessary.

本発明は電力設備の保守・点検を行う産業分野で利用することができる。   The present invention can be used in the industrial field where maintenance and inspection of electric power equipment is performed.

本発明の実施の形態を含む二つの制御所と制御対象との関係を概念的に示す説明図である。It is explanatory drawing which shows notionally the relationship between the two control stations containing embodiment of this invention, and a control object. 本発明の実施の形態に係る操作票の自動作成システムの処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the automatic creation system of the operation slip which concerns on embodiment of this invention. 操作票の具体例を示す説明図で、(a)がA制御所で作成した操作票、(b)がB制御所で変換された操作票、(c)がB制御所で追加処理を行って完成させた操作票である。It is explanatory drawing which shows the specific example of an operation slip, (a) The operation slip created in A control center, (b) The operation slip converted in B control center, (c) Additional processing in B control center This is an operation slip completed. 変換処理の手順を示すフローチャートである。It is a flowchart which shows the procedure of a conversion process.

符号の説明Explanation of symbols

13,23 送受信装置
14,24 模擬操作部
15,25 演算処理部
16,26 変換処理部
100,200 自動作成システム
101,102,201,202 遮断器
L 管轄分界線
13, 23 Transceiver 14, 24 Simulated operation unit 15, 25 Arithmetic processing unit 16, 26 Conversion processing unit 100, 200 Automatic creation system 101, 102, 201, 202 Breaker L Jurisdiction line

Claims (3)

送電線を介して接続されている複数の変電所の各電気機器を複数の制御所でそれぞれ管轄している場合の各変電所の停電操作の操作票の自動作成システムであって、
自所が管轄する変電所の停電操作を表す操作票を、自所のみの操作であるが他所の操作と手順的にリンクさせておく必要のある操作、他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある操作及び自所と他所とが協調して行う必要がある操作に分類して各操作毎に各操作を表すタイトルを付する一方、自所のみの前記操作及び自所と他所とが協調して行う必要がある前記操作の具体的な内容である手順を各タイトルに続けてそれぞれ作成するとともに他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある前記操作は前記タイトルのみとして作成し、このようにして作成した前記操作票を他所に通信手段を介して伝送する一つの制御所と、
前記一つの制御所で作成した前記操作票を通信手段を介して受信し、前記自所のみの操作の前記タイトルだけを残してこのタイトルに対応する手順の内容を削除するとともに、前記自所と他所とが協調して行う必要がある操作の手順における各操作の内容を逆にして自所の操作に変換する変換手段を具備する他の制御所とを有することを特徴とする停電操作の操作票の自動作成システム。
A system for automatically creating operation slips for power outage operations at each substation when each electrical equipment of a plurality of substations connected via a power transmission line has jurisdiction at a plurality of control stations.
An operation slip representing a power outage operation at a substation that is under its control is an operation only for the own site but must be linked in a procedural manner to an operation at another location. It is classified into operations that need to be linked to the operations in a procedural manner and operations that need to be performed in cooperation between the own place and other places, and a title that represents each operation is attached to each operation, while only the own place Procedures that are specific contents of the operations and the operations that need to be carried out in cooperation with the operation and the other place are created following the respective titles, and are operations only at other places, but the operations and procedures of the own place The operation that needs to be linked to is created only as the title, and one control station that transmits the operation slip thus created to other places via communication means,
The operation slip created at the one control station is received via communication means, and the contents of the procedure corresponding to the title are deleted while leaving only the title of the operation only at the own station. Operation of power outage operation characterized by having another control station having conversion means for reversing the contents of each operation in the operation procedure that needs to be performed in cooperation with another place and converting it to the operation of the own place Automatic vote creation system.
請求項1に記載する停電操作の操作票の自動作成システムにおいて、
前記他の制御所は、他所のみの操作であるが自所の操作と手順的にリンクさせておく必要のある操作として前記一つの制御所で、前記タイトルのみを作成しておいた前記タイトルに対応する操作の具体的な内容である手順を追加して自所での操作票を完成させる追加手段をさらに有することを特徴とする停電操作の操作票の自動作成システム。
In the automatic creation system of the operation sheet for power failure operation described in claim 1,
The other control station is an operation of only the other place, but as an operation that needs to be linked in a procedural manner with the operation of its own place, the one control station, to the title that has created only the title A system for automatically creating operation slips for power outage operation, further comprising an additional means for adding a procedure which is a specific content of a corresponding operation to complete an operation slip at the site.
請求項1に記載する停電操作の操作票の自動作成システムにおいて、
自所と他所とが協調して行う必要がある前記操作の具体的な内容である前記手順のうち、操作の手順が他所との関係でリンクさせて定められるリンク操作と、自所乃至他所で並行して行うことができる並行操作とに分類して識別し得るようし、前記並行操作に関しては自所乃至他所での個別の操作を許容するとともに、その終了のみを相手方に伝送するように前記操作票を構成することを特徴とする停電操作の操作票の自動作成システム。
In the automatic creation system of the operation sheet for power failure operation described in claim 1,
Among the procedures that are specific contents of the operation that need to be performed in cooperation between the own place and the other place, a link operation in which the operation procedure is determined by linking in relation to the other place, and the own place or the other place. It can be classified and identified as a parallel operation that can be performed in parallel, and with respect to the parallel operation, the individual operation at the own place or the other place is allowed and only the end is transmitted to the other party. A system for automatically creating operation sheets for power outages, characterized by configuring operation sheets.
JP2006355541A 2006-12-28 2006-12-28 Support system for creating operation slips during power outage operations Expired - Fee Related JP4767161B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006355541A JP4767161B2 (en) 2006-12-28 2006-12-28 Support system for creating operation slips during power outage operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006355541A JP4767161B2 (en) 2006-12-28 2006-12-28 Support system for creating operation slips during power outage operations

Publications (2)

Publication Number Publication Date
JP2008165568A true JP2008165568A (en) 2008-07-17
JP4767161B2 JP4767161B2 (en) 2011-09-07

Family

ID=39694962

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006355541A Expired - Fee Related JP4767161B2 (en) 2006-12-28 2006-12-28 Support system for creating operation slips during power outage operations

Country Status (1)

Country Link
JP (1) JP4767161B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003174724A (en) * 2001-12-06 2003-06-20 Toshiba Corp Power system monitor/control apparatus and program for making the apparatus operate
JP2006014527A (en) * 2004-06-28 2006-01-12 Mitsubishi Electric Corp Method of automatically creating system control procedures

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003174724A (en) * 2001-12-06 2003-06-20 Toshiba Corp Power system monitor/control apparatus and program for making the apparatus operate
JP2006014527A (en) * 2004-06-28 2006-01-12 Mitsubishi Electric Corp Method of automatically creating system control procedures

Also Published As

Publication number Publication date
JP4767161B2 (en) 2011-09-07

Similar Documents

Publication Publication Date Title
CN103177327A (en) Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures
CN103150618B (en) Power transmission network work plan generates system and method
CN101719690A (en) Dispatching method of electric network
CN100530008C (en) Method and automation system for operating and/or observing at least one field device
JP4786321B2 (en) Power system monitoring and control system
CN109510314B (en) Method for scheduling interaction between intelligent command DICP system and inspection robot system
JP2008225805A (en) Monitoring control system and position switching method for monitoring control system
JP4767161B2 (en) Support system for creating operation slips during power outage operations
JP2009234428A (en) Ctc updating device
JP4672749B2 (en) Train operation management system operation management system
CN108363315A (en) A kind of long-distance intelligent TT&C system based on Internet of Things
TWI264896B (en) System and method for remotely switching backup system program modules of a computer platform
CN102843265A (en) Non-resetting perturbation-free hot standby double-connection method of communication protocol
JP4714232B2 (en) Train operation management system operation management system
JP2008060808A (en) Airport facility remote monitoring and control system
JP5118439B2 (en) Method for determining outage equipment in power system
Tremblay et al. Protective relay upgrade utilizing real-time simulator technology
JP6829293B1 (en) Support devices, methods and programs for configuration management activities
JP5431380B2 (en) Power system supervisory control system
JP5040246B2 (en) Protocol conversion system and control method thereof
JP4792055B2 (en) Train operation management system operation management system
Paes et al. Electrical Equipment Design Considerations for Now and the Future
JP2006309460A (en) Private equipment maintenance management system and method
JP2016091393A (en) Online test method
CN106408180A (en) Business process splicing method and system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091020

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110119

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110608

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110614

R150 Certificate of patent or registration of utility model

Ref document number: 4767161

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees