CN106408180A - Business process splicing method and system - Google Patents
Business process splicing method and system Download PDFInfo
- Publication number
- CN106408180A CN106408180A CN201610806138.XA CN201610806138A CN106408180A CN 106408180 A CN106408180 A CN 106408180A CN 201610806138 A CN201610806138 A CN 201610806138A CN 106408180 A CN106408180 A CN 106408180A
- Authority
- CN
- China
- Prior art keywords
- item attribute
- operation flow
- flow process
- attribute
- current business
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Abstract
The present invention discloses a business process splicing method and system. According to the business process splicing method, after a project attribute change instruction is received, a current business process is terminated, the latest process link in the current business process is determined; a new project attribute is selected based on a project attribute selection instruction, and a business process to be executed of the new project attribute is determined; executed process links of the current business process are reserved, and the business process to be executed is adopted as the next business process of the latest process link; and therefore, the splicing of business processes can be completed, and the integrity of the business processes of a project can be ensured.
Description
Technical field
The application is related to project management field, more particularly, it relates to a kind of joining method of operation flow and system
Background technology
In order to reduce the operation cost of enterprise, optimize project management flow process in the project management of enterprise, can be for difference
Item attribute set up a whole set of different operation flow.
In the concrete implementation procedure of project, change because the external factor of project may result in current project attribute,
It is accomplished by for the item attribute of current project entering line translation, thus operation flow changes therewith, the Business Stream being continually changing
Journey also just gradually levels off to the real conditions of business.Run through the long-time entry of system, operation flow can be continuously available excellent
Change, the flow process after optimizing is only the flow process being best suitable for business event development.Therefore, how system is being allowed to implement people in system
Under the premise of member is hands off, self adjustment operation flow is possessed by domestic consumer, possesses the ability of flow process self-optimization, be ability
Field technique personnel technical problem urgently to be resolved hurrily.
Content of the invention
In view of this, the application provides a kind of joining method of operation flow and system, to realize old service flow process with newly
The splicing of operation flow, it is ensured that the globality of project operation flow, drives operation flow self-optimization.
To achieve these goals it is proposed that scheme as follows:
A kind of joining method of operation flow, including:
Receive item attribute alteration command;
Execution current business flow process is terminated based on described item attribute alteration command, and determines in described current business flow process
Up-to-date procedure links;
Receive item attribute and choose instruction;
Instruction is chosen based on described item attribute and chooses new projects attributes, and determine treat corresponding with described new projects attributes
Execution operation flow;
Retain the executed procedure links of described current business flow process, using described pending operation flow as described up-to-date
The next execution flow process of procedure links.
Preferably, described selection based on described item attribute instructs selection new projects attribute, and determines and described new projects
Before the corresponding pending operation flow of attribute, also include:
The different operation flow of the item attribute exploitation being different in advance.
A kind of splicing system of operation flow, including:
First signal receiving unit, for receiving item attribute alteration command;
Operation flow terminates unit, for execution current business flow process is terminated based on described item attribute alteration command, and
Determine up-to-date procedure links in described current business flow process;
Secondary signal receiving unit, chooses instruction for receiving item attribute;
Item attribute chooses unit, chooses new projects attributes for choosing instruction based on described item attribute, and determine with
The corresponding pending operation flow of described new projects attribute;
Operation flow concatenation unit, for retaining the executed procedure links of described current business flow process, waits to hold by described
Row operation flow is as the next execution flow process of described up-to-date procedure links.
Preferably:Developing business processes unit, for the operation flow different for different item attribute exploitations.
Through as shown from the above technical solution, this application discloses a kind of joining method of operation flow and system.Receiving
After item attribute alteration command, terminate execution current business flow process, and determine up-to-date procedure links in current business flow process.Enter
And, instruction is chosen based on item attribute and chooses new projects' attribute, and determine the pending operation flow of new projects' attribute.Enter one
Step, retain the executed procedure links of current business flow process and using pending operation flow as up-to-date procedure links the next one
Execution flow process, thus the splicing of finishing service flow process is it is ensured that the globality of project operation flow.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this
Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing providing obtains other accompanying drawings.
Fig. 1 shows a kind of schematic flow sheet of the joining method of operation flow disclosed in one embodiment of the invention;
Fig. 2 shows a kind of structural representation of the splicing system of operation flow disclosed in another embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.Based on this
Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under the premise of not making creative work
Apply example, broadly fall into the scope of protection of the invention.
The flow process showing a kind of joining method of operation flow disclosed in one embodiment of the invention referring to Fig. 1 is illustrated
Figure.
As shown in Figure 1, the method includes:
S101:Receive item attribute alteration command.
When project personnel need to change item attribute according to development of projects, project personnel are based on item attribute and change button
There is item attribute alteration command to system.
S102:Execution current business flow process is terminated based on described item attribute alteration command, and determines described current business
Up-to-date procedure links in flow process.
Terminate the current operation flow of execution immediately after system receives item attribute alteration command, further determine that and work as
The implementation status of phase operation flow, obtains the up-to-date procedure links of current business flow process execution.
S103:Receive item attribute and choose instruction.
Project personnel utilize item attribute to choose instruction and choose instruction to system generation item attribute.
S104:Instruction is chosen based on described item attribute and chooses new projects' attribute, and determine and described new projects attribute pair
The pending operation flow answered.
System can show multiple item attributes by showing interface to project personnel after receiving item attribute alteration command.
And then, project personnel can select corresponding new projects attribute as needed, and determination is corresponding with this new projects' attribute simultaneously waits to hold
Row operation flow.
Optional, in actual applications, project personnel can be that different item attributes develop different pending business in advance
Flow process.
S105:Retain the executed procedure links of described current business flow process, and using described pending operation flow as
The next execution flow process of described up-to-date procedure links.
As shown from the above technical solution, this application discloses a kind of joining method of operation flow and system.In receiving item
After mesh attribute alteration command, terminate execution current business flow process, and determine up-to-date procedure links in current business flow process.And then,
Instruction is chosen based on item attribute and chooses new projects' attribute, and determine the pending operation flow of new projects' attribute.Further, protect
Stay the executed procedure links of current business flow process and pending operation flow is executed as the next one of up-to-date procedure links
Flow process, thus the splicing of finishing service flow process is it is ensured that ensure the globality of project operation flow.
Show a kind of structural representation of the splicing system of operation flow disclosed in another embodiment of the present invention referring to Fig. 2
Figure.
As shown in Figure 2, this system includes:First signal receiving unit 1, operation flow terminate unit 2, secondary signal receives
Unit 3, item attribute choose unit 4 and operation flow concatenation unit 5.
First signal receiving unit 1 is used for receiving item attribute alteration command, and the item attribute receiving change is referred to
Order sends and terminates in unit 2 to operation flow.
Operation flow is terminated unit 2 and is connected with the first signal receiving unit 1, for receiving the first signal receiving unit 1
The item attribute alteration command sending, and execution current business flow process is terminated based on this item attribute alteration command and determines current
Up-to-date procedure links in operation flow.
Secondary signal receiving unit 3 terminates unit 2 with operation flow and is connected, and works as when operation flow termination unit 2 determines
After up-to-date procedure links in front operation flow, secondary signal receiving unit 3 receives the item attribute selection that project personnel send
Instruction, and the item attribute receiving is chosen instruction transmission to item attribute selection unit 4.
Item attribute choose unit 4 receive secondary signal receiving unit 3 send item attribute choose instruction, and based on should
Item attribute is chosen instruction and is chosen new projects' attribute and determine pending operation flow corresponding with new projects attributes.
After item attribute is chosen unit and determined pending operation flow, operation flow concatenation unit 5 retains current industry
The business executed procedure links of flow process, and pending operation flow is executed flow process as the next one of up-to-date procedure links, complete
Become the splicing of new business flow process and old service flow process.
Optionally, in other system embodiment disclosed by the invention, this system also includes developing business processes unit 6 and uses
In the operation flow different for different item attribute exploitations.
It should be noted that this system embodiment is corresponding with embodiment of the method, its implementation procedure is identical with execution principle,
Therefore not to repeat here.
Last in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by
One entity or operation are made a distinction with another entity or operation, and not necessarily require or imply these entities or operation
Between there is any this actual relation or order.And, term " inclusion ", "comprising" or its any other variant meaning
Covering comprising of nonexcludability, so that including a series of process of key elements, method, article or equipment not only include that
A little key elements, but also include other key elements being not expressly set out, or also include for this process, method, article or
The intrinsic key element of equipment.In the absence of more restrictions, the key element being limited by sentence "including a ...", does not arrange
Remove and also there is other identical element in the process including described key element, method, article or equipment.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment stressed is and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention.
Multiple modifications to these embodiments will be apparent from for those skilled in the art, as defined herein
General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention
It is not intended to be limited to the embodiments shown herein, and be to fit to and principles disclosed herein and features of novelty phase one
The scope the widest causing.
Claims (4)
1. a kind of joining method of operation flow is it is characterised in that include:
Receive item attribute alteration command;
Execution current business flow process is terminated based on described item attribute alteration command, and determines up-to-date in described current business flow process
Procedure links;
Receive item attribute and choose instruction;
Instruction is chosen based on described item attribute and chooses new projects attributes, and determine corresponding pending with described new projects attributes
Operation flow;
Retain the executed procedure links of described current business flow process, and using described pending operation flow as described up-to-date stream
The next execution flow process of Cheng Huanjie.
2. method according to claim 1 is it is characterised in that described choose the instruction new item of selection based on described item attribute
Mesh attribute, and before determining pending operation flow corresponding with described new projects attributes, also include:
The different operation flow of the item attribute exploitation being different in advance.
3. a kind of splicing system of operation flow is it is characterised in that include:
First signal receiving unit, for receiving item attribute alteration command;
Operation flow terminates unit, for terminating execution current business flow process based on described item attribute alteration command, and determines
Up-to-date procedure links in described current business flow process;
Secondary signal receiving unit, chooses instruction for receiving item attribute;
Item attribute chooses unit, chooses new projects attributes for choosing instruction based on described item attribute, and determine with described
The corresponding pending operation flow of new projects' attribute;
Operation flow concatenation unit, for retaining the executed procedure links of described current business flow process, by described pending industry
Business flow process is as the next execution flow process of described up-to-date procedure links.
4. system according to claim 3 is it is characterised in that also include:Developing business processes unit, for for different
The different operation flow of item attribute exploitation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610806138.XA CN106408180A (en) | 2016-09-06 | 2016-09-06 | Business process splicing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610806138.XA CN106408180A (en) | 2016-09-06 | 2016-09-06 | Business process splicing method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106408180A true CN106408180A (en) | 2017-02-15 |
Family
ID=57998903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610806138.XA Pending CN106408180A (en) | 2016-09-06 | 2016-09-06 | Business process splicing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106408180A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110210824A (en) * | 2019-05-23 | 2019-09-06 | 贝壳技术有限公司 | Operation flow changing process method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266669A (en) * | 2008-05-06 | 2008-09-17 | 广州市中联创通电脑有限公司 | Project process workflow based on plan template and its implementation method |
CN101286212A (en) * | 2007-04-12 | 2008-10-15 | 国际商业机器公司 | Business flow path execution method, business flow path engines and its deployment method |
CN102831505A (en) * | 2012-08-20 | 2012-12-19 | 南京徐工汽车制造有限公司 | Management system and management method for enterprise information |
CN104281906A (en) * | 2013-07-11 | 2015-01-14 | 江苏达科信息科技有限公司 | Process engine achieving method and system in service process |
CN105205597A (en) * | 2015-09-17 | 2015-12-30 | 浪潮通用软件有限公司 | Project process control method based on business activities |
-
2016
- 2016-09-06 CN CN201610806138.XA patent/CN106408180A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101286212A (en) * | 2007-04-12 | 2008-10-15 | 国际商业机器公司 | Business flow path execution method, business flow path engines and its deployment method |
CN101266669A (en) * | 2008-05-06 | 2008-09-17 | 广州市中联创通电脑有限公司 | Project process workflow based on plan template and its implementation method |
CN102831505A (en) * | 2012-08-20 | 2012-12-19 | 南京徐工汽车制造有限公司 | Management system and management method for enterprise information |
CN104281906A (en) * | 2013-07-11 | 2015-01-14 | 江苏达科信息科技有限公司 | Process engine achieving method and system in service process |
CN105205597A (en) * | 2015-09-17 | 2015-12-30 | 浪潮通用软件有限公司 | Project process control method based on business activities |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110210824A (en) * | 2019-05-23 | 2019-09-06 | 贝壳技术有限公司 | Operation flow changing process method and device |
CN110210824B (en) * | 2019-05-23 | 2021-11-09 | 贝壳技术有限公司 | Business process change processing method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106445506A (en) | Business flow chart generation method, device and system | |
CN102254056A (en) | Method for designing cable path of nuclear power station | |
CN106341486A (en) | Oracle database automatic deployment tool and method | |
WO2009057012A3 (en) | Coordinated change of transmission parameters for data and control information | |
CN105933236A (en) | Method and device for updating SDN (Software Defined Network) flow table | |
CN104361190B (en) | The method and device of empty terminal automation connection in electrical secondary system | |
CN110958134A (en) | Method and device for realizing network topology | |
CN106571945A (en) | Control surface and business surface separating method and system, server and cloud calculating platform | |
CN101493764A (en) | Business events flow path visual dynamic model building and functional operations linkage method | |
CN106408180A (en) | Business process splicing method and system | |
CN106095821A (en) | Universal form configuration management method | |
CN104010236B (en) | Optical circuit path planing method | |
CN111163128B (en) | Web front-end communication management method based on qWebchannel pipeline in QT | |
CN104811479A (en) | Virtual network node establishing method based on forwarding and control separation protocol | |
CN104010004A (en) | Method and system for establishing data transmission network | |
CN106878082A (en) | A kind of Microsoft Loopback Adapter thermomigration process and its device | |
CN103077479A (en) | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system | |
CN103051537B (en) | IP Circuit Service transmission dispatching method and system | |
CN103310124A (en) | Modeling method and device for optimal power flow model | |
CN103596041A (en) | Information prompt method and device | |
CN105634694A (en) | Method and system for data transmission between nodes | |
CN103596060A (en) | Information prompt method and device | |
CN109800944B (en) | Dispatcher load flow calculation method based on cloud calculation | |
CN106533958A (en) | Data consistency check method of heterogeneous system of cross-network isolation device | |
CN107992559B (en) | The data migration method of multi-data source |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |
|
RJ01 | Rejection of invention patent application after publication |