CN105205597A - Project process control method based on business activities - Google Patents

Project process control method based on business activities Download PDF

Info

Publication number
CN105205597A
CN105205597A CN201510592181.6A CN201510592181A CN105205597A CN 105205597 A CN105205597 A CN 105205597A CN 201510592181 A CN201510592181 A CN 201510592181A CN 105205597 A CN105205597 A CN 105205597A
Authority
CN
China
Prior art keywords
task
type
business activity
project
business
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510592181.6A
Other languages
Chinese (zh)
Inventor
舒鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur General Software Co Ltd
Original Assignee
Inspur General Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur General Software Co Ltd filed Critical Inspur General Software Co Ltd
Priority to CN201510592181.6A priority Critical patent/CN105205597A/en
Publication of CN105205597A publication Critical patent/CN105205597A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a project process control method based on business activities, and belongs to the field of project management of enterprise resource planning. The method comprises the steps that different business activities are established to distinguish different project task types, and different business activities represent different ERP business execution documents; then seamless integration of tasks and the ERP execution documents is achieved by assigning the business activity type to each task. Compared with the prior art, by means of the project process control method based on the business activities, task planning, timely execution control and feedback are achieved, and the problems that for a traditional project management system, the planning capacity is strong, and the execution and control capacity is weak, or the project management system is further a small ERP system are avoided.

Description

A kind of Project Process control method based on business activity
Technical field
The present invention relates to the project management field of Enterprise Resources Plan, specifically a kind of Project Process control method based on business activity.
Background technology
In traditional Project Management Software, the management of the project verification of project, plan itemizing, progress being reported to link is quite ripe, but for the project contract management in Project Process, project goods and materials get the raw materials ready management, project scheduling management the link such as robotization, the robotization of the project budget, the management of project stock relatively weak, and these are quite ripe in ERP management software.Usually in project implementation process, task needs to purchase, get the raw materials ready, pricing, the project scheduling performs the category of data project management, and purchase, get the raw materials ready, category that pricing belongs to ERP, that is, in corporate operation process, that project management or ERP need the contents such as management buying, stock, budget, but also there is not project control method or the system of the strong point that can integrate project management and ERP in prior art, the process control of task and the robotization of feedback cannot be realized.
Summary of the invention
Technical assignment of the present invention is for above-mentioned the deficiencies in the prior art, provides a kind of Project Process control method based on business activity.The method establishes the project scheduling by business activity and ERP business performs contacting of link, achieves the beginning of project management, plan, performs, completes the complete control of Life cycle.
Technical assignment of the present invention realizes in the following manner: a kind of Project Process control method based on business activity, be characterized in by business activity, task being associated with business paper, and then by the execution of the option control task of business activity and business paper to the feedback of task, comprise the following steps:
1) prefabricated business activity, all kinds of to describe different business activities;
2) set up 1) in prefabricated business activity and ERP perform the mapping relations of document;
3) set up progress update strategy model, in model, be provided with precision update algorithm;
4) set up 1) in prefabricated business activity and 3) described in the relation of progress update strategy;
5) set up task type, and its business activity, progress update strategy are set;
6) set up item type, and its progress report pattern, acquiescence task type are set;
7) set up item, and specify its item types, for the concrete execution of item controlled;
8) set up item output, and Bill of Material (BOM) and process route that output product is set, then multi-level decomposition launches to form project task accordingly;
9) task is issued after editor, amendment, examination & verification, and the task of issue is according to its task type, and pushing-type generates corresponding ERP business paper;
10) business paper routinely operation flow perform, call progress update algorithm in the link that completes of operation flow, automatically the progress of more new task.
The conveniently generation of follow-up document, can arrange its particular attribute for dissimilar project task in step 8), during for generation follow-up document.Described
As preferably, business activity described in step 1) comprises kind of design, buying type, type of sale, production type, maintenance type, delivery-type, Asset Type, description type, sub-project type.
Business activity can be designed as single table model, comprises sequence number, coding, title, description, and whether system is prefabricated.
Step 2) described in business activity and the ERP mapping relations that perform document comprise the relation that the relation of the relation of the relation of the relation of the relation of kind of design and Bill of Material (BOM), the relation purchasing type and procurement request, the relation purchasing type and purchase order, type of sale and sales order, production type and production order, maintenance type and maintenance order, delivery-type and issue voucher, Asset Type and assets increase.
The mapping relations that business activity and ERP perform document can adopt single table model, and this model comprises mapping relations numbering, business activity coding, document types, remarks, whether system is built-in.
When setting up progress update strategy model in step 3), definition progress more new interface, and realize progress more new interface by business paper progress update strategy, often kind of algorithm realization is placed in independent class, and a kind of business paper may exist multiple progress update strategy.
Progress update strategy can adopt single table model, comprises strategy number, policy name, description, policing algorithm realizes class, whether system is prefabricated.What wherein policing algorithm realized class description is the class and the procedure set that realize place.
The relation of business activity described in step 4) and progress update strategy comprises design class task and progress update strategy maps, purchase generic task and progress update strategy mapping relations thereof, sell generic task and progress update strategy mapping relations, production type task and progress update strategy mapping relations thereof, the mapping relations of the mapping relations of keeping in repair generic task and progress update strategy thereof, shipping generic task and progress update strategy mapping relations, assets generic task and progress update strategy thereof.Each mapping relations comprise sequence number, business activity, progress update strategy, applicable scene, whether system is predicted.
Whether task type described in step 5) can adopt single table model, comprise numbering, title, description, business activity, progress report mode, progress update strategy, allow excess to place an order.
Item types described in step 6) can adopt single table model, comprising: numbering, title, description, project code rule, acquiescence task type, Version Control, progress report pattern, task namely to issue the need of examination & verification, examination & verification.
Project described in step 7), for essential information and the control information of described project, can adopt boss's table model.Project master cast comprises: item types, coding, title, abbreviation, state, responsible department, project manager, project calendar, demand Start Date, demand Close Date, duration, ps, plan Close Date, duration; Project submodel, namely project task comprises: mission number, task names, ps, plan Close Date, duration, state, whether issue, task type, progress report mode, progress, responsibility tissue, person liable.
The particular attribute of dissimilar project task can adopt single table model, comprise association BOM, association technique, production code member, name of product, in batches, measurement unit.
Compared with prior art, the Project Process control method based on business activity of the present invention has following outstanding beneficial effect:
(1) supply chain that planning management project management can be good at and ERP are good at, production, budget, finance become one, achieve task scheduling, perform and control in time and feedback, avoid conventional items management system projected capacity strong and perform the problem that or project management system weak with control ability is a small-sized ERP system;
(2) by business activity, the task in project management associated with the business paper in ERP, achieve the Seamless integration-that task and ERP perform document, method is simple, be easy to realize.
Embodiment
With specific embodiment, the Project Process control method based on business activity of the present invention is described in detail below.
Embodiment:
Project Process control method based on business activity of the present invention comprises the following steps:
1. developer sets up business activity model, and prefab data.
Business activity model:
2. developer sets up business activity and the mapping relations model performing document, and prefab data.
Mapping relations model:
3.
4. developer sets up update strategy model, and prefab data.
Update strategy model:
5.
6. developer sets up the mapping relations of business activity and progress update strategy, and prefab data.
The mapping relations of business activity and progress update strategy:
7.
8. developer sets up task type model, and enforcement personnel to set up according to enterprise practical situation in the runtime and arrange task type.
Task type model:
9.
10. developer's set up item Type model, enforcement personnel to set up according to enterprise practical situation in the runtime and arrange the operation of project Type Control items of different types.
Item type models:
11.
12. developer's set up item models.
Project master cast:
Project submodel:
13.
The peculiar information model of 14. developer's design class task
Specific information model:
Task is issued after editor, amendment, examination & verification; Issuing of task is according to its task type, and pushing-type generates corresponding ERP business paper; Business paper routinely operation flow performs, and calls progress update algorithm in the link that completes of operation flow, automatically the progress of more new task.

Claims (5)

1. based on a Project Process control method for business activity, it is characterized in that by business activity, task being associated with business paper, and then by the execution of the option control task of business activity and business paper to the feedback of task, comprise the following steps:
1) prefabricated business activity;
2) set up 1) in prefabricated business activity and ERP perform the mapping relations of document;
3) set up progress update strategy model, in model, be provided with precision update algorithm;
4) set up 1) in prefabricated business activity and 3) described in the relation of progress update strategy;
5) set up task type, and its business activity, progress update strategy are set;
6) set up item type, and its progress report pattern, acquiescence task type are set;
7) set up item, and specify its item types, for the concrete execution of item controlled;
8) set up item output, and Bill of Material (BOM) and process route that output product is set, then multi-level decomposition launches to form project task accordingly;
9) task is issued after editor, amendment, examination & verification, and the task of issue is according to its task type, and pushing-type generates corresponding ERP business paper;
10) business paper routinely operation flow perform, call progress update algorithm in the link that completes of operation flow, automatically the progress of more new task.
2. the Project Process control method based on business activity according to claim 1, it is characterized in that, project task dissimilar in step 8) arranges its particular attribute, during for generation follow-up document.
3. the Project Process control method based on business activity according to claim 1 and 2, it is characterized in that, business activity described in step 1) comprises kind of design, buying type, type of sale, production type, maintenance type, delivery-type, Asset Type, description type, sub-project type.
4. the Project Process control method based on business activity according to claim 1 and 2, it is characterized in that, step 2) described in business activity and the ERP mapping relations that perform document comprise the relation that the relation of the relation of the relation of the relation of the relation of kind of design and Bill of Material (BOM), the relation purchasing type and procurement request, the relation purchasing type and purchase order, type of sale and sales order, production type and production order, maintenance type and maintenance order, delivery-type and issue voucher, Asset Type and assets increase.
5. the Project Process control method based on business activity according to claim 1 and 2, it is characterized in that, the relation of business activity described in step 4) and progress update strategy comprises design class task and progress update strategy maps, buying generic task and progress update strategy mapping relations thereof, sell generic task and progress update strategy mapping relations thereof, production type task and progress update strategy mapping relations thereof, the mapping relations of maintenance generic task and progress update strategy thereof, shipping generic task and progress update strategy mapping relations thereof, the mapping relations of assets generic task and progress update strategy thereof.
CN201510592181.6A 2015-09-17 2015-09-17 Project process control method based on business activities Pending CN105205597A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510592181.6A CN105205597A (en) 2015-09-17 2015-09-17 Project process control method based on business activities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510592181.6A CN105205597A (en) 2015-09-17 2015-09-17 Project process control method based on business activities

Publications (1)

Publication Number Publication Date
CN105205597A true CN105205597A (en) 2015-12-30

Family

ID=54953265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510592181.6A Pending CN105205597A (en) 2015-09-17 2015-09-17 Project process control method based on business activities

Country Status (1)

Country Link
CN (1) CN105205597A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106408180A (en) * 2016-09-06 2017-02-15 北京恒华伟业科技股份有限公司 Business process splicing method and system
CN111915271A (en) * 2020-07-29 2020-11-10 苏州安特威阀门有限公司 Purchasing method and system based on data middling station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641657A (en) * 2004-01-15 2005-07-20 英业达股份有限公司 Network project plan management method and platform
US20090125504A1 (en) * 2007-11-08 2009-05-14 Randy Adams Systems and methods for visualizing web page query results
CN101650800A (en) * 2009-09-23 2010-02-17 用友软件股份有限公司 Method and device for updating task content in project task plan system
CN102073933A (en) * 2010-12-31 2011-05-25 用友软件股份有限公司 Production management method and production management device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641657A (en) * 2004-01-15 2005-07-20 英业达股份有限公司 Network project plan management method and platform
US20090125504A1 (en) * 2007-11-08 2009-05-14 Randy Adams Systems and methods for visualizing web page query results
CN101650800A (en) * 2009-09-23 2010-02-17 用友软件股份有限公司 Method and device for updating task content in project task plan system
CN102073933A (en) * 2010-12-31 2011-05-25 用友软件股份有限公司 Production management method and production management device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106408180A (en) * 2016-09-06 2017-02-15 北京恒华伟业科技股份有限公司 Business process splicing method and system
CN111915271A (en) * 2020-07-29 2020-11-10 苏州安特威阀门有限公司 Purchasing method and system based on data middling station

Similar Documents

Publication Publication Date Title
Jaggernath et al. Green supply chain management
US20140337083A1 (en) System and method for supply chain optimization
Kumar et al. Achieving customer service excellence using Lean Pull Replenishment
Olson Supply chain information technology
Christopher Logistics and Supply Chain Management: Logistics & Supply Chain Management
Mohsen Developments of digital technologies related to supply chain management
CN104881758A (en) ERP system capable of realizing integrated supply chain cooperative production and operation method thereof
Song et al. Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform
Paul et al. Sustainable supply chain coordination with greening and promotional effort dependent demand
CN105205597A (en) Project process control method based on business activities
Vuković et al. Razvoj ERP-koncepta i ERP-sustava
Kilger Computer assembly
Stoilov et al. Functional analysis of enterprise resource planning systems
Trappey et al. The design and evaluation of a supply chain logistic hub for automobile and parts distribution
US20130046708A1 (en) System and method for using metadata to facilitate the distribution of goods through a supply chain
Rakićević et al. Open source enterprise resource planning: Solution for production planning in SMEs
Rizzi Representation of the supply chain through the business functions
Song Research on systematisation shipbuilding production management platform for flexible and agile controls on very complex production environments
Vuković et al. Development of ERP concept and ERP system
Chen School of Management, Harbin Institute of Technology, Nangang, Harbin, Heilongjiang, China, 150001. chenyin01@ hotmail. com Correspondence should be addressed to Yining Chen: chenyin01@ hotmail. com.
Johansson et al. Managing production ramp-up in manufacturing networks
US20150051936A1 (en) Resource planning system and method for classification products
Li The Past, Present and Future of Enterprise Resource Planning
Alinejad et al. Enterprise Resource Planning System Selection Methodologies in Electronic and Mobile Commerce
Balarabe Course: Purchasing and Supply Chain Management (Course Code: PSC

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151230