JP2008017673A - Circuit breaker operation determination system - Google Patents

Circuit breaker operation determination system Download PDF

Info

Publication number
JP2008017673A
JP2008017673A JP2006188953A JP2006188953A JP2008017673A JP 2008017673 A JP2008017673 A JP 2008017673A JP 2006188953 A JP2006188953 A JP 2006188953A JP 2006188953 A JP2006188953 A JP 2006188953A JP 2008017673 A JP2008017673 A JP 2008017673A
Authority
JP
Japan
Prior art keywords
circuit breaker
determination
power system
state
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006188953A
Other languages
Japanese (ja)
Other versions
JP4762066B2 (en
Inventor
Satoru Nakamura
悟 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006188953A priority Critical patent/JP4762066B2/en
Publication of JP2008017673A publication Critical patent/JP2008017673A/en
Application granted granted Critical
Publication of JP4762066B2 publication Critical patent/JP4762066B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a circuit breaker operation determination system capable of preventing a failure in a power system by grasping, before operation, such an operation of the circuit breaker which likely causes a problem in the power system. <P>SOLUTION: The determination system comprises an open/close state memory means 5 which stores the open/close state of the circuit breaker in the power system, a premise condition memory means 4 which stores a premise condition that is a premise for permitting the operation of each circuit breaker, a simulated operation commanding means 1 for commanding the simulated operation of the circuit breaker for determining permission of the operation, and a determination means 2 which determines the permission of the operation of the circuit breaker by comparing the premise condition for the operation that has been compared with the open/close state of the circuit breaker that is stored in the open/close state memory means 5. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、発電所、電力所、工場等における電力系統の遮断器の操作可否の判定を行う遮断器操作判定システムに関する。   The present invention relates to a circuit breaker operation determination system that determines whether or not a power circuit breaker can be operated in a power plant, power station, factory, or the like.

電力系統内の遮断器の開閉操作時には、操作者がシーケンス図等を読み、これから行う遮断器操作の前提条件の成立可否を判断すると共に、遮断器操作の波及効果を予測して実操作の可否を判断していた。このように電力系統内の遮断器の開閉操作は、操作者の経験やイメージ能力に依存していた。
また、操作者の経験やイメージ能力を補うために、電力系統における事故を模擬して、故障発生時における電力系統操作の訓練を行う電力系統のシミュレーション方法は知られている(例えば、特許文献1参照)。
When opening and closing the circuit breaker in the power system, the operator reads the sequence diagram, etc., determines whether the preconditions for the circuit breaker operation to be performed will be satisfied, and predicts the ripple effect of the circuit breaker operation to determine whether the actual operation is possible Was judging. As described above, the switching operation of the circuit breaker in the power system depends on the experience and image ability of the operator.
In addition, in order to supplement the experience and image ability of the operator, there is known a power system simulation method that simulates an accident in the power system and trains the operation of the power system when a failure occurs (for example, Patent Document 1). reference).

特開平5−199647号公報Japanese Patent Laid-Open No. 5-199647

しかし、発電所、電力所、大規模プラント等の電力系統では、系統内の遮断器の数が多いことから第2,第3の操作による影響は複雑になり、経験の浅い操作者が判断するのは困難である。このため、遮断器操作の前提条件の成立や実操作の可否を操作者が認知できない状態で実操作を行うと、停電や事故等の問題が発生する恐れがあった。
また、特許文献1に記載のシミュレーション方法は、予想可能な電力系統の故障に対する復旧操作の訓練には役立つが、予期できないトラブルに対する対応ができないのみならず、電力系統に問題が生じる恐れのある遮断器操作を事前に把握して電力系統の故障を防止することができないという課題があった。
However, in power systems such as power plants, power stations, large-scale plants, etc., since the number of circuit breakers in the system is large, the effects of the second and third operations become complicated, and an inexperienced operator judges. It is difficult. For this reason, when the actual operation is performed in a state where the operator cannot recognize whether the preconditions for the circuit breaker operation are satisfied or whether the actual operation is possible, there is a possibility that problems such as a power failure and an accident may occur.
In addition, the simulation method described in Patent Document 1 is useful for training a recovery operation for a predictable power system failure. However, the simulation method can not only cope with an unforeseen trouble, but can also cause a problem in the power system. There has been a problem that it is impossible to grasp the operation of the vessel in advance and prevent the failure of the power system.

そこで、本発明は、電力系統に問題が生じる恐れのある遮断器操作を操作前に把握して電力系統の故障を防止することができる遮断器操作判定システムを提供するものである。   Therefore, the present invention provides a circuit breaker operation determination system capable of grasping a circuit breaker operation that may cause a problem in the power system before the operation and preventing a failure of the power system.

本発明は、上記課題を解決するために、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段と、操作可否を判定する遮断器の模擬操作を指示する模擬操作指示手段と、指示された操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定する判定手段とからなる遮断器操作判定システムを提供するものである。   In order to solve the above-mentioned problem, the present invention provides an open / close state storage means for storing the open / close state of a circuit breaker in the power system, and a precondition storage means for storing a precondition as a premise of whether or not each breaker can be operated. The operation of the circuit breaker is compared by comparing the operation condition of the circuit breaker stored in the opening / closing state storage means with a simulated operation instruction means for instructing a simulated operation of the circuit breaker for determining whether or not the operation is possible. A circuit breaker operation determination system including determination means for determining availability is provided.

また、本発明は、前記判定手段が遮断器の操作を可能と判定したときに、前記開閉状態記憶手段が電力系統内の遮断器の開閉状態を操作後の状態に置き換えるようにした請求項1に記載の遮断器操作判定システムを提供するものである。   Further, in the present invention, when the determination unit determines that the circuit breaker can be operated, the switching state storage unit replaces the switching state of the circuit breaker in the power system with the state after the operation. The circuit breaker operation determination system described in 1. is provided.

また、本発明は、前記判定手段が、遮断器の操作を不能と判定したときに前提条件が不成立の箇所を表示するようにした請求項1又は2に記載の遮断器操作判定システムを提供するものである。   Moreover, this invention provides the circuit breaker operation determination system of Claim 1 or 2 which made it display the location where preconditions are not satisfied, when the said determination means determines that operation of a circuit breaker is impossible. Is.

また、本発明は、前記判定手段が、電力系統内の通電状態を表示する表示手段を備えた請求項1乃至3の何れかに記載の遮断器操作判定システムを提供するものである。   Moreover, this invention provides the circuit breaker operation determination system in any one of Claim 1 thru | or 3 with which the said determination means was provided with the display means which displays the energization state in an electric power grid | system.

また、本発明は、前記前提条件記憶手段が電力系統内の通電状態又は遮断器の開閉状態等の固定条件を記憶する手段を備えると共に、前記判定手段が該固定条件の成否を判定する手段を備えた請求項1乃至4の何れかに記載の遮断器操作判定システムを提供するものである。   In the present invention, the precondition storage unit includes a unit that stores a fixed condition such as an energized state in the power system or an open / closed state of the circuit breaker, and the determination unit includes a unit that determines whether the fixed condition is successful. The circuit breaker operation determination system according to any one of claims 1 to 4 is provided.

また、本発明は、電力系統内の遮断器を開閉操作する制御装置を備え、前記模擬操作指示手段が遮断器の実操作信号の入力を受けて模擬操作を指示し、前記判定手段が遮断器の操作を可能と判定したときに前記実操作信号を前記制御装置に出力するようにした請求項1乃至5の何れかに記載の遮断器操作判定システムを提供するものである。   The present invention also includes a control device that opens and closes a circuit breaker in an electric power system, wherein the simulation operation instruction means receives an actual operation signal input from the circuit breaker and instructs a simulation operation, and the determination means includes a circuit breaker. The circuit breaker operation determination system according to any one of claims 1 to 5, wherein when the operation is determined to be possible, the actual operation signal is output to the control device.

本発明に係る遮断器操作判定システムによれば、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段と、操作可否を判定する遮断器の模擬操作を指示する模擬操作指示手段と、指示された操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定する判定手段とからなる構成を有することにより、経験の浅い操作者でも遮断器操作の前提条件の成立や実操作の可否を迅速かつ確実に把握することができ、遮断器の誤操作による電力系統の停電や事故等の問題発生を防止することができる効果がある。   According to the circuit breaker operation determination system according to the present invention, the open / close state storage means for storing the open / close state of the circuit breaker in the electric power system, and the precondition storage means for storing the preconditions on which each circuit breaker can be operated are stored. And a simulated operation instruction means for instructing a simulated operation of the circuit breaker for determining whether or not the operation is possible, and comparing the preconditions of the instructed operation with the open / close state of the breaker stored in the open / close state storage means. By having a configuration comprising judgment means for judging whether or not the operation is possible, even an inexperienced operator can quickly and surely grasp the establishment of the preconditions for the circuit breaker operation and the availability of the actual operation, and erroneous operation of the circuit breaker It is possible to prevent the occurrence of problems such as power outages and accidents in the power system.

また、本発明は、前記判定手段が遮断器の操作を可能と判定したときに、前記開閉状態記憶手段が電力系統内の遮断器の開閉状態を操作後の状態に置き換えるようにした請求項1に記載の構成を有することにより、操作後の遮断器の開閉状態において、更に次の模擬操作を指示して操作可否を判定することができる効果がある。   Further, in the present invention, when the determination unit determines that the circuit breaker can be operated, the switching state storage unit replaces the switching state of the circuit breaker in the power system with the state after the operation. By having the structure described in the above, there is an effect that it is possible to instruct whether or not to operate by instructing the next simulated operation in the opened / closed state of the circuit breaker after the operation.

また、本発明は、前記判定手段が、遮断器の操作を不能と判定したときに前提条件が不成立の箇所を表示するようにした請求項1又は2に記載の構成を有することにより、前提条件が不成立の箇所を容易に把握することができる効果がある。   Further, the present invention provides the precondition by having the configuration according to claim 1 or 2, wherein the determination means displays a location where the precondition is not satisfied when it is determined that the operation of the circuit breaker is impossible. There is an effect that it is possible to easily grasp the location where the failure is not established.

また、本発明は、前記判定手段が、電力系統内の通電状態を表示する表示手段を備えた請求項1乃至3の何れかに記載の構成を有することにより、操作後の電力系統内の通電状態を実操作する前に把握することができる効果がある。   Moreover, this invention has the structure in any one of the Claims 1 thru | or 3 with which the said determination means was provided with the display means which displays the energization state in an electric power grid | system, The energization in the electric power grid | system after an operation There is an effect that the state can be grasped before actual operation.

また、本発明は、前記前提条件記憶手段が電力系統内の通電状態又は遮断器の開閉状態等の固定条件を記憶する手段を備えると共に、前記判定手段が該固定条件の成否を判定する手段を備えた請求項1乃至4の何れかに記載の構成を有することにより、系統内機器の点検や修理のために通電状態又は遮断器の開閉状態等の状態を固定する必要がある場合に、確実に固定状態を維持することができる効果がある。   In the present invention, the precondition storage unit includes a unit that stores a fixed condition such as an energized state in the power system or an open / closed state of the circuit breaker, and the determination unit includes a unit that determines whether the fixed condition is successful. By having the configuration according to any one of claims 1 to 4, when it is necessary to fix the energized state or the open / close state of the circuit breaker for inspection and repair of the equipment in the system, it is ensured. There is an effect that the fixed state can be maintained.

また、本発明は、電力系統内の遮断器を開閉操作する制御装置を備え、前記模擬操作指示手段が遮断器の実操作信号の入力を受けて模擬操作を指示し、前記判定手段が遮断器の操作を可能と判定したときに前記実操作信号を前記制御装置に出力するようにした請求項1乃至5の何れかに記載の構成を有することにより、遮断器の実操作信号を入力したときに操作可否の判定を行い、操作可能な場合にのみ実操作信号を制御装置に出力して遮断器を操作するから、電力系統に問題が生じる遮断器操作を確実に防止することができる効果がある。   The present invention also includes a control device that opens and closes a circuit breaker in an electric power system, wherein the simulation operation instruction means receives an actual operation signal input from the circuit breaker and instructs a simulation operation, and the determination means includes a circuit breaker. When the actual operation signal of the circuit breaker is input by having the configuration according to any one of claims 1 to 5, wherein the actual operation signal is output to the control device when it is determined that the operation is possible. Therefore, it is possible to reliably prevent a circuit breaker operation that causes a problem in the power system because the actual operation signal is output to the control device and the circuit breaker is operated only when the operation is possible. is there.

本発明の実施の形態を図示する実施例に基づいて説明する。
本発明に係る遮断器操作判定システムは、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段5と、各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段4と、操作可否を判定する遮断器の模擬操作を指示する模擬操作指示手段1と、指示された操作の前提条件と前記開閉状態記憶手段5に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定する判定手段2とから構成してある。
Embodiments of the present invention will be described based on examples shown in the drawings.
The circuit breaker operation determination system according to the present invention includes an open / close state storage unit 5 that stores the open / close state of a circuit breaker in the power system, and a precondition storage unit 4 that stores a precondition that is a precondition for the operation of each circuit breaker. And the simulated operation instruction means 1 for instructing the simulated operation of the circuit breaker for determining whether or not the operation can be performed, and comparing the preconditions of the instructed operation with the open / close state of the circuit breaker stored in the open / close state storage means 5 It is comprised from the determination means 2 which determines the operation possibility of a container.

図1に示す実施例において、遮断器操作判定システムは、模擬操作指示手段1と判定手段2と表示手段3と前提条件記憶手段4と開閉状態記憶手段5を備えたパーソナルコンピュータ等からなる。
前提条件記憶手段4は、図5及び図6に示すように、各遮断器の操作内容毎に操作が成立するための前提条件を記憶してある。図中の「+」記号はAND条件を示してあり、矢印の左側の条件を満たしたときに矢印の右側の操作が成立する。
In the embodiment shown in FIG. 1, the circuit breaker operation determination system includes a simulated operation instruction means 1, a determination means 2, a display means 3, a precondition storage means 4, and an open / close state storage means 5.
As shown in FIGS. 5 and 6, the precondition storage unit 4 stores a precondition for the operation to be established for each operation content of each circuit breaker. The “+” symbol in the figure indicates an AND condition, and the operation on the right side of the arrow is established when the condition on the left side of the arrow is satisfied.

開閉状態記憶手段5は、図4に示すように電力系統内の遮断器データを格納してあり、各遮断器の開閉状態(自動投入、自動開放、手動投入、手動開放、トリップ)を記憶することができるように構成してある。また、開閉状態記憶手段5は、判定手段2が遮断器の操作を可能と判定したときに、電力系統内の遮断器の開閉状態を操作後の状態に置き換えて、第2,第3の模擬操作の判定を行うことができるようにしてある。   As shown in FIG. 4, the open / close state storage means 5 stores circuit breaker data in the electric power system, and stores the open / close state (automatic on, automatic open, manual on, manual open, trip) of each circuit breaker. It is configured to be able to. In addition, when the determination unit 2 determines that the circuit breaker can be operated, the switching state storage unit 5 replaces the switching state of the circuit breaker in the power system with the state after the operation, so that the second and third simulations are performed. The operation can be determined.

模擬操作指示手段1は、図4に示すように、遮断器毎に操作可能な操作内容を表示する手段を備えており、これから操作を行おうとしている遮断器の操作内容を選択して模擬操作を指示することができるように構成してある。   As shown in FIG. 4, the simulated operation instruction means 1 includes means for displaying operation details that can be operated for each circuit breaker, and selects the operation content of the circuit breaker to be operated from now on. It is comprised so that it can instruct | indicate.

判定手段2は、模擬操作指示手段1で指示された操作の前提条件と、開閉状態記憶手段5に記憶された遮断器の開閉状態を比較して、これから操作を行おうとしている遮断器の操作可否を判定することができるように構成してある。判定手段2は、図5及び図6に示すように、模擬操作指示手段1で指示された操作の前提条件を表示する手段を備えており、遮断器の操作を不能と判定したときに前提条件が不成立の箇所を表示することができるようにしてある。また、判定手段2は、電力系統内の通電状態を表示する表示手段3を備えており、判定結果と共に問題の箇所を表示することができるようにしてある。
また、判定手段2は、遮断器の操作を可能と判定したときにはその旨を表示し、開閉状態記憶手段5に記憶された遮断器の開閉状態を操作後の状態に置き換えることができるようにしてある。
The judging means 2 compares the preconditions for the operation instructed by the simulated operation instructing means 1 with the open / close state of the circuit breaker stored in the open / close state storage means 5, and operates the circuit breaker to be operated from now on. It is configured so that it can be determined. As shown in FIGS. 5 and 6, the determination means 2 includes means for displaying a precondition for the operation instructed by the simulated operation instruction means 1, and the precondition when the operation of the circuit breaker is determined to be impossible. It is made possible to display a place where is not established. Moreover, the determination means 2 is provided with a display means 3 for displaying the energization state in the power system, and can display the problem location together with the determination result.
Further, when the determination means 2 determines that the circuit breaker can be operated, the determination means 2 displays that effect so that the open / close state of the circuit breaker stored in the open / close state storage means 5 can be replaced with the state after the operation. is there.

図2に示す実施例において、遮断器操作判定システムは、電力系統内の遮断器を開閉操作する制御装置8を備え、模擬操作指示手段1が遮断器の実操作信号の入力を受けて模擬操作を指示し、判定手段2が遮断器の操作を可能と判定したときに実操作信号を制御装置8に出力することができるように構成してある。遮断器操作判定システムは、プラントを管理するプラント計算機に組み込んで設けることができ、開閉状態記憶手段5は制御装置8の実操作信号により各遮断器の開閉状態を更新することができるようにしてある。   In the embodiment shown in FIG. 2, the circuit breaker operation determination system includes a control device 8 that opens and closes the circuit breaker in the power system, and the simulated operation instruction means 1 receives the actual operation signal of the circuit breaker and performs a simulated operation. When the determination means 2 determines that the circuit breaker can be operated, an actual operation signal can be output to the control device 8. The breaker operation determination system can be provided by being incorporated in a plant computer that manages the plant, and the open / close state storage means 5 can update the open / close state of each breaker according to the actual operation signal of the control device 8. is there.

図2に示すように、前提条件記憶手段4は、電力系統内の通電状態又は遮断器の開閉状態等の固定条件を記憶する固定条件記憶手段6を設けてある。固定条件記憶手段6は、固定条件入力手段7を備えており、遮断器や電気機器の点検・修理のために通電状態又は遮断器の開閉状態等を固定する必要がある箇所を入力することができるようにしてある。   As shown in FIG. 2, the precondition storage unit 4 is provided with a fixed condition storage unit 6 that stores a fixed condition such as an energized state in the power system or an open / close state of the circuit breaker. The fixed condition storage means 6 is provided with a fixed condition input means 7 for inputting a place where it is necessary to fix the energized state or the open / closed state of the circuit breaker for inspection / repair of the circuit breaker or the electric device. I can do it.

また、判定手段2は、固定条件の成否を判定する手段を備え、前提条件が成立したと判定したときに、操作後の状態に置き換えた遮断器の開閉状態と固定条件記憶手段6に記憶された固定条件を比較して固定条件の成否を判定することができるように構成してある。判定手段2は、固定条件が成立したと判定したときに実操作信号を制御装置8に出力し、固定条件が不成立と判定したときに表示手段3が判定結果と共に問題の箇所を表示するようにしてある。
図2に示す実施例において、上記以外の構成は実施例1の構成と同様である。
The determination means 2 includes means for determining whether or not a fixed condition is met. When it is determined that the precondition is satisfied, the circuit breaker switching state replaced with the post-operation state and the fixed condition storage means 6 are stored. The fixed conditions can be compared to determine whether the fixed conditions are successful. The determination means 2 outputs an actual operation signal to the control device 8 when it is determined that the fixed condition is satisfied, and the display means 3 displays the problem location together with the determination result when it is determined that the fixed condition is not satisfied. It is.
In the embodiment shown in FIG. 2, the configuration other than the above is the same as the configuration of the first embodiment.

次に、図2に示す遮断器操作判定システムの作用を図3に基づいて説明する。
模擬操作指示手段1が模擬操作の入力、又は遮断器の実操作信号の入力を受けると、判定手段2に模擬操作を指示する。判定手段2は、開閉状態記憶手段5及び前提条件記憶手段4から遮断器の開閉状態及び前提条件を読み込み、前提条件と開閉状態を比較して遮断器の操作可否を判定する。判定手段2は、前提条件が不成立と判断したときに、表示手段3に前提条件が不成立の箇所を表示する。
Next, the operation of the circuit breaker operation determination system shown in FIG. 2 will be described with reference to FIG.
When the simulated operation instruction unit 1 receives an input of a simulated operation or an actual operation signal of a circuit breaker, the determination unit 2 is instructed to perform the simulated operation. The determination means 2 reads the circuit breaker open / close state and precondition from the open / close state storage means 5 and the precondition storage means 4 and compares the precondition and the open / close state to determine whether the circuit breaker can be operated. When the determination unit 2 determines that the precondition is not satisfied, the determination unit 2 displays a location where the precondition is not satisfied on the display unit 3.

一方、判定手段2は、前提条件が成立したと判断したときには、開閉状態記憶手段5に記憶された遮断器の開閉状態を模擬操作後の状態に置き換えると共に、固定条件記憶手段6から固定条件を読み込み、置き換えた後の開閉状態と固定条件を比較して固定条件の成否を判定する。判定手段2は、固定条件が不成立と判断したときには、表示手段3に固定条件が不成立の箇所を表示し、固定条件が成立したと判断したときには遮断器操作可能の判定結果を表示する。このとき、模擬操作指示手段1が遮断器の実操作信号の入力を受けている場合には、判定手段2は実操作信号を制御装置8に出力して遮断器操作を実行する。   On the other hand, when the determination unit 2 determines that the precondition is satisfied, the determination unit 2 replaces the open / close state of the circuit breaker stored in the open / close state storage unit 5 with the state after the simulation operation, and sets the fixed condition from the fixed condition storage unit 6. The open / closed state after reading and replacement is compared with the fixed condition to determine whether the fixed condition is successful. When the determination unit 2 determines that the fixed condition is not established, the determination unit 2 displays a location where the fixed condition is not established on the display unit 3, and when it is determined that the fixed condition is established, displays a determination result indicating that the breaker operation is possible. At this time, when the simulated operation instruction unit 1 receives an actual operation signal of the circuit breaker, the determination unit 2 outputs the actual operation signal to the control device 8 to execute the circuit breaker operation.

図2に示す遮断器操作判定システムにより、遮断器操作の前提条件の成否を迅速かつ確実に把握することができると共に、遮断器操作を実行した場合に他の遮断機の自動投入又は自動開放が実行して固定条件に変動を与えないかの確認をすることができる。   With the circuit breaker operation determination system shown in FIG. 2, it is possible to quickly and reliably grasp the success or failure of the preconditions for circuit breaker operation, and when a circuit breaker operation is performed, other circuit breakers can be automatically turned on or opened automatically. It is possible to confirm whether the fixed condition is not changed by executing.

本発明に係る遮断器操作判定システムの一実施例を示す構成図。The block diagram which shows one Example of the circuit breaker operation determination system which concerns on this invention. 本発明に係る遮断器操作判定システムの他の実施例を示す構成図。The block diagram which shows the other Example of the circuit breaker operation determination system which concerns on this invention. その一実施例の動作を示すフローチャート。The flowchart which shows the operation | movement of the one Example. 模擬操作指示手段の一実施例を示す図。The figure which shows one Example of the simulation operation instruction | indication means. 前提条件の一例を示す図。The figure which shows an example of a precondition. 前提条件の一例を示す図。The figure which shows an example of a precondition.

符号の説明Explanation of symbols

1 模擬操作指示手段
2 判定手段
3 表示手段
4 前提条件記憶手段
5 開閉状態記憶手段
6 固定条件記憶手段
7 固定条件入力手段
8 制御装置
DESCRIPTION OF SYMBOLS 1 Simulated operation instruction means 2 Judgment means 3 Display means 4 Precondition storage means 5 Opening / closing state storage means 6 Fixed condition storage means 7 Fixed condition input means 8 Controller

Claims (6)

電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段と、操作可否を判定する遮断器の模擬操作を指示する模擬操作指示手段と、指示された操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定する判定手段とからなる遮断器操作判定システム。   Open / close state storage means for storing the open / close state of the circuit breakers in the power system, precondition storage means for storing preconditions for preconditions for the operation of each circuit breaker, and simulated operation of the circuit breaker for determining whether or not to operate Circuit breaker operation comprising simulated operation instruction means for instructing, and determination means for comparing the circuit breaker opening / closing state stored in the opening / closing state storage means to determine whether the circuit breaker can be operated or not Judgment system. 前記判定手段が遮断器の操作を可能と判定したときに、前記開閉状態記憶手段が電力系統内の遮断器の開閉状態を操作後の状態に置き換えるようにした請求項1に記載の遮断器操作判定システム。   2. The circuit breaker operation according to claim 1, wherein when the determination unit determines that the circuit breaker can be operated, the switching state storage unit replaces the switching state of the circuit breaker in the power system with a state after the operation. Judgment system. 前記判定手段が、遮断器の操作を不能と判定したときに前提条件が不成立の箇所を表示するようにした請求項1又は2に記載の遮断器操作判定システム。   The circuit breaker operation determination system according to claim 1 or 2, wherein when the determination unit determines that the operation of the circuit breaker is impossible, the location where the precondition is not satisfied is displayed. 前記判定手段が、電力系統内の通電状態を表示する表示手段を備えた請求項1乃至3の何れかに記載の遮断器操作判定システム。   The circuit breaker operation determination system according to any one of claims 1 to 3, wherein the determination unit includes a display unit that displays an energization state in the power system. 前記前提条件記憶手段が電力系統内の通電状態又は遮断器の開閉状態等の固定条件を記憶する手段を備えると共に、前記判定手段が該固定条件の成否を判定する手段を備えた請求項1乃至4の何れかに記載の遮断器操作判定システム。   The precondition storage unit includes a unit that stores a fixed condition such as an energized state in a power system or a switching state of a circuit breaker, and the determination unit includes a unit that determines whether the fixed condition is successful. The circuit breaker operation determination system according to any one of 4. 電力系統内の遮断器を開閉操作する制御装置を備え、前記模擬操作指示手段が遮断器の実操作信号の入力を受けて模擬操作を指示し、前記判定手段が遮断器の操作を可能と判定したときに前記実操作信号を前記制御装置に出力するようにした請求項1乃至5の何れかに記載の遮断器操作判定システム。
A control device that opens and closes a circuit breaker in an electric power system, wherein the simulation operation instruction means receives an actual operation signal of the circuit breaker and instructs a simulation operation, and the determination means determines that the circuit breaker can be operated The circuit breaker operation determination system according to any one of claims 1 to 5, wherein the actual operation signal is output to the control device when the operation is performed.
JP2006188953A 2006-07-10 2006-07-10 Circuit breaker operation judgment system Expired - Fee Related JP4762066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006188953A JP4762066B2 (en) 2006-07-10 2006-07-10 Circuit breaker operation judgment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006188953A JP4762066B2 (en) 2006-07-10 2006-07-10 Circuit breaker operation judgment system

Publications (2)

Publication Number Publication Date
JP2008017673A true JP2008017673A (en) 2008-01-24
JP4762066B2 JP4762066B2 (en) 2011-08-31

Family

ID=39074156

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006188953A Expired - Fee Related JP4762066B2 (en) 2006-07-10 2006-07-10 Circuit breaker operation judgment system

Country Status (1)

Country Link
JP (1) JP4762066B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010057346A (en) * 2008-08-29 2010-03-11 Hitachi Information & Control Solutions Ltd Simulator, simulation control method, and simulation control program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63234840A (en) * 1987-03-20 1988-09-30 東京電力株式会社 Method of implementing simulation immediately before switching operation of power system
JPH05316651A (en) * 1992-05-07 1993-11-26 Mitsubishi Electric Corp Simulating system for electric power system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63234840A (en) * 1987-03-20 1988-09-30 東京電力株式会社 Method of implementing simulation immediately before switching operation of power system
JPH05316651A (en) * 1992-05-07 1993-11-26 Mitsubishi Electric Corp Simulating system for electric power system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010057346A (en) * 2008-08-29 2010-03-11 Hitachi Information & Control Solutions Ltd Simulator, simulation control method, and simulation control program

Also Published As

Publication number Publication date
JP4762066B2 (en) 2011-08-31

Similar Documents

Publication Publication Date Title
JP4762066B2 (en) Circuit breaker operation judgment system
KR101837653B1 (en) Power plant simulator
CN108462251B (en) Method for monitoring a source switching switch and source switching switch for carrying out said method
JP2007236093A (en) Transmission tester and method for updating control system
JP2009232489A (en) Device for testing ac voltage circuit of distribution board, and method thereof
KR100863672B1 (en) Training simulator of distribution automation system and drivig method there of
JP2008043163A (en) Support system of power failure operation by working
JP4738257B2 (en) Power system protection system
JP2018057130A (en) Accident training assist device
JP2008231787A (en) Control system of movable apparatus when earthquake occurs
JP2012230553A (en) Monitoring controller and monitoring control method
CN104809931A (en) Power grid training case system combined hybrid simulation handling displaying method
JP2014206678A (en) Automatic switch operation exercising system and automatic switch operation exercising method
JP6636902B2 (en) Nuclear power plant system and training method using the same
JP5563043B2 (en) Remote monitoring control apparatus and method
JP2736133B2 (en) Power system training simulator
JP2009106006A (en) Protection interlocking inspection system
JP5851084B2 (en) Digital relay
JP7469869B2 (en) Plant operation and maintenance training system and operation and maintenance training method
KR20230052063A (en) Operator Training Method and Simulator Performing the Same for HVDC
JP5285362B2 (en) Simulation device, simulation control method, and simulation control program
JP2010139753A (en) Plant simulator and plant simulator operating method
JP2007162267A (en) Control system for electric opening/closing equipment
JP3133092B2 (en) Power system training simulator
JP2009153232A (en) Apparatus and method for monitoring electric power system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090602

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110301

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110316

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110511

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110531

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110607

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140617

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4762066

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140617

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees