JP2008043163A - Support system of power failure operation by working - Google Patents

Support system of power failure operation by working Download PDF

Info

Publication number
JP2008043163A
JP2008043163A JP2006218032A JP2006218032A JP2008043163A JP 2008043163 A JP2008043163 A JP 2008043163A JP 2006218032 A JP2006218032 A JP 2006218032A JP 2006218032 A JP2006218032 A JP 2006218032A JP 2008043163 A JP2008043163 A JP 2008043163A
Authority
JP
Japan
Prior art keywords
power failure
circuit breaker
open
close state
operation procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006218032A
Other languages
Japanese (ja)
Inventor
Makoto Ozasa
誠 小笹
Hiroshi Umeki
博 梅木
Yasushi Fukai
泰 深井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006218032A priority Critical patent/JP2008043163A/en
Publication of JP2008043163A publication Critical patent/JP2008043163A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To solve the problems that experience and ability of a person to prepare are required in preparing a power failure sheet, and that time is needed because a sequence diagram is required to be decoded and prepared. <P>SOLUTION: A support system of a power failure operation by working comprises a switching state storage means 10, a system diagram display means 1, a power failure system selecting means 2, an operating procedure display means 4, and a simulating operation means 5. The switching state storage means memorizes a switching state of a circuit breaker in an electric power system. The system diagram display means displays the switching state of the circuit breaker, and an energized state of each system on a system diagram. The power failure system selecting means selects the system of which power is interrupted, from the system diagram displayed. The operating procedure display means displays an operating procedure to switch the selected system to a power failure system. The simulating operation means operates the circuit breaker in a simulating manner based on the displayed operating procedure. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、電力系統において作業停電操作前に停電切替操作をシミュレーションする作業停電操作支援システムに関する。   The present invention relates to a work power failure operation support system that simulates a power failure switching operation before a work power failure operation in a power system.

発電所において定期検査を実施するときには、検査対象の系統を停電系統に切り替える作業停電操作を行う必要がある。この作業停電操作を安全且つ確実に行うために、予め操作手順である停電操作票を作成している。従来、停電操作票は、過去の定期検査時における停電操作票を参考にして、定期検査毎の検査対象を踏まえた停電範囲を系統図で確認しながら作成していた。   When a periodic inspection is performed at a power plant, it is necessary to perform a work power outage operation to switch the inspection target system to a power outage system. In order to perform this work power outage operation safely and reliably, a power outage operation slip which is an operation procedure is created in advance. Conventionally, a power outage operation slip has been created while referring to a power outage operation slip at the time of a past periodic inspection while confirming a power outage range based on the inspection target for each periodic inspection with a system diagram.

また、コンピュータ上で作業停電範囲を特定し、開閉器の操作手順を作成するようにした作業停電操作手順作成装置は知られている(例えば、特許文献1〜3参照)。   Further, a work blackout operation procedure creation device that identifies a work blackout range on a computer and creates a switch operation procedure is known (see, for example, Patent Documents 1 to 3).

特開2004−135394号公報JP 2004-135394 A 特開平9−140058号公報Japanese Patent Laid-Open No. 9-140058 特開平7−194032号公報JP-A-7-194032

しかし、停電操作票の作成には、作成者の経験や能力が必要であると共に、シーケンス図を解読して作成する必要があるために、時間を要するという課題があった。
また、特許文献1〜3に記載の作業停電操作手順作成装置は、適切な作業停電範囲を特定するのには役立つが、停電操作票の作成及び作業停電操作に要する工数を削減して、迅速且つ確実に作業停電操作を行うことができないという課題が残っていた。
However, the creation of a power outage operation vote requires the experience and ability of the creator, and it is necessary to decode and create the sequence diagram.
Moreover, although the work blackout operation procedure preparation apparatus of patent documents 1-3 is useful for specifying an appropriate work blackout range, it reduces the man-hour required for preparation of a blackout operation slip and work blackout operation, and it is quick. And the subject that operation blackout operation could not be performed reliably remained.

本発明は、上記課題を解決するために、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、前記遮断器の開閉状態及び各系統の通電状態を系統図上に表示する系統図表示手段と、表示された前記系統図から停電させる系統を選択する停電系統選択手段と、選択した系統を停電系統に切り替える操作手順を表示する操作手順表示手段と、表示した操作手順に基づいて遮断器を模擬操作する模擬操作手段とからなる作業停電操作支援システムを提供するものである。   In order to solve the above problems, the present invention provides an open / close state storage means for storing an open / close state of a circuit breaker in a power system, and a system for displaying the open / close state of the circuit breaker and the energization state of each system on a system diagram. Based on the figure display means, the power failure system selection means for selecting the power failure system from the displayed system diagram, the operation procedure display means for displaying the operation procedure for switching the selected system to the power failure system, and the displayed operation procedure It is an object of the present invention to provide a work blackout operation support system including a simulation operation means for simulating a circuit breaker.

本発明は、前記模擬操作手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定するようにした請求項1に記載の作業停電操作支援システムを提供するものである。   The present invention includes precondition storage means for storing preconditions on which the simulation operating means is premised on whether or not each breaker can be operated, and the circuit breaker operation preconditions and the circuit breaker stored in the open / close state storage means are stored. The work power failure operation support system according to claim 1, wherein the open / close state is compared to determine whether or not the circuit breaker can be operated.

本発明は、前記操作手順表示手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態に基づいて選択した系統を停電系統に切り替える操作手順を自動作成するようにした請求項1に記載の作業停電操作支援システムを提供するものである。   The present invention comprises a precondition storage means for storing a precondition for the operation procedure display means to be premised on whether or not each circuit breaker can be operated. The work power failure operation support system according to claim 1, wherein an operation procedure for automatically switching a selected system to a power failure system based on the open / close state is provided.

本発明は、前記模擬操作手段が、選択した系統を停電系統に切り替える操作手順を修正する操作手順修正手段を備えた請求項1乃至3の何れかに記載の作業停電操作支援システムを提供するものである。   The present invention provides the work power failure operation support system according to any one of claims 1 to 3, wherein the simulation operation means includes an operation procedure correcting means for correcting an operation procedure for switching the selected system to the power failure system. It is.

本発明は、前記系統図表示手段が、模擬操作の各操作項目において操作した遮断器と各系統の通電状態を表示するようにした請求項1乃至4の何れかに記載の作業停電操作支援システムを提供するものである。   5. The work power failure operation support system according to claim 1, wherein the system diagram display means displays the circuit breaker operated in each operation item of the simulated operation and the energization state of each system. Is to provide.

本発明は、前記系統図表示手段が、模擬操作の各操作項目において操作前の通電状態と操作後の通電状態を比較して表示するようにした請求項1乃至5の何れかに記載の作業停電操作支援システムを提供するものである。   The work according to any one of claims 1 to 5, wherein the system diagram display means compares and displays the energized state before the operation and the energized state after the operation in each operation item of the simulated operation. A power failure operation support system is provided.

本発明は、前記模擬操作手段において操作手順を確認後に選択した系統を停電系統に自動的に切り替える自動操作手段を備えた請求項1乃至6の何れかに記載の作業停電操作支援システムを提供するものである。   The present invention provides the work power failure operation support system according to any one of claims 1 to 6, further comprising automatic operation means for automatically switching a system selected after confirming an operation procedure in the simulation operation means to a power failure system. Is.

本発明は、前記自動操作手段が前記遮断器のインターロック操作を自動で行うようにした請求項7に記載の作業停電操作支援システムを提供するものである。   The present invention provides the work power failure operation support system according to claim 7, wherein the automatic operation means automatically performs the interlock operation of the circuit breaker.

本発明に係る作業停電操作支援システムによれば、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、前記遮断器の開閉状態及び各系統の通電状態を系統図上に表示する系統図表示手段と、表示された前記系統図から停電させる系統を選択する停電系統選択手段と、選択した系統を停電系統に切り替える操作手順を表示する操作手順表示手段と、表示した操作手順に基づいて遮断器を模擬操作する模擬操作手段とからなる構成を有することにより、電力系統内の遮断器の開閉状態及び各系統の通電状態を系統図上で確認しながら適切な停電系統を選択することができ、表示された操作手順と遮断器の模擬操作によって選択した系統が安全に切り替わることを確認することができる。また、表示された操作手順に基づいて確実に作業停電操作を行うことができる効果がある。   According to the work blackout operation support system according to the present invention, the open / close state storage means for storing the open / close state of the circuit breaker in the power system, and the open / close state of the circuit breaker and the energization state of each system are displayed on the system diagram. Based on the system diagram display means, the power outage system selection means for selecting the power outage system from the displayed system diagram, the operation procedure display means for displaying the operation procedure for switching the selected system to the power outage system, and the displayed operation procedure By selecting the appropriate power failure system while confirming the open / close state of the circuit breaker in the power system and the energization state of each system on the system diagram. It is possible to confirm that the selected system is safely switched by the displayed operation procedure and the circuit breaker simulation operation. In addition, there is an effect that the work blackout operation can be reliably performed based on the displayed operation procedure.

本発明は、前記模擬操作手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定するようにした請求項1に記載の構成を有することにより、経験の浅い操作者でも遮断器操作の前提条件の成立や実操作の可否を迅速かつ確実に把握することができ、遮断器の誤操作による他の系統の停電や事故等の問題発生を防止することができる効果がある。   The present invention includes precondition storage means for storing preconditions on which the circuit breaker operates as a premise for the operation of each circuit breaker, and the circuit breaker operation preconditions stored in the open / close state storage means With the configuration according to claim 1, which determines whether or not the circuit breaker can be operated by comparing the open / closed state, even an inexperienced operator can quickly establish the preconditions for operating the circuit breaker and determine whether or not the actual operation can be performed. In addition, it can be surely grasped, and there is an effect that it is possible to prevent the occurrence of problems such as power outages and accidents in other systems due to erroneous operation of the circuit breaker.

本発明は、前記操作手順表示手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態に基づいて選択した系統を停電系統に切り替える操作手順を自動作成するようにした請求項1に記載の構成を有することにより、遮断器操作の前提条件を満たした操作手順を自動作成することができ、迅速且つ確実に作業停電操作を行うことができる効果がある。   The present invention includes a precondition storage means in which the operation procedure display means stores preconditions on which each circuit breaker can be operated, and the circuit breakers stored in the preconditions for circuit breaker operation and the open / close state storage means An operation procedure that satisfies the preconditions for circuit breaker operation is automatically created by having the configuration according to claim 1 that automatically creates an operation procedure for switching the system selected based on the open / closed state to the power failure system. Therefore, there is an effect that the work blackout operation can be performed quickly and reliably.

本発明は、前記模擬操作手段が、選択した系統を停電系統に切り替える操作手順を修正する操作手順修正手段を備えた請求項1乃至3の何れかに記載の構成を有することにより、表示された操作手順を変更することができると共に、変更した操作手順に基づいて電力系統内の遮断器の開閉状態及び各系統の通電状態を系統図上で確認することができる効果がある。   The present invention is displayed by having the configuration according to any one of claims 1 to 3, wherein the simulation operation means includes operation procedure correction means for correcting an operation procedure for switching the selected system to a power failure system. In addition to being able to change the operating procedure, there is an effect that the open / close state of the circuit breaker in the power system and the energized state of each system can be confirmed on the system diagram based on the changed operating procedure.

本発明は、前記系統図表示手段が、模擬操作の各操作項目において操作した遮断器と各系統の通電状態を表示するようにした請求項1乃至4の何れかに記載の構成を有することにより、各操作段階において操作した遮断器と各系統の通電状態を把握することができ、系統を安全に切り替えることができる効果がある。   According to the present invention, the system diagram display means has a configuration according to any one of claims 1 to 4, wherein the circuit breaker operated in each operation item of the simulated operation and the energization state of each system are displayed. The circuit breaker operated in each operation stage and the energization state of each system can be grasped, and the system can be switched safely.

本発明は、前記系統図表示手段が、模擬操作の各操作項目において操作前の通電状態と操作後の通電状態を比較して表示するようにした請求項1乃至5の何れかに記載の構成を有することにより、各操作の前後における系統の通電状態の変化を一目で把握することができ、操作可否の判断を容易にすることができる効果がある。   The configuration according to any one of claims 1 to 5, wherein the system diagram display means compares and displays the energized state before the operation and the energized state after the operation in each operation item of the simulated operation. Thus, there is an effect that it is possible to grasp at a glance the change in the energization state of the system before and after each operation, and to easily determine whether or not the operation is possible.

本発明は、前記模擬操作手段において操作手順を確認後に選択した系統を停電系統に自動的に切り替える自動操作手段を備えた請求項1乃至6の何れかに記載の構成を有することにより、作業停電操作に要する工数を大幅に低減することができると共に、誤操作によるトラブルを防止することができる効果がある。   The present invention comprises an automatic operation means for automatically switching a system selected after confirming an operation procedure in the simulation operation means to a power failure system, thereby providing a work power failure. The man-hours required for the operation can be greatly reduced, and troubles due to erroneous operations can be prevented.

本発明は、前記自動操作手段が前記遮断器のインターロック操作を自動で行うようにした請求項7に記載の構成を有することにより、遮断器のインターロック操作も自動で行うことができ、選択した系統を確実に停電系統に切り替えて維持することができる効果がある。   According to the present invention, since the automatic operation means automatically performs the interlock operation of the circuit breaker, the interlock operation of the circuit breaker can also be automatically performed by selecting the circuit breaker. There is an effect that it is possible to reliably switch the maintained system to the power failure system and maintain it.

本発明の実施の形態を図示する実施例に基づいて説明する。
本発明に係る作業停電操作支援システムは、電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段10と、前記遮断器の開閉状態及び各系統の通電状態を系統図上に表示する系統図表示手段1と、表示された前記系統図から停電させる系統を選択する停電系統選択手段2と、選択した系統を停電系統に切り替える操作手順を表示する操作手順表示手段4と、表示した操作手順に基づいて遮断器を模擬操作する模擬操作手段5とから構成してある。
Embodiments of the present invention will be described based on examples shown in the drawings.
The work power failure operation support system according to the present invention includes an open / close state storage means 10 that stores the open / close state of a circuit breaker in a power system, and a system that displays the open / close state of the circuit breaker and the energization state of each system on a system diagram. The figure display means 1, the power failure system selection means 2 for selecting the power failure system from the displayed system diagram, the operation procedure display means 4 for displaying the operation procedure for switching the selected system to the power failure system, and the displayed operation procedure And a simulation operating means 5 for simulating the circuit breaker based on the above.

図1に示す実施例において、作業停電操作支援システムは、開閉状態記憶手段10と系統図表示手段1と停電系統選択手段2と操作手順表示手段4と模擬操作手段5を備えたパーソナルコンピュータ等からなる。   In the embodiment shown in FIG. 1, the work power failure operation support system includes an open / close state storage means 10, a system diagram display means 1, a power failure system selection means 2, an operation procedure display means 4, and a simulation operation means 5. Become.

開閉状態記憶手段10は、電力系統内の遮断器データを格納してあり、各遮断器の開閉状態を記憶することができるように構成してある。また、開閉状態記憶手段10は、図示しない遮断器開閉制御装置から各遮断器の開閉状態を受け取って、最新の開閉状態に更新することができるようにしてある。図示の実施例において、作業停電操作支援システムは、各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段11を備えている。   The open / close state storage means 10 stores circuit breaker data in the power system, and is configured to store the open / close state of each circuit breaker. The open / close state storage means 10 receives the open / close state of each circuit breaker from a circuit breaker open / close control device (not shown) and can update it to the latest open / close state. In the illustrated embodiment, the work power failure operation support system includes a precondition storage unit 11 that stores a precondition that is a precondition for the operation of each circuit breaker.

系統図表示手段1は、開閉状態記憶手段10に記憶された電力系統内の遮断器の開閉状態に基づいて、図7に示すように遮断器の開閉状態及び各系統の通電状態を系統図上に表示することができるように構成してある。系統図表示手段1は、電力系統全体を表示することができると共に、任意のエリアを表示することが可能である。図7乃至図15において、白抜四角形は開状態の遮断器を表し、黒色四角形は閉状態の遮断器を表している。また、黒色実線は通電系統を表し、灰色実線は停電系統を表している。   Based on the open / close state of the circuit breaker in the electric power system stored in the open / close state storage means 10, the system diagram display means 1 shows the open / close state of the circuit breaker and the energization state of each system on the system diagram as shown in FIG. It can be displayed on the screen. The system diagram display means 1 can display the entire power system and can display an arbitrary area. 7 to 15, white squares represent circuit breakers in an open state, and black squares represent circuit breakers in a closed state. Further, the black solid line represents the energization system, and the gray solid line represents the power failure system.

停電系統選択手段2は、図3に示すように、系統図表示手段1に表示された系統図上で停電させる系統をクリックして選択することができるように構成してある。停電系統選択手段2は、タッチパネル又はカーソルで系統をクリックして選択することができる。また、停電系統選択手段2は、系統番号を直接入力して系統を選択することも可能である。停電系統選択手段2は、図8に示すように、選択した系統の線種・色を変更表示して、選択した範囲を容易に確認することができるようにしてある。   As shown in FIG. 3, the power failure system selection means 2 is configured so that it can be selected by clicking on the system that causes the power failure on the system diagram displayed on the system diagram display means 1. The power failure system selection means 2 can select by clicking a system with a touch panel or a cursor. The power failure system selection means 2 can also select a system by directly inputting a system number. As shown in FIG. 8, the power failure system selection means 2 changes and displays the line type / color of the selected system so that the selected range can be easily confirmed.

操作手順表示手段4は、図4乃至図6に示すように、停電系統選択手段2で選択した系統を停電系統に切り替える操作手順を系統図表示手段1の系統図と同一画面に表示することができるように構成してある。また、操作手順表示手段4は、操作項目毎に操作手順と系統図を並べて表示し、各操作段階における遮断器の開閉状態及び各系統の通電状態を表示することができるようにしてある。   As shown in FIGS. 4 to 6, the operation procedure display means 4 can display the operation procedure for switching the system selected by the power failure system selection means 2 to the power failure system on the same screen as the system diagram of the system diagram display means 1. It is configured so that it can. The operation procedure display means 4 displays the operation procedure and the system diagram side by side for each operation item, and can display the open / close state of the circuit breaker and the energization state of each system at each operation stage.

図1に示す実施例において、操作手順表示手段4は、操作手順作成手段3を備えている。操作手順作成手段3は、前提条件記憶手段11に記憶された遮断器操作の前提条件と、開閉状態記憶手段10に記憶された遮断器の開閉状態に基づいて、選択した系統を停電系統に切り替える操作手順を自動で作成することができるように構成してある。また、操作手順作成手段3は、過去に作成した操作手順を記憶する記憶手段を備え、選択された系統の過去の操作手順を参考表示することもできる。   In the embodiment shown in FIG. 1, the operation procedure display means 4 includes an operation procedure creation means 3. The operation procedure creating means 3 switches the selected system to the power failure system based on the preconditions for the circuit breaker operation stored in the precondition storage means 11 and the circuit breaker open / close state stored in the open / close state storage means 10. The operation procedure is configured to be created automatically. In addition, the operation procedure creating means 3 includes storage means for storing operation procedures created in the past, and can also display the past operation procedures of the selected system as a reference.

模擬操作手段5は、操作手順表示手段4で表示した操作手順に基づいて遮断器を模擬操作するようにしてある。模擬操作手段5は、模擬操作の各操作項目において系統図上に操作した遮断器を点滅表示させると共に、停電系統に切り替わった系統の色・線種を変えて表示し、停電範囲を容易に確認することができるように構成してある。
また、模擬操作手段5は、図6に示すように、各操作項目において操作前の通電状態と操作後の通電状態を並べて表示し、操作前後における遮断器の開閉状態及び各系統の通電状態の変更箇所を比較表示することも可能である。
The simulated operation means 5 is configured to simulate the circuit breaker based on the operation procedure displayed by the operation procedure display means 4. The simulated operation means 5 blinks and displays the circuit breaker operated on the system diagram for each operation item of the simulated operation, and displays the color / line type of the system switched to the power outage system to easily check the power outage range. It is configured to be able to.
Moreover, as shown in FIG. 6, the simulation operation means 5 displays the energized state before the operation and the energized state after the operation side by side for each operation item, and displays the open / close state of the circuit breaker and the energized state of each system before and after the operation. It is also possible to compare and display the changes.

図1に示す実施例において、模擬操作手段5は、判定手段6を備えている。判定手段6は、前提条件記憶手段11に記憶された遮断器操作の前提条件と、開閉状態記憶手段10に記憶された遮断器の開閉状態を比較し、各操作における遮断器の操作可否を判定することができるように構成してある。判定手段6は、遮断器の操作を不能と判定したときに、判定結果及び前提条件が不成立の箇所を表示するようにしてある。
なお、操作手順表示手段4が操作手順作成手段3を備えている場合には、操作手順作成過程において遮断器の操作可否を判断していることから、判定手段を設けない構成にすることも勿論可能である。
In the embodiment shown in FIG. 1, the simulation operation means 5 includes a determination means 6. The determination means 6 compares the circuit breaker operation preconditions stored in the precondition storage means 11 with the circuit breaker switching states stored in the switching state storage means 10, and determines whether or not the circuit breaker can be operated in each operation. It is configured to be able to. When it is determined that the operation of the circuit breaker is impossible, the determination unit 6 displays a position where the determination result and the precondition are not satisfied.
In the case where the operation procedure display means 4 includes the operation procedure creation means 3, since it is determined whether or not the circuit breaker can be operated in the process of creating the operation procedure, it is of course possible to adopt a configuration in which the determination means is not provided. Is possible.

また、模擬操作手段5は、選択した系統を停電系統に切り替える操作手順を修正する操作手順修正手段7を備えている。操作手順修正手段7は、判定手段6が遮断器の操作を不能と判定したときに前提条件を満たすように操作手順を修正したり、模擬操作手段5で確認した系統の通電状態を変更するために操作手順を修正したりすることができる。模擬操作手段5は、操作手順修正手段7で操作手順を修正した操作項目について、修正後の操作手順に基づいて遮断器を模擬操作することができるように構成してある。   Moreover, the simulation operation means 5 is provided with the operation procedure correction means 7 which corrects the operation procedure which switches the selected system | strain to a power failure system. The operation procedure correction means 7 corrects the operation procedure so that the precondition is satisfied when the determination means 6 determines that the circuit breaker cannot be operated, or changes the energization state of the system confirmed by the simulated operation means 5. The operation procedure can be corrected. The simulated operation means 5 is configured to perform a simulated operation of the circuit breaker on the operation item whose operation procedure has been corrected by the operation procedure correction means 7 based on the corrected operation procedure.

図1に示す実施例において、作業停電操作支援システムは、模擬操作手段5において操作手順を確認後に、選択した系統を停電系統に自動的に切り替える自動操作手段8を備えている。自動操作手段8は、図6に示すように、操作ボタンをクリックすることにより、操作手順表示手段4で表示した操作手順に基づいて遮断器を自動的に操作することができるように構成してある。また、自動操作手段は、遮断器のインターロック操作をモータ駆動等により自動で行うことができるようにしてある。   In the embodiment shown in FIG. 1, the work power failure operation support system includes automatic operation means 8 that automatically switches the selected system to the power failure system after confirming the operation procedure in the simulated operation means 5. As shown in FIG. 6, the automatic operation means 8 is configured to automatically operate the circuit breaker based on the operation procedure displayed by the operation procedure display means 4 by clicking the operation button. is there. Further, the automatic operation means can automatically perform the interlock operation of the circuit breaker by a motor drive or the like.

次に、本発明に係る作業停電操作支援システムの作用を図2、図9乃至図15に基づいて説明する。
系統図表示手段1は、図7に示すように、開閉状態記憶手段10に記憶された電力系統内の遮断器の開閉状態に基づいて、現在の遮断器の開閉状態及び各系統の通電状態を系統図上に表示する。図7において「停電系統選択」ボタンをクリックすると停電系統選択手段2へ移行する。停電系統選択手段2において、系統図上で停電させる系統をクリックして選択すると、図8に示すように、停電系統選択手段2は選択した系統の線種・色を変更表示し、選択した範囲を容易に確認することができる。このとき、複数の系統を選択することも勿論可能である。
Next, the operation of the work blackout operation support system according to the present invention will be described with reference to FIGS. 2 and 9 to 15.
As shown in FIG. 7, the system diagram display means 1 indicates the current circuit breaker open / close state and the current state of each system based on the open / close state of the circuit breaker in the power system stored in the open / close state storage means 10. Display on the system diagram. When the “blackout system selection” button is clicked in FIG. In the power failure system selection means 2, when a power failure system is selected by clicking on the system diagram, as shown in FIG. 8, the power failure system selection means 2 changes and displays the line type / color of the selected system, and the selected range. Can be easily confirmed. At this time, it is of course possible to select a plurality of systems.

図8において「手順書作成」ボタンをクリックすると操作手順作成手段3へ移行する。操作手順作成手段3は、遮断器操作の前提条件と遮断器の開閉状態に基づいて、選択した系統を停電系統に切り替える操作手順を自動作成し、図9に示すように、操作手順表示手段4によって操作手順書と系統図を並べて表示する。操作手順の内容を確認後、「シミュレーション実行」ボタンをクリックすると模擬操作手段5へ移行する。   When the “procedure document creation” button is clicked in FIG. The operation procedure creating means 3 automatically creates an operation procedure for switching the selected system to the power failure system based on the preconditions for operating the circuit breaker and the open / close state of the circuit breaker. As shown in FIG. To display the operation procedure manual and system diagram side by side. After confirming the contents of the operation procedure, when the “simulation execution” button is clicked, the process proceeds to the simulation operation means 5.

模擬操作手段5は、操作手順表示手段4で表示した操作手順に基づいて遮断器を模擬操作し、図10乃至図14に示すように、各操作項目において操作内容と系統図を並べて表示する。また、模擬操作手段5は、系統図上に操作した遮断器を点滅表示させると共に、通電状態が変わった系統の色・線種を変えて表示し、変更箇所を容易に確認することができる。   The simulated operation means 5 performs a simulated operation of the circuit breaker based on the operation procedure displayed by the operation procedure display means 4, and displays the operation contents and the system diagram side by side for each operation item, as shown in FIGS. In addition, the simulated operation means 5 can display the circuit breaker operated on the system diagram in a blinking manner, and display the system by changing the color / line type of the system in which the energized state is changed, so that the changed part can be easily confirmed.

図10に示すように、模擬操作手段5は遮断器Aの投入模擬操作を実行すると、遮断器Aを点滅表示すると共に、新たに通電状態になった系統を破線表示して、操作箇所及び通電範囲を確認することができる。確認後に「次項目」ボタンをクリックすると、図11に示すように、次操作項目である遮断器Bの投入模擬操作が実行される。   As shown in FIG. 10, when the simulated operation means 5 executes the closing operation of the circuit breaker A, the circuit breaker A blinks and the newly energized system is displayed in broken lines, and the operation location and power supply are displayed. The range can be confirmed. When the “next item” button is clicked after the confirmation, as shown in FIG. 11, a closing operation of the circuit breaker B as the next operation item is executed.

図12に示すように、模擬操作手段5は遮断器Cの開放模擬操作を実行すると、遮断器Cを点滅表示して、系統Gの受電設備が切り替わったことを確認することができる。確認後に「次項目」ボタンをクリックすると、図13に示すように、次操作項目である遮断器Dの開放模擬操作が実行される。模擬操作手段5は遮断器Dを点滅表示すると共に、新たに停電状態になった系統を破線表示して、操作箇所及び停電範囲を確認することができる。   As shown in FIG. 12, when the simulated operation means 5 executes the opening simulation operation of the circuit breaker C, the circuit breaker C blinks and can confirm that the power receiving equipment of the system G has been switched. When the “next item” button is clicked after confirmation, as shown in FIG. 13, the circuit breaker D opening simulation operation, which is the next operation item, is executed. The simulated operation means 5 can display the circuit breaker D in a blinking manner, and can display the system that is newly in a power outage state with a broken line to confirm the operation location and the power outage range.

図14は、模擬操作手段5が全ての操作項目を模擬操作したときの表示画面を示している。停電系統選択手段2で選択した系統が停電系統に切り替わったことを確認して「シミュレーション終了」ボタンをクリックすると、判定手段6は各操作項目について操作可否の判定をして、結果を図15に示す画面に表示する。図15において、「実機操作実行」ボタンをクリックすると、自動操作手段8は操作手順に基づいて遮断器を自動的に操作して、停電系統選択手段2で選択した系統を停電系統に切り替えることができる。   FIG. 14 shows a display screen when the simulated operation means 5 performs a simulated operation on all the operation items. When it is confirmed that the system selected by the power failure system selection means 2 has been switched to the power failure system and the “simulation end” button is clicked, the determination means 6 determines whether or not each operation item can be operated, and the result is shown in FIG. Displayed on the screen. In FIG. 15, when the “actual machine operation execution” button is clicked, the automatic operation means 8 automatically operates the circuit breaker based on the operation procedure to switch the system selected by the power failure system selection means 2 to the power failure system. it can.

また、何れかの操作項目において、遮断器操作の前提条件や系統の通電範囲等に不具合がある場合には、操作手順修正手段7で該当の操作手順を修正し、修正後の操作手順において模擬操作を再実行することができる。   In addition, if any of the operation items has a defect in the preconditions for circuit breaker operation or the energization range of the system, the operation procedure correction means 7 corrects the corresponding operation procedure and simulates the corrected operation procedure. The operation can be re-executed.

本発明に係る作業停電操作支援システムの一実施例を示す構成図。The block diagram which shows one Example of the work blackout operation assistance system which concerns on this invention. その一実施例の動作を示すフローチャート。The flowchart which shows the operation | movement of the one Example. その一実施例の停電系統選択手段を示す図。The figure which shows the power failure system selection means of the one Example. その一実施例の操作手順表示手段を示す図。The figure which shows the operation procedure display means of the one Example. その一実施例の模擬操作の一例を示す図。The figure which shows an example of the simulation operation of the one Example. その一実施例の模擬操作の一例を示す図。The figure which shows an example of the simulation operation of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example. その一実施例の動作の一例を示す図。The figure which shows an example of the operation | movement of the one Example.

符号の説明Explanation of symbols

1 系統図表示手段
2 停電系統選択手段
3 操作手順作成手段
4 操作手順表示手段
5 模擬操作手段
6 判定手段
7 操作手順修正手段
8 自動操作手段
10 開閉状態記憶手段
11 前提条件記憶手段
DESCRIPTION OF SYMBOLS 1 System diagram display means 2 Power failure system selection means 3 Operation procedure creation means 4 Operation procedure display means 5 Simulated operation means 6 Judgment means 7 Operation procedure correction means 8 Automatic operation means 10 Opening / closing state storage means 11 Precondition storage means

Claims (8)

電力系統内の遮断器の開閉状態を記憶した開閉状態記憶手段と、前記遮断器の開閉状態及び各系統の通電状態を系統図上に表示する系統図表示手段と、表示された前記系統図から停電させる系統を選択する停電系統選択手段と、選択した系統を停電系統に切り替える操作手順を表示する操作手順表示手段と、表示した操作手順に基づいて遮断器を模擬操作する模擬操作手段とからなる作業停電操作支援システム。   From the open / close state storage means for storing the open / close state of the circuit breaker in the power system, the system diagram display means for displaying the open / close state of the circuit breaker and the energization state of each system on the system diagram, and the displayed system diagram It consists of a power failure system selection means for selecting a power failure system, an operation procedure display means for displaying an operation procedure for switching the selected system to the power failure system, and a simulated operation means for simulating the circuit breaker based on the displayed operation procedure. Work blackout operation support system. 前記模擬操作手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態を比較して遮断器の操作可否を判定するようにした請求項1に記載の作業停電操作支援システム。   The simulation operation means includes a precondition storage means for storing a precondition for presuming whether or not each circuit breaker can be operated, and compares a precondition for the circuit breaker operation with the open / close state of the circuit breaker stored in the open / close state storage means. The work power failure operation support system according to claim 1, wherein whether or not the circuit breaker is operable is determined. 前記操作手順表示手段が各遮断器の操作可否の前提となる前提条件を記憶した前提条件記憶手段を備え、遮断器操作の前提条件と前記開閉状態記憶手段に記憶された遮断器の開閉状態に基づいて選択した系統を停電系統に切り替える操作手順を自動作成するようにした請求項1に記載の作業停電操作支援システム。   The operation procedure display means includes a precondition storage means for storing preconditions on which each circuit breaker can be operated, and the circuit breaker operation preconditions and the circuit breaker open / close state stored in the open / close state storage means are displayed. The work power failure operation support system according to claim 1, wherein an operation procedure for switching a system selected on the basis of the system to a power failure system is automatically created. 前記模擬操作手段が、選択した系統を停電系統に切り替える操作手順を修正する操作手順修正手段を備えた請求項1乃至3の何れかに記載の作業停電操作支援システム。   The work power failure operation support system according to any one of claims 1 to 3, wherein the simulation operation means includes an operation procedure correcting means for correcting an operation procedure for switching the selected system to a power failure system. 前記系統図表示手段が、模擬操作の各操作項目において操作した遮断器と各系統の通電状態を表示するようにした請求項1乃至4の何れかに記載の作業停電操作支援システム。   The work power failure operation support system according to any one of claims 1 to 4, wherein the system diagram display means displays a circuit breaker operated in each operation item of the simulated operation and an energization state of each system. 前記系統図表示手段が、模擬操作の各操作項目において操作前の通電状態と操作後の通電状態を比較して表示するようにした請求項1乃至5の何れかに記載の作業停電操作支援システム。   The work power failure operation support system according to any one of claims 1 to 5, wherein the system diagram display means compares and displays the energized state before the operation and the energized state after the operation in each operation item of the simulated operation. . 前記模擬操作手段において操作手順を確認後に選択した系統を停電系統に自動的に切り替える自動操作手段を備えた請求項1乃至6の何れかに記載の作業停電操作支援システム。   The work power failure operation support system according to any one of claims 1 to 6, further comprising automatic operation means for automatically switching a system selected after confirming an operation procedure in the simulation operation means to a power failure system. 前記自動操作手段が前記遮断器のインターロック操作を自動で行うようにした請求項7に記載の作業停電操作支援システム。
The work power failure operation support system according to claim 7, wherein the automatic operation means automatically performs an interlock operation of the circuit breaker.
JP2006218032A 2006-08-10 2006-08-10 Support system of power failure operation by working Pending JP2008043163A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006218032A JP2008043163A (en) 2006-08-10 2006-08-10 Support system of power failure operation by working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006218032A JP2008043163A (en) 2006-08-10 2006-08-10 Support system of power failure operation by working

Publications (1)

Publication Number Publication Date
JP2008043163A true JP2008043163A (en) 2008-02-21

Family

ID=39177550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006218032A Pending JP2008043163A (en) 2006-08-10 2006-08-10 Support system of power failure operation by working

Country Status (1)

Country Link
JP (1) JP2008043163A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104424604A (en) * 2013-08-31 2015-03-18 中广核工程有限公司 Method and system for operating digitized procedures of nuclear power station
JP2017073856A (en) * 2015-10-05 2017-04-13 株式会社東芝 Power receiving and transforming facility operation support system
JP2018196289A (en) * 2017-05-19 2018-12-06 東京電力ホールディングス株式会社 Data generation device
JP2020135065A (en) * 2019-02-13 2020-08-31 株式会社東芝 Monitoring control device, monitoring control method, and monitoring control system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07212973A (en) * 1994-01-17 1995-08-11 Toshiba Corp Operation manual preparing and storing equipment for power system facility and power system monitor and controller
JP2003174724A (en) * 2001-12-06 2003-06-20 Toshiba Corp Power system monitor/control apparatus and program for making the apparatus operate
JP2004135394A (en) * 2002-10-08 2004-04-30 Mitsubishi Electric Corp Assisting arrangement and method for generating service power failure procedure
JP2006014527A (en) * 2004-06-28 2006-01-12 Mitsubishi Electric Corp Method of automatically creating system control procedures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07212973A (en) * 1994-01-17 1995-08-11 Toshiba Corp Operation manual preparing and storing equipment for power system facility and power system monitor and controller
JP2003174724A (en) * 2001-12-06 2003-06-20 Toshiba Corp Power system monitor/control apparatus and program for making the apparatus operate
JP2004135394A (en) * 2002-10-08 2004-04-30 Mitsubishi Electric Corp Assisting arrangement and method for generating service power failure procedure
JP2006014527A (en) * 2004-06-28 2006-01-12 Mitsubishi Electric Corp Method of automatically creating system control procedures

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104424604A (en) * 2013-08-31 2015-03-18 中广核工程有限公司 Method and system for operating digitized procedures of nuclear power station
JP2017073856A (en) * 2015-10-05 2017-04-13 株式会社東芝 Power receiving and transforming facility operation support system
JP2018196289A (en) * 2017-05-19 2018-12-06 東京電力ホールディングス株式会社 Data generation device
JP2020135065A (en) * 2019-02-13 2020-08-31 株式会社東芝 Monitoring control device, monitoring control method, and monitoring control system
JP7292894B2 (en) 2019-02-13 2023-06-19 株式会社東芝 MONITORING CONTROL DEVICE, MONITORING CONTROL METHOD AND MONITORING CONTROL SYSTEM

Similar Documents

Publication Publication Date Title
WO2006011584A1 (en) Safe plc, sequence program creation support software, and sequence program judgment method
JP2008043163A (en) Support system of power failure operation by working
JP4386927B2 (en) Monitoring control system and position switching method in monitoring control system
CN108462251B (en) Method for monitoring a source switching switch and source switching switch for carrying out said method
JP2012230553A (en) Monitoring controller and monitoring control method
JP4726575B2 (en) Insulation resistance measuring device
JP4542494B2 (en) Programmable display device, debugging support program, and debugging device control method
JP2021004908A (en) Response training method for power receiving facility abnormal time
JP2010139753A (en) Plant simulator and plant simulator operating method
JP5159379B2 (en) Drawing display device
JP2008123427A (en) Display system for monitoring control system
JP4762066B2 (en) Circuit breaker operation judgment system
JP5830975B2 (en) Motion control device
JP2009106006A (en) Protection interlocking inspection system
JP2018151746A (en) Disconnecting terminal switching system
JP6047507B2 (en) Railway security system and operation method in railway security system
JP5762871B2 (en) Digital control device and digital control system provided with the digital control device
JP2005122353A (en) Monitoring and controlling device
JPH10133559A (en) Maintenance training simulator
JP2005284673A (en) Plant supervisory control device
JP4960016B2 (en) Power system control system
JP2012029410A (en) Electric power system monitoring and control apparatus
US20180091806A1 (en) Screen image generation apparatus, screen image generation method, and screen image generation program
JP2014230423A (en) Protection relay device and power system protection system
JP2007140272A (en) Maintenance operation training system

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090618

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090724

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110223

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110301

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110513

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110707

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110802