JP2007218059A - Asbestos removing method - Google Patents
Asbestos removing method Download PDFInfo
- Publication number
- JP2007218059A JP2007218059A JP2006069947A JP2006069947A JP2007218059A JP 2007218059 A JP2007218059 A JP 2007218059A JP 2006069947 A JP2006069947 A JP 2006069947A JP 2006069947 A JP2006069947 A JP 2006069947A JP 2007218059 A JP2007218059 A JP 2007218059A
- Authority
- JP
- Japan
- Prior art keywords
- scaffold
- curing
- asbestos
- stage
- negative pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
本発明は、建築物内の天井部分におけるアスベスト除去方法に関するものである。 The present invention relates to a method for removing asbestos from a ceiling portion in a building.
足場が必要な天井部分のアスベスト除去において、従来のアスベストの発散を防止するための措置方法を図2を基に説明する。まず、室内空間全体を隔離ゾーンとすべく、床の養生1Aおよび壁面の養生1Bをプラスチックシートで完全に覆う。 A conventional method for preventing asbestos divergence in removing asbestos from a ceiling portion that requires a scaffold will be described with reference to FIG. First, the floor curing 1A and the wall curing 1B are completely covered with a plastic sheet so that the entire indoor space is set as an isolation zone.
次に、足場2、セキュリティゾーン3、負圧・除じん装置4を設置する。ここで、セキュリティゾーンとは隔離外部との出入り口に隣接して室内側に設置される更衣室、洗浄室、前室の3つを総称する。
従来の方法では、アスベスト除去作業中において足場にアスベストが付着するため、完全除去するための清掃を後工程で行う必要があり、非常に手間を要していた。 In the conventional method, since asbestos adheres to the scaffold during the asbestos removal work, it is necessary to perform cleaning for complete removal in a subsequent process, which is very laborious.
また、室内全体を隔離ゾーンとしていることから、室内全体を適正な負圧にするだけの大きな能力を有する負圧・除じん装置を設置する必要があった。 Further, since the entire room is used as an isolation zone, it has been necessary to install a negative pressure / dust removal device having a large capacity enough to bring the entire room to an appropriate negative pressure.
本発明は従来技術のこのような課題を鑑み、足場の清掃を必要とせず、また大容量の負圧・除じん装置を用いなくてもいいようなアスベスト除去方法を提供することを目的とする。 SUMMARY OF THE INVENTION The present invention has been made in view of the above-described problems of the prior art, and it is an object of the present invention to provide a method for removing asbestos that does not require cleaning of a scaffold and does not require the use of a large-capacity negative pressure / dust removal device. .
上記目的を達成するために、アスベストの発散を防止するために次のような措置を行う。 In order to achieve the above objectives, the following measures will be taken to prevent the asbestos from spreading.
まず、天井部分における全領域のアスベスト除去作業を可能とならしめるステージを有する足場(以下、「足場ステージ」と表現する。)を設置する。 First, a scaffold having a stage (hereinafter referred to as a “scaffold stage”) that makes it possible to remove asbestos in the entire area of the ceiling is installed.
次に、ステージから上方の室内空間を隔離ゾーンとして養生を行う。養生方法は、足場ステージを従来方法における床と考えれば全く同様の方法で実施する。その他の実施内容については、従来方法と同様に行う。 Next, curing is performed using the indoor space above the stage as an isolation zone. As for the curing method, if the scaffold stage is considered as a floor in the conventional method, it is carried out in exactly the same manner. About other implementation content, it carries out similarly to the conventional method.
ここでセキュリティゾーンについては、出入り口に接した室内の床面に設置するが、セキュリティゾーンと足場ステージ上方の隔離ゾーンとの間は作業者が通過できるトンネル状の養生をプラスチックシートにて作製、設置することで、外部から隔離する。このトンネル状の養生の中に梯子等を設置し、作業者が足場ステージ上に昇ったり、降りたりできるようにする。 Here, the security zone is installed on the floor of the room in contact with the doorway, but a tunnel-like curing that allows workers to pass between the security zone and the isolation zone above the scaffolding stage is made and installed with a plastic sheet. To isolate it from the outside. Ladder etc. will be installed in this tunnel-shaped curing so that workers can climb up and down on the scaffolding stage.
すなわち、本発明によるアスベスト除去方法は、足場が必要な天井部分のアスベスト除去作業において、ステージ状の足場を設置してから、ステージから上方の室内のみを隔離ゾーンとすべく養生することを第一の特徴としている。 That is, in the asbestos removal method according to the present invention, in the asbestos removal work for the ceiling portion where the scaffold is necessary, after the stage-like scaffold is installed, only the room above the stage is cured to be the isolation zone. It has the characteristics of
また、アスベストの発散を防止するための措置として、出入り口に隣接して設けられたセキュリティゾーンと隔離ゾーンとがトンネル状の養生で繋がっていることを第二の特徴としている。 In addition, as a measure for preventing asbestos from spreading, a second feature is that a security zone and an isolation zone provided adjacent to the entrance and exit are connected by a tunnel-like curing.
この方法によれば、アスベスト除去作業において足場ステージがアスベストによる汚染がないため、後工程での清掃作業が省ける。加えて足場ステージ上を養生していることから、作業に伴う通常の汚れも完全に防止できる。すなわち、事前に足場ステージおよび足場ステージを設置する空間を清掃しておけば、後工程での清掃作業は全く不用となる。 According to this method, since the scaffold stage is not contaminated with asbestos in the asbestos removal work, the cleaning work in the subsequent process can be omitted. In addition, since the scaffold stage is cured, it is possible to completely prevent normal dirt associated with the work. That is, if the scaffold stage and the space for installing the scaffold stage are cleaned in advance, the cleaning work in the subsequent process is completely unnecessary.
次に、隔離ゾーンが従来の室内空間全体から足場ステージから上方の室内空間になることで、負圧・除じん装置の容量を低くすることができる。すなわち、従来方法に比べ負圧・除じん装置の小型化もしくは設置台数の低減が可能となる。 Next, the capacity of the negative pressure / dust removal device can be reduced by changing the isolation zone from the entire conventional indoor space to the indoor space above the scaffold stage. That is, the negative pressure / dust removal device can be downsized or the number of installed devices can be reduced as compared with the conventional method.
また付随的効果として、従来の足場はやぐらの最上部に作業床設け、脚柱の下端に車輪を付けて人力により移動できるようにしたローリングタワー方式等の可動式の足場が一般的であるが、作業スペースが狭いため落下事故が多く安全面で問題があった。本発明の足場ステージは、全領域のアスベスト除去作業を可能とならしめる広い作業床を有しているため、安全性が高い。 As an incidental effect, the conventional scaffold is generally a movable scaffold such as a rolling tower system in which a work floor is provided at the top of the tower and a wheel is attached to the lower end of the pedestal so that it can be moved by human power. Because of the small work space, there were many falling accidents, and there were problems with safety. Since the scaffold stage of the present invention has a wide work floor that makes it possible to remove asbestos in the entire region, it is highly safe.
以下に本発明の最良の実施方法を図1に基づき説明する。 The best implementation method of the present invention will be described below with reference to FIG.
足場ステージ2を設置した後に、プテスチックシートを用いて足場ステージ上の養生1C、壁面の養生1B、およびセキュリティゾーン3との連結を目的としたトンネル状の養生1Cを施す。 After the scaffold stage 2 has been installed, a tunnel-shaped curing 1C for the purpose of connection with the curing 1C on the scaffolding stage, the curing on the wall surface 1B, and the
ただし本例においては、セキュリティゾーン3とトンネル状の養生1Dが直接繋がっているのではなく、その間にもう一つ別の養生部屋5を設けている。この養生部屋5は、プラスチック袋に詰められた廃アスベストを一時保管する場所として利用する。なお、養生部屋5からトンネル状養生には足場ステージへに昇降を行うための梯子6を設置する。 However, in this example, the
次に、隔離空間の容量に適した負圧・除じん装置4を設置する。 Next, a negative pressure /
1A 床の養生
1B 壁面の養生
1C 足場ステージ上の養生
2 足場もしくは足場ステージ
3 セキュリティゾーン
4 負圧・除じん装置
5 養生部屋
6 梯子1A Floor curing 1B Wall curing 1C Curing on scaffolding stage 2 Scaffolding or
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006069947A JP2007218059A (en) | 2006-02-14 | 2006-02-14 | Asbestos removing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006069947A JP2007218059A (en) | 2006-02-14 | 2006-02-14 | Asbestos removing method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2007218059A true JP2007218059A (en) | 2007-08-30 |
Family
ID=38495633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006069947A Pending JP2007218059A (en) | 2006-02-14 | 2006-02-14 | Asbestos removing method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2007218059A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009263114A (en) * | 2008-04-28 | 2009-11-12 | Fuji Ultrasonic Engineering Co Ltd | Asbestos processing method in elevator shaft |
-
2006
- 2006-02-14 JP JP2006069947A patent/JP2007218059A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009263114A (en) * | 2008-04-28 | 2009-11-12 | Fuji Ultrasonic Engineering Co Ltd | Asbestos processing method in elevator shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101042528B1 (en) | The construction works cage which has a expanded function | |
CN108005374A (en) | Clear up the hanging basket construction method of glass curtain wall | |
KR20170079436A (en) | Method For Restoring From Damages By Fire On Building | |
CN204841285U (en) | Dust purification equipment | |
JP2007218059A (en) | Asbestos removing method | |
JP2010203054A (en) | Building repair/demolition device and building repair/demolition method | |
KR101828318B1 (en) | Removal Device of The Decrepit Structure and the Removal Method | |
CN206318599U (en) | A kind of power supply for construction stair shaft mouthful protective door device | |
CN104234439B (en) | Angular adjustment apparatus in integrated support lifting process and angle adjusting method | |
KR102079390B1 (en) | The construction works cage which has a expanded function | |
KR102118725B1 (en) | Workbench support device | |
JP2013194429A (en) | Dust diffusion suppression method and dust diffusion suppression device | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
JP5365843B2 (en) | Building renovation / demolition equipment and building renovation / demolition method | |
JP2009084049A (en) | Asbestos removing work method in elevator shaft | |
CN104179126B (en) | Municipal overhead anti-collision wall construction method | |
CN207804811U (en) | Skyscraper transverse direction emergency escape channel structure | |
KR102606459B1 (en) | Scattering dust prevention device for high-rise vehicles for surface treatment, decoration and stray work of external steel and concrete structure, bridge underpart and bridge lower surface treatment using negative pressure principle and eco-friendly stable construction method using the same | |
CN207776478U (en) | Outer climbing frame protective device | |
JP2008308914A (en) | Work unit | |
JP5365844B2 (en) | Building renovation / demolition equipment and building renovation / demolition method | |
WO2020113258A1 (en) | Building floor-edge protection system | |
CN104863394B (en) | A kind of distribution box protection canopy | |
JP6362923B2 (en) | Dust collector for building demolition | |
CN220451382U (en) | Building engineering is with climbing frame |