JP2009084049A - Asbestos removing work method in elevator shaft - Google Patents

Asbestos removing work method in elevator shaft Download PDF

Info

Publication number
JP2009084049A
JP2009084049A JP2008066933A JP2008066933A JP2009084049A JP 2009084049 A JP2009084049 A JP 2009084049A JP 2008066933 A JP2008066933 A JP 2008066933A JP 2008066933 A JP2008066933 A JP 2008066933A JP 2009084049 A JP2009084049 A JP 2009084049A
Authority
JP
Japan
Prior art keywords
work
floor
asbestos
elevator shaft
floors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008066933A
Other languages
Japanese (ja)
Inventor
Shinichi Murakami
信一 村上
Yoshio Tabe
良夫 田部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittobo Ecology Co Ltd
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Nittobo Ecology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd, Nittobo Ecology Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2008066933A priority Critical patent/JP2009084049A/en
Publication of JP2009084049A publication Critical patent/JP2009084049A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a working method capable of removing asbestos in an elevator shaft in an extremely short period of time. <P>SOLUTION: This asbestos removing work method sets an area including a plurality of floors in the elevator shaft 1 as a work space 11 and work floors 14 are arranged at a lowest floor in the work space and at one or more floors above it. The work space is cured by a sheet material to prevent dust from leaking from the work space to outside and each work floor is cured by the sheet material to prevent the removed asbestos and the like from falling down from the work floor. An operator enters from an entrance 17 of each floor arranged with the work floor 14 on the respective floor and asbestos in the elevator shaft is removed at the plurality of floors in parallel. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、既設建築物において、エレベータシャフト内に存在するアスベストを除去する作業方法に関する。   The present invention relates to an operation method for removing asbestos present in an elevator shaft in an existing building.

既設建築物において、金属材等の耐火被覆としてアスベストが多く用いられており、エレベータシャフト内においても柱材や梁材等として用いているH形鋼などにアスベストが吹き付け被覆されている。近年、アスベスト粉塵の吸引による健康障害が指摘されており、アスベストは使用禁止にされている。既設アスベストについても、劣化による飛散や建築物解体時の飛散等を防止するため、アスベストの除去、封じ込め、囲い込み等を行うことが望まれており、また、エレベータの修理、更新のためにも、エレベータシャフト内のアスベストについて除去が望まれている。   In existing buildings, asbestos is often used as a fireproof coating for metal materials and the like, and asbestos is spray-coated on H-shaped steel and the like used as column materials and beam materials in the elevator shaft. In recent years, health problems due to suction of asbestos dust have been pointed out, and asbestos has been banned. For existing asbestos, it is desired to remove, contain, enclose, etc. asbestos in order to prevent scattering due to deterioration and scattering at the time of building demolition. Removal of asbestos in the elevator shaft is desired.

従来、エレベータシャフト内のアスベストの除去は次の手順で行っていた。すなわち、図11に示すように、エレベータシャフト1内において、エレベータかご2を上方に退避させておき、予め設定した特定階(通常、最下階)からエレベータシャフト1内に入ってその特定階及びその上に位置するように、複数階の作業床4及び昇降階段5を備えた足場3を組み、エレベータかご2の下方の空間から粉塵が外部に漏洩しないようにエレベータシャフト1内面をシート材で養生し、また、各作業床4から下方にアスベスト除去物等が落下しないよう各作業床4もシート材で養生し、特定階の出入り口に、前室7a、エアシャワー室7b、更衣室(保護衣等脱着室)7c等を備えた洗身設備7を設置して作業者がエレベータシャフト内に安全に出入り可能とし、エレベータシャフト1内に除塵吸引装置8に接続された吸引ダクト9を通し、エレベータシャフト1内を負圧吸引した状態で、洗身設備7を通って作業者がエレベータシャフト1内に入り、足場3を利用してエレベータシャフト1内のアスベスト除去(アスベストの飛散防止のために湿潤剤の吹き付け、アスベストの掻き落とし、除去したアスベストの袋詰め、排出等)を行っている。この際、労働安全衛生法には、「上下作業は極力避けること。」との規定があるため、まず、足場3の最上階の作業床4を用いてその付近のアスベスト除去を行い、次いで、その下の作業床4に移ってその付近のアスベスト除去を行うという動作を順次繰り返すことでエレベータシャフト1内のエレベータかご2の下方の全域のアスベスト除去を行っている。アスベスト除去を行った後は、清掃、養生の撤去を行い、その後、必要に応じ、アスベスト除去対象物に対して耐火材を被覆する耐火被覆復旧作業を行い、次いで、足場撤去を行う。その後、エレベータシャフト内の上方に退避させていたエレベータかごを下方に下ろし、エレベータシャフトの上方領域での作業に適した階に作業床を敷設し、その上に足場を組んで、上記と同様な手順によってアスベスト除去、耐火被覆復旧等を行っている。   Conventionally, asbestos in an elevator shaft has been removed by the following procedure. That is, as shown in FIG. 11, in the elevator shaft 1, the elevator car 2 is retracted upward, and enters the elevator shaft 1 from a preset specific floor (usually the lowest floor) to enter the specific floor and A scaffold 3 having a plurality of floors 4 and elevating stairs 5 is assembled so as to be positioned thereon, and the inner surface of the elevator shaft 1 is made of a sheet material so that dust does not leak outside from the space below the elevator car 2. Each work floor 4 is cured with a sheet material so as to prevent asbestos-removed material from falling downward from each work floor 4, and a front room 7a, an air shower room 7b, a changing room (protection) at the entrance of a specific floor A washing machine 7 equipped with a clothing desorption chamber) 7c and the like is installed so that the worker can safely enter and exit the elevator shaft, and the suction shaft connected to the dust removal suction device 8 is connected to the elevator shaft 1. An operator enters the elevator shaft 1 through the washing equipment 7 in a state where negative pressure is sucked into the elevator shaft 1 through the duct 9, and the asbestos in the elevator shaft 1 is removed by using the scaffold 3 (asbestos of asbestos). In order to prevent scattering, spraying of wetting agent, scraping off of asbestos, bagging of removed asbestos, discharging etc.) are performed. At this time, the Occupational Safety and Health Act has a provision that “avoid vertical work as much as possible.” First, the asbestos in the vicinity is removed using the work floor 4 on the top floor of the scaffold 3, and then The operation of moving to the work floor 4 below and removing asbestos in the vicinity thereof is sequentially repeated to remove asbestos in the entire area below the elevator car 2 in the elevator shaft 1. After removing asbestos, cleaning and curing are removed, and then, as necessary, a fireproof covering restoration work for covering the asbestos removal target with a fireproof material is performed, and then the scaffold is removed. Then, lower the elevator car that has been retreated above the elevator shaft, lay a work floor on the floor suitable for work in the upper area of the elevator shaft, build a scaffold on it, and Asbestos removal, fireproof coating restoration, etc. are performed according to procedures.

しかしながら、上記した従来技術では、狭いエレベータシャフト内に高い足場を組み、その足場の最上階から順次、アスベスト除去を行って行くため、工事期間がきわめて長くかかり、例えば、10階程度のエレベータシャフトの工事に15〜20日の工事期間を必要とするという問題があった。既設のビルでは、テナント等の絡みから、エレベータを長期間に渡って止めておくことはできず、特にビルにエレベータが1基しかない場合などにはなおさらであり、このため、エレベータシャフトのアスベストの除去が必要だと言われているにもかかわらず、容易に実施できないのが現状である。   However, in the above-described prior art, a high scaffold is assembled in a narrow elevator shaft, and asbestos removal is sequentially performed from the top floor of the scaffold. Therefore, the construction period is extremely long. For example, an elevator shaft of about 10 floors is required. There was a problem that a construction period of 15 to 20 days was required for the construction. In existing buildings, it is not possible to stop the elevator for a long period of time due to entanglement with tenants, especially when there is only one elevator in the building. Although it is said that it is necessary to remove this, it is not possible to implement it easily.

本発明はかかる状況に鑑みてなされたもので、例えば、土、日の2日間といった、きわめて短期間でエレベータシャフト内のアスベストの除去を行うことの可能な作業方法を提供することを課題とする。   The present invention has been made in view of such a situation, and it is an object of the present invention to provide a work method capable of removing asbestos in an elevator shaft in a very short period of time, for example, two days on soil and sun. .

本願請求項1に係る発明は、エレベータシャフト内のアスベスト除去を短期間で行うことができるようにするため、エレベータシャフト内の複数階にわたる領域を作業空間に設定し、エレベータかごを前記作業空間の外に位置させた状態でその作業空間内の最下階と、その上方の一つ以上の階に作業床を設ける工程と、作業床を設けた各階の出入り口から作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行う工程を有する構成としたものである。   In the invention according to claim 1 of the present invention, in order to be able to remove asbestos in the elevator shaft in a short period of time, an area extending over a plurality of floors in the elevator shaft is set as a work space, and the elevator car is placed in the work space. A process of providing a work floor on the lowest floor in the work space and one or more floors above the work space, and an operator on the work floor from the entrance of each floor where the work floor is provided. It is configured to have a process of removing asbestos in the elevator shaft in parallel on the upper and lower floors.

請求項2に係る発明は、エレベータシャフト内のアスベスト除去を更に短期間で行うことができるようにするため、エレベータシャフト内の複数階にわたる領域を作業空間に設定し、エレベータかごを前記作業空間の外に位置させた状態でその作業空間内のすべての階にそれぞれ、作業床を設ける工程と、作業床を設けた各階の出入り口から作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行う工程を有する構成としたものである。   In the invention according to claim 2, in order to enable asbestos removal in the elevator shaft to be performed in a shorter period of time, an area extending over a plurality of floors in the elevator shaft is set as a work space, and the elevator car is disposed in the work space. The process of providing work floors on all the floors in the work space while being positioned outside, and an operator enters the work floor from the entrance / exit of each floor where the work floor is provided, and in parallel on the upper and lower floors It is set as the structure which has the process of removing asbestos in an elevator shaft.

請求項3に係る発明は、上記した請求項1又は2に係るアスベスト除去作業方法において、少なくとも一部の前記作業床を、エレベータシャフト内に垂直に設けられているガイドレールに着脱可能なレールクリップ機構を備えた支持治具を用いて、前記ガイドレールに保持させることを特徴とするものである。   The invention according to claim 3 is the above-described asbestos removal work method according to claim 1 or 2, wherein at least a part of the work floor is detachable from a guide rail provided vertically in the elevator shaft. The guide rail is held by using a support jig provided with a mechanism.

請求項4に係る発明は、上記した請求項1から3のいずれか1項に係るアスベスト除去作業方法において、前記作業床を設置した後に、前記作業空間から粉塵が外部に漏洩しないように前記作業空間をシート材で養生し且つ各作業床から下方にアスベスト除去物等が落下しないよう各作業床をシート材で養生する工程と、作業床を設けた各階の出入り口にそれぞれ洗身設備を設ける工程と、前記作業空間内を負圧吸引する手段を設ける工程を設け、前記作業空間を負圧吸引した状態で、各洗身設備を通って対応する作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行うことを特徴とするものである。   The invention according to claim 4 is the asbestos removal work method according to any one of claims 1 to 3, wherein the work is performed so that dust does not leak outside from the work space after the work floor is installed. A process of curing the space with a sheet material and curing each work floor with a sheet material so that asbestos-removed materials do not fall downward from each work floor, and a process of providing washing facilities at the entrances and exits of each floor where the work floor is provided And a step of providing a means for sucking negative pressure in the work space, and in a state where the work space is sucked negative pressure, an operator enters the corresponding work floor through each washing equipment, The asbestos removal in the elevator shaft is performed in parallel.

請求項5に係る発明は、上記した請求項1から4のいずれか1項に係るアスベスト除去作業方法において、前記作業空間内の作業床の設置に先立って、最下階の作業床を除いた他の作業床の設置位置の下方に安全ネットを取り付け、その後作業床の設置を行うことを特徴とするものである。   The invention according to claim 5 is the asbestos removal work method according to any one of claims 1 to 4, wherein the work floor on the lowest floor is removed prior to installation of the work floor in the work space. A safety net is attached below the installation position of another work floor, and then the work floor is installed.

請求項6に係る発明は、上記した請求項1から5のいずれか1項に記載の諸工程を、エレベータシャフト内の他の領域について繰り返すことで、エレベータシャフト全体のアスベスト除去を行うことを特徴とするものである。   The invention according to claim 6 is characterized in that asbestos removal of the entire elevator shaft is performed by repeating the steps described in any one of claims 1 to 5 for other regions in the elevator shaft. It is what.

請求項7に係る発明は、上記した請求項1から6のいずれか1項記載のアスベスト除去作業方法において、アスベスト除去を行う工程の後に、前記作業床の撤去に先立って、アスベスト除去を行った対象に対する耐火被覆を行う工程を設けることを特徴とするものである。   The invention according to claim 7 is the asbestos removal work method according to any one of claims 1 to 6, wherein the asbestos removal is performed prior to the removal of the work floor after the step of removing asbestos. It is characterized by providing a process for performing fireproof coating on the object.

本願請求項1に係る発明のアスベスト除去作業方法では、エレベータシャフト内に複数階にわたって設定した作業空間のアスベスト除去に当たって、その作業空間内の最下階を含む複数の階に作業床を形成し、その作業床を形成した階の出入り口から作業者がエレベータシャフト内に出入りし、作業床を設けている複数の階で並行してアスベスト除去を行う構成としたことで、同時に複数の階でアスベスト除去作業を行うことができ、このため、作業期間を大幅に短縮することができ、また、従来のような高い足場を組む必要がなく、この点からも作業期間を短縮できる。この場合、複数階は好ましくは3階以上、より好ましくは4階以上、最も好ましくはすべての階が適用できる。   In the asbestos removal work method of the invention according to claim 1 of the present application, when asbestos removal of the work space set over a plurality of floors in the elevator shaft, work floors are formed on a plurality of floors including the lowest floor in the work space, Asbestos removal is performed on multiple floors at the same time by adopting a configuration that allows workers to enter and exit the elevator shaft from the entrance / exit of the floor where the work floor is formed, and removes asbestos in parallel on multiple floors where the work floor is installed. Therefore, the work period can be greatly shortened, and it is not necessary to assemble a high scaffold as in the prior art, and the work period can be shortened from this point of view. In this case, the multiple floors are preferably 3 floors or more, more preferably 4 floors or more, and most preferably all floors.

請求項2に係る発明では、エレベータシャフト内に複数階にわたって設定した作業空間のすべての階にそれぞれ作業床を設け、各階の出入り口から作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行う構成としたことにより、一層作業期間を短縮できる。   In the invention which concerns on Claim 2, a work floor is provided in all the floors of the work space set over the several floors in the elevator shaft, respectively, an operator enters on a work floor from the entrance and exit of each floor, and it is parallel on the upper and lower floors. By adopting a configuration for removing asbestos in the elevator shaft, the work period can be further shortened.

請求項3に係る発明では、少なくとも一部の前記作業床を、エレベータシャフト内に垂直に設けられているガイドレールに着脱可能なレールクリップ機構を備えた支持治具を用いて、前記ガイドレールに保持させる構成としたことで、作業床を所望の高さに取り付けることができ、例えば、作業床をエレベータシャフト内の梁の上面から離れた位置に取り付けることができ、梁上面に施していたアスベストを作業床に干渉することなく除去できる。   In the invention according to claim 3, at least a part of the work floor is attached to the guide rail by using a support jig provided with a rail clip mechanism that can be attached to and detached from the guide rail provided vertically in the elevator shaft. By having the structure to be held, the work floor can be attached to a desired height, for example, the work floor can be attached at a position away from the upper surface of the beam in the elevator shaft, and the asbestos applied to the upper surface of the beam Can be removed without interfering with the work floor.

請求項4に係る発明では、作業空間をシート材で養生し且つ各作業床から下方にアスベスト除去物等が落下しないよう各作業床をシート材で養生し、作業床を設けた各階の出入り口にそれぞれ洗身設備を設け、且つ前記作業空間内を負圧吸引する手段を設ける構成としたことにより、前記作業空間を負圧吸引した状態で、各洗身設備を通って対応する作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行うことができ、アスベストの周辺環境への飛散をきわめて確実に防止できる。   In the invention according to claim 4, the work space is cured with a sheet material, and each work floor is cured with a sheet material so that the asbestos removal material does not fall downward from each work floor. Since each washing equipment is provided with a means for sucking negative pressure in the work space, the work space is passed through each washing equipment on the corresponding work floor in a state where the work space is sucked with negative pressure. Asbestos can be removed from the elevator shaft in parallel on the upper and lower floors, and asbestos can be reliably prevented from scattering into the surrounding environment.

請求項5に係る発明では、作業床の設置に先立って、作業床の設置場所の下方に安全ネットを取り付け、その後作業床の設置を行う構成としたことにより、安全ネットで工具等の落下を防止でき、このため、上下階で平行して作業床の取り付け作業を行うことができ、この点からも作業期間の短縮を図ることができる。   In the invention according to claim 5, prior to the installation of the work floor, a safety net is attached below the installation location of the work floor, and then the work floor is installed. Therefore, the work floor can be attached in parallel on the upper and lower floors, and the work period can be shortened from this point.

請求項6に係る発明では、請求項1から5のいずれか1項に記載の諸工程を、エレベータシャフト内の他の領域について繰り返すことで、エレベータシャフト全体のアスベスト除去を短期間で行うことができる。   In the invention which concerns on Claim 6, the asbestos removal of the whole elevator shaft can be performed in a short period of time by repeating the process of any one of Claim 1-5 about the other area | region in an elevator shaft. it can.

請求項7に係る発明では、アスベスト除去のために設けた作業床を用いて、アスベスト除去を行った対象に対する耐火被覆を行うことができ、アスベスト除去のみならず耐火被覆復旧作業を短期間で実施できる。   In the invention according to claim 7, the work floor provided for removing asbestos can be used to perform fireproof coating on the target from which asbestos has been removed, and not only asbestos removal but also fireproof coating restoration work can be performed in a short period of time. it can.

以下、本発明のアスベスト除去作業方法の好適な実施の形態を説明する。図1はエレベータシャフトの一部領域を、本発明の一実施の形態のアスベスト除去作業方法を実施する状態で示す概略断面図、図2はエレベータシャフトの別の領域を、アスベスト除去作業方法を実施する状態で示す概略断面図であり、図11に示す従来例と同一部分には同一符号を付している。図1において、まず、エレベータシャフト1内の複数階にわたる領域を、一度にアスベスト除去を行う作業空間11に設定する。後述するようにこの作業空間11内のアスベスト除去を行った後は、図2に示すように、エレベータシャフト1内の別の領域に作業空間12を設定してアスベスト除去を行う。従って、この実施の形態のアスベスト除去作業方法は、エレベータシャフト1の全体を複数の作業空間に分割して、順次アスベスト除去を行ってゆくものである。最初に設定する作業空間11は、エレベータシャフトの下端又は上端から設定する。その作業空間11、12に含ませる階数は、エレベータシャフトの全階数や、エレベータシャフトを何回に分けてアスベスト除去を行うか、使用可能な洗身設備の個数、投入可能な作業員数等を考慮して定めるものであり、なるべく、各回に設定する作業空間内の階数を等しく設定することが工期短縮の上から好ましく、例えば、全部で10階のエレベータシャフトに対しては、最初に設定する作業空間11を5階又は6階とし、次回に設定する作業空間12を5階又は4階とすることが好ましい。   Hereinafter, preferred embodiments of the asbestos removal work method of the present invention will be described. FIG. 1 is a schematic cross-sectional view showing a partial region of an elevator shaft in a state in which the asbestos removal work method according to an embodiment of the present invention is performed. FIG. 2 shows another region of the elevator shaft in which the asbestos removal work method is carried out. It is a schematic sectional drawing shown in the state which does, and the same code | symbol is attached | subjected to the same part as the prior art example shown in FIG. In FIG. 1, first, an area extending over a plurality of floors in the elevator shaft 1 is set as a work space 11 for removing asbestos at a time. After the asbestos removal in the work space 11 as described later, as shown in FIG. 2, the work space 12 is set in another area in the elevator shaft 1 to remove the asbestos. Therefore, the asbestos removal work method of this embodiment divides the entire elevator shaft 1 into a plurality of work spaces and sequentially removes asbestos. The work space 11 to be set first is set from the lower end or the upper end of the elevator shaft. The number of floors included in the work spaces 11 and 12 is based on the total number of floors of the elevator shaft, how many times the elevator shaft is divided to remove asbestos, the number of washable equipment that can be used, the number of workers that can be input, etc. It is preferable to set the number of floors in the work space equal to each time as much as possible from the viewpoint of shortening the work period. For example, for an elevator shaft with 10 floors in total, the work to be set first The space 11 is preferably 5th or 6th floor, and the work space 12 to be set next time is preferably 5th or 4th floor.

エレベータシャフト1内の複数階にわたる領域を作業空間11に設定した後は、エレベータかご2を作業空間11の外(上方又は下方)に位置させた状態でその作業空間11内の最下階に作業床14を設け、その上方の各階には安全ネット15と作業床14を設ける。これらの作業床14や安全ネット15は、各階の出入り口17の扉18を開いてエレベータシャフト1内に入り、エレベータシャフト1内の既設の梁やガイドレール等を用いて設置可能であり、このため足場を組む等の面倒な作業が不要である。なお、エレベータシャフト1内での上下作業を安全に行うため、各安全ネット15を先に、作業床15の設置位置の下方に設置しておき、その後作業床14の設置作業を行う。安全ネット15を先に設置しておくと、その安全ネットが部品、工具等の落下を防止するので、安全ネットの上下での作業を並行して行うことが可能となり、工期短縮を図ることができる。また、最下階の下方の床(エレベータシャフト1の底面)を作業床として使用できる場合には、それを作業床とすることで、作業床14の設置は省略してもよい。   After an area extending over a plurality of floors in the elevator shaft 1 is set in the work space 11, work is performed on the lowest floor in the work space 11 with the elevator car 2 positioned outside (above or below) the work space 11. A floor 14 is provided, and a safety net 15 and a work floor 14 are provided on each floor above. These work floors 14 and safety nets 15 can be installed using the existing beams and guide rails in the elevator shaft 1 by opening the door 18 of the doorway 17 on each floor and entering the elevator shaft 1. Troublesome work such as building a scaffold is not required. In addition, in order to perform the up-and-down operation | work in the elevator shaft 1 safely, each safety net 15 is installed below the installation position of the work floor 15, and the installation work of the work floor 14 is performed after that. If the safety net 15 is installed first, the safety net prevents parts, tools, etc. from falling, so it is possible to work on the top and bottom of the safety net in parallel, thereby shortening the construction period. it can. When the floor below the lowest floor (the bottom surface of the elevator shaft 1) can be used as a work floor, the work floor 14 may be omitted by using it as the work floor.

前記したように作業床14は、エレベータシャフト1内の既設の梁やガイドレール等を用いて設置すればよい。例えば、既設の梁の上に適当な支持治具を用いて作業床を取り付けてもよいし、垂直なガイドレールの所望の高さ位置に、レールクリップ機構を備えた支持治具を用いて作業床を取り付けてもよいが、特に少なくとも一部の作業床14はガイドレールに取り付けることが好ましい。すなわち、既設の梁にはアスベスト被覆を行っている場合があり、その梁に作業床を保持させた場合には、アスベスト被覆を或る程度除去した後で作業床や支持治具の付け替えや高さ調整を行う必要があるが、ガイドレールに作業床を保持させた場合には、作業床を既設の梁の上面から適当に離れた高さ位置に設置することができ、作業床に干渉することなく梁上面のアスベスト除去が行える。以下、作業床14をガイドレールに取り付ける構造の一例を説明する。   As described above, the work floor 14 may be installed using existing beams or guide rails in the elevator shaft 1. For example, a work floor may be mounted on an existing beam using an appropriate support jig, or work may be performed using a support jig having a rail clip mechanism at a desired height position of a vertical guide rail. Although a floor may be attached, it is particularly preferable that at least a part of the work floor 14 is attached to the guide rail. In other words, the existing beam may be covered with asbestos, and when the work floor is held on the beam, the work floor and supporting jig are replaced and the height after removing the asbestos cover to some extent. Adjustment is required, but when the work floor is held on the guide rail, the work floor can be installed at a height that is appropriately separated from the upper surface of the existing beam, and it will interfere with the work floor. Asbestos can be removed from the upper surface of the beam. Hereinafter, an example of a structure for attaching the work floor 14 to the guide rail will be described.

図3はエレベータシャフト1の概略水平断面図であり、エレベータシャフト1内には、エレベータかご2の両側面を案内する垂直なガイドレール21、21と、カウンターウエイト24の両側面を案内する垂直なガイドレール22、22が設けられている。ガイドレール21、22は、断面が略T字状をなしており、フランジ部21a、22aとそれに直角なガイド部21b、22bを備えている。このフランジ部21a、22aを利用して、作業床14を支持するための支持治具を取り付けることができる。   FIG. 3 is a schematic horizontal sectional view of the elevator shaft 1. In the elevator shaft 1, vertical guide rails 21 and 21 for guiding both side surfaces of the elevator car 2 and vertical surfaces for guiding both side surfaces of the counterweight 24 are shown. Guide rails 22 are provided. The guide rails 21 and 22 have a substantially T-shaped cross section, and include flange portions 21a and 22a and guide portions 21b and 22b perpendicular to the flange portions 21a and 22a. A support jig for supporting the work floor 14 can be attached using the flange portions 21a and 22a.

図4は、ガイドレール21、22に支持治具26、27を取り付けた状態を示すエレベータシャフト1の概略水平断面図である。エレベータかご用のガイドレール21に取り付けた支持治具26は、図5、図6にも示すように、略コ字状で両端を外側に直角に延び出させた形状の支持体29と、その支持体29の中央の平坦部29aにガイドレール21のフランジ部21aを押し付けて固定するためのクリップ部材30と、支持体29とクリップ部材30を締結するボルト31及びナット32と、支持体29の両端のフランジ部29cにボルト33、ナット34で固定される長い、断面L字状の支持部材35等を備えている。この構成により、支持体29をガイドレール21の所望の高さ位置に位置させ、クリップ部材30をボルト31、ナット32で支持体29に締結することで支持治具26をガイドレール21の所望の高さ位置に固定することができ、また、ボルト31、ナット32を外すことで、支持治具26をガイドレール21から取り外すことができる。これらの支持体29、クリップ部材30、ボルト31、ナット32等は、支持治具26をガイドレールに着脱可能なレールクリップ機構を構成する。前記した支持部材35は、一対の支持治具26、26を、向かい合って配置されているガイドレール21、21に取り付けた状態では、両側の支持部材35が水平で互いに平行になるように支持体29に取り付けられている。   FIG. 4 is a schematic horizontal sectional view of the elevator shaft 1 showing a state in which the support jigs 26 and 27 are attached to the guide rails 21 and 22. As shown in FIGS. 5 and 6, the support jig 26 attached to the guide rail 21 for the elevator car is substantially U-shaped and has a support body 29 with both ends extending outwardly at right angles. The clip member 30 for pressing and fixing the flange portion 21 a of the guide rail 21 to the flat portion 29 a at the center of the support 29, the bolt 31 and the nut 32 that fasten the support 29 and the clip member 30, and the support 29 A long support member 35 having an L-shaped cross section, which is fixed to the flange portions 29c at both ends by bolts 33 and nuts 34, is provided. With this configuration, the support body 29 is positioned at a desired height position of the guide rail 21, and the clip member 30 is fastened to the support body 29 with the bolt 31 and the nut 32, whereby the support jig 26 is fixed to the desired position of the guide rail 21. The support jig 26 can be removed from the guide rail 21 by removing the bolt 31 and the nut 32. The support 29, the clip member 30, the bolt 31, the nut 32, and the like constitute a rail clip mechanism in which the support jig 26 can be attached to and detached from the guide rail. In the state where the pair of support jigs 26 and 26 are attached to the guide rails 21 and 21 arranged to face each other, the support member 35 described above is supported so that the support members 35 on both sides are horizontal and parallel to each other. 29 is attached.

カウンターウエイト用のガイドレール22に取り付けた支持治具27も、図4、図7、図8等に示すように、略コ字状の支持体29Aと、その支持体29Aの中央の平坦部29aにガイドレール22のフランジ部22aを押し付けて固定するためのクリップ部材30と、支持体29Aとクリップ部材30を締結するボルト31及びナット32を備えており、支持体29Aをガイドレール22の所望の高さ位置に位置させ、クリップ部材30をボルト31、ナット32で支持体29Aに締結することで支持治具27をガイドレール22の所望の高さ位置に固定することができ、また、ボルト31、ナット32を外すことで、支持治具27をガイドレール22から取り外すことができる。従って、これらの支持体29A、クリップ部材30、ボルト31、ナット32等は、支持治具27をガイドレールに着脱可能なレールクリップ機構を構成する。更に、支持治具27は、支持体29Aの一方の側板部29bに取り付けられたクランプ部材37と、そのクランプ部材37に保持される管状の長い支持部材38も備えている。ここで、クランプ部材37は、一対の支持治具27、27を、向かい合って配置されているガイドレール22、22に取り付けた状態では、両側のクランプ部材37、37が一本の支持部材38を水平に且つ、支持治具26の支持部材35とは直角となるように保持することができるように支持体29Aに取り付けられている。   The support jig 27 attached to the counterweight guide rail 22 also includes a substantially U-shaped support 29A and a flat portion 29a at the center of the support 29A, as shown in FIGS. Are provided with a clip member 30 for pressing and fixing the flange portion 22a of the guide rail 22, and a bolt 31 and a nut 32 for fastening the support body 29A and the clip member 30 to the support rail 29A. The support jig 27 can be fixed at a desired height position of the guide rail 22 by fastening the clip member 30 to the support body 29A with the bolt 31 and the nut 32, and the bolt 31. The support jig 27 can be removed from the guide rail 22 by removing the nut 32. Accordingly, the support 29A, the clip member 30, the bolt 31, the nut 32, and the like constitute a rail clip mechanism in which the support jig 27 can be attached to and detached from the guide rail. The support jig 27 further includes a clamp member 37 attached to one side plate portion 29b of the support 29A and a long tubular support member 38 held by the clamp member 37. Here, in the state where the pair of support jigs 27 and 27 are attached to the guide rails 22 and 22 arranged so as to face each other, the clamp members 37 and 37 on both sides can support the single support member 38. It is attached to the support 29A so that it can be held horizontally and at a right angle to the support member 35 of the support jig 26.

かくして、図4に示すように、一対の支持治具26、26を一対のガイドレール21、21に、所望の高さとなるように取り付け、両側に配置された一対の支持部材35、35に足場板、例えば伸縮足場板40を支持させ、また、一対の支持治具27、27を一対のガイドレール22、22に、所望の高さとなるように取り付け、その支持部材38と伸縮足場板40に別の足場板41、42等を支持させることで作業床14を所望高さに形成できる。ここで作業床14の高さは、その下方に位置する梁の上面のアスベスト除去に干渉しない位置となるように定めておけばよい。支持部材35、38の長さは、形成すべき作業床14の大きさに応じて適切に定めればよい。   Thus, as shown in FIG. 4, the pair of support jigs 26, 26 are attached to the pair of guide rails 21, 21 at a desired height, and the scaffolds are attached to the pair of support members 35, 35 arranged on both sides. A plate, for example, an extensible scaffolding plate 40 is supported, and a pair of support jigs 27, 27 are attached to the pair of guide rails 22, 22 so as to have a desired height, and the support member 38 and the extensible scaffolding plate 40 are attached. The work floor 14 can be formed at a desired height by supporting the other scaffold plates 41, 42 and the like. Here, the height of the work floor 14 may be determined so as not to interfere with the removal of asbestos on the upper surface of the beam positioned below the work floor 14. The lengths of the support members 35 and 38 may be appropriately determined according to the size of the work floor 14 to be formed.

なお、上記の実施の形態においては、一対の支持治具26、26を一対のガイドレール21、21に対して、支持体26及び支持部材35、35が外側になるように取り付けているが、これに限らず、図9に示すように、内側になるように取り付けてもよい。また、他方の支持治具27、27についても一対のガイドレール22、22に対してクランプ部材37、37及び支持部材38が内側(エレベータかご側)になるように取り付けてもよい。ただし、図4に示すように、支持治具26、27をガイドレール21、22に、支持部材35、38が外側となるように取り付けると、エレベータかご2やカウンターウエイト24の昇降に干渉しないので、エレベータを使用しない夜間などに適当なタイミングであらかじめ取り付けておくことが可能であり、エレベータの運行を完全に停止してアスベスト除去を行う作業期間を短縮できる利点が得られる。更に、上記の実施の形態では、支持部材35として断面L字型の条材を使用し、また支持部材38として管状のものを用いているが、支持部材35、38はこれらの断面形状のものに限らず、足場板を支持しうる任意のものを用いることができる。   In the above-described embodiment, the pair of support jigs 26 and 26 are attached to the pair of guide rails 21 and 21 so that the support body 26 and the support members 35 and 35 are outside. Not only this but as shown in FIG. 9, you may attach so that it may become inside. Further, the other support jigs 27 and 27 may be attached so that the clamp members 37 and 37 and the support member 38 are on the inner side (the elevator car side) with respect to the pair of guide rails 22 and 22. However, as shown in FIG. 4, if the support jigs 26 and 27 are attached to the guide rails 21 and 22 so that the support members 35 and 38 are on the outer side, the elevator car 2 and the counterweight 24 do not interfere with the elevation. It can be installed in advance at an appropriate timing at night when the elevator is not used, and there is an advantage that the operation period for removing asbestos can be shortened by completely stopping the operation of the elevator. Furthermore, in the above embodiment, the support member 35 is made of an L-shaped strip, and the support member 38 is a tubular member. However, the support members 35 and 38 have these cross-sectional shapes. Not limited to this, any one that can support the scaffold plate can be used.

作業床14を設置した後は、作業空間11から粉塵が外部に漏洩しないように作業空間11の天井面や側面を、プラスチックフィルム、プラスチックシート等のシート材(図示せず)で養生する。この際、除去すべきアスベストが存在している部分は、当然露出させておく。また、各作業床14もその作業床14から下方にアスベスト除去物や工具等が落下しないよう各作業床をプラスチックフィルム、プラスチックシート等のシート材(図示せず)で養生する。なお、各作業床14を養生した後も各階間の空気の流通は可能としておき、作業空間11の一部を負圧吸引することで、作業空間11内の全域を負圧とすることができるようにしておく。各階間での空気の流通を可能とする構造は特に限定するものではないが、図1に示すように、作業床14の上下を連通させる短管45を、その上端が作業床14の上面側に床面から10〜50cm程度突出するように設けておくことが好ましい。このような短管45を設けておくと、作業床14上に溜まっているアスベストが短管45を通って下方に落下することがないという利点が得られる。また、短管45の上端を閉じ、床面から上方に離れた位置の側面に開口を設けて上下階の流通を図るとか、短管45の上端開口の上方に適当な間隔を開けてアスベスト落下防止用の覆いを設ける等の変更を行ってもよい。   After the work floor 14 is installed, the ceiling surface and side surfaces of the work space 11 are cured with a sheet material (not shown) such as a plastic film or a plastic sheet so that dust does not leak from the work space 11 to the outside. At this time, a portion where asbestos to be removed is present is naturally exposed. Each work floor 14 is also cured with a sheet material (not shown) such as a plastic film or a plastic sheet so that asbestos-removed materials, tools, etc. do not fall downward from the work floor 14. In addition, after the work floors 14 are cured, air can be circulated between the floors, and a part of the work space 11 can be sucked with a negative pressure, so that the whole area of the work space 11 can be set to a negative pressure. Keep it like that. The structure that allows air to flow between the floors is not particularly limited. As shown in FIG. 1, the short pipe 45 that communicates the upper and lower sides of the work floor 14 has an upper end on the upper surface side of the work floor 14. It is preferable to be provided so as to protrude about 10 to 50 cm from the floor surface. Providing such a short tube 45 provides an advantage that asbestos accumulated on the work floor 14 does not fall downward through the short tube 45. Also, asbestos falls by closing the upper end of the short pipe 45 and providing an opening on the side surface at a position distant from the floor to distribute the upper and lower floors, or by opening an appropriate interval above the upper end opening of the short pipe 45 Changes such as providing a protective cover may be made.

次に、作業床14を設けた各階の出入り口17にそれぞれ洗身設備7を設ける。洗身設備7は、セキュリティハウスとも呼ばれるもので、前室7a、エアシャワー室7b、更衣室(保護衣等脱着室)7c等を備えている。次に、最下階に除塵吸引装置8を設置し、それに接続された吸引ダクト9をエレベータシャフト1内に通す。これにより、エレベータシャフト1内の作業空間11を負圧状態に保持することが可能となる。なお、洗身設備7の設置や除塵吸引装置8の設置は、エレベータシャフト1内で養生を行う前或いは作業床14や安全ネット15を設置する前に行ってもよい。   Next, the washing facilities 7 are provided at the entrances 17 of each floor where the work floor 14 is provided. The washing apparatus 7 is also called a security house, and includes a front room 7a, an air shower room 7b, a changing room (a protective clothing and a removable room) 7c, and the like. Next, the dust removal suction device 8 is installed on the lowest floor, and the suction duct 9 connected thereto is passed through the elevator shaft 1. Thereby, it becomes possible to hold | maintain the working space 11 in the elevator shaft 1 in a negative pressure state. In addition, you may perform installation of the washing apparatus 7 and installation of the dust removal suction apparatus 8 before performing the curing in the elevator shaft 1 or installing the work floor 14 and the safety net 15.

以上の準備が終了した後、除塵吸引装置8を作動させてエレベータシャフト1の作業空間11内を負圧状態に保ち、その状態で各階の洗身設備7を通って、作業者が保護衣を着て各階の作業床14の上に入り、各階並行してアスベスト除去作業を行う。すなわち、既設のアスベストにアスベスト飛散防止のための湿潤剤を吹き付け、スクレーパ、ナイフ等でアスベストを掻き落とし、アスベスト除去物を袋詰めして排出する等の作業を行う。これらの作業は各階で並行して行うため上下作業となるが、各階の間には作業床14を設け、且つシート材(図示せず)で養生しているので工具等の落下の恐れはなく、安全に実施できる。しかも、安全ネット15も設けているので、一層安全である。そして、各階で並行してアスベスト除去を行うため、従来のように、上から1階ずつアスベスト除去を行っていく場合に比べてはるかに短期間でアスベスト除去を行うことができる。   After the above preparation is completed, the dust removal suction device 8 is operated to keep the work space 11 of the elevator shaft 1 in a negative pressure state, and in that state, the operator passes the washing equipment 7 on each floor, and the worker wears protective clothing. It wears on the work floor 14 of each floor, and asbestos removal work is performed in parallel with each floor. That is, an asbestos scattering prevention humectant is sprayed on the existing asbestos, the asbestos is scraped off with a scraper, a knife or the like, and the asbestos removal product is bagged and discharged. Since these operations are performed in parallel on each floor, they are up and down operations. However, there is no fear of dropping of tools or the like because a work floor 14 is provided between the floors and is cured with a sheet material (not shown). Can be safely implemented. Moreover, since the safety net 15 is also provided, it is safer. And since asbestos removal is performed in parallel on each floor, asbestos removal can be performed in a much shorter period of time compared with the case where asbestos removal is performed one floor from the top as in the past.

作業空間11内でのアスベスト除去を終了すると、養生に用いていたシート材を撤去する。撤去したシート材や袋詰めしたアスベスト除去物等は、洗身設備7の更衣室7cで袋詰めし、外部に搬出する。また、作業者は更衣室7cで保護衣を脱ぎ、袋詰めして外部に搬出する。このように、洗身設備7を通って作業者が出入りし、また、アスベスト除去物等を搬出することで、アスベストの系外への飛散が防止される。   When the removal of asbestos in the work space 11 is completed, the sheet material used for curing is removed. The removed sheet material, the asbestos-removed material packed in the bag, and the like are packed in the changing room 7c of the scouring facility 7 and carried outside. In addition, the worker takes off the protective clothing in the changing room 7c, packs it in a bag, and carries it out. Thus, the worker enters and exits through the washing apparatus 7, and carries out asbestos-removed materials and the like to prevent asbestos from scattering outside the system.

エレベータシャフト1内のアスベスト除去を終了した後、必要があれば、アスベスト除去対象の金属材表面に耐火断熱材等を被覆し、耐火被覆復旧作業を行う。この作業も各階に設けている作業床14を用いて並行して行うことで、きわめて短期間で実施できるその後、各洗身設備7や作業床14、安全ネット15等の撤去を行う。以上によって、エレベータシャフト内の作業空間11に対するアスベスト除去作業が終了する。   After the removal of asbestos in the elevator shaft 1 is completed, if necessary, the surface of the metal material to be removed of asbestos is covered with a refractory heat insulating material or the like, and the refractory coating is restored. This operation can also be performed in a very short period of time by using the work floor 14 provided on each floor, and thereafter, each washing equipment 7, the work floor 14, the safety net 15 and the like are removed. Thus, the asbestos removal work for the work space 11 in the elevator shaft is completed.

次に、先にアスベスト除去を行った作業空間11に続く領域に、図2に示すように作業空間12を設定し、エレベータかご2をその作業空間12から外れた位置に移動させ、図1に示す作業空間11についての上記した作業と同様にしてアスベスト除去作業を行う。すなわち、エレベータシャフト1内の各階に作業床14、安全ネット15を設置し、養生を行い、各階の出入り口17の前に洗身設備7を設置し、各階で並行してアスベスト除去作業を行い、必要に応じ、耐火被覆復旧作業を行う。その後、各洗身設備7や作業床14、安全ネット15等の撤去を行う。以上によって、エレベータシャフト内の作業空間12に対するアスベスト除去作業が終了する。作業空間11、作業空間12のアスベスト除去により、エレベータシャフト1の全域のアスベスト除去が終わった場合には、これで作業を終了する。また、まだアスベスト除去を行っていない領域がある場合にはその領域についても上記と同様にしてアスベスト除去作業を行う。   Next, the work space 12 is set as shown in FIG. 2 in the area following the work space 11 from which asbestos has been removed first, and the elevator car 2 is moved to a position outside the work space 12. The asbestos removal work is performed in the same manner as the work described above for the work space 11 shown. That is, work floors 14 and safety nets 15 are installed on each floor in the elevator shaft 1, and curing is performed. Washing equipment 7 is installed in front of the doorway 17 on each floor, and asbestos removal work is performed in parallel on each floor. Perform fireproof covering restoration work as necessary. Thereafter, each washing equipment 7, work floor 14, safety net 15 and the like are removed. Thus, the asbestos removal work for the work space 12 in the elevator shaft is completed. When the asbestos removal of the entire area of the elevator shaft 1 is completed by the asbestos removal of the work space 11 and the work space 12, the work is finished. If there is a region where asbestos removal has not yet been performed, the asbestos removal operation is performed in the same manner as described above.

以上に説明したように、この実施の形態では、エレベータシャフト内に複数階にわたって設定した作業空間11、12において、それぞれの階に作業床を設け且つ作業員が出入りする洗身設備7を設け、各階でアスベスト除去作業を並行して行うようにしているので、きわめて短期間でアスベスト除去及び耐火被覆復旧作業を行うことができ、例えば、10階程度のエレベータシャフトに対して、作業空間11、12をそれぞれ5階ずつとしてアスベスト除去及び耐火被覆復旧作業を行うことにより、2日間で作業を完了できる。   As described above, in this embodiment, in the work spaces 11 and 12 set over a plurality of floors in the elevator shaft, the work floors are provided on the respective floors, and the washing facilities 7 in which workers enter and exit are provided. Since the asbestos removal work is performed in parallel on each floor, the asbestos removal and the fireproof covering restoration work can be performed in a very short period of time. For example, the work spaces 11 and 12 for the elevator shaft on the 10th floor By completing asbestos removal and fireproof covering restoration work on 5 floors each, work can be completed in 2 days.

なお、上記した実施の形態では、作業空間11、12内のそれぞれの階に作業床14を設け、且つそれぞれの階の出入り口17の前に洗身設備7を設置し、すべての階で並行してアスベスト除去及び耐火被覆復旧作業を行っているが、作業床17及び洗身設備7の設置は、必ずしもすべての階とする必要はなく、例えば1階おきとするとか、2階おきとする等の変更を加えてもよい。図10はその場合の実施の形態を示すものであり、作業空間11の最下階に作業床14を設け、且つ1階おいたその上の階に安全ネット15と作業床14を設け、且つ作業床14を設けている階の出入り口17の前に洗身設備7を設けている。この実施の形態では、それぞれの作業床14を用い、且つ適当な踏み台やはしごを用いて2階分のアスベスト除去及び耐火被覆復旧作業を行う。この場合でも、上下で並行してアスベスト除去及び耐火被覆復旧作業を行うことができるので、図11に示す従来例のように最上部から順次作業を行って行く場合に比べて工期の短縮を図ることができる。なお、一つの作業床14から2階分の作業を行うには、踏み台やはしごを用いるよりも足場を設けた方がよい場合もあるが、その場合の足場としては低く簡単なものでよく、簡単な足場を組むことで効率良く作業を行うことができる。   In the above-described embodiment, the work floor 14 is provided on each floor in the work spaces 11 and 12, and the washing equipment 7 is installed in front of the doorway 17 on each floor, and is parallel to all the floors. Asbestos removal and fireproof covering restoration work are performed, but it is not necessary to install the work floor 17 and the washing equipment 7 on every floor, for example, every other floor, every second floor, etc. Changes may be made. FIG. 10 shows an embodiment in that case, a work floor 14 is provided on the lowermost floor of the work space 11, and a safety net 15 and a work floor 14 are provided on the upper floor of the first floor, and Washing equipment 7 is provided in front of the doorway 17 on the floor where the work floor 14 is provided. In this embodiment, asbestos removal and fireproof covering restoration work for the second floor are performed using the respective work floors 14 and using an appropriate step or ladder. Even in this case, since the asbestos removal and the fireproof covering restoration work can be performed in parallel in the upper and lower directions, the work period can be shortened compared to the case where the work is sequentially performed from the top as in the conventional example shown in FIG. be able to. In addition, in order to perform work for two floors from one work floor 14, it may be better to provide a scaffold than using a step ladder or a ladder, but the scaffold in that case may be low and simple, It is possible to work efficiently by building a simple scaffold.

以上に本発明の好適な実施の形態を説明したが、本発明はこれらの実施の形態に限定されるものではなく、特許請求の範囲の記載範囲内で適宜変更可能である。例えば、図面に示す実施の形態では、作業空間内を負圧に吸引した状態でアスベスト除去を行っており、アスベスト粉塵の周辺環境への飛散をきわめて確実に防止できる利点を有しているが、作業空間の密閉度を上げることで、負圧吸引を省略してもよい。また、作業床14を設けた階の出入り口の前に洗身設備7を設けているが、場合によってはこれを省略してもよい。   The preferred embodiments of the present invention have been described above, but the present invention is not limited to these embodiments and can be appropriately changed within the scope of the claims. For example, in the embodiment shown in the drawings, asbestos removal is performed in a state where the working space is sucked to a negative pressure, and there is an advantage that the asbestos dust can be extremely reliably prevented from being scattered to the surrounding environment. By increasing the degree of sealing of the work space, negative pressure suction may be omitted. Moreover, although the washing apparatus 7 is provided in front of the entrance / exit of the floor in which the work floor 14 is provided, this may be omitted in some cases.

エレベータシャフトの一部領域を、本発明の一実施の形態のアスベスト除去作業方法を実施する状態で示す概略断面図Schematic sectional view showing a partial region of the elevator shaft in a state in which the asbestos removal work method according to one embodiment of the present invention is carried out エレベータシャフトの別の領域を、アスベスト除去作業方法を実施する状態で示す概略断面図Schematic sectional view showing another region of the elevator shaft in a state where the asbestos removal work method is carried out エレベータシャフトの概略水平断面図Schematic horizontal sectional view of elevator shaft ガイドレールに支持治具を取り付けた状態を示すエレベータシャフトの概略水平断面図Schematic horizontal cross-sectional view of the elevator shaft showing the support rail attached to the guide rail ガイドレール21に支持治具26を取り付けた状態を示す概略平面図Schematic plan view showing a state where the support jig 26 is attached to the guide rail 21 (a)は図5のA−A矢視概略正面図、(b)は図5のB−B矢視概略側面図(A) is a schematic front view taken along the line AA in FIG. 5, and (b) is a schematic side view taken along the line BB in FIG. ガイドレール22に支持治具27を取り付けた状態を示す概略平面図Schematic plan view showing a state where the support jig 27 is attached to the guide rail 22 (a)は図7のA−A矢視概略正面図、(b)は図5のB−B矢視概略側面図(A) is a schematic front view taken along the line AA in FIG. 7, and (b) is a schematic side view taken along the line BB in FIG. ガイドレール21に支持治具26を図5とは異なる態様で取り付けた状態を示す概略平面図Schematic plan view showing a state where the support jig 26 is attached to the guide rail 21 in a manner different from that shown in FIG. エレベータシャフトの一部領域を、図1とは異なる実施の形態のアスベスト除去作業方法を実施する状態で示す概略断面図Schematic sectional view showing a partial region of the elevator shaft in a state in which the asbestos removal work method of the embodiment different from that shown in FIG. 1 is carried out エレベータシャフトの一部領域を、従来のアスベスト除去作業方法を実施する状態で示す概略断面図Schematic sectional view showing a partial region of the elevator shaft in a state where a conventional asbestos removal work method is carried out

符号の説明Explanation of symbols

1 エレベータシャフト
2 エレベータかご
3 足場
4 作業床
5 階段
7 洗身設備
7a 前室
7b エアシャワー室
7c 更衣室(保護衣等脱着室)
8 除塵吸引装置
9 吸引ダクト
11、12 作業空間
14 作業床
15 安全ネット
17 出入り口
18 扉
21、22 ガイドレール
24 カウンターウエイト
26、27 支持治具
29、29A 支持体
30 クリップ部材
31、32 ボルト、ナット
33、34 ボルト、ナット
35 支持部材
37 クランプ部材
38 支持部材
40 伸縮足場板
41、42 足場板
45 短管
DESCRIPTION OF SYMBOLS 1 Elevator shaft 2 Elevator car 3 Scaffolding 4 Work floor 5 Stairs 7 Washing equipment 7a Front room 7b Air shower room 7c Changing room (Desorption room for protective clothing, etc.)
8 Dust removal suction device 9 Suction duct 11, 12 Work space 14 Work floor 15 Safety net 17 Entrance / exit 18 Door 21, 22 Guide rail 24 Counterweight 26, 27 Support jig 29, 29A Support 30 Clip member 31, 32 Bolt, Nut 33, 34 Bolt, nut 35 Support member 37 Clamp member 38 Support member 40 Telescopic scaffold plate 41, 42 Scaffold plate 45 Short tube

Claims (7)

エレベータシャフト内の複数階にわたる領域を作業空間に設定し、エレベータかごを前記作業空間の外に位置させた状態でその作業空間内の最下階と、その上方の一つ以上の階に作業床を設ける工程と、作業床を設けた各階の出入り口から作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行う工程を有するエレベータシャフト内のアスベスト除去作業方法。   The work space is set on the lowest floor in the work space and one or more floors above the work space with the elevator car positioned outside the work space, and an area extending over multiple floors in the elevator shaft. And an asbestos removal operation method in the elevator shaft, which includes a step in which an operator enters the work floor from the entrance / exit of each floor where the work floor is provided, and performs asbestos removal in the elevator shaft in parallel on the upper and lower floors. エレベータシャフト内の複数階にわたる領域を作業空間に設定し、エレベータかごを前記作業空間の外に位置させた状態でその作業空間内のすべての階にそれぞれ、作業床を設ける工程と、作業床を設けた各階の出入り口から作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行う工程を有するエレベータシャフト内のアスベスト除去作業方法。   A step of setting a work space on a plurality of floors in an elevator shaft and setting a work floor on each floor in the work space with the elevator car positioned outside the work space; An asbestos removal work method in an elevator shaft, which includes a step in which an operator enters the work floor from an entrance / exit of each floor and removes asbestos in the elevator shaft in parallel on the upper and lower floors. 少なくとも一部の前記作業床を、エレベータシャフト内に垂直に設けられているガイドレールに着脱可能なレールクリップ機構を備えた支持治具を用いて、前記ガイドレールに保持させることを特徴とする請求項1又は2記載のエレベータシャフト内のアスベスト除去作業方法。   At least a part of the work floor is held by the guide rail using a support jig provided with a rail clip mechanism that can be attached to and detached from a guide rail provided vertically in an elevator shaft. Item 3. An asbestos removal work method in an elevator shaft according to item 1 or 2. 前記作業床を設置した後に、前記作業空間から粉塵が外部に漏洩しないように前記作業空間をシート材で養生し且つ各作業床から下方にアスベスト除去物等が落下しないよう各作業床をシート材で養生する工程と、作業床を設けた各階の出入り口にそれぞれ洗身設備を設ける工程と、前記作業空間内を負圧吸引する手段を設ける工程を設け、前記作業空間を負圧吸引した状態で、各洗身設備を通って対応する作業床の上に作業者が入り、上下階で並行してエレベータシャフト内のアスベスト除去を行うことを特徴とする請求項1から3のいずれか1項記載のエレベータシャフト内のアスベスト除去作業方法。   After the work floor is installed, the work space is cured with a sheet material so that dust does not leak to the outside from the work space, and each work floor is removed from the work floor so that asbestos-removed materials do not fall downward. In the state where the step of curing in, the step of providing the washing equipment respectively at the entrance and exit of each floor provided with the work floor, the step of providing means for sucking negative pressure in the work space, the work space in the state of sucking the negative pressure 4. The asbestos according to claim 1, wherein an operator enters the corresponding work floor through each washing equipment and removes asbestos in the elevator shaft in parallel on the upper and lower floors. 5. To remove asbestos in the elevator shaft. 前記作業空間内の作業床の設置に先立って、最下階の作業床を除いた他の作業床の設置位置の下方に安全ネットを取り付け、その後作業床の設置を行うことを特徴とする請求項1から4のいずれか1項記載のエレベータシャフト内のアスベスト除去作業方法。   Prior to installation of the work floor in the work space, a safety net is attached below the installation position of other work floors excluding the work floor on the lowest floor, and then the work floor is installed. Item 5. An asbestos removal work method in an elevator shaft according to any one of Items 1 to 4. 請求項1から5のいずれか1項に記載の諸工程を、エレベータシャフト内の他の領域について繰り返すことで、エレベータシャフト全体のアスベスト除去を行うことを特徴とするエレベータシャフト内のアスベスト除去作業方法。   An asbestos removal work method in an elevator shaft, wherein asbestos removal of the entire elevator shaft is performed by repeating the steps according to any one of claims 1 to 5 for other regions in the elevator shaft. . 請求項1から6のいずれか1項記載のアスベスト除去作業方法において、アスベスト除去を行う工程の後に、前記作業床の撤去に先立って、アスベスト除去を行った対象に対する耐火被覆を行う工程を設けることを特徴とするエレベータシャフト内のアスベスト除去作業方法。   The asbestos removal work method according to any one of claims 1 to 6, wherein, after the step of removing asbestos, a step of performing a fireproof coating on the target from which the asbestos has been removed is provided prior to the removal of the work floor. Asbestos removal work method in the elevator shaft characterized by this.
JP2008066933A 2007-09-14 2008-03-17 Asbestos removing work method in elevator shaft Pending JP2009084049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008066933A JP2009084049A (en) 2007-09-14 2008-03-17 Asbestos removing work method in elevator shaft

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2007238967 2007-09-14
JP2008066933A JP2009084049A (en) 2007-09-14 2008-03-17 Asbestos removing work method in elevator shaft

Publications (1)

Publication Number Publication Date
JP2009084049A true JP2009084049A (en) 2009-04-23

Family

ID=40657963

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008066933A Pending JP2009084049A (en) 2007-09-14 2008-03-17 Asbestos removing work method in elevator shaft

Country Status (1)

Country Link
JP (1) JP2009084049A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011201613A (en) * 2010-03-24 2011-10-13 Taisei Corp Asbestos removing method
JP2013053515A (en) * 2012-10-12 2013-03-21 Ohbayashi Corp Asbestos removal method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011201613A (en) * 2010-03-24 2011-10-13 Taisei Corp Asbestos removing method
JP2013053515A (en) * 2012-10-12 2013-03-21 Ohbayashi Corp Asbestos removal method

Similar Documents

Publication Publication Date Title
US8875774B1 (en) Protective apparatus for windows and construction areas
JP5237895B2 (en) Anti-scatter device
JP5146772B2 (en) Building renovation / demolition equipment and building renovation / demolition method
KR20110135792A (en) Apparatus for dismantling building slate roof
JP2009084049A (en) Asbestos removing work method in elevator shaft
JP5104177B2 (en) Deposit processing apparatus and deposit processing method
KR101828318B1 (en) Removal Device of The Decrepit Structure and the Removal Method
JP5495818B2 (en) Exterior wall repair method
JP5365843B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP2003176911A (en) Stack demolition device, and method of demolition of stack
JP5764073B2 (en) Scatter prevention structure and method of removing external spray
JP5151377B2 (en) Deposit processing apparatus and deposit processing method
JP6061339B2 (en) Structure reconstruction method and structure reconstruction system
JP2007107359A (en) Asbestos removal method and asbestos removal device
JP6191129B2 (en) Deposit processing equipment
JP5365844B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP5779870B2 (en) Method for treating deposit, method for installing partition wall, and partition wall
JP5323750B2 (en) Asbestos removal method
KR102182837B1 (en) Demolaition system for slate with asbestos
JP5445653B2 (en) Asbestos removal method
JP6136223B2 (en) Deposit processing equipment
JP5927835B2 (en) How to remove deposits
JP2007218059A (en) Asbestos removing method
JP2008308914A (en) Work unit
JP6387217B2 (en) Working scaffold installation method