JP2007138522A - Connection structure of pile and pc steel bar - Google Patents

Connection structure of pile and pc steel bar Download PDF

Info

Publication number
JP2007138522A
JP2007138522A JP2005332994A JP2005332994A JP2007138522A JP 2007138522 A JP2007138522 A JP 2007138522A JP 2005332994 A JP2005332994 A JP 2005332994A JP 2005332994 A JP2005332994 A JP 2005332994A JP 2007138522 A JP2007138522 A JP 2007138522A
Authority
JP
Japan
Prior art keywords
pile
end plate
locking
fitting
fitting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005332994A
Other languages
Japanese (ja)
Other versions
JP4753136B2 (en
Inventor
Yoshinobu Kitani
好伸 木谷
Yoichi Kato
洋一 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP2005332994A priority Critical patent/JP4753136B2/en
Publication of JP2007138522A publication Critical patent/JP2007138522A/en
Application granted granted Critical
Publication of JP4753136B2 publication Critical patent/JP4753136B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a connection structure of a pile and a PC steel bar capable of simplifying connection work without making any projection on the outside of a connected prefabricated pile. <P>SOLUTION: A connection bar 20 having an upper huge section on the front end is erected on the upper end plate 25A of a lower pile 30A, and fitting groove strips 43 are formed in the side 4. An upper pile 30B forms an interlock receiving section capable of inserting and engaging the connection bar 20 in the outside 2 of the lower end plate 25B, and the fitting groove strips 43 are formed in the side 4 of the lower end plate 25B. The lower pile 30A is made to fall in a pile hole to hold on the ground (a), the upper pile 30B is made to fall to insert the connection bar 20 of the upper end plate 25A of the lower pile 30A in the interlock receiving section of the upper pile 30B. The upper pile 30B is rotated to make opening edges 46 and 46 coincide with each other by both piles 30A and 30B. In this case, the connection bar 20 of the lower pile 30A is interlocked with the interlock receiving section 10 of the upper pile 30B. A fitting connection member 50 is fitted to a fitting groove 49 formed by making the fitting groove strips 43 coincide with each other to constitute a connection structure 33 (b and c). <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

この発明は、複数の既製杭を上下に接合して連結杭を構成する際の杭の連結構造、および既製杭をコンクリート杭とした場合に使用するPC鋼棒に関する。 This invention relates to the connection structure of the pile at the time of joining a some ready-made pile up and down and comprising a connection pile, and the PC steel bar used when a ready-made pile is used as a concrete pile.

コンクリート製の既製杭を連結する際には、接合端部に鋼製の端板を取付け、端板同士を付け合わせて、溶接して接合する方法が未だに一般的となっている。溶接による場合には、熟練技術を要し、風雨がある場合には雨や埃が溶接に影響を与えるので、天候に作業の進捗が左右され工程管理に問題があった。そこで、溶接を使わない様々な方法が提案されている。   When connecting ready-made piles made of concrete, it is still common to attach steel end plates to the joint ends, attach the end plates together and weld them together. In the case of welding, skill is required, and when there is wind and rain, rain and dust affect the welding, so the progress of the work is affected by the weather and there is a problem in process management. Therefore, various methods that do not use welding have been proposed.

例えば、部分円形の帯状の連結具を被せて、連結具の外側から端板にボルトを打ち、固定していた(特許文献1)。また、他の方法では接続部材に2つの接続突起を突設して、上下端板に設けた凹部に、接続突起を嵌挿して、上杭、下杭を連結していた(特許文献2)。また、他の方法は、一方の端板に頭部を先端にしてボルトを突設して、他方の端板にボルトの頭部が挿入される大径部、大径溝部、鍔部を形成して、付け合わせた端板内で、接合する構造が提案されている(特許文献3)。
特開2003−82656 特開2002−161531 特開2004−76533
For example, a partially circular belt-like connector is put on, and a bolt is applied to the end plate from the outside of the connector to fix it (Patent Document 1). In another method, two connection protrusions are provided on the connection member, and the connection protrusions are inserted into the recesses provided on the upper and lower end plates to connect the upper pile and the lower pile (Patent Document 2). . Another method is to project a bolt with a head on one end plate and a large-diameter portion, large-diameter groove, or collar where the head of the bolt is inserted into the other end plate. And the structure joined within the attached end plate is proposed (patent document 3).
JP 2003-82656 A JP 2002-161531 A JP 2004-76533 A

前記従来の技術では特許文献1、2では、既製杭の外側面で突出物が形成されるので、突起物が杭穴壁に当たり、杭穴壁を崩すおそれもあり、その衝撃で突起物に負荷が掛かり、上下杭の連結が破壊されあるいは緩むおそれがあった。また、特許文献3では、ボルト5のボルト頭部51を、段差を有する鍔部33に係止するので、接合する端板の当接面に不整合があった場合、連結不能となるおそれもあった。   In Patent Documents 1 and 2, in the above-mentioned conventional technology, since the protrusion is formed on the outer surface of the ready-made pile, there is a possibility that the protrusion hits the pile hole wall and breaks the pile hole wall, and the impact is loaded on the protrusion. There was a risk that the connection between the upper and lower piles was broken or loosened. Moreover, in patent document 3, since the bolt head part 51 of the volt | bolt 5 is latched by the collar part 33 which has a level | step difference, when there is inconsistency in the contact surface of the end plate to join, there exists a possibility that it may become impossible to connect. there were.

また、連結に用いる部材、プレート、ボルト、特殊な端板など、それぞれの連結方法に、特殊な構造の材料を使用する必要があった。従ってコスト高や納期の長期化を招き、工期の短縮を拒む要因ともなっていた。   Moreover, it was necessary to use a material with a special structure for each connection method, such as a member used for connection, a plate, a bolt, and a special end plate. Therefore, the cost was increased and the delivery time was prolonged, and it was a factor that refused to shorten the construction period.

また、PC鋼棒は既製コンクリート杭の両端板の定着孔に定着して、コンクリートにプレストレスを導入するためにだけに使用していた。   In addition, PC steel bars are used only to fix prestress in concrete by fixing in the fixing holes of both end plates of ready-made concrete piles.

然るにこの発明は、係止部及び/又は係止受け部の口縁部をテーパー状の連結案内部を形成したので、あるいは、端板の外側面と嵌合連結材の外面とを略同一に形成したので、従来の汎用の端板をそのままあるいは加工して使用でき、前記問題点を解決した。   However, according to the present invention, since the tapered connecting guide portion is formed at the mouth portion of the locking portion and / or the locking receiving portion, or the outer surface of the end plate and the outer surface of the fitting connecting material are substantially the same. Since it is formed, a conventional general-purpose end plate can be used as it is or after processing, thus solving the above-mentioned problems.

即ちこの発明は、下杭の端板の上端面と上杭の端板の下端面とを当接して両端板を連結して、連結杭を構成する連結構造において、
一方の端板の端面に、先端に係止部を有する係止突起を形成し、他方の端板の端面に、前記突起を挿入して、係止部を係止できる係止受け部を有する係止凹部を形成し、前記係止部及び/又は係止受け部の口縁部をテーパー状の連結案内部を形成したことを特徴とする杭の連結構造。
That is, the present invention is a connecting structure that constitutes a connecting pile by connecting both end plates by contacting the upper end surface of the end plate of the lower pile and the lower end surface of the end plate of the upper pile,
A locking projection having a locking portion at the tip is formed on the end surface of one end plate, and a locking receiving portion is provided on the end surface of the other end plate to insert the protrusion and lock the locking portion. A connecting structure for piles, wherein a locking recess is formed, and a tapered connecting guide part is formed at the edge of the locking part and / or the locking receiving part.

前記において、係止突起は、軸部の先端を膨大に形成して略球形の係止部とし、係止凹部は、前記係止部を挿通できる大きさの大径穴と軸部を挿通でき係止部を挿通できない大きさの小径穴とを円周方向に並列し、前記小径穴の開口部をテーパー状に拡径した連結案内部を有する係止凹部を形成することを特徴とする杭の連結構造である。また、前記において、下杭及び上杭を、上下端板間に配置したPC鋼棒でストレスを導入したコンクリート製の杭とし、前記PC鋼棒の端縁を前記端板の内周側に定着させ、係止突起及び係止受け部を前記端板の外周側に配置したことを特徴とする杭の連結構造である。また、下杭又は上杭のいずれか一方の杭の端板の外周に、上杭又は下杭の外径を内径とするガイド筒を嵌装したことを特徴とする杭の連結構造である。また、一方の端板の外側面に複数の第一嵌合溝片を形成し、他方の端板の外側面に前記第一嵌合溝に対応して、第二嵌合溝片を形成し、前記両嵌合溝に、嵌合連結材を嵌合し、前記端板の外側面と前記嵌合連結材の外面とを略同一に形成したことを特徴とする杭の連結構造である。   In the above, the locking projection is formed into a substantially spherical locking portion by enormously forming the tip of the shaft portion, and the locking recess can be inserted through the large-diameter hole and the shaft portion large enough to allow the locking portion to be inserted. A pile characterized by forming a locking recess having a connecting guide portion in which a small-diameter hole of a size that cannot be inserted through the locking portion is juxtaposed in the circumferential direction and the opening of the small-diameter hole is expanded in a tapered shape. It is the connection structure of. Further, in the above, the lower pile and the upper pile are made of concrete piles in which stress is introduced with a PC steel rod disposed between the upper and lower end plates, and the edge of the PC steel rod is fixed to the inner peripheral side of the end plate. And a locking projection and a locking receiving portion are arranged on the outer peripheral side of the end plate. Moreover, it is the connection structure of the pile characterized by mounting the guide pipe | tube which makes the outer diameter of an upper pile or a lower pile an internal diameter in the outer periphery of the end plate of either a lower pile or an upper pile. A plurality of first fitting groove pieces are formed on the outer surface of one end plate, and a second fitting groove piece is formed on the outer surface of the other end plate corresponding to the first fitting groove. The pile connection structure is characterized in that a fitting connecting material is fitted into both the fitting grooves, and the outer surface of the end plate and the outer surface of the fitting connecting material are formed substantially the same.

また、他の発明は、下杭の端板の上端面と上杭の端板の下端面とを当接して両端板を連結して、連結杭を構成する連結構造において、一方の端板の外側面に複数の第一嵌合溝片を形成し、他方の端板の外側面に前記第一嵌合溝に対応して、第二嵌合溝片を形成し、前記両嵌合溝片を合わせて、前記上下杭を配置し、前記両嵌合溝片に共通する嵌合連結材を嵌合してなり、前記両嵌合溝に、嵌合連結材を嵌合し、前記端板の外側面と前記嵌合連結材の外面とを略同一に形成したことを特徴とする杭の連結構造である。   Moreover, other invention is the connection structure which contact | connects the upper end surface of the end plate of a lower pile, and the lower end surface of the end plate of an upper pile, connects both end plates, and comprises a connection pile, A plurality of first fitting groove pieces are formed on the outer side surface, and a second fitting groove piece is formed on the outer side surface of the other end plate corresponding to the first fitting groove piece. , The upper and lower piles are arranged, and a fitting connecting material common to both the fitting groove pieces is fitted, the fitting connecting material is fitted into the both fitting grooves, and the end plate This is a pile connection structure characterized in that the outer surface of the fitting connection member and the outer surface of the fitting connection member are formed substantially the same.

更に、他の発明は、既製コンクリート杭に埋設して使用するPC鋼棒であって、前記既製コンクリート杭の端板の定着孔との定着用の膨大部の先端側に軸部を延長し、該軸部の先端に連結用の膨大部を形成したことを特徴とするPC鋼棒である。   Furthermore, another invention is a PC steel rod used by being embedded in a ready-made concrete pile, and the shaft portion is extended to the front end side of the enormous portion for fixing with the fixing hole of the end plate of the ready-made concrete pile, A PC steel bar characterized in that a huge portion for connection is formed at the tip of the shaft portion.

前記係止部及び/又は係止受け部の口縁部をテーパー状の連結案内部を形成したので、上杭を回転されれば、係止部と係止受け部の係止が容易に行うことができ、連結作業を簡略化すると共に、端板の当接面に不陸があるなど不整合があった場合であっても、上下杭を接合することができる効果がある。   Since the tapered connection guide portion is formed on the mouth portion of the locking portion and / or the locking receiving portion, the locking portion and the locking receiving portion can be easily locked if the upper pile is rotated. It is possible to simplify the connecting operation and to join the upper and lower piles even when there is a mismatch such as unevenness on the contact surface of the end plate.

また、端板の外側面と嵌合連結材の外面とを略同一に形成したので、連結した既製杭の外面に突起物が生じないので、その突起部が杭穴壁に当接して、連結を破壊しあるいは杭穴壁を崩すおそれがない。従って、必要以上に大きな径の杭穴を空ける必要がなく、また既製杭の埋設作業を簡略化することができる効果がある。   In addition, since the outer surface of the end plate and the outer surface of the fitting connecting material are formed substantially the same, there is no projection on the outer surface of the connected prefabricated pile, so that the protruding portion abuts the pile hole wall and connects There is no risk of destroying or breaking the pile hole wall. Therefore, there is no need to make a pile hole having a larger diameter than necessary, and there is an effect that it is possible to simplify the work of burying a ready-made pile.

また、この発明で使用する端板は従来より汎用で使用している端板に係止受け部を設ければ完成でき、連結棒は、一般のPC鋼棒の極短尺のものを使用することができる。従って、この発明で使用する各部材については、製造コストの削減を図ることができ、また製造も簡略化できるので、納期の短縮化から、工程の短縮化を実現できる。   In addition, the end plate used in the present invention can be completed by providing a latch receiving portion on the end plate that has been used for general purposes, and the connecting rod should be a very short length of a general PC steel rod. Can do. Therefore, each member used in the present invention can reduce the manufacturing cost and can simplify the manufacturing process, so that the process can be shortened from the shortened delivery time.

また、PC鋼棒は、定着用の膨大部を延長して連結棒を構成した場合には、別途連結棒を作成し、既製杭に取り付ける作業を省略することができ、連結作業を更に簡略化できる。   In addition, when the connecting steel bar is constructed by extending the enlarging part for fixing the PC steel bar, it is possible to omit the work of creating a separate connecting bar and attaching it to the ready-made pile, further simplifying the connecting work it can.

(1) 下杭30Aの上端板25Aの一面2に先端に上膨大部22を有する連結棒(係止棒)20を立設し(図6鎖線図示20)、側面4に、開口縁46及び幅広部を有する嵌合溝片43、43を形成する(図6(a)、図2(a))。 (1) A connecting rod (locking rod) 20 having an upper enormous portion 22 at its tip is erected on one surface 2 of the upper end plate 25A of the lower pile 30A (shown by a chain line 20 in FIG. 6). Fitting groove pieces 43 and 43 having a wide portion are formed (FIGS. 6A and 2A).

上杭30Bは、下端板25Bの他面3に、下杭の連結棒20の上膨大部22を挿入して、回転して上膨大部22を係止できる挿通孔11、係止孔12を有する係止受け部11を形成する。また、下端板25Bの側面4に、開口縁46及び幅広部を有する嵌合溝片43、43を形成する(図6(a))。   The upper pile 30B has an insertion hole 11 and a locking hole 12 that can be inserted into the other surface 3 of the lower end plate 25B by inserting the upper huge portion 22 of the connecting rod 20 of the lower pile and rotating to lock the upper huge portion 22. The latch receiving part 11 which has is formed. Moreover, the fitting groove pieces 43 and 43 which have the opening edge 46 and a wide part are formed in the side surface 4 of the lower end board 25B (FIG. 6 (a)).

(2) 所定の杭穴に、下杭30Aを従来と同様な方法で降下させて地上で保持する(図6(a))。上杭30Bを降下させて、下杭30Aの上端板25Aの連結棒20の上膨大部22を、上杭30Bの係止受け部10の挿通孔11に挿入する。 (2) Lower the lower pile 30A into a predetermined pile hole by the same method as before and hold it on the ground (FIG. 6A). The upper pile 30B is lowered and the upper huge portion 22 of the connecting rod 20 of the upper end plate 25A of the lower pile 30A is inserted into the insertion hole 11 of the locking receiving portion 10 of the upper pile 30B.

下杭30Aの上端板25Aの嵌合溝片43の開口縁46と、上杭30Bの下端板25Bの嵌合溝片43の開口縁46とが合致するように上杭30Bを回転させる。嵌合溝片43、43の開口縁46、46が合致した状態で、下杭30Aの連結棒20の上膨大部22が、上杭30Aの係止受け部10の係止孔12に係止される(図5(b))。この状態で、上杭30Bの嵌合溝片43と下杭30Aの嵌合溝片43とが一致し、嵌合溝49を構成する(図6(b))。   The upper pile 30B is rotated so that the opening edge 46 of the fitting groove piece 43 of the upper end plate 25A of the lower pile 30A matches the opening edge 46 of the fitting groove piece 43 of the lower end plate 25B of the upper pile 30B. In a state where the opening edges 46 and 46 of the fitting groove pieces 43 and 43 are matched, the upper huge portion 22 of the connecting rod 20 of the lower pile 30A is locked in the locking hole 12 of the locking receiving portion 10 of the upper pile 30A. (FIG. 5B). In this state, the fitting groove piece 43 of the upper pile 30B coincides with the fitting groove piece 43 of the lower pile 30A to constitute the fitting groove 49 (FIG. 6B).

嵌合溝49に幅広部に対応した幅広部52を有する嵌合連結材50を、嵌合溝49に嵌合して、連結構造33を構成する。   The connecting structure 33 is configured by fitting the fitting connecting member 50 having the wide portion 52 corresponding to the wide portion in the fitting groove 49 into the fitting groove 49.

(3) 前記における連結棒20は、軸部21の両端部に上膨大部22、下膨大部23を形成した短い鋼材を使用することもできる(図5)。また、既製コンクリート杭25のコンクリート27に埋設して、プレストレスを導入するために使用されるPC鋼棒28を利用することもできる(図8(b)〜(d))。このPC鋼棒28の膨大部29(上端板25Aの定着孔8と定着するための)の先端側に延長して(上端板25Aの一面2より先端側に延長される)、連結棒20の軸部21を形成し、この軸部の先端(上端)に上膨大部22を形成することもできる(図8(d))。このPC鋼棒28は、下端側の膨大部29から上端側の膨大部29、上膨大部22まで一体に形成されている。また、PC鋼棒28の膨大部29が、連結棒20の下膨大部23と兼用されている。 (3) The connecting rod 20 in the above can also use a short steel material in which the upper bulge portion 22 and the lower bulge portion 23 are formed at both ends of the shaft portion 21 (FIG. 5). Moreover, it is also possible to use a PC steel rod 28 that is embedded in the concrete 27 of the ready-made concrete pile 25 and used for introducing prestress (FIGS. 8B to 8D). The PC steel rod 28 is extended to the front end side of the enlarging portion 29 (for fixing with the fixing hole 8 of the upper end plate 25A) (extends from the one surface 2 of the upper end plate 25A to the front end side), and the connecting rod 20 The shaft portion 21 can be formed, and the upper enormous portion 22 can also be formed at the tip (upper end) of the shaft portion (FIG. 8D). The PC steel bar 28 is integrally formed from the enormous portion 29 on the lower end side to the enormous portion 29 on the upper end side and the upper enlarging portion 22. Further, the enormous portion 29 of the PC steel rod 28 is also used as the lower enlarging portion 23 of the connecting rod 20.

図1〜図5、図8に基づきこの発明の実施例を説明する。   An embodiment of the present invention will be described with reference to FIGS.

[1]端板25の構成         [1] Configuration of the end plate 25

(1) 厚さtの鋼製円盤1の内周側の円40に沿って、PC鋼棒28の両端部の膨大部29を定着させる定着孔8、8を形成する。鋼製円板1の外周側の円41に沿って、係止受け部10を形成する。円40、41は、半径方向で、鋼製円盤1の幅L0(杭のコンクリートの肉厚に相当する)をほぼ3分の1づつに分割する位置に配置される。 (1) Fixing holes 8 and 8 for fixing enormous portions 29 at both ends of the PC steel rod 28 are formed along a circle 40 on the inner peripheral side of the steel disk 1 having a thickness t. The latch receiving portion 10 is formed along a circle 41 on the outer peripheral side of the steel disk 1. The circles 40 and 41 are arranged in the radial direction at positions that divide the width L0 of the steel disk 1 (corresponding to the thickness of the concrete of the pile) into approximately one third.

(2) 1つの係止受け部10は、鋼製円盤1に、大径Dの挿通孔11と小径Dの係止孔12を穿設する。挿通孔11と係止孔12とは、円41に沿って配置され、挿通孔11と係止孔12との間を係止孔12の直径に沿って削って、連通部14を介して連通させ、一体の開口を形成する(図4)。 (2) one latch receiving portion 10, a steel disc 1, is bored locking hole 12 of the insertion hole 11 and the small diameter D 2 of the large diameter D 1. The insertion hole 11 and the locking hole 12 are arranged along a circle 41, and the space between the insertion hole 11 and the locking hole 12 is cut along the diameter of the locking hole 12 and communicated via the communication portion 14. To form an integral opening (FIG. 4).

鋼製円盤1の厚さ内の中間位置から、鋼製円盤1の一面2(杭の外面に位置する側)に向けて、係止孔12を徐々に拡大して(径D)、他面3(杭のコンクリートに位置する側)で係止孔12と同芯で、径Dとなるように、テーパー状に形成する。従って、係止孔12は、鋼製円盤1の一面2から中間厚さまで径Dで、中間厚さから鋼製円盤1の他面3まで徐々に拡径して、鋼製円盤1の他面3では径Dとなり、略漏斗状の形状となっている。
<D<D
The locking hole 12 is gradually expanded (diameter D X ) from the intermediate position within the thickness of the steel disk 1 to one surface 2 (side located on the outer surface of the pile) of the steel disk 1, etc. in concentric with the retaining hole 12 in the surface 3 (the side situated in the concrete of the pile), so that the diameter D 1, is tapered. Thus, the locking hole 12, on the one diameter D 2 from 2 to an intermediate thickness of the steel disc 1, gradually enlarged from an intermediate thickness to the other surface 3 of the steel disc 1, other steel disk 1 in the surface 3 diameter D 1, and the has a substantially funnel-like shape.
D 2 <D X <D 3

また、径D部分では、挿通孔11側に向けて径Dで、挿通孔11と連通するように、連通部14を形成されている。係止孔12で、中間厚さの径Dの縁から面3にかけてのテーパー状の面を係止縁(連結案内部)13とする。 Further, the diameter D X moiety in diameter D X toward the insertion hole 11 side, so as to communicate with the insertion hole 11 is formed a communicating portion 14. A tapered surface extending from the edge of the intermediate thickness D 2 to the surface 3 in the locking hole 12 is defined as a locking edge (connection guide portion) 13.

(3) また、鋼製円盤1の外周部の所定位置(通常は係止孔12を通る半径の延長線上)に、目印17を形成する。目印17は、2つの鋼製円盤1、1を面2と面3とを当接して、係止孔12、12が連通した状態(上杭31と下杭30とを連結した状態)で、両鋼製円盤1、1の目印17、17が一致するような位置に形成されている(図3(a))。 (3) Moreover, the mark 17 is formed in the predetermined position (usually on the extended line of the radius which passes along the locking hole 12) of the outer peripheral part of the steel disk 1. FIG. The mark 17 is in a state where the two steel discs 1 and 1 are brought into contact with the surface 2 and the surface 3 and the locking holes 12 and 12 communicate with each other (a state where the upper pile 31 and the lower pile 30 are connected). The steel plates 1 and 1 are formed at positions where the marks 17 and 17 of the disks 1 and 1 coincide (FIG. 3A).

(4) 以上のようにして、コンクリート製の既製杭用の端板25を形成する(図1)。尚、端板25は一体に製造する。従って、この端板25では、PC鋼棒28の軸部及び膨大部29と、連結棒20の軸部21、膨大部22、23とが同じ構造となるならば、係止受け部10の断面形状を同一として、一方が鋼製円盤1の一面2側から形成し、他方を鋼製円盤1の他面3側から形成することもできる。 (4) The end plate 25 for a ready-made pile made of concrete is formed as described above (FIG. 1). The end plate 25 is manufactured integrally. Therefore, in this end plate 25, if the shaft part and the enormous part 29 of the PC steel rod 28 and the shaft part 21 and the enormous parts 22 and 23 of the connecting rod 20 have the same structure, the cross section of the latch receiving part 10 With the same shape, one can be formed from the one surface 2 side of the steel disk 1 and the other can be formed from the other surface 3 side of the steel disk 1.

(5) また、連結用の連結棒20を、長さLで、軸部21の径D(D<D)で、両端部に上膨大部22、下膨大部23(径D:D<D≦D)となるような構造で鋼材から形成する。一方の係止受け部10に取り付けた連結棒20が係止突起を構成する(図5(a))。両膨大部22、23は軸部21側のテーパー部(連結案内部)22a、23aが、略球形の一部となるような曲面のテーパー状に形成されている(図5(a))。 (5) In addition, the connecting rod 20 for connecting, in length L, a in diameter D 3 of the shaft portion 21 (D 3 <D 2) , the upper enlarged portion 22 at both ends, the lower enlarged portion 23 (diameter D 4 : D 2 <D 4 ≦ D). The connecting rod 20 attached to one locking receiving portion 10 constitutes a locking protrusion (FIG. 5A). Both enormous portions 22 and 23 are formed in a curved taper shape such that tapered portions (connection guide portions) 22a and 23a on the shaft portion 21 side are part of a substantially spherical shape (FIG. 5A).

[2]既製コンクリート杭30の構成         [2] Configuration of ready-made concrete pile 30

端板25の係止受け部10、10に栓(図示していない)をして面3を内側にして、成型用の型枠内に端板25、25を設置し(上端板25A、下端板25B)、PC鋼棒28、28、必要な鉄筋を配置して、通常の方法により、遠心成型で既製コンクリート杭30を構築する。この際、通常の方法により、ストレスを導入する。以上のようにして、既製コンクリート杭30を構成する(図2(a)、図5(a))。   The stoppers 10 and 10 of the end plate 25 are plugged (not shown) and the end plate 25 and 25 are placed in the molding frame with the surface 3 facing inward (the upper end plate 25A, the lower end Plate 25B), PC steel bars 28 and 28, and necessary reinforcing bars are arranged, and a ready-made concrete pile 30 is constructed by centrifugal molding by a normal method. At this time, stress is introduced by a normal method. The ready-made concrete pile 30 is comprised as mentioned above (FIG. 2 (a), FIG. 5 (a)).

従って、既製コンクリート杭30は、上に端板25A、下に端板25Bを有する構造となり、端板25Aの定着孔8と、端板25Bの定着孔8との間にPC鋼棒28の両端部の膨大部29が係止されている。また、図中27は、既製コンクリート杭30のコンクリート部分である。   Accordingly, the ready-made concrete pile 30 has a structure having an end plate 25A on the upper side and an end plate 25B on the lower side, and both ends of the PC steel rod 28 are disposed between the fixing hole 8 of the end plate 25A and the fixing hole 8 of the end plate 25B. The enormous part 29 of the part is locked. In the figure, reference numeral 27 denotes a concrete portion of the ready-made concrete pile 30.

[3]既製コンクリート杭30の施工(本件連結構造33の構築)         [3] Construction of ready-made concrete pile 30 (construction of this connection structure 33)

(1) 通常の方法により、下杭30Aとして、既製コンクリート杭30を埋設し、杭穴の開口部で保持する。 (1) A ready-made concrete pile 30 is buried as the lower pile 30A by a normal method and held at the opening of the pile hole.

(2) 端板25Aの係止受け部10に取り付けた栓を取り外し、連結棒20の下端部の下膨大部23を下杭30Aの端板25Aの挿通孔11に挿入し、連通部14を通して係止孔12に移動し、連結棒20の軸部21を係止孔12に位置させ、下膨大部23をテーバー部23a、係止縁13を案内として、テーパー状の係止縁13に位置させ、連結棒20の引き抜きを防止する。必要な係止受け部10(通常は総ての係止受け部10)に連結棒20を取り付ける(図2(b)、図5(b))。この際、連結棒20の下膨大部23が係止縁13に位置し、連結棒20の軸部21が係止孔12に位置するので、連結棒20は係止受け部10から抜けるおそれは無い。 (2) Remove the stopper attached to the locking receiving portion 10 of the end plate 25A, insert the lower enormous portion 23 of the lower end portion of the connecting rod 20 into the insertion hole 11 of the end plate 25A of the lower pile 30A, and pass through the communicating portion 14 It moves to the locking hole 12, the shaft part 21 of the connecting rod 20 is positioned in the locking hole 12, the lower enormous part 23 is positioned on the tapered locking edge 13 with the taber part 23a and the locking edge 13 as a guide. The connecting rod 20 is prevented from being pulled out. The connecting rod 20 is attached to the necessary latch receiving portions 10 (usually all the latch receiving portions 10) (FIGS. 2B and 5B). At this time, since the lower enormous portion 23 of the connecting rod 20 is positioned at the locking edge 13 and the shaft portion 21 of the connecting rod 20 is positioned at the locking hole 12, the connecting rod 20 may be detached from the locking receiving portion 10. No.

また、この際、連結棒20の中間部から上膨大部22にかけての部分が、係止突起を構成する。   At this time, a portion from the intermediate portion of the connecting rod 20 to the upper enormous portion 22 constitutes a locking projection.

(3) 続いて、所定の方法で杭打ち機に設置した上杭30Bを下降し(図2(a)、図5(a))、上杭30Bの下端板25Bを下杭30Aの上端板25Aに重ねる(図3(b)、図2(b)、図5(a)鎖線図示30B)。この際、連結棒20の上膨大部22、22を上杭30Bの下端板25Bの係止受け部10、10の挿通孔11に位置させる。また、係止受け部10、10は対応して形成されているので、1つの連結棒20で、位置を合わせると、総ての連結棒20、20が対応する係止受け部10、10の挿通孔11、11に挿入されるようになっている。この状態で、両端板30A、30Bの目印17A、17Bは一致していない(図3(b))。 (3) Subsequently, the upper pile 30B installed in the pile driving machine is lowered by a predetermined method (FIG. 2 (a), FIG. 5 (a)), and the lower end plate 25B of the upper pile 30B is replaced with the upper end plate of the lower pile 30A. 25A (FIG. 3 (b), FIG. 2 (b), FIG. 5 (a) chain line shown 30B). At this time, the upper huge portions 22 and 22 of the connecting rod 20 are positioned in the insertion holes 11 of the locking receiving portions 10 and 10 of the lower end plate 25B of the upper pile 30B. Further, since the latch receiving portions 10 and 10 are formed correspondingly, when the positions are aligned with one connecting rod 20, all the connecting rods 20 and 20 correspond to the corresponding latch receiving portions 10 and 10. It is inserted into the insertion holes 11 and 11. In this state, the marks 17A and 17B of the both end plates 30A and 30B do not match (FIG. 3B).

(4) 続いて、上杭30Bを回転させて、上杭30Bの下端板25Bの目印17Bを、下杭30Aの上端板25Aの目印17Aとを一致させる(図3(c))。上杭30Bを回転して、目印17A、17Bとを一致させることにより、連結棒20の上膨大部22のテーパー部22が係止縁13のテーパー状の斜面を案内として、連結棒20の軸部21の上側が上杭30Bの下端板25Bの係止孔12に位置し、上膨大部22が上杭30Bの下端板25Bの係止縁13に位置する(図5(b))。従って、目印17A、17Bを手がかりとして上杭30Bを回転させることにより、自動的に連結できるので、目視による確認が容易である。 (4) Subsequently, the upper pile 30B is rotated so that the mark 17B on the lower end plate 25B of the upper pile 30B is aligned with the mark 17A on the upper end plate 25A of the lower pile 30A (FIG. 3C). By rotating the upper pile 30B and aligning the marks 17A and 17B, the tapered portion 22 of the upper enlarged portion 22 of the connecting rod 20 is guided by the tapered slope of the locking edge 13, and the axis of the connecting rod 20 The upper side of the portion 21 is positioned in the locking hole 12 of the lower end plate 25B of the upper pile 30B, and the upper enlarged portion 22 is positioned on the locking edge 13 of the lower end plate 25B of the upper pile 30B (FIG. 5B). Therefore, since it can connect automatically by rotating the upper pile 30B using the marks 17A and 17B as a clue, visual confirmation is easy.

以上により、上下杭30B、30Aを連結した連結構造33が完了する。また、一旦このように連結したならば、連結棒20の軸部21は、上下の端板25A、25Bの係止孔12の孔壁で挟まれるので、ずれるおそれはないが、当接した端板25A、25Bの当接部分で少なくとも1箇所の溶接を施すこともできる。この場合には、より接合を確実にすることができる。   Thus, the connection structure 33 connecting the upper and lower piles 30B and 30A is completed. Also, once connected in this way, the shaft portion 21 of the connecting rod 20 is sandwiched between the hole walls of the locking holes 12 of the upper and lower end plates 25A, 25B, so there is no risk of shifting, but the abutted end It is also possible to perform at least one welding at the contact portion of the plates 25A and 25B. In this case, the joining can be made more reliable.

(5) 尚、ここで、連結棒20を下杭30Bの上端板25Bの係止受け部10、10に取り付けしたが、上杭30Bの係止受け部10に取り付けることもできる(図示していない)。 (5) Although the connecting rod 20 is attached to the locking receiving portions 10 and 10 of the upper end plate 25B of the lower pile 30B, it can also be attached to the locking receiving portion 10 of the upper pile 30B (not shown). Absent).

また、連結棒20を予め、溶接などにより、下杭30Aの上端板25Aに溶接等により固定しておくこともできる。   Moreover, the connecting rod 20 can be fixed to the upper end plate 25A of the lower pile 30A by welding or the like in advance.

また、下杭30Aの上端部外周に、案内筒35(例えば、防水処理をした厚紙製)の下部を被せて仮止めし、案内筒の内周を案内として、上杭30Bを下降して、上杭30Bの端板25Bを、下杭30Aの端板25Aに載置することもできる(図3(a)鎖線図示35)。   In addition, the lower end of the guide cylinder 35 (for example, made of waterproof cardboard) is temporarily attached to the outer periphery of the upper end of the lower pile 30A, and the upper pile 30B is lowered with the inner periphery of the guide cylinder as a guide, The end plate 25B of the upper pile 30B can be placed on the end plate 25A of the lower pile 30A (FIG. 3 (a), shown by a chain line 35).

[4]他の実施例         [4] Other embodiments

(1) 前記実施例において、連結に使用しない端板25(例えば、最下部の既製杭30の下端板25B、最上部の既製杭30の上端板25Aは、任意構造でも可能である。 (1) In the embodiment, the end plates 25 not used for connection (for example, the lower end plate 25B of the lowermost ready-made pile 30 and the upper end plate 25A of the uppermost ready-made pile 30 can be of any structure.

(2) また、前記実施例において、連結棒20を両端部に膨大部22、23を形成した鋼材から構成したが、上部のみに上膨大部22を形成した連結棒20を使用して、この連結棒20の軸部21を下杭30Aの上端板25Aの係止孔12に溶接して、この連結棒20の上膨大部22を上方に向けて配置することもできる(図示していない)。この場合にも、同様に、連結棒20の上膨大部22が下端板25Bの係止受け部10に係止される。この場合には、連結棒20として、汎用の皿状(頭部の軸側にテーパーが形成された)のボルトを使用することもできる。 (2) Moreover, in the said Example, although the connecting rod 20 was comprised from the steel material which formed the enormous parts 22 and 23 in both ends, using the connecting rod 20 which formed the upper enormous part 22 only in the upper part, The shaft portion 21 of the connecting rod 20 can be welded to the locking hole 12 of the upper end plate 25A of the lower pile 30A, and the upper enlarging portion 22 of the connecting rod 20 can be arranged upward (not shown). . Also in this case, similarly, the upper enlarged portion 22 of the connecting rod 20 is locked to the locking receiving portion 10 of the lower end plate 25B. In this case, the connecting rod 20 may be a general-purpose dish-shaped bolt (having a taper formed on the shaft side of the head).

(3) また、前記実施例において、下端板25Aの係止孔12に連結棒20を取り付けたが、外れないように一部を接着又は溶接などの処理をすれば、上端板Bの係止孔12に連結棒20を取り付けることもできる(図示していない)。 (3) Moreover, in the said Example, although the connecting rod 20 was attached to the locking hole 12 of 25 A of lower end plates, if processing, such as adhesion or welding, was carried out so that it might not remove | deviate, locking of the upper end plate B will be carried out. A connecting rod 20 can also be attached to the hole 12 (not shown).

(4) また、係止孔12にテーパー状の係止縁13を形成し、連結棒20にもテーパー部22a、23aを形成したが、テーバー部22a、23a又はテーパー状の係止縁13のいずれか一方を省略することもできる(図示していない)。 (4) Although the tapered locking edge 13 is formed in the locking hole 12 and the tapered portions 22a and 23a are also formed on the connecting rod 20, the taber portions 22a and 23a or the tapered locking edge 13 Either one can be omitted (not shown).

(5) また前記実施例において、鋼製円盤1の内周側の円40に沿って定着孔8、8、外周側の円41に沿って係止受け部10、10をそれぞれ設けたが、1つの円42に沿って、定着孔8、係止受け部10を交互または適宜な順番で、形成して端板25を構成することもできる(図8(a))。この場合、下端板25bは、上端板25aに対応させた構造とする。 (5) Moreover, in the said Example, although the fixing holes 8 and 8 and the latching receiving parts 10 and 10 were each provided along the circle | round | yen 41 of the outer peripheral side along the circle 40 of the inner peripheral side of the steel disk 1, It is also possible to form the end plate 25 by forming the fixing holes 8 and the locking receiving portions 10 alternately or in an appropriate order along one circle 42 (FIG. 8A). In this case, the lower end plate 25b has a structure corresponding to the upper end plate 25a.

(6) また、(5)のように1つの円42の周りに、定着孔8、係止受け部10を形成する場合、PC鋼棒28を加工して連結棒20を形成することもできる。 (6) When the fixing hole 8 and the latch receiving portion 10 are formed around one circle 42 as in (5), the PC steel rod 28 can be processed to form the connecting rod 20. .

即ち、下端版25aを従来の汎用の端版を使用して、型枠に端板を設置した状態で、PC鋼棒を若干長めとして、端部に膨大部29を形成し、膨大部29に続き先端側に連結棒の軸部21を形成し、軸部21の先端側に上膨大部22を形成する(図8(d))。また、下端板25Bでは、前記と同様の定着孔8と係止受け部10が交互に配置され、PC鋼棒28の他端の膨大部29を、下端板25Bの定着孔8に従来同様に定着させる(図8(b)参照)。以上のようにして、端板25A、25Bを使用して既製コンクリート杭30を製造する。   That is, the lower end plate 25a is a conventional general-purpose end plate, the end plate is installed on the mold, the PC steel rod is slightly longer, the enormous portion 29 is formed at the end, Next, the shaft portion 21 of the connecting rod is formed on the distal end side, and the upper enormous portion 22 is formed on the distal end side of the shaft portion 21 (FIG. 8D). Further, in the lower end plate 25B, the fixing holes 8 and the locking receiving portions 10 similar to the above are alternately arranged, and the enormous portion 29 at the other end of the PC steel rod 28 is connected to the fixing hole 8 of the lower end plate 25B as in the conventional case. Fix (see FIG. 8B). As described above, the ready-made concrete pile 30 is manufactured using the end plates 25A and 25B.

既製コンクリート杭30を使用した上下杭30A、30Bの連結は前記実施例と同様であり、下杭30Aの上端板25Aの連結棒20の上膨大部22を、上杭の下端板25Bの係止受け部10に係止して連結する。この場合には、予め下杭30Aの上端板25Aに連結棒20を取り付けた状態で埋設されるので、連結作業を更に簡略化できる。   The connection of the upper and lower piles 30A and 30B using the ready-made concrete pile 30 is the same as that of the above embodiment, and the upper huge portion 22 of the connecting rod 20 of the upper end plate 25A of the lower pile 30A is locked to the lower end plate 25B of the upper pile. The receiving part 10 is locked and connected. In this case, since the connection rod 20 is embedded in the upper end plate 25A of the lower pile 30A in advance, the connection work can be further simplified.

尚、PC鋼棒28の上端部に連結棒20を形成する場合、1つの既製コンクリート杭で、端板を共通させるために、上端板25Aを下端板25Bと同じ構造とすることもできる(図示していない)。この場合、上端板25Aでは、係止受け部10、10を使用しないので、必要ならば栓をする(図示していない)。   In addition, when forming the connection rod 20 in the upper end part of the PC steel rod 28, in order to make an end plate common in one ready-made concrete pile, the upper end plate 25A can also be made into the same structure as the lower end plate 25B (FIG. Not shown). In this case, the upper end plate 25A does not use the lock receiving portions 10 and 10, and is plugged if necessary (not shown).

(7) 前記実施例において、係止受け部10を鋼製円盤1に貫通させた孔としたが、鋼製円盤1」(端板25)が厚い場合には、他面3(コンクリート側)を塞いだ断面形状とすることもできる(図示していない)。 (7) In the said Example, although the latching receiving part 10 was made into the hole penetrated to the steel disk 1, when the steel disk 1 "(end plate 25) is thick, the other surface 3 (concrete side) The cross-sectional shape may be closed (not shown).

次ぎに、図6、図7に基づいて、他の発明の実施例を説明する。   Next, another embodiment of the invention will be described with reference to FIGS.

[1]端板25、既製コンクリート杭30の構成       [1] Configuration of end plate 25 and ready-made concrete pile 30

この実施例の端板25は、鋼製円盤1の側面4の所定位置に、嵌合溝片43、43を形成して構成する。嵌合溝片43は、端板25の他面3側(外面側)で開口縁45し、他面3側を幅狭部44として、一面2側(コンクリート側)を幅広部45としてある。嵌合溝片43、43は、2つの端板25、25を他面3と他面3とを当接した際に、幅狭部44、44の開口縁46、46が一致して、両嵌合溝片43、43で嵌合溝49を形成するような形状と位置で形成されている。また、嵌合溝片43は、少なくととも端板25の円周に対して、等間隔で2個形成するが、通常は、等間隔に4個以上形成することが望ましい。   The end plate 25 of this embodiment is formed by forming fitting groove pieces 43 and 43 at predetermined positions on the side surface 4 of the steel disk 1. The fitting groove 43 has an opening edge 45 on the other surface 3 side (outer surface side) of the end plate 25, the other surface 3 side as the narrow portion 44, and the one surface 2 side (concrete side) as the wide portion 45. When the two end plates 25, 25 are brought into contact with the other surface 3 and the other surface 3, the fitting groove pieces 43, 43 have the opening edges 46, 46 of the narrow portions 44, 44 aligned with each other. The fitting groove pieces 43 and 43 are formed in such a shape and position that the fitting groove 49 is formed. In addition, two fitting groove pieces 43 are formed at regular intervals with respect to the circumference of the end plate 25, but it is usually desirable to form four or more fitting groove pieces 43 at regular intervals.

他面2を外側に向けて(嵌合溝片43の開口縁46、46を外側に向けて)、上下端板25、25を既製杭成型用の型枠に設置して、通常の方法により、既製コンクリート杭30(下杭30A、上杭30B)を製造する(図6(a))。   With the other surface 2 facing outward (the opening edges 46 and 46 of the fitting groove 43 facing outward), the upper and lower end plates 25 and 25 are installed on a ready-made pile molding form, The ready-made concrete pile 30 (lower pile 30A, upper pile 30B) is manufactured (FIG. 6A).

[2]連結構造33の構成       [2] Configuration of connecting structure 33

正面鼓形(板状)で、嵌合溝49(2つの嵌合溝片43、43)の形状に対応させて嵌合連結材50を形成する。即ち、嵌合連結材50は、幅狭部51に対応して、中央に幅狭部51を形成し、幅広部45、45に対応して上下両端部に幅広部52、52を形成してある。   The fitting connecting material 50 is formed in a front drum shape (plate shape) so as to correspond to the shape of the fitting groove 49 (two fitting groove pieces 43 and 43). That is, the fitting connecting member 50 has a narrow portion 51 at the center corresponding to the narrow portion 51 and wide portions 52 and 52 at the upper and lower end portions corresponding to the wide portions 45 and 45. is there.

まず、杭穴内に埋設した下杭30を杭穴口で支持して、杭打ち機で上杭30Aを下降して(図6(a))、上杭30Bの下端板25Bを、下杭30Aの上端板25Aに、載置する(図6(a)鎖線図示30B、25B)。この状態で、上下杭30A、30Bの嵌合溝片43、43の開口縁46、46を一致させて、嵌合溝片43、43を連通して嵌合溝49を構成する。   First, the lower pile 30 embedded in the pile hole is supported by the pile hole mouth, the upper pile 30A is lowered by a pile driving machine (FIG. 6A), and the lower end plate 25B of the upper pile 30B is moved to the lower pile 30A. It is placed on the upper end plate 25A (FIG. 6A, chain lines 30B and 25B). In this state, the opening grooves 46 and 46 of the fitting groove pieces 43 and 43 of the upper and lower piles 30 </ b> A and 30 </ b> B are made to coincide with each other, and the fitting groove pieces 43 and 43 are communicated to constitute the fitting groove 49.

続いて、嵌合溝49、49に、嵌合連結材50、50を打ち込み、この発明の連結装置33を構成する(図6(b)(c))。また、このようにして嵌合溝49と嵌合連結材50とが嵌合し、嵌合溝49の幅狭部44、44に、嵌合連結材50の上下の幅広部52、52が嵌合し、上下杭30A、30Bの連結を維持できる。また、端板25A、25Bの側面4、4と嵌合連結材50の表面50aとが略面一に形成され、段差が無いので、実施例1と同様に上下杭30A、30Bの埋設中に該部が杭穴壁に当たることがない。   Subsequently, the fitting connecting members 50 and 50 are driven into the fitting grooves 49 and 49 to constitute the connecting device 33 of the present invention (FIGS. 6B and 6C). Further, the fitting groove 49 and the fitting connecting material 50 are fitted in this manner, and the upper and lower wide portions 52 and 52 of the fitting connecting material 50 are fitted into the narrow portions 44 and 44 of the fitting groove 49. The upper and lower piles 30A and 30B can be connected. In addition, since the side surfaces 4 and 4 of the end plates 25A and 25B and the surface 50a of the fitting connecting material 50 are formed substantially flush with each other, there is no step, so that the upper and lower piles 30A and 30B are being buried as in the first embodiment. The part does not hit the pile hole wall.

尚、この場合、必要ならば、嵌合連結材50の外周の一部を溶接することもできる。   In this case, if necessary, a part of the outer periphery of the fitting connecting member 50 can be welded.

[3]他の実施例       [3] Other embodiments

(1) 前記実施例において、嵌合溝片43の他面3側(コンクリート側)を深く形成して(端板25の中心側に向けて)、係止縁48を有する係止底部47を形成することもできる(図7(a)(b))。この場合には、係止底部47は底が広く、開口側の係止縁48が狭い蟻溝のように形成する。この場合に使用する嵌合連結材50も、上下両端部に、係止底部47の形状に応じて、先端側が広く基端側が狭い膨出係止部53、53を形成する(図7)。尚、この場合には、嵌合溝43、嵌合連結材50の正面形状を、鼓形から、長方形(幅狭部44、51、幅広部45、52を無くする)とすることもできる(図7(c))。 (1) In the embodiment, the engagement groove piece 43 is formed deeply on the other surface 3 side (concrete side) (toward the center side of the end plate 25), and the engagement bottom portion 47 having the engagement edge 48 is formed. It can also be formed (FIGS. 7A and 7B). In this case, the locking bottom portion 47 is formed like a dovetail having a wide bottom and a locking edge 48 on the opening side being narrow. The fitting connecting member 50 used in this case also forms bulging locking portions 53 and 53 at the upper and lower end portions according to the shape of the locking bottom portion 47 and having a wide distal end side and a narrow proximal end side (FIG. 7). In this case, the front shape of the fitting groove 43 and the fitting connecting member 50 can be changed from a drum shape to a rectangle (the narrow portions 44 and 51 and the wide portions 45 and 52 are eliminated) ( FIG. 7 (c)).

(2) また、前記実施例において、前記実施例1の端板25の側面4に更に、嵌合溝片43、43を形成して端板25とすることもできる(図示していない)。この場合には、連結棒20と係止受け部10との係止に加え、更に嵌合溝49と嵌合連結材50とが嵌合するので、上下杭30B、30Aはより強固に連結された連結構造33とすることができる(図6(a)鎖線図示20)。 (2) Moreover, in the said Example, the fitting groove pieces 43 and 43 can further be formed in the side surface 4 of the end plate 25 of the said Example 1, and it can also be set as the end plate 25 (not shown). In this case, since the fitting groove 49 and the fitting connecting material 50 are further fitted in addition to the locking of the connecting rod 20 and the locking receiving portion 10, the upper and lower piles 30B and 30A are more firmly connected. The connection structure 33 can be obtained (FIG. 6A, chain line 20 shown).

また、この場合には、前記実施例1の目印17、17の位置に嵌合溝片43、43を形成する。従って、上下杭30A、30Bの係止孔12、12が連通した状態(上杭30Bと下杭30Aとを連結した状態)で、幅狭部44、44の開口縁46、46を一致させる作業をすれば、即ち、両嵌合溝片43、43で嵌合溝49を形成するように上杭30Bを回転させれば、連結棒20と係止孔12とが一致して、同時に係合できる。よって、嵌合溝片43、43が前記実施例1の目印17、17と同じ役割を果たすので、目印17、17を不要にすることができる。   In this case, fitting groove pieces 43 and 43 are formed at the positions of the marks 17 and 17 in the first embodiment. Therefore, in the state in which the locking holes 12 and 12 of the upper and lower piles 30A and 30B are in communication (the state in which the upper pile 30B and the lower pile 30A are connected), the work of matching the opening edges 46 and 46 of the narrow portions 44 and 44 If the upper pile 30B is rotated so that the fitting groove 49 is formed by both the fitting groove pieces 43, 43, the connecting rod 20 and the locking hole 12 coincide with each other and engage simultaneously. it can. Therefore, since the fitting groove pieces 43 and 43 play the same role as the marks 17 and 17 in the first embodiment, the marks 17 and 17 can be made unnecessary.

この発明の実施例で(a)は下杭の上端板の平面図、(b)は上杭の下端板の底面図、(c)は(a)のA部拡大図、(d)は(b)のB部拡大図である。In the embodiment of the present invention, (a) is a plan view of the upper end plate of the lower pile, (b) is a bottom view of the lower end plate of the upper pile, (c) is an enlarged view of part A of (a), (d) is ( It is the B section enlarged view of b). 同じく図1(c)のC−C断面図に相当する図で、(a)は接合前、(b)は接合後を夫々表す。Similarly, it is a figure corresponding to CC sectional view of Drawing 1 (c), (a) expresses before joining and (b) expresses after joining, respectively. 同じく一部斜視図で、(a)は接合前、(b)は当接した状態、(c)は接合後を夫々表す。Similarly, in a partial perspective view, (a) shows before joining, (b) shows a contacted state, and (c) shows after joining. この発明の実施に使用する端板の係止受け部で、(a)は上端板の平面図、(b)はD−D断面図、(c)は、E−E断面図、(d)はF−F断面図である。FIG. 4A is a plan view of the upper end plate, FIG. 5B is a sectional view taken along the line DD, FIG. 5C is a sectional view taken along the line EE, and FIG. FIG. この発明の連結構造を説明する前の拡大縦断面図であり、(a)は連結前、(b)は連結後を夫々表す。It is an expansion longitudinal cross-sectional view before demonstrating the connection structure of this invention, (a) represents before connection, (b) represents after connection, respectively. この発明の実施例2で、(a)は連結前の正面図で、(b)は連結後の正面図、(c)は(b)のG−G線における拡大断面図である。In Embodiment 2 of the present invention, (a) is a front view before connection, (b) is a front view after connection, and (c) is an enlarged sectional view taken along line GG of (b). 同じく他の実施例で、(a)は拡大縦断面図、(b)は係止受け部の正面図、(c)は他の係止受け部の正面図である。Similarly, in another embodiment, (a) is an enlarged longitudinal sectional view, (b) is a front view of a latch receiving portion, and (c) is a front view of another latch receiving portion. この発明の実施例1の他の実施例で、(a)は下杭の下端板の平面図、(b)は他の実施例の上杭の下端版の底面図、(c)は同じく下杭の上端版の平面図、(d)は(c)のH−H線における拡大断面図である。In another embodiment of the first embodiment of the present invention, (a) is a plan view of the lower end plate of the lower pile, (b) is a bottom view of the lower end plate of the upper pile of the other embodiment, and (c) is also lower. The top view of the upper end version of a pile, (d) is an expanded sectional view in the HH line of (c).

符号の説明Explanation of symbols

1 鋼製円盤
2 一面(外側)
3 他面(コンクリート側)
4 側面
5 内周
8 定着孔
10 係止受け部
11 挿通孔
12 係止孔
13 係止縁
14 連通部
17、17A、17B 目印
20 連結棒
21 連結棒の軸部
22 連結棒の上膨大部
22a 上膨大部のテーパー部
23 連結棒の下膨大部
23a 下膨大部のテーパー部
25、25A、25B 端板
27 コンクリート部分
28 PC鋼棒
29 PC鋼棒の膨大部
30、30A、30B 既製コンクリート杭
33 連結構造
35 案内筒
40 円
41 円
42 円
43 嵌合溝片
44 嵌合溝片の幅狭部
45 嵌合溝片の幅広部
46 嵌合溝片の開口縁
47 嵌合溝片の係止底部
48 嵌合溝片の係止縁
49 嵌合溝
50 嵌合連結材
50a 嵌合連結材の表面
51 嵌合連結材の幅狭部
52 嵌合連結材の幅広部
53 嵌合連結材の膨出係止部
1 Steel disk 2 One side (outside)
3 Other side (concrete side)
4 Side surface 5 Inner circumference 8 Fixing hole 10 Locking receiving portion 11 Insertion hole 12 Locking hole 13 Locking edge 14 Communication portions 17, 17A, 17B Marking 20 Connecting rod 21 Connecting rod shaft 22 Large upper portion 22a of connecting rod Taper portion 23 of upper bulge portion Lower bulge portion 23a of connecting rod Taper portions 25, 25A, 25B of lower bulge portion End plate 27 Concrete portion 28 PC steel rod 29 Enlarged portion 30, 30A, 30B of PC steel rod Ready-made concrete pile 33 Connecting structure 35 Guide cylinder 40 yen 41 yen 42 yen 43 fitting groove piece 44 fitting groove piece narrow part 45 fitting groove piece wide part 46 fitting groove piece opening edge 47 fitting groove piece locking bottom part 48 Locking edge 49 of the fitting groove piece 50 Fitting groove 50 Fitting connecting material 50a Surface 51 of the fitting connecting material Narrow portion 52 of the fitting connecting material 52 Wide portion 53 of the fitting connecting material Swelling of the fitting connecting material Locking part

Claims (7)

下杭の端板の上端面と上杭の端板の下端面とを当接して両端板を連結して、連結杭を構成する連結構造において、
一方の端板の端面に、先端に係止部を有する係止突起を形成し、
他方の端板の端面に、前記突起を挿入して、係止部を係止できる係止受け部を有する係止凹部を形成し、
前記係止部及び/又は係止受け部の口縁部をテーパー状の連結案内部を形成した
ことを特徴とする杭の連結構造。
In the connection structure that constitutes the connection pile by connecting the both end plates by contacting the upper end surface of the end plate of the lower pile and the lower end surface of the end plate of the upper pile,
On the end face of one end plate, a locking projection having a locking portion at the tip is formed,
On the end face of the other end plate, the protrusion is inserted to form a locking recess having a locking receiving portion that can lock the locking portion,
The connection structure of the pile which formed the taper-shaped connection guide part in the edge part of the said latching | locking part and / or latching receiving part.
係止突起は、軸部の先端を膨大に形成して略球形の係止部とし、
係止凹部は、前記係止部を挿通できる大きさの大径穴と
軸部を挿通でき係止部を挿通できない大きさの小径穴とを円周方向に並列し、
前記小径穴の開口部をテーパー状に拡径した連結案内部を有する係止凹部を形成することを特徴とする
請求項1記載の杭の連結構造。
The locking protrusion is formed into a substantially spherical locking portion by enormously forming the tip of the shaft portion,
The locking recess has a large-diameter hole that can be inserted through the locking portion and a small-diameter hole that can be inserted through the shaft portion and cannot be inserted through the locking portion in the circumferential direction.
The pile connection structure according to claim 1, wherein a locking concave portion having a connection guide portion in which the opening of the small-diameter hole is tapered is formed.
下杭及び上杭を、上下端板間に配置したPC鋼棒でストレスを導入したコンクリート製の杭とし、
前記PC鋼棒の端縁を前記端板の内周側に定着させ、係止突起及び係止受け部を前記端板の外周側に配置したことを特徴とする
請求項1記載の杭の連結構造。
The lower pile and the upper pile are concrete piles in which stress is introduced with PC steel bars arranged between the upper and lower end plates,
The connection of the pile of Claim 1 which fixed the edge of the said PC steel rod to the inner peripheral side of the said end plate, and has arrange | positioned the latching protrusion and the latching receiving part to the outer peripheral side of the said end plate. Construction.
下杭又は上杭のいずれか一方の杭の端板の外周に、上杭又は下杭の外径を内径とするガイド筒を嵌装したことを特徴とする請求項1記載の杭の連結構造。 The pile connection structure according to claim 1, wherein a guide tube having an outer diameter of the upper pile or the lower pile as an inner diameter is fitted to an outer periphery of an end plate of either the lower pile or the upper pile. . 一方の端板の外側面に複数の第一嵌合溝片を形成し、他方の端板の外側面に前記第一嵌合溝に対応して、第二嵌合溝片を形成し、
前記両嵌合溝に、嵌合連結材を嵌合し、前記端板の外側面と前記嵌合連結材の外面とを略同一に形成したことを特徴とする
請求項1記載の杭の連結構造。
A plurality of first fitting groove pieces are formed on the outer surface of one end plate, a second fitting groove piece is formed on the outer surface of the other end plate corresponding to the first fitting groove,
The connection of the pile according to claim 1, wherein a fitting connecting material is fitted into the both fitting grooves, and an outer surface of the end plate and an outer surface of the fitting connecting material are formed substantially the same. Construction.
下杭の端板の上端面と上杭の端板の下端面とを当接して両端板を連結して、連結杭を構成する連結構造において、
一方の端板の外側面に複数の第一嵌合溝片を形成し、他方の端板の外側面に前記第一嵌合溝に対応して、第二嵌合溝片を形成し、
前記両嵌合溝片を合わせて、前記上下杭を配置し、前記両嵌合溝片に共通する嵌合連結材を嵌合してなり、
前記両嵌合溝に、嵌合連結材を嵌合し、前記端板の外側面と前記嵌合連結材の外面とを略同一に形成したことを特徴とする杭の連結構造。
In the connection structure that constitutes the connection pile by connecting the both end plates by contacting the upper end surface of the end plate of the lower pile and the lower end surface of the end plate of the upper pile,
A plurality of first fitting groove pieces are formed on the outer surface of one end plate, and a second fitting groove piece is formed on the outer surface of the other end plate corresponding to the first fitting groove,
Matching both the fitting groove pieces, placing the upper and lower piles, fitting the fitting connecting material common to both the fitting groove pieces,
A pile connection structure, wherein a fitting connecting material is fitted into both the fitting grooves, and an outer surface of the end plate and an outer surface of the fitting connecting material are formed substantially the same.
既製コンクリート杭に埋設して使用するPC鋼棒であって、前記既製コンクリート杭の端板の定着孔との定着用の膨大部の先端側に軸部を延長し、該軸部の先端に連結用の膨大部を形成したことを特徴とするPC鋼棒。 A PC steel rod that is embedded in a ready-made concrete pile and is used by extending the shaft portion to the tip side of the enormous portion for fixing with the fixing hole of the end plate of the ready-made concrete pile and connecting it to the tip of the shaft portion PC steel bar characterized by forming a huge part for use.
JP2005332994A 2005-11-17 2005-11-17 Pile connection structure, PC steel bar Active JP4753136B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005332994A JP4753136B2 (en) 2005-11-17 2005-11-17 Pile connection structure, PC steel bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005332994A JP4753136B2 (en) 2005-11-17 2005-11-17 Pile connection structure, PC steel bar

Publications (2)

Publication Number Publication Date
JP2007138522A true JP2007138522A (en) 2007-06-07
JP4753136B2 JP4753136B2 (en) 2011-08-24

Family

ID=38201726

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005332994A Active JP4753136B2 (en) 2005-11-17 2005-11-17 Pile connection structure, PC steel bar

Country Status (1)

Country Link
JP (1) JP4753136B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010077790A (en) * 2008-09-01 2010-04-08 D B S:Kk Reinforcement connection structure of pile head
JP2015086689A (en) * 2014-09-22 2015-05-07 シントク工業株式会社 Pile connection structure
JP2015132106A (en) * 2014-01-14 2015-07-23 新日鐵住金株式会社 Joint structure of steel pipe pile
JP2015183388A (en) * 2014-03-20 2015-10-22 株式会社クボタ Steel pipe connection structure and steel pipe connection method
JP2016014317A (en) * 2015-10-27 2016-01-28 株式会社クボタ Steel pipe connection structure and steel pipe connection method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122416A (en) * 1980-02-27 1981-09-25 Hasegawa Komuten Co Ltd Pc pile
JPS6429519A (en) * 1987-07-24 1989-01-31 Keiyo Blanking Kogyo Kk Pc concrete pile coupler fitting
JPH03287913A (en) * 1990-04-05 1991-12-18 Asahi Chem Ind Co Ltd Precast concrete pile
JP2000234334A (en) * 1999-02-17 2000-08-29 Yunitaito Kk Insert structure, connecting structure and connecting device for pc pile
JP2000328557A (en) * 1999-05-19 2000-11-28 Asahi Kasei Kenzai Kk Joint structure and its execution method for pile
JP2002161531A (en) * 2000-11-24 2002-06-04 Geotop Corp Joint structure of pile
JP2004076533A (en) * 2002-08-22 2004-03-11 Geotop Corp Pile connecting structure
JP2004150010A (en) * 2001-09-07 2004-05-27 Geotop Corp Connection structure of pile

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56122416A (en) * 1980-02-27 1981-09-25 Hasegawa Komuten Co Ltd Pc pile
JPS6429519A (en) * 1987-07-24 1989-01-31 Keiyo Blanking Kogyo Kk Pc concrete pile coupler fitting
JPH03287913A (en) * 1990-04-05 1991-12-18 Asahi Chem Ind Co Ltd Precast concrete pile
JP2000234334A (en) * 1999-02-17 2000-08-29 Yunitaito Kk Insert structure, connecting structure and connecting device for pc pile
JP2000328557A (en) * 1999-05-19 2000-11-28 Asahi Kasei Kenzai Kk Joint structure and its execution method for pile
JP2002161531A (en) * 2000-11-24 2002-06-04 Geotop Corp Joint structure of pile
JP2004150010A (en) * 2001-09-07 2004-05-27 Geotop Corp Connection structure of pile
JP2004076533A (en) * 2002-08-22 2004-03-11 Geotop Corp Pile connecting structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010077790A (en) * 2008-09-01 2010-04-08 D B S:Kk Reinforcement connection structure of pile head
JP2015132106A (en) * 2014-01-14 2015-07-23 新日鐵住金株式会社 Joint structure of steel pipe pile
JP2015183388A (en) * 2014-03-20 2015-10-22 株式会社クボタ Steel pipe connection structure and steel pipe connection method
JP2015086689A (en) * 2014-09-22 2015-05-07 シントク工業株式会社 Pile connection structure
JP2016014317A (en) * 2015-10-27 2016-01-28 株式会社クボタ Steel pipe connection structure and steel pipe connection method

Also Published As

Publication number Publication date
JP4753136B2 (en) 2011-08-24

Similar Documents

Publication Publication Date Title
JP4753136B2 (en) Pile connection structure, PC steel bar
JP4753426B2 (en) Steel pipe joints
KR102164316B1 (en) micro-pile boring casings pipe for one shot grouting
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
JP4373824B2 (en) Joining method of cast-in-place pile and steel pipe column
JP3959510B2 (en) Ready-made pile with protrusion
KR20170099273A (en) Joints Appartus of The Concrete Piles and Steel Pipe
JP3757645B2 (en) Integrated structure of column base and pile
KR100708546B1 (en) The shoe for an up-and-down hem reinforcement of a steel pipe pile
KR200277683Y1 (en) joint structure for PHC pile
JP6752416B2 (en) Ground reinforcement method
JP4555976B2 (en) Concrete ready-made pile
JP6854939B2 (en) Pile body joint, pile body connection structure and pile body connection method
KR20190137196A (en) Concret File Connecting Tool
KR20210098311A (en) Connecting device for PHC pile
KR20210098400A (en) Connecting device for PHC pile
JP4947650B2 (en) Construction method of PC well structure
JP2008303696A (en) Guard pipe unit
JP4789037B2 (en) Connection structure of ready-made piles
KR101930725B1 (en) Connecting apparatus kit for Concrete Pile ends
JPH04122733U (en) PC pile screw joint
JP4805722B2 (en) Segment for underground structure partition and manufacturing method thereof
JP4090145B2 (en) Pile joint structure and pile connection structure
KR200378179Y1 (en) Device for connecting high strength concrete piles
JP2007154456A (en) Structure for reinforcing pile head during construction of steel pipe pile, and construction method for steel pipe pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081007

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100714

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100727

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100922

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110322

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110513

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140603

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4753136

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250