JP2006214209A - Method of erecting and removing bridge girder, and bridge girder construction apparatus - Google Patents

Method of erecting and removing bridge girder, and bridge girder construction apparatus Download PDF

Info

Publication number
JP2006214209A
JP2006214209A JP2005029412A JP2005029412A JP2006214209A JP 2006214209 A JP2006214209 A JP 2006214209A JP 2005029412 A JP2005029412 A JP 2005029412A JP 2005029412 A JP2005029412 A JP 2005029412A JP 2006214209 A JP2006214209 A JP 2006214209A
Authority
JP
Japan
Prior art keywords
girder
erection
bridge
bridge girder
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005029412A
Other languages
Japanese (ja)
Other versions
JP4414906B2 (en
Inventor
Mitsuru Yamaguchi
充 山口
Kenichi Suzuki
賢一 鈴木
Jun Kobayashi
隼 小林
Shigekazu Shimazaki
繁一 嶋崎
Yoshihiko Ono
善彦 大野
Akira Utsunomiya
章 宇都宮
Masaki Ono
真揮 大野
Shinichi Kumahara
伸市 隈原
Shigehide Noda
重秀 野田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NODA JIDOSHA KOGYOSHO KK
Central Japan Railway Co
Tekken Corp
Original Assignee
NODA JIDOSHA KOGYOSHO KK
Central Japan Railway Co
Tekken Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NODA JIDOSHA KOGYOSHO KK, Central Japan Railway Co, Tekken Corp filed Critical NODA JIDOSHA KOGYOSHO KK
Priority to JP2005029412A priority Critical patent/JP4414906B2/en
Publication of JP2006214209A publication Critical patent/JP2006214209A/en
Application granted granted Critical
Publication of JP4414906B2 publication Critical patent/JP4414906B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method of erecting and removing a bridge girder, according to which working hours in a narrow construction field can be shortened and the construction field can be evacuated in a short time, and to provide a bridge girder construction apparatus for use in the method. <P>SOLUTION: Erection work of the bridge girder G is carried out by the bridge girder construction apparatus 1. First, while an erection girder 10 is borne by a carrying truck 20, a front portion of the erection girder 10 is forwarded from a construction completed section S to an erection scheduled section C, and by lowering a lower cylinder portion 33A to bear the front portion, the erection girder 10 is erected. Then the bridge girder G mounted on the erection girder 10 is forwarded to the erection scheduled section C by a girder forwarding truck 12, and by lowering the erection girder 10, the bridge girder G is set on an upper end P of a bridge pier. After completion of the erection, while being borne by the carrying truck 20, the erection girder 10 is withdrawn from the erection scheduled section C to the construction completed section S. Removal work of the bridge girder is carried out essentially by carrying out a procedure reverse to the erection work. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、橋桁の架設および撤去方法と橋桁工事用装置に関する。   The present invention relates to a bridge girder construction and removal method and a bridge girder construction apparatus.

工場から輸送された橋桁を現場で設置する架設工法として、架設桁を利用した架設桁工法がある。架設桁工法は、道路、鉄道もしくは河川等をまたいで橋桁を架設するなど桁下空間の確保が難しくかつ送り出し工法も採用しにくい場合、もしくは桁下および現場周辺の作業スペースに制約があるためトラッククレーン工法も採用できない場合等、作業スペースに制約が多い場合に適用される工法である。   As a construction method for installing a bridge girder transported from a factory on site, there is a construction girder method using a construction girder. In the construction girder method, it is difficult to secure the space under the girder and it is difficult to adopt the feeding method, such as erection of bridge girder across the road, railway or river, etc., or the work space around the girder and the site is limited. This method is applied when there are many restrictions on the work space, such as when the crane method cannot be used.

この架設桁工法は、あらかじめ十分な強度を持つ架設桁を、橋桁を架設しようとする区間に架け渡した後、この架設桁を利用して区間上に橋桁を送り出すとともに橋脚もしくは橋台上に設置する工法である。   In this construction girder construction method, a construction girder with sufficient strength is handed over to the section where the bridge girder is to be built, and then the bridge girder is sent over the section using this construction girder and installed on the pier or abutment. It is a construction method.

また、既設の橋桁を撤去する撤去工法としては、架設桁による引戻し工法がある。架設桁による引戻し工法は、既設の橋桁が架けられている区間に架設桁を架け渡した後、この架設桁に既設の橋桁を吊り下げるとともに引戻して撤去する工法である。   In addition, as a method for removing the existing bridge girder, there is a pullback method using a construction girder. The pull-back method using a built-up girder is a method in which an installed girder is hung on a section where an existing bridge girder is built, and then the existing bridge girder is suspended and pulled back to be removed.

なお、架設桁工法の1つとして特許文献1に記載のものが知られている。
特開平8−60620号公報
In addition, the thing of patent document 1 is known as one of the construction girder methods.
JP-A-8-60620

しかしながら、上記のような工法では、橋桁の設置および撤去作業に入る前に、あらかじめ橋桁を架設しようとする区間もしくは既設の橋桁が架けられている区間に架設桁を架設しておく必要があり、かつ、橋桁の設置および撤去作業が終了した後、架設桁を撤去する必要がある。ここで、架設桁の架設においては、この架設桁を支持するとともにその高さを調節するための架台等、架設桁に係る設備が必要であり、これら設備を橋脚の天端もしくは橋台背面の地表等に設けるなどの作業を伴う。したがって、架設桁の架設および撤去作業を短時間で行うことは非常に困難であり、一連の作業を終えるには長い時間を必要とする。さらに、幅が狭いうえに曲がっているような作業スペースしか確保できない現場においては、架設桁の軸線上に橋桁を取り付ける作業にもさまざまな調整を必要とするなど、より多くの時間を要することになる。また、架設桁は、架設桁自身の重量だけでなく、それに新設の橋桁もしくは既設の橋桁の重量を加えた重量を支えられる強度を有する必要があるから、その断面は大きくなることが多い。すると、このように狭い作業スペースしか確保できない場合、架設桁もしくは架設桁に係る設備が、近接する道路や鉄道の建築限界を侵してしまうことがある。このような場合、近接する道路や鉄道の交通規制を行った上で作業を行う、もしくは通行車両のない時間帯を見計らって作業を行うことになる。   However, in the construction method as described above, it is necessary to install a construction girder in the section where the bridge girder is to be installed in advance or in the section where the existing bridge girder is built before entering the construction and removal work of the bridge girder. And after the installation and removal work of the bridge girder is completed, it is necessary to remove the erection girder. Here, in erection girder construction, facilities related to the erection girder, such as a gantry for supporting the erection girder and adjusting the height thereof, are necessary. It is accompanied by work such as setting up. Therefore, it is very difficult to perform the installation and removal work of the installation girder in a short time, and it takes a long time to complete a series of operations. Furthermore, in a site where only a work space that is narrow and bent can be secured, it takes more time to install the bridge girder on the axis of the erection girder, requiring various adjustments. Become. Moreover, since the installation girder needs to have the strength to support not only the weight of the installation girder itself but also the weight of the newly installed bridge girder or the existing bridge girder, the cross section often becomes larger. Then, when only a narrow work space can be secured in this way, the installation girder or the installation related to the installation girder may violate the building limits of adjacent roads and railways. In such a case, the work is performed after traffic restrictions on nearby roads and railways are performed, or the work is performed in anticipation of a time zone without a passing vehicle.

しかし、長時間にわたって交通規制を行うことは難しく、また通行車両のない時間帯となると非常に短い時間に限られてしまい対応できないという問題がある。   However, it is difficult to regulate traffic for a long time, and there is a problem that it is not possible to cope with a time zone when there is no passing vehicle, because it is limited to a very short time.

本発明は上記のような事情に基づいて完成されたものであって、狭い現場での作業時間を短縮し短時間で現場を明渡すことができる橋桁の架設および撤去方法と、その方法に用いる橋桁工事用装置を提供することを目的とする。   The present invention has been completed based on the above circumstances, and a bridge girder erection and removal method capable of shortening the work time in a narrow field and clearing the field in a short time, and used in the method. The purpose is to provide bridge girder equipment.

上記の目的を達成するための手段として、請求項1の発明は、橋桁部材を架設しようとする架設区間に設置した架設桁を利用して前記橋桁部材を前記架設区間に設置する橋桁の架設方法であって、新設用の前記橋桁部材を前記架設桁における長さ方向の一端側へ寄せて取り付ける取り付け工程と、前記架設桁を前記架設区間と隣接する隣接スペースへ搬入する搬入工程と、前記架設桁の重心が前記隣接スペース内に残るようにしつつ前記隣接スペースから前記架設区間上へ前記架設桁の他端側を送り出した後に、前記他端側から支持脚部を下降させてこの他端側を支持することにより前記架設桁を前記架設区間上に架け渡す架渡し工程と、前記架設桁に取り付けられた前記橋桁部材を前記架設桁に沿って前記架設区間上へ送り出す送り出し工程と、前記架設区間上に達した前記橋桁部材を前記架設区間内に設けられた桁座部上に据え付ける据付工程と、前記支持脚部を上昇させるとともに前記架設桁を前記架設区間上から前記隣接スペースへ撤退させる撤退工程と、を経るところに特徴を有する。ここで、隣接スペースとは、設置済みの橋桁部材上であってもよく、地表面であってもよい。また、取り付け工程は、搬入工程と架渡し工程との間で行っても構わない。   As means for achieving the above object, the invention according to claim 1 is a method of installing a bridge girder in which the bridge girder member is installed in the installation section using the installation girder installed in the installation section where the bridge girder member is to be installed. A mounting step for attaching the bridge girder member for new installation to one end in the length direction of the erection girder, a carrying-in step for carrying the erection girder into an adjacent space adjacent to the erection section, and the erection The other end side of the support leg is lowered from the other end side after the other end side of the installation girder is sent out from the adjacent space onto the installation section so that the center of gravity of the girder remains in the adjacent space. A spanning step of passing the erection girder over the erection section by supporting the erection girder, and sending out the bridge girder member attached to the erection girder onto the erection section along the erection girder And an installation step of installing the bridge girder member that has reached the construction section on a girder seat provided in the construction section, and raising the support leg and adjoining the construction girder from the construction section It is characterized by a withdrawal process for withdrawal into space. Here, the adjacent space may be on the installed bridge girder member or the ground surface. Moreover, you may perform an attachment process between a carrying-in process and a delivery process.

請求項2の発明は、橋桁部材を撤去しようとする撤去区間に設置した架設桁を利用して前記橋桁部材を前記撤去区間から撤去する橋桁の撤去方法であって、前記架設桁を前記撤去区間と隣接する隣接スペースへ搬入する搬入工程と、前記架設桁の重心が前記隣接スペース内に残るようにしつつ前記隣接スペースから前記撤去区間上へ前記架設桁の他端側を送り出した後に、前記他端側から支持脚部を下降させてこの他端側を支持することにより前記架設桁を前記撤去区間上に架け渡す架渡し工程と、前記架設桁に前記橋桁部材を取り付ける取り付け工程と、前記架設桁に保持された前記橋桁部材を前記架設桁に沿ってこの架設桁の一端側へ送り込む送り込み工程と、前記支持脚部を上昇させるとともに前記架設桁を前記撤去区間上から前記隣接スペースへ撤退させる撤退工程と、を経るところに特徴を有する。ここで、隣接スペースとは、設置済みの橋桁部材上であってもよく、地表面であってもよい。   Invention of Claim 2 is the removal method of the bridge girder which removes the said bridge girder member from the said removal area using the installation girder installed in the removal area which is going to remove a bridge girder member, Comprising: The said installation girder is the said removal area A carrying-in process of carrying into the adjacent space adjacent to the other, and after feeding the other end side of the installation girder from the adjacent space onto the removal section so that the center of gravity of the installation girder remains in the adjacent space, the other A supporting step of lowering the supporting leg from the end side and supporting the other end side, a crossing step of crossing the erection girder on the removal section, an attaching step of attaching the bridge girder member to the erection girder, and the erection A feeding step of feeding the bridge girder member held by the spar along the erection girder to one end side of the erection girder, raising the support leg, and removing the erection girder from above the removal section Characterized in place through the a withdrawal step of withdrawing the space. Here, the adjacent space may be on the installed bridge girder member or the ground surface.

請求項3の発明は、架設区間または撤去区間に設置した架設桁を利用してこの架設区間への橋桁部材の架設またはこの撤去区間からの橋桁部材の撤去を行う橋桁工事用装置であって、前記橋桁部材よりも長尺に形成された前記架設桁と、前記架設桁に設けられてこの架設桁に前記橋桁部材を保持する桁保持部と、前記架設桁に保持された前記橋桁部材を前記架設桁に沿って移動可能な桁送り部と、前記架設桁の両端に設けられてこの架設桁を水平状態に支持するとともに前記架設桁を上下に昇降可能なリフト部を備えた一対の支持柱部と、前記一対の支持柱部のうち一方に設けられるとともにこの支持柱部の下方から伸縮可能な支持脚部と、前記架設桁を取り付けた状態で前記架設桁を支持しつつこの架設桁をその長さ方向に沿って移動可能な移動機構と、を備えるところに特徴を有する。   The invention of claim 3 is a bridge girder construction apparatus that uses a construction girder installed in a construction section or a removal section to construct a bridge girder member in this construction section or remove a bridge girder member from this removal section, The erection girder formed longer than the bridge girder member, the girder holding part provided on the erection girder and holding the bridge girder member on the erection girder, and the bridge girder member held on the erection girder A pair of support columns provided with a shift section that can move along the installation girder, and a lift section that is provided at both ends of the installation girder and supports the installation girder in a horizontal state and can move the installation girder up and down. And a support leg portion which is provided on one of the pair of support column portions and can be extended and contracted from below the support column portion, and supports the installation girder in a state where the installation girder is attached. Can move along its length It characterized in place comprising: a moving mechanism.

請求項4の発明は、請求項3に記載のものにおいて、前記移動機構が、前記橋桁部材を取り付けた前記架設桁を載せて走行可能な搬送台車であるところに特徴を有する。   According to a fourth aspect of the present invention, the moving mechanism according to the third aspect is characterized in that the moving mechanism is a transport carriage that can travel with the erected girder to which the bridge girder member is attached.

請求項5の発明は、請求項3または請求項4に記載のものにおいて、前記橋桁部材が鉄道橋の橋桁部材であって、前記移動機構がレール上を走行可能とされているところに特徴を有する。   The invention of claim 5 is characterized in that, in the invention of claim 3 or claim 4, the bridge girder member is a bridge girder member of a railway bridge, and the moving mechanism is capable of traveling on a rail. Have.

請求項6の発明は、請求項3〜請求項5のいずれかに記載のものにおいて、前記架設桁の長さが前記橋桁部材を架設または撤去すようとする前記架設区間または前記撤去区間の長さの2倍以上であるところに特徴を有する。   The invention according to claim 6 is the one according to any one of claims 3 to 5, wherein the length of the erection girder or the length of the detachment interval in which the length of the erection girder attempts to erection or remove the bridge girder member It is characterized by being at least twice the height.

<請求項1の発明>
請求項1の発明によれば、架設桁の設置において、架設桁を支持する架台等、架設桁に係る設備の設置を伴わないから、従来に比べ架設桁を設置する作業が短時間ですむ。また、橋桁部材を設置した後、架設桁をすみやかに搬送撤去できるから、従来のように架設桁およびそれに係る設備等を現場で組み上げたまま長期間留め置く必要がなく、短時間で現場を明渡すことができる。
<Invention of Claim 1>
According to the first aspect of the present invention, the installation of the installation girder is not accompanied by the installation of facilities related to the installation girder, such as a gantry for supporting the installation girder. In addition, after installing the bridge girder member, the installation girder can be quickly transported and removed, so there is no need to keep the installation girder and related equipment assembled at the site for a long time, and the site can be cleared in a short time. Can pass.

<請求項2の発明>
請求項2の発明によれば、架設桁の設置において、架設桁を支持する架台等、架設桁に係る設備の設置を伴わないから、従来に比べ架設桁を設置する作業が短時間ですむ。さらに、橋桁部材を架設桁に取り付ける作業を行った後、この架設桁をすみやかに撤去区間から撤去できるから、従来のように架設桁およびそれに係る設備等を現場で組み上げたまま長期間留め置く必要がなく、短時間で現場を明渡すことができる。
<Invention of Claim 2>
According to the invention of claim 2, since the installation of the installation girder is not accompanied by installation of facilities related to the installation girder such as a gantry for supporting the installation girder, the installation work of the installation girder is shorter than before. Furthermore, after the work of attaching the bridge girder member to the erection girder, this erection girder can be quickly removed from the removal section, so it is necessary to keep the erection girder and related equipment, etc. assembled on site for a long time as before. There is no, and the site can be revealed in a short time.

<請求項3の発明>
請求項3に記載の装置によって架設工事を行う際には、まず移動機構によって架設桁を支持しつつ、隣接スペースから架設区間上へ架設桁の他端側を送り出し、支持脚部を下降させてこの他端側を支持することにより、架設桁を架け渡すことができる。そして、架設桁に保持させた橋桁部材を桁送り部によって架設区間上へ送り出し、架設桁を下降させることによって桁座部上に橋桁部材を設置することができる。架設終了後には、同じく移動機構によって架設桁を支持しつつ架設区間から隣接スペースへ架設桁を撤退させればよい。一方、撤去工事は、基本的に上記架設工事の逆のプロセスを辿ることによって行うことができる。
<Invention of Claim 3>
When carrying out the construction work by the apparatus according to claim 3, firstly, while supporting the construction girder by the moving mechanism, the other end side of the construction girder is sent from the adjacent space onto the construction section, and the support leg portion is lowered. By supporting the other end side, the installation girder can be bridged. And a bridge girder member can be installed on a girder seat part by sending out the bridge girder member held by the erection girder onto the erection section by the girder and lowering the erection girder. After the erection is completed, the erection girder may be withdrawn from the erection section to the adjacent space while the erection girder is supported by the moving mechanism. On the other hand, the removal work can be basically performed by following the reverse process of the erection work.

このような装置によれば、架設桁を支持する架台等、架設桁に係る設備の設置を伴わないから、従来に比べ架設桁を設置する作業が短時間ですむ。また、架設桁およびそれに係る設備等を現場で組み上げたまま長期間留め置く必要がなく、短時間で現場を明渡すことができる。   According to such a device, installation of the installation girder such as a gantry for supporting the installation girder is not required, so that the installation work of the installation girder is shorter than that of the conventional apparatus. Moreover, it is not necessary to keep the erection girder and the equipment related to it for a long period of time while being assembled at the site, and the site can be handed over in a short time.

<請求項4の発明>
請求項4の発明によれば、移動機構が、橋桁部材を取り付けた架設桁を載せて走行可能な搬送台車である。このような構成によれば、橋桁架設工事においては、橋桁部材をあらかじめ架設桁に取り付けてから現場に搬入することができる。また、橋桁撤去工事においては、橋桁部材を取り付けたまま架設桁を現場から搬出することができる。これにより、橋桁部材の架設桁への取り付けおよび取り外しを現場以外の場所で行うことができるから、現場での作業時間をその分短縮できる。また、現場にこの作業のためのスペースを確保する必要がない。
<Invention of Claim 4>
According to invention of Claim 4, a moving mechanism is a conveyance trolley | bogie which can drive | work with the construction girder which attached the bridge girder member mounted. According to such a configuration, in the bridge girder erection work, the bridge girder member can be carried in the field after being attached to the erection girder in advance. In the bridge girder removal work, the installation girder can be carried out from the site with the bridge girder member attached. As a result, the bridge girder member can be attached to and detached from the erection girder at a place other than the site, and the work time at the site can be shortened accordingly. Moreover, it is not necessary to secure a space for this work at the site.

<請求項5の発明>
請求項5の発明によれば、架設しようとする橋桁部材もしくは撤去しようとする橋桁部材が鉄道橋の橋桁部材である場合において移動機構がレール上を走行可能とされている。このような構造によれば、架設桁の設置の際、架設桁は正規の線形に沿って誘導されるから、特に現場が曲線を含む区間である場合など、その設置に対する管理が容易となる。また、この橋桁部材が鉄道橋のものであれば、撤去の際には既存のレールを利用することができ、架設の際においては、隣接スペースに敷設したレールを使用できるとともに、この架設工事のために敷設したレールを路線の供用開始後そのまま使用することができる。
<Invention of Claim 5>
According to the invention of claim 5, when the bridge girder member to be installed or the bridge girder member to be removed is a bridge girder member of a railway bridge, the moving mechanism can run on the rail. According to such a structure, when the installation girder is installed, the installation girder is guided along a normal alignment, and therefore management of the installation is facilitated particularly when the site is a section including a curve. If this bridge girder is a railway bridge, existing rails can be used for removal, and rails installed in adjacent spaces can be used for erection. Therefore, the rail laid for this purpose can be used as it is after the start of service on the route.

<請求項6の発明>
請求項6の発明によれば、架設桁の長さが橋桁部材を架設または撤去すようとする架設区間または撤去区間の長さの2倍以上である。このような構成によれば、架設桁の架渡し作業中において架設桁の重心が隣接スペース内に残る。したがって、格別な工夫をすることなく、架設桁の架渡し作業の途中で突出端が下方へ傾いてしまうことを回避できる。
<Invention of Claim 6>
According to the invention of claim 6, the length of the erection girder is at least twice the length of the erection section or the detachment section where the bridge girder member is to be erected or removed. According to such a configuration, the center of gravity of the installation girder remains in the adjacent space during the installation work of the installation girder. Therefore, it is possible to avoid the projecting end from being inclined downward during the installation work of the installation girder without any special contrivance.

以下、本実施形態の橋桁工事用装置1を用いた橋桁Gの架設および撤去方法について図1〜図7によって説明する。   Hereinafter, the construction and removal method of the bridge girder G using the bridge girder construction apparatus 1 of the present embodiment will be described with reference to FIGS.

まず橋桁工事用装置1について述べる。この橋桁工事用装置1は、架設区間Cまたは撤去区間Dに設置した架設桁10を利用して、この架設区間Cへの橋桁G(本発明の橋桁部材に該当する)の架設、または撤去区間Dからの橋桁Gの撤去を行うためのものである。   First, the bridge girder construction apparatus 1 will be described. This bridge girder construction apparatus 1 uses the erection girder 10 installed in the erection section C or the removal section D to construct or remove the bridge girder G (corresponding to the bridge girder member of the present invention) to the erection section C. It is for removing the bridge girder G from D.

以下、各構成部材において、図1における左側(架設時の未施工側)を前方、右側(同既施工側)を後方とし、また、図2の左側を左方、右側を右方として説明する。   Hereinafter, in each component, the left side in FIG. 1 (the unconstructed side at the time of erection) is the front, the right side (the already constructed side) is the rear, the left side in FIG. 2 is the left side, and the right side is the right side. .

図1には、架設時において本実施形態の橋桁工事用装置1がその前方側を架設区間C上へ送り出された状態を表す側面図を示した。なお、ここに示した架設区間Cは、鉄道橋Bの橋桁Gが架設される区間であり、この架設区間Cに設置されている橋脚の天端P(本発明の桁座部に該当する)に新設の橋桁Gが設置される。この鉄道橋Bの架設においては、後方から順次橋桁Gの架設が行われ、架設区間Cの後方側は施工済みの既施工区間S(本発明の隣接スペースに該当する)であり、既施工区間Sの橋桁Gの上面にはレールRが敷かれている。   In FIG. 1, the side view showing the state by which the bridge girder construction apparatus 1 of this embodiment was sent out on the construction section C at the time of construction was shown. In addition, the construction section C shown here is a section in which the bridge girder G of the railway bridge B is constructed, and the top end P of the pier installed in the construction section C (corresponding to the girder seat portion of the present invention). A new bridge girder G will be installed. In the construction of the railway bridge B, the bridge girder G is constructed sequentially from the rear, and the rear side of the construction section C is an already constructed section S (corresponding to the adjacent space of the present invention). A rail R is laid on the upper surface of the S bridge girder G.

この橋桁工事用装置1は、橋桁Gを吊り下げる架設桁10を備えている。架設桁10は鋼材により、橋桁Gを架設しようとする架設区間C(撤去の際には橋桁Gを撤去しようとする撤去区間D)の長さの2倍よりもやや長い角筒状とされている。架設桁10の前後両端には、その前後両端から上方に延出された連結部11A、11Bが備えられ、その連結部11A、11Bの上端は互いに背合わせ方向に折り曲げられた突出片19A、19Bとされている。また、この架設桁10の上面には、橋桁Gを吊り下げる桁送り台車12用のレールが備えられ、一方下面には、橋桁Gもしくは後述する運搬台車20(本発明の移動機構に該当する)上に載置可能なスライドベース21が設けられている。   This bridge girder construction apparatus 1 includes an erection girder 10 that suspends a bridge girder G. The construction girder 10 is made of steel and has a rectangular tube shape slightly longer than twice the length of the construction section C in which the bridge girder G is to be constructed (the removal section D in which the bridge girder G is to be removed at the time of removal). Yes. The front and rear ends of the installation girder 10 are provided with connecting portions 11A and 11B extending upward from the front and rear ends, and the upper ends of the connecting portions 11A and 11B are projected pieces 19A and 19B bent in a back-to-back direction. It is said that. Further, a rail for a girder carriage 12 for suspending the bridge girder G is provided on the upper surface of the installation girder 10, and a bridge girder G or a transport carriage 20 described later (corresponding to the moving mechanism of the present invention) is provided on the lower surface. A slide base 21 that can be placed thereon is provided.

架設桁10の前後両端には、架設桁10を支持する支持柱部30A、30Bが設けられている。図2には、図1の状態における橋桁工事用装置1の正面図を、図3には、図1の状態における橋桁工事用装置1の背面図を示した。   Support pillar portions 30 </ b> A and 30 </ b> B that support the installation girder 10 are provided at both front and rear ends of the installation girder 10. 2 shows a front view of the bridge girder construction apparatus 1 in the state of FIG. 1, and FIG. 3 shows a rear view of the bridge girder construction apparatus 1 in the state of FIG.

この支持柱部30A、30Bの上端は、架設桁10の連結部11A、11Bから突出された突出片19A、19Bの下面に連結されている。支持柱部30A、30Bは、架設桁10を上下に昇降可能なリフト装置31A、31B(本発明のリフト部に該当する)を備え、前後両支持柱部30A、30Bのうち前方側の前方支持柱部30Aにおいては、一対の前方用リフト装置31Aが左右に所定間隔をもって固定され、後方側の後方支持柱部30Bにおいては、計4本の後方用リフト装置31Bが前後左右に所定間隔をもって固定されている。両リフト装置31A、31Bは上部筒部32A、32Bと、この上部筒部32A、32Bを収容する下部筒部33A、33Bとを備え、筒内に収納された伸縮装置(図示せず)を伸縮作動させることにより、上部筒部32A、32Bおよび下部筒部33A、33Bを相対的に上下動させ得るようになっている。このリフト装置31A、31Bの昇降スピードを速めるには、伸縮装置として油圧シリンダを用いるとよい。なお、前方用リフト装置31Aは、架設桁10の上面において後方に設けられた前方用伸縮制御機器34Aにより伸縮装置の作動を制御され、後方用リフト装置31Bは、架設桁10の後方において台車35の上に載せられた後方用伸縮制御機器34Bにより伸縮装置の作動を制御されている。   The upper ends of the support column portions 30A and 30B are connected to the lower surfaces of the protruding pieces 19A and 19B protruding from the connecting portions 11A and 11B of the installation girder 10. The support column portions 30A and 30B include lift devices 31A and 31B (corresponding to the lift portion of the present invention) that can raise and lower the erection girder 10 up and down, and support the front side of the front and rear support column portions 30A and 30B. In the column portion 30A, a pair of front lift devices 31A are fixed to the left and right with a predetermined interval, and in the rear support column portion 30B on the rear side, a total of four rear lift devices 31B are fixed to the front, rear, left and right with a predetermined interval. Has been. Both lift devices 31A and 31B include upper cylindrical portions 32A and 32B and lower cylindrical portions 33A and 33B for accommodating the upper cylindrical portions 32A and 32B, and extend and contract an expansion / contraction device (not shown) stored in the cylinder. By operating, the upper cylindrical portions 32A and 32B and the lower cylindrical portions 33A and 33B can be moved up and down relatively. In order to increase the lifting speed of the lift devices 31A and 31B, a hydraulic cylinder may be used as the telescopic device. The front lift device 31 </ b> A is controlled in its operation by a front expansion / contraction control device 34 </ b> A provided at the rear on the upper surface of the erection beam 10, and the rear lift device 31 </ b> B is disposed at the rear of the erection beam 10 with a carriage 35. The operation of the expansion / contraction device is controlled by the rear expansion / contraction control device 34B placed on the top.

そして、前後両リフト装置31A、31Bの下部筒部33A、33Bが上動されると、その下端部が地表等から離れ、前後両支持柱部30A、30Bは架設桁10を後述の運搬台車20によって支持した状態でこの架設桁10とともに搬送可能な状態となる。このとき、前方用リフト装置31Aは、図1に示すように、下部筒部33A内に上部筒部32Aがすっぽり収納されるようになっている。また、前後両リフト装置31A、31Bの下部筒部33A、33Bが下動され、その下端が地表等に達したところで上下動不能に固定されると、架設桁10を前後両支持柱部30A、30Bによって支持可能な状態となる。ここで、橋脚天端Pは既施工区間Sの地表面よりほぼ橋桁Gの高さ分だけ低いため、前方用リフト装置31Aの下部筒部33Aは、十分な長さを備えて架設区間Cの橋脚天端Pまで下降可能とされており、架設桁10の前端を橋脚天端P上に支持する支持脚部を兼ねている。   When the lower cylindrical portions 33A, 33B of the front and rear lift devices 31A, 31B are moved upward, the lower ends thereof are separated from the ground surface and the like, and the front and rear support column portions 30A, 30B are used to move the erection beam 10 to the transport carriage 20 described later. It becomes a state which can be conveyed with this installation girder 10 in the state supported by. At this time, as shown in FIG. 1, the front lift device 31 </ b> A is configured such that the upper cylindrical portion 32 </ b> A is completely stored in the lower cylindrical portion 33 </ b> A. Further, when the lower cylindrical portions 33A and 33B of both the front and rear lift devices 31A and 31B are moved downward and fixed at the lower end when reaching the ground surface or the like, they are fixed so that they cannot be moved up and down. It will be in the state which can be supported by 30B. Here, since the pier top end P is lower than the ground surface of the already-constructed section S by the height of the bridge girder G, the lower cylindrical portion 33A of the forward lift device 31A has a sufficient length and is provided in the installation section C. It can be lowered to the pier top end P, and also serves as a support leg for supporting the front end of the erection beam 10 on the pier top end P.

架設区間Cに架設される新設の橋桁Gは、その前後両端から所定の間隔だけ中心側へ入った位置の2箇所において架設桁10に吊り下げられている。図4には、図1のA−A断面図を示した。   The new bridge girder G installed in the erection section C is suspended from the installation girder 10 at two positions at a predetermined distance from both front and rear ends. FIG. 4 is a cross-sectional view taken along the line AA in FIG.

架設桁10上には、桁送り台車12(本発明の桁送り部に該当する)が、前後に一対配されている(図1を併せて参照)。この桁送り台車12は、架設桁10の上面に設けられた桁送り台車12用のレールに沿って走行するようになっている。   A pair of shift carriages 12 (corresponding to the shift section of the present invention) are disposed on the front and rear of the erection girder 10 (see also FIG. 1). The shift carriage 12 travels along a rail for the shift carriage 12 provided on the upper surface of the installation girder 10.

桁送り台車12の上部には桁吊り部13が備えられている。この桁吊り部13は、架設桁10の左右幅よりもやや左右両外側に張り出した厚板状をなし、その両端からは橋桁Gを吊り下げるPC鋼棒14が下げられている。各PC鋼棒14は、橋桁Gの上面において前後2ヶ所の吊り下げ位置に設けられた定着具(図示せず)に固定されている。定着具は、吊り下げ位置1箇所につき左右一対ずつ設けられている。この桁吊り部13、PC鋼棒14、定着具が本発明の桁保持部を構成している。   A girder suspension 13 is provided on the upper part of the carriage 12. This girder suspension portion 13 has a thick plate shape projecting slightly to the left and right outside of the lateral width of the installation girder 10, and a PC steel rod 14 for suspending the bridge girder G is lowered from both ends thereof. Each PC steel bar 14 is fixed to a fixing tool (not shown) provided at two suspended positions on the upper surface of the bridge girder G. The fixing tool is provided in a pair of left and right at one hanging position. This girder suspension part 13, the PC steel rod 14, and the fixing tool constitute the girder holding part of the present invention.

架設桁10の上面における前方には台車停止位置15がマークされ、桁吊り部13を載せた前後2台の桁送り台車12のうち前方の桁送り台車12がこの台車停止位置15で停止されると、橋桁Gが所定位置まで送り出された状態となる(図6を併せて参照)。   A carriage stop position 15 is marked in front of the upper surface of the installation girder 10, and the front carriage carriage 12 is stopped at the carriage stop position 15 of the two front and rear carriage carriages 12 on which the girder suspension portion 13 is placed. Then, the bridge girder G is sent to a predetermined position (see also FIG. 6).

なお、前方の桁送り台車12のやや後方には桁送り台車12を動かすための発電機16が備えられている。この発電機16の側方には安全柵で囲まれた足場17が設置され、この足場17には梯子18が備えられている。   A generator 16 for moving the shift carriage 12 is provided slightly behind the shift carriage 12 in the front. A scaffold 17 surrounded by a safety fence is installed on the side of the generator 16, and the scaffold 17 is provided with a ladder 18.

また、橋桁Gおよび架設桁10の下方には、これらを載せて搬送するための運搬台車20が、前後に2台配されている(図1を併せて参照)。2台の運搬台車20は所定間隔を保ち、既施工区間Sに敷かれたレールR上を走行可能とされている。前方の運搬台車20は、架設桁10の前端から架設区間Cの長さ分より後方の位置、つまり、架設区間C上に架設桁10の前方を突出させたとき、既施工区間Sの前端に位置するように配置されている。一方、後方の運搬台車20は、架設桁10もしくは橋桁Gおよび架設桁10を載せたとき、前後に架設桁10のバランスをとって支持可能となるように、前方の運搬台車20から所定の間隔を空けて配されている。   Further, below the bridge girder G and the erection girder 10, two transport carts 20 for placing and transporting these are arranged in front and rear (see also FIG. 1). The two transport carts 20 are allowed to travel on the rail R laid in the existing construction section S while maintaining a predetermined interval. The forward carriage 20 is located at a position behind the length of the erection section C from the front end of the erection beam 10, that is, when the front of the erection beam 10 is projected on the erection section C, at the front end of the existing construction section S. It is arranged to be located. On the other hand, the rear carriage 20 has a predetermined distance from the front carriage 20 so that when the installation girder 10 or the bridge girder G and the installation girder 10 are mounted, the installation girder 10 can be supported in a balanced manner. It is arranged with a gap.

運搬台車20には、橋桁Gおよび架設桁10を載せる桁載せ部22が備えられている。この桁載せ部22は、上方から見ると長辺側が橋桁Gおよび架設桁10の左右幅よりもやや幅広の断面長方形の板状をなしている(図4参照)。この桁載せ部22の左右両端にはレバーブロック23が備えられている。このレバーブロック23のチェーン23Aは、桁載せ部22上に橋桁Gおよび架設桁10が載る際、架設桁10の下面に設けられた後述するスライドベース21のワイヤ24に繋がれるようになっている。そして、レバーブロック23のレバー23Bを下動させると、桁載せ部22が上方に引っ張られる向きにチェーン23Aが巻かれ、橋桁Gはスライドベース21と桁載せ部22とにより挟まれてその位置ずれが防止されるようになっている。なお、運搬台車20の両側縁には、運搬台車20との接続部を支点として板面が水平方向となる水平位置と板面が垂直方向となる垂直位置との間で回動可能な安全足場25が連結されている。   The carriage 20 is provided with a girder mounting portion 22 on which the bridge girder G and the erection girder 10 are placed. When viewed from above, the girder mounting portion 22 has a plate-like shape with a rectangular cross section whose long side is slightly wider than the left and right widths of the bridge girder G and the installation girder 10 (see FIG. 4). Lever blocks 23 are provided at both left and right ends of the girder mounting portion 22. The chain 23 </ b> A of the lever block 23 is connected to a wire 24 of a slide base 21, which will be described later, provided on the lower surface of the installation girder 10 when the bridge girder G and the installation girder 10 are placed on the girder mounting portion 22. . Then, when the lever 23B of the lever block 23 is moved downward, the chain 23A is wound in the direction in which the girder mounting portion 22 is pulled upward, and the bridge girder G is sandwiched between the slide base 21 and the girder mounting portion 22 so that its position shifts. Is to be prevented. In addition, the safety scaffold which can be rotated on the both-sides edge of the conveyance trolley 20 between the horizontal position where a board surface becomes a horizontal direction, and the vertical position where a board surface becomes a vertical direction by using the connection part with the conveyance trolley 20 as a fulcrum. 25 are connected.

運搬台車20と対になって橋桁Gの位置ずれを防止するスライドベース21は、架設桁10の下面において、2台の運搬台車20にそれぞれ対応するように前後2ヶ所に配されている。このスライドベース21の下部には、図4に示すように、運搬台車20の桁載せ部22の上面と対向するベース部26が備えられ、このベース部26は、橋桁Gの左右幅よりもやや幅広の断面長方形の板状をなしている。ベース部26の左右幅方向における両端には、運搬台車20におけるレバーブロック23のチェーン23Aと連結されるワイヤ24が吊り下げられている。このスライドベース21には左右方向に伸縮可能なスライドベース用ジャッキ21Aが備えられており、架設桁10を前後方向に対し左右に向きを調整することができる。スライドベース21は、橋桁Gが橋脚天端Pに降ろされた際、桁送り台車12からチェーンブロック21Bにより吊り下げられた状態となる。そして、桁送り台車12が前後に移動することによりスライドベース21も移動するようになっている。なお、ベース部26の上面には安全防護柵27が設けられている。   The slide base 21 that is paired with the transport carriage 20 and prevents the positional deviation of the bridge girder G is disposed at two positions on the lower surface of the installation girder 10 so as to correspond to the two transport carriages 20 respectively. As shown in FIG. 4, a base portion 26 facing the upper surface of the girder mounting portion 22 of the transport carriage 20 is provided at the lower portion of the slide base 21, and this base portion 26 is slightly larger than the lateral width of the bridge girder G. It has a plate shape with a wide rectangular cross section. A wire 24 connected to the chain 23A of the lever block 23 of the transport carriage 20 is suspended from both ends of the base portion 26 in the left-right width direction. The slide base 21 is provided with a slide base jack 21 </ b> A that can be expanded and contracted in the left-right direction, and the installation girder 10 can be adjusted in the left-right direction with respect to the front-rear direction. When the bridge girder G is lowered to the bridge pier top end P, the slide base 21 is suspended from the girder carriage 12 by the chain block 21B. The slide base 21 is also moved by the shift carriage 12 moving back and forth. A safety protection fence 27 is provided on the upper surface of the base portion 26.

なお、架設桁10の後方の台車35には、後方用伸縮制御機器34Bとともに運搬台車20用の油圧ユニット28および発電機29が載せられている。   In addition, a hydraulic unit 28 and a generator 29 for the transporting carriage 20 are mounted on the carriage 35 behind the erection beam 10 together with the rear extension / contraction control device 34B.

次に、前述の橋桁工事用装置1を用いた橋桁Gの架設方法について述べる。
この架設方法は、新設用の橋桁Gを架設桁10に取り付ける取り付け工程、架設桁10を架設区間Cと隣接する既施工区間Sへ搬入する搬入工程、架設桁10を架設区間C上に架け渡す架渡し工程、架設桁10に取り付けられた橋桁Gを架設区間C上へ送り出す送り出し工程、橋桁Gを架設区間C内に設けられた橋脚天端Pに据え付ける据付工程、架設桁10を架設区間C上から既施工区間Sへ撤退させる撤退工程とを経ることにより、橋桁Gを架設区間Cに設置する橋桁の架設方法である。
Next, the construction method of the bridge girder G using the above-mentioned bridge girder construction apparatus 1 will be described.
This erection method includes an installation process for attaching a new bridge girder G to the erection girder 10, a carrying-in process for carrying the erection girder 10 into an existing construction section S adjacent to the erection section C, and laying the erection girder 10 over the erection section C. Overheading process, sending-out process for sending the bridge girder G attached to the erection girder 10 onto the erection section C, installation process for installing the bridge girder G on the pier top end P provided in the erection section C, and the erection girder 10 for the erection section C This is a bridge girder erection method in which the bridge girder G is installed in the erection section C through a withdrawal step of withdrawing from the top to the existing construction section S.

以下、この工程を順を追って説明する。
(1)橋桁Gの取り付け工程
施工ヤードにおいて橋桁Gの架設桁10への取り付けを行う。施工ヤードには、既施工区間Sに敷設された線路から分岐する引き込み線が敷設されている。まず、この引込み線のレールR上に橋桁工事用装置1を設置する。そして、レールR上面と架設桁10下面との上下方向の間隔が、スライドベース21と橋桁Gと運搬台車20とを併せた高さとほぼ等しくなるよう前後両支持柱部30A、30Bの高さを調節するとともに前後両リフト装置31A、31Bを上下動不能に固定する。その後、運搬台車20およびスライドベース21を所定の位置に配置するとともに、この運搬台車20とスライドベース21との間に橋桁Gを設置する。ここで、スライドベース21は運搬台車20の上下軸線上に、また、桁送り台車12は、橋桁Gの定着具に対応する位置に配置する。そして、桁送り台車12の桁吊り部13と橋桁Gの定着具とをPC鋼棒14によって連結すると、橋桁Gは運搬台車20とスライドベース21との間に挟まれた状態で、架設桁10の後方側(一端側)にて取り付けられる。そして、前後両支持柱部30A、30Bの上部筒部32A、32Bを降下させることにより架設桁10をわずかに降下させ、橋桁Gを運搬台車20とスライドベース21との間でしっかりと挟み付け固定した状態にする。そして、前後両支持柱部30A、30Bの下部筒部33A、33Bを上動させ架設桁10の両端に吊り下げるようにすると、橋桁Gと架設桁10とが運搬台車20で支持された状態になる。
Hereinafter, this process will be described in order.
(1) Installation process of bridge girder G At the construction yard, the bridge girder G is attached to the installation girder 10. In the construction yard, a lead-in line that branches from a track laid in the existing construction section S is laid. First, the bridge girder construction apparatus 1 is installed on the rail R of the lead-in line. The heights of the front and rear support column portions 30A and 30B are set so that the vertical distance between the upper surface of the rail R and the lower surface of the installation girder 10 is substantially equal to the combined height of the slide base 21, the bridge girder G, and the transport carriage 20. While adjusting, both the front and rear lift devices 31A and 31B are fixed so as not to move up and down. Thereafter, the transport cart 20 and the slide base 21 are arranged at predetermined positions, and the bridge girder G is installed between the transport cart 20 and the slide base 21. Here, the slide base 21 is arranged on the vertical axis of the transport carriage 20, and the carry carriage 12 is arranged at a position corresponding to the fixing tool of the bridge girder G. Then, when the girder suspension 13 of the carry carriage 12 and the fixing tool for the bridge girder G are connected by the PC steel rod 14, the bridge girder G is sandwiched between the transport carriage 20 and the slide base 21, and the installation girder 10 It is attached on the rear side (one end side). Then, the installation girder 10 is slightly lowered by lowering the upper cylindrical portions 32A and 32B of the front and rear support column portions 30A and 30B, and the bridge girder G is firmly clamped and fixed between the transport carriage 20 and the slide base 21. To the state. Then, when the lower cylindrical portions 33A, 33B of the front and rear support column portions 30A, 30B are moved up and suspended at both ends of the installation girder 10, the bridge girder G and the installation girder 10 are supported by the transport carriage 20. Become.

(2)架設桁10の搬入工程
次に、この橋桁Gおよび架設桁10を架設区間C後方の既施工区間Sに搬入する。
橋桁Gおよび架設桁10を載せた運搬台車20をレールRに沿って走行させ、この橋桁Gおよび架設桁10が架設区間C後方の既施工区間S上に至るまで前進させる。
(2) Carrying-in process of erection girder 10 Next, the bridge girder G and the erection girder 10 are carried into the existing construction section S behind the erection section C.
The transport carriage 20 carrying the bridge girder G and the erection girder 10 is caused to travel along the rail R, and the bridge girder G and the erection girder 10 are advanced to reach the existing construction section S behind the erection section C.

(3)架設桁10の架渡し工程
次に、この架設桁10を架設区間C上に架け渡す(図1参照)。
まず、既施工区間S上にある架設桁10を、その前方側(架設桁10の他端側)から架設区間C上に突出していくように前進させる。この際、あらかじめ架設区間C前方側の橋脚天端Pにおいて橋桁設置位置より前側に、支持ベース36を設置しておく。そして、運搬台車20を前進させ、図1に示すように、架設桁10の前端に備えられた下部筒部33Aの下端面が支持ベース36と対向する位置に達したところで、運搬台車20を停止させる。架設桁10の左右のズレは、スライドベース21のスライドベース用ジャッキ21Aを使用し、位置をあわせる。このとき、前方の運搬台車20は既施工区間Sにおける前端に位置している。ここで、架設桁10の長さが架設区間Cの長さの2倍以上とされているから、架設桁10の重心は既施工区間S内に残り、そのため架設区間C上の突出端が下方へ傾かないようになっている。
(3) Transfer process of the installation girder 10 Next, the installation girder 10 is transferred over the installation section C (see FIG. 1).
First, the erection girder 10 on the existing construction section S is advanced so as to protrude from the front side (the other end side of the erection girder 10) onto the erection section C. At this time, the support base 36 is installed in front of the bridge girder installation position at the pier top end P on the front side of the construction section C in advance. Then, the carriage 20 is moved forward, and the carriage 20 is stopped when the lower end surface of the lower cylindrical portion 33A provided at the front end of the installation girder 10 reaches a position facing the support base 36 as shown in FIG. Let The right and left misalignment of the installation girder 10 is adjusted using the slide base jack 21A of the slide base 21. At this time, the front carriage 20 is located at the front end in the already-constructed section S. Here, since the length of the erection girder 10 is more than twice the length of the erection section C, the center of gravity of the erection girder 10 remains in the existing section S, so that the protruding end on the erection section C is downward. It is designed not to tilt.

次に、前方支持柱部30Aの下部筒部33Aを、その下端面が橋脚天端Pの支持ベース36に当接するまで下動させ、その後前方用リフト装置31Aを上下動不能に固定する。ここで、この橋脚天端Pと後方支持柱部30Bの設置される既施工区間Sの上面との間には、ほぼ橋桁Gの高さ分の高低差がある。しかし、十分な長さの下部筒部33Aを下動させるだけでこの高低差に対応できるようになっている。したがって、例えば縦断勾配の厳しい現場においても、十分な長さの下部筒部33Aを用いることにより同じように対応できる。   Next, the lower cylindrical portion 33A of the front support column portion 30A is moved downward until the lower end surface thereof abuts on the support base 36 of the pier top end P, and thereafter the front lift device 31A is fixed so as not to move up and down. Here, there is almost a height difference corresponding to the height of the bridge girder G between the bridge pier top end P and the upper surface of the existing construction section S where the rear support column 30B is installed. However, it is possible to cope with this height difference only by moving the lower cylindrical portion 33A having a sufficient length downward. Therefore, for example, even in a site where the longitudinal gradient is severe, the same can be dealt with by using the sufficiently long lower cylindrical portion 33A.

そして、後方用リフト装置31Bの下部筒部33Bも下方へ降下させ、その下端面が地表のレールR上に当接したところで上下動不能に固定する。こうして、前後両支持柱部30A、30Bは、架設区間C前方の橋脚天端Pおよび後方の既施工区間S上にそれぞれ設置され、架設区間Cに架け渡された架設桁10はこの両端で支持される状態になる。   Then, the lower cylinder portion 33B of the rear lift device 31B is also lowered downward, and is fixed so that it cannot move up and down when its lower end surface comes into contact with the rail R on the ground surface. Thus, the front and rear support column portions 30A and 30B are respectively installed on the pier top end P in front of the installation section C and the existing construction section S in the rear, and the installation girder 10 spanned over the installation section C is supported at both ends. It becomes a state to be.

(4)橋桁Gの送り出し工程
次に、架設桁10において後方側に取り付けられた橋桁Gを前方に送り出す。
図5には、送り出し工程の様子を示す側面図を示した。
(4) Sending step of bridge girder G Next, the bridge girder G attached to the rear side in the erection girder 10 is sent forward.
In FIG. 5, the side view which shows the mode of a sending-out process was shown.

まず、スライドベース21と運搬台車20とを連結しているレバーブロック23を緩め、橋桁Gの位置ずれ防止を解除する。そして、桁送り台車12を架設桁10上のレールRに沿って前進させると、桁送り台車12の桁吊り部13からPC鋼棒14によって吊り下げられた橋桁Gも、この桁送り台車12に伴って前方に移動する。この橋桁Gの送り出しの際、図5に示すように、運搬台車20は既施工区間Sに留め置かれ、橋桁Gおよび橋桁Gの上に載ったスライドベース21は、桁送り台車12に吊り下げられた状態で架設区間C上に送り出される。   First, the lever block 23 connecting the slide base 21 and the transport carriage 20 is loosened, and the prevention of displacement of the bridge girder G is released. Then, when the carry carriage 12 is advanced along the rail R on the installation girder 10, the bridge girder G suspended from the carry suspension portion 13 of the carry carriage 12 by the PC steel rod 14 is also transferred to the carry carriage 12. Move forward with it. When the bridge girder G is sent out, as shown in FIG. 5, the transport carriage 20 is retained in the already-constructed section S, and the bridge girder G and the slide base 21 placed on the bridge girder G are suspended from the girder carriage 12. In this state, it is sent out on the construction section C.

そして、前方の桁送り台車12が架設桁10の上面にマークされた台車停止位置15に達したところで、桁送り台車12を停止させる。これにより、架設桁10に吊り下げられた橋桁Gは、架設区間C上において橋桁Gの設置位置に対応した位置に吊り下げられた状態となる。   When the forward carriage 12 reaches the carriage stop position 15 marked on the upper surface of the installation girder 10, the carriage 12 is stopped. As a result, the bridge girder G suspended from the erection girder 10 is hung at a position corresponding to the installation position of the bridge girder G on the erection section C.

(5)橋桁Gの据付工程
次に、この橋桁Gを架設区間C内の橋桁天端Pに据え付ける。
図6には、据付工程の様子を示す側面図を示した。
(5) Installation process of bridge girder Next, this bridge girder G is installed in the bridge girder top end P in the erection section C.
In FIG. 6, the side view which shows the mode of an installation process was shown.

まず、前後両支持柱部30A、30Bにおいて上部筒部32A、32Bを下降させることにより架設桁10を降下させる。そして、架設桁10に吊り下げられた橋桁Gが、橋脚天端Pに達したところで両リフト装置31A、31Bを上下動不能に固定する。このように、本発明のようにリフト装置31A、31Bを備えた支持柱部30A、30Bを縮めることにより架設桁10を降下させる方法によれば、従来のように上部で固定された架設桁からジャッキ等を用いて橋桁Gを降下させる方法と比べ、架設桁10の上面においてジャッキの設置スペースを確保する必要がなく、また、架設桁10に作用する荷重が増大することがない。さらに、リフト装置31A、31Bの昇降スピードはジャッキの降下スピードに比べ速いから、橋桁Gの据え付け作業を短時間で行うことができる。   First, the installation girder 10 is lowered by lowering the upper cylindrical portions 32A and 32B in the front and rear support column portions 30A and 30B. And when the bridge girder G suspended by the erection girder 10 reaches the pier top end P, both lift devices 31A and 31B are fixed so as not to move up and down. Thus, according to the method of lowering the erection beam 10 by shrinking the support pillars 30A and 30B provided with the lift devices 31A and 31B as in the present invention, from the erection beam fixed at the upper portion as in the prior art. Compared to the method of lowering the bridge girder G using a jack or the like, it is not necessary to secure a jack installation space on the upper surface of the installation girder 10 and the load acting on the installation girder 10 does not increase. Furthermore, since the lifting speed of the lifting devices 31A and 31B is faster than the lowering speed of the jack, the installation work of the bridge girder G can be performed in a short time.

そして、図6に示すように、橋桁Gが所定の位置にセットされたら、橋桁Gを吊り下げていたPC鋼棒14を外し橋脚天端Pに設置する。   Then, as shown in FIG. 6, when the bridge girder G is set at a predetermined position, the PC steel rod 14 from which the bridge girder G is suspended is removed and installed at the pier top end P.

(6)架設桁10の撤退工程
次に、橋桁Gを降ろした架設桁10を既施工区間Sに撤退させる。
図7には、撤退工程の様子を示す側面図を示した。
(6) Withdrawing process of erection girder 10 Next, the erection girder 10 with the bridge girder G lowered is withdrawn to the already-constructed section S.
In FIG. 7, the side view which shows the mode of a withdrawal process was shown.

まず、前後両リフト装置31A、31Bにおいて上部筒部32A、32Bを上昇させることにより、架設桁10を上昇させる。架設桁10の上昇に伴い、橋桁Gの上面に載っていたスライドベース21が、チェーンブロック21Bによって桁送り台車12から吊り下げられた状態になる。このスライドベース21の下面が既施工区間Sに留め置かれている運搬台車20の上面の高さよりもやや上方に達したところで、前後両リフト装置31A、31Bを上下動不能に固定する。そして、桁送り台車12を後方に移動させると、これに伴ってスライドベース21も後方に移動する。スライドベース21が運搬台車20上に至ったところで桁送り台車12を停止させる。そして、前後両リフト装置31A、31Bにおいて上部筒部32A、32Bを下降させることにより架設桁10を降下させ、スライドベース21を運搬台車20上に載せた状態にする。こうして、架設桁10を運搬台車20で支持可能な状態にした後、前後両リフト装置31A、31Bの下部筒部33A、33Bをその下端がレールR上から浮く位置まで上動させる。すると、架設桁10は前後2台の運搬台車20において支持された状態になる。この後、この運搬台車20をレールRにそって後進させることにより、架設桁10を既施工区間S上へ撤去させ、さらに施工ヤードまで搬送する。   First, the installation girder 10 is raised by raising the upper cylindrical portions 32A, 32B in both the front and rear lift devices 31A, 31B. As the erection girder 10 rises, the slide base 21 placed on the upper surface of the bridge girder G is suspended from the girder carriage 12 by the chain block 21B. When the lower surface of the slide base 21 reaches a position slightly higher than the height of the upper surface of the transport carriage 20 held in the already-constructed section S, the front and rear lift devices 31A and 31B are fixed so as not to move up and down. When the carriage 12 is moved rearward, the slide base 21 is moved rearward accordingly. When the slide base 21 reaches the carriage 20, the shift carriage 12 is stopped. Then, by lowering the upper cylindrical portions 32A and 32B in both the front and rear lift devices 31A and 31B, the installation girder 10 is lowered, and the slide base 21 is placed on the transport carriage 20. Thus, after making the erection beam 10 supportable by the carriage 20, the lower cylindrical portions 33A and 33B of the front and rear lift devices 31A and 31B are moved up to a position where the lower ends thereof float from the rail R. Then, the erection beam 10 is supported by the two front and rear transport carts 20. Thereafter, the transporting carriage 20 is moved backward along the rail R, whereby the erection beam 10 is removed onto the existing construction section S and further conveyed to the construction yard.

次に、前述の橋桁工事用装置1を用いた橋桁Gの撤去方法について述べる。
この橋桁の撤去方法は、基本的に前述した架設方法の逆のプロセスを辿ることになる。
Next, a method for removing the bridge girder G using the bridge girder construction apparatus 1 will be described.
This bridge girder removal method basically follows the reverse process of the erection method described above.

この撤去方法は、架設桁10を撤去区間Dの後方へ搬入する搬入工程、架設桁10を撤去区間D上に架け渡す架渡し工程、架設桁10に既設の橋桁Gを取り付ける取り付け工程、架設桁10に取り付けられた橋桁Gを撤去区間D後方へ送り込む送り込み工程、架設桁10を撤去区間D上からその後方へ撤退させる撤退工程とを経ることにより、橋桁Gの撤去をおこなう橋桁の撤去方法である。   This removal method includes a carrying-in process for carrying the installation girder 10 to the rear of the removal section D, a delivery process for transferring the installation girder 10 onto the removal section D, an attachment process for attaching an existing bridge girder G to the installation girder 10, In the removal method of the bridge girder that removes the bridge girder G through the feeding process of sending the bridge girder G attached to 10 to the rear of the removal section D and the withdrawal process of withdrawing the construction girder 10 from the removal section D to the rear thereof is there.

以下、この工程を順を追って説明する。なお、架設方法の説明に用いた図面を使って説明し、架設方法と重複する部分については説明を省略する。
(1)架設桁10の搬入工程
まず、施工ヤードにおいてレールR上に橋桁工事用装置1を設置する。そして、レールR上面と架設桁10下面との上下方向の間隔が、スライドベース21と運搬台車20とを併せた高さとなるよう前後両支持柱部30A、30Bの高さを調節するとともに両リフト装置31A、31Bを上下動不能に固定する。その後、スライドベース21を運搬台車20の上下軸線上に配置し運搬台車20上に載置し得る状態にセットする。そして、前後両支持柱部30A、30Bの下部筒部33A、33Bを上動させると、図7に示すのと同様に、架設桁10が運搬台車20に載せられた状態になるとともに、この運搬台車20により架設桁10が支持された状態になる。そして、架設桁10を載せた運搬台車20をレールRに沿って走行させ、この架設桁10が撤去区間D後方に至るまで前進させる。
Hereinafter, this process will be described in order. In addition, it demonstrates using the drawing used for description of the construction method, and abbreviate | omits description about the part which overlaps with the construction method.
(1) Carrying-in process of the installation girder 10 First, the bridge girder construction apparatus 1 is installed on the rail R in the construction yard. The heights of both the front and rear support pillars 30A and 30B are adjusted so that the vertical distance between the upper surface of the rail R and the lower surface of the installation girder 10 becomes the combined height of the slide base 21 and the transport carriage 20 and both lifts. The devices 31A and 31B are fixed so as not to move up and down. Thereafter, the slide base 21 is arranged on the vertical axis of the transport cart 20 and set in a state where it can be placed on the transport cart 20. When the lower cylindrical portions 33A and 33B of the front and rear support column portions 30A and 30B are moved upward, the erection girder 10 is placed on the carriage 20 as shown in FIG. The construction beam 10 is supported by the carriage 20. Then, the transport carriage 20 on which the erection beam 10 is placed is caused to travel along the rail R, and the erection beam 10 is advanced to the rear of the removal section D.

(2)架設桁10の架渡し工程
次に、この架設桁10を撤去区間D上に架け渡す。
上記した架設の場合と同様に、撤去区間D後方にある架設桁10を、その前方側(他端側)から撤去区間D上に突出していくように前進させ、前方用リフト装置31Aの下部筒部33Aを橋脚天端Pの支持ベース36に、後方用リフト装置31Bの下部筒部33BをレールR上に降ろして固定する。これにより、前後両支持柱部30A、30Bは、撤去区間D前方の橋脚天端Pおよび撤去区間D後方にそれぞれ設置され、撤去区間Dに架け渡された架設桁10はこの両端で支持される状態になる。
(2) Transfer process of the installation girder 10 Next, this installation girder 10 is transferred over the removal section D.
As in the case of the above-described erection, the erection girder 10 behind the removal section D is advanced so as to protrude from the front side (the other end side) onto the removal section D, and the lower cylinder of the front lift device 31A The lower cylindrical portion 33B of the rear lift device 31B is lowered onto the rail R and fixed to the support base 36 of the bridge pier top end P. As a result, the front and rear support column portions 30A and 30B are respectively installed at the pier top end P in front of the removal section D and the rear of the removal section D, and the erection beam 10 spanned over the removal section D is supported at both ends. It becomes a state.

(3)撤去する橋桁Gの取り付け工程
次に、この架設桁10に撤去する橋桁Gを取り付ける。
まず、桁送り台車12とスライドベース21とを所定の位置に配置し、前後両支持柱部30A、30Bの上部筒部32A、32Bを下降させることにより架設桁10を降下させる。そして、架設桁10が、橋桁Gの吊り下げ作業が可能な高さに達したところで前後両リフト装置31A、31Bを上下動不能に固定する(図6参照)。そして、橋桁Gの吊り下げ位置に配置された桁送り台車12と橋桁GとをPC鋼棒14等により連結させる。このとき、スライドベース21は橋桁G上に載った状態となる。
(3) Attachment process of bridge girder G to be removed Next, the bridge girder G to be removed is attached to the installation girder 10.
First, the carry carriage 12 and the slide base 21 are arranged at predetermined positions, and the installation girder 10 is lowered by lowering the upper cylindrical portions 32A and 32B of the front and rear support column portions 30A and 30B. When the erection girder 10 reaches a height at which the bridge girder G can be suspended, the front and rear lift devices 31A and 31B are fixed so as not to move up and down (see FIG. 6). And the girder carriage 12 and the bridge beam G, which are arranged at the hanging position of the bridge beam G, are connected by the PC steel rod 14 or the like. At this time, the slide base 21 is placed on the bridge girder G.

(4)撤去する橋桁Gの送り込み工程
次に、架設桁10において前方側に取り付けられた橋桁Gを後方側に送り込む。
まず、前後両リフト装置31A、31Bの上部筒部32A、32Bを上動することにより、橋桁Gを取り付けた架設桁10を上昇させる。そして、橋桁Gの下面が撤去区間D後方に留め置かれている運搬台車20の上面の高さとほぼ同じ高さに達したところで、前後両リフト装置31A、31Bを上下動不能に固定する(図5参照)。そして、桁送り台車12を後方に移動させると、これに伴ってスライドベース21を載せた橋桁Gも後方に移動する。そして、このスライドベース21が運搬台車20と上下軸線上に至ったところで桁送り台車12を停止させる。
(4) Feeding process of bridge girder G to be removed Next, the bridge girder G attached to the front side in the erection girder 10 is fed back.
First, the erection girder 10 to which the bridge girder G is attached is raised by moving up the upper cylindrical portions 32A and 32B of the front and rear lift devices 31A and 31B. Then, when the lower surface of the bridge girder reaches almost the same height as the upper surface of the transport carriage 20 retained behind the removal section D, the front and rear lift devices 31A and 31B are fixed so as not to move up and down (see FIG. 5). And if the carry carriage 12 is moved backward, the bridge girder G on which the slide base 21 is placed will also move backward. When the slide base 21 reaches the transporting carriage 20 on the vertical axis, the shift carriage 12 is stopped.

(5)架設桁10の撤退工程
次に、この架設桁10および橋桁Gを撤去区間D後方に撤去する。
まず、前後両支持柱部30A、30Bの上部筒部32A、32Bを下降することにより架設桁10を降下させ、橋桁Gを運搬台車20上に押し付けた状態にする。そして、前後両リフト装置31A、31Bの下部筒部33A、33Bを上動させると、架設桁10および橋桁Gは前後2台の運搬台車20において支持された状態になる。この運搬台車20をレールRにそって後進させることにより、架設桁10を撤去区間D後方へ撤去させる(図1参照)。
(5) Withdrawing step of erection girder 10 Next, the erection girder 10 and the bridge girder G are removed to the rear of the removal section D.
First, the installation girder 10 is lowered by lowering the upper cylindrical portions 32A, 32B of both the front and rear support column portions 30A, 30B, and the bridge girder G is pressed onto the transport carriage 20. And if the lower cylinder part 33A, 33B of both the front and rear lift devices 31A, 31B is moved up, the erection girder 10 and the bridge girder G will be supported by the two front and rear transport carts 20. By moving the transport carriage 20 backward along the rail R, the erection beam 10 is removed to the rear of the removal section D (see FIG. 1).

以上説明したように、本実施形態に係る橋桁工事用装置1を用いて橋桁Gの架設工事を行えば、まず運搬台車20によって架設桁10を支持しつつ、既施工区間Sから架設区間C上へ架設桁10の前方側を送り出し、下部筒部33Aを下降させてこの前方側を支持することにより、架設桁10を架け渡すことができる。そして、架設桁10に取り付けた橋桁Gを桁送り台車12によって架設区間C上へ送り出し、架設桁10を下降させることによって橋脚天端Pに橋桁Gを設置することができる。架設終了後には、同じく運搬台車20によって架設桁10を支持しつつ架設区間Cから既施工区間Sへ架設桁10を撤退させればよい。一方、撤去工事は、基本的に上記架設工事の逆のプロセスを辿ることによって行うことができる。このような方法によれば、架設桁を支持する架台等、架設桁に係る設備の設置を伴わないから、従来に比べ架設桁を設置する作業が短時間ですむ。また、架設桁およびそれに係る設備等を現場で組み上げたまま長期間留め置く必要がなく、短時間で現場を明渡すことができる。   As described above, when the bridge girder G is erected using the bridge girder construction apparatus 1 according to the present embodiment, the erection girder 10 is first supported by the transport carriage 20 while the erection g The construction girder 10 can be bridged by feeding the front side of the installation girder 10 to the lower side and lowering the lower cylindrical portion 33A to support this front side. The bridge girder G attached to the erection girder 10 is sent out onto the erection section C by the girder carriage 12 and the erection girder 10 is lowered to install the bridge girder G at the pier top end P. After the completion of the erection, the erection girder 10 may be withdrawn from the erection section C to the already-constructed section S while supporting the erection girder 10 by the carriage 20. On the other hand, the removal work can be basically performed by following the reverse process of the erection work. According to such a method, installation of the installation girders such as a gantry for supporting the installation girders is not required, so that the installation work of the installation girders can be shortened in comparison with the conventional method. Moreover, it is not necessary to keep the erection girder and the equipment related to it for a long period of time while being assembled at the site, and the site can be handed over in a short time.

また、運搬台車20は、橋桁Gを取り付けた架設桁10を載せて走行可能とされている。これにより、橋桁架設工事においては、橋桁Gをあらかじめ架設桁10に取り付けてから現場に搬入することができる。また、橋桁撤去工事においては、橋桁Gを取り付けたまま架設桁10を現場から搬出することができる。これにより、橋桁Gの架設桁10への取り付けおよび取り外しを現場以外の場所で行うことができるから、現場での作業時間をその分短縮できる。また、現場にこの作業のためのスペースを確保する必要がない。   Further, the transport cart 20 can travel with the erection beam 10 with the bridge beam G attached thereto. Thereby, in bridge girder erection work, the bridge girder G can be carried in the field after being attached to the erection girder 10 in advance. Further, in the bridge girder removal work, the erection girder 10 can be carried out from the site while the bridge girder G is attached. Thereby, since attachment and detachment of the bridge girder G to the erection girder 10 can be performed at a place other than the site, work time at the site can be shortened accordingly. Moreover, it is not necessary to secure a space for this work at the site.

さらに、運搬台車20がレールR上を走行可能とされている。これにより、架設桁10の設置の際、架設桁10は正規の線形に沿って誘導される。また、撤去の際には既存のレールRを利用することができ、架設の際においては、既施工区間Sに敷設したレールRを使用できるとともに、この架設工事のために敷設したレールRを路線の供用開始後そのまま使用することも可能である。   Further, the transport cart 20 can travel on the rail R. As a result, when the installation girder 10 is installed, the installation girder 10 is guided along a normal alignment. In addition, the existing rail R can be used for removal, and the rail R laid in the existing construction section S can be used for erection, and the rail R laid for this erection work can be used as a route. It can also be used as it is after the start of service.

<他の実施形態>
本発明は上記記述及び図面によって説明した実施形態に限定されるものではなく、例えば次のような実施形態も本発明の技術的範囲に含まれ、さらに、下記以外にも要旨を逸脱しない範囲内で種々変更して実施することができる。
<Other embodiments>
The present invention is not limited to the embodiments described with reference to the above description and drawings. For example, the following embodiments are also included in the technical scope of the present invention, and further, within the scope not departing from the gist of the invention other than the following. Various modifications can be made.

(1)本実施形態の架設方法では、橋桁Gを取り付けてから架設区間C後方の既施工区間Sに搬入したが、これに限らず、架設桁10を既施工区間Sに搬入した後、その既施工区間Sにおいて橋桁Gの取付を行ってもよい。   (1) In the erection method of this embodiment, after attaching the bridge girder G, it was carried into the existing construction section S behind the erection section C. However, not limited to this, after the construction girder 10 is carried into the existing construction section S, The bridge girder G may be attached in the existing construction section S.

(2)本実施形態では、多径間の橋桁Gを順番に架設および撤去する方法において、前方の下部筒部33Aを未架設区間側もしくは既撤去区間側の橋脚天端Pに設置したが、これに限らず、1径間のみの橋桁の架設および撤去において前方の下部筒部を架設区間もしくは撤去区間より前方の地表上に設置してもよい。   (2) In the present embodiment, in the method of installing and removing the multi-span bridge girder G in order, the front lower cylindrical portion 33A is installed at the pier top end P on the uninstalled section side or the already removed section side. However, the present invention is not limited to this, and the lower cylindrical portion in front of the bridge girder of only one span may be installed on the ground surface in front of the installation section or the removal section.

(3)本実施形態では、前方用リフト装置31Aの下部筒部33Aは架設桁10の前端を橋脚天端P上に支持する支持脚部を兼ねているが、これに限らず、前後両リフト装置の下部筒部が支持脚部を兼ねる構造としてもよい。   (3) In the present embodiment, the lower cylinder portion 33A of the forward lift device 31A also serves as a support leg portion that supports the front end of the installation girder 10 on the bridge pier top end P. It is good also as a structure where the lower cylinder part of an apparatus serves as a support leg part.

(4)本実施形態では、運搬台車20がレールR上を走行可能とされているが、これに限らず、レールのない路面を移動するものであってもよい。   (4) In the present embodiment, the transport cart 20 is allowed to travel on the rail R. However, the present invention is not limited to this, and the transport cart 20 may move on a road surface without a rail.

(5)本実施形態では、架設桁10は橋桁Gを架設しようとする架設区間Cもしくは橋桁Gを撤去しようとする撤去区間Dの長さの2倍よりもやや長い形状とされているが、これに限らず、既施工区間Sもしくは撤去区間D後方に重心が残るようにされればよく、例えば架設桁の後方に重り部材を取り付ける構造としてもよい。   (5) In this embodiment, the installation girder 10 has a shape slightly longer than twice the length of the installation section C in which the bridge girder G is to be installed or the removal section D in which the bridge girder G is to be removed. Not only this but a center of gravity should just be left behind the existing construction section S or the removal section D, for example, it is good also as a structure which attaches a weight member to the back of a construction girder.

(6)本実施形態では、橋桁Gの架設および撤去方法についてそれぞれ説明したが、架設方法および撤去方法を併用することにより橋桁の架け替えにも対応できる。   (6) In this embodiment, the construction and removal method of the bridge girder G has been described. However, the bridge girder can be replaced by using the construction method and the removal method in combination.

(7)本実施形態においては、橋桁Gの位置ずれ防止のためにスライドベース21を用いているが、これに限らず、例えばスライドベース21の替わりに運搬台車の左右両端に橋桁の側面と対向する支持壁部を設け、この支持壁部にて橋桁Gの位置ずれを防止するとともに支持壁部の上面にて架設桁を支持するようにしてもよい。   (7) In this embodiment, the slide base 21 is used to prevent the displacement of the bridge girder G. However, the present invention is not limited to this. For example, instead of the slide base 21, the left and right ends of the transport carriage face the side surfaces of the bridge girder. It is also possible to provide a supporting wall portion to prevent the positional displacement of the bridge girder G and to support the installation girder on the upper surface of the supporting wall portion.

(8)本実施形態では、リフト装置31A、31Bは上部筒部と下部筒部内に伸縮装置を設ける仕組みとされているが、これに限らず、伸縮装置が剥き出しにされたものであってもよい。   (8) In the present embodiment, the lift devices 31A and 31B are configured to provide the telescopic device in the upper cylindrical portion and the lower cylindrical portion, but not limited to this, even if the telescopic device is exposed. Good.

(9)本実施形態では、搬送時に前方支持柱部30Aおよび後方支持柱部30BをレールRから浮かせた状態で搬送したが、これに限らず、例えば前後両支持柱部の下端に車を設けレール上を走行させるようにしてもよい。   (9) In the present embodiment, the front support column portion 30A and the rear support column portion 30B are conveyed while being lifted from the rail R at the time of conveyance. However, the present invention is not limited to this. For example, a vehicle is provided at the lower ends of both the front and rear support column portions. You may make it drive | work on a rail.

(10)本実施形態に係る橋桁工事用装置1を用いた橋桁Gの架設および撤去においては、鋼製桁、RC桁、PC桁等さまざまな橋桁の架設および撤去に対応できる。   (10) In erection and removal of the bridge girder G using the bridge girder construction apparatus 1 according to the present embodiment, it is possible to cope with erection and removal of various bridge girder such as steel girder, RC girder, and PC girder.

(11)本実施形態では、各径間毎に1本ずつの橋桁Gを架設もしくは撤去する方法について説明したが、これに限らず、各径間毎に複数本の橋桁を並べて架設する、もしくは複数本並んだ既設の橋桁を撤去する場合にも適用できる。   (11) In the present embodiment, the method of installing or removing one bridge girder G for each span has been described. However, the present invention is not limited to this, and a plurality of bridge girders are installed side by side for each span, or It can also be applied to removing existing bridge girders that are lined up.

(12)本実施形態での上下動は、リフト装置31A、31Bによるとしたが、桁送り台車12の桁吊り部13とPC鋼棒14とをジャッキ等で伸縮させる装置を追加してもよい。   (12) Although the vertical movement in this embodiment is performed by the lift devices 31A and 31B, a device for extending and contracting the beam suspension portion 13 of the shift carriage 12 and the PC steel rod 14 with a jack or the like may be added. .

架設時において本実施形態の橋桁工事用装置がその前方側を架設区間上へ送り出された状態を表す側面図Side view showing a state in which the bridge girder construction apparatus according to the present embodiment is sent forward on the construction section at the time of construction. 図1の状態における橋桁工事用装置の正面図Front view of bridge girder construction equipment in the state of FIG. 図1の状態における橋桁工事用装置の背面図Rear view of bridge girder construction equipment in the state of FIG. 図1のA−A断面図AA sectional view of FIG. 送り出し工程の様子を示す側面図Side view showing the delivery process 据付工程の様子を示す側面図Side view showing the installation process 撤退工程の様子を示す側面図Side view showing the withdrawal process

符号の説明Explanation of symbols

B…鉄道橋
C…架設区間
D…撤去区間
G…橋桁(橋桁部材)
P…橋脚天端(桁座部)
R…レール
S…既施工区間(隣接スペース)
1…橋桁工事用装置
10…架設桁
12…桁送り台車(桁送り部)
13…桁吊り部(桁保持部)
14…PC鋼棒(桁保持部)
20…運搬台車(移動機構)
30A、30B…支持柱部
31A、31B…リフト装置(リフト部)
33A…下部筒部(支持脚部)
B ... Railway bridge C ... Installation section D ... Removal section G ... Bridge girder (bridge girder member)
P: Bridge pier top (girder seat)
R ... Rail S ... Existing construction section (adjacent space)
1 ... Bridge girder construction device 10 ... Installation girder 12 ... Girder carriage (girder part)
13 ... Girder hanging part (girder holding part)
14 ... PC steel bar (girder holding part)
20 ... Carriage cart (movement mechanism)
30A, 30B ... support column part 31A, 31B ... lift device (lift part)
33A ... Lower cylinder part (support leg part)

Claims (6)

橋桁部材を架設しようとする架設区間に設置した架設桁を利用して前記橋桁部材を前記架設区間に設置する橋桁の架設方法であって、
新設用の前記橋桁部材を前記架設桁における長さ方向の一端側へ寄せて取り付ける取り付け工程と、
前記架設桁を前記架設区間と隣接する隣接スペースへ搬入する搬入工程と、
前記架設桁の重心が前記隣接スペース内に残るようにしつつ前記隣接スペースから前記架設区間上へ前記架設桁の他端側を送り出した後に、前記他端側から支持脚部を下降させてこの他端側を支持することにより前記架設桁を前記架設区間上に架け渡す架渡し工程と、
前記架設桁に取り付けられた前記橋桁部材を前記架設桁に沿って前記架設区間上へ送り出す送り出し工程と、
前記架設区間上に達した前記橋桁部材を前記架設区間内に設けられた桁座部上に据え付ける据付工程と、
前記支持脚部を上昇させるとともに前記架設桁を前記架設区間上から前記隣接スペースへ撤退させる撤退工程と、を経ることを特徴とする橋桁の架設方法。
A bridge girder erection method in which the bridge girder member is installed in the erection section using an erection girder installed in the erection section where the bridge girder member is to be erected,
An attachment process for attaching the bridge girder member for new installation to one end side in the length direction of the installation girder,
A carry-in process of carrying the installation girder into an adjacent space adjacent to the installation section;
After the other end side of the installation girder is sent out from the adjacent space onto the installation section while the center of gravity of the installation girder remains in the adjacent space, the support leg is lowered from the other end side and the other A spanning step of bridging the erection girder on the erection section by supporting an end side;
A feeding step of feeding the bridge girder member attached to the erection girder onto the erection section along the erection beam;
An installation step of installing the bridge girder member that has reached the construction section on a girder seat portion provided in the construction section;
A bridge girder erection method comprising: a step of raising the support leg and withdrawing the erection girder from the erection section to the adjacent space.
橋桁部材を撤去しようとする撤去区間に設置した架設桁を利用して前記橋桁部材を前記撤去区間から撤去する橋桁の撤去方法であって、
前記架設桁を前記撤去区間と隣接する隣接スペースへ搬入する搬入工程と、
前記架設桁の重心が前記隣接スペース内に残るようにしつつ前記隣接スペースから前記撤去区間上へ前記架設桁の他端側を送り出した後に、前記他端側から支持脚部を下降させてこの他端側を支持することにより前記架設桁を前記撤去区間上に架け渡す架渡し工程と、
前記架設桁に前記橋桁部材を取り付ける取り付け工程と、
前記架設桁に保持された前記橋桁部材を前記架設桁に沿ってこの架設桁の一端側へ送り込む送り込み工程と、
前記支持脚部を上昇させるとともに前記架設桁を前記撤去区間上から前記隣接スペースへ撤退させる撤退工程と、を経ることを特徴とする橋桁の撤去方法。
A method for removing a bridge girder that removes the bridge girder member from the removal section using an erection girder installed in a removal section to remove the bridge girder member,
A carrying-in process of carrying the installation girder into an adjacent space adjacent to the removal section;
After the other end side of the installation girder is sent out from the adjacent space onto the removal section while the center of gravity of the installation girder remains in the adjacent space, the support leg is lowered from the other end side and the other A spanning step of bridging the erection girder onto the removal section by supporting an end side;
An attaching step of attaching the bridge girder member to the installation girder;
A feeding step of feeding the bridge girder member held by the erection girder to one end side of the erection girder along the erection girder;
A method for removing the bridge girder, comprising: a step of raising the support leg and withdrawing the erection girder from the removal section to the adjacent space.
架設区間または撤去区間に設置した架設桁を利用してこの架設区間への橋桁部材の架設またはこの撤去区間からの橋桁部材の撤去を行う橋桁工事用装置であって、
前記橋桁部材よりも長尺に形成された前記架設桁と、
前記架設桁に設けられてこの架設桁に前記橋桁部材を保持する桁保持部と、
前記架設桁に保持された前記橋桁部材を前記架設桁に沿って移動可能な桁送り部と、
前記架設桁の両端に設けられてこの架設桁を水平状態に支持するとともに前記架設桁を上下に昇降可能なリフト部を備えた一対の支持柱部と、
前記一対の支持柱部のうち一方に設けられるとともにこの支持柱部の下方から伸縮可能な支持脚部と、
前記架設桁を取り付けた状態で前記架設桁を支持しつつこの架設桁をその長さ方向に沿って移動可能な移動機構と、を備えることを特徴とする橋桁工事用装置。
A bridge girder construction device that uses a girder installed in a construction section or a removal section to construct a bridge girder member in this construction section or remove a bridge girder member from this removal section,
The erection girder formed longer than the bridge girder member;
A girder holding portion provided in the erection girder and holding the bridge girder member on the erection girder,
A girder that can move the bridge girder member held by the erection girder along the erection girder,
A pair of support columns provided with lift portions provided at both ends of the erection girder and supporting the erection girder in a horizontal state and capable of raising and lowering the erection girder up and down;
A support leg provided on one of the pair of support pillars and extendable from below the support pillar; and
A bridge girder construction apparatus comprising: a moving mechanism capable of moving the installation girder along its length direction while supporting the installation girder in a state where the installation girder is attached.
前記移動機構が、前記橋桁部材を取り付けた前記架設桁を載せて走行可能な搬送台車であることを特徴とする請求項3に記載の橋桁工事用装置。 4. The bridge girder construction apparatus according to claim 3, wherein the moving mechanism is a transport carriage that can travel on the bridge girder to which the bridge girder member is attached. 5. 前記橋桁部材が鉄道橋の橋桁部材であって、前記移動機構がレール上を走行可能とされていることを特徴とする請求項3又は請求項4に記載の橋桁工事用装置。 The bridge girder apparatus according to claim 3 or 4, wherein the bridge girder member is a bridge girder member of a railway bridge, and the moving mechanism is capable of traveling on a rail. 前記架設桁の長さが前記橋桁部材を架設または撤去すようとする前記架設区間または前記撤去区間の長さの2倍以上であることを特徴とする請求項3〜請求項5のいずれかに記載の橋桁工事用装置。 The length of the erection girder is at least twice the length of the erection section or the removal section where the bridge girder member is to be erected or removed. Equipment for bridge girder construction as described.
JP2005029412A 2005-02-04 2005-02-04 Bridge girder construction and removal method and bridge girder construction equipment Active JP4414906B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005029412A JP4414906B2 (en) 2005-02-04 2005-02-04 Bridge girder construction and removal method and bridge girder construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005029412A JP4414906B2 (en) 2005-02-04 2005-02-04 Bridge girder construction and removal method and bridge girder construction equipment

Publications (2)

Publication Number Publication Date
JP2006214209A true JP2006214209A (en) 2006-08-17
JP4414906B2 JP4414906B2 (en) 2010-02-17

Family

ID=36977656

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005029412A Active JP4414906B2 (en) 2005-02-04 2005-02-04 Bridge girder construction and removal method and bridge girder construction equipment

Country Status (1)

Country Link
JP (1) JP4414906B2 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010007243A (en) * 2008-06-24 2010-01-14 Kajima Corp Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method
CN101942807A (en) * 2010-10-08 2011-01-12 石家庄铁道大学国防交通研究所 Flow type bridge erecting machine
CN101949133A (en) * 2010-10-08 2011-01-19 石家庄铁道大学国防交通研究所 Straddle type bridge girder erection machine
CN102071650A (en) * 2010-12-02 2011-05-25 秦皇岛天业通联重工股份有限公司 Inside and outside general bridge girder erection machine for high speed railway tunnel and girder erecting technology thereof
CN103255719A (en) * 2011-09-02 2013-08-21 中铁上海工程局有限公司 Large-section special-shaped pier cap formwork and installing method thereof
CN103321156A (en) * 2013-07-01 2013-09-25 中铁科工集团有限公司 Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN103590336A (en) * 2012-08-17 2014-02-19 秦皇岛天业通联重工股份有限公司 Bridge erecting unit with automatic bearing balancing function and method for erecting bridges by aid of bridge erecting unit
CN104762885A (en) * 2015-03-31 2015-07-08 中铁工程机械研究设计院有限公司 Large-tonnage beam erection and transportation system in tunnel and beam erection span change procedure thereof
CN105862606A (en) * 2016-05-22 2016-08-17 李明 Beam transportation device for bridge erecting machine
CN106835993A (en) * 2017-03-07 2017-06-13 石家庄铁道大学 Mobile formwork front leg strut base
CN107881921A (en) * 2017-12-13 2018-04-06 中铁第五勘察设计院集团有限公司 One kind is hidden formula beam car
CN108570936A (en) * 2018-03-12 2018-09-25 中交二航局第二工程有限公司 Large-scale component high-altitude fortune sliding over long distances and positioning trolley
CN109403218A (en) * 2018-12-20 2019-03-01 中海外交通建设有限公司 A kind of bridge construction Bridge Erector of easy access
CN109695204A (en) * 2018-07-08 2019-04-30 中铁十一局集团汉江重工有限公司 A kind of Bridge Erector and bridge erection method
CN112276248A (en) * 2020-11-02 2021-01-29 唐山开滦建设(集团)有限责任公司 Method for dismantling box-type derrick
CN113931077A (en) * 2021-11-25 2022-01-14 中国能源建设集团安徽电力建设第一工程有限公司 Construction method for erecting prefabricated box girder bridge girder erection machine in limited construction space
CN114032781A (en) * 2021-11-30 2022-02-11 中铁二十四局集团上海铁建工程有限公司 Construction method for girder-carrying upper bridge of girder-transporting vehicle

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010007243A (en) * 2008-06-24 2010-01-14 Kajima Corp Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method
CN101942807A (en) * 2010-10-08 2011-01-12 石家庄铁道大学国防交通研究所 Flow type bridge erecting machine
CN101949133A (en) * 2010-10-08 2011-01-19 石家庄铁道大学国防交通研究所 Straddle type bridge girder erection machine
CN101942807B (en) * 2010-10-08 2014-01-22 石家庄铁道大学国防交通研究所 Flow type bridge erecting machine
CN101949133B (en) * 2010-10-08 2014-03-12 石家庄铁道大学国防交通研究所 Straddle type bridge girder erection machine
CN102071650A (en) * 2010-12-02 2011-05-25 秦皇岛天业通联重工股份有限公司 Inside and outside general bridge girder erection machine for high speed railway tunnel and girder erecting technology thereof
CN102071650B (en) * 2010-12-02 2015-12-09 秦皇岛天业通联重工股份有限公司 Universal bridging machine inside and outside Railway Tunnel
CN103255719A (en) * 2011-09-02 2013-08-21 中铁上海工程局有限公司 Large-section special-shaped pier cap formwork and installing method thereof
CN103255719B (en) * 2011-09-02 2015-04-08 中铁上海工程局有限公司 Installing method for large-section special-shaped pier cap formwork
CN103590336A (en) * 2012-08-17 2014-02-19 秦皇岛天业通联重工股份有限公司 Bridge erecting unit with automatic bearing balancing function and method for erecting bridges by aid of bridge erecting unit
CN103321156A (en) * 2013-07-01 2013-09-25 中铁科工集团有限公司 Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN104762885A (en) * 2015-03-31 2015-07-08 中铁工程机械研究设计院有限公司 Large-tonnage beam erection and transportation system in tunnel and beam erection span change procedure thereof
CN105862606A (en) * 2016-05-22 2016-08-17 李明 Beam transportation device for bridge erecting machine
CN106835993B (en) * 2017-03-07 2018-11-27 石家庄铁道大学 Mobile formwork front leg strut pedestal
CN106835993A (en) * 2017-03-07 2017-06-13 石家庄铁道大学 Mobile formwork front leg strut base
CN107881921B (en) * 2017-12-13 2023-08-08 中铁第五勘察设计院集团有限公司 Hiding type beam transporting vehicle
CN107881921A (en) * 2017-12-13 2018-04-06 中铁第五勘察设计院集团有限公司 One kind is hidden formula beam car
CN108570936A (en) * 2018-03-12 2018-09-25 中交二航局第二工程有限公司 Large-scale component high-altitude fortune sliding over long distances and positioning trolley
CN109695204B (en) * 2018-07-08 2024-06-04 中铁十一局集团汉江重工有限公司 Bridge girder erection machine and bridge girder erection method
CN109695204A (en) * 2018-07-08 2019-04-30 中铁十一局集团汉江重工有限公司 A kind of Bridge Erector and bridge erection method
CN109403218B (en) * 2018-12-20 2020-04-21 中海外交通建设有限公司 Bridge girder erection machine convenient to overhaul for bridge construction
CN109403218A (en) * 2018-12-20 2019-03-01 中海外交通建设有限公司 A kind of bridge construction Bridge Erector of easy access
CN112276248B (en) * 2020-11-02 2022-12-20 唐山开滦建设(集团)有限责任公司 Method for dismantling box type derrick
CN112276248A (en) * 2020-11-02 2021-01-29 唐山开滦建设(集团)有限责任公司 Method for dismantling box-type derrick
CN113931077A (en) * 2021-11-25 2022-01-14 中国能源建设集团安徽电力建设第一工程有限公司 Construction method for erecting prefabricated box girder bridge girder erection machine in limited construction space
CN114032781A (en) * 2021-11-30 2022-02-11 中铁二十四局集团上海铁建工程有限公司 Construction method for girder-carrying upper bridge of girder-transporting vehicle

Also Published As

Publication number Publication date
JP4414906B2 (en) 2010-02-17

Similar Documents

Publication Publication Date Title
JP4414906B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP6081117B2 (en) How to remove existing bridge and update existing bridge
JP4956332B2 (en) Bridge girder replacement method
JP2010037727A (en) Equipment and method for erecting precast pc plate for floor slab
JP5507383B2 (en) Heavy load erection machine and heavy load erection method
JP3954869B2 (en) Bridge girder replacement method
JP2006265884A (en) Method of removing existing pier of viaduct
JP4405958B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP2014190107A (en) Method of building bridge girder, removal method, and apparatus for constructing bridge girder
JP5184248B2 (en) Construction method of level crossing
JP5032787B2 (en) Heavy equipment installation equipment
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP2020002563A (en) Deck slab construction method
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
JP4958851B2 (en) Railway girder moving installation device, railway girder moving installation method and railway girder removal method
KR20060082970A (en) Crane for replacement of a girdir of a railway bridge and method for replacement of the girdir using the same
JP6172636B2 (en) Scaffolding system
JP3905099B2 (en) Hand girder delivery construction method for bridge girder
JP2009121145A (en) Overhanging erection machine and overhang erection method
KR101077092B1 (en) Girder installation method using trolly without closing nor detouring existing road
JP2019173435A (en) Floor system replacement method and floor system replacement device
JP5133146B2 (en) Railway girder moving installation method and railway girder removal method
JP4956331B2 (en) Bridge girder replacement method
JP2005307684A (en) Laying apparatus of precast concrete floor board

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060509

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20060509

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060509

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20060623

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060623

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071012

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091029

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091120

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121127

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4414906

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121127

Year of fee payment: 3

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131127

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250