CN109403218A - A kind of bridge construction Bridge Erector of easy access - Google Patents

A kind of bridge construction Bridge Erector of easy access Download PDF

Info

Publication number
CN109403218A
CN109403218A CN201811561162.7A CN201811561162A CN109403218A CN 109403218 A CN109403218 A CN 109403218A CN 201811561162 A CN201811561162 A CN 201811561162A CN 109403218 A CN109403218 A CN 109403218A
Authority
CN
China
Prior art keywords
plate
bridge
crossbeam
auxiliary
downside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811561162.7A
Other languages
Chinese (zh)
Other versions
CN109403218B (en
Inventor
范宝庆
高磊
李建夺
常雪岭
杨明
袁帅
黄锋锋
王兆阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Construction Co Ltd
Original Assignee
China Communications Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Construction Co Ltd filed Critical China Communications Construction Co Ltd
Priority to CN201811561162.7A priority Critical patent/CN109403218B/en
Publication of CN109403218A publication Critical patent/CN109403218A/en
Application granted granted Critical
Publication of CN109403218B publication Critical patent/CN109403218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Abstract

The invention discloses a kind of bridge construction Bridge Erectors of easy access, including crossbeam and bridge plate, one end of the crossbeam is provided with driving wheel, directive wheel is provided on the downside of the other end of the crossbeam, the other end of the crossbeam is fixedly connected with positioning supporting frame, the side of the positioning supporting frame is provided with fixing support rack, fixture is provided on the downside of the middle part of the crossbeam, the fixture includes bottom plate, auxiliary bracket, bottom bracket, auxiliary drop panel, connecting plate and sliding panel, the auxiliary bracket is mounted on the downside of bottom plate by shaft, the bottom bracket is mounted on the upside of one end of auxiliary bracket by shaft, one end of the sliding panel is rotatably connected on the inside of the other end of auxiliary bracket by shaft;By the fixture of design, when carrying out clamping conveying to bridge plate, bridge plate can be kept more firm when gripping by fixture to bridge plate stable holding.

Description

A kind of bridge construction Bridge Erector of easy access
Technical field
The invention belongs to technical fields, and in particular to a kind of bridge construction Bridge Erector of easy access.
Background technique
Bridge Erector is exactly the equipment that prefabricated beam piece is placed into prefabricated bridge pier and is got on.Bridge Erector belongs to crane Scope is put down after being then transported to position because its major function is to lift beam piece.Bridge Erector and lifting in general sense Machine is very different.Its desired condition is harsh, and there are beam on piece travelings, or cry vertical shift.Bridge Erector is divided into erection Highway bridge, conventional railway bridge, railway of passengers' private line bridge etc. are several.
A kind of bridge construction of existing easy access with Bridge Erector when in use, due to the problem of, thus we It is proposed a kind of bridge construction Bridge Erector of easy access.
Summary of the invention
The purpose of the present invention is to provide a kind of bridge construction Bridge Erectors of easy access, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme: a kind of bridge construction Bridge Erector of easy access, Including crossbeam and bridge plate, one end of the crossbeam is provided with driving wheel, is provided with directive wheel on the downside of the other end of the crossbeam, The other end of the crossbeam is fixedly connected with positioning supporting frame, and the side of the positioning supporting frame is provided with fixing support rack, institute It states and is provided with fixture on the downside of the middle part of crossbeam, the fixture includes bottom plate, auxiliary bracket, bottom bracket, auxiliary drop panel, connection Plate and sliding panel, the auxiliary bracket are mounted on the downside of bottom plate by shaft, and the bottom bracket is mounted on by shaft On the upside of one end of auxiliary bracket, one end of the sliding panel is rotatably connected on the inside of the other end of auxiliary bracket by shaft, institute One end that connecting plate is mounted on sliding panel by shaft, the connecting plate and sliding panel is stated to be rotatablely connected by shaft, it is described auxiliary Supporting plate is helped to be fixedly mounted on one end of connecting plate, the bridge plate is mounted on the inside of bottom plate, and the upside table of auxiliary drop panel One side contacts in face and bridge plate, the bottom bracket are contacted with the downside surface of bridge plate.
Preferably, the lower end of the positioning supporting frame and fixing support rack is provided with buffering foot, and the buffering foot includes Bumper post, pressing plate, host buffer spring, deflecting ring, deflecting block and auxiliary buffer spring, the upside of the pressing plate and positioning supporting frame Or fixing support rack is fixedly connected, the inside for being mounted on bumper post of the pressing plate, the host buffer spring is mounted on pressing plate Downside, the auxiliary buffer spring are mounted on the inner wall of bumper post, and the deflecting block is fixedly mounted on auxiliary buffer spring The two sides up and down of deflecting block are arranged in one end, the deflecting ring.
Preferably, flexible protective jacket, the both ends difference of the flexible protective jacket are provided on the outside of the host buffer spring It is fixedly connected with the inside bottom of the downside surface of pressing plate and bumper post.
Preferably, the deflecting ring of two sides is solid with the bottom of the downside surface of pressing plate and bumper post respectively above and below the deflecting block Fixed connection.
Preferably, the deflecting block is in a center of symmetry is mounted between deflecting ring, and the contact of deflecting ring and deflecting block Face is set as 45 degree of inclined surface.
Preferably, the inside of directive wheel is arranged in the fixing support rack, and fixing support rack is slidably connected with crossbeam.
Preferably, the surface of the sliding panel offers sliding groove, and shaft, the sliding panel and master are provided in sliding groove Clamping plate is rotatablely connected by shaft.
Preferably, driver's cabin is provided on the upside of the driving wheel.
Compared with prior art, the beneficial effects of the present invention are:
(1) by the fixture of design, when carrying out clamping conveying to bridge plate, can by fixture to bridge plate stable holding, Keep bridge plate more firm when gripping;
(2) by the buffering foot of design, when support frame is fixed, it can be buffered by buffering foot, prevent from supporting Frame stress is damaged.
Detailed description of the invention
Fig. 1 is Bridge Erector structural schematic diagram of the invention;
Fig. 2 is clamp structure schematic diagram of the invention;
Fig. 3 is buffer structure schematic diagram of the invention;
Fig. 4 is deflecting plate structural schematic diagram of the invention;
Fig. 5 is buffer structure schematic cross-sectional view of the invention;
In figure: 1, driving wheel;2, crossbeam;3, fixture;4, directive wheel;5, positioning supporting frame;6, foot is buffered;7, fixing support rack; 8, bottom plate;9, auxiliary bracket;10, bridge plate;11, bottom bracket;12, auxiliary drop panel;13, connecting plate;14, sliding panel;15, Bumper post;16, pressing plate;17, host buffer spring;18, deflecting ring;19, deflecting block;20, buffer spring is assisted.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5 is please referred to, the present invention provides a kind of technical solution: a kind of bridge construction Bridge Erector of easy access, packet Crossbeam 2 and bridge plate 10 are included, one end of crossbeam 2 is provided with driving wheel 1, is provided with directive wheel 4 on the downside of the other end of crossbeam 2, horizontal The other end of beam 2 is fixedly connected with positioning supporting frame 5, and the side of positioning supporting frame 5 is provided with fixing support rack 7, in crossbeam 2 Subordinate side is provided with fixture 3, more stable in order to clamp bridge plate 10, and fixture 3 includes bottom plate 8, auxiliary bracket 9, bottom Portion's supporting plate 11, auxiliary drop panel 12, connecting plate 13 and sliding panel 14, auxiliary bracket 9 are mounted on the downside of bottom plate 8 by shaft, Bottom bracket 11 is mounted on the upside of one end of auxiliary bracket 9 by shaft, and one end of sliding panel 14 is rotatably connected on by shaft On the inside of the other end of auxiliary bracket 9, connecting plate 13 is mounted on one end of sliding panel 14, connecting plate 13 and sliding panel 14 by shaft It is rotatablely connected by shaft, auxiliary drop panel 12 is fixedly mounted on one end of connecting plate 13, and bridge plate 10 is mounted on the interior of bottom plate 8 Side, and a side contacts of the uper side surface of auxiliary drop panel 12 and bridge plate 10, the downside surface of bottom bracket 11 and bridge plate 10 Contact, it is convenient that bridge plate 10 is lifted.
In the present embodiment, it is preferred that the lower end of positioning supporting frame 5 and fixing support rack 7 is provided with buffering foot 6, in order to Keep the buffering effect for buffering foot 6 more preferable, buffering foot 6 includes bumper post 15, pressing plate 16, host buffer spring 17, deflecting ring 18, deflecting Block 19 and auxiliary buffer spring 20, the upside of pressing plate 16 are fixedly connected with positioning supporting frame 5 or fixing support rack 7, pressing plate 16 It is mounted on the inside of bumper post 15, host buffer spring 17 is mounted on the downside of pressing plate 16, and auxiliary buffer spring 20 is mounted on buffering On the inner wall of column 15, deflecting block 19 is fixedly mounted on one end of auxiliary buffer spring 20, and deflecting block 19 is arranged in deflecting ring 18 Upper and lower two sides.
In the present embodiment, it is preferred that the outside of host buffer spring 17 is provided with flexible protective jacket, the both ends for the protective jacket that stretches It is fixedly connected respectively with the inside bottom of the downside surface of pressing plate 16 and bumper post 15, prevents host buffer spring 17 from touching deflecting Block 19.
In the present embodiment, it is preferred that the deflecting ring 18 of about 19 two sides of deflecting block respectively with the downside surface of pressing plate 16 and The bottom of bumper post 15 is fixedly connected, and keeps deflecting ring 18 easy to use.
In the present embodiment, it is preferred that deflecting block 19 is in a center of symmetry to be mounted between deflecting ring 18, and deflecting ring 18 with The contact surface of deflecting block 19 is set as 45 degree of inclined surface, keeps the using effect of deflecting block 19 more preferable.
In the present embodiment, it is preferred that the inside of directive wheel 4, and fixing support rack 7 and crossbeam 2 is arranged in fixing support rack 7 It is slidably connected, keeps fixing support rack 7 easy to use.
In the present embodiment, it is preferred that the surface of sliding panel 14 offers sliding groove, and shaft is provided in sliding groove, sliding Plate 14 and bottom plate 8 are rotatablely connected by shaft, keep sliding panel 14 easy to use.
In the present embodiment, it is preferred that the upside of driving wheel 1 is provided with driver's cabin, is easy to use Bridge Erector.
The working principle of the invention and process for using: it after the present invention installs, first checks for installation of the invention and fixes And security protection, it then can use, bridge plate 10 is placed on the inside of bottom plate 8, pass through 12 He of auxiliary drop panel Bottom plate 8 holds bridge plate 10, and bridge plate 10, which pushes auxiliary drop panel 12, tilts the connecting plate 13 of 12 one end of auxiliary drop panel, thus It drives sliding panel 14 that auxiliary bracket 9 is pushed to rotate in the downside of bottom plate 8, is close to the bottom bracket 11 of 9 one end of auxiliary bracket Bridge plate 10 is held in the lower section of bridge plate 10, keeps the clamping of bridge plate 10 more stable, is moved, passed through by driving wheel 1 Fixing support rack 7 is fixed on a bridge pier, and the flexible drive positioning supporting frame 5 of crossbeam 2, which is moved on next bridge pier, to be fixed, so Continue moving beam 2 afterwards to be moved on two bridge piers the bridge plate 10 of 3 inside of fixture, this completes make of the invention With process, the configuration of the present invention is simple is safe and convenient to use.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of bridge construction Bridge Erector of easy access, including crossbeam (2) and bridge plate (10), the one of the crossbeam (2) End is provided with driving wheel (1), is provided with directive wheel (4) on the downside of the other end of the crossbeam (2), the other end of the crossbeam (2) It is fixedly connected with positioning supporting frame (5), the side of the positioning supporting frame (5) is provided with fixing support rack (7), and feature exists In: it is provided with fixture (3) on the downside of the middle part of the crossbeam (2), the fixture (3) includes bottom plate (8), auxiliary bracket (9), bottom Portion's supporting plate (11), auxiliary drop panel (12), connecting plate (13) and sliding panel (14), the auxiliary bracket (9) are mounted on by shaft The downside of bottom plate (8), the bottom bracket (11) are mounted on the upside of one end of auxiliary bracket (9) by shaft, the sliding One end of plate (14) is rotatably connected on the inside of the other end of auxiliary bracket (9) by shaft, and the connecting plate (13) passes through shaft It is mounted on one end of sliding panel (14), the connecting plate (13) and sliding panel (14) are rotatablely connected by shaft, the auxiliary support Plate (12) is fixedly mounted on one end of connecting plate (13), and the bridge plate (10) is mounted on the inside of bottom plate (8), and assists support The uper side surface of plate (12) and a side contacts of bridge plate (10), the downside surface of the bottom bracket (11) and bridge plate (10) Contact.
2. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the positioning branch The lower end of support (5) and fixing support rack (7) is provided with buffering foot (6), and the buffering foot (6) includes bumper post (15), pressure Plate (16), host buffer spring (17), deflecting ring (18), deflecting block (19) and auxiliary buffer spring (20), the pressing plate (16) Upside is fixedly connected with positioning supporting frame (5) or fixing support rack (7), and the pressing plate (16) is mounted on the interior of bumper post (15) Portion, the host buffer spring (17) are mounted on the downside of pressing plate (16), and the auxiliary buffer spring (20) is mounted on bumper post (15) on inner wall, the deflecting block (19) is fixedly mounted on one end of auxiliary buffer spring (20), and the deflecting ring (18) sets It sets in the two sides up and down of deflecting block (19).
3. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the host buffer Be provided with flexible protective jacket on the outside of spring (17), the both ends of the flexible protective jacket respectively with the downside surface of pressing plate (16) and The inside bottom of bumper post (15) is fixedly connected.
4. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the deflecting block (19) the deflecting ring (18) of two sides is fixedly connected with the bottom of the downside surface of pressing plate (16) and bumper post (15) respectively up and down.
5. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the deflecting block (19) in a center of symmetry to be mounted between deflecting ring (18), and deflecting ring (18) and the contact surface of deflecting block (19) are set as four 15 degree of inclined surface.
6. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the fixed branch Support (7) is arranged in the inside of directive wheel (4), and fixing support rack (7) is slidably connected with crossbeam (2).
7. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the sliding panel (14) surface offers sliding groove, and shaft is provided in sliding groove, and the sliding panel (14) and bottom plate (8) are turned by shaft Dynamic connection.
8. a kind of bridge construction Bridge Erector of easy access according to claim 1, it is characterised in that: the driving wheel (1) driver's cabin is provided on the upside of.
CN201811561162.7A 2018-12-20 2018-12-20 Bridge girder erection machine convenient to overhaul for bridge construction Active CN109403218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811561162.7A CN109403218B (en) 2018-12-20 2018-12-20 Bridge girder erection machine convenient to overhaul for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811561162.7A CN109403218B (en) 2018-12-20 2018-12-20 Bridge girder erection machine convenient to overhaul for bridge construction

Publications (2)

Publication Number Publication Date
CN109403218A true CN109403218A (en) 2019-03-01
CN109403218B CN109403218B (en) 2020-04-21

Family

ID=65460017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811561162.7A Active CN109403218B (en) 2018-12-20 2018-12-20 Bridge girder erection machine convenient to overhaul for bridge construction

Country Status (1)

Country Link
CN (1) CN109403218B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006214209A (en) * 2005-02-04 2006-08-17 Noda Jidosha Kogyosho:Kk Method of erecting and removing bridge girder, and bridge girder construction apparatus
CN205711776U (en) * 2016-06-27 2016-11-23 陕西铁路工程职业技术学院 A kind of supporting bracket of bridge construction
CN207645656U (en) * 2017-11-22 2018-07-24 浙江中建路桥设备有限公司 A kind of heavy type Bridge Erector
CN207774702U (en) * 2018-01-05 2018-08-28 秦皇岛优益重工科技有限公司 It is a kind of novel from bale handle beam car
CN109024281A (en) * 2018-07-05 2018-12-18 长安大学 A kind of Bridge Erector auxiliary bracket

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006214209A (en) * 2005-02-04 2006-08-17 Noda Jidosha Kogyosho:Kk Method of erecting and removing bridge girder, and bridge girder construction apparatus
CN205711776U (en) * 2016-06-27 2016-11-23 陕西铁路工程职业技术学院 A kind of supporting bracket of bridge construction
CN207645656U (en) * 2017-11-22 2018-07-24 浙江中建路桥设备有限公司 A kind of heavy type Bridge Erector
CN207774702U (en) * 2018-01-05 2018-08-28 秦皇岛优益重工科技有限公司 It is a kind of novel from bale handle beam car
CN109024281A (en) * 2018-07-05 2018-12-18 长安大学 A kind of Bridge Erector auxiliary bracket

Also Published As

Publication number Publication date
CN109403218B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN106946161B (en) A kind of crane of carrier vehicle parts
CN107201719A (en) Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method
CN109403218A (en) A kind of bridge construction Bridge Erector of easy access
CN113910420A (en) Mold opening system
CN103806923B (en) The translation mechanism of telescoping steel form
CN104120657B (en) Follow-up beam face suspension cable guy rope hand-hole guiding device and construction method
CN113356606B (en) Assembly type building assembly equipment
CN215358395U (en) Colliery hydraulic support maintenance platform
CN209778185U (en) Hot galvanizing production line hydraulic lifting station
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN208763453U (en) Reinforced concrete brace, which is removed, uses hydraulic lifting bearing platform
CN206090316U (en) Little case roof beam adjustment jacking frame
CN109399153A (en) A kind of large wall panel roll-over table
CN214939295U (en) Novel road and bridge formwork support device
CN213331117U (en) Ditch cable duct platform truck in tunnel
CN210285937U (en) Jacking sucking disc device suitable for production of solar energy double glass
CN204400533U (en) Self-turnover-type elevator
CN215402783U (en) Hoisting device for petroleum pipeline construction
CN218968665U (en) Movable crane bracket for hydropower station overhaul
CN206665651U (en) Barreled feeding handling device
CN203568757U (en) Foldable hydraulic support hoisting frame
CN210710272U (en) Movable door pocket of elevator
CN202440281U (en) Mounting bracket of movable elevator
CN214734168U (en) Highway bridge transfers slope jacking structure
CN215104480U (en) Novel highway engineering template supports device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 050000 block a, No. 404, Yuhua East Road, high tech Zone, Shijiazhuang City, Hebei Province

Patentee after: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

Address before: 050000 206, block a, No. 256-1, Changjiang Avenue, Yuhua District, Shijiazhuang City, Hebei Province

Patentee before: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 106-582, Unit 1, Building 201, Yujingwan B, Caofeidian New City, Caofeidian Area, China (Hebei) Pilot Free Trade Zone, Tangshan City, Hebei Province, 063000

Patentee after: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.

Address before: 050000 block a, No. 404, Yuhua East Road, high tech Zone, Shijiazhuang City, Hebei Province

Patentee before: CHINA OVERSEAS TRAFFIC CONSTRUCTION CO.,LTD.