JP2006118214A - Filler for tunnel cavity, and tunnel excavating method using the same - Google Patents
Filler for tunnel cavity, and tunnel excavating method using the same Download PDFInfo
- Publication number
- JP2006118214A JP2006118214A JP2004307202A JP2004307202A JP2006118214A JP 2006118214 A JP2006118214 A JP 2006118214A JP 2004307202 A JP2004307202 A JP 2004307202A JP 2004307202 A JP2004307202 A JP 2004307202A JP 2006118214 A JP2006118214 A JP 2006118214A
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- aqueous solution
- gap
- filler
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Abstract
Description
本発明は、トンネルの掘削機と地山との間に形成された空隙に充填されるトンネル空隙用充填材と、これを利用したトンネル掘削方法に関する。 The present invention relates to a tunnel gap filling material filled in a gap formed between a tunnel excavator and a natural ground, and a tunnel excavation method using the same.
シールド機やトンネルボーリングマシン(以下「TBM」という場合がある)等のトンネル掘削機は、基本的には、地山を掘削するカッターヘッドと、カッターヘッドの後方に配置されてトンネル掘削機の動力やジャッキ等を保護するシールド部とから構成されている。 A tunnel excavator such as a shield machine or a tunnel boring machine (hereinafter sometimes referred to as “TBM”) is basically a cutter head for excavating natural ground and a power source of the tunnel excavator disposed behind the cutter head. And a shield part for protecting jacks and the like.
このような、トンネル掘削機は、通常カッターヘッドによる掘削径(掘削形状)よりも、シールド部の外径(外形)が小さく形成されている。そして、このカッターヘッドの掘削径とシールド部の外径との差(以下「余掘り部」という場合がある)により曲線線形や、地山の変形、膨張性地山等に対応している。 Such a tunnel excavator is formed so that the outer diameter (outer shape) of the shield portion is smaller than the excavation diameter (excavation shape) of the normal cutter head. The difference between the excavation diameter of the cutter head and the outer diameter of the shield part (hereinafter sometimes referred to as “excess excavation part”) corresponds to a curved line shape, deformation of the natural ground, an expansive natural ground, and the like.
ところが、未固結地山や亀裂の多い岩盤などの自立が困難な地山におけるトンネル施工では、余掘り部を有していることにより地山が崩落して、施工に支障をきたすことがあった。特に、このような自立が困難な地山において、何らかの原因により掘削作業を中断するような場合には、崩落した土砂が堆積、圧密、締め固められてトンネル掘削機を拘束して、掘削を再開することができない場合があった。 However, tunnel construction in unconsolidated grounds and cracked rocks such as rocks with many cracks may cause troubles due to the collapse of the ground due to the presence of overexcavations. It was. In particular, when the excavation work is interrupted for some reason in such a difficult ground, the collapsed sediment is accumulated, consolidated, and compacted to restrain the tunnel excavator and resume the excavation. There was a case that could not be done.
このため、このような自立が困難な地山においてトンネル掘削機によりトンネルを掘削する場合には、例えば地山にセメントミルク、水ガラス、発泡ウレタン等の注入材を注入することにより、地山を自立させて、崩落することを防止する場合があった。
また、特許文献1には、TBMによるトンネル掘削において、シールド部上半分の余掘り部を覆うように形成された偏平長方形の板状に形成されたバッグを配設して、当該バッグを、空気や水などの流体注入により膨らませることで地山を支保する方法が記載されている。
In Patent Document 1, in tunnel excavation by TBM, a flat rectangular plate formed so as to cover the upper half of the shield part is disposed, and the bag is attached to the air. A method of supporting a natural ground by inflating it by injecting fluid such as water is described.
ところが、前者の注入材による方法は、注入材を含んだ地山のトンネル掘削機との付着力が高まることにより、掘削機の外周面に付着して、掘進の妨げとなる場合があるという問題点を有していた。また、トンネル掘削機のチャンバ内において注入材を含んだ土砂が土砂取込口に付着して土砂搬出ができなくなることで、掘進が困難となる場合があるという問題点を有していた。
また、後者は、施工中の地山の崩壊を防止して、掘削機を保護することが可能であるものの、何らかの原因により掘削作業を中断する場合には、掘削機前面の切羽の崩落を防止することはできないため、切羽に関しては注入材により地山を自立させる必要があった。このため、掘削再開時には、注入材を含有した地山を掘進するため、注入材を含んだ土砂が掘削機のチャンバ内に付着して、施工に支障をきたす場合があるという問題点も有していた。
However, the former method using the injection material has a problem that adhesion to the tunnel excavator in the natural ground including the injection material increases, which may adhere to the outer peripheral surface of the excavator and hinder the excavation. Had a point. In addition, there has been a problem in that excavation may be difficult because the earth and sand containing the injection material adheres to the earth and sand intake and cannot be carried out in the chamber of the tunnel excavator.
In the latter case, it is possible to protect the excavator by preventing the collapse of the ground during construction, but if the excavation work is interrupted for some reason, the fall of the face on the front of the excavator is prevented. Because it was not possible to do this, it was necessary to make the ground stand self-supporting with an injection material. For this reason, when excavation is resumed, the ground containing the injection material is dug, so that the earth and sand containing the injection material may adhere to the chamber of the excavator, which may hinder the construction. It was.
本発明は、前記の問題点を解決するためになされたものであり、自立が困難な地山におけるトンネル掘削において、トンネルの施工に支障をきたすことなく、地山の崩壊を抑止することが可能な、トンネル空隙用充填材とこれを利用したトンネル掘削方法を提案することを課題とする。 The present invention has been made to solve the above-mentioned problems, and in tunnel excavation in a natural ground where it is difficult to stand on its own, it is possible to suppress the collapse of the natural ground without causing an obstacle to the construction of the tunnel. Another object is to propose a tunnel gap filler and a tunnel excavation method using the filler.
前記の課題を解決するために、請求項1に記載の発明は、トンネル掘削機の周囲と地山との間に形成される空隙に充填されるトンネル空隙用充填材であって、前記トンネル空隙用充填材がアクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液とを混合してなることを特徴としている。 In order to solve the above problems, the invention according to claim 1 is a filler for a tunnel gap that is filled in a gap formed between a periphery of a tunnel excavator and a natural ground, and the tunnel gap The filler for use is a mixture of an aqueous monovalent or divalent metal salt of acrylic acid, an aqueous solution of an aluminum water-soluble salt, and an aqueous bisulfite solution.
また、請求項2に記載の発明は、請求項1に記載のトンネル空隙用充填材であって、前記金属塩水溶液が1に対して、前記アルミニウム水溶性塩の水溶液が0.9以上1.5以下、前記重亜硫酸塩水溶液が0.9以上1.5以下の割合で混合されていることを特徴としている。 The invention according to claim 2 is the tunnel void filler according to claim 1, wherein the metal salt aqueous solution is 1 and the aluminum water-soluble salt aqueous solution is 0.9 or more and 1. 5 or less, wherein the bisulfite aqueous solution is mixed at a ratio of 0.9 to 1.5.
かかるトンネル空隙用充填材を、トンネル掘削機と地山の間に形成された空隙(余掘り部)に充填すれば、トンネル空隙用充填材が、空隙において所定の強度を有して硬化するため、未固結地山におけるトンネルの掘削においても、地山の崩壊を抑止することが可能となる。また、前記の配合により構成されたトンネル空隙用充填材は、鉄との付着力が弱いため、トンネル掘削機の外周面に付着することがなく、トンネル掘削機の推力の妨げとなることがない。また、何らかの原因によりトンネル掘削を中断する場合に、切羽面とトンネル掘削機との間の空隙にトンネル空隙用充填材を充填すれば、切羽の崩壊を抑止するとともに、掘削を再開した際に、トンネル空隙用充填材を含んだ土砂が、チャンバ内において付着することがなく、施工の妨げとなることがない。 If such a filler for a tunnel gap is filled in a gap (overexcavated portion) formed between a tunnel excavator and a natural ground, the filler for the tunnel gap is cured with a predetermined strength in the gap. It is also possible to suppress the collapse of the natural ground even when excavating a tunnel in the unconsolidated ground. Further, the tunnel gap filler constituted by the above-mentioned composition has a weak adhesion with iron, and therefore does not adhere to the outer peripheral surface of the tunnel excavator and does not hinder the thrust of the tunnel excavator. . In addition, when tunnel excavation is interrupted for some reason, if the gap between the face face and the tunnel excavator is filled with a filler for tunnel gap, the face collapse is suppressed, and when excavation is resumed, The earth and sand containing the filler for the tunnel gap does not adhere in the chamber and does not hinder the construction.
ここで、本発明に係るアクリル酸の一価または二価の金属塩水溶液としては、アクリル酸のアルカリ金属塩、アルカリ土類金属塩、ナトリウム塩又はマグネシウム塩等が挙げられる。また、アルミニウム水溶性塩の水溶液としては、アクリル酸アルミニウム、塩化アルミニウム、硝酸アルミニウム、硫酸アルミニウム、ミョウバン、ナトリウムミョウバン、酢酸アルミニウム、乳酸アルミニウム、ポリ塩化アルミニウム、ポリ硫酸塩化アルミニウム等が挙げられる。さらに、重亜硫酸塩水溶液としては、アルカリ金属塩、重亜硫酸ナトリウム塩又は重亜硫酸カリウム塩等が挙げられる。 Here, examples of the monovalent or divalent metal salt aqueous solution of acrylic acid according to the present invention include alkali metal salts, alkaline earth metal salts, sodium salts, and magnesium salts of acrylic acid. Examples of the aqueous solution of the aluminum water-soluble salt include aluminum acrylate, aluminum chloride, aluminum nitrate, aluminum sulfate, alum, sodium alum, aluminum acetate, aluminum lactate, polyaluminum chloride, polyaluminum sulfate chloride, and the like. Furthermore, examples of the aqueous bisulfite solution include alkali metal salts, sodium bisulfite salts, and potassium bisulfite salts.
また、請求項3に記載の発明は、トンネル掘削機により地山を掘削する掘削工程と、前記掘削工程に伴い前記トンネル掘削機と前記地山の間に形成される空隙にアクリル系材料からなるトンネル空隙用充填材を充填する充填工程と、を含むことを特徴とするトンネル掘削方法である。 According to a third aspect of the present invention, an excavation step of excavating a natural ground with a tunnel excavator, and an air gap formed between the tunnel excavator and the natural ground in the excavation step is made of an acrylic material. A tunnel excavation method comprising: a filling step of filling a filler for a tunnel gap.
また、請求項4に記載の発明は、請求項3に記載のトンネル掘削方法であって、前記充填工程が、アクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液と、を混合して前記トンネル空隙用充填材を構成する工程を含むことを特徴としている。 The invention according to claim 4 is the tunnel excavation method according to claim 3, wherein the filling step includes a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of aluminum water-soluble salt, And a step of mixing the aqueous bisulfite solution to form the tunnel void filler.
また、請求項5に記載の発明は、請求項4に記載のトンネル掘削方法であって、前記金属塩水溶液が1に対して、前記アルミニウム水溶性塩の水溶液が0.9以上1.5以下、前記重亜硫酸塩水溶液が0.9以上1.5以下の割合で混合することにより前記トンネル空隙用充填材を構成することを特徴としている。 The invention according to claim 5 is the tunnel excavation method according to claim 4, wherein the aqueous metal salt solution is 0.9 and the aqueous aluminum salt solution is 0.9 or more and 1.5 or less. The tunnel void filler is constituted by mixing the bisulfite aqueous solution at a ratio of 0.9 to 1.5.
かかるトンネル掘削方法は、シールド機やトンネルボーリングマシン等のトンネル掘削機と地山の間に形成された空隙に、トンネル掘削機のシールド部に開けた孔、開口部、背面等から、本発明に係るトンネル空隙用充填材を充填することにより、トンネル掘削機の掘進が妨げられることなく、地山の崩壊を抑止しながらトンネルの掘進が可能となるため、安定したトンネル施工が可能となる。つまり、前記の配合で構成されたアクリル系材料からなるトンネル空隙用充填材は、鉄との付着力が弱く、所定の強度を発現するため、トンネル掘進機に付着することなく硬化して、地山の崩壊を抑止することを可能としている。 Such a tunnel excavation method is applied to the present invention from a hole formed in a shield part of a tunnel excavator, an opening, a back surface, etc. in a gap formed between a tunnel excavator such as a shield machine or a tunnel boring machine and a natural ground. By filling the tunnel gap filling material, the tunnel excavation can be performed while preventing the excavation of the tunnel excavator and the collapse of the natural ground is suppressed, so that stable tunnel construction is possible. That is, the filler for tunnel voids made of an acrylic material composed of the above-mentioned composition has a weak adhesive force with iron and exhibits a predetermined strength, so that it hardens without adhering to the tunnel machine, It is possible to suppress the collapse of the mountain.
また、トンネル空隙用充填材を、そのまま裏込め材として使用することで、セグメント組立て後にセグメントの背面に充填する裏込め材の量を削減することが可能となり、経済的にも優れている。
また、トンネル空隙用充填材は、鉄との付着力が弱いため、施工を中断する場合には、切羽面とトンネル掘削機のカッターヘッドとの間の空隙に充填することにより、所定の強度に硬化したトンネル空隙用充填材が切羽の崩壊を抑止して、掘進再開後はトンネル空隙用充填材がトンネル掘削機の内部において付着することなく土砂と共に搬出されるため、施工に支障をきたすことがなく、好適である。
In addition, by using the tunnel gap filling material as it is as a backfilling material, it is possible to reduce the amount of backfilling material to be filled on the back surface of the segment after assembling the segment, which is economically superior.
In addition, since the tunnel gap filler has a weak adhesive force with iron, when the construction is interrupted, the gap between the face surface and the cutter head of the tunnel excavator is filled to a predetermined strength. The hardened tunnel gap filler prevents the face from collapsing, and after the excavation resumes, the tunnel gap filler is carried out with the earth and sand without adhering inside the tunnel excavator, which may hinder the construction. Not preferred.
さらに、請求項6に記載の発明は、請求項4又は請求項5に記載のトンネルの掘削方法であって、前記充填工程が、前記アクリル酸の一価または二価の金属塩水溶液と、前記アルミニウム水溶塩の水溶液と、前記重亜硫酸塩水溶液とを、3本の管路によりそれぞれ個別に送液する工程と、送液された前記アクリル酸の一価または二価の金属塩水溶液と、前記アルミニウム水溶塩の水溶液と、前記重亜硫酸塩水溶液とを、混合して空隙に充填する工程とを含むことを特徴としている。 Furthermore, the invention described in claim 6 is the tunnel excavation method according to claim 4 or claim 5, wherein the filling step includes the monovalent or divalent metal salt aqueous solution of the acrylic acid, A step of individually feeding an aqueous solution of an aluminum water salt and the aqueous bisulfite solution through three pipe lines, a monovalent or divalent metal salt aqueous solution of the acrylic acid fed, and And a step of mixing the aqueous solution of the aluminum water salt with the aqueous bisulfite solution to fill the voids.
かかるトンネル掘削方法は、混合後早期に硬化するトンネル空隙用充填材を、空隙への充填直前に混合することにより、トンネル延長が長いトンネル施工においても、トンネル空隙用充填材の配管途中に硬化が進行することにより、管路がふさがれて、施工に支障をきたすことがない。 In such tunnel excavation method, the tunnel gap filler that hardens early after mixing is mixed just before filling the gap, so that even in tunnel construction with a long tunnel extension, the tunnel gap filler can be cured in the middle of the piping. By proceeding, the pipeline is not blocked and construction will not be hindered.
本発明のトンネル空隙用充填材とこれを利用したトンネル掘削方法により、自立が困難な地山におけるトンネル掘削において、トンネルの施工に支障をきたすことなく、地山の崩壊を抑止することが可能なため、安定したトンネル施工が可能となる。 By the tunnel gap filling material of the present invention and the tunnel excavation method using the same, it is possible to suppress the collapse of the natural ground without causing any trouble in the tunnel construction in the tunnel excavation in the natural ground where it is difficult to be independent. Therefore, stable tunnel construction becomes possible.
以下、本発明の好適な実施の形態について、図面を参照して説明する。なお、説明において、同一要素には同一の符号を用い、重複する説明は省略する。 DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described with reference to the drawings. In the description, the same reference numerals are used for the same elements, and duplicate descriptions are omitted.
<第1の実施の形態>
以下、第1の実施の形態(以下、単に「第1実施形態」という場合がある)について説明する。
図1は、第1実施形態に係るトンネル空隙用充填材のトンネル掘削機であるシールド機と地山との空隙への充填状況を示す断面図である。また、図2は、第1実施形態の滑材兼裏込め材の注入装置を示す概略図である。
<First Embodiment>
Hereinafter, a first embodiment (hereinafter, simply referred to as “first embodiment”) will be described.
FIG. 1 is a cross-sectional view showing a state of filling a gap between a shield machine, which is a tunnel excavator, and a natural ground with a tunnel gap filler according to the first embodiment. Moreover, FIG. 2 is the schematic which shows the injection apparatus of the sliding material and backfilling material of 1st Embodiment.
第1実施形態では、図1に示すように、シールド機30により地山Gを掘進しながらシールド機30の内部において組立てられたセグメント10を地山Gに配設してトンネルTを構築するシールド工法において、トンネル掘進に伴いシールド機30の周囲と地山Gの掘削面K2との間に形成される空隙K3に、アクリル系材料からなるトンネル空隙用充填材12の充填を行う。なお、第1実施形態では、トンネル掘削機としてシールド機30を使用するものとしたが、例えばTBM(トンネルボーリングマシン)を使用してもよく、本発明に適用するトンネル掘削機はシールド機に限定されるものではない。また、第1実施形態では、セグメント10を使用するものとしたが、例えばライナーを使用してもよく、トンネルの支保構造は現場の状況に応じて適宜選定するものとする。 In the first embodiment, as shown in FIG. 1, the shield 10 constructs the tunnel T by arranging the segments 10 assembled inside the shield machine 30 in the ground pile G while excavating the ground pile G by the shield machine 30. In the construction method, the tunnel gap filling material 12 made of an acrylic material is filled in the gap K3 formed between the periphery of the shield machine 30 and the excavation surface K2 of the natural ground G as the tunnel is dug. In the first embodiment, the shield machine 30 is used as the tunnel excavator. However, for example, a TBM (tunnel boring machine) may be used, and the tunnel excavator applied to the present invention is limited to the shield machine. Is not to be done. In the first embodiment, the segment 10 is used. However, for example, a liner may be used, and the support structure of the tunnel is appropriately selected according to the situation at the site.
なお、空隙K3に充填されるトンネル空隙用充填材12は、アクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液との混合体である。
ここで、アクリル酸の一価または二価の金属塩水溶液とアルミニウム水溶性塩の水溶液と重亜硫酸塩水溶液の配合は、体積比で1:0.9〜1.5:0.9〜1.5の割合で混合されている。
In addition, the tunnel gap filler 12 filled in the gap K3 is a mixture of a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of an aluminum water-soluble salt, and a bisulfite aqueous solution.
Here, the blending of the monovalent or divalent metal salt aqueous solution of acrylic acid, the aqueous solution of the aluminum water-soluble salt and the aqueous bisulfite solution is 1: 0.9 to 1.5: 0.9 to 1. 5 is mixed.
ここで、アクリル酸の一価または二価の金属塩水溶液としては、アクリル酸のアルカリ金属塩、アルカリ土類金属塩、ナトリウム塩又はマグネシウム塩等を使用する。また、アルミニウム水溶性塩の水溶液としては、アクリル酸アルミニウム、塩化アルミニウム、硝酸アルミニウム、硫酸アルミニウム、ミョウバン、ナトリウムミョウバン、酢酸アルミニウム、乳酸アルミニウム、ポリ塩化アルミニウム、ポリ硫酸塩化アルミニウム等を使用する。さらに、重亜硫酸塩水溶液としては、アルカリ金属塩、重亜硫酸ナトリウム塩又は重亜硫酸カリウム塩等を使用する。
なお、上記アルミニウム水溶性塩の水溶液中のアルミニウム水溶塩(固形分)の濃度は、10〜70重量%の範囲内とし、より好ましくは30〜50重量%の範囲内とする。また、上記重亜硫酸塩水溶液中の重亜硫酸塩(固形分)の濃度は、0.5〜10重量%の範囲内とし、より好ましくは1〜5%の範囲内とする。
Here, as the monovalent or divalent metal salt aqueous solution of acrylic acid, an alkali metal salt, alkaline earth metal salt, sodium salt or magnesium salt of acrylic acid is used. As the aqueous solution of the aluminum water-soluble salt, aluminum acrylate, aluminum chloride, aluminum nitrate, aluminum sulfate, alum, sodium alum, aluminum acetate, aluminum lactate, polyaluminum chloride, polyaluminum sulfate chloride and the like are used. Furthermore, as the bisulfite aqueous solution, an alkali metal salt, sodium bisulfite salt, potassium bisulfite salt or the like is used.
In addition, the density | concentration of the aluminum water salt (solid content) in the aqueous solution of the said aluminum water-soluble salt shall be in the range of 10 to 70 weight%, More preferably, it shall be in the range of 30 to 50 weight%. Moreover, the density | concentration of the bisulfite (solid content) in the said bisulfite aqueous solution shall be in the range of 0.5 to 10 weight%, More preferably, it shall be in the range of 1 to 5%.
シールド機30は、図1に示すように、主に地山Gの掘削を行うカッターヘッド31とカッターヘッド31の後方に位置されていてシールド機30の内部の各種設備を防護するシールド部32とから構成されている。第1実施形態に係るシールド機30は、円形断面に形成されており、シールド部32の外径は、カッターヘッド31の外径よりも若干小さく形成されている。なお、シールド機30の形状は、円形断面に限定されるものではなく、例えば、断面が矩形状や楕円形状等、また、円形断面を複数連設した二連型断面や三連型断面等のものを使用してもよい。
As shown in FIG. 1, the shield machine 30 includes a
シールド部32の内部において、カッターヘッド31の背面には、カッターヘッド31により掘削された土砂が一時堆積されるチャンバ33が形成されており、チャンバ33内の土砂は、図示しない土砂搬送手段により、トンネルTの外部へ搬送される。また、シールド部32の内部には、シールドジャッキ35が配設されており、シールド部32の内部で組立てられて地山G内に配設されたセグメント10を土台としたシールドジャッキ35の推力により、シールド機30が前進する。
また、シールド部32の上部には、トンネル空隙用充填材12を空隙K3に充填するための注入孔34が貫通されている。なお、注入孔34の形状、数、配置等は限定されるものではなく、空隙K3への充填を確実に行うことが可能に適宜形成されている。
Inside the shield portion 32, a
Further, an injection hole 34 for filling the tunnel gap filler 12 into the gap K3 is passed through the upper portion of the shield portion 32. Note that the shape, number, arrangement, and the like of the injection hole 34 are not limited, and are appropriately formed so as to be able to reliably fill the gap K3.
第1実施形態に係るセグメント10は、所定数に分割された各部材が、シールド機30の内部で組立てられることにより、シールド部32の外径よりも若干小さい外径を有した円形断面に形成されている。なお、セグメント10の構成、材料、形状等は、上記のものに限定されるものではなく、現場の状況やトンネルTの完成断面などを考慮して、適宜設定するものとする。なお、図1における符号35は、シールド機30の内部への土砂等の流入を防止するためのテールシールである。
The segment 10 according to the first embodiment is formed in a circular cross section having an outer diameter slightly smaller than the outer diameter of the shield portion 32 by assembling the members divided into a predetermined number inside the shield machine 30. Has been. The configuration, material, shape, and the like of the segment 10 are not limited to those described above, and are appropriately set in consideration of the situation at the site, the completed cross section of the tunnel T, and the like. In addition, the code |
注入孔34には、ミキシング部22を介してトンネル空隙用充填材12を送液する注入管(管路)21が取り付けられている。
注入管21は、図2に示すように、アクリル酸の一価または二価の金属塩水溶液を送液する第一注入管21aと、アルミニウム水溶性塩の水溶液を送液する第二注入管21bと、重亜硫酸塩水溶液を送液する第三注入管21cの3本から構成されている。そして、各注入管21は、注入機23を介して、それぞれアクリル酸の一価または二価の金属塩水溶液が貯留された第一タンク24aと、アルミニウム水溶性塩の水溶液が貯留された第二タンク24bと、重亜硫酸塩水溶液が貯留された第三タンク24cに接続されている。
An injection pipe (pipe) 21 for feeding the tunnel gap filler 12 through the mixing portion 22 is attached to the injection hole 34.
As shown in FIG. 2, the injection pipe 21 includes a
トンネルTの構築は、図1に示すように、シールド機30の内部において所定の形状に形成されたセグメント10を随時地山Gに連設しながら、シールド機30のカッターヘッド31により地山Gを掘削しつつシールドジャッキ35の推力により掘進することで行われる(掘削工程)。
この際、シールド機30のカッターヘッド31により形成される掘削面K2は、シールド部32の外形よりも大きく形成されているため、カッターヘッド31の後方には掘削面K2とシールド部32の間に空隙K3が形成される。
As shown in FIG. 1, the tunnel T is constructed by connecting the segment 10 formed in a predetermined shape inside the shield machine 30 to the ground G at any time and using the ground head G by the
At this time, since the excavation surface K2 formed by the
このため、地山Gの崩壊の抑止を目的として、シールド部32に形成された注入孔34から、トンネル空隙用充填材12の空隙K3への充填を随時行う(充填工程)。さらに、セグメント10は、シールド機30の内部で形成されて、シールド部32の外径よりも若干小さい外径を有しているため、トンネル空隙用充填材12とセグメント10との間には隙間が形成される。このため、シールド機30の掘進と共に、随時セグメント10の背面に裏込め材11による裏込め注入を行う。ここで、第1実施形態では、裏込め材11として、セグメント10と一体に固化するセメント系充填材を使用するものとする。なお、裏込め材11の材質には、例えば、トンネル空隙用充填材12を使用してもよく、所定の強度を発現することにより地山Gの崩落を抑止するとともに止水性に優れていればセメント系充填材に限定されるものではない。 For this reason, for the purpose of preventing the collapse of the natural ground G, the tunnel gap filler 12 is filled from the injection hole 34 formed in the shield portion 32 as needed (filling step). Furthermore, since the segment 10 is formed inside the shield machine 30 and has an outer diameter slightly smaller than the outer diameter of the shield part 32, there is no gap between the tunnel gap filler 12 and the segment 10. Is formed. For this reason, backfilling with the backfilling material 11 is performed on the back surface of the segment 10 at any time as the shield machine 30 is dug. Here, in the first embodiment, a cement-based filler that solidifies integrally with the segment 10 is used as the backfill material 11. In addition, as the material of the backfill material 11, for example, a tunnel gap filler 12 may be used, as long as it suppresses the collapse of the natural ground G by exhibiting a predetermined strength and is excellent in water-stopping property. It is not limited to cement fillers.
そして、シールド機30が、図示しない到達位置に到達したら、シールド機30を到達位置から搬出することにより、裏込め材11及びトンネル空隙用充填材12によりトンネル覆工(セグメント10)の背面が裏込めされたトンネルTの構築が完了する。 When the shield machine 30 reaches a reach position (not shown), the back face of the tunnel lining (segment 10) is backed by the backfill material 11 and the tunnel gap filler 12 by unloading the shield machine 30 from the reach position. Construction of the filled tunnel T is completed.
なお、トンネル空隙用充填材12は、地上あるいは坑内の適当な場所からシールド機30の内部にまで延設された3本の注入管21により、アクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液とがそれぞれ個別に送液されて、空隙K3への充填直前にミキシング部22により混合されている(図2参照)。以下、「アクリル酸の一価または二価の金属塩水溶液とアルミニウム水溶性塩の水溶液と重亜硫酸塩水溶液」を区別しないときは単に「水溶液」と称する場合がある。 In addition, the filler 12 for the tunnel gap is made of a monovalent or divalent metal salt aqueous solution of acrylic acid by three injection pipes 21 extending from an appropriate place on the ground or in the mine to the inside of the shield machine 30. The aqueous solution of the aluminum water-soluble salt and the aqueous bisulfite solution are individually fed and mixed by the mixing unit 22 immediately before filling the gap K3 (see FIG. 2). Hereinafter, when “a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of an aluminum water-soluble salt and an aqueous bisulfite solution” are not distinguished, they may be simply referred to as “aqueous solution”.
トンネル空隙用充填材12は、図2に示すように、トンネル空隙用充填材12を構成する各水溶液が、それぞれ地上あるいは坑内の適当な場所に配設された注入プラントに装備される第一タンク24aと、第二タンク24bと、第三タンク24cに個別に保管されている。そして、3種類の各水溶液は、注入機23により、所定の流量に調整されたうえで、それぞれ第一注入管21a、第二注入管21b、第三注入管21cを介して、シールド機30の内部まで送液される。
As shown in FIG. 2, the tunnel gap filler 12 is a first tank in which each aqueous solution constituting the tunnel gap filler 12 is installed in an injection plant disposed at an appropriate place on the ground or in a mine. 24a, the
図1に示すように、シールド機30の内部まで送液された各水溶液は、注入孔34に固定されたミキシング部22により混合されてから注入孔34から空隙K3へ排出される。注入孔34はシールド機30の上面に配置されており、トンネル空隙用充填材12は空隙K3に上向きに注入されるため、シールド機30の下部にその周面を通って流下して、シールド機30の周囲全体に充填される。シールド機30には、注入孔34とは別に、上方に図示しない確認孔が形成されており、この確認孔を利用して、トンネル空隙用充填材12の充填状況を確認する。なお、トンネル空隙用充填材12の充填状況の確認は、前記の方法に限定されるものではなく、ハンマーなどによりシールド機30の内面を叩く打音調査により行うなど、適宜適切な方法を選定して行えばよい。また、注入孔34は、シールド機(トンネル掘削機)30の大きさに応じて適宜増加するものとする。 As shown in FIG. 1, each aqueous solution sent to the inside of the shield machine 30 is mixed by the mixing unit 22 fixed to the injection hole 34 and then discharged from the injection hole 34 to the gap K3. The injection hole 34 is arranged on the upper surface of the shield machine 30 and the tunnel gap filler 12 is injected upward into the gap K3. The entire circumference of 30 is filled. In addition to the injection hole 34, a confirmation hole (not shown) is formed in the shield machine 30, and the filling state of the tunnel gap filler 12 is confirmed using this confirmation hole. The confirmation of the filling state of the tunnel gap filling material 12 is not limited to the above method, and an appropriate method is appropriately selected, such as by performing a hitting sound investigation of hitting the inner surface of the shield machine 30 with a hammer or the like. Just do it. Also, the injection hole 34 is increased as appropriate according to the size of the shield machine (tunnel excavator) 30.
また、何らかの原因により、掘進作業を中断する場合には、切羽面K1とカッターヘッド31との間の空隙K4にもトンネル空隙用充填材12を充填することで、切羽面K1の崩壊を抑止する。
Further, when the excavation work is interrupted for some reason, the gap K4 between the face K1 and the
以上、第1実施形態に係るトンネル空隙用充填材及びこれを利用したトンネルの掘削方法によれば、次に示すような効果を得ることが可能となる。 As described above, according to the tunnel gap filler and the tunnel excavation method using the same according to the first embodiment, the following effects can be obtained.
つまり、第1実施形態では、トンネル空隙用充填材12として、アクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液とからなるアクリル系混合体を使用しているため、鉄との付着力が弱い性質を有しており、掘削面K2とシールド機30との空隙K3に充填されて固化しても、シールド機30に付着するなどしてトンネルの掘進を妨げることがない。そのため、地山Gの崩落が抑止された安全で施工性に優れたトンネル工事が可能となる。また、何らかの原因により掘進作業が中断される場合でも、トンネル空隙用充填材12を切羽面K1とカッターヘッド31との空隙K4に充填することで、切羽面K1の崩壊を抑止することが可能となる。また、工事再開後も、トンネル空隙用充填材12は所定の強度の硬化されているため掘削が可能なうえ、トンネル空隙用充填材12を含んだ土砂が、チャンバ33内において、付着することがないため、施工をスムーズに行うことが可能となる。なお、掘進作業が中断する場合において、空隙K4へのトンネル空隙用充填材12の充填とともに、チャンバ33内にトンネル空隙用充填材12を充填する場合もある。
That is, in the first embodiment, as the tunnel void filler 12, an acrylic mixture comprising a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of an aluminum water-soluble salt, and a bisulfite aqueous solution is used. Since it is used, it has a property of weak adhesion to iron, and even if it is filled and solidified in the gap K3 between the excavation surface K2 and the shield machine 30, it will adhere to the shield machine 30 and so on. Will not interfere with the excavation of. Therefore, tunnel construction that is safe and excellent in workability in which collapse of the natural ground G is suppressed is possible. Further, even when the excavation work is interrupted for some reason, it is possible to prevent the face K1 from collapsing by filling the gap K4 between the face K1 and the
また、トンネル空隙用充填材12は、各水溶液の混合後、早期に所定の強度に硬化するため、地山Gの崩落を抑止する機能も有しており、そのまま裏込め材として使用することができる。そのため、セグメント10の背面に充填する裏込め材11は、トンネル空隙用12とセグメント10との隙間のみに充填すればよく、従来の掘削面K2とセグメント10との隙間に裏込め注入を行う方法に比べて、大幅にその量を縮減することが可能となった。 Moreover, since the filler 12 for tunnel gaps is hardened to a predetermined strength at an early stage after mixing each aqueous solution, it also has a function of suppressing the collapse of the natural ground G and can be used as a backfill material as it is. it can. Therefore, the backfill material 11 to be filled in the back surface of the segment 10 may be filled only in the gap between the tunnel gap 12 and the segment 10, and the conventional method of performing backfill injection into the gap between the excavation surface K <b> 2 and the segment 10. Compared to, the amount can be greatly reduced.
また、トンネル空隙用充填材12は早期に硬化するように調節することができるため、砂層や礫混じり土層など、比較的間隙が大きい地盤における施工でも、地中に浸透する充填材(トンネル空隙用充填材12)の量が少なく、充填材の量を必要最小限に抑えつつ、確実に空隙K3を充填することが可能となり、経済的である。また、必要とされるトンネル空隙用充填材12及び裏込め材11の量を最小限に抑えることが可能となるため、その保管に必要なストックヤードの面積を縮小することができ、都市部など、用地的に制限がある施工箇所においても好適に適用可能である。 In addition, since the filler 12 for the tunnel gap can be adjusted so that it hardens at an early stage, the filler that penetrates into the ground (tunnel gap) even in constructions with relatively large gaps such as sand layers and gravel-mixed soil layers. The amount of the filler 12) for use is small, and the gap K3 can be reliably filled while minimizing the amount of filler, which is economical. Moreover, since it becomes possible to minimize the amount of the filler 12 for the tunnel gap and the backfilling material 11 required, the area of the stock yard necessary for the storage can be reduced, such as an urban area. Also, it can be suitably applied to construction sites where there are restrictions on the site.
また、各水溶液の品質管理は、それぞれ個別のタンク24a,24b,24cに保管するのみなため、容易である。また、空隙K3への注入後の品質はバラツキが少ないため、信頼性が高い。
また、本発明のトンネル空隙用充填材12は、低粘度なため、空隙K3への注入後、空隙K3全体に流下して確実に充填されるため、高品質なトンネル施工が可能となる。
Moreover, quality control of each aqueous solution is easy because it is only stored in the
Further, since the tunnel gap filler 12 according to the present invention has a low viscosity, after filling into the gap K3, it flows down into the entire gap K3 and is reliably filled, so that high-quality tunnel construction is possible.
また、本発明のトンネル空隙用充填材12は、各水溶液の配合により、硬化時間及び硬化後の強度を調節できるため、適用可能な地質が限定されない。 Moreover, since the filling material 12 for tunnel gaps of this invention can adjust hardening time and the intensity | strength after hardening by the mixing | blending of each aqueous solution, the applicable geology is not limited.
<第2の実施の形態>
以下、第2の実施の形態(以下、単に「第2実施形態」という場合がある)について説明する。
図3は、第2実施形態に係るトンネル空隙用充填材のトンネル掘削機であるトンネルボーリングマシン(以下「TBM」という場合がある)と地山との空隙への充填状況を示す断面図である。
<Second Embodiment>
Hereinafter, a second embodiment (hereinafter may be simply referred to as “second embodiment”) will be described.
FIG. 3 is a cross-sectional view showing a state of filling a gap between a tunnel boring machine (hereinafter sometimes referred to as “TBM”) which is a tunnel excavator for tunnel gap filler according to the second embodiment and a natural ground. .
第2実施形態では、図3に示すように、TBM40により地山(岩盤)Gを掘進しながらTBM40の後方において組立てられた鋼製支保工13と地山Gに吹き付けられた吹付コンクリート14によりトンネルTを構築するTBM工法において、トンネル掘進に伴いTBM40の周囲と地山Gの掘削面K2との間に形成される空隙K3に、アクリル系材料からなるトンネル空隙用充填材12の充填を行う。なお、第2実施形態では、トンネル掘削機としてオープン型のTBM40を使用するものとしたが、例えば岩盤シールドやフルシールド型のTBM等を適用してもよく、メイングリッパーとシールド部とを装備するトンネル掘削機であれば限定されるものではない。また、第2実施形態では、鋼製支保工13と吹付コンクリート14により、地山を支保する構成としたが、例えばライナーやセグメント等を使用してもよく、地山の支保構造は限定されるものではない。ここで、支保工としてライナーやセグメントを使用する場合は、ライナー又はセグメントの背面に裏込め材を充填するものとする。
In the second embodiment, as shown in FIG. 3, the tunnel is formed by the steel support 13 assembled behind the
第2実施形態に係るトンネル空隙用充填材12の各水溶液は、第1実施形態で使用したものと同様のものを使用するものとし、詳細な説明は省略する。 As each aqueous solution of the tunnel gap filler 12 according to the second embodiment, the same solution as that used in the first embodiment is used, and detailed description thereof is omitted.
TBM40は、図3に示すように、主に地山Gの掘削を行う複数のローラカッタ41aが配設されたカッターヘッド41と、カッターヘッド41の後方に位置されていてTBM40の内部の各種設備を防護するシールド部42と、メインビーム47により支持されてシールド部42の後方において側方に張り出して岩盤(地山G)から掘削反力をとるメイングリッパー46とから構成されている。第2実施形態に係るTBM40は、円形断面に形成されており、シールド部42の外径は、カッターヘッド41により形成される掘削面K2の内径よりも若干小さく形成されている。なお、TBM40の形状は、円形断面に限定されるものではなく、例えば、断面が矩形状や楕円形状等、また、円形断面を複数連設した二連型断面や三連型断面等のものを使用してもよい。
As shown in FIG. 3, the
シールド部42の内部におけるカッターヘッド41の背面には、カッターヘッド41により掘削された土砂が一時堆積されるチャンバ43が形成されており、チャンバ43内の土砂は、図示しない土砂搬送手段により、トンネルTの外部へ搬送される。また、TBM40は、メイングリッパー46により周囲の岩盤(掘削面K2)に掘削反力をとって、切羽面K1の掘削を行う。
また、シールド部42に上部には、トンネル空隙用充填材12を空隙K3に充填するための注入孔44が貫通されている。なお、注入孔44の形状、数、配置等は限定されるものではなく、空隙K3への充填を確実に行うことが可能に適宜形成されている。なお、図3における符号45は、TBM40の掘進の方向修正等を行う補助グリッパーである。
A
In addition, an injection hole 44 for filling the tunnel gap filler 12 into the gap K3 is penetrated in the upper part of the shield part. Note that the shape, number, arrangement, and the like of the injection hole 44 are not limited, and are appropriately formed so that the gap K3 can be reliably filled. In addition, the code |
鋼製支保工13は、予めトンネル断面形状に合せて形成された型鋼を地山の掘削面K2沿って配置することにより構成されている。そして、吹付コンクリート14は、鋼製支保工13が配置された掘削面K2に所定の厚みで吹き付けられている。
ここで、トンネル空隙用充填材12の注入装置20は、第1実施形態で示したものと同様なため、詳細な説明は省略する。なお、第2実施形態では、注入装置20を、図示しない起点側坑口近傍の作業ヤード内における所定の位置または坑内設置可能な注入プラントとして坑内に配置するものとする。
The steel support 13 is configured by arranging a steel mold formed in advance according to a tunnel cross-sectional shape along the excavation surface K2 of the natural ground. And the shotcrete 14 is sprayed by the predetermined thickness to the excavation surface K2 in which the steel supporter 13 is arrange | positioned.
Here, the injection device 20 for the tunnel gap filling material 12 is the same as that shown in the first embodiment, and thus detailed description thereof is omitted. In addition, in 2nd Embodiment, the injection apparatus 20 shall be arrange | positioned in a mine as an injection | pouring plant which can be installed in the predetermined position in a work yard near the origin side wellhead which is not illustrated, or a mine.
第2実施形態に係るトンネルTの構築は、図3に示すように、TBM40の後方において鋼製支保工13の組立てと吹付コンクリート14の地山Gへの吹き付けを随時行いながら、メイングリッパー46により掘削反力をとりつつカッターヘッド41により地山Gを掘削することにより行われる(掘削工程)。
この際、TBM40のカッターヘッド41により形成される掘削面K2は、シールド部42の外形よりも大きく形成されているため、カッターヘッド41の後方には空隙K3が形成される。
As shown in FIG. 3, the tunnel T according to the second embodiment is constructed by the
At this time, the excavation surface K <b> 2 formed by the
このため、地山Gの崩壊の抑止を目的として、シールド部42に形成された注入孔44から、トンネル空隙用充填材12の空隙K3への充填を随時行う(充填工程)。
そして、TBM40の後方では、随時、分割されて坑内に搬入された鋼製支保工13を掘削面K2の横断面に沿って配置されるように組立てた後、吹付コンクリート14が吹き付けられる。
For this reason, for the purpose of preventing the collapse of the natural ground G, the tunnel gap filler 12 is filled from time to time through the injection hole 44 formed in the shield part 42 (filling step).
Then, after the
TBM40による掘進が完了することにより、鋼製支保工13と吹付けコンクリート14とトンネル空隙用充填材12からなるトンネル支保工あるいは覆工を有したトンネルTの構築が完了する。
Completion of the excavation by the
なお、トンネル空隙用充填材12の空隙K3への充填方法は、第1実施形態で示した方法と同様なため、詳細な説明は省略する。 In addition, since the filling method to the space | gap K3 of the filler 12 for tunnel space | gap is the same as the method shown in 1st Embodiment, detailed description is abbreviate | omitted.
また、何らかの原因により、掘進作業を中断する場合には、切羽面K1とカッターヘッド41との間の空隙K4にもトンネル空隙用充填材12を充填することで、切羽面K1の崩壊を抑止する。
When the excavation operation is interrupted for some reason, the gap K4 between the face K1 and the
以上、第2実施形態に係るトンネル空隙用充填材及びこれを利用したトンネルの掘削方法によれば、亀裂の多い岩盤など、崩壊性の岩盤におけるトンネル工事においても、地山Gの崩落を抑えつつ、安全にTBM工法によるトンネル施工を行うことが可能となる。 As described above, according to the tunnel gap filling material and the tunnel excavation method using the same according to the second embodiment, the collapse of the natural ground G is suppressed even in the tunnel construction in the collapsible rock such as the rock with many cracks. It is possible to safely perform tunnel construction by the TBM method.
つまり、第2実施形態では、トンネル空隙用充填材12として、アクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液とからなるアクリル系混合体を使用しているため、鉄との付着力が弱い性質を有しており、掘削面K2とTBM40との空隙K3に充填されて固化しても、TBM40に付着してトンネルTの掘進を妨げることがない。そのため、地山Gの崩落を抑止して安全で施工性に優れたトンネル工事が可能となる。また、何らかの原因により掘進作業を中断する場合でも、トンネル空隙用充填材12を切羽面K1とカッターヘッド41との間の空隙K4に充填することで、切羽面K1の崩壊を抑止することが可能となる。また、工事再開後も、トンネル空隙用充填材12を含んだ土砂が、チャンバ43内において、付着することがないため、施工をスムーズに行うことが可能となる。なお、掘進作業が中断する場合において、空隙K4へのトンネル空隙用充填材12の充填とともに、チャンバ43内にトンネル空隙用充填材12を充填する場合もある。
That is, in the second embodiment, as the tunnel void filler 12, an acrylic mixture comprising a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of aluminum water-soluble salt, and a bisulfite aqueous solution is used. Because it is used, it has a property of weak adhesion to iron, and even if it is filled in the gap K3 between the excavation surface K2 and the
なお、この他の第2実施形態に係るトンネル空隙用充填材及びこれを利用したトンネルの掘削方法による作用効果は、第1実施形態で示したものと同様なため、詳細な説明は省略する。 The operational effects of the tunnel gap filling material and the tunnel excavation method using the same according to the second embodiment are the same as those shown in the first embodiment, and thus detailed description thereof is omitted.
以上、本発明について、好適な実施形態について説明したが、本発明は前記の実施形態に限られず、本発明の趣旨を逸脱しない範囲で適宜設計変更が可能である。
例えば、前記第1実施形態では、シールド機と掘削面との間に形成された空隙に充填されるトンネル空隙用充填材と、セグメントの背面に充填される裏込め材とに、それぞれ個別の材料を使用するものとしたが、これに限定されるものではなく、セグメントの裏込め材として、本発明のトンネル空隙用充填材を使用してもよい。
As mentioned above, although preferred embodiment was described about this invention, this invention is not limited to the said embodiment, A design change is possible suitably in the range which does not deviate from the meaning of this invention.
For example, in the first embodiment, the tunnel gap filler filled in the gap formed between the shield machine and the excavation surface and the backfilling material filled in the back surface of the segment are made of different materials. However, the present invention is not limited to this, and the tunnel void filler of the present invention may be used as a segment back-filling material.
また、前記各実施形態では、掘削機に形成された注入孔にミキシング部を固定して、空隙への注入直前に水溶液を混合する構成としたが、各水溶液の混合するタイミングは限定されるものではなく、例えば、トンネルの延長が短く、裏込め材が注入管内において送液途中で硬化することがなければ、予め混合されたものを送液して空隙に充填する構成としてもよい。
また、3種類の水溶液を一度に混合するのではなく、2種類の水溶液を混合した後、もう1種類の水溶液を添加して混合する構成としても良い。
Moreover, in each said embodiment, it was set as the structure which fixes a mixing part to the injection hole formed in the excavator, and mixes aqueous solution just before injection | pouring to a space | gap, but the timing which mixes each aqueous solution is limited. Instead, for example, if the extension of the tunnel is short and the backfill material does not harden in the middle of the liquid feeding in the injection pipe, a premixed liquid may be fed to fill the gap.
Further, instead of mixing three types of aqueous solutions at a time, after mixing two types of aqueous solutions, another type of aqueous solution may be added and mixed.
10 セグメント
11 裏込め材
12 トンネル空隙用充填材
13 鋼製支保工
14 吹付コンクリート
20 注入装置
21 注入管
22 ミキシング部
30 シールド機
40 TBM(トンネルボーリングマシン)
G 地山
K1 切羽面
K2 掘削面
K3,K4 空隙
DESCRIPTION OF SYMBOLS 10 Segment 11 Backfilling material 12 Tunnel gap filling material 13 Steel support 14 Shotcrete 20 Injection device 21 Injection pipe 22 Mixing part 30
G Ground mountain K1 Face face K2 Excavation face K3, K4 Air gap
Claims (6)
前記トンネル空隙用充填材がアクリル酸の一価または二価の金属塩水溶液と、アルミニウム水溶性塩の水溶液と、重亜硫酸塩水溶液と、を混合してなることを特徴とするトンネル空隙用充填材。 A tunnel gap filling material filled in a gap formed between a surrounding area of a tunnel excavator and a natural ground,
The filler for tunnel voids is formed by mixing a monovalent or divalent metal salt aqueous solution of acrylic acid, an aqueous solution of an aluminum water-soluble salt, and a bisulfite aqueous solution. .
前記掘削工程に伴い前記トンネル掘削機と前記地山の間に形成される空隙にアクリル系材料からなるトンネル空隙用充填材を充填する充填工程と、を含むことを特徴とするトンネル掘削方法。 Excavation process to excavate natural ground with a tunnel excavator;
A tunnel excavation method comprising: filling a gap formed between the tunnel excavator and the ground with a tunnel gap filler made of an acrylic material in accordance with the excavation process.
送液された前記アクリル酸の一価または二価の金属塩水溶液と、前記アルミニウム水溶塩の水溶液と、前記重亜硫酸塩水溶液とを、混合して空隙に充填する工程とを含むことを特徴とする、請求項4又は請求項5に記載のトンネルの掘削方法。 A step of individually feeding the aqueous solution of the monovalent or divalent metal salt of the acrylic acid, the aqueous solution of the aluminum water salt, and the aqueous solution of the bisulfite with the three filling lines in the filling step; ,
A step of mixing the filled monovalent or divalent metal salt aqueous solution of the acrylic acid, the aqueous solution of the aluminum water salt, and the aqueous bisulfite solution to fill the voids. The tunnel excavation method according to claim 4 or 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004307202A JP2006118214A (en) | 2004-10-21 | 2004-10-21 | Filler for tunnel cavity, and tunnel excavating method using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004307202A JP2006118214A (en) | 2004-10-21 | 2004-10-21 | Filler for tunnel cavity, and tunnel excavating method using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2006118214A true JP2006118214A (en) | 2006-05-11 |
Family
ID=36536343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004307202A Pending JP2006118214A (en) | 2004-10-21 | 2004-10-21 | Filler for tunnel cavity, and tunnel excavating method using the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2006118214A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008106457A (en) * | 2006-10-23 | 2008-05-08 | Kumagai Gumi Co Ltd | Tunnel excavator and tunnel construction method |
-
2004
- 2004-10-21 JP JP2004307202A patent/JP2006118214A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008106457A (en) * | 2006-10-23 | 2008-05-08 | Kumagai Gumi Co Ltd | Tunnel excavator and tunnel construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111396067B (en) | Comprehensive shield steel sleeve receiving construction method in complex environment | |
JPH11159275A (en) | Whale bone construction method of large cross-section tunnel | |
JP2007303155A (en) | Construction method of underground cavity and tunnel construction method | |
JP2007308924A (en) | Method of constructing soil improving composite pile structure, and apparatus for constructing the same | |
CN104453915B (en) | Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method | |
CN110469338B (en) | Confined water stratum shield receiving method | |
JP4730610B2 (en) | Tunnel excavation method and tunnel liner | |
JP2006118214A (en) | Filler for tunnel cavity, and tunnel excavating method using the same | |
CN103104265B (en) | Advanced lining method and lining equipment used in construction of weak surrounding rock tunnel | |
KR101745363B1 (en) | complex Temporary utility and its construction Method | |
JP5012149B2 (en) | Ground support structure and ground support method | |
JP4273031B2 (en) | Stabilization method of ground in shield method | |
JP2007162323A (en) | Wall body forming method and wall body | |
JP6487713B2 (en) | Joining method | |
CN114151096A (en) | Shield type TBM air-propelled assembled segment tunnel construction method | |
JP2004238831A (en) | Sharp curve excavating method | |
JP5495874B2 (en) | Removal method of shield excavator | |
JP3710991B2 (en) | Ground reinforcement method | |
JP2849605B2 (en) | Large section tunnel and its construction method | |
JP2005139840A (en) | Shield tunnel construction method and shield tunnel excavator | |
JP2554885B2 (en) | Shield method and shield machine | |
JPH11247592A (en) | Pipe jacking method for preceding intermediate shaft system | |
JPH0776988A (en) | Preliminary construction method for tunnel facing front bedrock | |
JP2023128599A (en) | Supporting structure and tunnel construction method | |
JP2006118213A (en) | Backfilling material and construction method of underground structure using the same |