JP2006053068A - Leak test method for inlet sealed section of bag container - Google Patents

Leak test method for inlet sealed section of bag container Download PDF

Info

Publication number
JP2006053068A
JP2006053068A JP2004235322A JP2004235322A JP2006053068A JP 2006053068 A JP2006053068 A JP 2006053068A JP 2004235322 A JP2004235322 A JP 2004235322A JP 2004235322 A JP2004235322 A JP 2004235322A JP 2006053068 A JP2006053068 A JP 2006053068A
Authority
JP
Japan
Prior art keywords
inlet
bag container
air supply
head
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004235322A
Other languages
Japanese (ja)
Other versions
JP4316446B2 (en
Inventor
Takashi Ogawa
隆司 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CORNES DODWELL Ltd
Original Assignee
CORNES DODWELL Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CORNES DODWELL Ltd filed Critical CORNES DODWELL Ltd
Priority to JP2004235322A priority Critical patent/JP4316446B2/en
Publication of JP2006053068A publication Critical patent/JP2006053068A/en
Application granted granted Critical
Publication of JP4316446B2 publication Critical patent/JP4316446B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To inspect leaks in an inlet sealed section of a bag container which is filled with a fluid product and of which the inlet is sealed by all around welding with a second membrane without leaking the fluid product in the bag container from the inlet and with high reliability. <P>SOLUTION: Under the condition that an inspection head 10 is in contact with a tip of the inlet 3 of the bag container 1 with a cavity in the inspection head 10 communicated with the inlet 3, pressurized air having constant pressure which is supplied upstream of an air supply valve 18 in an air supply pipe 16 in advance is supplied to the cavity in the inspection head 10 through the opening of the air supply valve 18. According to the time required for the air pressure in the air supply pipe 16 at a part between the air supply valve 18 and the inspection head 10, the cavity in the inspection head 10, and the inlet 3 of the bag container 1 to reach the pressure of the pressurized air from the beginning of air supply to the inspection head 10 when there is no leak in the inlet sealed section of the bag container 1, on the basis of a measured value of a flowmeter 19 after a lapse of predetermined time, it is decided that there is no leak when a measured flow is zero and that there is a leak when the measured flow is not zero. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

この発明は、流体製品を充填されたバッグ容器の注入口シール部の漏れを検査する方法に関する。   The present invention relates to a method for inspecting a leak of an inlet seal portion of a bag container filled with a fluid product.

流体製品用の容器として、第1と第2の2枚のメンブレンを有する製品注入口を備え、前記注入口の第1メンブレンを切り裂かれて内部に流体製品を充填され、その後に、前記第2メンブレンにより前記注入口をシールされるバッグ容器がある(特許文献1参照)。   As a container for a fluid product, a product inlet having first and second membranes is provided, the first membrane of the inlet is cut and filled with a fluid product, and then the second There is a bag container in which the inlet is sealed by a membrane (see Patent Document 1).

図7は前記バッグ容器の断面図であり、(a)は製品充填前の状態、(b)は製品充填中の状態、(c)は注入口シール後の状態を示している。   FIG. 7 is a cross-sectional view of the bag container, where (a) shows a state before product filling, (b) shows a state during product filling, and (c) shows a state after sealing the inlet.

このバッグ容器1は、気密性を有するバッグ本体2の一部に製品注入口3を設けたものであり、前記バッグ本体2は、一対のシート状バッグ材2a,2bの外周部をその全周にわたって溶着した構成となっている。   This bag container 1 is provided with a product injection port 3 in a part of a bag main body 2 having airtightness, and the bag main body 2 has an outer peripheral portion of a pair of sheet-like bag materials 2a and 2b as a whole. It becomes the composition which was welded over.

なお、図では、前記一対のバッグ材2a,2bを簡略化して示しているが、これらのバッグ材2a,2bは、例えば2枚の樹脂シートをその間に断熱空間を設けて重ねた二重シートからなっている。   In the figure, the pair of bag members 2a and 2b are shown in a simplified manner, but these bag members 2a and 2b are, for example, a double sheet in which two resin sheets are stacked with a heat insulating space therebetween. It is made up of.

また、前記製品注入口3は、前記バッグ本体2内に基端を挿入されて前記バッグ本体2に気密状態に溶着された筒状の口部材4と、前記口部材4の先端の開口面を密閉する第1メンブレン5と、前記口部材4の基端面に外周部の複数箇所を仮溶着された第2メンブレン6とからなっている。   The product inlet 3 includes a cylindrical mouth member 4 having a base end inserted into the bag body 2 and welded to the bag body 2 in an airtight state, and an opening surface at the distal end of the mouth member 4. The first membrane 5 is hermetically sealed, and the second membrane 6 is temporarily welded to the base end surface of the mouth member 4 at a plurality of outer peripheral portions.

前記口部材4は、例えばポリエチレン成形品からなっており、その基端の外周にバッグ本体溶着板部4aが形成され、先端の外周にフランジ部4bが形成されている。   The mouth member 4 is made of, for example, a polyethylene molded product. A bag main body welded plate portion 4a is formed on the outer periphery of the base end, and a flange portion 4b is formed on the outer periphery of the distal end.

また、前記第1と第2の2枚のメンブレン5,6はそれぞれ樹脂フィルムからなっており、第1メンブレン5は、その外周部の全周を前記口部材4の先端面に溶着されて前記口部材4の先端の開口面を密閉し、第2メンブレン6は、その外周部の複数箇所を前記口部材4の基端面に仮溶着され、前記口部材4に対する非溶着部と前記口部材4の基端面との間に製品流入部を形成している。   The first and second membranes 5 and 6 are each made of a resin film, and the first membrane 5 is welded to the distal end surface of the mouth member 4 on the entire outer periphery thereof. The opening surface at the front end of the mouth member 4 is sealed, and the second membrane 6 is temporarily welded to the base end surface of the mouth member 4 at a plurality of outer peripheral portions thereof, and the non-welded portion with respect to the mouth member 4 and the mouth member 4. A product inflow portion is formed between the base end surface of the product.

前記製品注入口3は、前記口部材4の基端部を前記バッグ本体2の一方のバッグ材2aの一部に設けられた注入口取付孔7に嵌合され、この口部材4の基端のバッグ本体溶着板部4aの全周を前記バッグ材2aの内面に溶着されて前記一方のバッグ材2aに取付けられている。   In the product inlet 3, the base end portion of the mouth member 4 is fitted into an inlet mounting hole 7 provided in a part of one bag material 2 a of the bag body 2. The bag body weld plate 4a is welded to the inner surface of the bag material 2a and attached to the one bag material 2a.

このバッグ容器1は、主に、酒類、果汁、果肉等の流体飲食品や流体医薬品のような大気中の細菌により変質劣化する流体製品の容器に利用されており、γ線照射等によりバッグ本体2内及び製品注入口3内(口部材41内の第1と第2のメンブレン5,6間の空気層を滅菌された状態で流体製品の充填ラインに搬入される。   This bag container 1 is mainly used as a container for fluid products such as alcoholic beverages, fruit juices, and pulp, and fluid products that are deteriorated and deteriorated by bacteria in the atmosphere such as fluid pharmaceuticals. 2 and the product inlet 3 (the air layer between the first and second membranes 5 and 6 in the mouth member 41 is sterilized and is carried into the fluid product filling line.

このバッグ容器1内への流体製品の充填は、その注入口3の先端に図示しない充填ヘッドを当接させた状態で、まず前記ヘッド内及び前記注入口3の第1メンブレン5の外面をスチーム殺菌した後、前記ヘッド内に設けられたメンブレンカッタにより前記第1メンブレン5を切り裂いて、図7(b)のように流体製品Aを前記注入口3の口部材4内及び前記第2メンブレン6の非溶着部を通してバッグ容器1内に充填し、その後に、前記充填ヘッドに対向させて配置された図示しないシールヘッドにより、前記バッグ容器1の注入口3に対応する部分を前記注入口3を設けた側とは反対側から押し潰して前記注入口3の第2メンブレン6の外周部を前記口部材4の基端面に押し付け、その状態で前記シールヘッドを加熱し、前記第2メンブレン6の全周を前記口部材4の基端面に溶着して前記口部材4の基端開口面を第2メンブレン6により密閉することにより前記注入口3をシールし、前記ヘッド内及び前記注入口3内(基端の開口面を第2メンブレン6により密閉された口部材4内)の洗浄及びスチームフラッシングを行なった後に、前記シールヘッドを後退させるとともに前記充填ヘッドを前記注入口3から切離すことにより行なわれている。   The filling of the fluid product into the bag container 1 is performed by first steaming the inside of the head and the outer surface of the first membrane 5 of the inlet 3 with a filling head (not shown) in contact with the tip of the inlet 3. After the sterilization, the first membrane 5 is cut by the membrane cutter provided in the head, and the fluid product A is fed into the mouth member 4 of the inlet 3 and the second membrane 6 as shown in FIG. The bag container 1 is filled into the bag container 1 through the non-welded portion, and then the portion corresponding to the inlet 3 of the bag container 1 is made to pass through the inlet 3 by a seal head (not shown) arranged to face the filling head. The outer side of the second membrane 6 of the injection port 3 is pressed against the base end surface of the mouth member 4 by crushing from the side opposite to the provided side, and the seal head is heated in this state, thereby the second membrane. 6 is welded to the base end face of the mouth member 4, and the base end opening face of the mouth member 4 is sealed with the second membrane 6, thereby sealing the inlet 3 and the inside of the head and the inlet After cleaning and steam flushing inside 3 (inside the mouth member 4 whose base end opening surface is sealed by the second membrane 6), the seal head is retracted and the filling head is separated from the inlet 3 Has been done.

そして、流体製品Aを充填されて注入口3を第2メンブレン6の全周溶着によりシールされたバッグ容器1は、前記第2メンブレン6の部分的な溶着不良による注入口シール部の漏れを検査され、そのシール部に漏れが無いことを確認して出荷または商品倉庫に搬入されている。   Then, the bag container 1 filled with the fluid product A and sealed with the inlet 3 by the entire circumference welding of the second membrane 6 is inspected for leakage of the inlet sealing portion due to partial welding failure of the second membrane 6. Then, it is confirmed that there is no leakage in the seal portion, and it is shipped or carried into the commodity warehouse.

前記バッグ容器1の製品充填後の注入口シール部の漏れ検査は、従来、前記バッグ容器1の注入口3部分の外面に、前記注入口3の周囲を覆う空室を有する検査ヘッドを当接させて前記注入口3の周囲に密閉された空間を形成し、その空間を内部空気の排出により所定圧に減圧するとともに減圧開始後の時間経過にともなう前記空間の空気圧の変化を測定することにより、その空気圧が所定圧で安定したときに漏れ無しと判定し、前記空気圧が所定圧よりもさらに低下したときに漏れありと判定する方法で行なわれている(特許文献2参照)。
特公平6―88585号公報 特開2004―85461号公報
Conventionally, the leak inspection of the inlet seal part after filling the product of the bag container 1 is made to contact an inspection head having an empty chamber covering the periphery of the inlet 3 on the outer surface of the inlet 3 part of the bag container 1. By forming a sealed space around the inlet 3 and reducing the space to a predetermined pressure by discharging internal air, and measuring the change in air pressure of the space over time after the start of pressure reduction When the air pressure is stabilized at a predetermined pressure, it is determined that there is no leakage, and when the air pressure further falls below the predetermined pressure, it is determined that there is a leak (see Patent Document 2).
Japanese Patent Publication No. 6-88585 JP 2004-85461 A

しかし、上記従来の漏れ検査方法では、バッグ容器1の注入口シール部に漏れがあるときに、前記バッグ容器1の注入口3部分の外面に検査ヘッドを当接させて形成された空間の減圧にともなってバッグ容器1内の流体製品Aが前記注入口3から前記空間に漏れ出すため、その漏れ出した流体製品が前記検査ヘッドに付着することがあり、その都度検査ヘッドの洗浄しなければならない。   However, in the above conventional leak inspection method, when there is a leak in the inlet seal portion of the bag container 1, the pressure reduction of the space formed by bringing the inspection head into contact with the outer surface of the inlet 3 portion of the bag container 1 As the fluid product A in the bag container 1 leaks into the space from the inlet 3, the leaked fluid product may adhere to the inspection head, and the inspection head must be washed each time. Don't be.

なお、この漏れ検査方法とは逆に、前記空間を所定圧に昇圧させ、昇圧開始後の時間経過にともなう前記空間の空気圧の変化を測定して注入口シール部の漏れを判定することも考えられ、その場合は、バッグ容器1の注入口シール部に漏れがあっても、バッグ容器1内の流体製品Aが注入口3から漏れ出して検査ヘッドに付着することはないが、この方法では、前記空間の空気温度がその昇圧(圧縮)にともなって数度程度高くなり、漏れ検査中に再び温度降下するため、その温度変化が前記空間の空気圧に大きく影響し、漏れ検査の信頼度が低下してしまう。   Contrary to this leakage inspection method, it is also conceivable to increase the space to a predetermined pressure and determine the leakage of the inlet seal portion by measuring the change in the air pressure of the space over time after the start of pressure increase. In this case, even if there is a leak in the inlet seal portion of the bag container 1, the fluid product A in the bag container 1 does not leak from the inlet 3 and adhere to the inspection head. The air temperature in the space becomes higher by several degrees as the pressure is increased (compression), and the temperature drops again during the leak test. Therefore, the temperature change greatly affects the air pressure in the space, and the reliability of the leak test is increased. It will decline.

この発明は、内部に流体製品を充填され、注入口を第2メンブレンの全周溶着によりシールされたバッグ容器の注入口シール部の漏れを、バッグ容器内の流体製品を注入口から漏れ出させることなく、しかも高い信頼度で検査することができる漏れ検査方法を提供することを目的としたものである。   According to the present invention, the fluid product in the bag container is leaked from the inlet, and the fluid product in the bag container is leaked from the inlet, in which the fluid product is filled and the inlet is sealed by the circumferential welding of the second membrane. It is an object of the present invention to provide a leakage inspection method that can be inspected with high reliability.

この発明は、バッグ本体の一部に、基端部を前記バッグ本体に設けられた注入口取付孔に嵌合されて前記バッグ本体に気密状態に溶着された筒状の口部材と、前記口部材の先端の開口面を密閉する第1メンブレンと、前記口部材の基端面に外周部の複数箇所を仮溶着された第2メンブレンとからなる製品注入口が設けられ、前記第1メンブレンを切り裂かれ、前記口部材内及び前記第2メンブレンの非溶着部を通して前記バッグ本体内に流体製品を充填された後に、前記第2メンブレンの全周を前記口部材の基端面に溶着されて前記注入口をシールされたバッグ容器の注入口シール部の漏れを検査する方法において、前記バッグ容器の注入口の先端に、前記注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された検査ヘッドを、前記空室を前記注入口内に連通させて当接させた状態で、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を、前記給気バルブを開いて前記検査ヘッドの前記空室内に供給し、前記バッグ容器の注入口シール部に漏れが無いときの前記検査ヘッドへの給気開始から前記給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及び前記バッグ容器の注入口内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間に応じて予め設定した時間後の前記流量計の測定値に基づいて、測定流量が0であるときに漏れ無しと判定し、前記測定流量が0でないときに漏れありと判定することを特徴とする。   The present invention includes a cylindrical mouth member, a base end portion of which is fitted in an inlet mounting hole provided in the bag body and welded in an airtight state to the bag body, and a part of the bag body; A product inlet comprising a first membrane that seals the opening surface at the distal end of the member and a second membrane that is temporarily welded to the base end surface of the mouth member at a plurality of outer peripheral portions is provided, and the first membrane is torn. The bag body is filled with a fluid product in the mouth member and through the non-welded portion of the second membrane, and then the entire periphery of the second membrane is welded to the base end surface of the mouth member, and the injection port In the method for inspecting the leakage of the inlet seal portion of the bag container sealed, the annular inlet contact portion that contacts the distal end surface of the inlet in an airtight state at the distal end of the inlet of the bag container, and By the inlet contact part An inspection head having a vacant opening at the end face formed and connected to an air supply pipe having an air supply valve and a flow meter is in contact with the vacancy communicating with the inside of the inlet, Pressurized air of a constant pressure supplied in advance to the upstream side of the air supply valve in the air supply pipe is supplied to the empty chamber of the inspection head by opening the air supply valve, From the start of air supply to the inspection head when there is no leak in the inlet seal portion, the air pressure in the air supply pipe on the inspection head side from the air supply valve, the space inside the inspection head empty space and the bag container inlet Based on the measured value of the flow meter after a preset time according to the time required until the pressure of the compressed air reaches the pressure, it is determined that there is no leakage when the measured flow rate is 0, and the measured flow rate is To judge that there is a leak when it is not 0 And butterflies.

この漏れ検査方法において、前記検査ヘッドへの供給空気の流量は、前記給気配管に介在された主流路管と、この主流路管内に両端を連通接続された金属細管からなるバイパス管と、前記バイパス管の上流側と下流側とにそれぞれ設けられた温度により電気抵抗値が変化する一対の抵抗体と、前記一対の抵抗体に通電し、これらの抵抗体の通電による発熱と前記バイパス管内を流れる流体との熱交換とにより生じる上流側抵抗体と下流側抵抗体との温度差をそれぞれの抵抗体の抵抗値差により検出して前記温度差に応じた流量信号を出力する温度差検出部とからなる流量計により測定するのが好ましい。   In this leakage inspection method, the flow rate of the supply air to the inspection head includes a main channel pipe interposed in the air supply pipe, a bypass pipe made of a metal thin tube having both ends connected in the main channel pipe, A pair of resistors whose electrical resistance values change depending on the temperatures provided on the upstream side and the downstream side of the bypass pipe, respectively, and the pair of resistors are energized, and heat generated by energization of these resistors and the inside of the bypass pipe A temperature difference detection unit that detects a temperature difference between the upstream resistor and the downstream resistor caused by heat exchange with the flowing fluid based on a resistance value difference between the resistors and outputs a flow rate signal corresponding to the temperature difference. It is preferable to measure with a flow meter comprising:

この漏れ検査方法においては、前記検査ヘッドへの給気開始から前記給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及びバッグ容器の注入口内の空間の空気圧が供給された加圧空気の圧力になるまでの所要時間に応じて、前記所要時間と同じかその直後の第1の時間と、それよりも数秒後の第2の時間とを予め設定しておき、前記第1の時間後の流量計の測定流量が0であるときに漏れ無しと判定し、前記第1の時間後の測定流量が0でないときは、前記第2の時間後の前記流量計の測定流量が0であるときに漏れ無しと判定し、前記第2の時間後の測定流量も0でないときに漏れありと判定するのが好ましい。   In this leakage inspection method, the air pressure in the air supply pipe on the inspection head side than the air supply valve, the space inside the inspection head, and the space in the bag container inlet is supplied from the start of air supply to the inspection head. Depending on the time required to reach the pressure of the pressurized air, a first time that is the same as or just after the required time and a second time that is several seconds after that are set in advance, and the first time When the measured flow rate of the flow meter after 1 time is 0, it is determined that there is no leakage. When the measured flow rate after the first time is not 0, the measured flow rate of the flow meter after the second time Preferably, it is determined that there is no leakage when the value is 0, and it is determined that there is no leakage when the measured flow rate after the second time is not 0.

この漏れ検査方法においては、前記バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された専用の検査ヘッドを用いて前記バッグ容器の注入口シール部の漏れ検査を行なってもよい。   In this leakage inspection method, the bag container has an annular inlet contact portion that is in airtight contact with the distal end surface of the inlet of the bag container, and a vacant chamber that opens to an end surface surrounded by the inlet contact portion, You may perform the leak test | inspection of the inlet seal part of the said bag container using the test head for exclusive use to which the air supply piping provided with the air supply valve and the flowmeter was connected.

また、この漏れ検査方法においては、前記バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と、前記注入口当接部により囲まれた端面に開口する第1の空室と、前記第1の空室に弁部を介して連通する第2の空室と、前記弁部を開閉する弁部材と、前記バッグ容器の注入口の第1メンブレンを切り裂くメンブレンカッタとを有し、前記第1の空室内に殺菌用スチーム及び洗浄水を選択的に供給するためのバルブを備えたスチーム/洗浄水供給配管と、前記第1の空室内のスチーム及び洗浄水を排出するためのバルブを備えたスチーム/洗浄水排出配管と、前記第2の空室内に前記バッグ容器内に充填する流体製品を供給するための製品供給配管とが接続された充填ヘッドの前記スチーム/洗浄水供給配管の接続部に、給気バルブと流量計を備えた給気配管を接続しておき、前記充填ヘッドを前記バッグ容器の注入口の先端に当接させ、この充填ヘッドの第1の空室内及び前記注入口の第1メンブレンの外面のスチーム殺菌、前記第1メンブレンの切り裂き、前記バッグ容器内への流体製品の充填、前記注入口の前記第2メンブレンの全周溶着による注入口シール、前記第1の空室内及び前記注入口内の洗浄及びスチームフラッシングを行なった後、前記充填ヘッドを前記バッグ容器の注入口に当接させたまま検査ヘッドとして利用し、前記弁部材により前記第1の空室と第2の空室との間を閉鎖するとともに前記スチーム/洗浄水供給配管と前記スチーム/洗浄水排出配管の両方のバルブを閉じ、前記給気バルブを開いて、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を前記充填ヘッドの第1の空室内に供給して前記バッグ容器の注入口シール部の漏れ検査を行なってもよい。   Further, in this leak inspection method, an annular inlet contact portion that is in airtight contact with the distal end surface of the inlet of the bag container, and a first opening that is open on an end surface surrounded by the inlet contact portion. A vacancy, a second vacancy communicating with the first vacancy via a valve portion, a valve member for opening and closing the valve portion, and a membrane cutter for tearing the first membrane of the inlet of the bag container; A steam / cleaning water supply pipe having a valve for selectively supplying sterilizing steam and cleaning water into the first empty chamber, and discharging the steam and cleaning water in the first empty chamber. The steam / washing water discharge pipe provided with a valve for carrying out and the steam / flushing head of the filling head connected to the product supply pipe for supplying the fluid product filling the bag container into the second empty chamber Supply water to the connection of the cleaning water supply pipe. An air supply pipe provided with a valve and a flow meter is connected, the filling head is brought into contact with the tip of the inlet of the bag container, and a first membrane of the filling head and a first membrane of the inlet Sterilization of the outer surface of the container, tearing of the first membrane, filling of the bag container with a fluid product, sealing of the inlet by the entire circumference welding of the second membrane of the inlet, the first empty chamber and the injection After performing cleaning and steam flushing in the mouth, the filling head is used as an inspection head while being in contact with the injection port of the bag container, and the first and second vacancies are formed by the valve member. And the valves of both the steam / wash water supply pipe and the steam / wash water discharge pipe are closed, the air supply valve is opened, and the air supply valve in the air supply pipe is preliminarily opened. It may be performed leakage inspection of the inlet seal portion of the bag container pressurized air constant pressure which has been supplied to the upstream side is supplied to the first air chamber of the filling head than.

この発明の漏れ検査方法は、内部に流体製品を充填され、注入口を第2メンブレンの全周溶着によりシールされたバッグ容器の注入口の先端に、前記注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された検査ヘッドを、前記空室を前記注入口内に連通させて当接させた状態で、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を、前記給気バルブを開いて前記検査ヘッドの前記空室内に供給し、前記バッグ容器の注入口シール部に漏れが無いときの前記検査ヘッドへの給気開始から前記給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及び前記バッグ容器の注入口内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間に応じて予め設定した時間後の前記流量計の測定値に基づいて、測定流量が0であるときに漏れ無しと判定し、前記測定流量が0でないときに漏れありと判定するものであるため、前記バッグ容器の注入口シール部の漏れを、バッグ容器内の流体製品を注入口から漏れ出させることなく、しかも高い信頼度で検査することができる。   In the leak inspection method of the present invention, a fluid product is filled therein, the inlet is sealed at the tip of the bag container sealed by circumferential welding of the second membrane, and the tip of the inlet is airtight. An inspection head having an annular inlet contact portion in contact with and a vacancy opening on an end face surrounded by the inlet contact portion, to which an air supply pipe having an air supply valve and a flow meter is connected, In a state where a vacant space is communicated with and brought into contact with the inlet, pressurized air having a constant pressure previously supplied upstream of the air supply valve in the air supply pipe is supplied to the air supply valve. Opened and supplied to the vacant chamber of the inspection head, and from the start of air supply to the inspection head when there is no leakage in the inlet seal portion of the bag container, Injecting the empty chamber of the inspection head and the bag container Based on the measured value of the flow meter after a preset time according to the time required for the air pressure in the space to become the pressure of the pressurized air, it is determined that there is no leakage when the measured flow rate is 0 Since it is determined that there is a leak when the measured flow rate is not 0, the leakage of the inlet seal portion of the bag container does not leak the fluid product in the bag container from the inlet, and is highly reliable. Can be inspected at a degree.

この漏れ検査方法において、前記検査ヘッドへの供給空気の流量は、前記給気配管に介在された主流路管と、この主流路管内に両端を連通接続された金属細管からなるバイパス管と、前記バイパス管の上流側と下流側とにそれぞれ設けられた温度により電気抵抗値が変化する一対の抵抗体と、前記一対の抵抗体に通電し、これらの抵抗体の通電による発熱と前記バイパス管内を流れる流体との熱交換とにより生じる上流側抵抗体と下流側抵抗体との温度差をそれぞれの抵抗体の抵抗値差により検出して前記温度差に応じた流量信号を出力する温度差検出部とからなる流量計により測定するのが好ましく、このような流量計を用いることにより、極く微小な流量も高精度に測定し、前記バッグ容器の注入口シール部の漏れを高い信頼度で検査することができる。   In this leakage inspection method, the flow rate of the supply air to the inspection head includes a main channel pipe interposed in the air supply pipe, a bypass pipe made of a metal thin tube having both ends connected in the main channel pipe, A pair of resistors whose electrical resistance values change depending on the temperatures provided on the upstream side and the downstream side of the bypass pipe, respectively, and the pair of resistors are energized, and heat generated by energization of these resistors and the inside of the bypass pipe A temperature difference detection unit that detects a temperature difference between the upstream resistor and the downstream resistor caused by heat exchange with the flowing fluid based on a resistance value difference between the resistors and outputs a flow rate signal corresponding to the temperature difference. It is preferable to measure with a flow meter consisting of the above, and by using such a flow meter, extremely minute flow rate can be measured with high accuracy, and leakage of the inlet seal part of the bag container is inspected with high reliability. You It is possible.

この漏れ検査方法においては、前記検査ヘッドへの給気開始から前記給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及びバッグ容器の注入口内の空間の空気圧が供給された加圧空気の圧力になるまでの所要時間に応じて、前記所要時間と同じかその直後の第1の時間と、それよりも数秒後の第2の時間とを予め設定しておき、前記第1の時間後の流量計の測定流量が0であるときに漏れ無しと判定し、前記第1の時間後の測定流量が0でないときは、前記第2の時間後の前記流量計の測定流量が0であるときに漏れ無しと判定し、前記第2の時間後の測定流量も0でないときに漏れありと判定するのが好ましく、このようにすることにより、前記バッグ容器の注入口シール部の漏れを、高い信頼度で、しかも短時間で検査することができる。   In this leakage inspection method, the air pressure in the air supply pipe on the inspection head side than the air supply valve, the space inside the inspection head, and the space in the bag container inlet is supplied from the start of air supply to the inspection head. Depending on the time required to reach the pressure of the pressurized air, a first time that is the same as or just after the required time and a second time that is several seconds after that are set in advance, and the first time When the measured flow rate of the flow meter after 1 time is 0, it is determined that there is no leakage. When the measured flow rate after the first time is not 0, the measured flow rate of the flow meter after the second time Preferably, it is determined that there is no leakage when the flow rate is 0, and it is determined that there is leakage when the measured flow rate after the second time is also not 0. In this way, the inlet seal portion of the bag container Leakage with high reliability and in a short time It is possible to 査.

この漏れ検査方法においては、前記バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された専用の検査ヘッドを用いて前記バッグ容器の注入口シール部の漏れ検査を行なってもよく、このようにすることにより、バッグ容器内への製品充填とその注入口シールを行なった後、任意の時期に前記バッグ容器の注入シール部の漏れ検査を行なうことができる。   In this leakage inspection method, the bag container has an annular inlet contact portion that is in airtight contact with the distal end surface of the inlet of the bag container, and a vacant chamber that opens to an end surface surrounded by the inlet contact portion, The bag container may be inspected for leaks at the inlet seal portion of the bag container using a dedicated inspection head connected to an air supply pipe and an air supply pipe equipped with a flow meter. After filling the product and sealing its inlet, it is possible to inspect the leakage of the injection seal portion of the bag container at any time.

また、この漏れ検査方法においては、前記バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と、前記注入口当接部により囲まれた端面に開口する第1の空室と、前記第1の空室に弁部を介して連通する第2の空室と、前記弁部を開閉する弁部材と、前記バッグ容器の注入口の第1メンブレンを切り裂くメンブレンカッタとを有し、前記第1の空室内に殺菌用スチーム及び洗浄水を選択的に供給するためのバルブを備えたスチーム/洗浄水供給配管と、前記第1の空室内のスチーム及び洗浄水を排出するためのバルブを備えたスチーム/洗浄水排出配管と、前記第2の空室内に前記バッグ容器内に充填する流体製品を供給するための製品供給配管とが接続された充填ヘッドの前記スチーム/洗浄水供給配管の接続部に、給気バルブと流量計を備えた給気配管を接続しておき、前記充填ヘッドを前記バッグ容器の注入口の先端に当接させ、この充填ヘッドの第1の空室内及び前記注入口の第1メンブレンの外面のスチーム殺菌、前記第1メンブレンの切り裂き、前記バッグ容器内への流体製品の充填、前記注入口の前記第2メンブレンの全周溶着による注入口シール、前記第1の空室内及び前記注入口内の洗浄及びスチームフラッシングを行なった後、前記充填ヘッドを前記バッグ容器の注入口に当接させたまま検査ヘッドとして利用し、前記弁部材により前記第1の空室と第2の空室との間を閉鎖するとともに前記スチーム/洗浄水供給配管と前記スチーム/洗浄水排出配管の両方のバルブを閉じ、前記給気バルブを開いて、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を前記充填ヘッドの第1の空室内に供給して前記バッグ容器の注入口シール部の漏れ検査を行なってもよく、このようにすることにより、前記バッグ容器内への製品充填及び注入口シールに続けて前記バッグ容器の注入シール部の漏れを検査することができる。   Further, in this leak inspection method, an annular inlet contact portion that is in airtight contact with the distal end surface of the inlet of the bag container, and a first opening that is open on an end surface surrounded by the inlet contact portion. A vacancy, a second vacancy communicating with the first vacancy via a valve portion, a valve member for opening and closing the valve portion, and a membrane cutter for tearing the first membrane of the inlet of the bag container; A steam / cleaning water supply pipe having a valve for selectively supplying sterilizing steam and cleaning water into the first empty chamber, and discharging the steam and cleaning water in the first empty chamber. The steam / washing water discharge pipe provided with a valve for carrying out and the steam / flushing head of the filling head connected to the product supply pipe for supplying the fluid product filling the bag container into the second empty chamber Supply water to the connection of the cleaning water supply pipe. An air supply pipe provided with a valve and a flow meter is connected, the filling head is brought into contact with the tip of the inlet of the bag container, and a first membrane of the filling head and a first membrane of the inlet Sterilization of the outer surface of the container, tearing of the first membrane, filling of the bag container with a fluid product, sealing of the inlet by the entire circumference welding of the second membrane of the inlet, the first empty chamber and the injection After performing cleaning and steam flushing in the mouth, the filling head is used as an inspection head while being in contact with the injection port of the bag container, and the first and second vacancies are formed by the valve member. And the valves of both the steam / wash water supply pipe and the steam / wash water discharge pipe are closed, the air supply valve is opened, and the air supply valve in the air supply pipe is preliminarily opened. The pressurized air having a constant pressure supplied to the upstream side from the upstream side may be supplied into the first empty chamber of the filling head to check the leakage of the inlet seal portion of the bag container. By doing so, it is possible to inspect the leakage of the injection seal portion of the bag container following the filling of the product into the bag container and the sealing of the inlet.

図1〜図4はこの発明の第1の実施例を示しており、図1はバッグ容器の注入シール部の漏れ検査を行なうための検査装置の構成図である。   1 to 4 show a first embodiment of the present invention, and FIG. 1 is a configuration diagram of an inspection apparatus for performing a leakage inspection of an injection seal portion of a bag container.

この検査装置は、図2に示した構成の専用の検査ヘッド10を備えたものであり、前記検査ヘッド10は、図7に示したバッグ容器1の注入口3の先端面に気密状態に当接する環状の注入口当接部11と前記注入口当接部11により囲まれた端面に開口する空室13を有している。   This inspection apparatus is provided with a dedicated inspection head 10 having the configuration shown in FIG. 2, and the inspection head 10 is in an airtight state on the distal end surface of the inlet 3 of the bag container 1 shown in FIG. An annular inlet contact portion 11 that is in contact with each other and an empty chamber 13 that opens on an end surface surrounded by the inlet contact portion 11 are provided.

なお、前記注入口当接部11は、検査ヘッド10の端面に気密性を有する環状の弾性部材12を設けて形成されている。また前記空室13は、一端が注入口当接部11により囲まれた端面に開口し、他端が検査ヘッド10の一側面に開口するL状の屈曲孔からなっており、検査ヘッド10の一側面に開口する端部が給気配管接続部とされている。   The inlet contact portion 11 is formed by providing an annular elastic member 12 having airtightness on the end face of the inspection head 10. The vacant chamber 13 has an L-shaped bent hole having one end opened on an end surface surrounded by the inlet contact portion 11 and the other end opened on one side surface of the inspection head 10. An end portion that opens to one side surface is an air supply pipe connection portion.

この検査ヘッド10は、前記バッグ容器1の注入口3をクランプするための複数の注入口クランプ部材15を備えたヘッド支持部材14の下側に上下動可能に支持されており、前記ヘッド支持部材14を介して図示しない自在アームまたは吊下げ索等に任意の位置及び向きに移動可能に設けられている。   The inspection head 10 is supported on the lower side of a head support member 14 having a plurality of inlet clamp members 15 for clamping the inlet 3 of the bag container 1 so as to be movable up and down. 14, a free arm or a suspension cable (not shown) is provided so as to be movable at an arbitrary position and orientation.

なお、前記複数の注入口クランプ部材15はそれぞれ前記ヘッド支持部材14内に設けられた図示しないクランプ用エアーシリンダにより、図2に実線で示したクランプ解除位置と鎖線で示したクランプ位置とに移動されるようになっており、また前記検査ヘッド10は、前記ヘッド支持部材14内に設けられた図示しない注入口押付け用エアーシリンダにより、図2に実線で示した位置と鎖線で示した注入口当接位置とに移動されるようになっている。   The plurality of injection port clamp members 15 are moved to a clamp release position indicated by a solid line and a clamp position indicated by a chain line in FIG. 2 by a clamp air cylinder (not shown) provided in the head support member 14, respectively. In addition, the inspection head 10 is connected to a position indicated by a solid line and an inlet indicated by a chain line in FIG. 2 by an air cylinder for pressing an inlet (not shown) provided in the head support member 14. It is moved to the contact position.

そして、前記検査ヘッド10には、図1に示したように、例えば0.6MPaの加圧空気を供給する図示しない給気源に、この給気源からの加圧空気を例えば0.5MPaに減圧する減圧弁17を介して接続された給気配管16が接続されている。   As shown in FIG. 1, the inspection head 10 is supplied with an air supply source (not shown) for supplying, for example, 0.6 MPa of pressurized air, and the compressed air from the air supply source is supplied with, for example, 0.5 MPa. An air supply pipe 16 connected via a pressure reducing valve 17 for reducing the pressure is connected.

なお、この給気配管16の検査ヘッド接続側の部分はフレキシブルホースからなっており、そのフレキシブルホースの端部を前記検査ヘッド10の一側面に開口する給気配管接続部に接続されている。   Note that a portion of the air supply pipe 16 on the inspection head connection side is formed of a flexible hose, and an end portion of the flexible hose is connected to an air supply pipe connection portion opening on one side surface of the inspection head 10.

前記給気配管16は、前記検査ヘッド10への給気及び給気停止を行なうための給気バルブ18と、前記検査ヘッド10への供給空気の流量を測定するための流量計19とを備えており、前記給気バルブ18は、前記検査ヘッド10への接続端の付近に設けられ、前記流量計19は、前記給気バルブ18よりも上流側(給気源側)に設けられている。   The air supply pipe 16 includes an air supply valve 18 for supplying and stopping supply of air to the inspection head 10 and a flow meter 19 for measuring the flow rate of supply air to the inspection head 10. The air supply valve 18 is provided in the vicinity of the connection end to the inspection head 10, and the flow meter 19 is provided upstream of the air supply valve 18 (air supply source side). .

図3は前記流量計19の構成図であり、この流量計19は、前記給気配管16に介在された管内の中間部に流路絞り21を備えた主流路管20と、主流路管20内の前記流路絞り21よりも上流側の部分と下流側の部分に両端を連通接続された金属細管からなるバイパス管22と、前記バイパス管22の上流側と下流側とにそれぞれ設けられた温度により電気抵抗値が変化する一対の抵抗体(例えばバイパス管22の上流側と下流側とにそれぞれ巻回された抵抗温度係数の大きいコイル)23a,23bと、前記一対の抵抗体23a,23bに通電し、これらの抵抗体23a,23bの通電による発熱と前記バイパス管22内を流れる流体との熱交換とにより生じる上流側抵抗体23aと下流側抵抗体23bとの温度差をそれぞれの抵抗体23a,23bの抵抗値差により検出して前記温度差に応じた流量信号(電圧信号)を出力する温度差検出部24と、前記温度差検出部24に電力を供給する電源25と、前記温度差検出部24からの流量信号を増幅して図1に示した漏れ判定手段27に出力する増幅回路26とからなっている。   FIG. 3 is a configuration diagram of the flow meter 19. The flow meter 19 includes a main flow pipe 20 having a flow restriction 21 at a middle portion in a pipe interposed in the air supply pipe 16, and a main flow pipe 20 A bypass pipe 22 made of a metal thin tube whose both ends are connected to the upstream portion and the downstream portion of the flow passage restrictor 21, and the upstream side and the downstream side of the bypass pipe 22, respectively. A pair of resistors (for example, coils having a large resistance temperature coefficient wound respectively on the upstream side and the downstream side of the bypass pipe 22) 23a, 23b, and the pair of resistors 23a, 23b whose electric resistance value varies with temperature. The temperature difference between the upstream resistor 23a and the downstream resistor 23b caused by heat generated by the energization of the resistors 23a and 23b and heat exchange with the fluid flowing in the bypass pipe 22 is determined as a resistance value. Body 2 a temperature difference detection unit 24 that detects a resistance value difference between a and 23b and outputs a flow rate signal (voltage signal) according to the temperature difference; a power source 25 that supplies power to the temperature difference detection unit 24; and the temperature An amplifying circuit 26 that amplifies the flow rate signal from the difference detection unit 24 and outputs the amplified signal to the leakage determination means 27 shown in FIG.

この流量計19は、前記上流側抵抗体23aと下流側抵抗体23bとの間に生じる温度差を利用して流量を測定するものであり、前記主流路管20及びバイパス管22内を流体が流れると、通電により発熱した一対の抵抗体23a,23bのうち、上流側抵抗体23aがバイパス管22内を流れる流体により熱を奪われて降温し、下流側抵抗体23bが前記上流側抵抗体23aから奪熱した前記流体から熱を与えられて昇温して一対の抵抗体23a,23bの温度に差が生じる。   The flow meter 19 measures a flow rate by utilizing a temperature difference generated between the upstream resistor 23a and the downstream resistor 23b, and a fluid flows through the main flow path pipe 20 and the bypass pipe 22. When flowing, among the pair of resistors 23a and 23b that generate heat by energization, the upstream resistor 23a is deprived of heat by the fluid flowing through the bypass pipe 22, and the downstream resistor 23b is cooled by the upstream resistor. Heat is applied from the fluid deprived from 23a and the temperature rises, causing a difference in temperature between the pair of resistors 23a and 23b.

この一対の抵抗体23a,23bの温度差は、前記流体の流量が少なくなるのにともなって小さくなり、主流路管20及びバイパス管22内を流体が流れなくなると、通電により発熱した一対の抵抗体23a,23bの温度が同じになる。   The temperature difference between the pair of resistors 23a and 23b decreases as the flow rate of the fluid decreases. When the fluid stops flowing in the main flow path pipe 20 and the bypass pipe 22, the pair of resistors that generate heat due to energization. The temperatures of the bodies 23a and 23b are the same.

そして、前記一対の抵抗体23a,23bの温度差は、それぞれの抵抗体23a,23bの抵抗値差として検出できるため、前記温度差に応じた流量信号を出力することができる。   Since the temperature difference between the pair of resistors 23a and 23b can be detected as a resistance value difference between the resistors 23a and 23b, a flow rate signal corresponding to the temperature difference can be output.

なお、この流量計19は、コフロック株式会社製の「マスフローメータ」の商品名で市販されている電子流量計であり、極く微小な流量も測定可能で、しかも高速応答性を有し、また0〜50℃の温度範囲における測定精度が±1.0%以内の高精度測定能力をもっている。   The flow meter 19 is an electronic flow meter marketed under the trade name “Mass Flow Meter” manufactured by Coflock Co., Ltd., which can measure extremely small flow rates, and has high-speed response. The measurement accuracy in the temperature range of 0 to 50 ° C is high accuracy measurement ability within ± 1.0%.

また、図1に示した漏れ判定手段27は、その具体的な構成は図示しないが、前記流量計19の測定値に基づいて前記バッグ容器1の注入口シール部の漏れを判定する漏れ判定回路と、その判定結果を報知するランプまたは表示パネル等を備えている。   Further, the leak determination means 27 shown in FIG. 1 is not shown in its specific configuration, but a leak determination circuit that determines the leak of the inlet seal portion of the bag container 1 based on the measurement value of the flow meter 19. And a lamp or a display panel for notifying the determination result.

前記検査装置による前記バッグ容器1の注入シール部の漏れ検査方法を説明すると、前記バッグ容器1は、製品充填ラインにおいて、製品注入口3の第1メンブレンを切り裂かれ、口部材4内及び第2メンブレン6の非溶着部を通して流体製品Aを充填された後に、前記第2メンブレン6の全周を前記口部材4の基端面に溶着されて前記注入口3をシールされ、前記製品充填ラインから搬出される。   The leak inspection method for the injection seal portion of the bag container 1 by the inspection apparatus will be described. The bag container 1 is cut in the first membrane of the product injection port 3 in the product filling line, and in the mouth member 4 and the second. After the fluid product A is filled through the non-welded portion of the membrane 6, the entire periphery of the second membrane 6 is welded to the base end surface of the mouth member 4, the inlet 3 is sealed, and the product is taken out from the product filling line. Is done.

そして、前記製品充填ラインから搬出された充填済みバッグ容器1は、前記検査装置に搬入される。   And the filled bag container 1 carried out from the said product filling line is carried in to the said inspection apparatus.

なお、前記バッグ容器1の注入シール部の漏れ検査は、前記製品充填ラインから連続的に搬出される全ての充填済みバッグ容器1に対して行なうのが好ましいが、前記製品充填ラインから連続的に搬出される多数の充填済みバッグ容器1のなかからピックアップした任意数の充填済みバッグ容器1に対して行なってもよい。   In addition, it is preferable to perform the leak inspection of the injection seal portion of the bag container 1 on all the filled bag containers 1 that are continuously carried out from the product filling line, but continuously from the product filling line. You may perform with respect to the arbitrary number of filled bag containers 1 picked up from many filled bag containers 1 carried out.

この漏れ検査方法では、まず、前記搬入されたバッグ容器1を、その注入口3を上に向けて図示しないテーブル上等に置き、前記検査ヘッド10を手動によりヘッド支持部材14とともに移動させて図2に実線で示したように前記バッグ容器1の注入口3の先端に対向させ、前記ヘッド支持部材14に設けられた複数の注入口クランプ部材15により前記注入口3をクランプするとともに、前記検査ヘッド10を前記注入口3の先端に押付けて、前記注入口3の先端に前記検査ヘッド10をその空室13を前記注入口3内に連通させて当接させる。   In this leakage inspection method, first, the carried bag container 1 is placed on a table or the like (not shown) with the inlet 3 facing upward, and the inspection head 10 is moved together with the head support member 14 by hand. 2, the injection port 3 is opposed to the tip of the injection port 3 of the bag container 1, and the injection port 3 is clamped by a plurality of injection port clamp members 15 provided in the head support member 14. The head 10 is pressed against the tip of the injection port 3, and the inspection head 10 is brought into contact with the tip of the injection port 3 with the empty chamber 13 communicating with the inside of the injection port 3.

一方、前記給気配管16内の前記給気バルブ18よりも上流側には、図示しない給気源から供給され、減圧弁17により減圧された一定圧の加圧空気を常に供給しておく。   On the other hand, upstream of the air supply valve 18 in the air supply pipe 16, a constant pressure of pressurized air supplied from an air supply source (not shown) and decompressed by the pressure reducing valve 17 is always supplied.

そして、この漏れ検査方法では、前記注入口3の先端に前記検査ヘッド10を当接させた状態で、前記給気バルブ18を開いて前記検査ヘッド10の空室13内に前記一定圧の加圧空気を供給するとともに、前記給気配管16内を流れる空気の流量を流量計19により測定し、前記バッグ容器1の注入口シール部に漏れが無いときの前記検査ヘッド10への給気開始から前記給気バルブ18よりも検査ヘッド10側の給気配管16内と前記検査ヘッド10の空室13内及び前記バッグ容器1の注入口3内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間に応じて予め設定した時間後の前記流量計19の測定値に基づいて、測定流量が0であるときに漏れ無しと判定し、前記測定流量が0でないときに漏れありと判定し、その判定結果を報知する。   In this leakage inspection method, with the inspection head 10 in contact with the tip of the inlet 3, the air supply valve 18 is opened to apply the constant pressure into the empty chamber 13 of the inspection head 10. While supplying compressed air, the flow rate of the air flowing through the air supply pipe 16 is measured by a flow meter 19, and air supply to the inspection head 10 is started when there is no leakage in the inlet seal portion of the bag container 1. The air pressure in the air supply pipe 16 closer to the inspection head 10 than the air supply valve 18, the space 13 in the inspection head 10, and the space in the inlet 3 of the bag container 1 becomes the pressure of the pressurized air. Based on the measured value of the flow meter 19 after a time set in advance according to the required time to become, it is determined that there is no leakage when the measured flow rate is 0, and there is leakage when the measured flow rate is not 0. Judgment To notify.

すなわち、前記給気バルブ18よりも検査ヘッド10側の給気配管16内と前記検査ヘッド10の空室13内及び前記バッグ容器1の注入口3内の空間の空気圧は、この空間への加圧空気の供給にともなって高くなる。   That is, the air pressure in the air supply pipe 16 closer to the inspection head 10 than the air supply valve 18, the space 13 in the inspection head 10, and the space in the inlet 3 of the bag container 1 is applied to this space. It becomes higher with the supply of compressed air.

そして、前記バッグ容器1の注入口シール部に漏れが無いときは、前記検査ヘッド10への給気開始後、一定の所要時間を経過した時点で前記空間の空気圧が前記加圧空気の圧力と同じになり、前記検査ヘッド10への供給空気流が止まって前記流量計19の測定流量が0になる。   And when there is no leak in the inlet seal part of the bag container 1, the air pressure in the space becomes equal to the pressure of the pressurized air after a certain time has elapsed after the start of air supply to the inspection head 10. As a result, the supply air flow to the inspection head 10 stops and the flow rate of the flow meter 19 becomes zero.

それに対し、前記バッグ容器1の注入口シール部に漏れがあるときは、前記空間に供給された空気の一部が前記注入口シール部の漏れ部分からバッグ容器1内に流入するため、前記所要時間を経過しても前記空間の空気圧は前記加圧空気の圧力よりも低く、前記検査ヘッド10への加圧空気の供給が継続され、前記流量計19の測定流量が0にならない。なお、前記バッグ容器1の注入口シール部に漏れがあっても、最終的には、バッグ容器1内の圧力が加圧空気の流入により前記加圧空気の圧力と同じになり、その時点で前記流量計19の測定流量が0になるが、その時期は、前記所要時間からさらに大きく遅れた時間後である。   On the other hand, when there is a leak in the inlet seal part of the bag container 1, a part of the air supplied to the space flows into the bag container 1 from the leaked part of the inlet seal part. Even if time elapses, the air pressure in the space is lower than the pressure of the pressurized air, the supply of the pressurized air to the inspection head 10 is continued, and the measured flow rate of the flow meter 19 does not become zero. Even if there is a leak in the inlet seal portion of the bag container 1, the pressure in the bag container 1 eventually becomes the same as the pressure of the pressurized air due to the inflow of the pressurized air. The measured flow rate of the flow meter 19 becomes 0, but the timing is after a time that is further delayed from the required time.

前記検査ヘッド10への給気開始から前記給気バルブ18よりも検査ヘッド10側の給気配管16内と前記検査ヘッド10の空室13内及び前記バッグ容器1の注入口3内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間は、前記空間の容積と前記加圧空気の圧力とによって決まる時間であり、計算によっても、例えば製品充填前のバッグ容器1からその注入口3部分を切取り、その注入口3の第1メンブレン5を切り裂き、第2メンブレン6の全周を口部材4の基端面に完全に溶着した標準材の漏れ検査によっても求めることができる。   From the start of air supply to the inspection head 10, the space in the air supply pipe 16 closer to the inspection head 10 than the air supply valve 18, in the empty space 13 of the inspection head 10 and in the inlet 3 of the bag container 1. The time required for the air pressure to become the pressure of the pressurized air is a time determined by the volume of the space and the pressure of the pressurized air, and also by calculation, for example, from the bag container 1 before product filling to its inlet. It can also be obtained by a leakage inspection of a standard material in which three portions are cut, the first membrane 5 of the injection port 3 is cut, and the entire circumference of the second membrane 6 is completely welded to the base end surface of the mouth member 4.

この所要時間は、例えば給気バルブ18よりも検査ヘッド10側の給気配管16内と検査ヘッド10の空室13内及びバッグ容器1の注入口3内の空間の容積が19.8cc、前記給気バルブ18に供給する加圧空気の圧力が0.5MPaの場合で8秒である。   This required time is, for example, that the volume of the space in the air supply pipe 16 closer to the inspection head 10 than the air supply valve 18, the empty space 13 of the inspection head 10, and the inlet 3 of the bag container 1 is 19.8 cc, It is 8 seconds when the pressure of the pressurized air supplied to the air supply valve 18 is 0.5 MPa.

ただし、実際の漏れ検査における前記検査ヘッド10への給気開始から前記流量計19の測定流量が0になるまでの時間は、バッグ容器1の注入口3をシールしている第2メンブレン6の緊張状態によって異なり、前記バッグ容器1の注入口シール部に漏れが無いときでも、前記第2メンブレン6の緊張力が充分で、前記空間の空気圧を受けても第2メンブレン6がほとんど撓み変形しない場合は、前記所要時間に応じて予め設定した時間後に前記流量計19の測定流量が0になり、前記第2メンブレン6の緊張力が弱く、前記空間の空気圧により第2メンブレン6がバッグ容器1内側に撓み変形する場合は、前記所要時間に応じて予め設定した時間から極く僅かに遅れて前記流量計19の測定流量が0になる。その遅れ時間は、最大でも1秒以下である。   However, the time from the start of air supply to the inspection head 10 in the actual leak inspection until the measured flow rate of the flow meter 19 becomes zero is the time of the second membrane 6 sealing the inlet 3 of the bag container 1. Depending on the tension state, even when there is no leakage in the inlet seal portion of the bag container 1, the tension force of the second membrane 6 is sufficient, and the second membrane 6 hardly bends and deforms even when it receives the air pressure in the space. In this case, the measured flow rate of the flow meter 19 becomes 0 after a time set in advance according to the required time, the tension of the second membrane 6 is weak, and the second membrane 6 is moved to the bag container 1 by the air pressure of the space. In the case of bending and deforming inward, the measured flow rate of the flow meter 19 becomes 0 with a slight delay from a preset time according to the required time. The delay time is at most 1 second or less.

図4は、前記検査ヘッド10への給気開始後の前記空間の空気圧変化を示しており、図において、aは、バッグ容器1の注入口シール部に漏れが無く、前記第2メンブレン6の緊張力が充分であるときの空気圧変化、bは、バッグ容器1の注入口シール部に漏れが無く、前記第2メンブレン6の緊張力が弱いときの空気圧変化、cは、バッグ容器1の注入口シール部に漏れがあるときの空気圧変化である。   FIG. 4 shows a change in air pressure in the space after the supply of air to the inspection head 10 is started. In FIG. 4, a indicates that there is no leakage in the inlet seal portion of the bag container 1, and the second membrane 6 The change in air pressure when the tension force is sufficient, b is the change in air pressure when there is no leakage in the inlet seal portion of the bag container 1 and the tension force of the second membrane 6 is weak, c is the note of the bag container 1. This is the change in air pressure when there is a leak in the inlet seal.

そのため、この実施例の漏れ検査方法では、前記漏れ判定手段27に、前記検査ヘッド10への給気開始から前記空間の空気圧が供給された加圧空気の圧力になるまでの所要時間に応じて、前記所要時間と同じかその直後、例えば0.5秒後の第1の時間tと、それよりも数秒後、例えば2秒後の第2の時間tとを予め設定しておき、図4に示したように、前記第1の時間t後に1回目の漏れ判定を行ない、前記第2の時間t後に2回目の漏れ判定を行なうことにより、前記第1の時間t後の流量計19の測定流量が0であるときに漏れ無しと判定し、前記第1の時間t後の測定流量が0でないときは、前記第2の時間t後の前記流量計の測定流量が0であるときに漏れ無しと判定し、前記第2の時間t後の測定流量も0でないときに漏れありと判定するようにしている。 Therefore, in the leak inspection method of this embodiment, the leak determination means 27 is in accordance with the time required from the start of air supply to the inspection head 10 until the air pressure in the space reaches the pressure of the pressurized air supplied. A first time t 1 that is the same as or immediately after the required time, for example, 0.5 seconds later, and a second time t 2 that is several seconds later, for example, 2 seconds later, is set in advance. as shown in FIG. 4, the first performs first leakage judging time t after 1, by performing a second leak determination in said second time t after 2, said first time t after 1 It is determined that there is no leakage when the measured flow rate of the flow meter 19 is 0, and when the measured flow rate after the first time t 1 is not 0, the measurement of the flow meter after the second time t 2 flow rate is determined to leak without when a 0, the second measured flow rate after time t 2 So that it is determined that there is leakage when not zero.

この漏れ検査方法は、バッグ容器1の注入口3の先端に検査ヘッド10を当接させた状態で前記検査ヘッド10への一定圧の加圧空気の供給を開始し、前記バッグ容器1の注入口シール部に漏れが無いときの前記検査ヘッド10への給気開始から前記給気バルブ18よりも検査ヘッド10側の給気配管16内と前記検査ヘッド10の空室13内及び前記バッグ容器1の注入口3内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間に応じて予め設定した時間後の前記流量計19の測定値に基づいて、測定流量が0であるときに漏れ無しと判定し、前記測定流量が0でないときに漏れありと判定するものであるため、前記バッグ容器1の注入口シール部の漏れを、バッグ容器1内の流体製品Aを注入口3から漏れ出させることなく、しかも高い信頼度で検査することができる。   In this leak inspection method, the supply of a constant pressure of pressurized air to the inspection head 10 is started in a state where the inspection head 10 is in contact with the tip of the inlet 3 of the bag container 1. From the start of air supply to the inspection head 10 when there is no leakage in the inlet seal portion, the inside of the air supply pipe 16 on the inspection head 10 side of the air supply valve 18, the inside of the empty chamber 13 of the inspection head 10, and the bag container When the measured flow rate is 0 based on the measured value of the flow meter 19 after a preset time according to the time required until the air pressure in the space of the one inlet 3 becomes the pressure of the pressurized air Therefore, it is determined that there is no leakage when the measured flow rate is not 0. Therefore, the leakage of the inlet seal portion of the bag container 1 is detected as the fluid product A in the bag container 1 as the inlet 3. Without leaking from It can be tested in even higher reliability.

さらに、この漏れ検査方法では、前記検査ヘッド10への供給空気の流量を、前記給気配管16に介在された主流路管20と、この主流路管20内に両端を連通接続された金属細管からなるバイパス管22と、前記バイパス管22の上流側と下流側とにそれぞれ設けられた温度により電気抵抗値が変化する一対の抵抗体23a,23bと、前記一対の抵抗体23a,23bに通電し、これらの抵抗体23a,23bの通電による発熱と前記バイパス管22内を流れる流体との熱交換とにより生じる上流側抵抗体23aと下流側抵抗体23bとの温度差をそれぞれの抵抗体23a,23bの抵抗値差により検出して前記温度差に応じた流量信号を出力する温度差検出部24とからなる流量計19により測定しているため、極く微小な流量も高精度に測定し、前記バッグ容器1の注入口シール部の漏れを高い信頼度で検査することができる。   Further, in this leakage inspection method, the flow rate of the supply air to the inspection head 10 is set to a main flow pipe 20 interposed in the air supply pipe 16 and a metal thin tube having both ends connected in the main flow pipe 20. A bypass pipe 22, and a pair of resistors 23a and 23b whose electrical resistance values change depending on temperatures provided on the upstream side and the downstream side of the bypass pipe 22, respectively, and the pair of resistors 23a and 23b. The temperature difference between the upstream resistor 23a and the downstream resistor 23b generated by heat generated by energization of these resistors 23a and 23b and heat exchange with the fluid flowing in the bypass pipe 22 is determined as the resistor 23a. , 23b, and a temperature difference detector 24 that outputs a flow rate signal corresponding to the temperature difference and detects a very small flow rate. It is determined, inspecting the leakage of inlet seal portion of the bag container 1 reliably thing.

また、この漏れ検査方法では、上述したように、前記検査ヘッド10への給気開始から前記給気バルブ18よりも検査ヘッド10側の給気配管16内と前記検査ヘッド10の空室13内及びバッグ容器1の注入口3内の空間の空気圧が供給された加圧空気の圧力になるまでの所要時間に応じて、前記所要時間と同じかその直後の第1の時間tと、それよりも数秒後の第2の時間tとを予め設定しておき、前記第1の時間t後の流量計19の測定流量が0であるときに漏れ無しと判定し、前記第1の時間t後の測定流量が0でないときは、前記第2の時間t後の前記流量計19の測定流量が0であるときに漏れ無しと判定し、前記第2の時間t後の測定流量も0でないときに漏れありと判定するようにしているため、前記バッグ容器1の注入口シール部の漏れを、高い信頼度で、しかも短時間で検査することができる。 Further, in this leakage inspection method, as described above, from the start of air supply to the inspection head 10, the inside of the air supply pipe 16 closer to the inspection head 10 than the air supply valve 18 and the inside of the empty chamber 13 of the inspection head 10. And a first time t 1 which is the same as or just after the required time, depending on the required time until the air pressure of the space in the inlet 3 of the bag container 1 reaches the pressure of the supplied pressurized air, The second time t 2 after several seconds is set in advance, and when the measured flow rate of the flow meter 19 after the first time t 1 is 0, it is determined that there is no leakage, and the first time When the measured flow rate after time t 1 is not 0, it is determined that there is no leakage when the measured flow rate of the flow meter 19 after the second time t 2 is 0, and after the second time t 2 When the measured flow rate is not zero, it is determined that there is a leak. Leakage of inlet seal of the container 1, with high reliability, yet it is possible to inspect in a short time.

なお、前記バッグ容器1の注入口シール部の漏れ判定回数は1回だけにしてもよく、その場合は、前記所要時間よりも数秒後(例えば2秒後)の流量計19の測定流量に基づいて前記注入口シール部の漏れを判定することにより、前記バッグ容器1の注入口シール部の漏れを、高い信頼度で、しかも短時間で検査することができる。   Note that the number of leak determinations at the inlet seal portion of the bag container 1 may be only one, and in that case, based on the measured flow rate of the flow meter 19 several seconds after the required time (for example, after 2 seconds). By determining the leakage of the inlet seal portion, the leakage of the inlet seal portion of the bag container 1 can be inspected with high reliability and in a short time.

また、上記実施例では、前記バッグ容器1の注入口3の先端面に気密状態に当接する環状の注入口当接部11と前記注入口当接部11により囲まれた端面に開口する空室13を有し、給気バルブ18と流量計19を備えた給気配管16が接続された専用の検査ヘッド10を用いてバッグ容器1の注入口シール部の漏れ検査を行なっているため、バッグ容器1内への製品充填とその注入口シールを行なった後、任意の時期に前記バッグ容器1の注入シール部の漏れ検査を行なうことができる。   Further, in the above embodiment, the annular inlet contact portion 11 that comes into contact with the distal end surface of the inlet 3 of the bag container 1 in an airtight state and the vacant space that opens to the end face surrounded by the inlet contact portion 11. 13 is used to perform a leakage inspection of the inlet seal portion of the bag container 1 using a dedicated inspection head 10 to which an air supply pipe 16 having an air supply valve 18 and a flow meter 19 is connected. After filling the container 1 with the product and sealing the inlet thereof, the leakage inspection of the injection seal portion of the bag container 1 can be performed at any time.

なお、上記第1の実施例では、専用の検査ヘッド10を用いてバッグ容器1の注入口シール部の漏れ検査を行なっているが、前記注入口シール部の漏れ検査は、バッグ容器1内に流体製品Aを充填する充填装置に漏れ検査機能を付加することにより、前記充填装置の充填ヘッドを検査ヘッドに利用して行なってもよい。   In the first embodiment, the leak inspection of the inlet seal portion of the bag container 1 is performed using the dedicated inspection head 10. The leak inspection of the inlet seal portion is performed in the bag container 1. By adding a leak inspection function to the filling device for filling the fluid product A, the filling head of the filling device may be used as the inspection head.

図5及び図6はこの発明の第2の実施例を示しており、図5は漏れ検査機能を付加した充填装置の構成図である。   5 and 6 show a second embodiment of the present invention, and FIG. 5 is a block diagram of a filling apparatus to which a leak inspection function is added.

この充填装置は、図6に示した構成の充填ヘッド30を備えたものであり、この充填ヘッド30は、図7に示したバッグ容器1の注入口3の先端面に気密状態に当接する環状の注入口当接部31と、前記注入口当接部31により囲まれた端面に開口する第1の空室32と、前記第1の空室32に弁部33を介して連通する第2の空室34と、前記弁部33を開閉する弁部材35と、前記バッグ容器1の注入口3の第1メンブレン6を切り裂くメンブレンカッタ37とを有している。   This filling apparatus is provided with a filling head 30 having the configuration shown in FIG. 6, and this filling head 30 is an annular shape that comes into contact with the distal end surface of the inlet 3 of the bag container 1 shown in FIG. The inlet contact portion 31, the first vacant chamber 32 opened at the end face surrounded by the inlet contact portion 31, and the second vacant portion 32 communicated with the first vacant chamber 32 via the valve portion 33. A vacant chamber 34, a valve member 35 that opens and closes the valve portion 33, and a membrane cutter 37 that tears the first membrane 6 of the inlet 3 of the bag container 1.

前記弁部33は垂直な円形孔であり、前記弁部材35は前記円形孔の周面に気密状態に周接する丸棒状部材からなっており、この弁部材35の先端にメンブレンカッタ37が設けられている。   The valve portion 33 is a vertical circular hole, and the valve member 35 is a round bar-like member that is in airtight contact with the peripheral surface of the circular hole, and a membrane cutter 37 is provided at the tip of the valve member 35. ing.

前記弁部材35は、充填ヘッド30内に気密状態で上下方向にスライド可能に挿入されたロッド36の先端に固定されており、図示しないロッド昇降機構により、弁部33を閉塞するとともにメンブレンカッタ37を前記第1の空室32内に引込んだ位置(図5の位置)と、前記弁部33を閉塞するとともに前記メンブレンカッタ37を前記注入口当接部31よりも下方に突出させた位置と、前記第2の空室34内に引込まれて前記弁部33を開放し、前記第1の空室32と第2の空室34とを連通させた位置とに移動される。   The valve member 35 is fixed to the distal end of a rod 36 that is inserted in the filling head 30 in an airtight manner so as to be slidable in the vertical direction. The valve member 35 is closed by a rod lifting mechanism (not shown) and the membrane cutter 37. And the position where the valve portion 33 is closed and the membrane cutter 37 protrudes downward from the inlet contact portion 31. Then, it is drawn into the second vacant chamber 34 to open the valve portion 33 and is moved to a position where the first vacant chamber 32 and the second vacant chamber 34 are communicated with each other.

また、この充填ヘッド30は、前記第2の空室34よりも上側部分に前記ロッド36の周囲を囲んで形成されたシールド室38を有している。   Further, the filling head 30 has a shield chamber 38 formed so as to surround the rod 36 at a portion above the second empty chamber 34.

さらに、この充填ヘッド30には、前記第1の空室32内に連通するスチーム/洗浄水供給口32a及び排出口32bと、前記第2の空室34内に連通する流体製品供給口34aと、前記シールド室38内に連通するスチーム供給口38a及び排出口38bが設けられている。   Further, the filling head 30 includes a steam / washing water supply port 32 a and a discharge port 32 b communicating with the first empty chamber 32, and a fluid product supply port 34 a communicating with the second empty chamber 34. A steam supply port 38a and a discharge port 38b communicating with the shield chamber 38 are provided.

また、図では省略しているが、この充填ヘッド30は、前記バッグ容器1の注入口3をクランプし、この注入口3を、その先端面を前記注入口当接部31に押付けて充填ヘッド30に固定する注入口固定機構を備えている。   Although not shown in the figure, the filling head 30 clamps the inlet 3 of the bag container 1 and presses the inlet 3 against the inlet abutting portion 31 of the inlet 3 so as to fill the head. An injection port fixing mechanism for fixing to 30 is provided.

そして、前記充填ヘッド30には、図5に示したように、前記第1の空室32内に殺菌用スチーム及び洗浄水を選択的に供給するためのバルブ40を備えたスチーム/洗浄水供給配管39と、前記第1の空室32内のスチーム及び洗浄水を排出するためのバルブ46を備えたスチーム/洗浄水排出配管45と、前記第2の空室34内にバッグ容器1内に充填する流体製品Aを供給するための製品供給配管47とが接続されている。   As shown in FIG. 5, the filling head 30 is provided with a steam / cleaning water supply provided with a valve 40 for selectively supplying sterilizing steam and cleaning water into the first empty chamber 32. A pipe 39, a steam / wash water discharge pipe 45 having a valve 46 for discharging steam and wash water in the first empty chamber 32, and the bag container 1 in the second empty chamber 34. A product supply pipe 47 for supplying the fluid product A to be filled is connected.

なお、スチーム/洗浄水供給配管39は、バルブ42を備えたスチーム供給配管41と、バルブ44を備えた洗浄水供給配管43とに接続されており、殺気用スチームは、前記洗浄水供給配管43のバルブ44を閉じ、前記スチーム供給配管41のバルブ42と前記スチーム/洗浄水供給配管39のバルブ40を開くことにより前記第1の空室32内に供給され、洗浄水は、前記スチーム供給配管41のバルブ42を閉じ、前記洗浄水供給配管43のバルブ44と前記スチーム/洗浄水供給配管39のバルブ40を開くことにより前記第1の空室32内に供給される。   The steam / cleaning water supply pipe 39 is connected to a steam supply pipe 41 provided with a valve 42 and a cleaning water supply pipe 43 provided with a valve 44. The valve 44 of the steam supply pipe 41 and the valve 42 of the steam supply pipe 41 and the valve 40 of the steam / wash water supply pipe 39 are opened to supply the first empty chamber 32, and the wash water is supplied to the steam supply pipe. The valve 42 of the 41 is closed, and the valve 44 of the cleaning water supply pipe 43 and the valve 40 of the steam / cleaning water supply pipe 39 are opened, so that the first empty chamber 32 is supplied.

また、製品供給配管47には、バッグ容器1への充填作業の開始時に殺菌用スチームが一定時間供給され、その後に流体製品が連続的に供給され、充填作業の終了時に洗浄水を一定時間供給されるとともに、その後に殺菌用スチームが一定時間供給される。   Further, sterilization steam is supplied to the product supply pipe 47 at the start of the filling operation of the bag container 1 for a certain period of time, and then the fluid product is continuously supplied, and cleaning water is supplied for a certain period of time at the end of the filling operation. At the same time, sterilizing steam is supplied for a certain period of time.

さらに、前記充填ヘッド30には、前記シールド室38内にシールド用スチームを供給するためのバルブ49を備えたシールドスチーム供給配管48と、前記シールド室38内のシールド用スチームを排出するためのバルブ51を備えたシールドスチーム排出配管50とが接続されている。なお、前記シールドスチーム供給配管48は、前記スチーム供給配管41から分岐されている。   Further, the filling head 30 includes a shield steam supply pipe 48 having a valve 49 for supplying shield steam into the shield chamber 38, and a valve for discharging the shield steam in the shield chamber 38. A shield steam discharge pipe 50 having 51 is connected. The shield steam supply pipe 48 is branched from the steam supply pipe 41.

前記シールドスチーム供給配管48とシールドスチーム排出配管50のバルブ49,51は、バッグ容器1への充填作業の開始前に開かれ、充填作業の終了後閉じられる常開バルブであり、前記充填ヘッド30内にスライド可能に挿入された前記ロッド36のスライド部は、充填作業中、常に前記シールド室38内のスチームによりシールドされる。   The valves 49 and 51 of the shield steam supply pipe 48 and the shield steam discharge pipe 50 are normally open valves that are opened before the filling operation of the bag container 1 is started and are closed after the filling operation is finished. The slide portion of the rod 36 slidably inserted therein is always shielded by the steam in the shield chamber 38 during the filling operation.

そして、この実施例では、前記充填ヘッド30のスチーム/洗浄水供給配管39の接続部、例えば前記スチーム/洗浄水供給配管39のバルブ40よりも充填ヘッド30側の部分に、給気バルブ18と流量計19を備え、図示しない給気源に減圧弁17を介して接続された給気配管16を接続し、前記流量計19に漏れ判定手段27を接続して、充填装置に漏れ検査機能を付加している。なお、前記流量計19は上述した第1の実施例のものと同じであるから、その説明は省略する。   In this embodiment, the supply valve 18 is connected to the connecting portion of the steam / washing water supply pipe 39 of the filling head 30, for example, the portion of the steam / washing water supply pipe 39 closer to the filling head 30 than the valve 40. A flow meter 19 is provided, an air supply pipe 16 connected via a pressure reducing valve 17 to an air supply source (not shown) is connected, and a leak determination means 27 is connected to the flow meter 19 to provide a leakage inspection function to the filling device. It is added. Since the flow meter 19 is the same as that of the first embodiment described above, description thereof is omitted.

この実施例の漏れ検査方法は、バッグ容器1の注入口3の先端に前記充填ヘッド30を当接させて前記バッグ容器1内に流体製品Aを充填し、このバッグ容器1の注入口3を第2メンブレン6の全周溶着によりシールした後、前記充填ヘッド30を前記バッグ容器1の注入口3に当接させたまま検査ヘッドとして利用して前記バッグ容器1の注入口シール部の漏れ検査を行なうものであり、前記バッグ容器1内への流体製品Aの充填は、次のような手順で行なう。   In the leakage inspection method of this embodiment, the filling head 30 is brought into contact with the tip of the inlet 3 of the bag container 1 to fill the bag container 1 with the fluid product A, and the inlet 3 of the bag container 1 is After sealing by welding the entire circumference of the second membrane 6, the filling head 30 is used as an inspection head while being in contact with the inlet 3 of the bag container 1, and the leak inspection of the inlet seal part of the bag container 1 is performed. The filling of the fluid product A into the bag container 1 is performed according to the following procedure.

まず、前記充填ヘッド30を、前記弁部材35を図5の位置、つまり弁部33を閉塞するとともにメンブレンカッタ37を第1の空室32内に引込んだ位置に移動させた状態で、この充填ヘッド30をバッグ容器1の注入口3の先端に当接させ、その状態で、スチーム/洗浄水供給配管39から前記第1の空室32内に殺菌用スチームを供給し、その殺菌用スチームをスチーム/洗浄水排出配管45から排出して、前記第1の空室32内及び前記注入口3の第1メンブレン5の外面をスチーム殺菌する。   First, the filling head 30 is moved in a state where the valve member 35 is moved to the position shown in FIG. 5, that is, to the position where the valve portion 33 is closed and the membrane cutter 37 is drawn into the first empty chamber 32. The filling head 30 is brought into contact with the tip of the inlet 3 of the bag container 1, and in this state, sterilizing steam is supplied from the steam / wash water supply pipe 39 into the first empty chamber 32, and the sterilizing steam is supplied. Is discharged from the steam / washing water discharge pipe 45 to steam sterilize the inside of the first empty chamber 32 and the outer surface of the first membrane 5 of the inlet 3.

次に、前記殺菌用スチームの供給及び排出を停止し、前記弁部材35を弁部33を閉塞するとともにメンブレンカッタ37を前記注入口当接部31よりも下方に突出させた位置に移動させて、前記メンブレンカッタ37により前記注入口3の第1メンブレン5を切り裂く。   Next, the supply and discharge of the sterilizing steam is stopped, the valve member 35 is closed to the valve portion 33, and the membrane cutter 37 is moved to a position protruding downward from the inlet contact portion 31. The first membrane 5 of the inlet 3 is cut by the membrane cutter 37.

次に、前記弁部材35を第2の空室34内に引込んで前記弁部33を開放し、製品供給配管47から前記第2の空室34内に供給された流体製品Aを、前記第1の空室32内と、前記注入口3の口部材4内及び第2メンブレン6の非溶着部を通してバッグ容器1内に充填する。   Next, the valve member 35 is drawn into the second empty chamber 34 to open the valve portion 33, and the fluid product A supplied from the product supply pipe 47 into the second empty chamber 34 is supplied to the second empty chamber 34. The bag container 1 is filled through the inside of one empty chamber 32, the inside of the mouth member 4 of the inlet 3, and the non-welded portion of the second membrane 6.

次に、前記充填ヘッド30に対向させて配置された図示しないシールヘッドにより、前記バッグ容器1の注入口3に対応する部分を前記注入口3を設けた側とは反対側から押し潰して前記注入口3の第2メンブレン6の外周部を前記口部材4の基端面に押し付け、その状態で前記シールヘッドを加熱し、前記第2メンブレン6の全周を前記口部材4の基端面に溶着して前記口部材4の基端開口面を第2メンブレン6により密閉することにより前記注入口3をシールする。   Next, a seal head (not shown) arranged to face the filling head 30 is used to crush a portion corresponding to the injection port 3 of the bag container 1 from the side opposite to the side where the injection port 3 is provided. The outer peripheral portion of the second membrane 6 of the inlet 3 is pressed against the base end surface of the mouth member 4, the seal head is heated in this state, and the entire periphery of the second membrane 6 is welded to the base end surface of the mouth member 4. Then, the inlet 3 is sealed by sealing the base end opening surface of the mouth member 4 with the second membrane 6.

次に、前記弁部材35を再び図5の位置(弁部33を閉塞するとともにメンブレンカッタ37を第1の空室32内に引込んだ位置)に移動させ、スチーム/洗浄水供給配管39から前記第1の空室32内にまず洗浄水を供給し、その洗浄水をスチーム/洗浄水排出配管45から排出して、前記第1の空室32内及び前記注入口3内を洗浄し、次いで、前記スチーム/洗浄水供給配管39から前記第1の空室32内に殺菌用スチームを供給し、そのスチームをスチーム/洗浄水排出配管45から排出して、前記第1の空室32内及び前記注入口3内を殺菌用スチームによりフラッシングし、その後に、前記シールヘッドを後退させる。   Next, the valve member 35 is moved again to the position shown in FIG. 5 (the position where the valve portion 33 is closed and the membrane cutter 37 is drawn into the first empty chamber 32), and the steam / wash water supply pipe 39 is used. First, cleaning water is supplied into the first empty chamber 32, and the cleaning water is discharged from the steam / cleaning water discharge pipe 45 to clean the inside of the first empty chamber 32 and the inlet 3. Next, sterilizing steam is supplied from the steam / washing water supply pipe 39 into the first empty chamber 32, and the steam is discharged from the steam / washing water discharge pipe 45 to enter the first empty chamber 32. The inside of the injection port 3 is flushed with sterilizing steam, and then the seal head is retracted.

そして、この実施例では、前記バッグ容器1内への製品充填及び注入口シールを行なった後、前記充填ヘッド30を前記バッグ容器1の注入口3に当接させたまま検査ヘッドとして利用し、図5の位置に移動された前記弁部材35により前記第1の空室32と第2の空室との間を閉鎖するとともに前記スチーム/洗浄水供給配管39とスチーム/洗浄水排出配管45の両方のバルブ40,46を閉じ、前記給気バルブ18を開いて、予め前記給気配管16内の前記給気バルブ18よりも上流側に供給しておいた一定圧の加圧空気を前記充填ヘッド30の第1の空室32内に供給して、前記バッグ容器1の注入口シール部の漏れを、上述した第1の実施例と同様にして検査する。   In this embodiment, after filling the bag container 1 and sealing the inlet, the filling head 30 is used as an inspection head while being in contact with the inlet 3 of the bag container 1, The valve member 35 moved to the position shown in FIG. 5 closes the space between the first vacant chamber 32 and the second vacant chamber, and the steam / washing water supply pipe 39 and the steam / washing water discharge pipe 45 are connected. Both the valves 40 and 46 are closed, the air supply valve 18 is opened, and the pressurized air having a constant pressure previously supplied to the upstream side of the air supply valve 18 in the air supply pipe 16 is filled. The liquid is supplied into the first empty chamber 32 of the head 30, and the leakage of the inlet seal portion of the bag container 1 is inspected in the same manner as in the first embodiment described above.

この実施例の漏れ検査方法は、前記充填ヘッド30をバッグ容器1の注入口3の先端に当接させ、この充填ヘッド30の第1の空室内及び前記注入口3の第1メンブレン5の外面のスチーム殺菌、前記第1メンブレン5の切り裂き、前記バッグ容器1内への流体製品Aの充填、前記注入口3の第2メンブレン6の全周溶着による注入口シール、前記第1の空室32内及び前記注入口3内の洗浄及びスチームフラッシングを行なった後、前記充填ヘッド30を前記バッグ容器1の注入口3に当接させたまま検査ヘッドとして利用し、前記弁部材35により前記第1の空室32と第2の空室34との間を閉鎖するとともに前記スチーム/洗浄水供給配管39とスチーム/洗浄水排出配管45の両方のバルブ40,46を閉じ、前記給気バルブ18を開いて、予め前記給気配管16内の前記給気バルブ18よりも上流側に供給しておいた一定圧の加圧空気を前記充填ヘッド30の第1の空室32内に供給して前記バッグ容器1の注入口シール部の漏れ検査を行なうものであるため、前記バッグ容器1内への製品充填及び注入口シールに続けて前記バッグ容器1の注入シール部の漏れを検査することができる。   In the leakage inspection method of this embodiment, the filling head 30 is brought into contact with the tip of the injection port 3 of the bag container 1, and the first empty space of the filling head 30 and the outer surface of the first membrane 5 of the injection port 3. Steam sterilization, tearing of the first membrane 5, filling of the bag product 1 with the fluid product A, sealing of the inlet through the entire circumference of the second membrane 6 of the inlet 3, and the first empty chamber 32. After the inside and the inside of the injection port 3 are cleaned and steam flushed, the filling head 30 is used as an inspection head while being in contact with the injection port 3 of the bag container 1, and the valve member 35 makes the first And the valves 40 and 46 of both the steam / wash water supply pipe 39 and the steam / wash water discharge pipe 45 are closed, and the air supply valve 18 is closed. Open and supply the pressurized air of a constant pressure, which has been supplied to the upstream side of the air supply valve 18 in the air supply pipe 16 in advance, into the first empty chamber 32 of the filling head 30, and Since the leak inspection of the inlet seal portion of the bag container 1 is performed, the leak of the injection seal portion of the bag container 1 can be inspected following the product filling into the bag container 1 and the inlet seal. .

しかも、この漏れ検査方法は、前記充填ヘッド30を検査ヘッドとしてバッグ容器1の注入口シール部の漏れ検査を行なうものであるため、バッグ容器1内への製品充填及び注入口シール毎に注入シール部の漏れを検査することができる。   In addition, since this leak inspection method uses the filling head 30 as an inspection head to perform a leak inspection of the inlet seal portion of the bag container 1, the product is filled into the bag container 1 and the injection seal is provided for each inlet seal. The leakage of the part can be inspected.

なお、前記バッグ容器1の注入シール部の漏れ検査は、所定数のバッグ容器1への製品充填を行なう毎に行なうことも可能である。   The leak inspection of the injection seal portion of the bag container 1 can be performed every time a predetermined number of bag containers 1 are filled with products.

この発明の第1の実施例を示すバッグ容器の注入シール部の漏れ検査を行なうための検査装置の構成図。The block diagram of the test | inspection apparatus for performing the leak test | inspection of the injection | pouring seal | sticker part of the bag container which shows 1st Example of this invention. 専用の検査ヘッドの断面図。Sectional drawing of a dedicated inspection head. 流量計の構成図。The block diagram of a flow meter. 検査ヘッドへの給気開始後の給気バルブよりも検査ヘッド側の給気配管内と検査ヘッドの空室内及びバッグ容器の注入口内の空間の空気圧変化を示す図。The figure which shows the air pressure change of the space in the air supply piping by the side of a test | inspection head from the air supply valve after the air supply to a test | inspection head is started, the space | gap of a test | inspection head, and the inlet of a bag container. この発明の第2の実施例を示す漏れ検査機能を付加した充填装置の構成図。The block diagram of the filling apparatus which added the leak test | inspection function which shows the 2nd Example of this invention. 充填ヘッドの断面図。Sectional drawing of a filling head. バッグ容器の製品充填前、製品充填中及び注入口シール後の状態の断面図。Sectional drawing of the state before product filling of a bag container, during product filling, and after an inlet seal.

符号の説明Explanation of symbols

1…バッグ容器、2…バッグ本体、3…注入口、4…口部材、5…第1メンブレン、6…第1メンブレン、7…注入口取付孔、A…流体製品、10…検査ヘッド、11…注入口当接部、13…空室、16…給気配管、18…給気バルブ、19…流量計、27…漏れ判定手段、30…充填ヘッド、31…注入口当接部、32…第1の空室、33…弁部、34…第2の空室、35…弁部材、37…メンブレンカッタ、39…スチーム/洗浄水供給配管、40…バルブ、45…スチーム/洗浄水排出配管、46…バルブ、47…製品供給配管。   DESCRIPTION OF SYMBOLS 1 ... Bag container, 2 ... Bag main body, 3 ... Injecting port, 4 ... Port member, 5 ... 1st membrane, 6 ... 1st membrane, 7 ... Injecting port attachment hole, A ... Fluid product, 10 ... Inspection head, 11 DESCRIPTION OF SYMBOLS ... Injection port contact part, 13 ... Empty, 16 ... Supply pipe, 18 ... Supply valve, 19 ... Flow meter, 27 ... Leak determination means, 30 ... Filling head, 31 ... Injection port contact part, 32 ... First vacant chamber 33 ... Valve part 34 ... Second vacant chamber 35 ... Valve member 37 ... Membrane cutter 39 ... Steam / wash water supply pipe 40 ... Valve 45 ... Steam / wash water discharge pipe , 46 ... Valve, 47 ... Product supply piping.

Claims (5)

バッグ本体の一部に、基端部を前記バッグ本体に設けられた注入口取付孔に嵌合されて前記バッグ本体に気密状態に溶着された筒状の口部材と、前記口部材の先端の開口面を密閉する第1メンブレンと、前記口部材の基端面に外周部の複数箇所を仮溶着された第2メンブレンとからなる製品注入口が設けられ、前記第1メンブレンを切り裂かれ、前記口部材内及び前記第2メンブレンの非溶着部を通して前記バッグ本体内に流体製品を充填された後に、前記第2メンブレンの全周を前記口部材の基端面に溶着されて前記注入口をシールされたバッグ容器の注入口シール部の漏れを検査する方法において、
前記バッグ容器の注入口の先端に、前記注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された検査ヘッドを、前記空室を前記注入口内に連通させて当接させた状態で、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を、前記給気バルブを開いて前記検査ヘッドの前記空室内に供給し、前記バッグ容器の注入口シール部に漏れが無いときの前記検査ヘッドへの給気開始から前記給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及び前記バッグ容器の注入口内の空間の空気圧が前記加圧空気の圧力になるまでの所要時間に応じて予め設定した時間後の前記流量計の測定値に基づいて、測定流量が0であるときに漏れ無しと判定し、前記測定流量が0でないときに漏れありと判定することを特徴とするバッグ容器の注入口シール部の漏れ検査方法。
A cylindrical mouth member that is fitted in an inlet mounting hole provided in the bag body and welded in an airtight state to the bag body in a part of the bag body, and a distal end of the mouth member A product inlet comprising a first membrane that seals the opening surface, and a second membrane that is temporarily welded to a base end surface of the mouth member at a plurality of outer peripheral portions, the first membrane is cut, and the mouth After filling the bag body with the fluid product through the non-welded portion of the member and the second membrane, the entire periphery of the second membrane was welded to the base end surface of the mouth member to seal the inlet. In the method of inspecting the leakage of the inlet seal part of the bag container,
At the tip of the inlet of the bag container, an annular inlet contact portion that comes into airtight contact with the tip surface of the inlet and an empty chamber that opens to the end surface surrounded by the inlet contact portion, An inspection head to which an air supply pipe having an air supply valve and a flow meter is connected is connected in advance with the vacancy communicating with the inside of the inlet, and is more preliminarily than the air supply valve in the air supply pipe. The inspection when the pressurized air having a constant pressure supplied to the upstream side is supplied to the vacant chamber of the inspection head by opening the air supply valve, and there is no leakage in the inlet seal portion of the bag container Required from the start of air supply to the head until the air pressure in the air supply pipe on the inspection head side relative to the air supply valve, the space inside the inspection head empty space and the bag container inlet becomes the pressure of the pressurized air The flow meter after a preset time according to the time Based on the value, it determines that the leakage no when the measured flow rate is zero, the leak inspection method of the inlet seal of the bag container and judging that there is leakage when the measured flow is not zero.
検査ヘッドへの供給空気の流量を、給気配管に介在された主流路管と、この主流路管内に両端を連通接続された金属細管からなるバイパス管と、前記バイパス管の上流側と下流側とにそれぞれ設けられた温度により電気抵抗値が変化する一対の抵抗体と、前記一対の抵抗体に通電し、これらの抵抗体の通電による発熱と前記バイパス管内を流れる流体との熱交換とにより生じる上流側抵抗体と下流側抵抗体との温度差をそれぞれの抵抗体の抵抗値差により検出して前記温度差に応じた流量信号を出力する温度差検出部とからなる流量計により測定することを特徴とする請求項1に記載のバッグ容器の注入口シール部の漏れ検査方法。   The flow rate of the supply air to the inspection head is divided into a main channel pipe interposed in the air supply pipe, a bypass pipe made of a metal thin tube having both ends connected in the main channel pipe, and an upstream side and a downstream side of the bypass pipe. And a pair of resistors whose electric resistance values change depending on the temperature of each of the resistors, and energizing the pair of resistors, and heat exchange between the resistors and the fluid flowing in the bypass pipe. A temperature difference between the upstream resistor and the downstream resistor is detected by a resistance difference between the resistors, and measured by a flow meter including a temperature difference detection unit that outputs a flow signal corresponding to the temperature difference. The leakage inspection method for an inlet seal part of a bag container according to claim 1. 検査ヘッドへの給気開始から給気バルブよりも検査ヘッド側の給気配管内と前記検査ヘッドの空室内及びバッグ容器の注入口内の空間の空気圧が供給された加圧空気の圧力になるまでの所要時間に応じて、前記所要時間と同じかその直後の第1の時間と、それよりも数秒後の第2の時間とを予め設定しておき、前記第1の時間後の流量計の測定流量が0であるときに漏れ無しと判定し、前記第1の時間後の測定流量が0でないときは、前記第2の時間後の前記流量計の測定流量が0であるときに漏れ無しと判定し、前記第2の時間後の測定流量も0でないときに漏れありと判定することを特徴とする請求項1に記載のバッグ容器の注入口シール部の漏れ検査方法。   From the start of air supply to the inspection head until the air pressure in the air supply pipe closer to the inspection head than the air supply valve and the space inside the inspection head empty space and the bag container inlet becomes the pressure of the supplied pressurized air According to the required time, a first time that is the same as or immediately after the required time and a second time that is several seconds after that are set in advance, and the flow meter after the first time is measured. When the flow rate is 0, it is determined that there is no leakage, and when the measured flow rate after the first time is not 0, there is no leakage when the measured flow rate of the flow meter after the second time is 0. 2. The leak inspection method for an inlet seal part of a bag container according to claim 1, wherein the leakage is determined when the measured flow rate after the second time is not zero. バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と前記注入口当接部により囲まれた端面に開口する空室を有し、給気バルブと流量計を備えた給気配管が接続された専用の検査ヘッドを用いて前記バッグ容器の注入口シール部の漏れ検査を行なうことを特徴とする請求項1〜3のいずれかに記載のバッグ容器の注入口シール部の漏れ検査方法。   An annular inlet contact portion that comes into airtight contact with the front end surface of the inlet of the bag container, and an empty chamber that opens to an end face surrounded by the inlet contact portion, and includes an air supply valve and a flow meter. The bag container inlet seal according to any one of claims 1 to 3, wherein a leakage inspection of the bag container inlet seal portion is performed using a dedicated inspection head to which an air supply pipe is connected. Inspection method for leaking parts. バッグ容器の注入口の先端面に気密状態に当接する環状の注入口当接部と、前記注入口当接部により囲まれた端面に開口する第1の空室と、前記第1の空室に弁部を介して連通する第2の空室と、前記弁部を開閉する弁部材と、前記バッグ容器の注入口の第1メンブレンを切り裂くメンブレンカッタとを有し、前記第1の空室内に殺菌用スチーム及び洗浄水を選択的に供給するためのバルブを備えたスチーム/洗浄水供給配管と、前記第1の空室内のスチーム及び洗浄水を排出するためのバルブを備えたスチーム/洗浄水排出配管と、前記第2の空室内に前記バッグ容器内に充填する流体製品を供給するための製品供給配管とが接続された充填ヘッドの前記スチーム/洗浄水供給配管の接続部に、給気バルブと流量計を備えた給気配管を接続しておき、前記充填ヘッドを前記バッグ容器の注入口の先端に当接させ、この充填ヘッドの第1の空室内及び前記注入口の第1メンブレンの外面のスチーム殺菌、前記第1メンブレンの切り裂き、前記バッグ容器内への流体製品の充填、前記注入口の前記第2メンブレンの全周溶着による注入口シール、前記第1の空室内及び前記注入口内の洗浄及びスチームフラッシングを行なった後、前記充填ヘッドを前記バッグ容器の注入口に当接させたまま検査ヘッドとして利用し、前記弁部材により前記第1の空室と第2の空室との間を閉鎖するとともに前記スチーム/洗浄水供給配管と前記スチーム/洗浄水排出配管の両方のバルブを閉じ、前記給気バルブを開いて、予め前記給気配管内の前記給気バルブよりも上流側に供給しておいた一定圧の加圧空気を前記充填ヘッドの第1の空室内に供給して前記バッグ容器の注入口シール部の漏れ検査を行なうことを特徴とする請求項1〜3のいずれかに記載のバッグ容器の注入口シール部の漏れ検査方法。   An annular inlet contact portion that is in airtight contact with the front end surface of the inlet of the bag container, a first vacancy opening at an end face surrounded by the inlet contact portion, and the first vacancy A second vacant space that communicates with the valve portion, a valve member that opens and closes the valve portion, and a membrane cutter that tears the first membrane at the inlet of the bag container. Steam / cleaning water supply pipe having a valve for selectively supplying steam and cleaning water for sterilization to the steam, and steam / cleaning having a valve for discharging steam and cleaning water in the first empty chamber A water discharge pipe and a connection part of the steam / wash water supply pipe of the filling head to which a product supply pipe for supplying a fluid product to be filled in the bag container is connected to the second empty chamber. Connects air supply pipe with air valve and flow meter The filling head is brought into contact with the tip of the inlet of the bag container, steam sterilization of the first empty chamber of the filling head and the outer surface of the first membrane of the inlet, and tearing of the first membrane, After filling the bag container with the fluid product, sealing the inlet by the entire circumference welding of the second membrane of the inlet, cleaning and steam flushing in the first chamber and the inlet, the filling The head is used as an inspection head in contact with the inlet of the bag container, and the valve member closes the space between the first and second vacancies and the steam / wash water supply pipe. And the steam / cleaning water discharge pipe are closed, the air supply valve is opened, and a constant pressure previously supplied upstream of the air supply valve in the air supply pipe is set. The inlet of a bag container according to any one of claims 1 to 3, wherein compressed air is supplied into the first empty chamber of the filling head to perform a leak inspection of the inlet seal part of the bag container. Seal inspection method for seals.
JP2004235322A 2004-08-12 2004-08-12 Leakage inspection method for inlet seal of bag container Expired - Lifetime JP4316446B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004235322A JP4316446B2 (en) 2004-08-12 2004-08-12 Leakage inspection method for inlet seal of bag container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004235322A JP4316446B2 (en) 2004-08-12 2004-08-12 Leakage inspection method for inlet seal of bag container

Publications (2)

Publication Number Publication Date
JP2006053068A true JP2006053068A (en) 2006-02-23
JP4316446B2 JP4316446B2 (en) 2009-08-19

Family

ID=36030646

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004235322A Expired - Lifetime JP4316446B2 (en) 2004-08-12 2004-08-12 Leakage inspection method for inlet seal of bag container

Country Status (1)

Country Link
JP (1) JP4316446B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007308197A (en) * 2006-05-22 2007-11-29 Cornes Dodwell Ltd Method of filling bag containers with products
JP2010151471A (en) * 2008-12-24 2010-07-08 Asahi Enterp:Kk Device and method for pressure control
CN103786932A (en) * 2012-07-04 2014-05-14 楚天科技股份有限公司 Infusion soft bag heat seal strength online detecting device and infusion soft bag production line
JP2018096975A (en) * 2016-12-08 2018-06-21 ポール・コーポレーションPall Corporation Method and system for leak testing
JP2018119806A (en) * 2017-01-23 2018-08-02 住友ゴム工業株式会社 Inflation facility and gas leak detection method
JP2020051883A (en) * 2018-09-27 2020-04-02 大日本印刷株式会社 Leak inspection device and method of pouch bag having outlet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105738047B (en) 2016-03-29 2017-12-26 威格气体纯化科技(苏州)股份有限公司 Work seal detection means, multi-section type annular seal space process equipment and method
CN112444344A (en) * 2021-02-01 2021-03-05 中国科学院空天信息创新研究院 Aerostat airbag air tightness detection device and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007308197A (en) * 2006-05-22 2007-11-29 Cornes Dodwell Ltd Method of filling bag containers with products
JP2010151471A (en) * 2008-12-24 2010-07-08 Asahi Enterp:Kk Device and method for pressure control
CN103786932A (en) * 2012-07-04 2014-05-14 楚天科技股份有限公司 Infusion soft bag heat seal strength online detecting device and infusion soft bag production line
JP2018096975A (en) * 2016-12-08 2018-06-21 ポール・コーポレーションPall Corporation Method and system for leak testing
JP2018119806A (en) * 2017-01-23 2018-08-02 住友ゴム工業株式会社 Inflation facility and gas leak detection method
JP2020051883A (en) * 2018-09-27 2020-04-02 大日本印刷株式会社 Leak inspection device and method of pouch bag having outlet

Also Published As

Publication number Publication date
JP4316446B2 (en) 2009-08-19

Similar Documents

Publication Publication Date Title
JP5840237B2 (en) Leak detection method and apparatus
JP3001820B2 (en) Container leak test method and apparatus
JP4316446B2 (en) Leakage inspection method for inlet seal of bag container
JP2008111856A (en) Methods and apparatus for determining presence of fluid leak
US12085479B2 (en) Leak detector with clamp for enclosing a section of pipe
TW201237385A (en) Differential pressure measuring method and device
JP5049199B2 (en) External pressure detection type leak inspection device and leak inspection method using the same
JP2006177810A (en) Inspection device and inspection method
JP2002168725A (en) Method and device for inspecting liquid container
JP2003035624A (en) Leak inspection method and apparatus therefor
JP2011075480A (en) Inspection method of vacuum pump, and vacuum pressure measuring device
JP4874726B2 (en) Container leak detection device and detection method
JP2005315784A (en) Leak detecting method, and detector therefor
JP2005037268A (en) Flow rate inspection device
JP2002303559A (en) Method and device for leakage test of spout and spout setting machine
JP2008180664A (en) Method and device for inspecting liquidtightness of dispenser for drink
JPS6258127A (en) Air leak tester
JP3747303B2 (en) Gas measuring device in sealed space
JPH07151637A (en) Method and apparatus for detecting leak
JP3065777U (en) Leak inspection device
JP3643443B2 (en) Gas piping airtightness inspection device
JP2006184046A (en) Liquid leakage inspection apparatus
JPH04208833A (en) Device for inspecting leakage of liquid
JPH0915085A (en) Leak detector
JPH11248594A (en) Method and device for inspecting container for leakage

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070731

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090415

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090512

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090520

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4316446

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130529

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250