JP2005188275A - Preceding handrail for temporary scaffold - Google Patents

Preceding handrail for temporary scaffold Download PDF

Info

Publication number
JP2005188275A
JP2005188275A JP2004343592A JP2004343592A JP2005188275A JP 2005188275 A JP2005188275 A JP 2005188275A JP 2004343592 A JP2004343592 A JP 2004343592A JP 2004343592 A JP2004343592 A JP 2004343592A JP 2005188275 A JP2005188275 A JP 2005188275A
Authority
JP
Japan
Prior art keywords
handrail
building
preceding handrail
scaffold
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2004343592A
Other languages
Japanese (ja)
Inventor
Nobuo Sugiyama
信夫 杉山
Takuya Wakatsuki
琢哉 若月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUGIKOU KK
Sugiko Co Ltd
Original Assignee
SUGIKOU KK
Sugiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUGIKOU KK, Sugiko Co Ltd filed Critical SUGIKOU KK
Priority to JP2004343592A priority Critical patent/JP2005188275A/en
Publication of JP2005188275A publication Critical patent/JP2005188275A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a preceding handrail for a temporary scaffold which enables a worker on an existing working floor to carry out a transfer work of the handrail when relocating the preceding handrail to the uppermost layer level for building up the scaffold on the uppermost layer. <P>SOLUTION: The preceding handrail 20 is provided on the temporary scaffold where upright posts of the uppermost layer are successively built up in accordance with a progress of the construction work, and projects upward from the working floor 9. The preceding handrail is composed of a preceding handrail pole 21 installed parallel to the upright post 2 and a handrail member 50 engageable to the preceding handrail pole. The preceding handrail has a first engaging part 30 for engaging the upright post relatively displaceable in a vertical direction, a second engaging part 40 for engaging the upright post to prevent the preceding handrail from descending, and an engaging means 22 for engaging detcahably an engaging part of the handrail member. The first engaging part is relatively and rotatably supported by the preceding handrail pole. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、仮設足場の先行手摺に関するものであり、より詳細には、最上層の作業床から上方に突出するように構成された仮設足場の先行手摺に関するものである。   The present invention relates to a preceding handrail of a temporary scaffold, and more particularly to a preceding handrail of a temporary scaffold configured to protrude upward from the uppermost work floor.

建築物又は土木構造物の建設工事に使用される仮設足場として、枠組足場及び単管足場が実用に供されている。枠組足場は、建枠を建込み、床付き布枠を作業用足場板として建枠の各層に架設することにより建設中の建物の外側に構築され、建設工事の完了直前の適切な時期に解体される。他方、単管足場は、建設工事の進捗に相応して単管(鋼管)を上層に順次建込む形式の仮設足場である。単管足場は、地盤面の敷板上に固定型ベース金具を所定間隔に配置し、鋼管製の建地を建込み、根がらみ、腕木、布、中桟、手摺及び筋交い等を構成する鋼管を緊結金具(クランプ金具)によって緊結し、足場板を腕木上に敷設することにより組立てられる。単管足場は、枠組足場と同じく、建設工事の完了直前の適切な時期に解体される。   As a temporary scaffold used for construction work of a building or a civil engineering structure, a frame scaffold and a single pipe scaffold are practically used. The frame scaffolding is built outside the building under construction by building the building frame and laying the floored cloth frame on each layer of the building frame as a working scaffold board, and dismantled at an appropriate time just before the completion of the construction work Is done. On the other hand, a single pipe scaffold is a temporary scaffold of a type in which single pipes (steel pipes) are sequentially built on the upper layer according to the progress of construction work. Single-pipe scaffolding consists of steel pipes that comprise fixed base metal fittings on the ground surface at predetermined intervals, erected steel pipe construction, and are used to form roots, arms, cloth, center rails, handrails, braces, etc. It is assembled by tying with a fastening fitting (clamp fitting) and laying the scaffolding board on the arm. Single pipe scaffolds, like the framework scaffolds, are dismantled at an appropriate time just prior to completion of construction work.

仮設足場の最上層作業床には、墜落防止用の安全措置として、手摺を設ける必要がある。最上層の手摺は、最上層の布枠よりも上方に突出することから、一般に、先行手摺、先付手摺又は手摺先行型足場と呼ばれている(以下、単に「先行手摺」という。)。この先行手摺は、建設工事の進捗に従って足場を上方に延ばす際に、順次、上層に移設しなければならない。従来は、いずれの形式の仮設足場においても、先行手摺として、鋼管を手摺形態に組立てる工法が採用されてきた。   A handrail must be provided on the uppermost work floor of the temporary scaffolding as a safety measure to prevent the crash. Since the uppermost handrail protrudes upward from the uppermost fabric frame, it is generally called a preceding handrail, a front handrail or a handrail preceding type scaffold (hereinafter simply referred to as “preceding handrail”). This leading handrail must be moved to the upper layer one by one when the scaffold is extended upward as the construction progresses. Conventionally, in any type of temporary scaffolding, a construction method has been employed in which a steel pipe is assembled in a handrail form as a leading handrail.

ここに、枠組足場については、先行手摺の移設作業を簡素化する昇降式又は盛替え式の枠組足場用先行手摺が近年開発され、比較的多くの建設現場に普及しつつある。この種の先行手摺として、建枠の垂直支柱を走行するガイドローラを備えた昇降式の先行手摺が知られている(特開2003-41779号公報) 。他の形式の枠組足場用先行手摺として、建枠の垂直支柱(建地)に取付け可能な手摺支柱と、手摺支柱の間に架設される伸縮手摺とから構成される盛替え式の先行手摺が知られている(特開2001-288883 号公報) 。   Here, as for the frame scaffolding, a lifting / replacement type frame scaffolding handrail that simplifies the moving work of the preceding railings has been developed in recent years and is becoming popular in a relatively large number of construction sites. As this type of preceding handrail, an elevating-type preceding handrail having a guide roller that runs on a vertical column of a building frame is known (Japanese Patent Laid-Open No. 2003-41779). Another type of handrail for frame scaffolding is a refillable handrail composed of handrail struts that can be attached to vertical struts (buildings) of building frames and telescopic handrails built between handrail struts. Known (Japanese Patent Laid-Open No. 2001-288883).

これに対し、単管足場では、建地、腕木、布等の足場構成部材を連結する緊結金具等が建地の随所に取付けられるので、枠組足場用の昇降式先行手摺又は盛替え式先行手摺(これらの先行手摺は、建地に係合した状態で昇降する部分を有する)を使用することができない。このため、単管足場に関しては、上層の建地、根がらみ、腕木、布及び足場板を組立てた後、最上層の足場板上で先行手摺用の鋼管等を緊結金具で建地に取付ける工法が依然として採用されている。このような手摺取付け作業は、それ自体、手摺のない状態で実行される高所作業であるので、その安全措置として、建地間に張設した親綱ロープや、建地に所定間隔に取付けられる安全帯係止金具等が使用されている(特開平8-226226号公報) 。例えば、ロータリーガイドと呼ばれる安全帯取り元金具を単管足場用鋼管に約30cm程度の間隔で予め取付けた建地パイプを使用し、或いは、鋼管用緊結金具を建地の適所に取付け、これらの金具に安全帯のフックを係留することにより、作業の安全を確保する対策が実際に採られている。
特開2003-41779号公報 特開2001-288883 号公報 特開平8-226226号公報
On the other hand, in a single pipe scaffolding, fasteners, etc. for connecting scaffold components such as building land, arms, cloth, etc., are attached everywhere on the building ground, so the lifting and lowering handrails for framed scaffolds (These handrails have a portion that moves up and down while engaged with the building). For this reason, for single-pipe scaffolding, after assembling the upper building, rooting, braces, cloth, and scaffolding plate, a steel pipe for the handrail on the uppermost scaffolding plate is attached to the building with a tight fitting. Is still adopted. Such a handrail attachment work is a high place work that is performed without a handrail itself, so as a safety measure, it is attached to a master rope rope stretched between construction sites or at predetermined intervals on the construction site. The safety band locking metal fitting etc. which are used are used (Unexamined-Japanese-Patent No. 8-226226). For example, using a construction pipe in which a safety band former metal fitting called a rotary guide is attached in advance to a steel pipe for a single-ply scaffold at an interval of about 30 cm, or attaching a steel pipe fastening fitting to an appropriate place on a building, Measures to ensure the safety of work are actually taken by mooring hooks of safety belts to the metal fittings.
JP 2003-41779 A JP 2001-288883 JP-A-8-226226

しかしながら、親綱ロープに依存した安全措置は、作業効率及び確実性の点で難点があった。また、鋼管用緊結金具を安全帯係止金具として利用した安全措置は、緊結金具を本来の使用目的と異なる目的で使用したものであることから、強度又は耐久性の点で必ずしも確実なものであるとはいい難く、金具の取付け・取外しが不便である点や、足場鋼管の緊結金具と位置的に干渉する可能性、更には、上層の建地に対する金具取付け時の安全性等をも考慮すると、実用性の面でも難点があった。   However, safety measures that depend on parent ropes have difficulties in terms of work efficiency and certainty. In addition, safety measures that use steel pipe tightening brackets as safety band locking brackets are not necessarily reliable in terms of strength or durability because they are used for purposes different from their intended use. Considering the point that it is difficult to install and remove the bracket, there is a possibility that it may interfere with the position of the scaffolding steel pipe, and the safety when mounting the bracket on the upper building. Then, there was also a difficulty in terms of practicality.

このため、昇降式又は盛替え式の枠組足場用先行手摺の如く、最上層の単管足場を組み上げるために最上層レベルに先行手摺を移設する際、既存の作業床( 即ち、最上層の一層下側の作業床) の作業者が先行手摺移設作業を行うことができるようにする単管足場用先行手摺の開発が要望された。   For this reason, when moving the leading handrail to the uppermost layer to assemble the uppermost single-pipe scaffolding, such as a lifting handrail or a handrail for a frame scaffold, the existing work floor (i.e. There has been a demand for the development of a handrail for a single-pipe scaffolding that allows the worker on the lower work floor) to perform the work of moving the handrail.

本発明は、このような課題に鑑みてなされたものであり、その目的とするところは、最上層の足場を組み上げるために最上層レベルに先行手摺を移設する際、既存の作業床(即ち、最上層の一層下側の作業床)の作業者が先行手摺移設作業を行うことができる仮設足場の先行手摺を提供することにある。   The present invention has been made in view of such problems, and the object of the present invention is to provide an existing work floor (i.e., when transferring a handrail to the uppermost level in order to assemble the uppermost scaffold. It is an object of the present invention to provide a temporary handrail for a temporary scaffold that allows an operator on the lower floor (the work floor below the uppermost layer) to perform a handrail transfer work.

上記目的を達成すべく、本発明は、建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に対して垂直方向に相対変位可能に係合する第1係合部と、先行手摺柱の降下を阻止すべく前記建地、又は建地に一体的に連結した足場構成部材と係合する第2係合部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記第1係合部は、前記第2係合部の上側に配置されるとともに、先行手摺柱本体に相対回転可能に支持されることを特徴とする仮設足場の先行手摺を提供する。
In order to achieve the above object, the present invention is provided in a temporary scaffold that sequentially builds the upper building according to the progress of the construction work, and in the preceding handrail of the temporary scaffold protruding upward from the uppermost work floor,
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar is integrally connected to the building or the building so as to prevent the lowering of the preceding handrail pillar, and a first engaging portion that engages with the building so as to be relatively displaceable in a vertical direction. A second engaging portion that engages with the scaffold component; and a locking means that removably locks the locking portion of the handrail member, wherein the first engaging portion is a portion of the second engaging portion. Provided is a preceding handrail for a temporary scaffold, which is arranged on the upper side and is supported by a preceding handrail column main body so as to be relatively rotatable.

本発明の上記構成によれば、既存の作業床の作業者は、先行手摺柱の係止手段に手摺部材の係止部を係止するとともに、先行手摺柱の第1係合部を最上層の建地に取付けた後、建地の案内により先行手摺柱を上昇させる。第1係合部は、先行手摺柱に対して回転変位しながら建地上を上昇するので、先行手摺柱は、建地の案内で円滑に上昇する。作業者は、所定位置まで先行手摺柱が上昇したときに先行手摺柱の第2係止部を建地又は足場構成部材(布等)に取付け、先行手摺柱の降下を阻止し、これにより、先行手摺柱を最上層レベルに取付けることができる。   According to the above configuration of the present invention, the worker on the existing work floor locks the locking portion of the handrail member with the locking means of the leading handrail column, and the first engaging portion of the leading handrail column is the uppermost layer. After attaching to the building site, the handrail pillar is raised by the guidance of the building site. Since the first engaging portion moves up the building ground while being rotationally displaced with respect to the preceding handrail column, the preceding handrail column is smoothly raised by the guidance of the building site. The operator attaches the second locking portion of the preceding handrail column to the building or scaffolding component (cloth, etc.) when the preceding handrail column rises to a predetermined position, and prevents the descending of the preceding handrail column, A leading handrail post can be attached to the top level.

作業者は更に、手摺部材の他の係止部を別の先行手摺柱の係止手段に係止するとともに、隣接する最上層の建地に対して、この先行手摺柱の第1係合部を取付け、先行手摺柱を建地に沿って押し上げる。第1係合部は、回転変位しながら建地上を上昇し、先行手摺柱は、建地に沿って円滑に上昇する。所定位置まで先行手摺柱が上昇したときに第2係止部を建地に取付けることにより、隣接する建地の上部に先行手摺柱を取付けることができる。手摺部材は、これらの先行手摺柱の間に水平に懸架され、最上層レベルの先行手摺を形成する。   The operator further locks the other locking portion of the handrail member to the locking means of another preceding handrail column, and the first engaging portion of the preceding handrail column with respect to the adjacent uppermost building. And push up the handrail pillar along the building. The first engaging portion rises on the building ground while being rotationally displaced, and the leading handrail pillar rises smoothly along the building land. By attaching the second locking portion to the building when the preceding handrail column has risen to a predetermined position, the preceding handrail column can be attached to the upper part of the adjacent building. The handrail member is suspended horizontally between the preceding handrail pillars to form the uppermost level handrail.

本発明は又、 建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に一体的に連結した足場構成部材に固定される第1係合部と、先行手摺柱の降下を阻止すべく前記建地と係合する第2係合部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記第1係合部は、前記第2係合部の上側に配置されるとともに、先行手摺柱本体に相対回転可能に支持されることを特徴とする仮設足場の先行手摺を提供する。
The present invention is also provided in a temporary scaffolding that is provided in a temporary scaffolding that sequentially builds the upper building according to the progress of the construction work, and protrudes upward from the uppermost working floor.
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar includes a first engaging portion fixed to a scaffold component integrally connected to the building, and a second engaging portion engaged with the building to prevent the preceding handrail pillar from being lowered. And a locking means for removably locking the locking portion of the handrail member, wherein the first engagement portion is disposed on the upper side of the second engagement portion and is relative to the preceding handrail pillar body. Provided is a handrail for a temporary scaffold characterized by being rotatably supported.

本発明の上記構成によれば、既存の作業床の作業者は、先行手摺柱の係止手段に手摺部材の係止部を係止するとともに、最上層の建地に一体的に連結した足場構成部材に先行手摺柱の第1係合部を取付ける。建地、腕木及び布を構成する各管体を緊結具で緊結することにより構築される単管足場の場合、このような足場構成部材として腕木を好適に使用し得る。好ましくは、上記第1係合部は、先行手摺柱の垂直中心軸線及び/又は水平軸線を中心に回転可能に先行手摺柱に支持される。更に好ましくは、第2係合部は、先行手摺を移設すべき最上層の作業床の下側のレベルにおいて建地に固定される。   According to the above-described configuration of the present invention, the worker on the existing work floor locks the locking portion of the handrail member to the locking means of the preceding handrail pillar and is integrally connected to the uppermost building. The first engaging portion of the preceding handrail post is attached to the component member. In the case of a single-pipe scaffold constructed by tying each tubular body constituting the building site, the timber, and the cloth with a tying tool, the limb can be suitably used as such a scaffold component. Preferably, the first engaging portion is supported by the preceding handrail column so as to be rotatable about the vertical center axis and / or the horizontal axis of the preceding handrail column. More preferably, the second engaging portion is fixed to the building at a level below the uppermost work floor to which the leading handrail is to be transferred.

先行手摺柱本体に相対回転可能に支持された第1係合部は、第1係合部を足場構成部材に取付ける際に回転するので、足場構成部材に対する第1係合部の取付け作業は、比較的容易である。作業の容易性は、安全性確保に通じることから、実務的には、非常に有益である。例えば、作業者は、第1係合部を回転させて、迅速且つ適切に足場構成部材に取付けることができるので、このような作業の際に先行手摺柱が脱落又は落下する可能性が大きく低下する。   Since the first engaging portion supported so as to be relatively rotatable with respect to the preceding handrail post body rotates when the first engaging portion is attached to the scaffold component, the mounting operation of the first engagement portion with respect to the scaffold component is It is relatively easy. The ease of work leads to ensuring safety, so it is very useful in practice. For example, since the operator can rotate the first engagement portion and quickly and appropriately attach it to the scaffold component member, the possibility that the leading handrail pillar will drop or drop during such work is greatly reduced. To do.

本発明は更に、建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に固定される固定部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記固定部は、先行手摺を移設すべき最上層の作業床の下側のレベルで前記建地に固定され、前記先行手摺柱を支持することを特徴とする仮設足場の先行手摺を提供する。
The present invention is further provided in a temporary scaffold that sequentially builds the upper building according to the progress of the construction work, and in the preceding handrail of the temporary scaffold protruding upward from the uppermost work floor,
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar includes a fixing portion fixed to a building, and a locking means for detachably locking the locking portion of the handrail member, and the fixing portion is an uppermost layer to which the leading handrail is to be transferred. A temporary handrail for a temporary scaffolding is provided, which is fixed to the building at a level below the work floor and supports the preceding handrail pillar.

このような本発明の構成によれば、既存の作業床上の作業員は、先行手摺移設作業の際、先行手摺柱に設けられた固定部を最上層作業床の下側レベルで建地に堅固に固定することができる。従って、先行手摺移設作業の作業効率、安全性及び確実性は、大きく向上する。   According to such a configuration of the present invention, the worker on the existing work floor can firmly fix the fixed portion provided on the preceding handrail pillar to the building floor at the lower level of the uppermost work floor during the moving operation of the preceding handrail. Can be fixed to. Therefore, the work efficiency, safety, and certainty of the handrail moving work are greatly improved.

本発明によれば、最上層の足場を組み上げるために最上層レベルに先行手摺を移設する際、従来のように親綱ロープ又は安全帯係止金具付きの建地パイプを使用したり、或いは、安全帯係止手段として鋼管用緊結金具を使用することなく、既存の作業床の作業者が先行手摺移設作業を行うことができる。また、本発明の先行手摺は、軽量であり、先行手摺柱も円滑に上昇することから、比較的軽微な力で先行手摺の移設作業を行うことができる。このため、本発明の先行手摺は、比較的腕力が弱い女性作業者等が単独で先行手摺移設作業を遂行し得るように設計することも可能であり、実用的に極めて有利である。   According to the present invention, when transferring the handrail to the top layer level to assemble the top layer scaffolding, a master rope or a construction pipe with a safety belt locking bracket as in the past is used, or The operator of the existing work floor can perform the handrail moving work without using the steel pipe binding metal fitting as the safety belt locking means. In addition, the preceding handrail of the present invention is lightweight, and the preceding handrail column can be raised smoothly, so that the moving operation of the preceding handrail can be performed with a relatively slight force. For this reason, the leading handrail of the present invention can be designed so that a female worker or the like having relatively weak arm strength can perform the leading handrail moving work alone, which is extremely advantageous practically.

本発明の先行手摺は、単管足場及び枠組足場の双方おいて使用可能であるが、従来の単管足場の先行手摺組立方法と対比すると、本発明の先行手摺を単管足場の先行手摺として使用した場合、殊に有利な効果が得られる。   The preceding handrail of the present invention can be used in both the single tube scaffold and the frame scaffold, but when compared with the conventional handrail assembly method of the single tube scaffold, the preceding handrail of the present invention is used as the preceding handrail of the single tube scaffold. Particularly advantageous effects are obtained when used.

本発明の好ましい実施形態において、上記先行手摺柱は、足場の外側に張り出すように変形し、第1係合部は、先行手摺柱本体から足場の内側に延びる水平な支持部材に支持される。このような構成によれば、足場構成部材と手摺部材とが先行手摺の上昇時に干渉しないように手摺部材を足場の外側に配置することができるので、比較的容易に先行手摺を上昇させることができる。   In a preferred embodiment of the present invention, the preceding handrail column is deformed so as to project outward from the scaffold, and the first engagement portion is supported by a horizontal support member extending from the preceding handrail column body to the inside of the scaffold. . According to such a configuration, since the handrail member can be arranged outside the scaffold so that the scaffold component member and the handrail member do not interfere when the preceding handrail is raised, the preceding handrail can be raised relatively easily. it can.

好ましくは、先行手摺柱は、安全帯を係留可能な安全帯係留部を備える。安全帯係留部は、安全帯のフックを係留可能な部材からなり、先行手摺柱の上端部に配設される。更に好ましくは、安全帯係留部は、手指で握持可能な形態を有し、作業者は、安全帯係留部を手指で握持して先行手摺柱を持上げ又は移動させることができる。変形例として、先行手摺柱には、親綱を係留可能な親綱案内部が設けられる。   Preferably, the leading handrail post includes a safety belt mooring portion capable of mooring the safety belt. The safety belt mooring portion is made of a member capable of mooring the hook of the safety belt and is disposed at the upper end portion of the preceding handrail pillar. More preferably, the safety band mooring part has a form that can be gripped with fingers, and the operator can lift or move the preceding handrail pillar by holding the safety band mooring part with fingers. As a modified example, a parent rope guide portion capable of mooring the parent rope is provided on the preceding handrail pillar.

本発明の好適な実施形態によれば、第2係合部は、垂直方向に相対変位可能に建地に係合し、建地に取付けられた緊結金具によって降下を阻止されるとともに、先行手摺の自重により、安定した状態で緊結金具上に静止する。本発明の他の好適な実施形態によれば、第2係合部は、建地に緊結可能な緊結具からなり、建地に対する緊結力により先行手摺柱の降下を阻止する。   According to a preferred embodiment of the present invention, the second engaging portion engages with the building site so as to be relatively displaceable in the vertical direction, and is prevented from descending by the fastening hardware attached to the building site, and the leading handrail. Due to its own weight, it rests on the fastening hardware in a stable state. According to another preferred embodiment of the present invention, the second engagement portion is composed of a fastening tool that can be fastened to the building site, and prevents the descending of the preceding handrail column by the fastening force with respect to the building site.

好ましくは、先行手摺柱の係合部は、建地を収容可能な凹部を形成する保持部材と、凹部内に収容した建地が凹部から離脱するのを阻止する開閉部材とを有する。開閉部材は、保持部材に枢動可能に支持され、凹部を閉鎖する閉鎖位置と、凹部を開放する開放位置とに変位する。更に好ましくは、保持部材は、開閉部材を閉鎖位置に拘束するワンタッチ式係止機構を備える。この種の係止機構として、例えば、スプリングの弾性復元力により被係止部材を拘束し且つスプリングの外力変形により比較的容易に被係止部材の拘束力を開放するプランジャ型係止機構又はグラビティロック機構等を好適に使用し得る。   Preferably, the engaging portion of the preceding handrail pillar includes a holding member that forms a recess capable of accommodating a building site, and an opening / closing member that prevents the building site accommodated in the recess from being detached from the recess. The opening / closing member is pivotally supported by the holding member and is displaced between a closed position for closing the recess and an open position for opening the recess. More preferably, the holding member includes a one-touch type locking mechanism that restrains the opening / closing member in the closed position. As this type of locking mechanism, for example, a plunger type locking mechanism or gravity that restrains the locked member by the elastic restoring force of the spring and releases the locking force of the locked member relatively easily by the external force deformation of the spring. A lock mechanism or the like can be suitably used.

好適には、手摺部材は、係止孔を有する係止部を両端部に備え、先行手摺柱の係止手段は、係止孔に挿入可能な水平軸部を備える。水平軸部は、軸部から突出する突状又は舌状部材を備える。突状又は舌状部材は、軸部を手摺部材の係止孔に挿入するときに過渡的に軸部内に引っ込む。突状又は舌状部材は、軸部が手摺部材の係止孔に完全に挿入されると、初期の突出形態に復帰し、手摺部材の係合部が水平軸部から離脱するのを防止する。このような水平軸部の係止機構として、上述のグラビティロック機構等を好適に使用し得る。   Preferably, the handrail member includes a locking portion having a locking hole at both ends, and the locking means of the preceding handrail column includes a horizontal shaft portion that can be inserted into the locking hole. The horizontal shaft portion includes a protruding or tongue-like member protruding from the shaft portion. The projecting or tongue-like member transiently retracts into the shaft portion when the shaft portion is inserted into the locking hole of the handrail member. When the shaft portion is completely inserted into the locking hole of the handrail member, the projecting or tongue-like member returns to the initial protruding form and prevents the engaging portion of the handrail member from being detached from the horizontal shaft portion. . As such a horizontal shaft portion locking mechanism, the above-described gravity lock mechanism or the like can be suitably used.

先行手摺は、好ましくは、手摺部材からなる中桟を含み、先行手摺柱は、手摺部材の係止部を係止可能な第2の係止手段を中間高さ部分に備える。中桟を構成する手摺部材は、最上層レベルの先行手摺を形成する際に同時に先行手摺柱に係止される。このように2本の手摺部材を先行手摺柱に係止した場合、先行手摺を最上層レベルに移設したときに、手摺及び中桟が同時に組上がるので、爾後の作業の安全性が更に高まる。なお、所望により、最上層レベルの足場板を敷設した後に最上層作業床の上で中桟を先行手摺柱に係止したり、付加的な中桟(第2又は第3の中桟)を先行手摺柱に係止し、或いは、筋交い状の桟を付加的に先行手摺柱に係止するように構成することも可能である。   The preceding handrail preferably includes an intermediate rail made of a handrail member, and the preceding handrail column includes second locking means capable of locking the locking portion of the handrail member at the intermediate height portion. The handrail member constituting the middle rail is locked to the preceding handrail pillar at the same time when the uppermost level handrail is formed. When the two handrail members are locked to the preceding handrail pillar in this way, when the preceding handrail is moved to the uppermost level, the handrail and the middle rail are assembled at the same time, so that the safety of the work after the dredging is further increased. If desired, after laying the uppermost level scaffolding plate, the middle rail is locked to the leading handrail pillar on the uppermost working floor, or an additional middle rail (second or third middle rail) is attached. It is also possible to engage with the leading handrail column, or to construct a bracing bar to be additionally locked to the preceding handrail column.

手摺部材として、隣り合う先行手摺柱の間に延び、先行手摺柱同士の相対位置の変化に追随して回動、伸縮又は変形する比較的高剛性の線型部材を使用することができる。この種の手摺部材の代表例として、入子式に組付けられた二重管構造の内管及び外管より構成される伸縮手摺が挙げられる。伸縮手摺は、外管からの内管の突出により伸長し、外管内への内管の引込みにより短縮する。伸縮手摺の両端部には、先行手摺柱の係止手段に係止可能な係止部が設けられる。他の構造の手摺部材として、例えば、弾性変形可能な高強度の線型部材、比較的高剛性のロープ、高強度のチェーン、或いは、中間部に関節連結手段を有する屈曲可能な高剛性の線型部材などが挙げられる。   As the handrail member, it is possible to use a relatively high-rigidity linear member that extends between adjacent preceding handrail columns and rotates, expands, contracts, or deforms following the change in the relative position of the preceding handrail columns. A typical example of this type of handrail member is an extendable handrail composed of an inner tube and an outer tube having a double-pipe structure assembled in a telescopic manner. The telescopic handrail extends by the protrusion of the inner tube from the outer tube, and is shortened by drawing the inner tube into the outer tube. Locking portions that can be locked to the locking means of the preceding handrail pillar are provided at both ends of the telescopic handrail. As a handrail member of another structure, for example, a high-strength linear member that can be elastically deformed, a relatively high-rigidity rope, a high-strength chain, or a bendable high-rigidity linear member that has a joint connecting means in the middle part Etc.

先行手摺柱は、上記第1及び第2係合部に加えて、建地に一体的に連結した足場構成部材に係合する第3係合部を更に備えても良い。第3係合部は、例えば、布に着座し、先行手摺柱の荷重を布に伝達する。   In addition to the first and second engaging portions, the leading handrail pillar may further include a third engaging portion that engages with a scaffold component member integrally connected to the building site. For example, the third engaging portion is seated on the cloth and transmits the load of the preceding handrail pillar to the cloth.

以下、添付図面を参照して、本発明の好適な実施例について詳細に説明する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

図1は、単管足場の全体構成を示す斜視図及び立面図である。   FIG. 1 is a perspective view and an elevation view showing the overall structure of a single tube scaffold.

単管足場1は、鋼製パイプからなる建地2、根がらみ3、布4、腕木5、手摺6、中桟7、筋交い8及び足場板9を多層(図1では、7層)に組立てた全体構成を有し、建設中の建築物Aの外壁面に沿って配置される。工具落下等を阻止する養生ネット15、16(図1(B))が、単管足場1の外面等に張設され、単管足場1の傾倒を防止する壁つなぎ部材17が、建地2及び建築物Aを相互連結するように配設される。   The single-pipe scaffolding 1 is constructed by assembling a building 2 made of steel pipe, a root tie 3, a cloth 4, a brace 5, a handrail 6, a middle rail 7, a brace 8, and a scaffolding board 9 in multiple layers (seven layers in FIG. 1). It is arranged along the outer wall surface of the building A under construction. Curing nets 15 and 16 (FIG. 1 (B)) for preventing tool dropping or the like are stretched on the outer surface or the like of the single pipe scaffold 1, and a wall connecting member 17 for preventing the single pipe scaffold 1 from being tilted is provided on the building 2 And the building A is arranged to be interconnected.

単管足場1の組立初期には、敷板11が、単管足場1の配置に相応して地盤上に配置され、固定型ベース金具12が、釘等の係止具によって敷板11に固定される。根がらみ3が、緊結金具(クランプ金具)13によって建地2の最下部に緊結され、地盤レベル近傍で建地2を相互連結する。建地2は、梁間方向に約0.9〜1.2m程度、桁行方向に約1.8m程度の間隔を隔てて配置される。布4及び腕木5が緊結金具13によって建地2に緊結され、建地2の間に梁間方向又は桁行方向に架設される。   In the initial stage of assembling the single pipe scaffold 1, the floor board 11 is arranged on the ground according to the arrangement of the single pipe scaffold 1, and the fixed base metal fitting 12 is fixed to the floor board 11 by a locking tool such as a nail. . The root guard 3 is fastened to the lowermost part of the building 2 by a fastening fitting (clamp fitting) 13 and interconnects the building 2 near the ground level. The building 2 is arranged at an interval of about 0.9 to 1.2 m in the beam-to-beam direction and about 1.8 m in the beam direction. The cloth 4 and the braces 5 are fastened to the building 2 by the fastening fittings 13 and are laid between the buildings 2 in the beam-to-beam direction or the crossing direction.

建築物Aが建築工事の進捗に従って順次上層に延びるにつれて、建地2は、継手金具によって順次上層に継ぎ足される。各層の布4、腕木5、手摺6、中桟7及び筋交い8は、緊結金具によって建地2に順次緊結される。各層の足場板9が、腕木5の間に敷設され、作業床又は作業通路が各層に形成される。第2層より上層のレベルでは、手摺6及び中桟7が緊結金具によって建地2に緊結される。手摺6は、足場板9から90cm以上の高さに配置される。   As the building A sequentially extends to the upper layer according to the progress of the building work, the building site 2 is successively added to the upper layer by the fittings. The cloth 4, the arm 5, the handrail 6, the middle rail 7, and the brace 8 of each layer are sequentially fastened to the building site 2 by fastening hardware. Scaffold plates 9 of each layer are laid between the arms 5 and a work floor or a work passage is formed in each layer. At a level higher than the second layer, the handrail 6 and the middle rail 7 are fastened to the building site 2 by the fastening hardware. The handrail 6 is disposed at a height of 90 cm or more from the scaffold plate 9.

図1に示す単管足場1では、最上層(第7層)の足場板9が敷設されており、建地2の最上部は、最上層の足場板9から所定距離、例えば、約1〜1.5m程度上方に突出する。最上部の建地2には、本発明の先行手摺20が配置される。   In the single-tube scaffold 1 shown in FIG. 1, the uppermost (seventh) scaffolding plate 9 is laid, and the uppermost part of the building 2 is a predetermined distance from the uppermost scaffolding plate 9, for example, about 1 to It protrudes upward about 1.5m. The leading handrail 20 of the present invention is disposed on the uppermost building 2.

図2〜図9には、先行手摺20の第1実施例が示されている。図2は、先行手摺20の構成を示す単管足場1の最上層部の立面図であり、図3は、先行手摺20を構成する先行手摺柱21の斜視図、正面図及び側面図である。   2 to 9 show a first embodiment of the leading handrail 20. FIG. 2 is an elevation view of the uppermost layer portion of the single-tube scaffold 1 showing the configuration of the leading handrail 20, and FIG. 3 is a perspective view, a front view, and a side view of the leading handrail column 21 that constitutes the leading handrail 20. is there.

図2に示す如く、先行手摺20は、各建地2の作業床側(足場板9の側)に配置された先行手摺柱21と、両端部を先行手摺柱21に係止した上下2段(手摺及び中桟)の伸縮手摺50とから構成される。先行手摺柱21は、建地2に係合する上下の保持具30、40を上端部及び下端部に備えるとともに、伸縮手摺50を係止可能な係止手段を構成する突起22を上部及び中央部に備える。手摺を構成する伸縮手摺50は、足場板9から距離Hの高さに配置される。   As shown in FIG. 2, the leading handrail 20 includes a leading handrail column 21 disposed on the work floor side (the side of the scaffolding plate 9) of each building 2, and two upper and lower stages in which both ends are locked to the preceding handrail column 21. It is comprised from the telescopic handrail 50 of a handrail and a middle rail. The leading handrail pillar 21 includes upper and lower holders 30 and 40 that engage with the building 2 at the upper end portion and the lower end portion, and the protrusions 22 constituting the locking means that can lock the telescopic handrail 50 are provided at the upper and middle portions. Prepare for the department. The telescopic handrail 50 constituting the handrail is disposed at a height of a distance H from the scaffold plate 9.

図3に示すように、先行手摺柱21の本体部分は、方形横断面を有する垂直な鋼製角型中空部材からなり、手指で握持可能なコの字形握持部23が、先行手摺柱21の上端に配設される。作業者は、握持部23を手指で握持し、先行手摺柱21を持上げ又は運搬することができる。握持部23は、概ね手摺のレベルにおいて建地2の作業床側に配置され、安全帯のフックを係留可能な安全帯係留部を構成する。   As shown in FIG. 3, the main body portion of the leading handrail column 21 is made of a vertical steel square hollow member having a square cross section, and a U-shaped gripping portion 23 that can be gripped by a finger is formed by the leading handrail column. 21 is disposed at the upper end of the plate. The operator can hold the gripping part 23 with fingers and lift or carry the leading handrail pillar 21. The gripping portion 23 is disposed on the work floor side of the building 2 at the level of the handrail, and constitutes a safety belt mooring portion that can moor a hook of the safety belt.

上下の突起22は、実質的に同一の構造を有し、各突起22は、水平軸部24及び可動舌部25からなる。水平軸部24は、作業床側(足場板9の側)の先行手摺柱21の面から水平に突出する。可動舌部25は、水平軸部24の基端側に向かって拡開する三角形状の垂直可動板からなり、水平軸部24から垂下する。可動舌部25は、水平軸部24内に内装したスプリング(図示せず)によって常時下方に付勢されており、水平軸部24及び可動舌部25は、グラビティロック機構を構成する。   The upper and lower protrusions 22 have substantially the same structure, and each protrusion 22 includes a horizontal shaft portion 24 and a movable tongue portion 25. The horizontal shaft portion 24 protrudes horizontally from the surface of the preceding handrail pillar 21 on the work floor side (the scaffold plate 9 side). The movable tongue 25 is a triangular vertical movable plate that expands toward the proximal end of the horizontal shaft 24, and hangs down from the horizontal shaft 24. The movable tongue 25 is always urged downward by a spring (not shown) housed in the horizontal shaft 24, and the horizontal shaft 24 and the movable tongue 25 constitute a gravity lock mechanism.

図4(A)は、保持具30の構造を示す平面図であり、図4(B)、図4(C)及び図4(D)は、図4(A)に示すI−I線、II−II線及びIII −III 線における断面図である。図5(A)は、保持具40の構造を示す平面図であり、図5(B)、図5(C)及び図5(D)は、図5(A)に示すIV−IV線、V −V 線及びVI−VI線における断面図である。   4A is a plan view showing the structure of the holder 30, and FIGS. 4B, 4C, and 4D are II lines shown in FIG. It is sectional drawing in the II-II line and the III-III line. 5A is a plan view showing the structure of the holder 40, and FIGS. 5B, 5C, and 5D are IV-IV lines shown in FIG. It is sectional drawing in a V-V line and a VI-VI line.

図4に示すように、上側保持具30は、先行手摺柱21の水平支軸27に回転可能に支持された回転保持部31と、回転保持部31の垂直枢軸33を中心に枢動可能に支持された開閉部32と、図4(A)に実線で示す閉鎖位置に開閉部32を係止する係止機構34とから構成される。保持具30は、垂直方向に相対変位可能に建地2に係合する第1係合部を構成する。   As shown in FIG. 4, the upper holding tool 30 is pivotable about a rotation holding portion 31 rotatably supported by the horizontal support shaft 27 of the preceding handrail column 21 and a vertical pivot 33 of the rotation holding portion 31. The opening / closing portion 32 is supported, and a locking mechanism 34 that locks the opening / closing portion 32 at a closed position indicated by a solid line in FIG. The holder 30 constitutes a first engaging portion that engages with the building 2 so as to be relatively displaceable in the vertical direction.

支軸27は、先行手摺柱21の上端部を貫通するボルト27aと、ボルト27aの先端部に螺合するワッシャ付きナット27bとからなる。回転保持部31は、上板31a、下板31b及び垂直基端部31cを一体化した構成を有し、基端部31cには、ボルト27aが貫通するボルト孔31dが穿設される。ボルト27aのヘッド部は、適度なナット27bの締付けにより、基端部31cを回転可能に支承し、基端部31cは、ボルト27aの水平中心軸線を中心に回転する。   The support shaft 27 includes a bolt 27a that penetrates the upper end portion of the preceding handrail column 21, and a washer-attached nut 27b that is screwed into a tip portion of the bolt 27a. The rotation holding portion 31 has a configuration in which an upper plate 31a, a lower plate 31b, and a vertical base end portion 31c are integrated, and a bolt hole 31d through which the bolt 27a passes is formed in the base end portion 31c. The head portion of the bolt 27a rotatably supports the base end portion 31c by tightening the appropriate nut 27b, and the base end portion 31c rotates around the horizontal center axis of the bolt 27a.

上板31a及び下板31bは、建地2を受入れ可能な概ね半円形の凹部38を形成するとともに、建地2の円形断面に相応するように凹部38の両側に延びる左右の腕部35、36を形成する。上板31a及び下板31bは、第1腕部35に配置された枢軸33によって開閉部32の枢支部32aを枢動可能に支持し、第2腕部36に配置された係止機構34によって開閉部32の先端部32bを第2腕部36に係止する。   The upper plate 31a and the lower plate 31b form a substantially semicircular recess 38 capable of receiving the building 2 and the left and right arms 35 extending on both sides of the recess 38 so as to correspond to the circular section of the building 2; 36 is formed. The upper plate 31 a and the lower plate 31 b support the pivotal support portion 32 a of the opening / closing portion 32 by a pivot 33 disposed on the first arm portion 35, and can be pivoted by a locking mechanism 34 disposed on the second arm portion 36. The distal end portion 32 b of the opening / closing portion 32 is locked to the second arm portion 36.

枢軸33は、上板31a及び下板31bを垂直に貫通するリベットからなり、図4(C)に示すように、基端部32aの円形開口32cを貫通する。係止機構34は、図4(D)に示す如く、上板31aに固定された基台34aと、基台34aに螺入した係止具34bと、係止具34bの下端から下方に突出するラッチ部34cとを備える。ラッチ部34cは、上板31aの開口部31dを貫通し、開閉部32の係止孔32d内に延入する。係止具34bは、ラッチ部34cを常時下方に付勢するスプリング(図示せず)を内装しており、ラッチ部34cは、開閉部32に係止する。   The pivot 33 is formed of a rivet that vertically penetrates the upper plate 31a and the lower plate 31b, and penetrates the circular opening 32c of the base end portion 32a as shown in FIG. 4C. As shown in FIG. 4D, the locking mechanism 34 includes a base 34a fixed to the upper plate 31a, a locking tool 34b screwed into the base 34a, and a downward projecting from the lower end of the locking tool 34b. Latch part 34c. The latch portion 34 c passes through the opening portion 31 d of the upper plate 31 a and extends into the locking hole 32 d of the opening / closing portion 32. The locking tool 34 b includes a spring (not shown) that constantly urges the latch portion 34 c downward, and the latch portion 34 c is locked to the opening / closing portion 32.

係止具34bの円板形つまみ部34fを手指で上方に引き上げると、ラッチ部34cは、スプリングの弾発力に抗して上昇し、係止孔32dから離脱する。開閉部32は、枢軸33を中心に時計廻り方向に回転し、図4(A)に破線で示す開放位置に移動する。開放位置では、保持具30は、建地2との係合を解き、建地2から離脱することができる。   When the disc-shaped knob portion 34f of the locking tool 34b is pulled upward with fingers, the latch portion 34c rises against the spring force of the spring and is detached from the locking hole 32d. The opening / closing part 32 rotates in the clockwise direction around the pivot 33 and moves to an open position indicated by a broken line in FIG. In the open position, the holder 30 can be disengaged from the building site 2 and detached from the building site 2.

枢軸33を中心に開閉部32を開放位置から反時計廻り方向に回転させると、開閉部32の傾斜面32eがラッチ部34cの傾斜面34eと衝合し、ラッチ部34cをスプリングの弾発力に抗して過渡的に押し上げる。ラッチ部34cと係止孔32dとが整合すると、ラッチ部34cは、スプリングの弾発力により再び突出し、図4(D)に示すように、開閉部32に係合する。閉鎖位置の保持具30は、回転保持部31及び開閉部32によって、建地2を凹部38内に保持する。   When the opening / closing portion 32 is rotated counterclockwise from the open position around the pivot 33, the inclined surface 32e of the opening / closing portion 32 abuts with the inclined surface 34e of the latch portion 34c, and the latch portion 34c is caused by the elasticity of the spring. Push up transiently against. When the latch portion 34c and the locking hole 32d are aligned, the latch portion 34c protrudes again due to the spring force of the spring and engages with the opening / closing portion 32 as shown in FIG. The holder 30 in the closed position holds the building 2 in the recess 38 by the rotation holding part 31 and the opening / closing part 32.

上側の保持具30と対をなす下側保持具40の構造が、図5に示されている。保持具40は、先行手摺柱の降下を阻止すべく建地2と係合する第2係合部を構成する。保持具40は、先行手摺柱21に固定された固定保持部41と、保持部41の垂直枢軸43を中心に枢動可能に支承された開閉部42と、図5(A)に実線で示す閉鎖位置に開閉部42を係止する係止機構44とから構成される。   The structure of the lower holder 40 that is paired with the upper holder 30 is shown in FIG. The holding tool 40 constitutes a second engaging portion that engages with the building site 2 so as to prevent the descending of the handrail pillar. The holding tool 40 is shown by a solid line in FIG. 5A, a fixed holding portion 41 fixed to the preceding handrail column 21, an opening / closing portion 42 supported so as to be pivotable about the vertical pivot 43 of the holding portion 41. The locking mechanism 44 locks the opening / closing part 42 in the closed position.

保持具40の構造は、保持部41が先行手摺柱21に固定されている点を除き、保持具30の構造と実質的に同一である。即ち、保持部41は、上板41a、下板41b及び垂直基端部41cを一体化した構成を有し、基端部41cは、溶接又は固定ボルト等によって先行手摺柱21に固定される。上板41a及び下板41bは、建地2を受入れ可能な概ね半円形の凹部48を形成する。保持部41の第1腕部45に配置された枢軸43は、開閉部42の基端部42aを枢動可能に支承し、保持部41の第2腕部46に配置された係止機構44は、開閉部42の先端部42bを第2腕部46に係止する。枢軸43は、基端部42aの円形開口42cを貫通し、係止機構44は、基台44a、係止具44b及びラッチ部44cを備え、ラッチ部44cは、開閉部42の係止孔42d内に延入する。   The structure of the holder 40 is substantially the same as the structure of the holder 30 except that the holding portion 41 is fixed to the preceding handrail pillar 21. That is, the holding portion 41 has a configuration in which the upper plate 41a, the lower plate 41b, and the vertical base end portion 41c are integrated, and the base end portion 41c is fixed to the leading handrail column 21 by welding or a fixing bolt. The upper plate 41a and the lower plate 41b form a substantially semicircular recess 48 that can receive the building 2. The pivot 43 disposed on the first arm portion 45 of the holding portion 41 supports the base end portion 42 a of the opening / closing portion 42 so as to be pivotable, and the locking mechanism 44 disposed on the second arm portion 46 of the holding portion 41. Locks the distal end portion 42 b of the opening / closing portion 42 to the second arm portion 46. The pivot 43 passes through the circular opening 42c of the base end portion 42a, and the locking mechanism 44 includes a base 44a, a locking tool 44b, and a latch portion 44c. The latch portion 44c is a locking hole 42d of the opening / closing portion 42. Extend into.

係止具44bの円板形つまみ部44fを手指で上方に引き上げると、ラッチ部44cは、スプリングの弾発力に抗して上昇し、係止孔42dから離脱し、保持具40は、建地2との係合を解き、建地2から離脱することができる。枢軸43を中心に開放位置の開閉部42を閉鎖位置に回転させると、傾斜面42e、44eの衝合によりラッチ部44cが過渡的に押し上げられ、ラッチ部44cは、係止孔42dに係止し、かくして、保持具40は、凹部48内に建地2を保持する。   When the disc-shaped knob portion 44f of the locking tool 44b is pulled upward with fingers, the latch portion 44c rises against the spring force of the spring, and is detached from the locking hole 42d. The engagement with the ground 2 can be released and the building 2 can be detached. When the opening / closing portion 42 in the open position is rotated to the closed position around the pivot 43, the latch portion 44c is transiently pushed up by the contact of the inclined surfaces 42e, 44e, and the latch portion 44c is locked in the locking hole 42d. Thus, the holder 40 holds the building site 2 in the recess 48.

図6は、伸縮手摺50の構造を示す平面図、正面図及び部分拡大断面図である。   FIG. 6 is a plan view, a front view, and a partially enlarged sectional view showing the structure of the telescopic handrail 50.

伸縮手摺50は、入子式に組付けられた内管51及び外管52より構成される。内管51は、外管52内に相対変位可能に挿入される。伸縮手摺50は、外管52の開口端からの内管51の突出により伸長し、外管52内への内管51の引込みにより短縮する。係止部53、54が、内管51及び外管52の各外端部に設けられ、先行手摺柱21の突起22を挿入可能な係止孔55が、係止部53、54の平板部56、57に夫々穿設される。使用において、係止孔55は、突起22(図3)を遊嵌状態に貫通せしめる。なお、係止部53は、内管51の外端を挿入可能な管状基部58を有し、基部58に挿入した内管51の外端は、溶接用円形開口部59を利用した溶接等により、基部58に固着する。   The telescopic handrail 50 includes an inner pipe 51 and an outer pipe 52 assembled in a telescopic manner. The inner tube 51 is inserted into the outer tube 52 so as to be relatively displaceable. The telescopic handrail 50 is extended by the protrusion of the inner tube 51 from the open end of the outer tube 52 and is shortened by drawing the inner tube 51 into the outer tube 52. Locking portions 53 and 54 are provided at the outer end portions of the inner tube 51 and the outer tube 52, and a locking hole 55 into which the protrusion 22 of the preceding handrail column 21 can be inserted is a flat plate portion of the locking portions 53 and 54. 56 and 57 are respectively drilled. In use, the locking hole 55 allows the protrusion 22 (FIG. 3) to pass through in a loosely fitted state. The locking portion 53 has a tubular base 58 into which the outer end of the inner tube 51 can be inserted. The outer end of the inner tube 51 inserted into the base 58 is welded using a circular opening 59 for welding or the like. To the base 58.

係止ピン61、62が内管51及び外管52の内部に固定され、管51、52の直径方向に延びる。弾性部材60が、係止ピン61、62を周回し、係止ピン61、62の間に延びる。弾性部材60は、その弾性復元力により外管52の内周面に弾力的に摩擦係合して円滑な内管51の伸縮運動をもたらすとともに、外管52からの内管51の脱落を阻止する。係止ピン62は又、外管52内に引き込んだ内管51の内端に衝合し、更なる内管51の引き込みを禁止する。従って、伸縮手摺50の最大長は、弾性部材60によって規制され、伸縮手摺50の最小長は、係止ピン62の位置によって決定される。   The locking pins 61 and 62 are fixed inside the inner tube 51 and the outer tube 52 and extend in the diameter direction of the tubes 51 and 52. The elastic member 60 goes around the locking pins 61 and 62 and extends between the locking pins 61 and 62. The elastic member 60 elastically frictionally engages with the inner peripheral surface of the outer tube 52 by its elastic restoring force to cause a smooth expansion and contraction of the inner tube 51 and prevents the inner tube 51 from dropping off from the outer tube 52. To do. The locking pin 62 also abuts on the inner end of the inner tube 51 drawn into the outer tube 52 and inhibits further pulling of the inner tube 51. Therefore, the maximum length of the telescopic handrail 50 is regulated by the elastic member 60, and the minimum length of the telescopic handrail 50 is determined by the position of the locking pin 62.

図7は、伸縮手摺50の係止部53、54を先行手摺柱21の突起22に係止する態様を示す部分側面図である。   FIG. 7 is a partial side view showing a mode in which the locking portions 53 and 54 of the telescopic handrail 50 are locked to the protrusion 22 of the preceding handrail pillar 21.

係止孔55内に突起22を挿入するように係止部53、54を水平軸部24に係合させると(図7(A)) 、可動舌部25は、係止部53、54に衝合して水平軸部24内に引っ込む(図7(B))。係止孔55が可動舌部25を超えると、可動舌部25は、水平軸部24に内装したスプリングの弾性復元力により再び隆起し、係止部53、54を水平軸部24に係止する(図7(C))。係止部53、54を突起22から取り外す場合、可動舌部25を手指で水平軸部24内に引っ込め、係止部53、54を水平軸部24から離脱させれば良い。なお、突起22には、先行手摺柱21の両側に位置する伸縮手摺50が、係合する。   When the locking portions 53 and 54 are engaged with the horizontal shaft portion 24 so as to insert the protrusions 22 into the locking holes 55 (FIG. 7A), the movable tongue 25 is moved to the locking portions 53 and 54. It collides and retracts into the horizontal shaft portion 24 (FIG. 7B). When the locking hole 55 exceeds the movable tongue 25, the movable tongue 25 is raised again by the elastic restoring force of the spring built in the horizontal shaft portion 24, and the locking portions 53, 54 are locked to the horizontal shaft portion 24. (FIG. 7C). When the locking portions 53 and 54 are removed from the protrusion 22, the movable tongue 25 may be retracted into the horizontal shaft portion 24 with fingers and the locking portions 53 and 54 may be detached from the horizontal shaft portion 24. The protrusions 22 engage with the extendable handrails 50 located on both sides of the preceding handrail column 21.

次に、先行手摺20の使用方法について説明する。   Next, a method for using the leading handrail 20 will be described.

図8及び図9は、先行手摺20の使用方法を示す立面図である。   8 and 9 are elevation views showing how to use the leading handrail 20.

作業者は、上層の建地2に対して、先行手摺柱21の上側保持具30を取付け(図8(A))、手摺用及び中桟用の各伸縮手摺50の係止部53又は54を上下の突起22に夫々係止し、先行手摺柱21の下部を手指で握持して先行手摺柱21を押し上げる(図8(B) )。先行手摺柱21は、建地2に対して傾斜し、その傾斜角度は、上昇時に変化する。しかしながら、上側保持具30が先行手摺柱21に対して相対回転するので、先行手摺柱21は、建地2に対する傾斜角度を若干変化させながら建地2の案内により上昇する。建地2及び布4の交差部に配置された緊結金具13を超えて先行手摺柱21の下端部が上昇したとき、先行手摺柱21の下側保持具40内に建地2を収容して開閉部42を閉じ、これにより、上下の保持具30、40を建地2に上下動可能に取付けることができる(図8(C))。下側保持具40の降下は、緊結金具13によって阻止されるので、先行手摺柱21は、最上層の建地2のレベルに静止する。なお、建地2に対する保持具30、40の取付けは、前述の如く、開放位置の開閉部32、42を閉鎖位置に回転させて、凹部38、48内に建地2を収容し且つ保持することによって行えば良い(図4(A)、図5(A))。   The operator attaches the upper holding tool 30 of the leading handrail column 21 to the upper building 2 (FIG. 8A), and the locking portions 53 or 54 of the telescopic handrails 50 for the handrail and the middle rail. Are respectively engaged with the upper and lower protrusions 22 and the lower part of the preceding handrail pillar 21 is held with fingers to push up the preceding handrail pillar 21 (FIG. 8B). The leading handrail column 21 is inclined with respect to the building site 2, and the inclination angle thereof changes when it rises. However, since the upper holding tool 30 rotates relative to the preceding handrail column 21, the preceding handrail column 21 rises by guiding the building site 2 while slightly changing the inclination angle with respect to the building site 2. When the lower end portion of the preceding handrail column 21 rises beyond the fastening fitting 13 disposed at the intersection of the building site 2 and the cloth 4, the building site 2 is accommodated in the lower holding tool 40 of the preceding handrail column 21. By closing the opening / closing part 42, the upper and lower holders 30, 40 can be attached to the building 2 so as to be movable up and down (FIG. 8C). Since the lower holding tool 40 is prevented from descending by the fastening fitting 13, the leading handrail column 21 is stationary at the level of the uppermost building 2. In addition, the attachment of the holders 30 and 40 to the building 2 is performed by rotating the open / closed portions 32 and 42 in the open position to the closed position and housing and holding the building 2 in the recesses 38 and 48 as described above. (FIGS. 4A and 5A).

次いで、作業者は、隣り合う建地2に別の(第2の)先行手摺柱21を取付けるべく、各伸縮手摺50の係止部53又は54を先行手摺柱21の突起22に係止し、上側保持具30を建地2に取付け、先行手摺柱21を押し上げる(図8(D))。第2の先行手摺柱21は、保持具30の回転により、建地2に対する傾斜角度を若干変化させながら建地2に沿って上昇する。作業者は更に、先行手摺柱21の下端部が緊結金具13を超えて上昇したとき、先行手摺柱21の下側保持具40を建地2に取付ける(図8(E))。上下の保持具30、40は、建地2に上下動可能に係合する。下側保持具40の降下は、緊結金具13によって阻止されるので、先行手摺柱21は、最上層の建地2のレベルに静止し、伸縮手摺50は、先行手摺柱21の間において水平に延びる。   Next, the operator locks the locking portion 53 or 54 of each telescopic handrail 50 to the protrusion 22 of the preceding handrail column 21 in order to attach another (second) preceding handrail column 21 to the adjacent building 2. Then, the upper holding tool 30 is attached to the building 2 and the leading handrail pillar 21 is pushed up (FIG. 8D). The second leading handrail column 21 rises along the building site 2 while the tilt angle with respect to the building site 2 is slightly changed by the rotation of the holder 30. The operator further attaches the lower holding tool 40 of the preceding handrail column 21 to the building site 2 when the lower end portion of the preceding handrail column 21 rises beyond the fastening fitting 13 (FIG. 8E). The upper and lower holders 30 and 40 engage with the building 2 so as to be movable up and down. Since the lower holding tool 40 is prevented from descending by the fastening fitting 13, the leading handrail column 21 is stationary at the level of the uppermost building 2, and the telescopic handrail 50 is horizontally disposed between the preceding handrail columns 21. Extend.

引き続き、作業者は、隣接する建地スパンに先行手摺を形成すべく、先行して取付けた第2先行手摺柱21の突起22に別の伸縮手摺50の係止部53又は54を引っ掛ける(図9(A) )。この作業は、伸縮手摺50の一端部を手指で握持して他端側の係止部53又は54を突起22に係止することにより行うことができる。この伸縮手摺50については、第2先行手摺柱21を建地2に取付ける作業(図8(D))の前に第2先行手摺柱21の突起22に係止しておいても良い。   Subsequently, the operator hooks the locking portion 53 or 54 of another telescopic handrail 50 on the protrusion 22 of the second preceding handrail column 21 attached in advance so as to form the preceding handrail on the adjacent building span (see FIG. 9 (A)). This operation can be performed by holding one end portion of the telescopic handrail 50 with fingers and engaging the engaging portion 53 or 54 on the other end side with the protrusion 22. The telescopic handrail 50 may be locked to the protrusion 22 of the second preceding handrail column 21 before the work of attaching the second preceding handrail column 21 to the building 2 (FIG. 8D).

作業者は更に、各伸縮手摺50の他方の係止部53又は54を別の(第3の)先行手摺柱21の突起22に係止し、上側保持具30を建地2に取付け、先行手摺柱21を押し上げる(図9(B))。先行手摺柱21は、上側保持具30の回転により、建地2に対する傾斜角度を若干変化させながら建地2に沿って上昇する。先行手摺柱21の下端部が緊結金具13を超えたとき、先行手摺柱21の下側保持具40は、建地2に取付けられ(図9(C))、上下の保持具30、40は、建地2に上下動可能に係合する。下側保持具40の降下は、緊結金具13によって阻止されるので、先行手摺柱21は、最上層の建地2のレベルに静止し、伸縮手摺50は、先行手摺柱21の間で水平に延びる。   The operator further locks the other locking portion 53 or 54 of each telescopic handrail 50 to the protrusion 22 of another (third) preceding handrail column 21 and attaches the upper holding tool 30 to the building site 2. The handrail column 21 is pushed up (FIG. 9B). The leading handrail column 21 rises along the building site 2 while the inclination angle with respect to the building site 2 is slightly changed by the rotation of the upper holding tool 30. When the lower end portion of the leading handrail column 21 exceeds the binding fitting 13, the lower holding tool 40 of the leading handrail column 21 is attached to the building site 2 (FIG. 9C), and the upper and lower holding tools 30, 40 are Engage with the building 2 so as to be movable up and down. Since the lower holding tool 40 is prevented from descending by the fastening fitting 13, the leading handrail column 21 is stationary at the level of the uppermost building 2, and the telescopic handrail 50 is horizontally disposed between the preceding handrail columns 21. Extend.

このような一連の作業を反復実施することにより、最上層レベル全域に先行手摺20を形成することができる。かくして、上記構成の先行手摺20によれば、最上層への先行手摺移設作業は、既存の作業床の作業者が安全且つ迅速に遂行することができる。先行手摺柱21及び伸縮手摺50は、比較的軽量であり、先行手摺柱21は、円滑に上昇することから、先行手摺移設作業は、比較的軽微な力で行うことができる。また、単管足場1の解体時等には、先行手摺20は、建地2に沿って先行手摺柱21を降下させることにより、全体的に降下するので、足場解体時の取扱いも容易である。しかも、上記構成の先行手摺20によれば、保持具30、40の閉鎖・開放および伸縮手摺50の係止・取外しにより、先行手摺20の取付け又は取外しを簡易且つ迅速に遂行することができ、また、部品点数も比較的少ないことから、先行手摺の構成部品又は資材の建設現場間転用を効率的に行うことが可能となり、建設現場間の移動、運搬等の経費も節減することもできるので、実用的に極めて有利である。   By repeating such a series of operations, the leading handrail 20 can be formed over the entire uppermost level. Thus, according to the preceding handrail 20 having the above-described configuration, the work of transferring the preceding handrail to the uppermost layer can be performed safely and quickly by the worker on the existing work floor. The preceding handrail column 21 and the telescopic handrail 50 are relatively lightweight, and the preceding handrail column 21 is smoothly raised, so that the handrail moving operation can be performed with a relatively small force. Further, when the single pipe scaffold 1 is dismantled, the leading handrail 20 is lowered entirely by lowering the leading handrail pillar 21 along the building 2, so that handling at the time of dismantling the scaffold is easy. . Moreover, according to the preceding handrail 20 having the above-described configuration, the attachment or removal of the preceding handrail 20 can be easily and quickly performed by closing and opening the holders 30 and 40 and locking and removing the telescopic handrail 50. In addition, since the number of parts is relatively small, it is possible to efficiently transfer the components or materials of the leading handrail between construction sites, and it is possible to reduce expenses such as movement and transportation between construction sites. It is extremely advantageous for practical use.

図10は、本発明の第2実施例に係る先行手摺柱21の斜視図、正面図及び側面図である。   FIG. 10 is a perspective view, a front view, and a side view of the leading handrail column 21 according to the second embodiment of the present invention.

図10に示す先行手摺柱21は、前述の実施例と同じく、建地2に係合する上下の保持具30、40’を上端部及び下端部に備えるとともに、伸縮手摺50を係止可能な係止手段を構成する突起22を上部及び中央部に備える。しかしながら、下側の保持具40’は、鋼管用緊結金具(クランプ金具)に類似した構造を有し、先行手摺柱21に固定された固定保持部41’と、保持部41’の支承部43’に支承された開閉部42’と、開閉部42’を係止する係止機構44’とから構成される。   The leading handrail column 21 shown in FIG. 10 includes upper and lower holders 30 and 40 ′ that engage with the building site 2 at the upper end portion and the lower end portion, as in the above-described embodiment, and can lock the telescopic handrail 50. Protrusions 22 constituting locking means are provided in the upper part and the central part. However, the lower holding tool 40 ′ has a structure similar to a steel pipe binding metal fitting (clamp metal fitting), and a fixed holding portion 41 ′ fixed to the preceding handrail column 21 and a support portion 43 of the holding portion 41 ′. An opening / closing portion 42 'supported by' and a locking mechanism 44 'for locking the opening / closing portion 42'.

図11は、本発明の第3実施例に係る先行手摺柱21の斜視図である。   FIG. 11 is a perspective view of the leading handrail column 21 according to the third embodiment of the present invention.

上側の保持具30”は、水平軸線を中心に回転可能に先行手摺柱21の上部に取付けられた回転保持部31”と、左右の係止機構34”によって回転保持部31”に支持された開閉部32”とから構成される。下側の保持具40”は、先行手摺柱21に固定した固定保持部41”と、左右の係止機構44”によって固定保持部41”に支持された開閉部42”とから構成される。   The upper holding tool 30 ″ is supported on the rotation holding portion 31 ″ by a rotation holding portion 31 ″ attached to the upper portion of the preceding handrail column 21 so as to be rotatable about a horizontal axis, and a left and right locking mechanism 34 ″. The lower holding tool 40 ″ is supported by the fixed holding portion 41 ″ by the fixed holding portion 41 ″ fixed to the preceding handrail column 21 and the left and right locking mechanisms 44 ″. And an opening / closing part 42 ″.

図12は、本発明の第4実施例に係る先行手摺柱21の斜視図、正面図及び側面図であり、図13は、図12に示す先行手摺柱21の使用形態を示す単管足場最上層部の立面図である。図12及び図13において、図2〜図11に示す各構成要素と実質的に同一の構成要素については、同一の参照符号が付されている。   12 is a perspective view, a front view, and a side view of the preceding handrail pillar 21 according to the fourth embodiment of the present invention, and FIG. 13 is a single-tube scaffolding that shows a usage pattern of the preceding handrail pillar 21 shown in FIG. It is an elevation view of an upper layer part. 12 and 13, components that are substantially the same as those shown in FIGS. 2 to 11 are given the same reference numerals.

前述の各実施例においては、建地2の上端レベルが均一に設定される通常の単管足場において好適に使用し得る先行手摺柱について説明した。他方、単管足場の組立方法として、図13に示す如く、建地2の上端レベルに高低差が生じる建地千鳥組の組立方法が知られている。図13には、先行手摺20を最上層の足場板9に配置した状態で、更に上層の布4、腕木5及び建地2(2a、2b)を千鳥組に組立てた状態が示されている。最上層の緊結金具13から上方に突出する建地2aの寸法(上方突出量)は、比較的小寸法h1に設定され、建地2bの上方突出量は、比較的大寸法h2に設定される。建地2a、2bは、布4の長手方向に交互に配置される。建地2aの上方突出量(寸法h1)は、通常は、150〜300mm程度に設定されるので、前述の各実施例の先行手摺柱を用いた場合、先行手摺柱の上昇時に上側の保持具30が建地2aの上端を超え、先行手摺柱は、建地2aから脱落してしまう。   In each of the above-described embodiments, the preceding handrail pillar that can be suitably used in a normal single pipe scaffold in which the upper end level of the building 2 is set uniformly has been described. On the other hand, as a method for assembling a single pipe scaffold, as shown in FIG. 13, a method for assembling a building zigzag assembly in which a height difference occurs at the upper end level of the building 2 is known. FIG. 13 shows a state in which the top handrail 20 is arranged on the uppermost scaffolding plate 9 and the upper cloth 4, the arm 5 and the building 2 (2a, 2b) are assembled in a zigzag group. . The size (upward projection amount) of the building site 2a protruding upward from the uppermost fastening metal fitting 13 is set to a relatively small size h1, and the upward projection amount of the building site 2b is set to a relatively large size h2. . The building sites 2 a and 2 b are alternately arranged in the longitudinal direction of the cloth 4. Since the upward protrusion amount (dimension h1) of the building 2a is normally set to about 150 to 300 mm, when the preceding handrail column of each of the above-described embodiments is used, the upper holding tool is raised when the preceding handrail column is raised. 30 exceeds the upper end of the building site 2a, and the leading handrail pillar falls off the building site 2a.

図12には、このような建地千鳥組の単管足場に適応可能な先行手摺柱21が示されている。図12に示す先行手摺柱21では、上側の保持具30は、先行手摺柱21の下端から所定寸法h3の位置に配置されており、寸法h3は、建地2aの上方突出量h1よりも小さく、先行手摺柱21の上昇時に上側保持具30が建地2aから脱落することがない寸法に設定される。先行手摺柱21、上側保持具30、下側保持具40及び伸縮手摺50の各部構造は、図2〜図9に示す第1実施例と実質的に同一であり、先行手摺20は、図13に示す如く、最上層の作業床(足場板9)に先行手摺20を形成する。   FIG. 12 shows a leading handrail column 21 that can be applied to such a single-ply scaffolding of a built-up zigzag group. In the preceding handrail pillar 21 shown in FIG. 12, the upper holding tool 30 is disposed at a position of a predetermined dimension h3 from the lower end of the preceding handrail pillar 21, and the dimension h3 is smaller than the upward projecting amount h1 of the building 2a. The upper holding tool 30 is set to a dimension that does not drop off from the building 2a when the leading handrail column 21 is raised. Each structure of the leading handrail column 21, the upper holding tool 30, the lower holding tool 40, and the telescopic handrail 50 is substantially the same as that of the first embodiment shown in FIGS. As shown in FIG. 4, the leading handrail 20 is formed on the uppermost work floor (scaffold plate 9).

図14は、先行手摺20の使用方法を示す立面図である。
前述の各実施例と同様、作業者は、上層の建地2bに対して、先行手摺柱21の上側保持具30を取付け(図14(A))、手摺用及び中桟用の各伸縮手摺50の係止部53又は54(図6)を上下の突起22に夫々係止し、先行手摺柱21の下部を手指で握持して先行手摺柱21を押し上げる(図14(B) )。先行手摺柱21は、建地2bに対する傾斜角度を若干変化させながら建地2bの案内により上昇する。先行手摺柱21の下端部が建地2b及び布4の交差部の緊結金具13を超えて上昇したとき、作業者は、先行手摺柱21の下側保持具40内に建地2bを収容して開閉部42を閉じ、これにより、上下の保持具30、40は、建地2に上下動可能に取付けられる。下側保持具40の降下は、緊結金具13によって阻止され、先行手摺柱21は、最上層の建地2bのレベルに静止する。
FIG. 14 is an elevation view showing how to use the leading handrail 20.
As in the previous embodiments, the operator attaches the upper holding tool 30 of the leading handrail pillar 21 to the upper building 2b (FIG. 14A), and each telescopic handrail for handrails and middle rails. The 50 locking portions 53 or 54 (FIG. 6) are locked to the upper and lower protrusions 22, respectively, and the lower portion of the preceding handrail column 21 is gripped by fingers to push up the preceding handrail column 21 (FIG. 14B). The leading handrail column 21 is raised by guiding the building site 2b while slightly changing the inclination angle with respect to the building site 2b. When the lower end portion of the leading handrail column 21 rises beyond the binding metal 13 at the intersection of the building land 2b and the cloth 4, the operator houses the building land 2b in the lower holding tool 40 of the preceding handrail column 21. Thus, the opening / closing part 42 is closed, whereby the upper and lower holders 30, 40 are attached to the building 2 so as to be movable up and down. Lowering of the lower holding tool 40 is blocked by the fastening fitting 13, and the leading handrail column 21 is stopped at the level of the uppermost building 2b.

次いで、作業者は、隣り合う建地2aに別の(第2の)先行手摺柱21を取付けるべく、各伸縮手摺50の係止部53又は54を第2の先行手摺柱21の突起22に係止し、上側保持具30を建地2aに取付け、先行手摺柱21を押し上げる(図8(C))。第2の先行手摺柱21は、保持具30の回転により、傾斜角度を若干変化させながら建地2aに沿って上昇する。作業者は更に、先行手摺柱21の下端部が緊結金具13を超えたとき、先行手摺柱21の下側保持具40を建地2bに取付ける(図8(D))。下側保持具40は、建地2aを収容して開閉部42を閉じ、かくして、上下の保持具30、40は、建地2に上下動可能に係合する。下側保持具40の降下は、緊結金具13によって阻止されるので、先行手摺柱21は、最上層の建地2aのレベルに静止し、伸縮手摺50は、先行手摺柱21の間に水平に延びる。   Next, the operator attaches the locking portion 53 or 54 of each telescopic handrail 50 to the protrusion 22 of the second preceding handrail pillar 21 in order to attach another (second) preceding handrail pillar 21 to the adjacent building 2a. The upper holding tool 30 is attached to the building site 2a, and the leading handrail column 21 is pushed up (FIG. 8C). The second leading handrail column 21 rises along the building 2 a while the inclination angle is slightly changed by the rotation of the holder 30. The operator further attaches the lower holding tool 40 of the preceding handrail column 21 to the building site 2b when the lower end portion of the preceding handrail column 21 exceeds the binding fitting 13 (FIG. 8D). The lower holding tool 40 accommodates the building site 2a and closes the opening / closing part 42. Thus, the upper and lower holding tools 30, 40 are engaged with the building site 2 so as to be movable up and down. Since the lower holding tool 40 is prevented from descending by the fastening fitting 13, the leading handrail column 21 is stationary at the level of the uppermost building 2 a, and the telescopic handrail 50 is horizontally disposed between the preceding handrail columns 21. Extend.

図15は、本発明の第5実施例に係る先行手摺柱21の背面図、側面図及びVII-VII線断面図である。また、図16は、図15に示す先行手摺柱21の斜視図であり、図17は、先行手摺柱21の使用形態を示す単管足場最上層部の断面図である。なお、図16において、先行手摺柱21の上端部に配設された親綱案内具70は、図示を省略されている。また、図15〜17において、図2〜図14に示す各構成要素と実質的に同一の構成要素については、同一の参照符号が付されている。   FIG. 15 is a rear view, a side view, and a sectional view taken along line VII-VII of the preceding handrail pillar 21 according to the fifth embodiment of the present invention. 16 is a perspective view of the preceding handrail pillar 21 shown in FIG. 15, and FIG. 17 is a cross-sectional view of the uppermost layer portion of the single-tube scaffold showing the usage pattern of the preceding handrail pillar 21. In addition, in FIG. 16, the master rope guide tool 70 arrange | positioned at the upper end part of the preceding handrail pillar 21 is abbreviate | omitting illustration. 15 to 17, components that are substantially the same as the components illustrated in FIGS. 2 to 14 are denoted by the same reference numerals.

本例の先行手摺20は、前述の第2実施例と同様、水平軸線を中心に回転可能に先行手摺柱21に取付けられた上側保持具30と、鋼管用緊結金具に類似した構造を有する下側保持具40’とを備える。また、この先行手摺20は、上記第4実施例と同じく、建地千鳥組の単管足場に適応可能な構成を有し、上側保持具30は、緊結金具13(図17)の上端レベルMLから所定寸法h4の位置に配置されている。寸法h4は、建地2aの上方突出量h1(図13)よりも小さく、先行手摺柱21の上昇時に上側保持具30が建地2aから脱落することがない寸法に設定される。   The preceding handrail 20 of the present example has a structure similar to the upper holding tool 30 attached to the preceding handrail column 21 so as to be rotatable about the horizontal axis, and a steel pipe binding bracket, as in the second embodiment. Side holder 40 '. Further, the leading handrail 20 has a configuration that can be adapted to a single-pipe scaffolding of a building zigzag group as in the fourth embodiment, and the upper holding tool 30 is the upper end level ML of the fastening bracket 13 (FIG. 17). To a predetermined dimension h4. The dimension h4 is smaller than the upward protrusion amount h1 (FIG. 13) of the building 2a, and is set to a dimension that prevents the upper holding tool 30 from falling off the building 2a when the preceding handrail pillar 21 is lifted.

本例の先行手摺柱21は、図15に示すように、建地2a(仮想線で示す)の中心軸線CLから所定距離Sだけ足場の外側に変形しており、垂直支柱部分21a、傾斜部分21b、下方延長部分21c及び水平延長部分21dから構成される。なお、距離Sは、150mm程度の寸法に設定される。   As shown in FIG. 15, the leading handrail pillar 21 of this example is deformed to the outside of the scaffold by a predetermined distance S from the central axis CL of the building 2a (indicated by the imaginary line), and includes a vertical column portion 21a, an inclined portion 21b, the downward extension part 21c, and the horizontal extension part 21d. The distance S is set to a dimension of about 150 mm.

垂直支柱部分21aは、建地と平行に垂直に延び、垂直支柱部分21aの上端には、親綱案内具70が配設される。親綱案内具70は、垂直支柱部分21aの上端部に固定された一対の板状支持部材71と、支持部材71に取付けられた水平支軸72と、水平支軸72に回転可能に支持された親綱案内ローラ73と、支持部材71に固定された親綱外れ止め部材74とから構成される。使用において、親綱(図示せず)は、親綱外れ止め部材74内に形成された親綱通し孔75に挿通され、布4(図17)の長手方向に張られる。親綱案内ローラ73は、親綱を布4の長手方向に変位可能に支持する。   The vertical column portion 21a extends vertically in parallel with the building site, and a master rope guide tool 70 is disposed at the upper end of the vertical column portion 21a. The master rope guide tool 70 is supported by a pair of plate-like support members 71 fixed to the upper end portion of the vertical column portion 21a, a horizontal support shaft 72 attached to the support member 71, and the horizontal support shaft 72 so as to be rotatable. The master rope guide roller 73 and the master rope slip prevention member 74 fixed to the support member 71 are configured. In use, the master rope (not shown) is inserted into a master rope passage hole 75 formed in the master rope prevention member 74 and stretched in the longitudinal direction of the cloth 4 (FIG. 17). The master rope guide roller 73 supports the master rope so that it can be displaced in the longitudinal direction of the cloth 4.

前述の各実施例と同様、伸縮手摺50を係止可能な係止手段を構成する突起22が、垂直支柱部分21aの内側面に突設される。突起22の下方には、水平延長部分21dが取付けられる。水平延長部分21dは、腕木5(仮想線で示す)の方向に水平に延び、上側保持具30が、水平支軸27によって、水平延長部分21dの先端部に回転可能に支持される。上側保持具30は、前述の第1実施例に示す上側保持具(図4)と実質的に同一の構造を有する。傾斜部分21bは、垂直支柱部分21aの下端部から下方且つ足場内方に延び、垂直な下方延長部分21cは、傾斜部分21bの下端から垂下する。垂直支柱部分21aと傾斜部分21bとの連接部は、レベルML付近に概ね位置し、傾斜部分21b及び下方延長部分21cは、腕木5の下側に配置される。下方延長部分21cには、下側保持具40’が取付けられる。下側保持具40’は、前述の第2実施例(図10)と同じく、鋼管用緊結金具に類似した構造を有し、下方延長部分21cに固定された固定保持部41’と、保持部41’の支承部43’に支承された開閉部42’と、開閉部42’を係止する係止機構44’とから構成される。上下の保持具30、40’は、建地2の中心軸線CL上に整列する。上側の保持具30は、垂直方向に相対変位可能に最上層階の建地2に係合し、下側の保持具40’は、一層下側の建地2の部分に緊締され、建地2に対する緊結力によって先行手摺柱21を建地2に固定する。   As in the above-described embodiments, the protrusion 22 constituting the locking means that can lock the telescopic handrail 50 is provided on the inner side surface of the vertical column portion 21a. A horizontal extension 21 d is attached below the protrusion 22. The horizontal extension portion 21d extends horizontally in the direction of the arm 5 (indicated by a virtual line), and the upper holding tool 30 is rotatably supported by the distal end portion of the horizontal extension portion 21d by the horizontal support shaft 27. The upper holder 30 has substantially the same structure as the upper holder (FIG. 4) shown in the first embodiment. The inclined portion 21b extends downward and inward from the lower end portion of the vertical column portion 21a, and the vertical downward extending portion 21c hangs from the lower end of the inclined portion 21b. The connecting portion between the vertical column portion 21a and the inclined portion 21b is generally located in the vicinity of the level ML, and the inclined portion 21b and the downward extending portion 21c are disposed on the lower side of the arm 5. A lower holding tool 40 'is attached to the lower extension portion 21c. Similarly to the second embodiment (FIG. 10), the lower holding tool 40 ′ has a structure similar to the steel pipe fitting, and a fixed holding portion 41 ′ fixed to the lower extension portion 21c, and a holding portion. An opening / closing part 42 ′ supported by a support part 43 ′ of 41 ′ and a locking mechanism 44 ′ for locking the opening / closing part 42 ′. The upper and lower holders 30 and 40 ′ are aligned on the central axis CL of the building 2. The upper holding tool 30 engages with the building 2 on the uppermost floor so that the upper holding tool 30 can be relatively displaced in the vertical direction, and the lower holding tool 40 ′ is fastened to a portion of the lower building 2, The leading handrail column 21 is fixed to the building 2 by the binding force with respect to 2.

図17には、このような先行手摺柱21と、伸縮手摺50(図6)とから構成される先行手摺20の使用方法が示されている。   FIG. 17 shows a method of using the preceding handrail 20 composed of the preceding handrail column 21 and the telescopic handrail 50 (FIG. 6).

図17(A)には、最上層の建地2及び腕木5を組み立てた状態が示されている。最上層の足場板は、未だ取付けられておらず、この段階で、一層下側の作業床(足場板9)上の作業員(図示せず)が、先行手摺20の上層移設作業を行う。作業員は、保持具30、40’を解放し、保持具30、40’と建地2との係合を解く。   FIG. 17A shows a state in which the uppermost building 2 and the arm 5 are assembled. The uppermost scaffold board is not yet attached. At this stage, an operator (not shown) on the lower work floor (scaffold board 9) performs the upper layer transfer work of the leading handrail 20. The worker releases the holding tools 30 and 40 ′ and releases the engagement between the holding tools 30 and 40 ′ and the building site 2.

作業員は更に、図17(B)に示す如く、先行手摺柱21を上昇させる。伸縮手摺50は、図13に示す如く、手摺支柱21に係止しており、伸縮手摺50は、先行手摺柱21の上昇に伴って傾斜し且つ伸縮する。腕木5が建地2の外側に部分的に延びることから、伸縮手摺50が腕木5に干渉しないように、手摺支柱21を足場外方に若干膨らむような軌跡で上昇させることが望ましい。   The worker further raises the leading handrail column 21 as shown in FIG. As shown in FIG. 13, the telescopic handrail 50 is locked to the handrail support column 21, and the telescopic handrail 50 tilts and expands and contracts as the preceding handrail column 21 rises. Since the arm 5 partially extends outside the building 2, it is desirable to raise the handrail column 21 along a trajectory that slightly expands outward from the scaffolding so that the telescopic handrail 50 does not interfere with the arm 5.

所定レベルまで先行手摺支柱21が上昇したとき、作業員は、図17(C)に示すように、腕木5の上側に延びる建地2の部分に上側保持具30を係合させるとともに、下側保持具40’を腕木5の下側に位置する建地2の部分に緊締し、手摺支柱21を建地2に固定する。   When the leading handrail column 21 is raised to a predetermined level, the worker engages the upper holding tool 30 with the portion of the building 2 that extends to the upper side of the arm 5 as shown in FIG. The holder 40 ′ is fastened to the portion of the building 2 that is located below the arm 5, and the handrail column 21 is fixed to the building 2.

図18は、本発明の第6実施例に係る先行手摺柱21の側面図であり、図19は、先行手摺柱21の下端部の構造を示す拡大斜視図である。図18及び図19において、前述の各実施例の各構成要素と実質的に同一の構成要素については、同一の参照符号が付されている。   FIG. 18 is a side view of the leading handrail column 21 according to the sixth embodiment of the present invention, and FIG. 19 is an enlarged perspective view showing the structure of the lower end portion of the leading handrail column 21. In FIG. 18 and FIG. 19, the same reference numerals are assigned to substantially the same components as those of the above-described embodiments.

先行手摺柱21は、図15に示す先行手摺柱と実質的に同一の上部構造を有し、上端部に配設した親綱案内具70と、先行手摺柱21の内側面に配設された突起22とを備える。しかしながら、本例の先行手摺柱21は、円形断面の鋼管からなり、腕木係合具80を支持する回転支持部85が、図19に示すように、先行手摺柱21の下部に形成される。腕木係合具80を構成する回転支持部85は、先行手摺柱21の外周面とほぼ同じ直径を有し、回転支持部85の外周面は、先行手摺柱21の中心軸線を中心に回転する。上下一対のブラケット82が、回転支持部85に固定され、腕木5を挿通可能な保持部81を一体的に支持する。保持部81には、保持部81を腕木5に固定するための固定具83が配設される。   The preceding handrail column 21 has substantially the same upper structure as the preceding handrail column shown in FIG. 15 and is disposed on the inner surface of the preceding handrail column 21 and the parent rope guide tool 70 disposed on the upper end portion. And a protrusion 22. However, the preceding handrail column 21 of this example is made of a steel pipe having a circular cross section, and a rotation support portion 85 that supports the brace engaging tool 80 is formed below the preceding handrail column 21 as shown in FIG. The rotation support portion 85 constituting the brace engaging tool 80 has substantially the same diameter as the outer peripheral surface of the preceding handrail column 21, and the outer peripheral surface of the rotation support portion 85 rotates around the central axis of the preceding handrail column 21. . A pair of upper and lower brackets 82 are fixed to the rotation support portion 85 and integrally support the holding portion 81 through which the arm 5 can be inserted. The holder 81 is provided with a fixture 83 for fixing the holder 81 to the arm 5.

先行手摺柱21は、水平連結管28を更に備える。連結管28のU型連結具29が先行手摺柱21の本体部分下端に連結される。連結具29は、柱本体部分の下端側面に延びる左右一対のフランジ部29bと、連結管28の一端に固定されたウェブ部29cとを備える。上下一対の固定ボルト29aが、フランジ部29b及び柱本体部分を貫通し、連結具29は、柱本体部分の下端に固定される。   The leading handrail column 21 further includes a horizontal connecting pipe 28. A U-shaped connector 29 of the connecting pipe 28 is connected to the lower end of the main body portion of the preceding handrail column 21. The connection tool 29 includes a pair of left and right flange portions 29 b extending on the lower end side surface of the column main body portion, and a web portion 29 c fixed to one end of the connection pipe 28. A pair of upper and lower fixing bolts 29a penetrates the flange portion 29b and the column main body portion, and the connector 29 is fixed to the lower end of the column main body portion.

連結管28の他端には、下側保持具40’が取付けられる。下側保持具40’は、鋼管用緊結金具に類似した構造を有し、連結管28に固定された固定保持部41’と、保持部41’の支承部43’に支承された開閉部42’と、開閉部42’を係止する係止機構44’とから構成される。下側保持具40’は、建地2の部分に緊締される。   A lower holding tool 40 ′ is attached to the other end of the connecting pipe 28. The lower holding tool 40 ′ has a structure similar to that of a steel pipe tightening fitting, and a fixed holding portion 41 ′ fixed to the connecting pipe 28 and an opening / closing portion 42 supported by a support portion 43 ′ of the holding portion 41 ′. 'And a locking mechanism 44' for locking the opening / closing part 42 '. The lower holding tool 40 ′ is fastened to the portion of the building site 2.

図18に示す如く、先行手摺柱21は、建地2に緊締した下側保持具40’と、腕木5に係合した腕木係合具80とによって支持される。先行手摺柱21を最上層に移設する場合には、図17に示す方法と同様、下側保持具40’及び腕木係合具80を建地2及び腕木5から解放し、伸縮手摺50を傾斜させ且つ伸縮させながら先行手摺柱21を上昇させ、下側保持具40’及び腕木係合具80を最上層の建地2及び腕木5に固定すれば良い。   As shown in FIG. 18, the leading handrail pillar 21 is supported by a lower holding tool 40 ′ fastened to the building 2 and an arm engaging tool 80 engaged with the arm 5. When the leading handrail column 21 is moved to the uppermost layer, the lower holding tool 40 ′ and the arm engaging member 80 are released from the building 2 and the arm 5 and the telescopic handrail 50 is inclined as in the method shown in FIG. Then, the leading handrail column 21 is raised while being extended and contracted, and the lower holding tool 40 ′ and the brace engaging tool 80 may be fixed to the uppermost building 2 and the brace 5.

図20及び図21は、図18に示す先行手摺柱の変形例を示す側面図である。   20 and 21 are side views showing modifications of the preceding handrail pillar shown in FIG.

図20に示す先行手摺柱21では、水平連結管28及びU型連結具29は省略され、先行手摺柱21の構造は、全体的に簡素化されている。即ち、先行手摺柱21の柱本体部分は、下端部を足場内方に直角に屈曲した形態を有し、下側保持具40’は、水平に延びる先行手摺柱21の水平部分先端に固定される。   In the preceding handrail pillar 21 shown in FIG. 20, the horizontal connecting pipe 28 and the U-shaped connector 29 are omitted, and the structure of the preceding handrail pillar 21 is simplified as a whole. That is, the column main body portion of the leading handrail column 21 has a form in which the lower end portion is bent at right angles to the inside of the scaffold, and the lower holding tool 40 ′ is fixed to the tip of the horizontal portion of the preceding handrail column 21 extending horizontally. The

図21に示す先行手摺柱21の構造は、腕木係合具80及び回転支持部85を省略し、図20に示す先行手摺柱の構造を更に簡素化した構成のものである。先行手摺柱21の水平部分先端に固定された下側保持具40’は、建地2に堅固に緊締され、先行手摺柱21は、建地2に対する下側保持具40’の緊結力によって建地2に固定される。   The structure of the preceding handrail pillar 21 shown in FIG. 21 is a structure in which the arm engagement tool 80 and the rotation support portion 85 are omitted, and the structure of the preceding handrail pillar shown in FIG. 20 is further simplified. The lower holding tool 40 ′ fixed to the front end of the horizontal portion of the leading handrail column 21 is firmly tightened to the building site 2, and the leading handrail column 21 is built by the binding force of the lower holding tool 40 ′ with respect to the building site 2. Fixed to ground 2.

図22は、本発明の第7実施例に係る先行手摺柱の側面図、背面図及びVIII-VIII線断面図であり、図23及び図24は、上下の保持具の構造を示す平面図及び底面図である。各図において、前述の各実施例の各構成要素と実質的に同一の構成要素については、同一の参照符号が付されている。   22 is a side view, a rear view, and a sectional view taken along line VIII-VIII of a preceding handrail pillar according to a seventh embodiment of the present invention. FIGS. 23 and 24 are a plan view and a plan view showing the structure of the upper and lower holders, respectively. It is a bottom view. In each figure, the same reference numerals are given to the components that are substantially the same as the components of the above-described embodiments.

本例の先行手摺柱21は、上側保持具130、下側保持具140、突起22及び親綱案内具70を備えるとともに、左右の補助支柱120、水平補強材121及び布材係合部150を備える。補助支柱120及び水平補強材121は、先行手摺柱21の本体部分に左右対称に固定され、布材係合部150は、各補助支柱120の下端部に夫々配置される。布材係合部150は、補助支柱120の下端に固定された布材掛け具151と、掛け具151の下面開口を開閉する係脱可能な固定ピン152とから構成される。固定ピン152は、布材掛け具151内に布4(破線で示す)を収容し、布4を掛け具151内に保持する。   The preceding handrail pillar 21 of the present example includes an upper holding tool 130, a lower holding tool 140, a protrusion 22, and a master rope guide tool 70, as well as left and right auxiliary columns 120, a horizontal reinforcing material 121, and a cloth material engaging portion 150. Prepare. The auxiliary strut 120 and the horizontal reinforcing member 121 are fixed symmetrically to the main body portion of the preceding handrail pillar 21, and the cloth material engaging portion 150 is disposed at the lower end of each auxiliary strut 120. The cloth material engaging portion 150 includes a cloth material hanging tool 151 fixed to the lower end of the auxiliary column 120 and a detachable fixing pin 152 that opens and closes the lower surface opening of the hanging tool 151. The fixing pin 152 accommodates the cloth 4 (indicated by a broken line) in the cloth material 151 and holds the cloth 4 in the cloth 151.

図23(A)に示すように、上側保持具130は、円筒形回転管135、136に夫々固定された把持具131、132と、把持具131、132の閉鎖位置を規制するストッパ134と、把持具131、132の回転を拘束する把持具固定ピン133とから構成される。回転管135、136は、手摺柱本体廻りに回転可能に支持される。建地2は、左右の把持具131、132によって形成された建地収容空間138を貫通し、建地収容空間138内に保持される。固定ピン133の先端部133aは、把持具131、132の各係止孔137を貫通し、把持具131、132の開放を禁止する。固定ピン133の基端部133bは、手摺柱本体に上下動可能且つ回転可能に支持される。図22(A)に破線で示すように固定ピン133を上方に引き上げて先端部133aを把持具131、132の係止孔137から引き抜くと、把持具131、132は、回転管135、136の回転によって、図23(B)に示す如く、手摺柱本体の垂直中心軸線を中心に回動することができる。建地収容空間138は、このような把持具131、132の回動によって開放し、これにより、保持具130は、建地2との係合を解き、建地2から離脱することができる。   As shown in FIG. 23A, the upper holding tool 130 includes gripping tools 131 and 132 fixed to the cylindrical rotary tubes 135 and 136, and a stopper 134 that regulates the closed position of the gripping tools 131 and 132, It comprises a gripping tool fixing pin 133 that restrains the rotation of the gripping tools 131 and 132. The rotary tubes 135 and 136 are supported so as to be rotatable around the handrail column main body. The building site 2 penetrates the building site accommodation space 138 formed by the left and right grippers 131 and 132 and is held in the building site accommodation space 138. The distal end portion 133a of the fixing pin 133 passes through the locking holes 137 of the gripping tools 131 and 132, and prohibits the opening of the gripping tools 131 and 132. The base end portion 133b of the fixing pin 133 is supported by the handrail column main body so as to be vertically movable and rotatable. When the fixing pin 133 is pulled upward as shown by the broken line in FIG. 22A and the distal end portion 133a is pulled out from the locking hole 137 of the gripping tools 131 and 132, the gripping tools 131 and 132 are connected to the rotary tubes 135 and 136, respectively. By the rotation, as shown in FIG. 23 (B), it can be rotated around the vertical central axis of the handrail column body. The building site accommodation space 138 is opened by such rotation of the gripping tools 131 and 132, whereby the holding tool 130 can be disengaged from the building site 2 and detached from the building site 2.

図24(A)に示すように、上側保持具140は、円筒形回転管145、146に夫々固定された把持具141、142と、把持具141、142の閉鎖位置を規制するストッパ144と、把持具141、142の回転を拘束する把持具固定ピン143とから構成される。回転管145、146は、手摺柱本体廻りに回転可能に支持される。建地2は、左右の把持具141、142によって形成された建地収容空間148を貫通し、建地収容空間148内に保持される。固定ピン143の先端部143aは、把持具141、142の各係止孔147を貫通し、把持具141、142の開放を禁止する。固定ピン143の基端部143bは、手摺柱本体に上下動可能且つ回転可能に支持される。図22(A)に破線で示すように固定ピン143を上方に引き上げて先端部143aを把持具141、142の係止孔147から引き抜くと、把持具141、142は、回転管145、146の回転によって、図24(B)に示す如く、手摺柱本体の垂直中心軸線を中心に回動することができる。建地収容空間148は、このような把持具141、142の回動によって開放し、これにより、保持具140は、建地2との係合を解き、建地2から離脱することができる。   As shown in FIG. 24A, the upper holding tool 140 includes gripping tools 141 and 142 fixed to the cylindrical rotary tubes 145 and 146, and a stopper 144 that regulates the closed position of the gripping tools 141 and 142, It is comprised from the holding tool fixing pin 143 which restrains rotation of the holding tools 141 and 142. The rotary tubes 145 and 146 are supported so as to be rotatable around the handrail post body. The building site 2 passes through the building site accommodation space 148 formed by the left and right grippers 141 and 142 and is held in the building site accommodation space 148. The distal end portion 143a of the fixing pin 143 passes through the locking holes 147 of the gripping tools 141 and 142, and prohibits the opening of the gripping tools 141 and 142. The base end portion 143b of the fixing pin 143 is supported by the handrail column main body so as to be vertically movable and rotatable. 22A, when the fixing pin 143 is pulled upward and the distal end portion 143a is pulled out from the locking hole 147 of the gripping tools 141, 142, the gripping tools 141, 142 are connected to the rotating tubes 145, 146. By the rotation, as shown in FIG. 24 (B), it can be rotated around the vertical central axis of the handrail column body. The building space 148 is opened by such rotation of the gripping tools 141, 142, whereby the holder 140 can be disengaged from the building 2 and detached from the building 2.

なお、固定ピン133は、手摺柱本体に対する基端部133bの回転、そして、固定ピン133自体の弾性変形により、図23(C)に示すように保持具130の回転(手摺柱本体の垂直中心軸線を中心とした揺動又は回動)をある程度まで許容する。   The fixing pin 133 is rotated by the rotation of the base end portion 133b with respect to the handrail column main body and the elastic deformation of the fixing pin 133 itself as shown in FIG. Swinging or turning about the axis) is allowed to some extent.

図25は、先行手摺支柱21を単管足場に取り付けた状態を示す側面図である。   FIG. 25 is a side view showing a state in which the handrail support column 21 is attached to the single pipe scaffold.

上下の保持具130、140は、建地2に取付けられ、布材係合部150は、布4に着座する。先行手摺柱21の鉛直荷重は、実質的に布4によって支持され、先行手摺柱21の傾倒は、保持具130、140によって拘束される。手摺用及び中桟用の各伸縮手摺50の係止部53又は54(図6)は、上下の突起22に夫々係止する。   The upper and lower holders 130 and 140 are attached to the building 2, and the cloth material engaging portion 150 is seated on the cloth 4. The vertical load of the leading handrail column 21 is substantially supported by the cloth 4, and the tilt of the leading handrail column 21 is restrained by the holders 130 and 140. The locking portions 53 or 54 (FIG. 6) of the telescopic handrails 50 for the handrail and the middle rail are respectively locked to the upper and lower protrusions 22.

先行手摺移設時には、作業者は、固定ピン133、143を上方に引き抜き、把持具131、132、141、142を回転させて建地収容空間138、148を開放するとともに、固定ピン152を引き抜き、布材掛け具151の下面開口を開放する。これにより、保持具130、140は、建地2と係合を解き、布材係合部150は、布4との係合を解く。作業者は更に、先行手摺柱21を押し上げるとともに、保持具130、140を前述の如く上層の建地2に係合させる。所望のレベルまで先行手摺柱21が上昇したとき、布材係合部150は、上層の布4に係合せしめられる。保持具130は、図23(C)に示す如く、手摺柱本体の垂直中心軸線を中心に左右に揺動又は回動することができるので、先行手摺支柱21は、円滑に上昇し、布材係合部150は、比較的容易に布4に係合する。   At the time of moving the leading handrail, the operator pulls the fixing pins 133 and 143 upward, rotates the gripping tools 131, 132, 141, and 142 to open the building housing spaces 138 and 148, and pulls the fixing pin 152, The lower surface opening of the cloth material hanging tool 151 is opened. Thereby, the holders 130 and 140 are disengaged from the building site 2, and the cloth material engaging part 150 is disengaged from the cloth 4. The operator further pushes up the leading handrail column 21 and engages the holding tools 130 and 140 with the upper building 2 as described above. When the leading handrail column 21 rises to a desired level, the cloth material engaging portion 150 is engaged with the upper cloth 4. As shown in FIG. 23 (C), the holder 130 can swing or rotate left and right around the vertical center axis of the handrail column body. The engaging part 150 engages with the cloth 4 relatively easily.

以上、本発明の好適な実施例について詳細に説明したが、本発明は上記実施例に限定されるものではなく、特許請求の範囲に記載された本発明の範囲内で種々の変形又は変更が可能である。   The preferred embodiments of the present invention have been described in detail above, but the present invention is not limited to the above-described embodiments, and various modifications or changes can be made within the scope of the present invention described in the claims. Is possible.

例えば、伸縮手摺50は、1段又は2段に限定されるものではなく、3段以上配置しても良い。   For example, the telescopic handrail 50 is not limited to one or two stages, and may be arranged in three or more stages.

また、建地2の桁行方向の間隔が比較的小寸法に設定される場合、先行手摺柱21を1スパン置きに配置することも可能である。   In addition, when the interval in the column direction of the building 2 is set to a relatively small size, it is possible to arrange the leading handrail pillars 21 every other span.

更に、本発明の先行手摺20によって梁間方向の先行手摺を形成しても良い。   Further, the preceding handrail in the direction between the beams may be formed by the preceding handrail 20 of the present invention.

更に又、本発明において、第1係合部、第2係合部、第3係合部及び固定部の数は、上記実施例に限定されるものではなく、更に多数の係合部又は固定部を先行手摺柱に設けることも可能である。   Furthermore, in the present invention, the numbers of the first engaging portion, the second engaging portion, the third engaging portion, and the fixing portion are not limited to the above-described embodiments, and a larger number of engaging portions or fixing portions. It is also possible to provide the part on the handrail pillar.

本発明の先行手摺は、建築、土木、大型設備、大型工作機械等の建設、組立又は維持・管理のために仮設足場として設置される単管足場において、最上層部に形成される先行手摺として好ましく使用される。本発明の先行手摺は、所望により、枠組足場の手摺としても利用可能である。   The leading handrail of the present invention is a leading handrail formed in the uppermost layer in a single pipe scaffold that is installed as a temporary scaffold for construction, assembly, maintenance, or management of construction, civil engineering, large equipment, large machine tools, etc. Preferably used. The leading handrail of the present invention can also be used as a handrail for a frame scaffold if desired.

単管足場の全体構成を示す斜視図及び立面図である。It is the perspective view and elevation which show the whole structure of a single pipe | tube scaffold. 本発明の第1実施例に係る先行手摺の構成を示す単管足場の最上層部の立面図である。It is an elevation view of the uppermost layer part of a single pipe scaffold which shows the composition of the preceding handrail concerning the 1st example of the present invention. 図2に示す先行手摺を構成する先行手摺柱の斜視図、正面図及び側面図である。FIG. 3 is a perspective view, a front view, and a side view of a preceding handrail column constituting the preceding handrail shown in FIG. 2. 先行手摺柱の回転保持具の構造を示す平面図、I−I線断面図、II−II線断面図及びIII −III 線断面図である。It is a top view, II line sectional view, II-II line sectional view, and III-III line sectional view which shows the structure of the rotation holder of a preceding handrail pillar. 先行手摺柱の固定保持具の構造を示す平面図、IV−IV線断面図、V −V 線断面図及びVI−VI線断面図であるIt is a top view, IV-IV sectional view, V-V sectional view, and VI-VI sectional view which show the structure of a fixed handrail pillar holding fixture 伸縮手摺の構造を示す平面図、正面図及び部分拡大断面図である。It is the top view which shows the structure of an expansion-contraction handrail, a front view, and a partial expanded sectional view. 伸縮手摺の係止部を先行手摺柱の突起に係止する態様を示す部分側面図である。It is a partial side view which shows the aspect which latches the latching | locking part of an expansion-and-contraction handrail to the protrusion of a preceding handrail pillar. 先行手摺の使用方法を示す立面図であり、先行手摺組立時の作業手順が示されている。It is an elevation which shows the usage method of a preceding handrail, and the work procedure at the time of a preceding handrail assembly is shown. 先行手摺の使用方法を示す立面図であり、図8に示す作業に引き続く作業の手順が示されている。It is an elevation view which shows the usage method of a prior handrail, and the procedure of the operation | work following the operation | work shown in FIG. 8 is shown. 本発明の第2実施例に係る先行手摺柱の斜視図、正面図及び側面図である。It is a perspective view, a front view, and a side view of a preceding handrail pillar according to a second embodiment of the present invention. 本発明の第3実施例に係る先行手摺柱の斜視図である。It is a perspective view of the preceding handrail pillar concerning the 3rd example of the present invention. 本発明の第4実施例に係る先行手摺柱の斜視図、正面図及び側面図である。It is a perspective view, a front view, and a side view of a preceding handrail pillar according to a fourth embodiment of the present invention. 図12に示す先行手摺柱の使用形態を示す単管足場最上層部の立面図である。It is an elevational view of the uppermost layer part of the single pipe scaffold showing the usage pattern of the leading handrail pillar shown in FIG. 図12に示す先行手摺の使用方法を示す立面図である。FIG. 13 is an elevation view showing a method of using the leading handrail shown in FIG. 12. 本発明の第5実施例に係る先行手摺柱の背面図、側面図及びVII-VII線断面図である。It is the rear view, side view, and VII-VII sectional view taken on the front handrail pillar which concerns on 5th Example of this invention. 図15に示す先行手摺柱の斜視図である。It is a perspective view of the preceding handrail pillar shown in FIG. 先行手摺柱の使用形態を示す単管足場最上層部の断面図である。It is sectional drawing of the single-pipe scaffold uppermost layer part which shows the usage pattern of a preceding handrail pillar. 本発明の第6実施例に係る先行手摺柱の側面図である。It is a side view of the preceding handrail pillar concerning the 6th example of the present invention. 図18に示す先行手摺柱の下端部の構造を示す拡大斜視図である。It is an expansion perspective view which shows the structure of the lower end part of the preceding handrail pillar shown in FIG. 図18に示す先行手摺柱の変形例を示す側面図である。It is a side view which shows the modification of the preceding handrail pillar shown in FIG. 図18に示す先行手摺柱の他の変形例を示す側面図である。It is a side view which shows the other modification of the preceding handrail pillar shown in FIG. 本発明の第7実施例に係る先行手摺柱の側面図、背面図及びVIII-VIII線断面図である。It is the side view, rear view, and VIII-VIII sectional view taken on the front handrail pillar which concerns on 7th Example of this invention. 上側保持具の構造を示す平面図である。It is a top view which shows the structure of an upper holder. 下側保持具の構造を示す底面図である。It is a bottom view which shows the structure of a lower holder. 先行手摺柱を単管足場に取り付けた状態を示す側面図である。It is a side view which shows the state which attached the preceding handrail pillar to the single pipe | tube scaffold.

符号の説明Explanation of symbols

1 単管足場
2 建地
4 布
5 腕木
7 中桟
9 足場板(作業床)
20 先行手摺
21 先行手摺柱
22 突起(係止手段)
30、130 上側保持具(第1係合部)
31 回転保持部
32 開閉部
40、140 下側保持具(第2係合部)
40’下側保持具(固定部)
41 固定保持部
42 開閉部
50 伸縮手摺(手摺部材)
70 親綱案内具
80 腕木係合具(第1係合部)
150 布材係合部(第2又は第3係合部)
DESCRIPTION OF SYMBOLS 1 Single-tube scaffold 2 Building land 4 Cloth 5 Arm 7 7 Middle rail 9 Scaffolding board (work floor)
20 Leading handrail 21 Leading handrail pillar 22 Protrusion (locking means)
30, 130 Upper holder (first engaging portion)
31 Rotation holding part 32 Opening / closing part 40, 140 Lower holding tool (second engagement part)
40 'lower holder (fixed part)
41 fixed holding part 42 opening and closing part 50 telescopic handrail (handrail member)
70 Parent rope guide tool 80 Arm engagement tool (first engagement part)
150 Cloth material engaging part (2nd or 3rd engaging part)

Claims (15)

建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に対して垂直方向に相対変位可能に係合する第1係合部と、先行手摺柱の降下を阻止すべく前記建地、又は建地に一体的に連結した足場構成部材と係合する第2係合部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記第1係合部は、前記第2係合部の上側に配置されるとともに、先行手摺柱本体に相対回転可能に支持されることを特徴とする仮設足場の先行手摺。
According to the progress of the construction work, in the temporary handrail of the temporary scaffolding that is provided in the temporary scaffolding that sequentially builds the upper building, and projects upward from the uppermost work floor,
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar is integrally connected to the building or the building so as to prevent the lowering of the preceding handrail pillar, and a first engaging portion that engages with the building so as to be relatively displaceable in a vertical direction. A second engaging portion that engages with the scaffold component; and a locking means that removably locks the locking portion of the handrail member, wherein the first engaging portion is a second engaging portion of the second engaging portion. A preceding handrail for a temporary scaffold, wherein the preceding handrail is disposed on the upper side and is supported by a preceding handrail column main body so as to be relatively rotatable.
建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に一体的に連結した足場構成部材に固定される第1係合部と、先行手摺柱の降下を阻止すべく前記建地と係合する第2係合部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記第1係合部は、前記第2係合部の上側に配置されるとともに、先行手摺柱本体に相対回転可能に支持されることを特徴とする仮設足場の先行手摺。
According to the progress of the construction work, in the temporary handrail of the temporary scaffolding that is provided in the temporary scaffolding that sequentially builds the upper building, and projects upward from the uppermost work floor,
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar includes a first engaging portion fixed to a scaffold component integrally connected to the building, and a second engaging portion engaged with the building to prevent the preceding handrail pillar from being lowered. And a locking means for removably locking the locking portion of the handrail member, wherein the first engagement portion is disposed on the upper side of the second engagement portion and is relative to the preceding handrail pillar body. A preceding handrail of a temporary scaffold characterized by being rotatably supported.
前記第2係合部は、先行手摺を移設すべき最上層の作業床の下側のレベルにおいて、前記建地に固定されることを特徴とする請求項1又は2に記載の仮設足場の先行手摺。   The preceding second of the temporary scaffold according to claim 1 or 2, wherein the second engaging portion is fixed to the building at a level below the uppermost work floor to which a preceding handrail is to be transferred. handrail. 前記第1係合部は、先行手摺柱の垂直中心軸線及び/又は水平軸線を中心に回転可能に先行手摺柱に支持されることを特徴とする請求項1又は2に記載の仮設足場の先行手摺。   The preceding first of the temporary scaffolding according to claim 1 or 2, wherein the first engaging portion is supported by the preceding handrail column so as to be rotatable around a vertical center axis and / or a horizontal axis of the preceding handrail column. handrail. 前記仮設足場は、単管足場であり、建地、腕木及び布を構成する各管体を緊結具で緊結することにより構築され、前記足場構成部材は、前記腕木であることを特徴とする請求項2又は4に記載の仮設足場の先行手摺。   The temporary scaffold is a single-pipe scaffold, and is constructed by fastening each tubular body constituting a building site, arms and cloth with a fastening tool, and the scaffold component is the arms. Item 5. The preceding handrail of the temporary scaffold according to Item 2 or 4. 建設工事の進捗に相応して上層の建地を順次建込む仮設足場に設けられ、最上層の作業床から上方に突出する仮設足場の先行手摺において、
建地と平行に取付けられる先行手摺柱と、該先行手摺柱に係止可能な手摺部材とから構成され、
前記先行手摺柱は、建地に固定される固定部と、前記手摺部材の係止部を着脱可能に係止する係止手段とを備え、前記固定部は、先行手摺を移設すべき最上層の作業床の下側のレベルで前記建地に固定され、先行手摺柱本体を支持することを特徴とする仮設足場の先行手摺。
According to the progress of the construction work, in the temporary handrail of the temporary scaffolding that is provided in the temporary scaffolding that sequentially builds the upper building, and projects upward from the uppermost work floor,
It is composed of a preceding handrail column attached in parallel to the building site, and a handrail member that can be locked to the preceding handrail column,
The preceding handrail pillar includes a fixing portion fixed to a building, and a locking means for detachably locking the locking portion of the handrail member, and the fixing portion is an uppermost layer to which the leading handrail is to be transferred. A preceding handrail of a temporary scaffold, which is fixed to the building at a lower level of the work floor and supports a preceding handrail pillar body.
前記先行手摺柱は、安全帯又は親綱を係留可能な安全帯係留部又は親綱案内部を備えることを特徴とする請求項1乃至6のいずれか1項に記載の仮設足場の先行手摺。   The preceding handrail pillar according to any one of claims 1 to 6, wherein the preceding handrail pillar includes a safety belt mooring portion or a master rope guide portion capable of mooring a safety belt or a parent rope. 前記第2係合部は、垂直方向に相対変位可能に建地に係合し、建地に取付けられた緊結具又は足場構成部材によって降下を阻止されることを特徴とする請求項1又は2に記載の仮設足場の先行手摺。   The second engaging portion is engaged with a building site so as to be relatively displaceable in the vertical direction, and is prevented from descending by a binding tool or a scaffold component member attached to the building. Leading handrail for temporary scaffolding as described in. 前記第2係合部は、前記建地に緊結され、建地に対する緊結力により先行手摺柱の降下を阻止することを特徴とする請求項1又は2に記載の仮設足場の先行手摺。   The preceding handrail of the temporary scaffold according to claim 1 or 2, wherein the second engaging portion is tightly coupled to the building site and prevents the leading handrail column from being lowered by a binding force with respect to the building site. 前記係合部は、建地を収容可能な凹部を形成する保持部材と、凹部内に収容した建地が凹部から離脱するのを阻止する開閉部材とを有することを特徴とする請求項1又は2に記載の仮設足場の先行手摺。   The said engaging part has a holding member which forms the recessed part which can accommodate a building, and an opening-and-closing member which prevents that the building house accommodated in the recessed part remove | deviates from a recessed part. The preceding handrail of the temporary scaffold as described in 2. 前記先行手摺柱は、足場の外側に張り出すように変形し、前記第1係合部は、前記先行手摺柱本体から足場の内側に延びる水平な支持部材に支持されることを特徴とする請求項1乃至3のいずれか12項に記載の仮設足場の先行手摺。   The preceding handrail pillar is deformed so as to project outward from the scaffold, and the first engagement portion is supported by a horizontal support member that extends from the preceding handrail pillar body to the inside of the scaffold. Item 14. The preceding handrail of the temporary scaffold according to any one of Items 1 to 3. 前記手摺部材は、係止孔を有する係止部を両端部に備え、前記先行手摺柱の係止手段は、係止孔に挿入可能な水平軸部を有し、該水平軸部は、軸部から突出する突状又は舌状部材を備え、突状又は舌状部材は、軸部を手摺部材の係止孔に挿入するときに過渡的に軸部内に引っ込むことを特徴とする請求項1乃至11のいずれか1項に記載の仮設足場の先行手摺。   The handrail member includes a locking portion having a locking hole at both ends, and the locking means of the preceding handrail column has a horizontal shaft portion that can be inserted into the locking hole, and the horizontal shaft portion has a shaft A protrusion or tongue-like member protruding from the portion is provided, and the protrusion or tongue-like member transiently retracts into the shaft portion when the shaft portion is inserted into the locking hole of the handrail member. The preceding handrail of the temporary scaffold of any one of thru | or 11. 手摺部材からなる中桟を更に有し、前記先行手摺柱は、中桟の手摺部材の係止部を係止可能な第2の係止手段を中間高さ部分に備えることを特徴とする請求項1乃至12のいずれか1項に記載の仮設足場の先行手摺。   An intermediate rail made of a handrail member is further provided, and the preceding handrail pillar includes a second locking means capable of locking a locking portion of the handrail member of the middle rail at an intermediate height portion. Item 13. The preceding handrail of the temporary scaffold according to any one of Items 1 to 12. 前記手摺部材は、入子式に組付けられた二重管構造の伸縮手摺からなることを特徴とする請求項1乃至13のいずれか1項に記載の仮設足場の先行手摺。   The preceding handrail of the temporary scaffold according to any one of claims 1 to 13, wherein the handrail member is a telescopic handrail having a double-pipe structure assembled in a telescoping manner. 前記先行手摺柱は、建地に一体的に連結した足場構成部材に係合する第3係合部を備えることを特徴とする請求項1に記載の仮設足場の先行手摺。
The preceding handrail of a temporary scaffold according to claim 1, wherein the preceding handrail column includes a third engaging portion that engages with a scaffold component member integrally connected to a building site.
JP2004343592A 2003-12-02 2004-11-29 Preceding handrail for temporary scaffold Withdrawn JP2005188275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004343592A JP2005188275A (en) 2003-12-02 2004-11-29 Preceding handrail for temporary scaffold

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003403375 2003-12-02
JP2004343592A JP2005188275A (en) 2003-12-02 2004-11-29 Preceding handrail for temporary scaffold

Publications (1)

Publication Number Publication Date
JP2005188275A true JP2005188275A (en) 2005-07-14

Family

ID=34797512

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004343592A Withdrawn JP2005188275A (en) 2003-12-02 2004-11-29 Preceding handrail for temporary scaffold

Country Status (1)

Country Link
JP (1) JP2005188275A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063841A (en) * 2006-09-08 2008-03-21 Nikko Co Ltd Handrail for prefabricated scaffold
JP2008291859A (en) * 2007-05-22 2008-12-04 Ps Mitsubishi Construction Co Ltd External temporary structure for seismically-isolated structure
FR2919009A1 (en) * 2007-07-20 2009-01-23 Hunnebeck France Soc Par Actio Parts assembling assembly for scaffolding level, has beam is connected to upright part along destination position, where assembly is arranged such that beam is connected to upright part in position lower than destination position
JP2010024657A (en) * 2008-07-16 2010-02-04 Tatsuo Ono Leading handrail
JP2010222884A (en) * 2009-03-24 2010-10-07 Sano Kasetsu Kogyo:Kk Assembling and demolition method for scaffold
JP2010242419A (en) * 2009-04-08 2010-10-28 Tatsuo Ono Preceding handrail
JP2013213373A (en) * 2012-04-04 2013-10-17 Step Up Kk Preceding handrail for tube and coupler scaffolding and construction method of the same
JP2014031623A (en) * 2012-08-01 2014-02-20 Step Up Kk Preceding handrail for framework scaffold and method of constructing the same
KR102099446B1 (en) * 2019-07-24 2020-04-09 박숙현 Scaffold unit assembley, system scaffold having the same, and method for constructing the same
GB2577863A (en) * 2018-09-20 2020-04-15 Sherwood Samuel A scaffold barrier
WO2020192811A1 (en) * 2019-03-25 2020-10-01 Wilhelm Layher Verwaltungs-Gmbh Railing post for a leading railing for a scaffolding, scaffolding having a leading railing, and method for implementing a leading railing on a scaffolding
WO2020192812A1 (en) * 2019-03-25 2020-10-01 Wilhelm Layher Verwaltungs-Gmbh Railing device, namely a leading railing for a scaffold
JP2021004463A (en) * 2019-06-25 2021-01-14 株式会社杉孝グループホールディングス Gable side preceding handrail in temporary scaffold
WO2022124890A1 (en) 2020-12-07 2022-06-16 Scafom Holding B.V. Rail assembly for a scaffold, scaffold, set of scaffold parts, and methods
AT524584A4 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
US20220372773A1 (en) * 2019-09-20 2022-11-24 Turner Access Limited Temporary Scaffolding Rest

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063841A (en) * 2006-09-08 2008-03-21 Nikko Co Ltd Handrail for prefabricated scaffold
JP2008291859A (en) * 2007-05-22 2008-12-04 Ps Mitsubishi Construction Co Ltd External temporary structure for seismically-isolated structure
FR2919009A1 (en) * 2007-07-20 2009-01-23 Hunnebeck France Soc Par Actio Parts assembling assembly for scaffolding level, has beam is connected to upright part along destination position, where assembly is arranged such that beam is connected to upright part in position lower than destination position
JP2010024657A (en) * 2008-07-16 2010-02-04 Tatsuo Ono Leading handrail
JP2010222884A (en) * 2009-03-24 2010-10-07 Sano Kasetsu Kogyo:Kk Assembling and demolition method for scaffold
JP2010242419A (en) * 2009-04-08 2010-10-28 Tatsuo Ono Preceding handrail
JP2013213373A (en) * 2012-04-04 2013-10-17 Step Up Kk Preceding handrail for tube and coupler scaffolding and construction method of the same
JP2014031623A (en) * 2012-08-01 2014-02-20 Step Up Kk Preceding handrail for framework scaffold and method of constructing the same
GB2577863A (en) * 2018-09-20 2020-04-15 Sherwood Samuel A scaffold barrier
WO2020192811A1 (en) * 2019-03-25 2020-10-01 Wilhelm Layher Verwaltungs-Gmbh Railing post for a leading railing for a scaffolding, scaffolding having a leading railing, and method for implementing a leading railing on a scaffolding
WO2020192812A1 (en) * 2019-03-25 2020-10-01 Wilhelm Layher Verwaltungs-Gmbh Railing device, namely a leading railing for a scaffold
JP2021004463A (en) * 2019-06-25 2021-01-14 株式会社杉孝グループホールディングス Gable side preceding handrail in temporary scaffold
JP7329213B2 (en) 2019-06-25 2023-08-18 株式会社杉孝グループホールディングス Installation structure of gable side leading handrail in temporary scaffolding
KR102099446B1 (en) * 2019-07-24 2020-04-09 박숙현 Scaffold unit assembley, system scaffold having the same, and method for constructing the same
US20220372773A1 (en) * 2019-09-20 2022-11-24 Turner Access Limited Temporary Scaffolding Rest
US12084876B2 (en) * 2019-09-20 2024-09-10 Sunshine Enterprise Group Eu Limited Temporary scaffolding rest
WO2022124890A1 (en) 2020-12-07 2022-06-16 Scafom Holding B.V. Rail assembly for a scaffold, scaffold, set of scaffold parts, and methods
NL2027056B1 (en) * 2020-12-07 2022-07-07 Scafom Holding B V Handrail assembly for scaffolding, scaffolding, scaffolding parts set, and methods
AT524584A4 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
AT524584B1 (en) * 2021-03-09 2022-07-15 Herbert Brodinger handrail post
WO2022187878A1 (en) 2021-03-09 2022-09-15 Brodinger Herbert Railing post

Similar Documents

Publication Publication Date Title
JP2005188275A (en) Preceding handrail for temporary scaffold
DK3015623T3 (en) PROCEDURE AND APPARATUS FOR ASSEMBLING A STRAIGHT TOWER
EP2649257B1 (en) Pivoting horizontal and vertical scaffold members and a method of erecting an offset scaffold platform
US20110132685A1 (en) Scaffolding
RU2400609C2 (en) Complex system of accident prevention support in construction
ES2904808T3 (en) Joining Arrangement
US4153229A (en) Folding scaffold support
CA2912837A1 (en) Work platform system including suspended paneled portion and method of implementing same
JP4163177B2 (en) Scaffolding system
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
KR100821668B1 (en) A foldup scaffold
JP6984864B2 (en) Master rope support and its installation method
JP6145362B2 (en) Intermediate work floor forming apparatus and intermediate work floor forming method
JP2006336267A (en) Main rope post system
JP7274334B2 (en) Lifting device for foldable temporary scaffolding and lifting method thereof
JP4101232B2 (en) Construction method using a temporary scaffolding that can be raised and lowered
JP2004197364A (en) Timbering
JP7216600B2 (en) folding temporary scaffolding
US20240093516A1 (en) Pre-assembled climbing scaffold with movement system with cart and gang panel
JP2008522062A (en) Safety equipment for construction work
JP4083709B2 (en) Temporary scaffolding fixture
JPH10176415A (en) Hanging scaffold metal fixture for constructing building and hanging scaffold
JP2004068450A (en) Safety handrail
JP3171964U (en) Opening and closing device for side opening for raising and lowering temporary scaffolding
JP2022177780A5 (en)

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20080205