JP2005155131A - Intermediate floor base isolation structure of building - Google Patents
Intermediate floor base isolation structure of building Download PDFInfo
- Publication number
- JP2005155131A JP2005155131A JP2003393860A JP2003393860A JP2005155131A JP 2005155131 A JP2005155131 A JP 2005155131A JP 2003393860 A JP2003393860 A JP 2003393860A JP 2003393860 A JP2003393860 A JP 2003393860A JP 2005155131 A JP2005155131 A JP 2005155131A
- Authority
- JP
- Japan
- Prior art keywords
- column
- steel plate
- floor
- seismic isolation
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Vibration Prevention Devices (AREA)
Abstract
Description
本発明は、建物の中間階免震構造に関する。 The present invention relates to an intermediate floor base isolation structure of a building.
従来より、建物の上部構造と下部構造との間に免震装置を設置して免震層を形成し、建物全体の固有周期を長周期化することにより、地震エネルギー入力の低減を図る免震構造が実用に供されている。この免震構造は、耐震安全性に課題を有する既存建物の耐震改修にも適用されており、なかには、中間階に免震層を形成するケースもある(例えば、特許文献1参照。)。
建物の中間階を免震化する場合、例えば、柱頭に免震装置を設置した柱の応力状態は、柱脚固定のキャンティレバー型の応力状態と同様になり、柱に大きな曲げモーメントが発生する。そのため、当該柱の強度および剛性を増大させる必要から、当該柱の周囲を大きく増打ちして柱断面を大きくすることで、これに対処している。
For example, when a base floor of a building is seismically isolated, the stress state of a column with a seismic isolation device installed at the top of the column is the same as the stress state of a cantilever type with a fixed column base, and a large bending moment is generated in the column. . Therefore, since it is necessary to increase the strength and rigidity of the column, this is dealt with by greatly increasing the circumference of the column to increase the column cross section.
しかしながら、柱断面が大きくなるため、免震装置設置階では有効スペースが大幅に減少してしまうという問題があった。
本発明は、上述する問題点に鑑みてなされたもので、免震装置設置階における僅かな有効スペースの減少で、建物の中間階免震構造を実現することを目的とする。
However, since the column cross-section becomes large, there is a problem that the effective space is greatly reduced on the floor where the seismic isolation device is installed.
This invention is made | formed in view of the problem mentioned above, and it aims at implement | achieving the intermediate | middle floor seismic isolation structure of a building by the slight reduction of an effective space in a seismic isolation apparatus installation floor.
上記目的を達成するため、本発明に係る建物の中間階免震構造では、建物の中間階の柱の一部に免震装置を設置する建物の中間階免震構造において、前記免震装置が設置される柱の外周に鋼板が巻装され、当該鋼板脚部の内周側には基端部を下階に固定支持された柱脚部鉄筋が配設されていることを特徴とする。
ここで、建物の中間階とは、最上階を除く建物のいずれかの階を指す。従って、1階も中間階に含むものとする。
本発明では、免震装置が設置される柱の外周に鋼板が巻装されることにより、柱の強度および剛性を増大させることができる。加えて、鋼板脚部の内周側に柱脚部鉄筋を配設することにより、鋼板が負担する応力を鋼板脚部の柱脚部鉄筋を介して下階に伝達することができる。その結果、従来に比べて、柱の断面積が格段に小さくなり、免震装置設置階における有効スペースの減少を僅かなものとすることができる。
In order to achieve the above object, in the intermediate floor seismic isolation structure of a building according to the present invention, the seismic isolation device in the intermediate floor seismic isolation structure of the building in which the seismic isolation device is installed in a part of the pillar of the intermediate floor of the building. A steel plate is wound around the outer periphery of the column to be installed, and a column base part reinforcing bar whose base end is fixedly supported on the lower floor is disposed on the inner peripheral side of the steel plate leg part.
Here, the intermediate floor of the building refers to any floor of the building except the top floor. Accordingly, the first floor is included in the intermediate floor.
In the present invention, the steel sheet is wound around the outer periphery of the column where the seismic isolation device is installed, whereby the strength and rigidity of the column can be increased. In addition, by disposing the column base reinforcing bars on the inner peripheral side of the steel plate legs, the stress borne by the steel plates can be transmitted to the lower floor via the column base reinforcing bars of the steel plate legs. As a result, the cross-sectional area of the column is significantly reduced compared to the conventional case, and the reduction of the effective space on the seismic isolation device installation floor can be made small.
また、本発明に係る建物の中間階免震構造では、前記鋼板は前記柱脚部鉄筋に固着されていることが好ましい。
本発明では、鋼板を鋼板脚部の内周側の柱脚部鉄筋に溶接等で予め固着しておくことにより、鋼板が受ける応力を確実に下階に伝達することができる。
Moreover, in the intermediate floor seismic isolation structure of a building according to the present invention, it is preferable that the steel plate is fixed to the column base rebar.
In this invention, the stress which a steel plate receives can be reliably transmitted to a lower floor by fixing to a column base part reinforcement of the inner peripheral side of a steel plate leg by welding etc. beforehand.
また、本発明に係る建物の中間階免震構造では、前記鋼板と前記柱との間に無収縮モルタルが充填されていることが好ましい。
既存建物を中間階免震構造によって耐震改修する場合に、鋼板と柱の間に無収縮モルタルを充填することにより、鋼板と柱の間に隙間が生じるのを防止することができる。
Moreover, in the intermediate floor seismic isolation structure of the building which concerns on this invention, it is preferable that the non-shrink mortar is filled between the said steel plate and the said pillar.
When an existing building is subjected to seismic retrofitting with an intermediate floor seismic isolation structure, a non-shrinkable mortar is filled between the steel plate and the column, thereby preventing a gap from being formed between the steel plate and the column.
また、本発明に係る建物の中間階免震構造では、部分的に前記鋼板に代えて、炭素繊維シートが前記柱の外周に巻装されていてもよい。
既存建物を中間階免震構造によって耐震改修する場合に、柱の曲げ応力が小さい部分には、鋼板に代えて炭素繊維シートを巻装してもよい。
Moreover, in the intermediate floor seismic isolation structure of the building which concerns on this invention, it replaced with the said steel plate partially and the carbon fiber sheet may be wound by the outer periphery of the said pillar.
When an existing building is subjected to seismic retrofit with an intermediate floor seismic isolation structure, a carbon fiber sheet may be wound around the portion where the bending stress of the column is small instead of the steel plate.
本発明によれば、免震装置が設置される柱の外周に鋼板を巻装し、且つ、当該鋼板脚部の内周側に、下階に基端部を固定支持された柱脚部鉄筋を配設することにより、免震装置設置階における僅かな有効スペースの減少で、建物の中間階免震構造を実現することができる。 According to the present invention, a column base rebar in which a steel plate is wound around the outer periphery of a column on which a seismic isolation device is installed, and a base end portion is fixedly supported on a lower floor on the inner peripheral side of the steel plate leg portion. By disposing, the intermediate floor seismic isolation structure of the building can be realized with a slight reduction in effective space on the seismic isolation device installation floor.
以下、本発明に係る建物の中間階免震構造の実施形態、特に、既存建物の1階を免震構造とすることによって耐震改修する場合について説明する。
図1は、本発明に係る建物の中間階免震構造の第一の実施形態を示す立断面図である。また、図2は、その矢視断面図である。
本実施形態による建物の中間階免震構造1では、上梁3u直下の既存柱2の一部が切除され、その間に免震装置4が設置されるとともに、既存柱2の周囲には、免震装置4の下面から柱脚部6dまで鋼板6が巻かれている。
鋼板6は、厚さ6mm程度の角型鋼管を二分割した鋼管を既存柱2の両側から建込み、突合せ部Wを突合せ溶接するか、かみ合わせ継手としたものである。
なお、既存建物は鉄骨鉄筋コンクリート造であり、既存柱2は、鉄筋コンクリート柱10bの中心部に鉄骨10aが埋め込まれた構造になっている。ただし、本発明の適用対象としての既存建物は、鉄骨鉄筋コンクリート造に限るものではなく、鉄筋コンクリート造でもかまわない。
Hereinafter, an embodiment of an intermediate floor seismic isolation structure of a building according to the present invention, in particular, a case where earthquake-proof repair is performed by setting the first floor of an existing building as a base isolation structure will be described.
FIG. 1 is an elevational sectional view showing a first embodiment of an intermediate floor seismic isolation structure for a building according to the present invention. Moreover, FIG. 2 is the arrow sectional drawing.
In the seismic isolation structure 1 of the middle floor of the building according to the present embodiment, a part of the existing
The
The existing building is a steel reinforced concrete structure, and the existing
免震装置4は、ゴムと鋼板が交互に積層された積層ゴム4aであり、上面にはアンカーボルト4uが複数溶接された上板4bが取り付けられるとともに、下面にもアンカーボルト4dが複数溶接された下板4cが取り付けられている。
The
積層ゴム4aの上板4bに溶接されたアンカーボルト4uは、上梁3uと柱2uの接合部5u外周部に設けられた増打ちコンクリート7uに埋設されている。また、増打ちコンクリート7u内は、補強鉄筋9uが格子状に配設されるとともに、既存の上梁3uおよび柱2uとの付着強度を確保するために、柱2uの外周面にアンカーボルト9が複数打設されている。
The
一方、積層ゴム4aの下板4cに溶接されたアンカーボルト4dは、鋼板6によって補強された補強柱5の柱頭部に埋設されている。鋼板6と既存柱2との間の厚さ約50mmの間隙には無収縮モルタル7が充填され、鋼板6と既存柱2との間に隙間が生じないように配慮されている。
鋼板柱脚部6d内周面には、地下階の補強柱5d内に埋設される柱脚部鉄筋8の先端部が床スラブ3sを鉛直方向に貫通して配設されるとともに、柱脚部鉄筋8と鋼板6とは溶接によって接合されている。
On the other hand, the
On the inner peripheral surface of the steel
地下階の補強柱2dは、既存柱2dの外周を厚さ125mmほど増打ちコンクリート7dを打設するとともに、帯筋9dによって鉛直方向に一定の離間間隔をおいて補強されている。そして、増打ちコンクリート7d内には、上階から床スラブ3sを鉛直方向に貫通する柱脚部鉄筋8が埋設されている。
なお、地下階の柱2dに増打ちコンクリート7dが打設できない場合は、1階の床梁3dを補強して、鋼板柱脚部6dの応力を処理すればよい。
The
In addition, when the increased-
次に、地震時における、本実施形態による建物の中間階免震構造1の作用について説明する。
地震によって上梁3uに水平力が作用すると、当該水平力は、上梁3uと柱2uの接合部5uに埋設されたアンカーボルト4uを介して積層ゴム4aに伝えられ、積層ゴム4aは当該水平力が作用する方向にせん断変形をする。一方、積層ゴム4aに作用する水平力は、積層ゴム4a下面のアンカーボルト4dを介して補強柱5に伝えられ、補強柱5断面、即ち、既存柱2およびその外周に巻かれた鋼板6の断面には曲げ応力とせん断力が発生する。鋼板6が負担する曲げ応力とせん断力は、鋼板柱脚部6dに溶接された柱脚部鉄筋8を介して下階に伝達される。そして、下階に伝達された曲げ応力は地下階の補強柱2dが負担し、下階に伝達されたせん断力は図示しない地下外壁が負担する。従って、1階の床梁3dの補強は不要となる。
Next, the operation of the intermediate floor seismic isolation structure 1 according to the present embodiment at the time of an earthquake will be described.
When a horizontal force acts on the
本実施形態による建物の中間階免震構造1では、免震装置4が設置される既存柱2の外周に鋼板6が巻装されることにより、既存柱2の強度および剛性を増大させることができる。加えて、鋼板脚部6dの内周側に柱脚部鉄筋8を配設することにより、鋼板6が負担する力を鋼板脚部6dの柱脚部鉄筋8を介して下階に伝達することができる。その結果、従来に比べて、既存柱2の断面積が格段に小さくなり、免震装置設置階における有効スペースの減少を僅かなものとすることができる。
In the intermediate floor seismic isolation structure 1 according to the present embodiment, the
図3は、本発明に係る建物の中間階免震構造の第二の実施形態を示す立断面図である。
本実施形態による建物の中間階免震構造11では、補強柱5の柱頭部の外周には鋼板6ではなく、炭素繊維シート12がエポキシ樹脂等の接着剤により貼着されている点が、第一の実施形態と異なる。これは、柱頭部分は曲げ応力が小さいため、既存柱2に炭素繊維シート12を巻くだけで充分だからである。
また、柱脚部鉄筋8は充分な定着長さTを有しており、鋼板6とは溶接されていない点が、第一の実施形態と異なる。これは、柱脚部鉄筋8と無収縮モルタル7との間に発生する付着応力によって、鋼板6が負担する応力を下階に伝達できるため、柱脚部鉄筋8と鋼板6とを溶接する必要がないからである。
なお、ネジ鉄筋などを用いて柱脚部鉄筋8に継手部を設ければ、地下階まで一体となった鉄筋を用いずに済み、施工時に支障とならない。
そして、本実施形態による建物の中間階免震構造11も第一実施形態と同様の作用効果を奏する。
FIG. 3 is an elevational sectional view showing a second embodiment of the intermediate floor seismic isolation structure for a building according to the present invention.
In the
Moreover, the column
In addition, if a joint part is provided in the column
And the intermediate floor
以上、本発明に係る建物の中間階免震構造の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。例えば、上記の実施形態では、既存建物の柱について本発明に係る建物の中間階免震構造を適用しているが、本発明は新設建物の柱についても適用することができる。また、上記の実施形態では、柱頭に免震装置を設置しているが、本発明では、柱脚や柱中間部に免震装置を設置してもよい。また、免震装置設置階は、1階に限るものではなく、他の階へも設置できることは言うまでもない。さらに、本発明の適用対象としての既存建物は、鉄骨鉄筋コンクリート造に限るものではなく、鉄筋コンクリート造にも適用できることは言うまでもない。 As mentioned above, although embodiment of the intermediate floor seismic isolation structure of the building which concerns on this invention was described, this invention is not limited to said embodiment, In the range which does not deviate from the meaning, it can change suitably. For example, in the above embodiment, the intermediate floor seismic isolation structure of a building according to the present invention is applied to a column of an existing building, but the present invention can also be applied to a column of a new building. Moreover, in said embodiment, although the seismic isolation apparatus was installed in the capital, in this invention, you may install a seismic isolation apparatus in a column base or a column intermediate part. Needless to say, the seismic isolation device installation floor is not limited to the first floor, and can be installed on other floors. Furthermore, it goes without saying that an existing building as an application target of the present invention is not limited to a steel-framed reinforced concrete structure, but can also be applied to a reinforced concrete structure.
1、11 建物の中間階免震構造
2 既存柱
4 免震装置
5 補強柱
6 鋼板
7 無収縮モルタル
8 柱脚部鉄筋
9 アンカーボルト
12 炭素繊維シート
1, 11 Base floor seismic isolation structure of building 2
Claims (4)
前記免震装置が設置される柱の外周に鋼板が巻装され、当該鋼板脚部の内周側には基端部を下階に固定支持された柱脚部鉄筋が配設されていることを特徴とする建物の中間階免震構造。 In the middle floor seismic isolation structure of buildings where seismic isolation devices are installed on some of the pillars on the middle floor of the building,
A steel plate is wound around the outer periphery of the column where the seismic isolation device is installed, and a column base rebar with a base end fixedly supported on the lower floor is disposed on the inner peripheral side of the steel plate leg. A seismic isolation structure on the middle floor of a building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003393860A JP4238991B2 (en) | 2003-11-25 | 2003-11-25 | Seismic isolation structure on the middle floor of the building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003393860A JP4238991B2 (en) | 2003-11-25 | 2003-11-25 | Seismic isolation structure on the middle floor of the building |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005155131A true JP2005155131A (en) | 2005-06-16 |
JP4238991B2 JP4238991B2 (en) | 2009-03-18 |
Family
ID=34720101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003393860A Expired - Fee Related JP4238991B2 (en) | 2003-11-25 | 2003-11-25 | Seismic isolation structure on the middle floor of the building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4238991B2 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006009477A (en) * | 2004-06-28 | 2006-01-12 | Taisei Corp | Intermediate base isolating structure of existing building |
JP2007132038A (en) * | 2005-11-09 | 2007-05-31 | Univ Nagoya | Aseismatic repairing apparatus and aseismatic repairing method for building |
JP2011149222A (en) * | 2010-01-22 | 2011-08-04 | Takenaka Komuten Co Ltd | Construction method of concrete slab and the concrete slab |
JP2012167473A (en) * | 2011-02-14 | 2012-09-06 | Oriental Shiraishi Corp | Reinforcement structure and reinforcement method of columnar structure |
JP2017036560A (en) * | 2015-08-07 | 2017-02-16 | 前田建設工業株式会社 | Seismic isolator replacement method |
JP2017222992A (en) * | 2016-06-13 | 2017-12-21 | 株式会社竹中工務店 | Base isolation structure |
JP2019124029A (en) * | 2018-01-15 | 2019-07-25 | 株式会社竹中工務店 | Seismic isolation construction |
CN113482388A (en) * | 2021-07-18 | 2021-10-08 | 陕西省建筑科学研究院有限公司 | Method for installing post-anchoring reinforcing steel bar for reinforcing concrete beam |
-
2003
- 2003-11-25 JP JP2003393860A patent/JP4238991B2/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006009477A (en) * | 2004-06-28 | 2006-01-12 | Taisei Corp | Intermediate base isolating structure of existing building |
JP2007132038A (en) * | 2005-11-09 | 2007-05-31 | Univ Nagoya | Aseismatic repairing apparatus and aseismatic repairing method for building |
JP4698389B2 (en) * | 2005-11-09 | 2011-06-08 | 国立大学法人名古屋大学 | Seismic retrofit equipment and seismic retrofit method for buildings |
JP2011149222A (en) * | 2010-01-22 | 2011-08-04 | Takenaka Komuten Co Ltd | Construction method of concrete slab and the concrete slab |
JP2012167473A (en) * | 2011-02-14 | 2012-09-06 | Oriental Shiraishi Corp | Reinforcement structure and reinforcement method of columnar structure |
JP2017036560A (en) * | 2015-08-07 | 2017-02-16 | 前田建設工業株式会社 | Seismic isolator replacement method |
JP2017222992A (en) * | 2016-06-13 | 2017-12-21 | 株式会社竹中工務店 | Base isolation structure |
JP2019124029A (en) * | 2018-01-15 | 2019-07-25 | 株式会社竹中工務店 | Seismic isolation construction |
JP7103575B2 (en) | 2018-01-15 | 2022-07-20 | 株式会社竹中工務店 | Seismic isolation structure |
CN113482388A (en) * | 2021-07-18 | 2021-10-08 | 陕西省建筑科学研究院有限公司 | Method for installing post-anchoring reinforcing steel bar for reinforcing concrete beam |
Also Published As
Publication number | Publication date |
---|---|
JP4238991B2 (en) | 2009-03-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5213248B2 (en) | Seismic reinforcement structure for existing buildings | |
JP2008063803A (en) | Composite floor slab formed of shape steel with inner rib, composite floor slab bridge, or composite girder bridge | |
JP4238991B2 (en) | Seismic isolation structure on the middle floor of the building | |
JP6638905B2 (en) | Beam-column connection structure and beam-column connection method | |
JP2009281066A (en) | Building structure using composite structural beam having pc structure on its ends | |
JP5142656B2 (en) | Seismic reinforcement frame of cloth foundation opening | |
JP2008266910A (en) | Projection structure of anchorage or deviator of tendon, and construction method therefor | |
JP2010261270A (en) | Composite structure and method for constructing composite structure building | |
JP5465303B2 (en) | Reinforced structure | |
JP5424761B2 (en) | Seismic reinforcement method for existing buildings | |
JP5087026B2 (en) | Seismic reinforcement structure | |
JP2005200928A (en) | Reinforcing structure of columnar construction | |
JP4242300B2 (en) | Reinforcement method of concrete structure using continuous fiber sheet | |
KR101193796B1 (en) | Seismic Reinforcing Method of Column & Girder Frame | |
JP2016169565A (en) | In-plane shear bearing force structure, and roof structure, wall structure and floor structure having in-plane shear bearing force structure | |
JP2005248651A (en) | Earthquake resistant reinforcing structure | |
JP2009102878A (en) | Beam-column connection structure | |
JP2005083136A (en) | Composite structure support | |
JP2007291636A (en) | Mixed-structure beam | |
JP4439938B2 (en) | Wall type reinforced concrete structure and its construction method | |
JP2013083063A (en) | Method for reinforcing existing mullion wall of reinforcement concrete structure | |
JP5379581B2 (en) | Seismic reinforcement members | |
KR20170040022A (en) | Hybrid beam with wide PSC lower flange and enlarged section upper flange and structure frame using the same | |
JP2010285804A (en) | Floor slab structure | |
JP6638906B2 (en) | Beam-column connection structure and beam-column connection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060921 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080425 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080513 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080701 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20081118 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081209 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120109 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4238991 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120109 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130109 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130109 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140109 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140109 Year of fee payment: 5 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140109 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150109 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |