JP2005120607A - Road construction method, and concrete block and superstructure work slab used for the same - Google Patents

Road construction method, and concrete block and superstructure work slab used for the same Download PDF

Info

Publication number
JP2005120607A
JP2005120607A JP2003354109A JP2003354109A JP2005120607A JP 2005120607 A JP2005120607 A JP 2005120607A JP 2003354109 A JP2003354109 A JP 2003354109A JP 2003354109 A JP2003354109 A JP 2003354109A JP 2005120607 A JP2005120607 A JP 2005120607A
Authority
JP
Japan
Prior art keywords
road
concrete
mountain
block
concrete block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003354109A
Other languages
Japanese (ja)
Other versions
JP3956226B2 (en
Inventor
Tadahiko Shoda
忠彦 荘田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHOUDA KK
Original Assignee
SHOUDA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHOUDA KK filed Critical SHOUDA KK
Priority to JP2003354109A priority Critical patent/JP3956226B2/en
Publication of JP2005120607A publication Critical patent/JP2005120607A/en
Application granted granted Critical
Publication of JP3956226B2 publication Critical patent/JP3956226B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Retaining Walls (AREA)
  • Road Paving Structures (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a road construction method and a superstructure work slab and a concrete block used for the method for constructing a road having statically and dynamically excellent stability allowing an increase in the widened amount by a required amount and coping with ground looseness or the like caused by an earthquake or a heavy rain. <P>SOLUTION: In this road construction method and the superstructure work slab and concrete block used for the method, a foundation anchored to a mountain slope is constructed, and the wide concrete block is erected on the valley side on the upper part up to a height lower by a predetermined height than the height of a planned road surface. The superstructure work slab shaped to project as far as the valley side end of the planned road surface is balanced and anchored to the upper face of the block, and foamed mortar or foamed concrete serving as a back-fill material is filled and placed below the mountain side of the superstructure work slab at the back face of the block to construct the road. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、急峻な山法面に道路を拡幅ないし造成するのに適した道路を造成することができる道路造成方法、及びそれに用いるコンクリートブロック並びに上部工版に関する。   The present invention relates to a road building method capable of building a road suitable for widening or building a road on a steep mountain slope, a concrete block used therefor, and an upper construction plate.

一般に、山間部の法面に道路を拡幅ないし造成する場合、計画道路幅に合わせて下部基礎を打ち、その上部に丈夫な擁壁又は大きなブロックを立て、法面との間に土砂(盛土)を入れ、その上部を道路としていた。この一般的な工法では、擁壁又はブロックの上端位置が道路端と一致するため、道路幅に制限があり、法面が急傾斜の場合、所要幅の道路を形成することができないという難点がある。   In general, when roads are widened or built on the slopes of mountainous areas, the lower foundation is struck in accordance with the planned road width, a strong retaining wall or a large block is set on the upper part, and earth and sand (banking) between the slopes. And the upper part of the road was used as a road. In this general construction method, the upper end position of the retaining wall or block coincides with the road edge, so the road width is limited, and when the slope is steep, the road with the required width cannot be formed. is there.

特に、急峻な山岳地帯は、道路幅が狭く大型バス等が離合しては運行できないような地域が数多くある。山側は切取り作業の不可能な崖となっている。このような急峻な山法面に造成された道路を拡幅するために、所要幅に形成した床版の底部中間位置を基礎上に立てた支柱で支持し、支柱位置から谷側に張り出して道路幅を広く取ることも行われている。しかし、この床版による道路拡幅工法では、張り出し部分の荷重をバランスウェイトさせる必要もあり、床版の山寄りの位置を路面に強固に固定する必要性があり、そのため現道端面に相当大きな基礎打ち工事を必要とし、多くの場合道路を長期に亘って全面通行止めにしなければならず、迂回路が無いような道路や、迂回路を造成できないような道路では実施できないという難点があった。   In particular, in the steep mountainous area, there are many areas where the road width is narrow and large buses cannot be operated due to separation. The mountain side is a cliff that cannot be cut. In order to widen the road created on such a steep mountain slope, the bottom intermediate position of the floor slab formed to the required width is supported by a pillar standing on the foundation, and the road extends from the pillar position to the valley side. A wide range is also taken. However, in this road widening method using floor slabs, it is necessary to balance the load of the overhanging part, and it is necessary to firmly fix the slab's hillside position on the road surface. There is a problem that it is necessary to perform construction work and in many cases the road must be completely closed for a long period of time, and it cannot be implemented on a road where there is no detour or where a detour cannot be created.

以上のような難点を克服するため、特許第2929588(道路拡張構造)では、その特許請求の範囲に記載のように、谷側が傾斜面をなす道路を谷側に拡張する道路拡張構造において、下部基礎及びその上に立設された支柱から成る支柱体を立設し、この支持体の上部に谷側を上向きにして斜設した傾斜版を設け、その上に盛土を備えることを特徴とする道路拡張構造が示されている。傾斜版の傾斜角は盛土の安息角(30°程度)とされる。即ち、盛土を行ったとき、傾斜版が支柱上で安定して支持される状態とされる。   In order to overcome the above difficulties, Patent No. 2929588 (Road Expansion Structure), as described in the claims, in the road expansion structure that expands the road whose valley side forms an inclined surface to the valley side, It is characterized in that a pillar body composed of a foundation and a pillar erected on the foundation is erected, an inclined plate obliquely installed with the valley side facing upward is provided on the upper part of the support body, and embankment is provided thereon. A road expansion structure is shown. The inclination angle of the inclined plate is the repose angle of the embankment (about 30 °). That is, when banking is performed, the inclined plate is stably supported on the support column.

この傾斜版による拡幅工法によれば、下部基礎及び上部基礎を現道端面より谷側に離れた位置で打ち、下部基礎上に支柱を立て、その上部に谷側を上向きとして傾斜版を載置固定し、その後盛土すれば良いので、下部基礎より谷側に拡幅可能であると共に、道路を全面通行止めしなくて済むという利点がある。   According to this widening method using an inclined plate, the lower foundation and the upper foundation are struck at a position away from the end face of the existing road to the valley side, a column is placed on the lower foundation, and the inclined plate is placed with the valley side facing upward. Since it only needs to be fixed and then embanked, it can be widened to the valley side from the lower foundation, and there is an advantage that the road does not need to be completely closed.

しかしながら、上記傾斜版による道路拡幅工法にあっては、傾斜板自体が不安定で、支柱を基準としての張り出し幅が傾斜版の全水平幅の1/3に制限されるという難点があり、また安定した安全設計を得にくい等の問題点がある。   However, in the road widening method using the inclined plate, the inclined plate itself is unstable, and the overhang width with respect to the support column is limited to 1/3 of the entire horizontal width of the inclined plate. There are problems such as difficulty in obtaining a stable safety design.

上記特許第2929588号の問題点を改善することを目的として、本発明者等は特開2002-356801号公報(道路造成方法及びそれに用いる上部工版)を提案した。この方法は、道路を拡幅ないし造成したい山法面下方に基礎を作り、その上部で谷側に計画路面より所定高さだけ低い高さまでコンクリートブロックを立て、その裏面と前記山法面との間にコンクリートを投設して下部工を形成し、
前記下部工の上面に載置される水平姿勢の埋め込み床版及び該埋め込み床版の谷側端面を基点として計画道路の最外端位置まで直線的又は曲線的に延伸された壁版とで成る上部工版の前記埋め込み床版を前記下部工の上面に合わせて載置し、
前記埋め込み床版を前記下部工の前記コンクリートに対しアンカー止めすると共に、前記壁版上部を前記山法面に対しアンカー止めし、
前記埋め込み床版上部で前記壁版及び前記山法面との間に土砂を埋め立て道路を造成することを特徴とする。ここで用いる上部工版は埋め込み床版及び壁版を備えるので、Z字形又はくの字形となるのが1つの特徴である。さらに、強固な固定と地震時の水平方向に作用する振動に対して柔軟性をもたせるべく、コンクリートブロックは水平方向には柔な構造とし、かつコンクリートブロックの裏面と前記山法面との間には慣性力を低下すべく比重2.0以下の軽量コンクリートを投設することとしている。
In order to improve the problem of the above-mentioned Japanese Patent No. 2929588, the present inventors proposed Japanese Patent Application Laid-Open No. 2002-356801 (a road building method and an upper construction plate used therefor). In this method, a foundation is formed below the mountain slope where the road is to be widened or built, and a concrete block is set up on the valley side to a height lower than the planned road surface by a predetermined height, between the back surface and the mountain slope. Concrete is cast on the substructure,
A horizontal embedded floor slab placed on the upper surface of the substructure, and a wall slab that is linearly or curvedly extended from the valley end surface of the embedded floor slab to the outermost end position of the planned road Place the embedded floor slab of the upper construction plate according to the upper surface of the lower construction,
Anchoring the embedded floor slab to the concrete of the substructure, and anchoring the upper part of the wall slab to the mountain slope,
In the upper part of the embedded floor slab, earth and sand are reclaimed between the wall slab and the mountain slope, and a road is created. Since the upper construction plate used here has an embedded floor slab and a wall slab, it is one of the features that it is Z-shaped or U-shaped. In addition, the concrete block should have a flexible structure in the horizontal direction and be fixed between the back surface of the concrete block and the mountain slope so that it can be firmly fixed and flexible against vibrations acting in the horizontal direction during an earthquake. Plans to install lightweight concrete with a specific gravity of 2.0 or less to reduce inertial force.

しかしながら、特開2002-566801号公報に示される道路造成方法及びそれに用いる上部工版は、説明通りの機能を有し実用化しつつあるが、上部工版はZ字形又はくの字形となるのでその製作費用を多く要し、運送コストを高くしている。また、裏込め材として用いられている比重2.0以下のコンクリートは品質過剰で仕上がりコストを高くしているという問題点があった。
特許第2929588号公報、第1頁、図1 特開2002-356801号公報、第1頁、図1
However, the road construction method disclosed in Japanese Patent Application Laid-Open No. 2002-566801 and the upper construction plate used therefor have the functions as described and are being put into practical use. A lot of production costs are required, and transportation costs are high. In addition, the concrete having a specific gravity of 2.0 or less used as a backfilling material has a problem in that the quality is excessive and the finishing cost is high.
Japanese Patent No. 2929588, page 1, Fig. 1 Japanese Patent Laid-Open No. 2002-356801, page 1, FIG.

本発明は、特開2002-556801号の道路造成方法を改善し、急峻な山法面であっても現道の通行を確保しながら道路拡幅工事を行なうことができ、張り出し幅を大きくして、かつ静的及び動的安定性に優れ、施工容易にして安価に提供できる道路造成方法を提供することを目的とする。   The present invention improves the road construction method disclosed in Japanese Patent Application Laid-Open No. 2002-556801, and can widen the road while ensuring the traffic on the current road even on steep mountain slopes, increasing the overhang width. And it aims at providing the road construction method which is excellent in static and dynamic stability, can be provided easily at a low cost.

また、裏込め材を改良し、性能向上しつつ、施工単価を低下させることを目的とする。   Moreover, it aims at reducing a construction unit price, improving backfilling material and improving performance.

さらに、上部工版の形状を平板状に近づけて、製作、運搬、裾付け容易でかつ安価に提供できるようにすることを目的とする。   It is another object of the present invention to make the shape of the upper work plate closer to a flat plate shape, which can be easily manufactured, transported and skirted and can be provided at low cost.

またさらに、安価に製作でき、施工容易で、丈夫であり、その上に平板上の重量物を安定させて支持できるコンクリートブロックを提供することを目的とする。   It is another object of the present invention to provide a concrete block that can be manufactured at low cost, is easy to construct, is durable, and can stably support a heavy object on a flat plate.

上記課題を解決することができる本発明は、道路を拡幅ないし造成したい山法面の下方に、前記山法面に対しアンカー止めされた基礎を作り、又は現場状態に応じては基礎のみを作り、
前記基礎の上部で谷側に計画路面の高さより所定高さだけ低い高さまで、幅の広いコンクリートブロックを立て、
段積みされる各ブロックの背面には、裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設して背面足場とできるコンクリートブロックを積み上げ、
前記ブロックの上面に前記計画路面の谷側端部まで張り出した形の上部工版をバランスさせて載置すると共に、これを前記山法面に対してアンカー止めし、
前記ブロックの背面で前記上部工版の山側下方に裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設し、
前記上部工版及び前記山法面との間には、適宜土砂等を埋め立て又はアスファルトを布設し、前記計画通りの道路を造成することを特徴とする。
The present invention capable of solving the above problems is to create a foundation anchored to the mountain slope below the mountain slope where the road is to be widened or constructed, or only the foundation depending on the field conditions. ,
Stand a wide concrete block on the valley side at the top of the foundation to a height lower than the planned road surface by a predetermined height,
The back of each block to be stacked is filled with foam mortar or foam concrete or lightweight concrete as a backfill material, and piled up concrete blocks that can be used as a back scaffold,
The upper construction plate in the form of projecting to the valley side end of the planned road surface is balanced and placed on the upper surface of the block, and this is anchored to the mountain slope,
Filling and placing foamed mortar or foamed concrete or lightweight concrete as a backfill material on the back side of the block below the mountain side of the upper construction plate,
Between the upper construction plate and the mountain slope, earth or sand is appropriately buried or asphalt is laid to create a road as planned.

本発明の道路造成方法では、山法面に基礎を作ってアンカー止めし、谷側面に沿って幅のあるコンクリートブロックを立て、各ブロックの背面には、裏込め材として発泡モルタルないし発泡コンクリートを充填、打設してコンクリートブロックを積み上げ、その上に上部工版を載置固定し、その後、裏込め材を最終投設し、その硬化を待って適宜土砂等を埋め立て又はアスファルトを布設して道路を拡幅ないし造成する。この手順は、工数少なく、短期で工事終了でき、かつ安全施工が可能である。基礎上での作業であり、これにコンクリートブロックを順次立て、その上に工場生産された上部工版を載置する形である。上部工版の載置作業及び裏込め材の打設時間を除いて片側通行可能である。   In the road construction method of the present invention, the foundation is formed on the mountain slope and anchored, and a wide concrete block is set up along the side of the valley. Fill and place concrete blocks, pile up the concrete block, place and fix the upper construction plate on it, then place the backfill material, wait for it to harden, and refill the earth and sand or lay asphalt as appropriate Widen or build the road. This procedure requires fewer man-hours, can be completed in a short period of time, and can be safely constructed. This is a work on the foundation, in which concrete blocks are placed in order, and the upper construction plate produced at the factory is placed on it. One-sided passage is possible except for the placement work of the upper plate and the placement time of the backfill material.

設計は、基礎、コンクリートブロック、上部工版、裏込め材、アンカー、固定ボルト等に部材分けし、モデルを用いて容易に計算できるので、低コストで、安全設計が可能である。裏込め材としての発泡モルタルないし発泡コンクリート等は、比重1.5g/cm3以下で調節することができる。比重を1.5g/cm3以下とすることにより、材料原価を低くすることができるのみならず、慣性力低下に基き耐震強度の向上を図ることができる。圧縮強度に関しては、比重0.8g/cm3の絶乾発泡モルタルで2〜2.5N/mm2を出すことができる。裏込め材としては、圧縮強度向上のため、また比重低下の向上を図るため、砂以外のフライアッシュ、腐敗の恐れのない木質片等の有機物、その他の軽量素材を配合することもできる。圧縮強度0.5N/cm2以上を条件とする。 The design can be divided into the foundation, concrete block, upper work plate, backfill material, anchor, fixing bolt, etc., and can be calculated easily using the model. Therefore, safe design is possible at low cost. Foaming mortar or foamed concrete as a backfilling material can be adjusted to a specific gravity of 1.5 g / cm 3 or less. By setting the specific gravity to 1.5 g / cm 3 or less, not only the material cost can be lowered, but also the seismic strength can be improved based on the decrease in inertial force. Regarding the compressive strength, 2 to 2.5 N / mm 2 can be obtained with an absolutely dry foamed mortar having a specific gravity of 0.8 g / cm 3 . As the back-filling material, in order to improve the compressive strength and to reduce the specific gravity, it is possible to mix fly ash other than sand, organic matter such as wooden pieces that do not cause spoilage, and other lightweight materials. The compression strength is 0.5 N / cm 2 or more.

上部工版としては、前記ブロックを基準として谷側へ延長された谷側張り出し部と、前記ブロックから前記山側へ延長された山側張り出し部を有し、拡幅量が大きい場合、前記山側張り出し部の下面には、前記谷側張り出し部の上部に車両が配置された場合の重量に見合うカウンタウェイト部が付属される。  As the upper construction plate, it has a valley side projecting portion extended to the valley side with respect to the block, and a mountain side projecting portion extended from the block to the mountain side, and when the amount of widening is large, A counterweight portion corresponding to the weight when a vehicle is disposed on the upper portion of the valley side projecting portion is attached to the lower surface.

上部工版は、プレキャスト、又はプレストレスト成型される。上部工版は、一般に、山側部分を重くすべく、山側部分の下方にカウンタウェイト部を付けた形とする。上部工版は、コンクリートブロックに載置した後、コンクリートブロックに対し、ボルトで固定する。安全のため、コンクリートブロックの幅Dの山側端点DMを基準として、上部工版重心がコンクリートブロック幅の内側(山側)寄りの位置に来るように設計する。これにより、工事中、上部工版をコンクリートブロック上で安定して支持できる。   The upper construction plate is precast or prestressed. In general, the upper construction plate has a shape in which a counterweight portion is attached below the mountain side portion in order to make the mountain side portion heavy. After the upper construction plate is placed on the concrete block, it is fixed to the concrete block with bolts. For safety, it is designed so that the center of gravity of the upper plate is located closer to the inside (mountain side) of the concrete block width with reference to the mountain side end point DM of the width D of the concrete block. Thereby, the upper construction plate can be stably supported on the concrete block during construction.

コンクリートブロックは、プレキャスト又はプレストレスト成型される。コンクリートブロックは、谷側面に沿う谷側壁面と、この壁面に直交する直交壁面とを有してT字形に形成し、前記谷側壁面及び前記直交壁面には、夫々上下に伸びる通し鉄筋を挿通可能の鉄筋挿通孔を備える。谷側壁面にはその両端部分を含めて2個以上の鉄筋挿通孔を設ける。直交壁面には交差位置から離れた位置に少なくとも1個の鉄筋挿通孔を設ける。   The concrete block is precast or prestressed. The concrete block has a valley side wall surface along the valley side surface and an orthogonal wall surface orthogonal to the wall surface, and is formed in a T shape, and through the trough side wall surface and the orthogonal wall surface, a reinforcing bar extending vertically is inserted. A rebar insertion hole is provided. Two or more reinforcing bar insertion holes including both end portions are provided on the valley side wall surface. The orthogonal wall surface is provided with at least one reinforcing bar insertion hole at a position away from the intersection position.

コンクリートブロックは、複数のコンクリートブロックを段状に積み上げて所要高さを確保できる。積み上げたコンクリートブロックの各鉄筋挿通孔には上下に鉄筋を通し、下方の基礎と上方の上部工版との間で相互に強固に連結する。段積み段階でのコンクリートブロックは、下方の段のコンクリートブロックに強固に固定されつつ発泡モルタル等が打設される。これにより、幅のあるコンクリートブロックは、谷側と山側の方向線上で十分な幅を持った高強度な擁壁ともなり、その上部で上部工版を安定支持することができる。構築されたコンクリートブロックの裏面には順次裏込め材が投設されるので、前記直交壁面は裏込め材と一体化され、さらに高強度の擁壁となる。発明特有のコンクリート擁壁構築工法である。   The concrete block can secure a required height by stacking a plurality of concrete blocks in a step shape. Reinforcing bars are passed up and down through the reinforcing bar insertion holes of the stacked concrete blocks, and the lower foundation and the upper upper plate are firmly connected to each other. The concrete block at the stacking stage is casted with foamed mortar or the like while being firmly fixed to the concrete block at the lower stage. Thereby, the concrete block with a width | variety also becomes a high intensity | strength retaining wall with sufficient width | variety on the direction line of a valley side and a mountain side, and can support an upper construction plate stably in the upper part. Since the backfilling material is sequentially placed on the back surface of the constructed concrete block, the orthogonal wall surface is integrated with the backfilling material and becomes a high-strength retaining wall. It is a concrete retaining wall construction method unique to the invention.

本発明によれば、道路を拡幅ないし造成したい山法面の下方に、前記山法面に対し適宜アンカー止めされた基礎を作り、
前記基礎の上部で谷側に計画路面の高さより所定高さだけ低い高さまで、幅の広いコンクリートブロックを立て、
段積みされる各ブロックの背面には、裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設して背面足場とできるコンクリートブロックを積み上げ、
前記ブロックの上面に前記計画路面の谷側端部まで張り出した形の上部工版をバランスさせて載置すると共に、これを前記山法面に対し斜め下方に向けてアンカー止めし、
前記ブロックの背面で前記上部工版の山側下方に裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設し、
前記上部工版及び前記山法面との間には、適宜土砂を埋め立て又はアスファルトを布設して前記計画通りの道路を造成することができる。
According to the present invention, below the mountain slope where the road is to be widened or built, a foundation is appropriately anchored to the mountain slope,
Stand a wide concrete block on the valley side at the top of the foundation to a height lower than the planned road surface by a predetermined height,
The back of each block to be stacked is filled with foam mortar or foam concrete or lightweight concrete as a backfill material, and piled up concrete blocks that can be used as a back scaffold,
The upper construction plate in the form of protruding to the valley side end of the planned road surface is placed on the upper surface of the block in a balanced manner, and this is anchored to the mountain slope surface obliquely downward,
Filling and placing foamed mortar or foamed concrete or lightweight concrete as a backfill material on the back side of the block below the mountain side of the upper construction plate,
Between the upper construction plate and the slope, the road as planned can be created by appropriately reclaiming earth or sand or laying asphalt.

構成要素が単純であるので、安全設計を容易、確実に行うことができる。基礎の上にブロックを立て、その上に上部工版を載せ、アンカ止めし、埋込み材を充填、打設するという手順であるので、工事期間を短縮でき、しかも山間部の狭隘な道路であっても完全通行止めすることなく、片側通行で対処できる。ほとんど全ての工事を基礎上で行うことができるので、全工事を安全に逐行することができる。さらに裏込め材を発泡モルタルないし発泡コンクリート等とするので慣性力低く耐震性をさらに高くすることができる。   Since the components are simple, safety design can be easily and reliably performed. It is a procedure that puts a block on the foundation, puts the upper construction plate on it, anchors it, fills it with embedding material, and casts it, so the construction period can be shortened, and it is a narrow road in the mountains. But you can deal with one-sided traffic without completely closing it. Since almost all construction can be done on the foundation, all construction can be done safely. Further, since the backfill material is foamed mortar or foamed concrete, the inertial force is low and the earthquake resistance can be further enhanced.

裏込め材としての発泡モルタルないし発泡コンクリートの比重を1.5g/cm3以下とすれば、材料単価の低減を図ることができ、現場への材料運送費用を低くすることができ、しかも耐震性を高めることができる。 If the specific gravity of foam mortar or foam concrete as the backfill material is 1.5 g / cm 3 or less, the unit price of the material can be reduced, the cost of transporting the material to the site can be reduced, and the earthquake resistance can be reduced. Can be increased.

上部工版を前記ブロックの谷側端面から谷側へ延長された谷側張り出し部と、前記ブロックの山側端面から前記山側へ延長された山側張り出し部を有し、
前記山側張り出し部の下面には、重量バランス用のカウンタウェイト部を付属させた形とすれば、従来のZ字形やくの字形のものと異なり概ね平板状であり、製作容易で製造コストを低下させることができる。しかも現場への搬送及び投置作業が容易である。カウンタウェイト部を設けることができるので、重量バランスを自由にとることができ、工事を安全に遂行できる。
The upper construction plate has a valley side projecting portion extended from the valley side end surface of the block to the valley side, and a mountain side projecting portion extended from the mountain side end surface of the block to the mountain side,
If the counterweight portion for weight balance is attached to the lower surface of the ridge-side overhanging portion, unlike the conventional Z-shaped or cross-shaped one, it is generally flat plate shape, which is easy to manufacture and reduces the manufacturing cost. be able to. In addition, it is easy to carry and place on site. Since the counterweight portion can be provided, the weight balance can be freely set, and the construction can be performed safely.

コンクリートブロックを谷側に沿う谷側壁面と、この壁面に直交する直交壁面とを有してT字形に形成し、前記谷側壁面及び前記直交壁面には、夫々上下に伸びる通し鉄筋を挿通可能の鉄筋挿通孔を備えれば、これらを積み重ねて上下に鉄筋を挿通し、3点補強の強固な幅の有るブロック構造物とすることができ、その上に重量物を載置することが可能である。しかも、その裏面に発泡モルタルないし発泡コンクリートのような裏込め材を充填、打設し、硬化させて一体化すれば、幅のあるコンクリート擁壁と同等の高強度の擁壁とすることができる。本コンクリートブロックは、本発明方法以外の土留め擁壁や落石対応の擁壁構造にも応用可能である。   The concrete block has a valley side wall surface along the valley side and an orthogonal wall surface orthogonal to the wall surface, and is formed into a T-shape, and through the trough side wall surface and the orthogonal wall surface, a vertical reinforcing bar can be inserted. If the reinforcing bar insertion holes are provided, these can be stacked to insert the reinforcing bars up and down to form a block structure with a strong width of three-point reinforcement, on which heavy objects can be placed It is. Moreover, if a backfilling material such as foamed mortar or foamed concrete is filled on the back surface, placed, cured, and integrated, a high-strength retaining wall equivalent to a wide concrete retaining wall can be obtained. . The concrete block can be applied to a retaining wall structure other than the method of the present invention and a retaining wall structure for falling rocks.

以下、添付図面を参照しつつ、本発明を実施するための最適の形態を説明する。図1は、本発明の道路造成方法を断面構造で示す説明図、図2はこれに用いることができる上部工版の平面図及び側面図、図3は、これに用いることができるコンクリートブロックの斜視図、図4は、本発明の他の実施形態に係る断面説明図である。   DESCRIPTION OF THE PREFERRED EMBODIMENTS The best mode for carrying out the present invention will be described below with reference to the accompanying drawings. FIG. 1 is an explanatory view showing the road construction method of the present invention in a sectional structure, FIG. 2 is a plan view and a side view of an upper construction plate that can be used for this, and FIG. 3 is a concrete block that can be used for this FIG. 4 is a cross-sectional explanatory view according to another embodiment of the present invention.

図1に示すように、本発明の道路造成方法は、急峻な山1に造成された幅Aの現道2を幅Bだけ拡幅する例で示している。   As shown in FIG. 1, the road construction method of the present invention shows an example in which a current road 2 having a width A created on a steep mountain 1 is widened by a width B.

順次示すと、まず、拡幅すべき幅Bの中間位置で、その下方に基礎3を打ち、これを山1の法面に対しPCより線等じん性のある永久アンカー鋼材4を用いてアンカー固定する。山が急峻であっても、基礎部分は平地であることも有る。このような場合には基礎に対するアンカーは省略されることもある。アンカー鋼材4の周りには、グラウトミルク5が注入される。従って、基礎3は山1の法面に強固に固定される。   In sequence, first, at the middle position of the width B to be widened, hit the foundation 3 below it, and fix it using permanent anchor steel material 4 that is tougher than PC against the slope of the mountain 1 To do. Even if the mountain is steep, the foundation may be flat. In such a case, the anchor for the foundation may be omitted. Grout milk 5 is injected around the anchor steel material 4. Accordingly, the foundation 3 is firmly fixed to the slope of the mountain 1.

これらの工事中、現道2の端部に図示しない柵を設け、その下方で基礎3を作る工事をすることができるので、現道2は、そのまま用いることができ、片側通行できる。   During these constructions, a fence (not shown) can be provided at the end of the current road 2 and the foundation 3 can be constructed below the fence, so that the current road 2 can be used as it is and can be passed on one side.

前記基礎3を山1にアンカー固定した後、図3に示すコンクリートブロック6を用いて擁壁7を構築する。   After anchoring the foundation 3 to the mountain 1, a retaining wall 7 is constructed using a concrete block 6 shown in FIG.

擁壁7は、図3に示すコンクリートブロックの鉄筋挿通孔8を介して鉄筋9を通し、計画路面高さH1より所定高さΔHだけ低い高さH2まで積み上げられる。   The retaining wall 7 passes through the reinforcing bar 9 through the reinforcing bar insertion hole 8 of the concrete block shown in FIG. 3, and is stacked up to a height H2 lower than the planned road surface height H1 by a predetermined height ΔH.

図3に示すように、コンクリートブロック6は、谷側壁面10とこれに直交する直交壁面11を有している。谷側壁面10の両側には、相隣り合うコンクリートブロック6と噛合させるための凸凹面が形成されている。   As shown in FIG. 3, the concrete block 6 has a valley side wall surface 10 and an orthogonal wall surface 11 orthogonal to the valley side wall surface 10. On both sides of the valley side wall surface 10, uneven surfaces for engaging with the adjacent concrete blocks 6 are formed.

擁壁7を形成するに際し、各コンクリートブロック6は、1段づつ積み上げられ、各段毎に発泡モルタル12が充填1打設される。各段のコンクリートブロックを6−i(i=1、2、3・・・)で示す。各段毎に打設された発泡モルタルは12−i(i=1、2、3・・・)で示す。   When the retaining wall 7 is formed, each concrete block 6 is stacked one by one, and one foamed mortar 12 is filled in each stage. Each concrete block is indicated by 6-i (i = 1, 2, 3,...). The foamed mortar placed for each stage is indicated by 12-i (i = 1, 2, 3,...).

発泡モルタル12は、不連続空隙を有するポーラスモルタルであり、その空隙率は、30〜50%又はそれ以上とすることができる。配合は、砂、セメント、フライアッシュ、その他の混合物である。その特性を表1に示す。

Figure 2005120607
表1に示す発泡モルタル12は、高強度を具現するには5日以上の日数を要するが、コンクリートブロック6の設置に次ぐ一段づつの打設作業では、一昼夜を置いて次段を積み上げることができる。これらの手順により、最上段のコンクリートブロック6−7が積まれる。この時点では、最後の発泡モルタル12−7は、まだ打設しない。 The foam mortar 12 is a porous mortar having discontinuous voids, and the porosity can be 30 to 50% or more. The formulation is sand, cement, fly ash, and other mixtures. The characteristics are shown in Table 1.
Figure 2005120607
The foamed mortar 12 shown in Table 1 takes 5 days or more to realize high strength. However, in the one-step placing work following the installation of the concrete block 6, the next stage can be piled up day and night. it can. By these procedures, the uppermost concrete block 6-7 is stacked. At this point, the final foam mortar 12-7 has not yet been placed.

コンクリートブロック6の積み上げ及び発泡モルタル12の打設に際しては、山1側との関係において、適宜排水設備が敷設される。例えば、山1側に沿って排水管を配置し、それを基礎3の上部に向けて配管し、排水孔を基礎3上に設ける。又は、適宜中間位置で、対応するコンクリートブロック6−iから谷側排水孔を設ける等とする。以上の如くして構成される擁壁7の部分を、ここでは、中間工と呼ぶ。この中間工の形成過程において、下段に対し上段ブロックを固定した後に発泡モルタル12が打設される。そのとき、作業者はコンクリートブロック6の直交壁面11の上部へ直接、又は相隣合うブロックとの間に足場板を架けてその上に乗ることができる。十分な広さを持たせているので、作業を安全に行うことができる。   When stacking the concrete blocks 6 and placing the foamed mortar 12, drainage facilities are appropriately laid in relation to the mountain 1 side. For example, a drain pipe is arranged along the mountain 1 side, piped toward the upper part of the foundation 3, and a drain hole is provided on the foundation 3. Alternatively, a valley drainage hole is provided from the corresponding concrete block 6-i at an appropriate intermediate position. The portion of the retaining wall 7 configured as described above is referred to herein as an intermediate work. In the process of forming the intermediate work, the foamed mortar 12 is placed after the upper block is fixed to the lower step. At that time, the operator can ride on the scaffolding plate directly on the upper part of the orthogonal wall surface 11 of the concrete block 6 or between the adjacent blocks. Since it has a sufficient area, the work can be performed safely.

最上段のコンクリートブロック6−7を設置した後、山1へ永久アンカー13を打ち、コンクリートブロック6−7上へ上部工版14を載置し、鉄筋9、9と結合した後、永久アンカー13と結合する。   After installing the uppermost concrete block 6-7, the permanent anchor 13 is hit on the mountain 1 and the upper construction plate 14 is placed on the concrete block 6-7. Combine with.

図2に示すように、上部工版14は、谷側張り出し部15と山側張り出し部16を有し、その中間部が前記コンクリートブロック6の上端で支持される。本例では、山側張り出し部16の下方にはカウンタウェイト部16Wが形成されている。上部工版15の谷側端部には、防護柵設置用のポケット孔17が設けられている。前記コンクリートブロック6の鉄筋挿通孔8の主鉄筋に対応する5個の鉄筋固定孔18が設けられている。前記永久アンカー13を固定するためのアンカー固定孔19が設けられている。さらに、中間部分に発泡モルタル注入孔20が設けられている。   As shown in FIG. 2, the upper work plate 14 includes a valley side projecting portion 15 and a mountain side projecting portion 16, and an intermediate portion thereof is supported by the upper end of the concrete block 6. In this example, a counterweight portion 16 </ b> W is formed below the mountain side projecting portion 16. A pocket hole 17 for installing a guard fence is provided at the end of the upper plate 15 on the valley side. Five reinforcing bar fixing holes 18 corresponding to the main reinforcing bars of the reinforcing bar insertion holes 8 of the concrete block 6 are provided. An anchor fixing hole 19 for fixing the permanent anchor 13 is provided. Further, a foamed mortar injection hole 20 is provided in the intermediate portion.

前記最上段のコンクリートブロック6−7の上に、上部工版14が載置され、これを鉄筋9及び永久アンカー13と結合した後、モルタル注入孔20を介して最終段の発泡モルタル12−7を充填打設する。   An upper construction plate 14 is placed on the uppermost concrete block 6-7, and after this is coupled to the reinforcing bar 9 and the permanent anchor 13, the final foam mortar 12-7 is passed through the mortar injection hole 20. Filling and placing.

以上により、道路構造の骨格が定まる。その後、上部工版14と山1との間に土砂を埋め、転圧し、アスファルト21を敷き、防護柵22を取付け、白線を引き、本発明の工法に基く拡幅工事が終了する。これまでの間、一方通行は保たれる。コンクリートブロック1段づつの積み上げであるので、工事の安全も確保できる。   As described above, the skeleton of the road structure is determined. After that, earth and sand are buried between the upper construction plate 14 and the mountain 1 and rolled, asphalt 21 is laid, a protective fence 22 is attached, a white line is drawn, and the widening work based on the construction method of the present invention is completed. Until now, one-way traffic is maintained. Since the concrete blocks are stacked one by one, construction safety can be secured.

以上の方法により完成される道路構造の設計について示すと、コンクリートブロック7の谷側端面を基準として、谷側に加わる総荷重に基くモーメントM1、それより山側に加わる総荷重に基くモーメントをM2とし、これに安全率Fsを加えて、次式が成立する。

Figure 2005120607
数1の山側のモーメントM2には、カウンタウェイト部16Wを含めた山側張り出し部16の重量の他、鉄筋9の坑張力及び永久アンカー13の張力(例えば11トン)を含めることができるので、M2/M1は3以上の大きな値例えば10とすることができる。具体的には、上部工版14の転倒計算、コンクリートブロック6の支持力、地震荷重による安定性等について計算することができる。これらの計算において、本発明の工法では構成要素が単純化されているので、計算容易であり、かつ安全係数を充分大とすることができる。 The design of the road structure completed by the above method will be described. The moment M1 based on the total load applied to the valley side and the moment based on the total load applied to the mountain side based on the valley side end face of the concrete block 7 as M2. By adding the safety factor Fs to this, the following equation is established.
Figure 2005120607
The peak-side moment M2 of Formula 1 can include the pit tension of the reinforcing bar 9 and the tension of the permanent anchor 13 (for example, 11 tons) in addition to the weight of the peak-side protruding portion 16 including the counterweight portion 16W. / M1 can be a large value of 3 or more, for example 10. Specifically, it is possible to calculate the overturning of the upper work plate 14, the supporting force of the concrete block 6, the stability due to the seismic load, and the like. In these calculations, the components of the method of the present invention are simplified, so that the calculation is easy and the safety factor can be made sufficiently large.

コンクリートブロック6による擁壁7は、鉄筋9を縦方向に通しており、横方向の振動を吸収可能な形としている。また、山1側の裏込め材12の比重を1.5g/cm3以下の値とするので、比重2.0以上の普通コンクリートと比べ、慣性力が小さく、耐震性能が高い。裏込め材の比重を1.0 g/cm3以下とすれば尚好ましい。 The retaining wall 7 made of the concrete block 6 passes through the reinforcing bars 9 in the vertical direction, and has a shape capable of absorbing lateral vibration. Moreover, since the specific gravity of the backfilling material 12 on the mountain 1 side is set to a value of 1.5 g / cm 3 or less, the inertial force is small and the seismic performance is high as compared with ordinary concrete having a specific gravity of 2.0 or more. More preferably, the specific gravity of the backfill material is 1.0 g / cm 3 or less.

図4は、他の実施形態を示す説明図である。図1〜3で示した実施形態では、上部工版14にカウンタウェイト部16Wを設けたが、これは安全上のものであり、張り出し寸法が小さい場合等にはこれを省略することもできる。   FIG. 4 is an explanatory view showing another embodiment. In the embodiment shown in FIGS. 1 to 3, the counterweight portion 16 </ b> W is provided on the upper work plate 14, but this is for safety and can be omitted when the overhanging dimension is small.

図4に示すように、拡幅すべき幅B1が小さい場合には、上部工版23の山側張り出し部の寸法を小さくし、かつカウンタウェイト部を省略することができる。安全上、何ら問題ないからである。図4において、図1に示したものと同一機能を果す部材には、同一参考符号を付けて示してある。本発明の道路構造の作用、効果については、図1に示したものと同様である。所要の拡幅を行うことができ、安全係数を大とすることができ、工事を安全に行うことができ、しかも材料単価、施工費用を低くすることができる。   As shown in FIG. 4, when the width B <b> 1 to be widened is small, the size of the ridge-side overhanging portion of the upper work plate 23 can be reduced and the counterweight portion can be omitted. This is because there is no problem for safety. In FIG. 4, members having the same functions as those shown in FIG. 1 are denoted by the same reference numerals. The operation and effect of the road structure of the present invention are the same as those shown in FIG. The required widening can be performed, the safety factor can be increased, construction can be performed safely, and the material unit price and construction cost can be reduced.

本発明は、上記実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で適宜設計的変更を加えることができ、各種態様で実施し得る。   The present invention is not limited to the above-described embodiment, and can be appropriately modified in design without departing from the gist of the present invention, and can be implemented in various modes.

本発明の道路造成方法を断面構造で示す説明図である。It is explanatory drawing which shows the road construction method of this invention with a cross-sectional structure. 上部工版の平面図(a図)及びその側面図(b図)である。It is the top view (a figure) and its side view (b figure) of an upper process plate. 下段及び中間段に用いられるコンクリートブロックの斜視図である。It is a perspective view of the concrete block used for a lower stage and an intermediate stage. 本発明の他の実施形態に係る道路断面の説明図である。It is explanatory drawing of the road cross section which concerns on other embodiment of this invention.

符号の説明Explanation of symbols

1 山
2 現道
3 基礎
4 アンカー鋼材
5 グラウトミルク
6−i(i=1、2、3・・・) コンクリートブロック
7 擁壁
8 鉄筋挿通孔
9 鉄筋
10 コンクリートブロックの谷側壁面
11 コンクリートブロックの直交壁面
12−i(i=1、2、3・・・) 発泡モルタル
13 永久アンカー
14、23 上部工版
15 谷側張り出し部
16 山側張り出し部
16W カウンタウェイト部
17 ポケット孔
18 鉄筋固定孔
19 アンカー固定孔
20 発泡モルタル注入孔
21 アスファルト
22 防護柵
1 mountain 2 current road 3 foundation 4 anchor steel 5 grout milk 6-i (i = 1, 2, 3,...) Concrete block 7 retaining wall 8 reinforcing bar insertion hole 9 reinforcing bar 10 concrete block valley side wall 11 concrete block Orthogonal wall surface 12-i (i = 1, 2, 3,...) Foamed mortar 13 Permanent anchors 14, 23 Upper construction plate 15 Valley side overhanging portion 16 Mountain side overhanging portion 16W Counterweight portion 17 Pocket hole 18 Reinforcing bar fixing hole 19 Anchor Fixed hole 20 Foamed mortar injection hole 21 Asphalt 22 Guard fence

Claims (4)

道路を拡幅ないし造成したい山法面の下方に、前記山法面に対しアンカー止めされた基礎を作り、又は現場状態に応じては基礎のみを作り、
前記基礎の上部で谷側に計画路面の高さより所定高さだけ低い高さまで、幅の広いコンクリートブロックを立て、
段積みされる各ブロックの背面には、裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設して背面足場とできるコンクリートブロックを積み上げ、
前記ブロックの上面に前記計画路面の谷側端部まで張り出した形の上部工版をバランスさせて載置すると共に、これを前記山法面に対し斜め下方に向けてアンカー止めし、
前記ブロックの背面で前記上部工版の山側下方には、裏込め材として発泡モルタルないし発泡コンクリート或いは軽量コンクリートを充填、打設し、
前記上部工版及び前記山法面との間には、適宜土砂等を埋め立て又はアスファルトを布設して前記計画通りの道路を造成することを特徴とする道路造成方法。
Make a foundation anchored to the mountain slope below the mountain slope where you want to widen or build the road, or make only the foundation according to the site condition,
Stand a wide concrete block on the valley side at the top of the foundation to a height lower than the planned road surface by a predetermined height,
The back of each block to be stacked is filled with foam mortar or foam concrete or lightweight concrete as a backfill material, and piled up concrete blocks that can be used as a back scaffold,
The upper construction plate in the form of protruding to the valley side end of the planned road surface is placed on the upper surface of the block in a balanced manner, and this is anchored to the mountain slope surface obliquely downward,
Filling and placing foamed mortar or foamed concrete or lightweight concrete as a backfilling material on the back side of the block below the mountain side of the upper construction plate,
A road construction method characterized in that a road as planned is created by reclaiming earth or sand or laying asphalt as appropriate between the upper construction plate and the mountain slope.
請求項1に記載の道路造成方法に用いられる発泡モルタルないし発泡コンクリートであって、それらの比重は、1.5g/cm3以下とされることを特徴とする道路造成方法。 A road mortar or foam concrete used in the road construction method according to claim 1, wherein the specific gravity thereof is 1.5 g / cm 3 or less. 請求項1に記載の道路造成方法に用いることができる上部工版であって、
前記ブロックの谷側端面から谷側へ延長された谷側張り出し部と、前記ブロックの山側端面から前記山側へ延長された山側張り出し部を有し、
前記山側張り出し部の下面には、重量バランス用のカウンタウェイト部が付属されることを特徴とする上部工版。
An upper construction plate that can be used in the road construction method according to claim 1,
A trough side projecting portion extending from the trough side end surface of the block to the trough side, and a mountain side projecting portion extending from the crest side end surface of the block to the mountain side;
An upper construction plate, wherein a counterweight portion for weight balance is attached to a lower surface of the mountain-side protruding portion.
請求項1に記載の道路造成方法に用いることができるコンクリートブロックであって、
谷側に沿う谷側壁面と、この壁面に直交する足場兼用の直交壁面とを有してT字形に形成され、
前記谷側壁面及び前記直交壁面には、夫々上下に伸びる通し鉄筋を挿通可能の鉄筋挿通孔を備えたことを特徴とするコンクリートブロック。
A concrete block that can be used in the road construction method according to claim 1,
It has a valley side wall surface along the valley side and an orthogonal wall surface that also serves as a scaffold perpendicular to the wall surface, and is formed in a T shape.
A concrete block characterized in that the valley side wall surface and the orthogonal wall surface each have a reinforcing bar insertion hole through which a reinforcing bar extending vertically can be inserted.
JP2003354109A 2003-10-14 2003-10-14 Road construction method and upper construction plate used therefor Expired - Fee Related JP3956226B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003354109A JP3956226B2 (en) 2003-10-14 2003-10-14 Road construction method and upper construction plate used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003354109A JP3956226B2 (en) 2003-10-14 2003-10-14 Road construction method and upper construction plate used therefor

Publications (2)

Publication Number Publication Date
JP2005120607A true JP2005120607A (en) 2005-05-12
JP3956226B2 JP3956226B2 (en) 2007-08-08

Family

ID=34612194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003354109A Expired - Fee Related JP3956226B2 (en) 2003-10-14 2003-10-14 Road construction method and upper construction plate used therefor

Country Status (1)

Country Link
JP (1) JP3956226B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092463A (en) * 2005-09-30 2007-04-12 Ohbayashi Corp Construction method of approach section of viaduct, structure based on construction method of approach section, and structural object having the structure
JP2008144442A (en) * 2006-12-08 2008-06-26 Nishi Nippon Spc Kk Banking structure and method of constructing same
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
KR100987463B1 (en) * 2008-04-08 2010-10-13 호암종합건설(주) Structure of reinforced earth retaining wall and method for constructing the same
JP2011063993A (en) * 2009-09-17 2011-03-31 Free Kogyo Kk Method for reclaiming bridge
JP2012102514A (en) * 2010-11-09 2012-05-31 Hirose & Co Ltd Retaining wall panel, retaining wall structure using the same, and construction method of retaining wall
CN110761126A (en) * 2019-12-04 2020-02-07 中铁二院工程集团有限责任公司 Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method
CN111719571A (en) * 2020-07-08 2020-09-29 广州市恒盛建设工程有限公司 Construction method for foam concrete reinforcement of confined space high-fill roadbed side slope

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092463A (en) * 2005-09-30 2007-04-12 Ohbayashi Corp Construction method of approach section of viaduct, structure based on construction method of approach section, and structural object having the structure
JP4695953B2 (en) * 2005-09-30 2011-06-08 株式会社大林組 Construction method of approach part of viaduct, structure based on construction method of approach part, and structure provided with said structure
JP2008144442A (en) * 2006-12-08 2008-06-26 Nishi Nippon Spc Kk Banking structure and method of constructing same
JP4533371B2 (en) * 2006-12-08 2010-09-01 西日本エス・ピー・シー株式会社 Embankment structure and construction method thereof
KR100987463B1 (en) * 2008-04-08 2010-10-13 호암종합건설(주) Structure of reinforced earth retaining wall and method for constructing the same
JP2011063993A (en) * 2009-09-17 2011-03-31 Free Kogyo Kk Method for reclaiming bridge
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
CN101838957B (en) * 2010-05-07 2012-07-04 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
JP2012102514A (en) * 2010-11-09 2012-05-31 Hirose & Co Ltd Retaining wall panel, retaining wall structure using the same, and construction method of retaining wall
CN110761126A (en) * 2019-12-04 2020-02-07 中铁二院工程集团有限责任公司 Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method
CN110761126B (en) * 2019-12-04 2024-05-24 中铁二院工程集团有限责任公司 Rock foundation existing high-speed railway fine soil filling embankment side width structure and construction method
CN111719571A (en) * 2020-07-08 2020-09-29 广州市恒盛建设工程有限公司 Construction method for foam concrete reinforcement of confined space high-fill roadbed side slope

Also Published As

Publication number Publication date
JP3956226B2 (en) 2007-08-08

Similar Documents

Publication Publication Date Title
CN201125354Y (en) Steep hill road bed branch block reinforced structure
AU2014237379B2 (en) Precast concrete retaining wall
CN106638673A (en) Construction method of combined supporting and retaining structure
CN101240550A (en) Construction method for lattice type steel column tower crane pedestal
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
KR101118263B1 (en) Rain retaining facility and constructing method thereof using precast concrete block
CN109403372A (en) Abrupt slope road structure and its construction method
JP3600214B2 (en) Road construction method and superstructure used for it
JP3956226B2 (en) Road construction method and upper construction plate used therefor
KR101206860B1 (en) Excavation tunnel constructing method using vertical side wall and arch ceiling
US6745421B2 (en) Abutment with seismic restraints
JP2020070705A (en) Method for constructing lightweight fill retaining wall structure
JP2004100157A (en) Retaining wall structure and its construction method
CN115627781B (en) Slope reinforcement structure for rapidly treating existing slope collapse and construction method
CN110258627A (en) Combined type anchor draws road shoulder retaining wall and its construction method
CN209368866U (en) Abrupt slope road structure
JP2787806B2 (en) Earth retaining wall
CN209260748U (en) A kind of stepped tower crane
JP2010168845A (en) Road widening structure
JP4834649B2 (en) Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure
JP3710434B2 (en) Widening road
US4594825A (en) Cantilevered support member and foundation unit
KR102272494B1 (en) Slope reinforcement structure using support and tension and Its Construction method
JP2006176975A (en) Lightweight banking structure and composite banking structure composed of this structure and reinforcing earth wall structure
US20030084630A1 (en) Perimeter walls

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060818

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060829

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070307

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20070316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070403

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070425

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees